• Factory
• Installation• Inspection form
Manufacturing & Installation
• Transport
BioBooster material • Plastic• Sun energy • Low running costs• Advantages of the plastic
Cooling
• Evaporative Cooling system
Maintenance and Hygiene
• BioBoost Spore buster • Guaranties • Lime control • Filter
• Draining holes
Electrical• Single phase or DC power • 0.75kw irrigation pump• 0.42kw fans
Irrigation• Pump
• Non-dripper valves• Sprayers
• Solenoid valves• Timer for irrigation
Irrigation (continue)• Water gets pumped• Intervals for watering • Water usage
Seed and seeding• Purchasing• Weighing • Soaking (1hour)• Measuring cup• Seeding the trays
Harvesting the fodder• Grow for 5-7days• Harvest from day 5-7• Can combine seed
Feeding and additional feed• Fodder• Roughage • Bacteria
Feeding• Weight gain • Milk production
• Overall health
Client needs the following
• Concrete slab• Power supply or DC solar
• Water point
• Floor plan The plan for the slab
• Day 1
• Day 2
• Day 3
Seed to feed
• Day 4Seed to feed (continue)
• Day 5• Day 6
• Day 7
Different feed• Barley and Maize
• Barley
• Canola
Different feed (continue)
• Lupens
• Sunflower
• Oats
Feed for variety of animals
• Cattle
• Goats
• Pigs
Feed for variety of animals (continue)
• Sheep
• Ostrich
Feeding in extreme conditions
• Suitable for all weather circumstances