Tropical storms Classification Development Trajectories Forecasting Hazards Future prospects.
FORECASTING EASTERN US WINTER STORMS Are We Getting Better and Why?
description
Transcript of FORECASTING EASTERN US WINTER STORMS Are We Getting Better and Why?
FORECASTING EASTERN FORECASTING EASTERN US WINTER STORMSUS WINTER STORMS
Are We Getting Better Are We Getting Better and Why?and Why?
Jeff S. WaldstreicherJeff S. WaldstreicherNOAA/NWS Eastern RegionNOAA/NWS Eastern Region
Scientific Services Division – Bohemia, NYScientific Services Division – Bohemia, NY
Northeast Regional Operational Workshop Northeast Regional Operational Workshop (NROW)(NROW)
November 4, 2004November 4, 2004
OUTLINEOUTLINE
Winter Storm Warning ProgramWinter Storm Warning Program Verification ReviewVerification Review Key Activities and DevelopmentsKey Activities and Developments Relationship Between Event Totals Relationship Between Event Totals
and Warning Performanceand Warning Performance Summary Summary
MOTIVATIONMOTIVATION Winter of 2003-2004 PerformanceWinter of 2003-2004 Performance
EASTERN REGION WIDEEASTERN REGION WIDE POD - .921 POD - .921 FAR - .321FAR - .321 Lead Time – 18.5 hoursLead Time – 18.5 hours
NORTHEASTNORTHEAST POD - .920POD - .920 FAR - .321 FAR - .321 Lead Time – 20.3 hoursLead Time – 20.3 hours
Is this indicative of a positive performance Is this indicative of a positive performance trend?trend?
If yes, what are the contributing factors?If yes, what are the contributing factors?
WINTER STORM WARNINGWINTER STORM WARNINGVERIFICATION RESULTSVERIFICATION RESULTS
1993-94 to 2003-041993-94 to 2003-04
EASTERN REGION WINTER STORM WARNINGSPOD
0.5
0.6
0.7
0.8
0.9
1
SEASON
PO
D
POD
Linear(POD)
EASTERN REGION WINTER STORM WARNINGSFAR and EVENT TOTALS
0
0.1
0.2
0.3
0.4
0.5
0.6
SEASON
FA
R
0
500
1000
1500
2000
2500
3000
# E
vent
s
FAR
#Events
Linear (FAR)
EASTERN REGION WINTER STORM WARNINGSLEAD TIME and EVENT TOTALS
8
10
12
14
16
18
20
SEASON
LT
(h
r)
0
500
1000
1500
2000
2500
3000
# E
ven
ts
LT
#Events
Linear (LT)
NORTHEASTNORTHEASTPODPOD
NORTHEAST Winter Storm WarningsAnnual Probability of Detection (POD)
0.5
0.6
0.7
0.8
0.9
1
Season
POD
0
500
1000
1500
2000
# of
Eve
nts
NORTHEAST Winter Storm WarningsPOD - 3 Year Running Mean
0.5
0.6
0.7
0.8
0.9
1
93/94
-95/96
94/95
-96/97
95/96
-97/98
96/97
-98/99
97/98
-99/00
98/99
-00-01
99/00
-01/02
00/01
-02/03
01/02
-03/04
3-Seasons
PO
D
05001000150020002500300035004000
NORTHEAST Winter Storm WarningsPOD - 2 Year Running Mean
0.5
0.6
0.7
0.8
0.9
1
2-Seasons
PO
D
050010001500200025003000
NORTHEASTNORTHEASTFARFAR
NORTHEAST Winter Storm WarningsAnnual False Alarm Ratio (FAR)
00.10.20.30.40.50.60.70.80.9
1
Season
FA
R
0
500
1000
1500
2000
# E
ven
ts
NORTHEAST Winter Storm WarningsFAR - 2 Year Running Mean
00.10.20.30.40.50.60.70.80.9
1
2-Seasons
FA
R
050010001500
200025003000
NORTHEAST Winter Storm WarningsFAR - 3 Year Running Mean
00.10.20.30.40.50.60.70.80.9
1
3-Seasons
FA
R
05001000150020002500300035004000
NORTHEASNORTHEASTT
LEAD TIMELEAD TIMENORTHEAST Winter Storm Warnings
Annual Lead Time
810121416182022
Season
Lea
d T
ime
(hr)
0
500
1000
1500
2000
# E
vent
s
NORTHEAST Winter Storm WarningsLead Time - 2 Year Running Mean
810121416182022
2-Seasons
Lea
d T
ime
(hr)
050010001500200025003000
NORTHEAST Winter Storm WarningsLead Time - 3 Year Running Mean
810121416182022
3-Seasons
Lea
d T
ime
(hr)
05001000150020002500300035004000
KEY ACTIVITIES AND KEY ACTIVITIES AND DEVELOPMENTS DEVELOPMENTS
RELATED TO RELATED TO FORECASTING WINTER FORECASTING WINTER
STORMSSTORMS1993-20041993-2004
NWP ADVANCESNWP ADVANCES
Global ModelGlobal Model 1993 – AVN/MRF at T126/L28 1993 – AVN/MRF at T126/L28
2/day AVN to 126h and 1/day MRF to 240h2/day AVN to 126h and 1/day MRF to 240h 2004 – GFS at T256/L64 to 84 h2004 – GFS at T256/L64 to 84 h
4/day to 384h (T170/L42 84-180h T126/L28 to 386h)4/day to 384h (T170/L42 84-180h T126/L28 to 386h) Numerous improvements to physics, data assimilation etc…Numerous improvements to physics, data assimilation etc…
Medium Range Ensemble Forecast Medium Range Ensemble Forecast System (MREF)System (MREF) ~1997 – 1/day 12 member system~1997 – 1/day 12 member system 2004 – 4/day 48 member system including lag members2004 – 4/day 48 member system including lag members
NGMNGM – Static Since 1993– Static Since 1993
NWP ADVANCESNWP ADVANCES
Eta (NAM)Eta (NAM) 1993 – Early Eta 80 km / 38 levels / 00 and 12Z / 48h1993 – Early Eta 80 km / 38 levels / 00 and 12Z / 48h 1995 – Meso Eta 32 km / 50 levels / 03 and 15Z / 33h1995 – Meso Eta 32 km / 50 levels / 03 and 15Z / 33h 2004 – MesoEta 12 km / 60 levels / 4 x day / 84 hr2004 – MesoEta 12 km / 60 levels / 4 x day / 84 hr Numerous improvements to physics, data assimilation etc…Numerous improvements to physics, data assimilation etc…
Local Area Modeling - Workstation EtaLocal Area Modeling - Workstation Eta
Short Range Ensemble Forecast System (SREF)Short Range Ensemble Forecast System (SREF) ~1999 – 10 members (5 48 km Eta / 5 RSM)~1999 – 10 members (5 48 km Eta / 5 RSM) 2004 – 15 members (10- 32 km Eta / 5- 40 km RSM)2004 – 15 members (10- 32 km Eta / 5- 40 km RSM)
Rapid Update Cycle (RUC)Rapid Update Cycle (RUC) ~1994 – RUC1 – 60 km / 25 levels~1994 – RUC1 – 60 km / 25 levels 1998 – RUC2 – 40 km / 40 levels1998 – RUC2 – 40 km / 40 levels 2004 – RUC2 – 20 km / 50 levels2004 – RUC2 – 20 km / 50 levels
1994-19971994-1997 WSR-88D Network Installation CompletedWSR-88D Network Installation Completed
PCGRIDDS/NAWIPS/GARPPCGRIDDS/NAWIPS/GARP Gridded Model Data into Field OfficesGridded Model Data into Field Offices
NWS Lake Effect Snow StudyNWS Lake Effect Snow Study BUFKITBUFKIT Expansions of Snow Spotter NetworksExpansions of Snow Spotter Networks
Expansion of Collaborative Research Expansion of Collaborative Research Projects (COMET)Projects (COMET) First Real-time local model in NWS ER field office First Real-time local model in NWS ER field office
(MM5 at BUF and BGM)(MM5 at BUF and BGM)
1998-20001998-2000
AWIPS Installations CompletedAWIPS Installations Completed Advanced Workstations w/ Integrated Data SetsAdvanced Workstations w/ Integrated Data Sets
Public Forecast Program TransfersPublic Forecast Program Transfers 1998-99 – BGM/CTP start Winter Warning Program1998-99 – BGM/CTP start Winter Warning Program 1999-00 – AKQ/BTV/CAR/RNK start Winter Warning 1999-00 – AKQ/BTV/CAR/RNK start Winter Warning
ProgramProgram Pros – New ideas/techniques, Smaller Forecast AreasPros – New ideas/techniques, Smaller Forecast Areas Cons – Less experienceCons – Less experience
Active Teletraining Program EstablishedActive Teletraining Program Established Web based training modules Web based training modules
1998-20001998-2000
Regional Workshops/ConferencesRegional Workshops/Conferences Northeast Regional Operational WorkshopNortheast Regional Operational Workshop Southern New England WorkshopSouthern New England Workshop Great Lakes Operational Meteorology WorkshopGreat Lakes Operational Meteorology Workshop Northeast Storm ConferenceNortheast Storm Conference
Continued Expansion of COMET ProjectsContinued Expansion of COMET Projects
CSTAR Collaborative Research Projects CSTAR Collaborative Research Projects FundedFunded North Carolina State Univ. – WFO Raleigh (early North Carolina State Univ. – WFO Raleigh (early
2000)2000) State Univ. of New York at Albany – WFO Albany State Univ. of New York at Albany – WFO Albany
(late 2000)(late 2000)
2001-20042001-2004
Eastern Region Winter Weather Best Eastern Region Winter Weather Best Practices Team Practices Team (2001)(2001)
IFPSIFPS Collaborative Forecast ProcessCollaborative Forecast Process
HPC Winter Weather Experiment (WWE)HPC Winter Weather Experiment (WWE) 2001-02 – 4 WFOs (AKQ/LWX/PHI/CTP)2001-02 – 4 WFOs (AKQ/LWX/PHI/CTP) 2002-03 – All Eastern Region2002-03 – All Eastern Region 2003-04 – ~75% of CONUS2003-04 – ~75% of CONUS 2004-05 – Integrated into routine HPC Operations2004-05 – Integrated into routine HPC Operations
Test new collaborative forecast process among Test new collaborative forecast process among HPC and WFOs for winter storm eventsHPC and WFOs for winter storm events
Evaluate new products from SREFEvaluate new products from SREF
2001-20042001-2004 Implementation of CSTAR Research Implementation of CSTAR Research
ResultsResults U. at Albany ProjectU. at Albany Project
Mesoscale Banding in Winter StormsMesoscale Banding in Winter Storms Precipitation MicrophysicsPrecipitation Microphysics Cold Season Closed LowsCold Season Closed Lows Terrain-Forced Snow StormsTerrain-Forced Snow Storms Impacts of Climate Regimes (ENSO, NAO, etc…)Impacts of Climate Regimes (ENSO, NAO, etc…)
N.C. State ProjectN.C. State Project Cold Air DammingCold Air Damming Coastal FrontsCoastal Fronts Precipitation Type Forecasting MethodologiesPrecipitation Type Forecasting Methodologies
Regional COMET ProjectsRegional COMET Projects BTV/McGill Univ.BTV/McGill Univ. OKX/Stony Brook Univ.OKX/Stony Brook Univ.
2001-20042001-2004
Weather Event Simulator (WES)Weather Event Simulator (WES) – 2001 – 2001 Training Workstation that can simulate real-Training Workstation that can simulate real-
time data flow and forecast processestime data flow and forecast processes
AWIPS Archive ServerAWIPS Archive Server - 2002- 2002 Local Capability to archive full AWIPS data sets Local Capability to archive full AWIPS data sets
for WES playbackfor WES playback
Expansion of local office training Expansion of local office training activities and workshopsactivities and workshops
2001-20042001-2004
Coming together of several Coming together of several activities and developments:activities and developments: Applied Research and Technique Applied Research and Technique
DevelopmentDevelopment TechnologiesTechnologies TrainingTraining Operational Application and ProceduresOperational Application and Procedures
Mesoscale Band Project Mesoscale Band Project TimelineTimeline
RELATIONSHIP BETWEEN RELATIONSHIP BETWEEN EVENT COUNTS AND EVENT COUNTS AND
WARNING PERFORMANCEWARNING PERFORMANCE
IMPACTS OF CLIMATE IMPACTS OF CLIMATE REGIMES?REGIMES?
ACTIVE SEASONS IN ACTIVE SEASONS IN NORTHEASTNORTHEAST
>1200 Events>1200 EventsSeasoSeaso
nn# of # of
EventsEventsPODPOD FARFAR Lead Lead
TimeTime
93-94*93-94* 14161416 .923.923 .230.230 11.811.8
95-9695-96 17131713 .842.842 .246.246 14.614.6
00-0100-01 12201220 .913.913 .296.296 18.018.0
02-0302-03 13831383 .916.916 .277.277 16.216.2
MeanMean .899.899 .262.262 15.215.2
MODERATE SEASONS IN MODERATE SEASONS IN NORTHEASTNORTHEAST
800-1200 Events800-1200 EventsSeasoSeaso
nn# of # of
EventsEventsPODPOD FARFAR Lead Lead
TimeTime
98-9998-99 10501050 .890.890 .314.314 13.613.6
99-0099-00 10161016 .902.902 .201.201 12.712.7
03-0403-04 10691069 .920.920 .321.321 20.320.3
MeanMean .904.904 .279.279 15.515.5
LAMELAME SEASONS IN NORTHEASTSEASONS IN NORTHEAST <800 Events<800 Events
SeasoSeasonn
# of # of EventsEvents
PODPOD FARFAR Lead Lead TimeTime
94-9594-95 561561 .772.772 .467.467 13.613.6
96-9796-97 654654 .855.855 .538.538 11.311.3
97-9897-98 788788 .803.803 .489.489 12.812.8
01-0201-02 470470 .840.840 .402.402 11.711.7
MeanMean .818.818 .474.474 12.312.3
MONTHLY NAO/PNA vs. MONTHLY NAO/PNA vs. EventsEvents
Cumulative Winter (Dec-Jan-Feb-Mar) Monthly Mean NAO shows Cumulative Winter (Dec-Jan-Feb-Mar) Monthly Mean NAO shows some correlation to number of winter storm eventssome correlation to number of winter storm events
Cumulative Winter Monthly Mean PNA shows little or no correlationCumulative Winter Monthly Mean PNA shows little or no correlation
Shorter term (daily/weekly) index values likely more importantShorter term (daily/weekly) index values likely more important
SUMMARYSUMMARY
Winter storm warning performance Winter storm warning performance appears to be improving across the appears to be improving across the NortheastNortheast Greatest improvements in Lead TimeGreatest improvements in Lead Time
Lead Time improvements are not a result of Lead Time improvements are not a result of improved PODimproved POD
No increase in false alarms notedNo increase in false alarms noted
Event totals impact warning performanceEvent totals impact warning performance More events – better performanceMore events – better performance Most impact on False Alarms and Lead TimeMost impact on False Alarms and Lead Time
SUMMARYSUMMARY
Performance improvements appear Performance improvements appear
to be related to an evolving “end-to be related to an evolving “end-
to-end” collaborative process of:to-end” collaborative process of:
Discovery and SharingDiscovery and Sharing
Demonstration of Added Value (Operational Utility)Demonstration of Added Value (Operational Utility)
Operational ImplementationOperational Implementation
Training ActivitiesTraining Activities
Periodic Review and RefinementPeriodic Review and Refinement