Footer Text Date FM 1776 AT FM 1450 Public Meeting January 10, 2017 The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT.

Transcript of FM 1776 AT FM 1450 -...

Page 1: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

Footer Text Date

FM 1776 AT FM 1450 Public Meeting

January 10, 2017

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been,

carried out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT.

Page 2: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

FM 1776 at FM 1450 Alternatives Analysis

Agenda

Introductions.

Purpose of the Public Meeting.

Project Description & Study Area.

Need and Purpose for the Project.

Alternatives Being Considered.

Next Steps.

Submitting Comments.

Q & A.

2

Page 3: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

FM 1776 at FM 1450 Alternatives Analysis

Introductions

3

Gary Law, P.E. – TxDOT Odessa District, Director of

Transportation Planning and Development. Gene Powell – TxDOT Odessa District Public

Information Officer. Pradeep Ramadoss, PMP – TxDOT Project Manager.

Naser Abusaad, P.E., AICP – Consultant Project

Manager.

Page 4: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

FM 1776 at FM 1450 Alternatives Analysis

Purpose of the Public Meeting

4

Inform Public of Project.

Present Data and Findings.

Seek Input on Alternatives.

Solicit Comments.

Page 5: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

FM 1776 at FM 1450 Alternatives Analysis 5

Project Description & Study Area FM 1776 at FM 1450 From 2 miles south of

FM 1450. To 2 miles north of FM 1450. Approximately 4 miles long.

Develop & evaluate alternatives.

Page 6: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

FM 1776 at FM 1450 Alternatives Analysis 6

Need and Purpose for the Project

Project is needed because the intersection of FM 1776 at FM 1450 is operationally inefficient.

Purpose of project is to correct operational deficiencies and increase mobility in the project area.

Page 7: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

FM 1776 at FM 1450 Alternatives Analysis 7

Need and Purpose for the Project

Operational Deficiencies FM 1776 through traffic must

stop and make 2 turns to continue.

FM 1450 traffic must slow down with turning traffic.

No turning and deceleration lanes.

Page 8: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

FM 1776 at FM 1450 Alternatives Analysis 8

Need and Purpose for the Project

Mobility & Regional Connectivity

Important north-

south connectivity.

Vital transportation corridor between IH 10 and IH 20.

Freight / Trucks.

Page 9: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

FM 1776 at FM 1450 Alternatives Analysis 9

Alternatives Being Considered

No Build Alternative 4 Build Alternatives

1. West of existing north FM 1776. 2. Close to existing north FM 1776 as possible. 3. East of existing north FM 1776. 4. Aligning FM 1776 perpendicular to FM 1450.

Due to availability of funding, alternatives will be implemented in phases: Phase 1: Construct at-grade intersections. Phase 2 (future): Construct bridge / overpass.

Page 10: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

FM 1776 at FM 1450 Alternatives Analysis 10

Alternatives Being Considered

No Build Alternative Do nothing.

Keep maintaining roads as they exist today.

Page 11: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

FM 1776 at FM 1450 Alternatives Analysis 11

Alternatives Being Considered

Alternative A (green) Bridge over FM 1450, west of

existing north FM 1776.

Ramps to and from FM 1776 and FM 1450.

Phased construction depending on availability of project funding—

Phase 1: Construct at-grade intersections. Phase 2 (future): Construct bridge over

FM 1450.

Existing FM 1776

Page 12: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

FM 1776 at FM 1450 Alternatives Analysis 12

Alternatives Being Considered

Alternative B (yellow) Bridge over FM 1450, near

existing north FM 1776.

Ramps to and from FM 1776 and FM 1450.

Phased construction depending on availability of project funding—

Phase 1: Construct at-grade intersections. Phase 2 (future): Construct bridge over

FM 1450.

Page 13: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

FM 1776 at FM 1450 Alternatives Analysis 13

Alternatives Being Considered

Alternative C (orange) Bridge over FM 1450, east of

existing north FM 1776.

Ramps to and from FM 1776 and FM 1450.

Phased construction depending on availability of project funding—

Phase 1: Construct at-grade intersections. Phase 2 (future): Construct bridge over

FM 1450.

Page 14: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

FM 1776 at FM 1450 Alternatives Analysis 14

Alternatives Being Considered

Alternative D (blue) Realign FM 1776 to create single

intersection at FM 1450.

Allows for future bridge and ramps.

Phased construction depending on availability of project funding—

Phase 1: Construct realignment of FM 1776. Phase 2 (future): Construct ramps and bridge over FM 1450.

Page 15: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

FM 1776 at FM 1450 Alternatives Analysis 15

Alternatives Being Considered

Criteria

Safety o + + + +

Construction Cost (in current $, millions) 0 8.5 9.3 9.9 7.5

Buildings Impacted 0 1 3 1 1

Residential Impacts 0 0 1 0 0

Length (in miles) 4.3 3.9 4.3 4.3 4.5

Parcels Impacted 11 10 11 11 10

ROW Needed (in acres) 0 63.8 58.0 73.8 53.5

Page 16: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

FM 1776 at FM 1450 Alternatives Analysis 16

Next Steps

2016 2017 2018 2019 2020 2021 2022

Data Collection

Alternatives Analysis

Preliminary Design

Environmental Analysis

Opportunity for Public Hearing

Final Design

Right-of-Way & Utility Adj.*

Construction*

We are here

* Pending the availability of funding

Anticipated Schedule

Public Meeting

Public Meeting

Opportunity for Public Hearing

Page 17: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

FM 1776 at FM 1450 Alternatives Analysis 17

Submitting Comments

Submit at today’s meeting or Submit in writing to:

Gene Powell TxDOT 3901 East US Highway 80 Odessa, TX 79761

or by email at [email protected]

Comments must be postmarked by January 25, 2017

Page 18: FM 1776 AT FM 1450 - ftp.dot.state.tx.usftp.dot.state.tx.us/pub/txdot/get-involved/oda/fm-1776/011017... · Footer Text Date FM 1776 AT FM 1450 . Public Meeting . January 10, 2017

FM 1776 at FM 1450 Alternatives Analysis 18