FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING &...

23
FORAYS OVERVIEW FORAYS OVERVIEW 2012 2012

Transcript of FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING &...

Page 1: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

FORAYS OVERVIEWFORAYS OVERVIEW20122012

Page 2: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

INTRODUCTIONINTRODUCTION

FORAYSFORAYS ISIS ANAN ENGINEERINGENGINEERING && CONSTRUCTIONCONSTRUCTION COMPANYCOMPANY FORMEDFORMED BYBYAA GROUPGROUP OFOF PROFFESIONALSPROFFESIONALS HAVINGHAVING RICHRICH EXPERIENCEEXPERIENCE SPANNINGSPANNING MOREMORETHANTHAN THREETHREE DECADESDECADES OFOF ASSOCIATIONASSOCIATION WITHWITH LEADINGLEADING MULTINATIONALMULTINATIONALBACKGROUNDBACKGROUND ANDAND SPECIALIZEDSPECIALIZED ININ THETHE FIELDFIELD OFOF BUISINESS,BUISINESS,INTERNATIONALINTERNATIONAL PROCUREMENTPROCUREMENT SERVICES,SERVICES, EPCEPC PROJECTSPROJECTS ANDANDINSTRUMENTATION,INSTRUMENTATION, ELECTRICALELECTRICAL ANDAND TELECOMMUNICATIONTELECOMMUNICATIONCONSTRUCTIONCONSTRUCTION ININ NATIONALNATIONAL && INTERNATIONALINTERNATIONAL ARENAARENA

PAGE 2

Page 3: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

FORAYS PROFILEFORAYS PROFILEFORAYSFORAYS ISIS FORMEDFORMED ASAS ANAN ENGINEERINGENGINEERING ANDAND CONSTRUCTIONCONSTRUCTIONCOMPANYCOMPANY ININ ORDERORDER TOTO CATERCATER THETHE GROWINGGROWING NEEDSNEEDS OFOF THETHEINSTRUMENTATIONINSTRUMENTATION ,, ELECTRICALELECTRICAL CONSTRUCTIONCONSTRUCTION ANDAND TELECOMTELECOMINDUSTRYINDUSTRY..

GLOBALGLOBAL NETWORKNETWORK SERVICES,SERVICES, SPECIALIZEDSPECIALIZED ININ FIBREFIBRE OPTICOPTIC SPLICING,SPLICING,OFCOFC TESTING,TESTING, SOFTWARESOFTWARE INSTALLATION,INSTALLATION, INTEGRATIONINTEGRATION ANDANDCOMMISSIONINGCOMMISSIONING OFOF UBR,UBR, WIMAX,WIMAX, EDP,EDP, LMDSLMDS && OMEOME SYSTEMS,SYSTEMS, BASEDBASEDATAT HYDERABAD,HYDERABAD, INDIA,INDIA, ISIS ALSOALSO ANAN INTEGRALINTEGRAL PARTPART OFOF FORAYSFORAYS..

PAGE 3

Page 4: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

WORLDWIDE NETWORKWORLDWIDE NETWORK

FORAYS QATAR W.L.LFORAYS QATAR W.L.LDoha, QatarDoha, Qatar

FORAYS SERVICES & CONSTRUCTIONS Pvt. Ltd. FORAYS SERVICES & CONSTRUCTIONS Pvt. Ltd. Hyderabad Hyderabad -- IndiaIndia

HEADQUARTERS

FORAYS SERVICES & CONSTRUCTIONS Pvt. Ltd

MUMBAI-INDIA

SUBSIDIARIES & BRANCH OFFICES

PAGE 4

Page 5: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

FORAYS SERVICES & CONSTRUCTIONS Pvt. Ltd.

FORAYSFORAYS INDIAINDIA WILLWILL FOCUSFOCUS ONON THETHE LARGELARGEINDIANINDIAN SUBCONTINENTSUBCONTINENT MARKETMARKET WHEREWHEREMAJORMAJOR INVESTMENTINVESTMENT ISIS BEINGBEING MADEMADE ININPOWER,POWER, INFRASTRUCTUREINFRASTRUCTURE ANDAND OILOIL && GASGASSECTORSSECTORS ..

TOTO DEVELOP,DEVELOP, TRAINTRAIN ANDAND RETAINRETAIN THETHE VASTVASTPOOLPOOL OFOF PROFESSIONALPROFESSIONAL HUMANHUMAN RESOURCESRESOURCESAVAILABLEAVAILABLE ININ THETHE LOCALLOCAL MARKETMARKET..

TOTO AUGMENTAUGMENT SKILLEDSKILLED MANPOWERMANPOWER TOTO THETHERESPECTIVERESPECTIVE PROJECTSPROJECTS ACROSSACROSS THETHEGLOBEGLOBE..

PAGE 5

Page 6: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

FORAYS QATAR W.L.LFORAYS QATAR W.L.L

FORAYSFORAYS QATARQATAR WILLWILL BEBE THETHE NERVENERVECENTRECENTRE OFOF MIDDLEMIDDLE EASTEAST OPERATIONSOPERATIONS..

FORAYSFORAYS QATARQATAR WILLWILL NOTNOT ONLYONLY CATERCATERTHETHE NEEDSNEEDS OFOF MIDDLEMIDDLE EASTEAST MARKETMARKETBUTBUT ALSOALSO ACTACT ASAS AA BASEBASE CENTRECENTRE FORFORTRAININGTRAINING && TALENTTALENT DEVELOPMENTDEVELOPMENT ININORDERORDER TOTO SUPPLEMENTSUPPLEMENT OTHEROTHER REGIONSREGIONS..

PAGE 6

Page 7: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

MISSIONMISSION

TOTO DEVELOPDEVELOP FORAYSFORAYS ASAS AA WORLDWORLD SCALESCALE INSTRUMENTATION,INSTRUMENTATION,ELECTRICALELECTRICAL && TELECOMTELECOM ENGINEERINGENGINEERING CONSTRUCTIONCONSTRUCTIONCOMPANYCOMPANY MEETINGMEETING HIGHESTHIGHEST INTERNATIONALINTERNATIONAL INDUSTRYINDUSTRYSTANDARDSTANDARD COMMITTEDCOMMITTED ITSELFITSELF TOTO SUPPLYSUPPLY INSTRUMENTSINSTRUMENTS ,,EQUIPMENT,EQUIPMENT, ERECTIONERECTION MATERIALS,MATERIALS, INSTALLATION,INSTALLATION, TESTINGTESTING //CALIBRATIONCALIBRATION && COMMISSIONINGCOMMISSIONING OFOF PROJECTSPROJECTS INCLUDINGINCLUDINGMAINTENANCE,MAINTENANCE, MODERNISATIONMODERNISATION // REVAMPINGREVAMPING OFOF PLANTSPLANTS ININTHETHE FIELDFIELD OFOF OILOIL && GAS,GAS, PETROCHEMICALS,PETROCHEMICALS, FERTILIZERS,FERTILIZERS,CHEMICALS,CHEMICALS, POWER,POWER, ETCETC.. MEETINGMEETING ALLALL TECHNOTECHNO--ECONOMICECONOMICREQUIREMENTSREQUIREMENTS DEFINEDDEFINED WITHWITH CLIENTS,CLIENTS, ININ COMPLIANCECOMPLIANCEWITHWITH THETHE CODESCODES ANDAND REGULATIONSREGULATIONS ININ FORCEFORCE ININ THETHECOUNTRIESCOUNTRIES FORFOR WHICHWHICH PRODUCTSPRODUCTS OROR SERVICESSERVICES AREAREMEANTMEANT..

PAGE 7

Page 8: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

VISION

TO DEVELOP A CONDUCIVE WORKINGENVIRONMENT.

TO DEVELOP A SLEW OF MEASURES FORIMPROVEMENT OF OPERATIONAL EFFICIENCY.

PAGE 8

Page 9: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

VISION TO RENEW, REJUVENATE AND ADD HUMAN

RESOURCE MANAGEMENT & DEVELOPMENTSYSTEM SO AS TO ENSURE A VIBRANT MOTIVATEDWORKFORCE ON A LONG TERM BASIS IN ORDERTO PROVIDE CONTINUOUS QUALITY SERVICE TOTHE ESTEEMED CLIENTS.

TO OPERATE AND RUN THE ORGANISATIONULTIMATELY WITH THE STRENGTH OF ITS OWNPROCEDURES & SYSTEMS.

PAGE 9

Page 10: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

FIELD OF BUSINESSFIELD OF BUSINESS

OIL & GASOIL & GAS PETROCHEMICALSPETROCHEMICALS REFINERIESREFINERIES CEMENT AND STEELCEMENT AND STEEL TELECOMMUNICATIONTELECOMMUNICATION FERTILIZERS / CHEMICALSFERTILIZERS / CHEMICALS POWER / POWER / NUCLEAR POWER / NUCLEAR POWER / SOLAR POWER AND SOLAR POWER AND

DESALINATIONDESALINATION PHARMACEUTICALS AND FOOD PROCESSINGPHARMACEUTICALS AND FOOD PROCESSING LIQUIFIED NATURAL GAS (LNG)LIQUIFIED NATURAL GAS (LNG)

PAGE 10

Page 11: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

FIELD ENGINEERINGFIELD ENGINEERING PROCUREMENTPROCUREMENT INSPECTIONINSPECTION INSTALLATIONINSTALLATION TESTING / CALIBRATIONTESTING / CALIBRATION COMMISSIONING ASSISTANCECOMMISSIONING ASSISTANCE REVAMPING / RETROFITTINGREVAMPING / RETROFITTING SHUT DOWN / MAINTENANCESHUT DOWN / MAINTENANCE

PAGE 11

FIELD OF SERVICESFIELD OF SERVICES

Page 12: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

PAGE 12ORGANIZATION CHART

CHAIRMAN & MANAGING DIRECTOR[CMD]

Mr. Mathew M Mankanthanam

EXECUTIVE DIRECTOR[EXDR]

Mr. Suresh P Thomas

FINANCE,ACCOUNTING & CONTROL[FACO]

Mr. Nilesh Bajaj

HUMAN RESOURCE MGT.[HRMA]

Mr.M.Balachandran

COMPANY SECRETARY[COSE]

Mr.V.G.Venkataraman

BUSINESS DEVEOPMENT & PROPOSAL[BUDPRO]

A.I. Mr. Mathew M Mankanthanam

QUALITY & HSE MGT.[QHSE]

Mr. Shilin VenugopalGENERAL MANAGER-Projects[PROJCONST]Mr. N.R.Niburaj

CONSTRUCTION MANAGER[CONST]

QA/QCEngineer

Planning Engineer

Field Engineer

Testing Engineer

SafetyEngineer

Site Admin& Accounts

PROCUREMENTMr. Jackson Kuriakose

Page 13: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

MANPOWERMANPOWER

CAPABILITY TO EXECUTE PROJECTS CAPABILITY TO EXECUTE PROJECTS UP TO 1.5 MILLION MHRS / YEAR.UP TO 1.5 MILLION MHRS / YEAR.

PAGE 13

Page 14: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

ManpowerManpower

Construction Managers & Engineers 26Construction Managers & Engineers 26

Supervisors & Technicians 60Supervisors & Technicians 60

AdmnAdmn., Accounts & Logistics 16., Accounts & Logistics 16

Direct Direct LabourLabour 400400

Direct Direct LabourLabour through through SubSub--contractors 300contractors 300__________________________________________________________________

Total Direct & Indirect Manpower 802Total Direct & Indirect Manpower 802Direct labour through sub-contractors 300

Direct labour 400

Const. Mgrs. & Engrs.26

Supervisors & technicians 60 Admn.. &

Logistics 16

PAGE 14

Page 15: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

S.No Project Name Scope of work Client W.O. No. Year

Work order Value in

Million INR

1 2 x 35 MW CPP & Rolling Mill, TUML Plant, Nagpur

Installation of Instrumentation Works

Topworth Urja & Metals Limited.

TUML/FSCOL/WO/IE/2012-13/152 2012 7.08

2AVU & STR LPG units for IOCL Paradeep Refinery, Orissa.

Installation of Instrumentation Works

ESSAR Projects (India) Limited.

EPIL/HO/LOI/IOCL/2012/018 2012 31.50

3 1.8MTPA Syn gas based DRI, Angul, Orissa

Supply & Installation of Electrical & Instrumentation Works

Jindal Steel & Power Ltd

JSPL/LOI/2011-12/143 2012 44.60

4 Sulphur Recovery Unit-H2 Plant of Adani Wilmar, Mundra, Kutch.

Supply & Installation of Electrical & Instrumentation Works

Linde Engineering India Pvt. Ltd.

002 0MA4670 Sup.000 / 4680 2012 2.65

5 Amonia, Uria & OSBL UNIT OF MATIX FERTILIZER, Durgapur,W.B

Installation of Instrumentation Works

ESSAR Projects (India) Limited.

EPIL/DRG/MTX/LOI/137 2012 43.08

6 2X5000MT AMMONIA STORAGE SYSTEM, W.B

Supply & Installation of Electrical & Instrumentation Works

UNDHE INDIA PRIVATE LIMITED

UIPL/MATIX/0156/P/U002, U003 2011 6.18

7

Sulphur Recovery Unit-HPCL Refinery, Mahul, Mumbai.

Supply & Installation of Electrical & Instrumentation Works

Linde Engineering India Pvt. Ltd.

&AG-W-SY-1006.017, &AG-W-SY-1006.016

2011 28.08

8Johnson Matthey Chemical-123, Kanpur- U.P

Supply & Installation of Electrical & Instrumentation Works

Johnson Matthey Chemical India PvtLtd. 4500083580 / 81 2011 22.46

9 40 MW Thin Film Solar Power Plant, Kutch, Gujarat

Supply & Installation of Electrical Works

ADANI INFRA (INDIA) LIMITED.

4500057108 / 5700042501 2011 45.9

10Essar Oil Refinery Expansion, Jamnagar.

Instrumentation works for ETP & Desalination Unit.Train-1

ESSAR Projects (India) Limited.

1500002706 / 1500002754 2011 28.07

11CFU, PP, Coker & Alkylation- Reliance Refinery, Jamnagar.

Instrumentation AMC & Field Inst. Modification

Reliance Petroleum Ltd 99677 2011 13.9

12 BUTENE-1- Reliance Industries, Hazira, Surat.

Installation of Instrumentation Works

Reliance Industries Ltd, Hazira. HSP/31024099 2010 8.58

PAGE 15MAJOR PROJECT(1-12)

Page 16: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

S.No. Project Name Scope of work Client W.O. No. YearWork Order Value

in Millions INR

13 REPLICA PLANT, Kanpur – U.P.

Supply & Installation of Electrical &

Instrumentation Works

Johnson Matthey Chemical India PvtLtd. 4500073503 / 16 2010 13.07

14CFU, PP, Coker & Alkylation-Reliance Refinery, Jamnagar

Instrumentation AMC & Field Inst. Modification Reliance Petroleum Ltd JS4 / 574192 2010 12.90

15 KCIL-FORMALDHYDE UNIT

Supply & Installation of Electrical &

Instrumentation Works

Kanoria Chemical India Ltd. ( Consultant-Uhde

India Pvt. Ltd.)KCIL:DLH:2010:109 2010 14.50

16 POLY ISCOYNATE UNIT

Supply & Installation of Electrical &

Instrumentation Works

Aker Powergas Pvt. Ltd(End-user-BUYER) 2096/2041/TP023 2010 13.7

17 30 MW Power Plant Supply and Erection of Instrumentation Works

Shree Virangana Steels Ltd

SVSL/NGP/WP-CPP/INST-CONT/09-

10/512009 3.42

18 30 MW Power Plant Electrical Erection Works

Shree Virangana Steels Ltd

SVSL/NGP/WO-CPP/ELE CONT/09-

10/562009 0.17

19HPU System in Coker-Reliance Refinery, Jamnagar

Instrumentation Erection Works Reliance Industries Ltd ES4/53525950 2009 0.12

20 Sulphur Unit 672 & 431-RIL Refinery, Jamnagar

Instrumentation Erection Works Reliance Industries Ltd 1JJG/ES4/3681859 2009 4.20

21LNUU 471 Compressor-Reliance Refinery, Jamnagar

Instrumentation Erection Works Reliance Industries Ltd 1JJG/ES4/3688124 2009 0.76

22DHDS 2-Reliance Refinery, Jamnagar

Instrumentation Erection Works Reliance Petroleum Ltd 2JRH/ES4/5352134

6 2009 5.22

23 FCC-RIL Refinery, Jamnagar Steam Tracing Reliance Petroleum Ltd 2J/ES4/53521528 2009 1.70

MAJOR PROJECT(13-23)PAGE-16

Page 17: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

24

CFU, PP, Coker & Alkalation-RIL Refinery, Jamnagar

Instrumentation AMC & Field Inst. Modification Reliance Petroleum Ltd ES4/573801 2009 12.20

25Crude 2-Reliance Refinery, Jamnagar Steam Tracing Reliance Petroleum Ltd 2JRD/ES4/535236

56 2009 0.69

26Wire Line Project Hyderabad City Splicing

Reliance Infocom Engineering Pvt.Ltd A.P. RA8/15618108 2007 7.79

27Wire Line Project Hyderabad City Splicing

Reliance InfocomEngineering RA8/15649525 2007 0.97

28 FA Hyderabad City SplicingReliance Infocom Engineering RA8/15664307 2008 0.84

29 WIN Project Kurnool District SplicingReliance InfocomEngineering RA8/15672257 2008 0.10

30Civil Work & WIN Project in Hyderabad City Civil Work & Splicing

Reliance InfocomEngineering RA8/15725884 2008 0.11

31Civil Work in Hyderabad City Civil Work & Splicing

Reliance Infocom Engineering RA8/15725920

20080.60

32WIN Project Kammam & Meheboob Nagar District Splicing

Reliance InfocomEngineering RA8/15727446

2008 2.23

33WIN Project Ananthapur District Splicing

Reliance InfocomEngineering RA8/15758448

2008 3.41

34WIN Project Shamsabad In Hyderabad Splicing

Reliance Infocom Engineering RA8/15758478

2008 0.27

35WIN Project Shamsabad In Hyderabad Splicing

Reliance Infocom Engineering RA8/15758478

20080.27

S.N Project Name Scope of work Client W.O. No. Year Work Order value in Million INR

PAGE 17MAJOR PROJECT(24-35)

Page 18: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

S.No. Project Name Scope of work Client W.O. No. Year Work Order Value

in Million INR

36WIN Project East Godavari District Splicing

Reliance InfocomEngineering RA8/15786275 2008 0.31

37WIN Project AnanthapurDistrict Splicing

Reliance InfocomEngineering RA8/15786302 2008

0.45

38WIN Project AnanthapurDistrict Splicing

Reliance InfocomEngineering RA8/15789751 2008

0.43

39WIN Project in Warangal District Splicing

Reliance InfocomEngineering RA8/15789820 2008 0.45

40 FA Hyderabad City SplicingReliance InfocomEngineering RA8/15829253 2009 0.45

41WIN Project AnanthapurDistrict Splicing

Reliance InfocomEngineering RA8/15855721 2009 0.07

42WIN Project in Warangal District Splicing

Reliance InfocomEngineering RA8/15859570 2009 0.09

43IT Varam -Kainikavaram(Location) Splicing

Reliance InfocomEngineering RA8/15859572 2009 0.17

44WIN Project in Warangal District Splicing

Reliance InfocomEngineering RA/815859574 2009 0.18

45WIN Project in OngoleDistrict Splicing

Reliance Infocom Engineering RA8/15859575 2009 0.19

46WIN Project AnanthapurDistrict Splicing

Reliance InfocomEngineering RA8/15859577 2009 0.21

PAGE 18

MAJOR PROJECT(36-46)

Page 19: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

47Erraguntapalem -Kalugotla (Location) Splicing

Reliance InfocomEngineering RA8/15859578 2009 0.02

48 WIN Project Vijayawada SplicingReliance Infocom Engineering RA8/15859580 2009 0.23

49 Madaksira -Narpanahally(Location) Splicing

Reliance Infocom Engineering RA8/15859584 2009 0.08

50 WIN Project Vijayawada SplicingReliance InfocomEngineering RA8/15859585 2009 0.28

51WIN Project CuddapahDistrict Splicing

Reliance InfocomEngineering RA8/15859588 2009 0.19

52WIN Project CuddapahDistrict Splicing Reliance Infocom

Engineering RA8/15859592 2009 0.16

53Wire Line Activities Hyderabad City Splicing

Reliance InfocomEngineering RA8/15864038 2009 0.11

54Wire Line Activities Thirupathi Splicing

Reliance InfocomEngineering RA8/15864097 2009 0.09

55Wire Line Project Orissa State Splicing

Reliance InfocomEngineering Pvt. Ltd (Orissa) RO3/15828246 2009 1.54

56Wire Line Project Orissa State Splicing

Reliance InfocomEngineering Pvt. Ltd (Orissa RO3/15858685 2009 0.58

PAGE 19

S.No. Project Name Scope of work Client W.O. No. Year Work Order Value in

Million INR

MAJOR PROJECT(47-56)

Page 20: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

QUALITY ASSURANCEQUALITY ASSURANCE THETHE KEYKEY GOALGOAL OFOF FORAYSFORAYS’’SS QUALITYQUALITY POLICYPOLICY ISIS CLIENTCLIENT’’SS

SATISFACTIONSATISFACTION..

THETHE COMPANYCOMPANY’’SS QUALITYQUALITY ASSURANCEASSURANCE SYSTEMSYSTEM ISIS DEDICATEDDEDICATEDTOTO SATISFYINGSATISFYING EVERYEVERY CLIENTCLIENT ’’ SS TECHNICALTECHNICAL ANDANDECONOMICALECONOMICAL REQUIREMENTSREQUIREMENTS..

THISTHIS COVERSCOVERS ALLALL PHASESPHASES OFOF PROJECTPROJECT MANAGEMENTMANAGEMENT &&CONFORMSCONFORMS TOTO ISOISO..

THETHE EFFECTIVENESSEFFECTIVENESS OFOF QAQA SYSTEMSYSTEM ISIS CONSTANTLYCONSTANTLYMONITOREDMONITORED BYBY TOPTOP MANAGEMENTMANAGEMENT THROUGHTHROUGH THETHE QUALITYQUALITYCOMMITTEE,COMMITTEE, THETHE QAQA MANUALMANUAL && PROCEDURESPROCEDURES ESTABLISHEDESTABLISHEDBYBY QAQA // QCQC MANAGERMANAGER..

WEWE ATAT FORAYSFORAYS AREARE COMMITEDCOMMITED TOTO TOTALTOTAL QUALITYQUALITYMANGEMENTMANGEMENT && CONTINUOUSCONTINUOUS QUALITYQUALITY IMPROVEMENTIMPROVEMENT..

PAGE 20

Page 21: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

QUALITY CONTROLQUALITY CONTROL

FORAYS SHALL HAVE A DEDICATED AND WELL EXPERIENCED TEAM OF QUALITY CONTROL PERSONNEL.

FORAYS SHALL PROVIDE THE CHECKS, TESTING DOCUMENTS,CONTROL AND MEASURES AGAINST ESTABLISHED REQUIREMENTS.

THE QUALITY WORKMANSHIP IS BASED ON SPECIFICATION OF THE CONTRACT AND OTHER CONTRACT DOCUMENTS.

LOCAL REGULATION & CODES OF STANDARDS REFERRED TO, IN THE CONTRACT DOCUMENTS.

QUALITY CONTROL PROCEDURES AND TEST PLAN (DULY APPROVED BY CLIENTS).

PAGE 21

Page 22: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

SAFETYSAFETY

SAFETYSAFETY ISIS ONEONE OFOF THETHE MOSTMOST IMPORTANTIMPORTANT SUBJECTSSUBJECTSWHEREWHERE TOPTOP MOSTMOST ATTENTIONATTENTION ISIS GIVENGIVEN DURINGDURING ENTIREENTIREEXECUTIONEXECUTION OFOF PROJECTPROJECT..

FORAYSFORAYS ’’ SS SAFETYSAFETY DEPARTMENT,DEPARTMENT, SHALLSHALL IDENTIFY,IDENTIFY,THROUGHTHROUGH ““ZEROZERO ACCIDENTACCIDENT POLICYPOLICY””..

HOWHOW TOTO PREVENTPREVENT ACCIDENTS?ACCIDENTS?

--ELEMINATEELEMINATE UNSAFEUNSAFE ACTACT..--ELEMINATEELEMINATE UNSAFEUNSAFE CONDITIONCONDITION..--DISCOVERDISCOVER THETHE CAUSESCAUSES..

SAFETYSAFETY ACHIEVEDACHIEVED BYBY ADHERINGADHERING TOTO STRICTSTRICT SAFETYSAFETYMANAGEMENTMANAGEMENT ANDAND PROCEDURESPROCEDURES..

PAGE 22

Page 23: FORAYS OVERVIEWforays.co.in/corporateoverview.pdfFORAYS OVERVIEW 2012. ... FINANCE,ACCOUNTING & CONTROL [FACO] Mr. Nilesh Bajaj ... Project Name Scope of work Client W.O. No. Year

Forays Services & Constructions Pvt. Ltd.Forays Services & Constructions Pvt. Ltd.Registered Office:Registered Office:

1301, 13th Floor, The Ambience Court, Plot No1301, 13th Floor, The Ambience Court, Plot No--2,2,SectorSector--19 D,19 D, Vashi, Navi MumbaiVashi, Navi Mumbai-- 400 705.400 705.

Tel: +91Tel: +91-- 022022-- 2783 2809 / 2820 / 2821 /28152783 2809 / 2820 / 2821 /2815(M) + 91(M) + 91--98339886869833988686

Fax: +91Fax: +91-- 2222--2783 2815, E2783 2815, E--mail: mail: [email protected]@forays.co.inWebsite: Website: www.forays.co.inwww.forays.co.in

Contact: Mr. Mathew M. Contact: Mr. Mathew M. MankanthanamMankanthanam

PAGE 23

Branch Office:

1st Floor, 3-5-996, Street No. 5,Narayanaguda, Opp. Honda Showroom,

Hyderabad-500029, A.P., IndiaTel: +91-40-23223134, 30221632

(M): +91-9393191339Fax: +91-40-32432259

E-mail: [email protected]: Mr. Tibin Thomas

Subsidiary:

Forays Qatar W.L.L.,P.O.Box No. 13738, Doha, Qatar

Tel: +9741-4604801(M): +974-5558576Fax: +9741-4604802

E-Mail: [email protected]: Mr. Abraham Mathew