Piping Plans for Dual Mechanical Seals
![Page 2: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/2.jpg)
Purpose of Piping Plans
�Create a more favorable environmentfor the mechanical seal
• Flushing to remove heat
• Lowering fluid temperature
• Altering the seal chamber pressure
• Cleaning the process fluids
• Control atmospheric side of seal
![Page 3: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/3.jpg)
Purpose of Piping Plans
�Provide a means of detecting andcontrolling seal leakage
• Capture and/or prevent leakage
• Detect leakage
• Route leakage to appropriate collection
or disposal system
• Provide fluid other than process fluid for
the seal environment
![Page 4: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/4.jpg)
Requirements of Mechanical Seals
�Liquid seals
• Stable fluids
• Good lubricating properties
• Fluids do not flash or vaporize in seal
chamber
• Free from contamination and solids
• Moderate viscosities
![Page 5: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/5.jpg)
Requirements of Mechanical Seals
�Gas seals
• Gas or vapor suitable for sealing
• Constant supply of external buffer/barrier
gas
• Process fluids free from contamination
from both liquids and solids
• Process fluids which are not adversely
affected by gas leakage
![Page 6: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/6.jpg)
Methods of Achieving Goals
�Piping or routing of process fluids
�Introduction of external fluids
�Auxiliary equipment
• Seal coolers
• Cyclone separators
• Reservoirs
�Instrumentation
![Page 7: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/7.jpg)
Plan 52What• Unpressurized buffer
fluid circulationthrough reservoir.
• Fluid is circulated bya pumping ring in thedual seal assembly.
![Page 8: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/8.jpg)
![Page 9: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/9.jpg)
![Page 10: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/10.jpg)
Plan 52Why• Outboard seal acts
as a safety backupto the primary seal.
• Zero to very lowprocess emissions.
• No processcontamination isallowed.
![Page 11: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/11.jpg)
Plan 52Where• Used with dual
unpressurized seals(“tandem”).
• High vapor pressurefluids, lighthydrocarbons.
• Hazardous or toxicfluids.
• Heat transfer fluids.
![Page 12: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/12.jpg)
API 682 Type A Arrangement 2
2CW-CW
![Page 13: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/13.jpg)
Plan 52Preventative
Maintenance
• Piping loop mustself-vent to vaporrecovery/flaresystem nearatmosphericpressure.
• Process vaporpressure is generallygreater thanreservoir pressure.
• Buffer fluid must becompatible withprocess leakage.
![Page 14: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/14.jpg)
Plan 52Preventative
Maintenance
(continued)• Primary seal leakage
is indicated byincreased ventpressure.
• Reservoir level gageindicates outboardseal leakage.
![Page 15: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/15.jpg)
Plan 53AWhat• Pressurized barrier
fluid circulationthrough reservoir.
• Fluid is circulated bya pumping ring in thedual seal assembly.
![Page 16: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/16.jpg)
![Page 17: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/17.jpg)
Plan 53AWhy• Isolate process
fluids.
• Zero processemissions.
![Page 18: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/18.jpg)
Plan 53AWhere• Used with dual
pressurized seals(“double”).
• High vapor pressurefluids, lighthydrocarbons.
• Hazardous or toxicfluids.
• Heat transfer fluids.
• Dirty, abrasive orpolymerizing fluids.
• Mixers or agitators.
• Vacuum service.
![Page 19: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/19.jpg)
API 682 Type C Arrangement 33CW-FB
![Page 20: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/20.jpg)
Plan 53APreventative
Maintenance
• Piping loop mustself-vent to reservoirlocated at highestelevation.
• Pressurize reservoirat all times,maximum gascharge 150 - 200 psi(10 - 14 bar)
• Barrier fluid must becompatible withprocess.
• Reservoir level gageindicates both IB andOB seal leakage.
![Page 21: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/21.jpg)
Plan 53BWhat• Pressurized barrier
fluid circulation witha bladderaccumulator.
• Fluid is circulated bya pumping ring in thedual seal assembly.
![Page 22: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/22.jpg)
![Page 23: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/23.jpg)
![Page 24: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/24.jpg)
![Page 25: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/25.jpg)
![Page 26: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/26.jpg)
Plan 53BWhy• Isolate process fluid.
• Zero processemissions.
• Higher pressure thanPlan 53A.
![Page 27: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/27.jpg)
Plan 53BWhere• Used with dual
pressurized seals(“double”).
• High vapor pressurefluids, lighthydrocarbons.
• Hazardous or toxicfluids.
• Heat transfer fluids.
• Dirty, abrasive orpolymerizing fluids.
![Page 28: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/28.jpg)
API 682 Type C Arrangement 3
3CW - BB
![Page 29: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/29.jpg)
Plan 53BPreventative
Maintenance
• Piping loop must befully vented beforestarting.
• Accumulator must bepressurized at alltimes, usually by gascharge.
• Barrier fluid must becompatible withprocess.
• Regularly monitorbarrier pressure –manually add barrierfluid when pressuredecays.
![Page 30: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/30.jpg)
Plan 53CWhat• Pressurized barrier
fluid circulation witha pistonaccumulator.
• Fluid is circulated bya pumping ring in thedual seal assembly.
![Page 31: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/31.jpg)
![Page 32: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/32.jpg)
Plan 53CWhy• Isolate process fluid.
• Zero processemissions.
• Higher pressure thanPlan 53A.
• Dynamic tracking ofsystem pressure.
![Page 33: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/33.jpg)
Plan 53CWhere• Used with dual
pressurized seals(“double”).
• High vapor pressurefluids, lighthydrocarbons.
• Hazardous or toxicfluids.
• Heat transfer fluids.
![Page 34: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/34.jpg)
API 682 Type A Arrangement 33CW - BB
![Page 35: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/35.jpg)
Plan 53CPreventative
Maintenance
• Piping loop must befully vented beforestarting.
• Reference line musttolerate processcontaminationwithout plugging.
• Barrier fluid must becompatible withprocess.
• Reservoir level gageindicates bothinboard andoutboard sealleakage.
![Page 36: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/36.jpg)
Plan 54What• Pressurized barrier
fluid circulation by anexternal system.
![Page 37: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/37.jpg)
![Page 38: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/38.jpg)
Plan 54Why• Isolate process fluid.
• Zero processemissions.
• Seal cannot inducecirculation.
![Page 39: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/39.jpg)
Plan 54Where• Used with dual
pressurized seals(“double”).
• High vapor pressurefluids, lighthydrocarbons.
• Hazardous or toxicfluids.
• Heat transfer fluids.
• Dirty, abrasive, orpolymerizing fluids.
• Mixers or agitators.
![Page 40: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/40.jpg)
API 682 Type C Arrangement 3
3CW - BB
![Page 41: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/41.jpg)
Plan 54Preventative
Maintenance
• Piping loop must befully vented beforestarting.
• Circulating systemmust be pressurizedand energized at alltimes.
• Barrier fluid must becompatible withprocess.
• Circulation systemlevel gage indicatesboth inboard andoutboard seal leakage.
![Page 42: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/42.jpg)
Plan 72What• Unpressurized buffer
gas control system.
• Containment sealsupport typically withnitrogen buffer gas.
![Page 43: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/43.jpg)
![Page 44: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/44.jpg)
Plan 72Why• Zero to very low
process emissions.
• Safety backup toprimary seal.
![Page 45: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/45.jpg)
Plan 72Where• Used with dual
unpressurizedcontainment seals(“tandem”).
• High vapor pressurefluids, lighthydrocarbons.
• Hazardous or toxicfluids.
• Clean, non-polymerizing, non-oxidizing fluids.
• Used in combinationwith Plan 75 and/orPlan 76.
![Page 46: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/46.jpg)
API 682 Type A with Containment
2CW - CS
![Page 47: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/47.jpg)
Plan 72Preventative
Maintenance
• Clean, reliable, lowpressure gas must besupplied to seal at alltimes.
• Bottled gas supply isnot recommendedexcept as part of anemergency backupsystem.
• Primary seal leakage isindicated by pressurein the vent line.
![Page 48: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/48.jpg)
Plan 72Preventative
Maintenance
(continued)
• Vent or drain areusually connected tolow pressure vaporrecovery/flare system.
![Page 49: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/49.jpg)
Plan 74What• Pressurized barrier gas
control system.
• Gas seal supporttypically with nitrogenbarrier gas.
![Page 50: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/50.jpg)
![Page 51: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/51.jpg)
Plan 74Why• Isolate process fluid.
• Zero processemissions.
![Page 52: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/52.jpg)
Plan 74Where• Used with dual
pressurized gas seals(“double”).
• High vapor pressurefluids, lighthydrocarbons.
• Hazardous or toxicfluids.
• Services that do nottolerate barrier fluids.
• Clean, non-polymerizing fluids.
• Moderate temperaturefluids.
![Page 53: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/53.jpg)
Plan 74Preventative
Maintenance
• Clean, reliable,pressurized gas mustbe supplied to seal atall times.
• Barrier pressure istypically at least 25 psi(1.75 bar) above sealchamber pressure.
• Flow meter indicatesboth inboard andoutboard seal leakage.
![Page 54: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/54.jpg)
Plan 74Preventative
Maintenance
(continued)
• Bottled gas supply isnot recommendedexcept as part of anemergency backupsystem.
![Page 55: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/55.jpg)
Plan 75What• Drain from containment
seal cavity to liquidcollector and vaporrecovery.
![Page 56: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/56.jpg)
![Page 57: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/57.jpg)
Plan 75Why• Leakage collection for
zero to very lowprocess emissions.
• Safety indicator forprimary seal.
![Page 58: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/58.jpg)
Plan 75Where• May be used alone or
with Plan 72 oncontainment seals.
• Fluids that condense atambient temperature.
• High pressure fluids,light hydrocarbons.
• Hazardous or toxicfluids.
• Clean, non-polymerizing, non-oxidizing fluids.
![Page 59: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/59.jpg)
API 682 Type A with Containment
2CW - CS
![Page 60: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/60.jpg)
Plan 75Preventative
Maintenance
• Collection reservoirmust be located belowseal drain anddownward-slopedpiping.
• Continuously ventcollection reservoir tolow pressure vaporrecovery/flare system.
• Drain collectionreservoir to liquidrecovery system asneeded.
![Page 61: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/61.jpg)
Plan 75Preventative
Maintenance
(continued)
• Primary seal leakage isindicated by increasedvent pressure.
• Monitor regularly forliquid level, valvesettings, and low ventpressure.
![Page 62: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/62.jpg)
Plan 76What• Vent from containment
seal cavity to vaporrecovery.
![Page 63: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/63.jpg)
![Page 64: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/64.jpg)
Plan 76Why• Leakage collection for
zero to very lowprocess emissions.
• Safety indicator forprimary seal.
![Page 65: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/65.jpg)
Plan 76Where• May be used alone or
with Plan 72 oncontainment seals.
• Fluids that do notcondense at ambienttemperature.
• High vapor pressurefluids, lighthydrocarbons.
• Hazardous or toxicfluids.
• Clean, non-polymerizing, non-oxidizing fluids.
![Page 66: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/66.jpg)
API 682 Type A with Containment
2CW - CS
![Page 67: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/67.jpg)
Plan 76Preventative
Maintenance
• Continuously vent tolow pressure vaporrecovery/flare system.
• Vent piping shouldinclude a condensatedrain.
• Primary seal leakage isdetected by increasedvent pressure.
• Monitor regularly forvalve settings, blockedlines, and low ventpressure.
![Page 68: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/68.jpg)
Good Piping Practices
�Minimize line losses
�Large diameter tubing
�Upward sloping lines
�Long radius bends
high point vent
Vertical
Equipment
Horizontal
Equipment
18 - 24 in.
(0.45 - 0.6 m)
3 ft. (0.9 m) max
low point drain
Plan 23 Example
![Page 69: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/69.jpg)
Good Piping Practices
�Minimize line losses
�Large diameter tubing
�Upward sloping lines
�Long radius bends
Vertical
Equipment
Horizontal
Equipment
18 - 24 in.
(0.45 - 0.6 m)
4 ft. (1.2 m) max
low point drain
Plan 53A Example
![Page 70: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/70.jpg)
Review
�Intended to create a more favorableenvironment for the seal
�Collect and detect seal leakage and providesafety backup
�Documented in several API, ASME, and ISOstandards
�May require auxiliary equipment or externalsources of fluids
�Necessary to improve seal reliability/Safety
![Page 71: Fluiten Plan API](https://reader031.fdocuments.us/reader031/viewer/2022012318/545da4fab1af9f2d0a8b4d37/html5/thumbnails/71.jpg)
Questions?