for Service Respect Responsibilitywaf-e.dubudisk.com/bsreng.dubuplus.com/[email protected]... ·...
Transcript of for Service Respect Responsibilitywaf-e.dubudisk.com/bsreng.dubuplus.com/[email protected]... ·...
Service
Respect
Responsibility
for
CONTENTS
About Us
Business Area
Company Organization
Licenses & Certificates
Company History
References
Employees Experience
Main Customers
Overseas Agency
1
2
3
4
5
6
7
8
9
About Us
Introduction
Since beginning operations in 2005, BSR Co., Ltd. has pavedits way as a front runner in a petrochemical, environmentand energy sector.We have many experiences in the design and construction ofpetrochemical plants, hydro power plants and watertreatment systems.With individuals of experience and knowledge working in ourcompany, we are striving to grow to be a global energy andenvironment company.
Established : July, 2005Employees : 30Capital : $200,000(200million WON)
BSR Co., Ltd.
Business Area
Plant Engineering
Sales Goods
Over seas Agents
Hydropower Plant
Petrochemical Plant
Environment Plant
Industry Plant
Biomass Pallet
API Process Pumps
KGAL
KYOWA
Company Organization
Sales
BiomassPallet
API Pump
HydroPowerPlant
HydroPower
TidalPower
HydroMechan
icalworks
PlantPipingDesign
2D3D(PDS)
StressAnalysis
WaterTreatment
plant
Water
WasteWater
Sewage
OverseasConsulting
KGAL
KYOWA
Admin.
Management
Account
AdministrationGoodsEngineering
R&D Center
C E O
Licenses & Certificates
License Designated Office Number ofLicenses
Date ofAcquisition
Certification of Venture
Enterprises
Korea Technology Finance Corporation
No.20110101125 Mar.2011
Certification of Korea Engineering
Korea Engineering & Consulting Association
No.01-000323 Apr.2011
Certificate of Inno-BizSmall and Medium
Business Administration Korea
No.110102-00389 Mar.2011
R&D CenterKorea Industrial
Technology Association2012110057 Jan.2012
ISO 9001 SBC April.2012
Renewable Energy Company
KNREC May.2013
Company History
2013. 01 Agency Agreement with CW Pump Korea (API Pump)
2012. 02 Dubai Branch Office Established
2012. 01 R & D Center Established
2011. 12 Merge BSR Env. Co. (Soil Reclamation Biz.)
2011. 04 Registered as an Engineering Company
2011. 03 Registered as a Venture Company
2011. 03 Inno-biz Certification Acquired
2009. 02 Agency Agreement with KYOWAJapan[Special Floodgates and Steel Equipments]
2008. 09 Agency Agreement with KGAL England[Special Floodgates, Hydropower, and Bridges]
2005. 07 BSR Co., Ltd. Established
Hydropower Plant
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
Gilboa Pumped storage Power Plant
2014
Kyungdong E&C
Electra Ortam / Israel
Detail Design for steel lining (150MWⅹ2Units)
Hasang Hydraulic Power Plant
2015
POSCO Engineering
Indonesia
Detail design for 14.15MW x 3Units,Hydraulic Power Plant
Youngheung 1,2 Hydraulic Power Plant
2011
Whacheon Plant
Korea South East Power
Detail Design for 2.6MW x 2UnitsHydraulic Power Plant
References
Hydropower Plant
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
Wampu Hydralic Power Plant
2014
POSCO Engineering
Indonesia
Detail desing for 15MW x 3Units Hydraulic Power Plant
Gulpur Hydraulic Power Plant
2014
Daelim E&C
Pakistan
Basic design for 34MW x 3Units Hydraulic Power Plant
Paldang Hydraulic Power Plant
2010
Hyundai Engineering
Korea Hydro & Nuclear Power
Feasibility Study for 24MW x 2Units Hydraulic Power Plant
References
Hydropower Plant
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
Garolim Tidal Power Plant
2010
Hyundai Engineering
Korea West Power
Detail Engineering for 26MW x 20Units Tidal Power Plant
Gangwha Tidal Power Plant
2010
Hyundai Engineering
Korea Hydro & Nuclear Power
Feasibility Study for 30MW x 28UnitsTidal Power Plant
Incheon Tidal Power Plant
2010
Hyundai Engineering
Korea Hydro & Nuclear Power
Feasibility Study for 30MW x 48UnitsTidal Power Plant
References
Hydropower Plant
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
Uiam Hydraulic Power Plant
2009
Hyundai Engineering
Korea Hydro & Nuclear Power
Detail Engineering for 24MW x 2Units Hydraulic Power Plant
ChungPyeong Hydraulic Power Plant
2009
Hyundai Engineering
Korea Hydro & Nuclear Power
Detail Engineering for 60MW x 1Unit Hydraulic Power Plant
Congo Hydro Power Plant
2008
Shin Woo Engineering
Congo SNEL
Feasibility Study for 11MW x 9Units Hydro Power Plant
References
Petrochemical Plant
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
Biodiesel Plant Revamping
2011
E-Mac Bio
E-Mac Bio
Engineering for Civil, Structure, piping and Mechanical
Poly Silicon Cleaning Package
2011
OCI
OCI
Engineering for Civil, Structure, piping Mechanical and Electrical
Malaysia Biodiesel Plant
2007
Global Bio-Diesel
Global Bio-Diesel
Engineering for 200,000 m3/year
References
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
KCC P2 Project
2009
KCC
KCC
Piping Design for 6,000 m3/year
HDO #2 HOU Project
2009
Hyundai Engineering
HOU
Piping Design
KCC P1 Project
2008
KCC
KCC
Piping Design
Petrochemical Plant
References
Environment & Industry Plant
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
Bahrain United Steel Mill Project
2012
Samsung Engineering
Bahrain SULB
Piping Design
Kwangyang Steel NO.4 Yonju
2012
Posco Engineering
POSCO Kwang Yang Steel
Piping Design
Daejeon Sewage Treatment
2011
Samsung Engineering
Daejeon City
Basic Design for 700,000 ton/daySewage Treatment System
References
Environment & Industry Plant
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
Hyundai Steel Revamping
2011
Hyosung Engineering
Hyundai Steel
Piping Design
Chung-Shim Sewage Treatment
2011
Hyundai Engineering
Chung-Shim Association
Detail Design for 5,000 Ton/daySewage Treatment
Water Supply & Sewage Project
2011
Hyundai Engineering
Anisok City Equatorial Guinea
Detail Engineering for 17,000/12,000 Ton/day Water Supply & Sewage Treatment
References
Environment & Industry Plant
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
Hynix Waste Water Treatment
2011
Green Tech Industry
Hynix Co., Ltd.
Detail Design for 4,000 Ton/day Waste Water Treatment
Sanghyun Sewage Treatment
2011
EPS Solution
Kwang-Kyo City
Detail Engineering for 13,000 Ton/day Sewage Treatment
Songdo Sewage Treatment
2010
GS Construction
Incheon Free Economic Zone
Detail Design for 42,500 Ton/day Sewage Treatment
References
Environment & Industry Plant
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
EBAS Water Supply & Sewage Project
2009
Hyundai Engineering
Ebibeyin City
Equatorial GuineaDetail Engineering for 3,000/5,000 Ton/dayWater Supply & Sewage Treatment
Siwha MTV Sewage Treatment
2009
Hyundai Engineering
K-Water
Detail Design for 12,500 Ton/day Sewage Treatment
Chung-La Water Circulation System
2009
ISAN Engineering
Incheon Development & Tourism Corporation
Detail Design for Water Circulation System
References
Environment & Industry Plant
• Project
• Year
• Contractor
• End User
• Main Work
• Project
• Year
• Contractor
• End User
• Main Work
Youngdong YT-Sun Solar Power Plant
2011
Taeguk Green Tech
Youngdong YT-Sun
Detail Design for 3,000kW Solar Power Plant
Duzone 2 Solar Power Plant
2011
Duzone Solar
Duzone Solar
Detail Design for 2,000kW Solar Power Plant
References
References for Oversea project
Bismayah New-city project in IRAQ Reconstruction Plan
Main Project features :
Design of water treatment plant in Bismayah New-city project Water treatment plant
(Q=225,000 m3/year).
Treatment process: Rapid sand filtration process , Flash moxer, Flocculation &
Sedimentation, Disinfection and Sludge Treatment
Project period : 2012-2013
Client : NIC(National Investment Committe)
Location : IRAQ
Construction of STP Ilugin
Main Project features :
• Water treatment plant (Q=5,000m³/day).
• Treatment process: Influent Pump Station , Screen & Grit Removal, Aeration Tank(SBR),
Disinfection and Sludge Treatment, OCU Facility
Project period : 2012
Client : Manila Water Company
Location : Philippines
Basic Design for WWTP Central Irbid & Wadi Arab WWTP upgrades and hydropower station
Main Project features :
• Water treatment plant (Q=20,000m³/day)
• Wadi Arab WWTP : Aeration System, Sand Filter & UV Disinfection
• Central Irbid WWTP : Biological Treatment, Physical Final Treatment, Sludge Treatment,hydropower station
Project period : 2012
Client : HASHEMITE KINGDOM OF JORDAN
Location : Jordan
References for Oversea project
Basic and detailed design for Nsoc Nsomo WTP & STP
Main Project features :
• Water treatment plant (WTP : Q=1200m³/day , STP : Q=800m³/day).
• WTP : Intake pump station, Flocculation and Sedimentation, Rapid Sand AC Filter,booster pumping station.
• STP : Small Pump Station, Pretreatment & Equalization, SBR Reaction, SludgeDewatering
Project period : 2012
Client : GOBIERNO DE GUINEA ECUATORIAL Hyundai Engineering
Location : Equatorial Guinea
Basic Design for jeddah, Airport 2 Sewage Treatment Plant in Saudi Arabia
Main Project features :
• Water treatment plant (Q=500,000m³/day).
• Sewage Collection System : Primary clarification, Biological treatment, Tertiary treatment,
UV disinfection
• Process of Sludge Treatment : Sludge Gravity Thickening, Anaerobic digestion,
Dewatering
Project period : 2011
Client : NATIONAL WATER COMPANY KINGDOM OF SAUDI ARABIA
Location : Saudi Arabia
Basic Design for Saudi Sharq WWTP.
Main Project features :
• Water treatment plant (Q=8,000m³/day)
• Process of Waste Water Treatment : DAT, membrane bio reactor,reverse osmosis, R/O system
Project period : 2011
Client : Mitsubishi Rayon Corporation Hyundai Engineering
Location : Saudi Arabia
References for Oversea project
Feasibility study for the development of water resource and construction of water supply
system in Lemba Imbu
Main Project features :
• Development of water resources : Capacity : 220,000 m³/day
• Water treatment plant (Q=200,000m³/day).
• Treatment process: Conventional treatment, Sludge treatment facilityTransmission mains D600~1200mm, L=20.28km, Reservoirs 5units, Distribution mainD80~600mm, L=100.06km
Project period : 2010-2011
Client : REGIDESO, DR Congo
Location : Kinshasa City, DR. Congo
Basic Design for Egypt-6th Oct WWTP
Main Project features :
• Water treatment plant (Q=250,000m³/day).
• Treatment process: Standard activated sludge method, secondary clarifier, filtering anddisinfection. Sludge treatment facility
Project period : 2011
Client : mitsubish Rayon Corporation Hyundai Engineering
Location : Egypt
References for Oversea project
Basic and detailed design for Anisok WTP & STP
Main Project features :
• Water treatment plant (WTP : Q=1700m³/day, STP : Q=1,200m³/day)
• WTP : Intaket pump station, Flocculation and Sedimentation, Rapid Sand AC Filter,booster pumping station
• STP : Small Pump Station, Pretreatment & Equalization, SBR Reaction, SludgeDewatering
Project period : 2010
Client : GOBIERNO DE GUINEA ECUATORIA Hyundai Engineering
Location : Equatorial Guinea
Basic and detailed design for EBAS WTP & STP
Main Project features :
• Water treatment plant (WTP : Q=3,000m³/day, STP : Q=5,000m³/day)
• WTP : Intaket pump station, Flocculation and Sedimentation, Rapid Sand AC Filter ,booster pumping station
• STP : Small Pump Station, Pretreatment & Equalization, SBR Reaction, SludgeDewatering
Project period : 2009
Client : GOBIERNO DE GUINEA ECUATORIA Hyundai Engineering
Location : Equatorial Guinea Ebibeyin City
Research & Development
While the importance of water resources increases by social changes including
population increase and industry development, the necessity of effective utilization
and management of water resources becomes highlighted as solutions to resolve
flood and drought owing to meteorological disasters from global warming. With
this background in mind BSR is studying hydropower facility development and
renewable energy systems Perform many studies to be.
49
Employees Experience
Mechanical Engineer
Name Major Experience Certification
Lee, Y. B. M.E. 28years Registered M.E.
Jeon, K. S. M.E. 23years Registered ASTM Ph. I/II
Ho, M. K. M.E. 40years Registered M.E.
Lee, Y. G. M.E. 18years -
Seo, Y. H. M.E. 10years -
Kim, B. Y. M.E. 10years -
Ryu, K. S. M.E. 10years Registered WPE.
Min, J. H. M.E. 9years -
Lee, S. J. M.E. 7years -
Kim, E. J. M.E. 6years Registered M.E.
Lee, H. S. M.E. 6years Registered M.E.
Lee, D. W. M.E. 4years -
Park, D. H. M.E. 2years -
Electrical & Instrument Engineer
Name Major Experience Certification
Kwon, K. S. E.E. 26 years Registered E.E.
Son, L. G. E.E. 32 years -
Han, J. G E.E. 34 years -
Cheon, G. G E.E. 34 years Registered E.E.
Seok, S. Y E.E. 20 years -
Hong, S. H. E.E. 18 years -
Yang, S. O. E.E. 12 years -
Ha, H. O. E.E. 14 years -
Kim, Y. G. E.E. 10 years Registered E.E.
Lee, S. W. E.E. 8 years Registered E.E.
Gwon, K. W. E.E. 6 years Registered Tech
Shin, M. H. E.E. 3 years -
Civil Engineer
Name Major Experience Certification
Jeon, S. J. C.E. 39 years Registered C.E.
Kim, I. C. C.E. 10 years Registered C.E.
Employees Experience
Main Customers
Overseas Agency
Overseas Agency
Overseas Agency
CW-Hydro
Thank you
for attention
#201~#204, 179, Siheung-daero, Guemcheon-Gu, Seoul, KoreaTel. +82-2-792-6077~8 Fax. +82-2-796-6078