www.forbesmarshall.com
![Page 2: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/2.jpg)
www.forbesmarshall.com
Energy Balance in a typical steam and condensate loop
Generation 100%
80%Distribution losses
3-5%
Boiler House Losses 15-18%
Trap & Condensate 20%
Process demand 55%
![Page 3: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/3.jpg)
www.forbesmarshall.com
Condensate Drained and Flash steam
vented @3bar
Losses from traps – 75 Kgs/hr
Moisture drained.. 350 Kgs/hr
Feed Water Tank@ 30 Deg C
Process demand 500Kgs/hr dry steam
Boiler required capacity = 1010Kgs/hr
Typical Steam & Condensate Loop Coil Type
![Page 4: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/4.jpg)
www.forbesmarshall.com
High Fuel Bill !!!Poor Product
Quality !!!
High Water
consumption !!!
Corr
osio
n of
Equi
pmen
t !!!
Wet Steam !!!
Poor Life of the Coil
boilers !!!
High Cycle Times !!!
High Steam Loads !!!
The Issues
![Page 5: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/5.jpg)
www.forbesmarshall.com
FWT@ 90 Deg C
Moisture Drained 2%
Condensate Recovery 20%
Process Steam Demand Reduced to 450 Kg/hr
The Solution : Shell Type Boiler
![Page 6: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/6.jpg)
www.forbesmarshall.com
Coil Type Boiler Shell Type Boiler
The Difference
![Page 7: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/7.jpg)
www.forbesmarshall.com
Advantages
![Page 8: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/8.jpg)
www.forbesmarshall.com
SOUNDS EXCITING !!!
A few more reasons to Change
![Page 9: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/9.jpg)
www.forbesmarshall.com
Parameters Fuel Savings Criteria Consumption
Coil Type Boiler 48.75 lt/hr 28% Eff = 75% dryness fraction = 80%
Coil Type Boiler 49.85 lt/hr 30% Eff = 75% dryness fraction = 65%
Shell Type Boiler 35.49 lt/hr Eff = 89% dryness fraction = 98%
Savings due to
Flash Steam recovery Right Trapping
Dry Steam generation
Temperature & Pressure Control
Low Cost of Ownership
![Page 10: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/10.jpg)
www.forbesmarshall.com
Actual Savings ofActual Savings of
25 - 30%25 - 30%
![Page 11: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/11.jpg)
www.forbesmarshall.com
Industry Coil Boiler Shell Boiler
Pharma Industry in Pune
Heating period for 100 ml (Autoclave) 55 mins 35 mins
Heating period for 500 ml (Autoclave) 66 mins 50 mins
Distilled water o/p from Multicolumn 200 lit 275 lit
Bottling Company
Bottles produced per Minute (BPM) 340 500
Rubber Company
Batch Time 8 Hrs 6 Hrs
Pieces per month 109,000 167,000
Increased Productivity
![Page 12: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/12.jpg)
www.forbesmarshall.com
Coil Boiler Shell Boiler
Steam Quality Wet Dry Saturated
Constant Load Poor Steady
Fluctuating Load Water carry over as Steady due to sufficient
no steam space steam space
Instantaneous Loads Pressure Drop Steady Output
The 2 Q’s ….
![Page 13: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/13.jpg)
www.forbesmarshall.com
Savings in Water
![Page 14: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/14.jpg)
www.forbesmarshall.com
Partial List of industries using Shell Type boilers –
1. Food 13. Personal Products2. Garments 14. Beverages3. Chemicals 15. Packaging Industries4. Cattle feed 16. Plastics5. Dairy6. Educational Institutes7. Rubber8. Hotels9. Hospitals10. Formulations11. Pharmaceuticals12. Glass
More than 200 boilers in operation in the industries which traditionally used coil type boilers
Reference List
![Page 15: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/15.jpg)
www.forbesmarshall.com
![Page 16: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/16.jpg)
www.forbesmarshall.com
The Old System
Feed Water Tank@ 30 Deg C
35% Moisture at 180 Deg C drained
Condensate Drained and
Flash steam vented @3bar
TD traps..!
850kg/hr600 kg/hr
Pressure Drop..
![Page 17: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/17.jpg)
www.forbesmarshall.com
Problems
![Page 18: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/18.jpg)
www.forbesmarshall.com
FWT@ 90 Deg C
Condensate at 95 Deg C
Condensate at 95 Deg Crecovered
Recoverable Flash Steam @ 3 bar
1TPH boiler, dry steam load – 550Kgs/hr
Changed to FT
traps..!
No Pressure Drop..
The Solution !
![Page 19: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/19.jpg)
www.forbesmarshall.com
o Fuel consumption reduced from 5 Tankers per 2 months to 4 tankers per 2 month.
(Saving of 6 tanker of 10000 Kg/Year)
o Reduced load on ETP… Practically the ETP remains idle now.
o For a Drum Heating process – The heating time has reduced from 10 hrs to 4 hours.
o Reactor heating process – 14 hrs to 8 hrs. (Endothermic Reaction)
Results Speak for themselves
![Page 20: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/20.jpg)
www.forbesmarshall.com
More improvements and Benefits
![Page 21: Forbes Marshall Boilers](https://reader033.fdocuments.us/reader033/viewer/2022061402/55d53d74bb61eb34678b4685/html5/thumbnails/21.jpg)
www.forbesmarshall.com