Broken Needle Handling Process Supervisor Operator Mechanic Needle Controller PM & Maintenance I/C Released on 01/03/2015 Needle Breaks Switch Off the M/C & Inform Supervisor Separate affected Components from rest of WIP Search & collect all the broken parts of the Needle All Parts Found ? Carry out all the broken needle parts in designated container to Needle Controller Y Inform the Line Mechanic about the Needle Breakage Take out the Needle part from the M/c and give to Oparator Check all the parts against the needle Mock-up All Parts OK ? Issue New Needle Y Attach all the parts in the Broken Needle Control Register & Record Get the Register Audited in the Evening Open the Needle Plate & Other Required Parts N Check for the Needle Parts inside the oil tank N Check surrounding work area thru magnet stick for needle part Carry the affected components in the closed lid container to metal detector Pass all the Components thru Metal Detector All Parts Found ? Y Initiate Broken Needle Fragment Retrieval Procedure N Check & ensure every step is being taken as mentioned in the form Attach the available needle parts in the form. Take Operator’s & Maintenance Signature and sign the form Check All the Steps Taken properly. Authorize the issue of New Needle Check all the process followed properly and issue new needle

description

Flow chart for handling broken needle in sewing

Transcript of Flow Chart Broken Needle

  • Broken Needle Handling ProcessS

    u

    p

    e

    r

    v

    i

    s

    o

    r

    O

    p

    e

    r

    a

    t

    o

    r

    M

    e

    c

    h

    a

    n

    i

    c

    N

    e

    e

    d

    l

    e

    C

    o

    n

    t

    r

    o

    l

    l

    e

    r

    P

    M

    &

    M

    a

    i

    n

    t

    e

    n

    a

    n

    c

    e

    I

    /

    C

    Released on 01/03/2015

    Needle Breaks

    Switch Off the

    M/C & Inform

    Supervisor

    Separate affected

    Components from

    rest of WIP

    Search & collect

    all the broken

    parts of the

    Needle

    All Parts

    Found ?

    Carry out all the

    broken needle

    parts in

    designated

    container to

    Needle Controller

    Y

    Inform the Line

    Mechanic about

    the Needle

    Breakage

    Take out the

    Needle part from

    the M/c and give

    to Oparator

    Check all the parts

    against the needle

    Mock-up

    All Parts

    OK ?Issue New Needle Y

    Attach all the

    parts in the

    Broken Needle

    Control Register &

    Record

    Get the Register

    Audited in the

    Evening

    Open the Needle

    Plate & Other

    Required Parts

    N

    Check for the

    Needle Parts

    inside the oil tank

    N

    Check

    surrounding work

    area thru magnet

    stick for needle

    part

    Carry the affected

    components in

    the closed lid

    container to metal

    detector

    Pass all the

    Components thru

    Metal Detector

    All Parts

    Found ?

    Y

    Initiate Broken

    Needle Fragment

    Retrieval

    Procedure

    N

    Check & ensure

    every step is being

    taken as

    mentioned in the

    form

    Attach the

    available needle

    parts in the form.

    Take Operators &

    Maintenance

    Signature and sign

    the form

    Check All the

    Steps Taken

    properly.

    Authorize the

    issue of New

    Needle

    Check all the process

    followed properly and

    issue new needle