Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/modification/...COMMERCIAL PROJECT At Land...
Transcript of Form 1 & 1Aenvironmentclearance.nic.in/writereaddata/modification/...COMMERCIAL PROJECT At Land...
FORM 1 & 1 A
For
PROPOSEDRESIDENTIALCUMCOMMERCIALPROJECT
At
LandbearingnewS.No7to10,88,99,100,101and105ofvillageBalkumTal.&Dist.Thane,Maharashtra
Proposed By
PIRAMAL ESTATE PVT. LTD.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 1
APPENDIX‐I
(Seeparagraph–6)FORM1
(I) BASICINFORMATION
Sr.No. Item Details
1 Nameoftheproject/s ProposedResidentialcumCommercialProjectatBalkum,Thane
2 S.No.intheSchedule 8(b)
3 Proposedcapacity/area/length/tonnagetobehandled/commandarea/leasearea/numberofwellstobedrilled.
TotalPlotArea 1,29,580 m2
Built‐upAreaDetails
BuiltupArea 1,81,518.23 m2
TotalConstructionArea 4,18,898.00 m2
Detailed Area Statement is attached asAnnexureI
4 New/Expansion/Modernization NewProject
5 ExistingCapacity/Areaetc. ‐
6 Categoryofprojecti.e.AorB BCategory
7 Doesitattractthegeneralcondition?ifyes,pleasespecify
No
8 Doesitattractthespecificcondition?Ifyes,pleasespecify
No
9 Location
Plot/Survey/KhasraNo. Land bearing new S. No 7 to 10, 88, 99, 100,101 and 105 of village Balkum Tal. & Dist.Thane,Maharashtra
Village VillageBalkum
Tehsil Thane
District Thane
State Maharashtra
10 Nearestrailwaystation/portalongwithdistanceinkms.
ThaneRailwayStation
Distance~5km
11 NearestTown,city,DistrictHeadquartersalongwithdistanceinkms.
ThaneCity
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 2
Sr.No. Item Details
12 VillagePanchayat,ZillaParishad,MunicipalCorporation,Localbody(completepostaladdresseswithtelephonenos.tobegiven)
ThaneMunicipalCorporation(TMC)
13 Nameoftheapplicant Mr.ShijuBhaskar
14 Registeredaddress PiramalEstatePvt.Ltd.8thFloor,PiramalTower,PeninsulaCorporatePark,G.K.Marg,LowerParel,Mumbai‐400013
15 Addressforcorrespondence: PiramalEstatePvt.Ltd.8thFloor,PiramalTower,PeninsulaCorporatePark,G.K.Marg,LowerParel,Mumbai‐400013
Name Mr.ShijuBhaskar
Designation(Owner/Partner/CEO) Director
Address PiramalEstatePvt.Ltd.8thFloor,PiramalTower,PeninsulaCorporatePark,G.K.Marg,LowerParel,Mumbai‐400013
Pincode 400013
E‐mail [email protected]
TelephoneNo. 02233514000
FaxNo. 02233514000
16 Detailsofalternativesitesexamined,ifany.Locationofthesesitesshouldbeshownonatoposheet.
Village‐District‐State
1.
2.
3.
We are developing residential project on ourownland
17 Interlinkedprojects NotApplicable
18 Whetherseparateapplicationofinterlinkedprojecthasbeensubmitted?
No
19 Ifyes,dateofsubmission NotApplicable
20 IfNo,Reason Standaloneconstructionproject
21 Whethertheproposalinvolvesapproval/clearanceunder:if,yesdetailsofthesameandtheirstatustobegiven
a) TheForest(Conservation)Act,1980?
b) Thewildlife(protection)Act,1972?
c) TheCRZNotification,1991?
NoNo
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 3
Sr.No. Item Details
22 WhetherthereisanyGovernmentOrder/policyrelevant/relatingtothesite?
No
23 Forestlandinvolved(hectares) No forest land involved in proposed projectsite
24 Whetherthereisanylitigationpendingagainsttheprojectand/orlandinwhichtheprojectisproposetobesetup?
a) Nameofthecourtb) CaseNo.c) Orders/Directionsofthe
courtifanyanditsrelevancewiththeproposedproject.
Nosuchlitigationpendingagainsttheproject
Capacity corresponding to sectoral activity (such as production capacity for manufacturing,mining lease area and production capacity for mineral production, area for mineralexploration, length for linear transport infrastructure, generation capacity for powergenerationetc.,)
(II)Activity
1. Construction, operation or decommissioning of the Project involving actions,
whichwillcausephysicalchangesinthelocality(topography,landuse,changesinwaterbodies,etc.)
Sr.No.
Information/Checklistconfirmation
Yes/No
Details thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata
1.1 Permanentortemporarychangeinlanduse,landcoverortopographyincludingincreaseinintensityoflanduse(withrespecttolocallanduseplan)
Yes LandsituatedinIndustrialzone
1.2 Clearanceofexistingland,vegetationandbuildings?
Yes Treeswhicharecomingunderbuilding linewillbecut
1.3 Creationofnewlanduses? Yes Residentialproject
1.4 Pre‐constructioninvestigationse.g.borehouses,soiltesting?
No
1.5 Constructionworks?
Yes ProposedResidentialProject
1.6 Demolitionworks?
No
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 4
Sr.No.
Information/Checklistconfirmation
Yes/No
Details thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata
1.7 TemporarysitesusedforconstructionworksorHousingofconstructionworkers?
Yes Temporary sheds will be provided forworkers
1.8 Abovegroundbuildings,structuresorearthworksincludinglinearstructures,cutandfillorexcavations
Yes ‐‐
1.9 Undergroundworksincludingminingortunnelling?
No
1.10 Reclamationworks? No
1.11 Dredging?
No
1.12 Offshorestructures? No
1.13 Productionandmanufacturingprocesses?
No
1.14 Facilitiesforstorageofgoodsormaterials?
Yes Onlyconstructionmaterialwillbestored intemporarystoragesite
1.15 Facilitiesfortreatmentordisposalofsolidwasteorliquideffluents?
Yes Mechanical composting for Municipal SolidWasteDisposalandSewageTreatmentPlantforsewagedisposal.
1.16 Facilitiesforlongtermhousingofoperationalworkers?
No
1.17 Newroad,railorseatrafficduringconstructionoroperation?
Yes Internalroads
1.18 Newroad,rail,airwaterborneorothertransportinfrastructureincludingneworalteredroutesandstations,ports,airportsetc?
No Existing roadwill beused for the transportpurpose.
1.19 Closureordiversionofexistingtransportroutesorinfrastructureleadingtochangesintrafficmovements?
No
1.20 Newordivertedtransmissionlinesorpipelines?
No
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 5
Sr.No.
Information/Checklistconfirmation
Yes/No
Details thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata
1.21 Impoundment,damming,culverting,realignmentorotherchangestothehydrologyofwatercoursesoraquifers?
No
1.22 Streamcrossings? No
1.23 Abstractionortransfersofwaterformgroundorsurfacewaters?
No
1.24 Changesinwaterbodiesorthelandsurfaceaffectingdrainageorrun‐off?
No There will not be any changes in waterbodiesorthelandsurface
1.25 Transportofpersonnelormaterialsforconstruction,operationordecommissioning?
Yes Construction workers and constructionmaterial
1.26 Long‐termdismantlingordecommissioningorrestorationworks?
No
1.27 Ongoingactivityduringdecommissioningwhichcouldhaveanimpactontheenvironment?
Yes Existingstructuretobedemolished
1.28 Influxofpeopletoanareaineithertemporarilyorpermanently?
Yes Only Constructionworkerswill stay duringconstructionphaseandofficepersonnel
1.29 Introductionofalienspecies?
No Nointroductionofalienspecieswilloccurasthisispurelyresidentialproject
1.30 Lossofnativespeciesorgeneticdiversity?
No Nothreatofspecieslosswilloccur
1.31 Anyotheractions?
No No
2 Use ofNatural resources for construction or operation of the Project (such as
land, water, materials or energy, especially any resources which are non‐renewableorinshortsupply):
Sr.No. Information/checklistconfirmation
Yes/No Details thereof (with approximatequantities /rates, wherever possible)withsourceofinformationdata
2.1 Landespeciallyundevelopedoragriculturalland(ha)
No
2.2 Water(expectedsource& Yes TotalWaterdemandwillbe1449KLD
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 6
competingusers)unit:KLD ThedetailedwaterbalanceisattachedasAnnexureIV
2.3 Minerals(MT) No
2.4 constructionmaterial–stone,aggregates,sand/soil(expectedsource–MT)
Yes Stoneaggregatesdemandwillbesourcedfromnearbylocalvendors
2.5 Forestsandtimber(source–MT)
Yes Onlydoorframes(ifsoplanned)
2.6 Energyincludingelectricityandfuels(source,competingusers)Unit:fuel(MT),energy(MW)
Yes MaximumDemandload:15MW SourceofElectricity:MSEDCL
2.7 Anyothernaturalresources(useappropriatestandardunits)
No
3. Use,storage,transport,handlingorproductionofsubstancesormaterials,whichcouldbeharmful tohumanhealthor the environmentor raise concernsaboutactualorperceivedriskstohumanhealth.
Sr.No. Information/Checklistconfirmation
Yes/No Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata
3.1 Useofsubstancesormaterials,whicharehazardous(asperMSIHCrules)tohumanhealthortheenvironment(flora,fauna,andwatersupplies)
Yes Used oil from DG sets will be given toauthorisedrecyclers
3.2 Changes in occurrence ofdisease or affect diseasevectors (e.g. insectorwaterbornediseases)
No
3.3 Affectthewelfareofpeoplee.g.bychanginglivingconditions?
No Proposed Projectwill not effect thewelfareofpeople
3.4 Vulnerablegroupsofpeoplewhocouldbeaffectedbytheprojecte.g.hospitalpatients,children,theelderlyetc.,
No Proposed Project will not affect hospitalpatients, children etc. as these are locatedawayfromprojectsite
3.5 Anyothercauses No
4. Productionofsolidwastesduringconstructionoroperationordecommissioning(MT/month)
Sr.No. Information/Checklist
confirmationYes/No Detailsthereof(withapproximate
quantities/rates,whereverpossible)withsourceofinformationdata
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 7
4.1 Spoil, overburden orminewastes
No
4.2 Municipalwaste(domesticandorcommercialwastes)
Yes TotalSolidWasteGenerationwillbe5,994kg/day
4.3 Hazardouswastes(asperHazardousWasteManagementRules)
No Used oil from DG set will be given toauthorisedrecyclers.
4.4 Other industrial processwastes
No No, This is a Construction Project forResidentialBuildings
4.5 Surplusproduct No NotApplicable
4.6 Sewagesludgeorothersludgefromeffluenttreatment
Yes Usedasmanure
4.7 Construction ordemolitionwastes
No NotApplicable
4.8 Redundantmachineryorequipment
No NotApplicable
4.9 Contaminatedsoilsorothermaterials
No NotApplicable
4.10 Agriculturalwastes No NotApplicable4.11 Othersolidwastes No NotApplicable
5. Releaseofpollutantsoranyhazardous,toxicornoxioussubstancestoair(Kg/hr)
Sr.No.Information/Checklistconfirmation
Yes/No
Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata
5.1 Emissions fromcombustion of fossil fuelsfrom stationary or mobilesources
No NotApplicable
5.2 Emissionsfromproductionprocesses
No NotApplicable
5.3 Emissions from materialshandling including storageortransport
Yes Fugitiveemissionfromhandlingsuchassand,aggregates,cementetc.
5.4 Emissions fromconstruction activitiesincluding plant andequipment
Yes Transportationofconstructionmaterial,DGsetsetc.
5.5 Dustorodoursfromhandlingofmaterialsincludingconstructionmaterials,sewageandwaste
Yes Transportation, loading and unloading ofmaterialwillgeneratedust
5.6 Emissionsfromincinerationofwaste
No NotApplicable
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 8
Sr.No.
Information/Checklistconfirmation
Yes/No
Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata
5.7 Emissions from burning ofwasteinopenair(e.g.slashmaterials, constructiondebris)
No NotApplicable
5.8 Emissions from any othersources
No NotApplicable
6. GenerationofNoiseandVibration,andEmissionsofLightandHeat:
Sr.No.Information/Checklistconfirmation
Yes/No
Detailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdatawithsourceofinformationdata
6.1 Fromoperationofequipmente.g.engines,ventilationplant,crushers
Yes Increase in noise levels due to operation ofconstruction equipments & vehicularmovement emissions from vehicles & DGsets
6.2 From industrial or similarprocesses
No NotApplicable
6.3 Fromconstructionordemolition
Yes Increase in noise levels due to operation ofconstruction equipments & vehicularmovement emissions from vehicles & DGsets
6.4 Fromblastingorpiling No OpenFoundation6.5 Fromconstructionor
operationaltrafficYes Traffic during construction phase is
negligible and during operation phase ismore.
6.6 From lighting or coolingsystems
No NotApplicable
6.7 Fromanyothersources No NotApplicable7. Risks of contamination of land or water from releases of pollutants into the
groundorintosewers,surfacewaters,groundwater,coastalwatersorthesea:
Sr.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata
7.1 Fromhandling,storage,useorspillageofhazardousmaterials
Yes DuetospillageofusedoilfromDGset
7.2 From discharge ofsewage or othereffluentstowaterortheland (expected modeandplaceofdischarge)
No STPwillbeused.SurplusTreatedWaterwillbedischargedinMunicipalSewerLines.
7.3 By deposition ofpollutantsemittedtoair
No NotApplicable
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 9
Sr.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata
into the land or intowater
7.4 Fromanyothersources No NotApplicable
7.5 Is there a risk of longterm build up ofpollutants in theenvironmentfromthesesources?
No NotApplicable
8. RiskofaccidentsduringconstructionoroperationoftheProject,which
couldaffecthumanhealthortheenvironmentSr.No. Information/Checklist
confirmationYes/No Detailsthereof(withapproximate
quantities/rates,whereverpossible)withsourceofinformationdata
8.1 Fromexplosions,spillages,firesetcfromstorage,handling,useorproductionofhazardoussubstances
No NotApplicable
8.2 Fromanyothercauses
No NotApplicable
8.3 Couldtheprojectbeaffectedbynaturaldisasterscausingenvironmentaldamage(e.g.floods,earthquakes,landslides,cloudburstetc)?
No The proposed structure is designed as perSeismicZoneIIIstandards.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 10
9. Factorswhichshouldbeconsidered(suchasconsequentialdevelopment)whichcouldleadtoenvironmentaleffectsorthepotentialforcumulativeimpactswithotherexistingorplannedactivitiesinthelocality
Sr.No. Information/Checklist
confirmationYes/No Details thereof (with approximate
quantities/rates, wherever possible) withsourceofinformationdata
9.1
Leadtodevelopmentofsupporting. facilities,ancillarydevelopmentordevelopmentstimulatedbytheprojectwhichcouldhaveimpactontheenvironmente.g.:
•Supportinginfrastructure(roads,powersupply,wasteorwastewatertreatment,etc.)•housingdevelopment•extractiveindustries•supplyindustries•other
No
9.2 Lead to after‐use of thesite,whichcouldhaveanimpact on theenvironment
No NotApplicable
9.3 Set a precedent for laterdevelopments
No NotApplicable
9.4 Havecumulativeeffectsduetoproximitytootherexistingorplannedprojectswithsimilareffects
No NotApplicable
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 11
(III)EnvironmentalSensitivity
Sr.No.Areas
Name/Identity
Aerialdistance(within15km.)Proposedprojectlocationboundary
1 Areasprotectedunderinternationalconventions,nationalorlocallegislationfortheirecological,landscape,culturalorotherrelatedvalue
Yes SanjayGandhiNationalPark:4km
2 Areaswhichareimportantor sensitive for ecologicalreasons ‐ Wetlands,watercourses or otherwaterbodies,coastalzone,biospheres, mountains,forests
No
3 Areas used by protected,important or sensitivespecies of flora or faunafor breeding, nesting,foraging, resting, overwintering,migration
No
4 Inland, coastal, marine orundergroundwaters
Yes UlhasRiver:~1.2km
5 State,Nationalboundaries No 6 Routesorfacilitiesusedby
thepublicforaccesstorecreationorothertourist,pilgrimareas
No
7 Defenceinstallations No
8 Densely populated orbuilt‐uparea
Yes Fullyurbanisedarea
9 Areasoccupiedbysensitiveman‐madelanduses(hospitals,schools,placesofworship,communityfacilities)
Yes Hospitals, schools, colleges, communityfacilities & places of worship are presentaround the Project site. These places fallunderThaneMunicipalCorporation
10 Areascontainingimportant,highqualityorscarceresources(groundwaterresources,surfaceresources,forestry,agriculture,fisheries,tourism,minerals)
No
11 Areasalreadysubjectedto No
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 12
Sr.No.
Areas
Name/Identity
Aerialdistance(within15km.)Proposedprojectlocationboundary
pollutionorenvironmentaldamage.(thosewhereexistinglegalenvironmentalstandardsareexceeded)
12 Areassusceptibletonaturalhazardwhichcouldcausetheprojecttopresentenvironmentalproblems(earthquakes,subsidence,landslides,erosion,floodingorextremeoradverseclimaticconditions)
No
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 13
(IV). ProposedTermsofReferenceforEIAstudies
Iherebygivenundertakingthatthedata&informationgivenintheapplication&enclosuresare true to thebestofmyknowledge&belief& I amaware that if anypartof thedataandinformation submitted is found to be false or misleading at any stage, the project will berejectedandclearancegive,ifanytotheprojectwillberevokedatourriskandcost.Date:29.12.2015Place:Thane
Mr.ShijuBhaskar PiramalEstatePvt.Ltd.
8thFloor,PiramalTower,PeninsulaCorporatePark,G.K.Marg,LowerParel,Mumbai‐400013
Signatureoftheapplicant Withname&fulladdress (Projectproponent/Authorisedsignatory)NOTE:
1) TheprojectsinvolvingclearanceunderCoastalRegulationZoneNotification,1991shallsubmitwiththeapplication a C.R.Z map duly demarcated by one of the authorized agencies, showing the projectactivities, w.r.t C.R.Z(at the stage of TOR) and the recommendations of the State Coastal Zonemanagement Authority(at the stage of EC). Simultaneous action shall also be taken to obtain therequisiteclearanceundertheprovisionsoftheC.R.ZNotification,1991fortheactivitiestobelocatedintheCRZ.
2) The projects to be located within 10 km of the national Parks, Sanctuaries, Biosphere Reserves,
MigratoryCorridorsofWildAnimals,theprojectproponentshallsubmitthemapdulyauthenticatedbyChiefWildlifeWardenshowingthesefeaturesvis‐avistheprojectlocationandtherecommendationsorcommentsofthechiefWildlifethereon.(atthestageofEC)
3) AllcorrespondencewiththeministryofEnvironment&ForestsincludingsubmissionofapplicationforTOR/Environmental Clearance, subsequent clarifications as may be required from time to time,participation in theEACmeetingonbehalfof theprojectproponent shallbemadeby theauthorisedsignatoryonly.Theauthorisedsignatoryshouldalsosubmitadocumentinsupportofhisclaimofbeinganauthorisedsignatoryforthespecificproject.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 14
APPENDIX‐II
(Seeparagraph6)
FORM‐1A(onlyforconstructionprojectslistedunderitem8oftheSchedule)
CHECKLISTOFENVIRONMENTALIMPACTS
(ProjectproponentsarerequiredtoprovidefullinformationandwherevernecessaryattachexplanatorynoteswiththeFormand
submitalongwithproposedenvironmentalmanagementplan&monitoringprogramme)
1. LANDENVIRONMENT
(Attachpanoramicviewoftheprojectsiteandthevicinity)
1.1 Willtheexistinglandusegetsignificantlyalteredfromtheprojectthatisnotconsistentwiththesurroundings?(ProposedlandusemustconformtotheapprovedMasterPlan/DevelopmentPlanofthearea.Changeoflanduseifanyandthestatutoryapprovalfromthecompetentauthoritybesubmitted).AttachMapsof(i)sitelocation,(ii)surroundingfeaturesoftheproposedsite(within500meters)and(iii)thesite(indicatinglevels&contours)toappropriatescales.Ifnotavailableattachonlyconceptualplans.
Theexistinglandusewillnotgetalteredfromtheproject.Asperthezoningstructuretheareacomesunderresidentialarea.
ProposeddevelopmentisinlinewithD.PofTMC.Followingdocumentsareattachedassupportingdocuments.
1. ConceptualPlanandDetailedBuildingDetailsareattachedasANNEXUREII
1.2 Listoutallthemajorprojectrequirementsintermsofthelandarea,builtuparea,waterconsumption,powerrequirement,connectivity,communityfacilities,parkingneeds,etc.
TotalPlotArea 1,29,580 m2
BuiltUpAreaDetails
BuiltupArea 1,81,518.23 m2
TotalConstructionArea 4,18,898.00 m2
WaterConsumption
TotalWaterConsumption 1449 KLD
EnergyConsumption
TotalEnergyConsumption 15 MW
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 15
ParkingProvided
Details Parking(Nos)
ParkingProvided(4W) 3262
Connectivity Proposedsiteisaccessibleby:i) 60mwideOldAgraRoadand
LocationplanisattachedasANNEXUREIII
1.3 Whatarethelikelyimpactsoftheproposedactivityontheexistingfacilitiesadjacenttotheproposedsite?(Suchasopenspaces,communityfacilities,detailsoftheexistinglanduse,disturbancetothelocalecology).
The project being a well planned activity willresult in organized open spaces and green areas.The biodiversity in the area will increase due toproposedgreenareas.Communitycumrecreationalfacilitieswillbedevelopedhencenostressontheexistingfacilityisanticipated.
1.4. Willtherebeanysignificantlanddisturbanceresultinginerosion,subsidence&instability?(Detailsofsoiltype,slopeanalysis,vulnerabilitytosubsidence,seismicityetcmaybegiven).
Themainreasonsforerosionareoverexploitationofgroundwater,instableslopes,landslidesetc.Theproposed construction will involve cutting andfilling operations. The project will involveconstruction of roads and development of greenareas,whichwouldreducethechancesoferosionandsubsidence.Subsidence is not anticipated as ground waterwouldnotbeusedasasourceofwatersupply.Asperseismic‐zoningmapofIndia,theprojectsitefallsunderzoneIII.StructuraldesignrequirementswillbeasperzoneIII.
1.5 Willtheproposalinvolvealterationofnaturaldrainagesystems?(Givedetailsonacontourmapshowingthenaturaldrainageneartheproposedprojectsite)
Theproposeddevelopmentisplannedinsuchamannerthatitwillnotaltertheexistingdrainagepatternofthearea.
1.6 Whatarethequantitiesofearthworkinvolvedintheconstructionactivity‐cutting,filling,reclamationetc.(Givedetailsofthequantitiesofearthworkinvolved,transportoffillmaterialsfromoutsidethesite,etc.)
Cuttingandfillingforconstructionactivityarebalanced,sonotransportationofearthwillberequired
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 16
1.7 Givedetailsregardingwatersupply,wastehandlingetcduringtheconstructionperiod.
SupplySource:ThaneMunicipalCorporation
1.8 Willthelowlyingareas&wetlandsgetaltered?(Providedetailsofhowlowlyingandwetlandsaregettingmodifiedfromtheproposedactivity)
Nowetlandsandlow‐lyingareasonthesite.
1.9 Whetherconstructiondebris&wasteduringconstructioncausehealthhazard?(Givequantitiesofvarioustypesofwastesgeneratedduringconstructionincludingtheconstructionlabourandthemeansofdisposal)
Nohealthhazard.Minorquantityofconstructiondebriswillbegeneratedwhichwillbesentoutside.
2. WATERENVIRONMENT
2.1 Givethetotalquantityofwaterrequirementfortheproposedprojectwiththebreakupofrequirementsforvarioususes.Howwillthewaterrequirementmet?Statethesources&quantitiesandfurnishawaterbalancestatement.
EnclosedasANNEXUREIVSOURCE:TMC
2.2 Whatisthecapacity(dependablefloworyield)oftheproposedsourceofwater?
TheproposedwaterdemandwillbemetfromThaneMunicipalCorporation
2.3 Whatisthequalityofwaterrequired,incase,thesupplyisnotfromamunicipalsource?(Providephysical,chemical,biologicalcharacteristicswithclassofwaterquality)
WaterwillbesourcedbyTMC
2.4 Howmuchofthewaterrequirementcanbemetfromtherecyclingoftreatedwastewater?(Givethedetailsofquantities,sourcesandusage)
TreatedwaterfromSTPwillbeusedforflushingintoiletandgardening
Totalsewagegenerated 1359 KLD
TotalSTPcapacity 1500 m3
Treatedwaterrecycledforflushing
544 KLD
Treatedwaterforgardening 182 KLD
Sludgegenerated 14 KLD
Excesstreatedwater 619 KLD
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 17
2.5 Willtherebediversionofwaterfromotherusers?(Pleaseassesstheimpactsoftheprojectonotherexistingusesandquantitiesofconsumption)
Nodiversionisanticipated
2.6 Whatistheincrementalpollutionloadfromwastewatergeneratedfromtheproposedactivity?(Givedetailsofthequantitiesandcompositionofwastewatergeneratedfromtheproposedactivity)
The total sewage of about 1359 KLD will begenerated from the complex. The composition ofwaste water is given in the table indicating thequalityofrawwastewaterbeforetreatment
Parameters Values Units
pH 7‐8 mg/l
BOD 250‐300 mg/l
COD 450‐600 mg/l
O&G/ABS 10‐20 mg/l
TSS 100‐200 mg/l
Mitigation measures: Domestic Effluent will betreated in the SewageTreatment plant of capacity1500m3.The treatedsewagewaterwillbereusedforflushingandgardening.
2.7 Givedetailsofthewaterrequirementsmetfromwaterharvesting?Furnishdetailsofthefacilitiescreated.
Theprojectactivityshallhaverainwaterharvestingonlyofrainfallon terraces.Surfacerainwaterwillbeconnectedtothestormwaterdrainagesystem
2.8. Whatwouldbetheimpactofthelandusechangesoccurringduetotheproposedprojectontherunoffcharacteristics(quantitativeaswellasqualitative)oftheareainthepostconstructionphaseonalongtermbasis?Woulditaggravatetheproblemsoffloodingorwaterlogginginanyway?
ProposeddevelopmentisintunewithD.PofTMC
Theprojectwillhaveproperstormwaterdrainagefacility as per Strom Water Drain Remarks byconcernedauthority.Sotherewillbenoproblemofwaterloggingduetothisproject.
2.9 Whataretheimpactsoftheproposalonthegroundwater?(Willtherebetappingofgroundwater;givethedetailsofgroundwatertable,rechargingcapacity,andapprovalsobtainedfromcompetentauthority,ifany)
In the proposed development there will be notapping of groundwater. Water demand for theconstruction as well as operational phase will bemetfromsourcessuchasTMC.Rainwaterharvesting schemewill bepracticed forgroundwater recharge, which will have a positiveimpactonthegroundwatertable.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 18
2.10 Whatprecautions/measuresaretakentopreventtherun‐offfromconstructionactivitiespollutingland&aquifers?(Givedetailsofquantitiesandthemeasurestakentoavoidtheadverseimpacts)
Topreventdegradationandmaintainthequalityof
watersource,adequatecontrolmeasureshavebeen
proposed to check the surface run‐off, as well as
uncontrolledflowofwaterintoanywaterbody.
Avoidexcavationduringmonsoonseason.
Rainwater harvesting can serve as a solution towaterprobleminworstcasescenario.
Following methods can increase efficiency of
rainwaterharvestingandrecharginggroundwater.
Catchdrainageall along theperipheryofplot topreventsurfacerunoff.
Reduceandfiltersurfacerunoff.
Usevegetatedswalesanddepressions to reducerunoff.
2.11 Howisthestormwaterfromwithinthesitemanaged?(Statetheprovisionsmadetoavoidfloodingofthearea,detailsofthedrainagefacilitiesprovidedalongwithasitelayoutindicationcontourlevels)
Duringrainyseason,aftertherainfallsomepartoftherainwaterpercolates into thegroundand joinsground water table, a part is retained as soilmoisture, some part is lost in evapotranspirationand the remaining part overflows as stormwaterrunoff.Thequantityofrunoffreachingthesewersordrainsisconsiderableascomparedwithsanitarysewage.
Theprojectwillhaveproperstormwaterdrainagefacility as per Strom Water Drain Remarks byconcernedauthority.Sotherewillnobeproblemofwaterloggingduetothisproject.
2.12 Willthedeploymentofconstructionlabourersparticularlyinthepeakperiodleadtounsanitaryconditionsaroundtheprojectsite(Justifywithproperexplanation)
No, the deployment of construction labourerswillnot lead to any unsanitary condition. Theconstruction labourers will be provided withtemporary shelter shades within the projectpremises.Theunsanitaryconditionwillberemovedby means of providing readymade septic tanks &soak pits. Solid waste will be disposed off inmunicipalwastedisposalsystem.
2.13 Whaton‐sitefacilitiesareprovidedforthecollection,treatment&safedisposalofsewage?(Givedetailsofthequantitiesofwastewatergeneration,treatmentcapacitieswithtechnology&facilitiesforrecyclinganddisposal)
The Sewage Treatment Plant (STP) is designed totreat the raw waste water generated fromResidentialbuildingSewagegeneration:1359KLDTreated water to be recycled for gardening:188KLDTreatedwaterrecycledforflushing:483KLD
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 19
2.14 Givedetailsofdualplumbingsystemiftreatedwasteusedisusedforflushingoftoiletsoranyotheruse.
Yes,dualplumbingwillbeprovided
3. VEGETATION
3.1 Isthereanythreatoftheprojecttothebiodiversity?(Giveadescriptionofthelocalecosystemwithit’suniquefeatures,ifany)
Thereisnosensitiveecosystempresentatsitethatwill be disturbed by the project, as existing landuseinsurroundingareaisResidential
3.2 Willtheconstructioninvolveextensiveclearingormodificationofvegetation?(Provideadetailedaccountofthetrees&vegetationaffectedbytheproject)
3.3 Whatarethemeasuresproposedtobetakentominimizethelikelyimpactsonimportantsitefeatures(Givedetailsofproposalfortreeplantation,landscaping,creationofwaterbodiesetcalongwithalayoutplantoanappropriatescale)
About 36,367 m2 areas are provided for thedevelopment of Green belt in the premises. Thegreen belt will be developed for control ofpollutionandaestheticviewofthecomplex
4. FAUNA
4.1 Istherelikelytobeanydisplacementoffauna‐bothterrestrialandaquaticorcreationofbarriersfortheirmovement?Providethedetails.
No.Theproposedsiteanditssurroundingsdonotsupportanyhabitatforanygroupofwildanimals
4.2 Anydirectorindirectimpactsontheavifaunaofthearea?Providedetails.
No.Therewillbenodirectorindirectimpactontheavifaunaofthearea.
4.3 Prescribemeasuressuchascorridors,fishladdersetctomitigateadverseimpactsonfauna
SincetheProposedProjectwouldnothaveanyadverseimpactonfaunahencemitigationmeasurenotrelevant
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 20
5. AIRENVIRONMENT
5.1 Willtheprojectincreaseatmosphericconcentrationofgases&resultinheatislands?(Givedetailsofbackgroundairqualitylevelswithpredictedvaluesbasedondispersionmodelstakingintoaccounttheincreasedtrafficgenerationasaresultoftheproposedconstructions)
TheProjectwillresult innegligible increaseintheatmospheric concentrations of gases due to D.G.operations(backuppoweronly)andtheincreasedtraffic.Theproposedactivitywillnot result in theformationofanyheatislands,asitdoesnotinvolveanysignificantchangeinthelandusepatternortheconcretingofareas.
5.2 Whataretheimpactsongenerationofdust,smoke,odorousfumesorotherhazardousgases?Givedetailsinrelationtoallthemeteorologicalparameters.
Diesel generator sets operated for back‐up powersupply are identified as the onlymajor sources ofgaseous and particulate emission. Impact ofvehicular is not significant. SO2, SPM,NOX and COemissions are expected due to fuel combustion ingeneratorsets.
5.3 Willtheproposalcreateshortageofparkingspaceforvehicles?Furnishdetailsofthepresentleveloftransportinfrastructureandmeasuresproposedforimprovementincludingthetrafficmanagementattheentry&exittotheprojectsite.
TotalParkingprovided:Fourwheeler:3262Nos.Twowheeler:2632Nos.
5.4 Providedetailsofthemovementpatternswithinternalroads,bicycletracks,pedestrianpathways,footpathsetc.,withareasundereachcategory.
Internalroads,footpaths/pedestrianpathwayshavebeenplannedwithintheproposedcomplex
5.5 Willtherebesignificantincreaseintrafficnoise&vibrations?Givedetailsofthesourcesandthemeasuresproposedformitigationoftheabove.
Considering the addition of vehicles due to theproposed project with the existing roads andvehicles plying on them, there will be marginalincreaseinthenoiselevelsbutwillnotresultinanimpact.
5.6 WhatwillbetheimpactofDGsets&otherequipmentonnoiselevels&vibrationin&ambientairqualityaroundtheprojectsite?Providedetails.
DGsetwillbeusedinconstructionandoperationphaseonlyincaseofpowerfailure.The DG Sets shall be as per the guide lines laiddownbyEPRforspecificnoiseemissionstandards.Measures shall be taken for reduction of noise byusingacousticenclosures.Noise emissions are expected from variousconstructionequipmentandmachinerybutwillnotresultinanimpact.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 21
6. AESTHETICS
6.1 Willtheproposedconstructionsinanywayresultintheobstructionofaview,scenicamenityorlandscapes?Aretheseconsiderationstakenintoaccountbytheproponents?
Theproposedlanduseofthesitewouldbemainlyresidential and will not result in obstruction ofview, scenic amenity or landscape. However, thebuildings will be planned in such a way that theorganisedopenareas and landscapedareas are atthecentresothatallcanenjoythegreenareas.
6.2 Willtherebeanyadverseimpactsfromnewconstructionsontheexistingstructures?Whataretheconsiderationstakenintoaccount?
Internal roads, footpaths/ pedestrian pathwayshavebeenplannedwithintheproposedcomplex
6.3 Whetherthereareanylocalconsiderationsofurbanform&urbandesigninfluencingthedesigncriteria?Theymaybeexplicitlyspeltout.
The Project has been designed as per thedepartment of town planning, Government ofMaharashtra.
6.4 Arethereanyanthropologicalorarchaeologicalsitesorartefactsnearby?Stateifanyothersignificantfeaturesinthevicinityoftheproposedsitehavebeenconsidered.
No anthropological or archaeological sites orartefactsarefoundnearthesitearea.
7. SOCIO‐ECONOMICASPECTS
7.1 Willtheproposalresultinanychangestothedemographicstructureoflocalpopulation?Providethedetails.
No.Majorityof the labourwillberecruited locallyand only minimal skilled workers would be fromoutside,which is anticipated to be very small andwill not alter the existing demographic profile ofthearea.
7.2 Givedetailsoftheexistingsocialinfrastructurearoundtheproposedproject.
The Project comes in Residential area and has allbasic infrastructural facilities as schools, medicalestablishments,shops,etc.
7.3 Willtheprojectcauseadverseeffectsonlocalcommunities,disturbancetosacredsitesorotherculturalvalues?Whatarethesafeguardsproposed?
No. The Projectwill have positive impact on localcommunities.
8. BUILDINGMATERIALS
8.1 Mayinvolvetheuseofbuildingmaterialswithhigh‐embodiedenergy.Aretheconstructionmaterialsproducedwithenergyefficientprocesses?(Givedetailsof
Yesthebuildingmaterialswithhighembodiedenergywillbeused
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 22
energyconservationmeasuresintheselectionofbuildingmaterialsandtheirenergyefficiency)
8.2 Transportandhandlingofmaterialsduringconstructionmayresultinpollution,noise&publicnuisance.Whatmeasuresaretakentominimizetheimpacts?
Adequate mitigative measures will be adopted.Construction equipment with idling controltechnologieswill be used.Regularmaintenance ofthe equipments will be carried out. Theconstruction activities will be carried out duringthe daytime only. The workers exposed to highnoisegeneratingwouldbeprovidedwithearplugsearmuffs.AsperEnvironmentalManagementPlan.
8.3 Arerecycledmaterialsusedinroadsandstructures?Statetheextentofsavingsachieved?
Fly ash in cement concrete. Typically 20‐ 25%offlyashissubstitutedincement.
8.4 Givedetailsofthemethodsofcollection,segregation&disposalofthegarbagegeneratedduringtheoperationphasesoftheproject.
Thebio‐degradableandnon‐biodegradablewastewillbesegregatedatsourceofwastegeneration.Solidwastegenerated:5994kg/day
9. ENERGYCONSERVATION
9.1 Givedetailsofthepowerrequirements,sourceofsupply,backupsourceetc.Whatistheenergyconsumptionassumedpersquarefootofbuilt‐uparea?Howhaveyoutriedtominimizeenergyconsumption?
Sourceofpowersupply:MSEDCLDGSetwillbeprovidedasemergencybackup.
TotalEnergyConsumption
15 MW
DGSetCapacity 7470 kVA
9.2 Whattypeof,andcapacityof,powerback‐uptoyouplantoprovide?
DGSetwillbeprovidedasemergencybackupforlightingincommonareas,oneliftperbuildingandfirepumpineachbuilding.
Total 7470 kVA
9.3 Whatarethecharacteristicsoftheglassyouplantouse?Providespecificationsofitscharacteristicsrelatedtobothshortwaveandlongwaveradiation?
Reflective+A12+6mmdoubleglazing
9.4 Whatpassivesolararchitecturalfeaturesarebeingusedinthebuilding?Illustratetheapplicationsmadeintheproposedproject.
The building structure will be designed in such away that solar light can be utilised maximum fordaytime.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 23
9.5 Doesthelayoutofstreets&buildingsmaximisethepotentialforsolarenergydevices?Haveyouconsideredtheuseofstreetlighting,emergencylightingandsolarhotwatersystemsforuseinthebuildingcomplex?Substantiatewithdetails.
Solar street lights are proposed in areas suchas/openspaces/commonarea/pathways/RG/etcSolarhotwatersystemswillbeprovided
9.6 Isshadingeffectivelyusedtoreducecooling/heatingloads?WhatprincipleshavebeenusedtomaximizetheshadingofWallsontheEastandtheWestandtheRoof?Howmuchenergysavinghasbeeneffected?
Yes.Shadinghasbeeneffectivelyusedtoreducethecoolingloads.
9.7 Dothestructuresuseenergy‐efficientspaceconditioning,lightingandmechanicalsystems?Providetechnicaldetails.Providedetailsofthetransformersandmotorefficiencies,lightingintensityandair‐conditioningloadassumptions?AreyouusingCFCandHCFCfreechillers?Providespecifications.
Yes. The rooms will be so dimensioned thateffectiveairconditioningcanbecarriedout.Publicareas will be cooled by natural ventilation. Thedesign of the building will be such thatmaximumuse of natural ventilation can be achieved. Thewalls, roofs and openingswill be so designed thatinfluxofheatisminimum.
9.8. Whatarethelikelyeffectsofthebuildingactivityinalteringthemicro‐climates?Provideaselfassessmentonthelikelyimpactsoftheproposedconstructiononcreationofheatisland&inversioneffects?
Heatemission from theproposedconstructioncanbefromthefollowingsources:Heat absorbed from the concrete structures, heatgeneratedfromequipments/appliances,andduetoincreasedpopulationintheproposeddevelopment.However theheatgeneratedwillnotbesignificantandwillbedissipated in the lushgreensandopenareas provided within. Hence it can be concludedthattheheatislandeffectshallnotbeaconcernfortheproposedproject.
9.9. Whatarethethermalcharacteristicsofthebuildingenvelope?(a)roof;(b)externalwalls;and(c)fenestration?GivedetailsofthematerialusedandtheU‐valuesortheRvaluesoftheindividualcomponents.
UvalueinWatts/hr/m2/C
Roof 0.409 Watts/hr/m2/C
Wall 0.44 Watts/hr/m2/C
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 24
9.10 Whatprecautions&safetymeasuresareproposedagainstfirehazards?Furnishdetailsofemergencyplans.
The fire fighting system shall compromise ofhydrant systemandportable extinguishers. Smokedetectors will be provided along with manual callpoints. External yard hydrants shall be installedaround all buildings in the complex in galvanizedsteelfirehosecabinet(weatherproof).Allexternalyard hydrants shall be at one meter height fromfinishedgroundlevelasperNationalBuildingCode.Externalfirehydrantsshallbelocatedsuchthatnoportion of any building ismore than 45m from ahydrant, and the external hydrants are notvulnerabletomechanicalorvehiculardamage.
9.11 Ifyouareusingglassaswallmaterialprovidesdetailsandspecificationsincludingemissivityandthermalcharacteristics.
NotApplicable
9.12 Whatistherateofairinfiltrationintothebuilding?Providedetailsofhowyouaremitigatingtheeffectsofinfiltration.
Thefollowingmeasureswillbeadoptedtomitigatetheeffectsofinfiltration: Aluminiumwindowswithrubbergasket,sothat
thewindowsaresealed,willbeprovided. Summer cross section ventilation will be
maximum.
9.13 Towhatextentthenon‐conventionalenergytechnologiesareutilisedintheoverallenergyconsumption?Providedetailsoftherenewableenergytechnologiesused.
NotApplicable
10. EnvironmentManagementPlan
TheEnvironmentManagementPlanwouldconsistofallmitigationmeasuresforeachitemwiseactivitytobeundertakenduringtheconstruction,operationandtheentirelifecycletominimizeadverseenvironmentalimpactsasaresultoftheactivitiesoftheproject.Itwouldalsodelineatetheenvironmentalmonitoringplanforcomplianceofvariousenvironmentalregulations.Itwillstatethestepstobetakenincaseofemergencysuchasaccidentsatthesiteincludingfire.
EnclosedasAnnexureV
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 25
ANNEXUREIAreaStatement
A)AREASTATEMENTFORPLOT SQ.MTS.1.AREAOFPLOTASPER7/12EXTRACT 129580.002.DEDUCTIONFOR ‐‐‐‐‐a.ROADSETBACKAREA 1974.00b.PROPOSEDROAD ‐‐‐‐‐c.AREAUNDERNOTINPOSSESSION 1327.00TOTAL(a+b+c) 3301.003.BALANCEAREAOFTHEPLOT(1a‐2) 126279.004.DEDUCTIONFOR
a. 25%AMENITYOPENSPACEOF(126279.00x25%)=31569.75SQ.M.
31569.75
5.NETGROSSAREAOFTHEPLOT(3‐4a) 94709.256.RECREATIONALGROUND15%of'5' 14206.387.BALANCEAREAOFTHEPLOT(5‐6) 80502.878.ADDITIONALUPTO80%OF'3'=126279.00x80%=101023.20SQ.M.‐‐‐‐‐‐‐‐‐A(AVAIL.D.R.(2a+4a)=1974.00+31569.75=33543.75‐‐BBALANCET.D.R.AREATOBEPURCHASEFROMOUTSIDE=(A‐B)=67479.45SQ.M.EFROM
101023.00
9.TOTALAREA(7+8) 1,81,525.8710.F.S.I.PERMISSIBLE 1.0011.F.S.I.CREDITAVAILABLEBYDEVELOPMENTRIGHTS
‐‐‐‐
12.PERMISSIBLEFLOORAREA(9x10) 1,81,525.8713.EXISTINGFLOORAREA 0.00014.PROPOSEDFLOORAREA 1,81,518.2315.TOTALPROPOSEDAREA(13+14) 1,81,518.2316.BALANCEF.S.I.AREA 7.64
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 26
ANNEXUREIIConceptualPlan
EXISTI
NG THA
NE BHI
WANDI
ROAD
COMPLEX -2
EXPERIENCE CENTER
TEMPLE-T2
TEMPLE-T3
DRAIN
DRAIN
DRAI
N
DRAI
N
30.00 M. WIDE D.P. ROAD
30.00 M. WIDE D.P. ROAD
20.00
M. WID
E D.P.
ROAD
20.00
M. WID
E D.P.
ROAD
BAYER CO
ADJ.
BAYER CO
ADJ.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 27
BUILDINGDETAILS
BuildingNo.Building
ConfigurationHeightof
Building(m) Flats Population
ResidentialBuildinginCluster‐I
3Towerswith2levelbasement+5levelpodium+27floorswithTownhouses
92 266 1330
ResidentialBuildinginCluster‐II
2Towerswith2levelbasement+5levelpodium+27floorswithTownhouses
92 181 905
ResidentialBuildinginCluster–III
3Towerswith2levelbasement+5levelpodium+27floorswithTownhouses
92 246 1230
ResidentialBuildinginCluster–IV
2Towerswith2levelbasement+5levelpodium+27floors
withTownhousesand5towerswithG+27
Floors
92 994 4970
IconicTower2levelbasemet+Gr+
24floors92 21 105
Commercial2Towerswith2lvlBasement+Gr+4LvlPodium+26Floors
92 ‐ 4068
TempleComplex
2Buildingswith2LvlBasement+Gr+6
floors23 168 840
Total 1876 13,448
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 28
ANNEXUREIIILocationPlan
SiteU/R
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 29
ANNEXUREIV
WaterBalanceStatement
Particulars No.ofFlats/Units
Occupancy Population
WaterRequirementBasis(lit/day)
WaterDemandKLD
Flats 1,876 5person/flat 9380 135 1266
Commercial40,683.68
m21person/10
SqMt4068 45 183
Total 13448 1449
SewageGeneration
90%offreshwaterand100%offlushingrequirement
1359
Sludge
1%ofSewage
Generation14
RecyclingforFlushing
Flats 1,876 5person/flat 9380 45 422
Commercial40,683.68
m21person/10
SqMt4068 30 122
Total 13448 544Gardening 36,367.00 5l/m2 182
ExcessTreatedWaterinMunicipalSewerLines
619
*BasisforwatersupplyistakenfromBIS:NationalBuildingCodeofIndia2005:Part9Page19
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProject,Thane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 30
ANNEXUREV
EnvironmentalManagementPlanduringConstructionPhase
Sr.No.
EnvironmentalComponents
PredictedImpacts
ProbablesourceofImpact
MitigationMeasures Remarks
CONSTRUCTIONPHASE1. AmbientAir
QualityNegativeimpactinsideconstructionsitepremises.Nonegativeimpactoutsidesite.
Dustemissionsfromexcavation,airemissionsfrommachineryandotherconstructionactivitiesatsite.
Dustreductionmeasuressuchasroadwatering.Periodicmaintenanceofconstructionequipment.Useofgoodqualityfuels.UseofPersonalProtectiveEquipments
Impactsaretemporaryduringconstructionphase.Impactswillbeconfinedtoshortdistances,ascoarseparticleswillsettlewithintheshortdistancefromactivities.
2. Noise Negativeimpactnearnoisegenerationsourcesinsidepremises.Nosignificantimpactonambientnoiselevelsinthesurroundingarea.
NoisegeneratedfromconstructionactivitiesandoperationofconstructionequipmentandDGsets
Useofwellmaintainedequipment.Heavyconstructionactivitylimitedtoday‐timehoursonly.Useofnoisemufflersinandconstructionvehicle.Useofearplugs/muffsbyconstructionstaff.
Temporaryimpactsduringconstructionphase.Noblastingorotherhighnoiseactivitiesenvisaged.
3. Water Nosignificantnegativeimpact.
Surfacerunofffromprojectsite.Oil/fuelandwastespills.Improperdebrisdisposal.Dischargeofsewagefromlabourcamp.
Siltfencestoreducerun‐offSecondarycontainmentanddykesinmaterialstorageareas.Sewagetreatmentinseptictanks.
Labourwillbeemployedtoreducesizeoflabourcamps.Noperennialsurfacewaterresourceadjacenttosite.Noexcavationworkwillbe
4. Land Minornegativeimpact
Excavation,Constructiondebris,waste
Reutilizationandrecyclingofconstructiondebris
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProject,Thane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 31
fromlabourcamp.
Wastefromlabourcampswillbecollectedandcompostedonsite.Noncompostablewastewillbetransportedtolandfillsite.Topsoilwillbeconservedandusedforlandscapinginfunctionalphase.
‐
5. Aesthetics Minornegativeimpacts
ConstructionactivitiesandExcavation
Theimpactswillbecompensatedbyextensivetreeplantationandgardeningintheusephase.
Shorttermimpactrestrictedonlyintheinitialstagesofconstruction.
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProject,Thane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 32
ENVIRONMENTALMANAGEMENTPLANDURINGFUNCTIONALPHASE
Sr.No.
EnvironmentalComponents
PredictedImpacts
ProbableSourceOfImpact
MitigationMeasures
Remarks
FUNCTIONALPHASE
1. AmbientAirQuality
MinorNegativeimpact
ParticulateandgaseousemissionsfromDGsetsandvehiclemovement
Useoflowsulphur
goodfuel
Periodic
maintenanceofDG
sets
UseofCNG/LPGas
afuelshouldbe
encouraged.
DGsetswillbeused.
2. Noise Minornegativeimpactinsidepremises.
Noisefromvehiclemovementandoperationofdieselgeneratorsetsduringpowerfailure.
HousingofDGsets
inbuildingswith
appropriate
acoustics.
Traffic
management
measuresto
reducenoise
Appropriatetrees
whichwillactas
noisesbarriers
willbeplantedin
thepremisesand
alongroadside.
‐‐
3. Water Nosignificantadverseimpact
Oil/fuelandwastespillsinvehicleparkingarea.Dischargeofsewage.Dischargeofcontaminatedstormwater
Sewagewaterwill
betreatedand
recycled.
Rainwater
harvestingand
rechargeof
groundwater
aquiferis
proposed.
Good
housekeepingand
stormwater
managementwill
befollowed.
Recycledwaterwillbeusedforgardeningandflushingpurpose.
4. Land Nonegative Storageand Treatmentand Segregationof
ApplicationformforEnvironmentalClearanceProjectName:ResidentialProject,Thane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 33
Sr.No.
EnvironmentalComponents
PredictedImpacts
ProbableSourceOfImpact
MitigationMeasures Remarks
impact disposalofsolidwastes.Dischargeofsewage.Fuelandmaterialspills.
reuseofsewage
water.
Integratedwaste
managementand
spillcontrolplan
Drygarbagewill
besentfor
recyclingandwet
garbagewillbe
composted.
dryandwetgarbagebeforewillbedonebeforedisposal.
5. Biological OverallPositiveimpact
Habitat
disturbance
Greenspaces
insidethe
premiseswillhelp
tocompensatethe
earliereffectfrom
vegetation.
Landscapingand
extensive
plantationinthe
premises.
Landscapingwill
helpinreducing
anyadverse
impactsonair
andnoise
quality.
6. Socio‐economic
Overallpositiveimpact
Increasedjobopportunityinhouseholdmaintenanceandancillaryservices.
‐‐ Positiveandlongtermimpact‐
FUNCTIONALPHASE
7.TrafficPattern
NosignificantImpact
Thecomplexislikelytoaddmoderatelytothetrafficflowconsideredduringpeakhour.
Traffic
Management
practiseswillbe
employed.
Adequateparking
spacewillbe
providedinthe
premises.