RBS 6000 FAMILY ACCEPTANCE TEST FORM 1 (7)
Prepared: EID/OJI/CCA Tatang SukamanApproved: EID/OJI/CE [M. Raymil Mirza]
Date: 2015-02-02Sheet: 2G_3G_OTDR Rev: G
OPERATING WAVE LENGTH : 1310 nm 1550 nmATTENUATION (dB/km) : 0.22 (1310nm)/0.36 (1550nm)TOT ATTENUATION (dB/km) : 0.40(1310nm) / 0.25(1550nm)
OTDR TYPE :
NO. OF SPLICE (JOINT) :
OPTICAL LENGTH M TOT
FIBER# LABEL m db/km db/km1 Sector 1 #TX2 Sector 1 #RX3 Sector 2 #TX4 Sector 2 #RX5 Sector 3 #TX6 Sector 3 #RX
**) Max ATTENUATION (dB/km) : 0.22 (1310nm)/0.36 (1550nm)**) Max ATTENUATION (dB/m) : 0.00022 (1310nm)/0.00036 (1550nm)**) Max TOT ATTENUATION (dB/km) : 0.40(1310nm) / 0.25(1550nm)
STANDARD PRACTICE FOR ACCEPTANCE PROCESSOTDR / ATTENUATION MEASUREMENT
DOCUMENT NO. :
TESTING REPORT PT. XL AXIATA
CABLE ROUTE : DU_RRU DU_RRU_RRUCABLE TYPE : 2F LC- LC SMNUMBER OF FIBER :
TOTAL CABLE LENGTH (M): S1=.m, S2=..m, S3=..m, S
FIBER#ATTENUATION
R E M A R K S
**) Max TOT ATTENUATION (dB/m) : 0.00040(1310nm) / 0.00025(1550nm)
-
RBS 6000 FAMILY ACCEPTANCE TEST FORM 2 (7)
Prepared: EID/OJI/CCA Tatang SukamanApproved: EID/OJI/CE [M. Raymil Mirza]
Date: 2015-02-02Sheet: 2G_3G_OTDR Rev: G
Sector 1 TX
Sector 1 RX
-
RBS 6000 FAMILY ACCEPTANCE TEST FORM 3 (7)
Prepared: EID/OJI/CCA Tatang SukamanApproved: EID/OJI/CE [M. Raymil Mirza]
Date: 2015-02-02Sheet: 2G_3G_OTDR Rev: G
Sector 2 TX
Sector 2 RX
-
RBS 6000 FAMILY ACCEPTANCE TEST FORM 4 (7)
Prepared: EID/OJI/CCA Tatang SukamanApproved: EID/OJI/CE [M. Raymil Mirza]
Date: 2015-02-02Sheet: 2G_3G_OTDR Rev: G
Sector 3 TX
Sector 3 RX
-
RBS 6000 FAMILY ACCEPTANCE TEST FORM 5 (7)
Prepared: EID/OJI/CCA Tatang SukamanApproved: EID/OJI/CE [M. Raymil Mirza]
Date: 2015-02-02Sheet: 2G_3G_OTDR Rev: G
Inspection Summary
Zone Diameter Defects ScratchesInner Outer Result Count Result Count
Zone_A 0 25Zone_B 25 120Zone_C 120 130Zone_D 130 250
Result = Pass/Reject
-
RBS 6000 FAMILY ACCEPTANCE TEST FORM 6 (7)
Prepared: EID/OJI/CCA Tatang SukamanApproved: EID/OJI/CE [M. Raymil Mirza]
Date: 2015-02-02Sheet: 2G_3G_OTDR Rev: G
Sector 1 TX
Sector 1 RX
Sector 2 TX
Sector 2 RX
-
RBS 6000 FAMILY ACCEPTANCE TEST FORM 7 (7)
Prepared: EID/OJI/CCA Tatang SukamanApproved: EID/OJI/CE [M. Raymil Mirza]
Date: 2015-02-02Sheet: 2G_3G_OTDR Rev: G
Sector 3 TX
Sector 3 RX
VENDOR(For ATP with contractor and handover to Field Operation)
NameField Operation
Name
Name Date & Signature
ACCEPTANCE PROCESS BY : VERIFIED AND APPROVED BY PT. HUAWEI SERVICES
Construction & Installation
2G_3G_OTDR