For sale or Lease - LoopNet...For sale or Lease Six New R&D/Advanced Manufacturing Buildings...
Transcript of For sale or Lease - LoopNet...For sale or Lease Six New R&D/Advanced Manufacturing Buildings...
For sale or Lease Six New R&D/Advanced Manufacturing Buildings ±23,955 SF to ±38,047 SF
Executive Managing Director510.300.0213CA RE License #01069911
STEVE KAPP, SIOR
Director510.923.6209CA RE License #01426551
SHAWN KLEIN
KEY BUSINESS ADVANTAGES• Central Bay Area location close to San Francisco, the Peninsula, Oakland International airport, Port of Oakland and universities• Functional footprint, heavy power and loading • Secure building site within a well-maintained business park• Superior modern construction meeting all codes• High-visibility building to display to customers and employees• Low business taxes• Excellent freeway access and transportation options, including I-880, the Harbor Bay ferry to San Francisco, and a business park shuttle to the ferry and Coliseum BART station, which is free to end users
north loop road
BC
D
E
F
A
580
880
580
880
Prominent location inheart of Harbor Bay
Business Park
2.5 Parking stallsper 1,000 SF
5 minute driveto Oakland
International Airport
Access to Bay Trail Free BART shuttleand 24-hour security
Water ferry toSan FranciscoFerry Building
features n ± 23,955 SF Building
n Mezzanine ±3,192 SF
n ± 1.4 Acre Site
n 24’ Clear Height
n 800 Amps 277/480 V 3 Phase Power
n 1 Dock / 1 Grade n 58 Parking Spaces
NORTH LOOP 3 - ALAMEDA BUILDING A / 23,955 SF
EVEV
EVEV
EVEV
EVEV
C CC C C CC C C C C C
CC
LOADING DOCK
FUTURE DEMISING WALL
PATIO PATIO
FUTURE ELEVATOR FUTURE ELEVATOR
21'-8" 21'-8" 22'-4" 25'-8" 25'-8" 22'-4" 21'-8" 21'-8"
30'-8
"31
'-0"
42'-4
"39
'-4"
144'-
10"
43'-4" 48'-0" 42'-1"
134'-7" 30'-10" 134'-7"
15'-5" 15'-5" 42'-1" 48'-0" 43'-4"
FUTURE ELECTRICALFUTURE STAIR FUTURE STAIR
HI-BAY 2HI-BAY 1
A b
BUILDING A / 23,955 SF
features n ± 23,955 SF Building
n Mezzanine ±3,192 SF
n ± 1.4 Acre Site
n 24’ Clear Height
n 800 Amps 277/480 V 3 Phase Power
n 1 Dock / 1 Grade n 57 Parking Spaces
EVEV
EVEV
EVEV
EVEV
C CC C C CC C C C C C
CC
LOADING DOCK
FUTURE DEMISING WALL
PATIO PATIO
FUTURE ELEVATOR FUTURE ELEVATOR
21'-8" 21'-8" 22'-4" 25'-8" 25'-8" 22'-4" 21'-8" 21'-8"
30'-8
"31
'-0"
42'-4
"39
'-4"
144'-
10"
43'-4" 48'-0" 42'-1"
134'-7" 30'-10" 134'-7"
15'-5" 15'-5" 42'-1" 48'-0" 43'-4"
FUTURE ELECTRICALFUTURE STAIR FUTURE STAIR
HI-BAY 2HI-BAY 1
A b
BUILDING B / 23,955 SF NORTH LOOP 3 - ALAMEDA
EVEV
EVEV
C C C C C C CC
C C C C C CC
C
C
EV
PATIO
LOADING DOCK
21'-8" 13'-11" 19'-6" 19'-6" 19'-6" 20'-3"
29'-7
"33
'-0"
33'-1
"32
'-0"
39'-4
"
35'-7" 39'-0" 39'-9" 39'-10" 39'-9"
168'-
6"
195'-6"
FUTURE STAIR
HI-BAY
c
Future Elevator
BUILDING C / 34,582 SFNORTH LOOP 3 - ALAMEDA
features n ± 34,582 SF Building
n ± 2.1 Acre Site
n 24’ Clear Height n 1200 Amps 277/480 V 3 Phase Power
n 2 Dock / 2 Grade n 85 Parking Spaces
n Mezzanine: - Existing ±4,800 SF - Allowable Expansion ±3,022 SF - Total Potential ±7,822 SF
BUILDING C / 34,582 SF NORTH LOOP 3 - ALAMEDABUILDING d / 28,234 SF
features n ± 28,234 SF Building
n ± 1.94 Acre Site
n 24’ Clear Height n 1,000 Amps 277/480 V 3 Phase Power
n 2 Dock / 2 Grade n 74 Parking Spaces
n Mezzanine: - Existing ±2,811 SF - Allowable Expansion ±3,066 SF - Total Potential ±5,877 SF
EVEV
EVEV
CCCCCCCCCCCC
C
PATIO
FUTURE ELEVATOR
21'-0" 21'-0" 19'-9" 21'-7"
29'-8
"32
'-8"
32'-8
"32
'-8"
39'-4
"
168'-
6"
39'-7" 41'-1" 42'-0" 41'-5"
FUTURE STAIR
165'-7"
HI-BAY
LOADING DOCK
D
BUILDING e / 37,261 SFNORTH LOOP 3 - ALAMEDA
features n ± 37,261 SF Building
n ± 2.32 Acre Site
n 28’ Clear Height
n Glass Line in the High Bay Lab/Manufacturing Areasn Knockout Window Panels for Possible Mezzanine Expansion n 1600 Amps 277/480 V 3 Phase Power
n 2 Dock / 2 Grade n 87 Parking Spaces
n Mezzanine: - Existing ±4,630 SF - Allowable Expansion ±3,026 SF - Total Potential ±7,656 SF
EVEV
EVEV
EV
PATIO
FUTURE ELEVATOR
42'-9" 42'-9" 42'-9" 39'-11" 39'-10"
209'-6"
39'-4
"32
'-6"
32'-3
"32
'-3"
29'-7
"
167'-
5"
21'-7" 21'-1" 21'-3" 21'-6" 21'-4" 21'-4"
HI-BAY
LOADING DOCK
E
features n ± 38,047 SF Building
n ± 2.57 Acre Site
n 28’ Clear Heightn Glass Line in the High Bay Lab/Manufacturing Areasn Knockout Window Panels for Possible Mezzanine Expansion n 1600 Amps 277/480 V 3 Phase Power
n 2 Dock / 2 Grade n 96 Parking Spaces
n Mezzanine: - Existing ±5,299 SF - Allowable Expansion ±3,028 SF - Total Potential ±8,327 SF
BUILDING f / 38,047 SF NORTH LOOP 3 - ALAMEDA
CCCCCCC
CCCCCC
C
CCCCCCCCC C
EVEV
EVEV
EV
C CC
PATIO
FUTURE ELEVATOR
18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 16'-1" 21'-7"
39'-8" 40'-4" 36'-0" 36'-0" 36'-0" 37'-9"
29'-8
"42
'-0"
42'-5
"39
'-4"
154'-
11"
227'-3"
FUTURE STAIR
HI-BAY
LOADING DOCK
F
DIABLO
EL CERRITOLAFAYETTE
MORAGA
ORINDA
SAN RAMON
WALNUTCREEK
BELVEDERE
SAUSALITO
SANFRANCISCO
PALO ALTO
BELMONT
BRISBANE
BURLINGAME
EASTPALO ALTO
FOSTERCITY
SAN MATEO
MONTARA
PACIFICA
REDWOODCITY
SOUTH SAN FRANCISCO
WOODSIDE
CAMPBELL
CUPERTINO
LOS ALTOS
LOS GATOS
LOYOLA
MILPITASMOUNTAINVIEW
SAN JOSE
SANTACLARA
SARATOGA
ALAMEDA
ALBANY
SAN LEANDRO
BERKELEY
CASTROVALLEY
DUBLIN
EMERYVILLE
FREMONT
HAYWARD
OAKLAND
PIEDMONT
PLEASANTON
SUNOLUNION CITY
HAYWARD/SAN MATEO
BRIDGE
OAKLANDINTERNATIONAL
AIRPORT
DOWNTOWNSAN FRANCISCO
SAN JOSEINTERNATIONAL
AIRPORT
SAN FRANCISCOINTERNATIONAL
AIRPORT
TIME TO:
OAKLAND INTERNATIONAL AIRPORTHAYWARD/SAN MATEO BRIDGEFREMONTWALNUT CREEKDOWNTOWN SAN FRANCISCOPALO ALTOSAN FRANCISCO INTERNATIONAL AIRPORTSAN JOSE INTERNATIONAL AIRPORT
5 Minutes20 Minutes26 Minutes30 Minutes35 Minutes35 Minutes40 Minutes40 Minutes
N o r t h L o o p 3 | c e n t r a l ly l o c at e d
Ferry to SF
ColiseumComplex Coliseum
Station
San LeandroStation
4 Min to 880Dedicated
Shuttle to BARTand Ferry
FruitvaleStation
880
580
880
Harb
or Ba
y Pkw
y
Doolittle Dr
Hege
nberg
er Rd
Edgewater Dr
98th Ave
66th Ave
High St
Otis Dr
Encinal Ave
Broad
way
Park
St
Mecartney Rd
Davis St
ferry Connectivity
BART Connectivity
3
2
FERRIES LINES FROM x TO XXXXFERRY LINES FROM xTO xxx
17-1115 | 12/18
The information contained herein has been obtained from sources deemed reliable but has not been verified and no guarantee, warranty or representation, either express or implied, is made with respect to such information. Terms of sale or lease and availability are subject to change or withdrawal without notice.
san francisco
alameda
oakland
BUILDING & SITE FEATURES• Two-story glass entries with partial 2nd story floor space• Ample Parking (+/-2.5/1,000 SF)• High image building exteriors and landscaping• Reliable utilities and a lower cost (+/-20%) clean energy supply from Alameda Municipal Power (not PG&E)• Two (2) Loading Docks and two (2) grade doors• 24’ Clear Heights• Compliance with all applicable building codes and requirements: :: Seismic :: Title 24 (energy efficiency) :: Loading and vehicle areas :: Americans with Disabilities Act (ADA)
RON COWAN PKWY
HARB
OR B
AY P
KWY
DOOLITTLE DR
HEGE
NBER
GER R
D98TH AVE
MCARTNEY RD
880
OAKLANDINTERNATIONAL
AIRPORT