Client’s Project Goals

Shaw Group Development Corp. Design & construct 62,523 sf commercial office

building MS Project construction schedule Project cost & cash flow analysis Develop construction contract & terms

Project Management Plan

Project Consists of 3 parts Project Controls

Project ScopeProject ScheduleCash Flow Report

Transportation DesignTraffic analysisPavement designParking lot design

Legal AspectsContract development & termsPreparation for negotiationsRegulatory Agencies

Project Size and Cost

Structure 3 Stories 62,523 sqft total Estimated cost - $479,000

Parking Lot Aggregate cost - $38,000 Asphalt cost - $95,000

Total Estimated Project Cost - $612,000

Project Schedule

Transportation Design

Key Elements of the Design Traffic Analysis Pavement Design & Cost Estimating Parking Lot Design

Traffic Analysis

Observed Traffic Counts Space Coast TPO Transportation Data Management

System FDOT Trip Calculation Software Pre/Post LOS Analysis for Babcock St. and University

Blvd.

Pavement Design

AASHTO Guide For Design of Pavement Structures Use of RAP (Recycled Asphalt Pavement) 2007 RS Means Precision Rock and Dredge – Palm Bay (Lime Stone) VA Paving – Cocoa (HMA)

Pavement Design

Parking Lot Design

City of Palm Bay Codes ADA Guidelines Lights by Outside Source Using ECO Lighting

Solutions

Parking Lot Design

Legal Aspects

Contract Development Preparations for Negotiations Permits, Licenses, Agencies

Contract Development-1

Contract Development for Florida Tech CommonsDescription of lands/siteContractors Responsibilities

Labor Schedule Permits

Owners Responsibilities Communication Payments Insurance

Contract Development-2

Tests and InspectionsChange OrdersClaims – settle orally if possibleDispute Resolution

Good Faith Negotiations Mediation Arbitration Litigation

Liquidated Damages

Negotiations

Preparation for NegotiationsGather outside information on possible alternatives and prices to

compare to.Establish points of leverage that can be used during negotiation.Set a goal or target maximum/minimum value that you are willing

to buy/sell at.Decide initial approach method (friendly negotiation/good cop-bad

cop/etc…)Through negotiations try to determine the oppositions stand point

(do they NEED an agreement? do they have other options? Etc…)Most importantly, always shoot for a Win/Win conclusion. If both

parties can improve their situation and keep a friendly position with each other it will make it easier to negotiate again in the future.

Permits, Licenses, Agencies

Follow municipal & state codes and regulations Acquire permits and licenses Keep in good standing with agencies and the

public

Project Summary

Schedule Timing Cash Flow Traffic Summary Pavement Features Parking Lot Design Contract Development Negotiation Tactics Acquire Permits and Licenses

Thank you for choosing Shaw group

Project plan meets client’s goals We will produce a quality project We appreciate your business I will be your project manager