Minister ARC. Mike Onolememen #TheJonathanReport Federal Ministry of Works

Transcript of Fmw

Page 1: Fmw

Minister

ARC. Mike Onolememen 

#TheJonathanReport

Federal Ministry of Works

Page 2: Fmw

Table of content

• Introduction• Key Achievements• Commissioning of the six (6nos.) Pedestrian bridges constructed

in Abuja• More Completed Projects…• Periodic maintenance

#TheJonathanReport

Page 3: Fmw

Introduction

• By introducing SURE-P (The Subsidy Reinvestment and Empowerment Programme) President Jonathan has been able to generate unprecedented funding for vital infrastructure projects across all the geopolitical zones of Nigeria.

• Highlights of the ministry of works are as follows:

#TheJonathanReport

Page 4: Fmw

Key Achievements• Some 2,000 kilometers of road were

built or rehabilitated by the end of 2013 - the highest in a single year by any government.

• Increased good and safe motorable length of Federal Roads from about 52% (17,742km) to nearly 85% (28,320km).

• Deployed 38 state-of-the-art Bergkamp FP5 Mobile Pothole patchers for year-round road repairs.

#TheJonathanReport

Page 5: Fmw

• Introduced the SURE P Public Works Programme, which trained and hired more than 6,000 Nigerian youths to maintain and improve the country’s road system.

• Installed street lighting along usually dark urban stretches of Federal highways and major bridges across the country.

#TheJonathanReport

Key Achievements

Page 6: Fmw

• Commenced construction of the 2nd Niger Bridge, which is funded through a Public Private Partnership (PPP) arrangement.• Launched the rehabilitation of

the 127.6km Lagos-Ibadan expressway.

#TheJonathanReport

Key Achievements

Page 7: Fmw

- Pedestrian Bridge on Nnamdi Azikiwe Expressway by Ahmadu Bello way ( Banex Junction).

- Pedestrain Bridge on Nnamdi Azikiwe Expressway by Shehu Shagari way ( NICON Junction).

- Pedestrian Bridge on Nnamdi Azikiwe Expressway by Olusegun Obasanjo Way ( Wuye Junction).

#TheJonathanReport

Commissioning of the six (6nos.) Pedestrian bridges constructed in Abuja

Page 8: Fmw

- Pedestrian Bridge on Nnamdi Azikiwe Expressway by Tafawa Balewa Way (Old Secretariat Junction).

- Pedestrian Bridge on Shehu Yar’adua Way by Okonjo Iwela Way (VIO Mabushi Junction)

- Pedestrian Bridge on Shehu Yar’adua Way by Ladi Kwali Way ( Sheraton Junction).

#TheJonathanReport

Commissioning of the six (6nos.) Pedestrian bridges constructed in Abuja

Page 9: Fmw

• Rehabilitation of the Oturkpo-Oweto Road in Benue State, Otukpa-Anyangba-Ajaokuta-Okene Road in Kogi, Ningi-Yadagumgume-Fuskar Mata Road in Bauchi, Wukari-Takum Road in Taraba and Benin-Shagamu Expressway in Edo State.

#TheJonathanReport

Key Achievements

Page 10: Fmw

• Otukpa – Ayangba –Ajaokuta -Okene

• Completion of the Dualization of Ibadan-Ilorin road section I (Ibadan - Oyo) in Oyo State

• Completion of the Reconstruction of Vom-Manchok road in Plateau State.

• Completion of the Repairs of 3rd Mainland Bridge (Phase II), covering additional works for the replacement of 8Nos. Expansion Joints in Lagos State.

• Completion of the Dualization of Onitsha-Owerri Road (Section I) and Onitsha Eastern Bypass, in Anambra State.

#TheJonathanReport

More Completed Projects…

Page 11: Fmw

Completion of the Rehabilitation of Uba-Mbalala road in Borno State.

Completion of the Rehabilitation of Funtua-GusauSokoto road (Section II: Gusau-Talata Mafara) in Zamfara and Sokoto States.

Completion of the Rehabilitation of Obiozora-UburuIshiagu Road in Enugu and Ebonyi States.

Completion of the Access Road to Kaduna Refinery in Kaduna State. Completion of the Construction/Rehabilitation of Gbogan-Iwo road

in Oyo State. Completion of the Rehabilitation of Owerri-Aba Road in Imo and

Abia States.

#TheJonathanReport

More Completed Projects…

Page 12: Fmw

• Reinstatement of Washouts at km6+750, km30+400 and km35+325 along Onitsha-Enugu dual carriageway in Anambra and Enugu States.

• Rehabilitation of Odo Oba-Takie-Gambari-Otte-Oyo State border along Ibadan-Oyo Ogbomosho-Ilorin road in Oyo State.

• Emergency reinstatement of Washout/Gully erosion at KM127+000 at Auchi along Okene-Benin road and Km14+000 along Auchi-Agenebode road in Edo State.

• Construction of Langtang-Lalin-Tunkus-Shendam Road in Plateau State.

#TheJonathanReport

More Completed Projects…

Page 13: Fmw

Periodic maintenance Jebba-Lafiaji Road in Niger State Takai-Albasu-Gaya Road in Kano State. Nafada-Gombe Abba Road in Gombe State. Hong-Mubi Road in Adamawa State Okpala-Igwurita Road in Imo State Ado-Ilumoba-Agbado-Ikare Road Section A in Ekiti State. Dingaya-Galambi-Rungo Road in Sokoto State Rumukurshi-Chokocho Road in Cross River State Akure-Owo Road in Ondo State East-West-Odi Road in Bayelsa State

#TheJonathanReport

Page 14: Fmw

#TheJonathanReport

Page 15: Fmw

#TheJonathanReport

Page 16: Fmw

#TheJonathanReport

Page 17: Fmw

#TheJonathanReport

Page 18: Fmw

#TheJonathanReport

Page 19: Fmw

#TheJonathanReport

Page 20: Fmw

#TheJonathanReport

Page 21: Fmw

#TheJonathanReport