Florida Department of TRANSPORTATION - DISTRICT ONE · 2016-08-29 · FLORIDA DEPARTMENT OF...
Transcript of Florida Department of TRANSPORTATION - DISTRICT ONE · 2016-08-29 · FLORIDA DEPARTMENT OF...
Florida Department of
TRANSPORTATION - DISTRICT ONEFlorida Department of
TRANSPORTATION - DISTRICT ONE
SOUTHWESTAREA OFFICE(FORT MYERS)
DISTRICT ONEHEADQUARTERS
(BARTOW)
ADOPTED FIVE YEAR WORK PROGRAMFISCALFISCAL YEARS YEARS 2017-20212017-2021
MANATEE COUNTY
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
COUNTYMANATEE
MISSION STATEMENT The Department will provide a safe, interconnected statewide transportation system for Florida's citizens and visitors that ensures the mobility of people and goods, while enhancing economic prosperity and sustaining the quality of our environment.
July 1, 2016 Through June 30, 2021
ADOPTED WORK PROGRAM REPORT
Robin StublenCommunications SpecialistDistrict One Headquarters801 North BroadwayP.O. Box 1249Bartow, FL 33831(863) 519-2362
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 28/18/2016Run Date: SnapShot Date: 7/20/2016
Zachary BurchGovernment Affairs &Communications ManagerSouthwest Area Office10041 Daniels ParkwayFort Myers, Fl. 33913(239) 225‐1950
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
COUNTYMANATEE
July 1, 2016 Through June 30, 2021
CURRENTLY REPORTED ACTIVE FUND CODES
ADOPTED WORK PROGRAM REPORT
ACSA Advance Construction (SA)
ACSU Advance Construction (SU)
BRRP State Bridge Repair And Rehab
DDR District Dedicated Revenue
DI State-Statewide Inter/Intrastate Highway
DIH State In-house Product Support
DITS Statewide ITS - State 100%
DPTO State PTO
DS State Primary Highways and PTO
FTA Federal Transit Administration
FTAT FHWA Transfer to FTA (non-bud)
GMR General Revenue for SIS
HSP Highway Safety Program
LF Local Funds
LFP Local Fund for Participating
SA STP, Any Area
SIB1 State Infrastructure Bank
SU STP, Urban Areas > 200k
TRIP Trans Regional Incentive Prog
TSM Transport Systems Mgmt.
DSB1
ACNP Advanced Construction NHPP
TALT Transportation Alternatives Any Area
TALU Transportation Alternatives (Population > 200K)
TRWR Transportational Regional Incentive Program
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 38/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
HIGHWAYS
FPN: 4331422 Project/Location: 10TH AVE FROM RIVERSIDE DRIVE TO 17TH
STREET
Project Length: 1.126
Desc: URBAN CORRIDOR IMPROVEMENTS
Comments:
Begin Mile Post: 0.000 End Mile Post: 1.126
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $825,000
$825,000Project Total:
FPN: 4331421 Project/Location: 10TH AVENUE FROM RIVERSIDE DRIVE TO 17TH
STREET
Project Length: 1.126
Desc: PD&E/EMO STUDY
Comments:
Begin Mile Post: 0.000 End Mile Post: 1.126
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE ACSU $1,000,000
PDE SU $4,500
$1,004,500Project Total:
FPN: 4380861 Project/Location: 13TH AVENUE WEST AT US 301/US 41
Project Length: 0.010
Desc: ADD RIGHT TURN LANE(S)
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.010
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $135,000
CST SU $560,307
$135,000 $560,307Project Total:
FPN: 4313502 Project/Location: 15TH ST E/301 BLVD E FROM TALLEVAST ROAD
TO US 41
Project Length: 4.744
Desc: ADD LANES & RECONSTRUCT
Comments:
Begin Mile Post: 1.679 End Mile Post: 6.246
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $23,070
$23,070Project Total:
FPN: 4313501 Project/Location: 15TH STREET EAST FROM TALLEVAST ROAD TO
US 41
Project Length: 4.744
Desc: PD&E/EMO STUDY
Comments:
Begin Mile Post: 1.679 End Mile Post: 6.423
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE ACSU $26,368
$26,368Project Total:
FPN: 4369821 Project/Location: 51ST STREET WEST AT 53RD AVENUE
WEST
Project Length: 0.030
Desc: ADD TURN LANE(S)
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.030
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $120,000
CST SU $345,019
$120,000 $345,019Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 48/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
FPN: 4351131 Project/Location: 63RD AVE E AT 33RD STREET E
Project Length: 0.470
Desc: ADD LEFT TURN LANE(S)
Comments:
Begin Mile Post: 1.530 End Mile Post: 2.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE ACSU $6,727
RRU SU $225,000
ROW LFP $89,116
CST SU $1,855,504
$95,843 $2,080,504Project Total:
FPN: 4369831 Project/Location: BLACKSTONE PARK AT 14TH AVE W, 23RD ST W
& BUSINESS 41 (VALENCIA DR)
Project Length: 0.001
Desc: SIDEWALK
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE TALU $12,297
CST TALU $475,809
$12,297 $475,809Project Total:
FPN: 4136391 Project/Location: BRADENTON TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.790
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 6.559 End Mile Post: 7.349
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $185,604 $199,391 $205,372 $221,368 $228,009
$185,604 $199,391 $205,372 $221,368 $228,009Project Total:
FPN: 4390131 Project/Location: BUSINESS 41 (8TH AVE) FROM 14TH STREET
WEST TO 9TH STREET WEST
Project Length: 0.209
Desc: PEDESTRIAN SAFETY IMPROVEMENT
Comments:
Begin Mile Post: 7.388 End Mile Post: 7.552
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $9,471
CST DIH $10,000
CST DS $601,659
$621,130Project Total:
FPN: 4351201 Project/Location: ELLENTON GILLETTE RD AT 69TH ST
E
Project Length: 0.215
Desc: ADD LEFT TURN LANE(S)
Comments:
Begin Mile Post: 3.502 End Mile Post: 3.717
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE TALU $2,018
CST SU $866,260
$868,278Project Total:
FPN: 4332771 Project/Location: EMERGENCY VEHICLE PRIORITY SYSTEM
MANATEE COUNTY
Project Length: 0.001
Desc: ATMS - ARTERIAL TRAFFIC MGMT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST SU $1,631,700
$1,631,700Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 58/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
FPN: 4136401 Project/Location: HOLMES BEACH TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.100
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.100
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $13,700 $8,469 $8,723 $8,985 $9,255
$13,700 $8,469 $8,723 $8,985 $9,255Project Total:
FPN: 4363211 Project/Location: I 75 (SR 93) SOUTH OF UNIVERSITY BLVD NORTH
OF US 301
Project Length: 11.400
Desc: WETLAND MITIGATION/RESTORATION
Comments:
Begin Mile Post: 0.000 End Mile Post: 11.400
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV DS $394,900 $311,500
$394,900 $311,500Project Total:
FPN: 4385951 Project/Location: I-275 AT I-75 (SR 93)
Project Length: 0.001
Desc: LANDSCAPING
Comments:
Begin Mile Post: 14.380 End Mile Post: 14.381
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $10,000
CST DIH $10,560
CST DS $517,440
$10,000 $528,000Project Total:
FPN: 4379731 Project/Location: I-275 AT SKYWAY REST AREA
Project Length: 0.250
Desc: REST AREA
Comments:
Begin Mile Post: 10.700 End Mile Post: 10.950
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DSB1 $216,800
DSB DSB1 $8,965,663
$9,182,463Project Total:
FPN: 4385281 Project/Location: I-275 AT SUNSHINE SKYWAY
SEAWALL
Project Length: 0.250
Desc: MISCELLANEOUS STRUCTURE
Comments:
Begin Mile Post: 10.700 End Mile Post: 10.950
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DSB1 $125,000
DSB DSB1 $5,194,970
ENV DSB1 $215,000
$5,534,970Project Total:
FPN: 4362991 Project/Location: I-275 SB TO I-75 NB DECK
REPLACEMENT
Project Length: 0.425
Desc: BRIDGE-REPAIR/REHABILITATION
Comments:
Begin Mile Post: 0.364 End Mile Post: 0.789
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE BRRP $299,565
PE DIH $10,000
CST BRRP $6,738,058
CST DIH $10,270
$309,565 $6,748,328Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 68/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
FPN: 4389951 Project/Location: I-75 (SR 93) AT SR 64
Project Length: 0.807
Desc: LANDSCAPING
Comments:
Begin Mile Post: 6.908 End Mile Post: 7.715
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $10,000
CST DIH $11,100
CST DS $1,110,000
$10,000 $1,121,100Project Total:
FPN: 2010327 Project/Location: I-75 (SR 93) AT UNIVERSITY PARKWAY
(MANATEE)
Project Length: 0.460
Desc: LANDSCAPING
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.460
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST DDR $924,300
CST DIH $58,282
$982,582Project Total:
FPN: 2010325 Project/Location: I-75 (SR 93) AT US 301 INTERCHANGE
Project Length: 1.150
Desc: INTERCHANGE - ADD LANES
Comments:
Begin Mile Post: 10.250 End Mile Post: 11.400
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $11,229
ROW DDR $16,000
ROW DIH $12,000
ROW DS $1,705,000
$1,744,229Project Total:
FPN: 4340261 Project/Location: I-75 (SR 93A) FROM N OF I-275 TO
MANATEE/HILLSBOROUGH COUNTY LINE
Project Length: 5.320
Desc: ITS FREEWAY MANAGEMENT
Comments:
Begin Mile Post: 15.251 End Mile Post: 20.571
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $6,912
PE DITS $125,000
DSB DIH $87,840
DSB DITS $3,173,531
$3,393,283Project Total:
FPN: 2010324 Project/Location: I-75 (SR93) AT UNIVERSITY
INTERCHANGE
Project Length: 0.460
Desc: INTERCHANGE - ADD LANES
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.460
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST ACNP $173,260
INC DDR $2,500,000
$173,260 $2,500,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 78/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
FPN: 2010326 Project/Location: I-75 AT SR 64
Project Length: 2.476
Desc: INTERCHANGE IMPROVEMENT
Comments:
Begin Mile Post: 6.252 End Mile Post: 8.157
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE ACNP $200,679
RRU ACNP $2,137,481
CST ACNP $46,641,008
CST DI $4,292,295
$53,271,463Project Total:
FPN: 4349291 Project/Location: I-75 S OF MOCCASIN WALLOW RD TO
HILLSBOROUGH C/L
Project Length: 4.857
Desc: RESURFACING
Comments:
Begin Mile Post: 15.714 End Mile Post: 20.571
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE ACNP $8,891
CST ACNP $9,938,731
$9,947,622Project Total:
FPN: 4350382 Project/Location: MANATEE COUNTY SCOUR COUNTERMEASURE
AT VARIOUS LOCATIONS
Project Length: 0.802
Desc: BRIDGE-REPAIR/REHABILITATION
Comments:
Begin Mile Post: 0.480 End Mile Post: 1.204
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE BRRP $97,099
$97,099Project Total:
FPN: 4388701 Project/Location: MANATEE COUNTY SR 70 ASCT
Project Length: 9.209
Desc: ATMS - ARTERIAL TRAFFIC MGMT
Comments:
Begin Mile Post: 0.000 End Mile Post: 7.448
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST TSM $790,000
$790,000Project Total:
FPN: 4126731 Project/Location: MANATEE COUNTY TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 5.519
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 0.560 End Mile Post: 6.079
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $2,220
OPS DITS $433,611 $471,739 $490,665 $510,302 $525,611
$435,831 $471,739 $490,665 $510,302 $525,611Project Total:
FPN: 1961421 Project/Location: MANATEE MPO IDENTIFIED OPERATIONAL
IMPROVEMENTS - FUNDING
Project Length: 0.000
Desc: FUNDING ACTION
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST SU $237,941 $1,785,534 $759,354 $1,123,650 $3,598,798
$237,941 $1,785,534 $759,354 $1,123,650 $3,598,798Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 88/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
FPN: 4371061 Project/Location: MANATEE/SARASOTA TMC OPS FUND COUNTY
WIDE
Project Length: 0.001
Desc: OTHER ITS
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $429,000
OPS DS $429,000 $429,000 $429,000 $429,000 $429,000
$858,000 $429,000 $429,000 $429,000 $429,000Project Total:
FPN: 4353691 Project/Location: MOCCASIN WALLOW ROAD AT US 41
Project Length: 0.100
Desc: ADD TURN LANE(S)
Comments:
Begin Mile Post: 6.142 End Mile Post: 6.242
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE ACSU $8,469
ROW SU $69,412
CST SU $230,770
$77,881 $230,770Project Total:
FPN: 4332131 Project/Location: MORGAN JOHNSON ROAD FROM RIVERSIDE
TERRACE TO SR 64
Project Length: 0.657
Desc: SIDEWALK
Comments:
Begin Mile Post: 1.543 End Mile Post: 2.200
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE TALU $8,184
CST TALT $89,838
CST TALU $444,003
$8,184 $533,841Project Total:
FPN: 4136421 Project/Location: PALMETTO TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.751
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 0.505 End Mile Post: 1.256
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $49,631 $49,389 $50,871 $52,397 $53,969
$49,631 $49,389 $50,871 $52,397 $53,969Project Total:
FPN: 4389921 Project/Location: SOUTHERN PARKWAY WEST FROM 43RD STREET
WEST TO 26TH STREET WEST
Project Length: 0.001
Desc: BIKE PATH/TRAIL
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE TALT $215,000
$215,000Project Total:
FPN: 4350901 Project/Location: SR 70 (15TH STREET E) AT 9TH AVE
E
Project Length: 0.136
Desc: ROUNDABOUT
Comments:
Begin Mile Post: 2.652 End Mile Post: 2.788
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $16,736
RRU SU $100,000
ROW ACSU $365,882
ROW SU $373,920
CST SU $1,237,637
$756,538 $1,337,637Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 98/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
FPN: 4380621 Project/Location: SR 43 (US 301) FROM 2ND AVENUE TO W. OF 51ST
AVE
Project Length: 3.324
Desc: RESURFACING
Comments:
Begin Mile Post: 0.542 End Mile Post: 3.866
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $19,152
RRU DS $500,000
CST DDR $1,109,856
CST DIH $528,000
CST DS $9,275,467
$19,152 $500,000 $10,913,323Project Total:
FPN: 4081853 Project/Location: SR 64 (MANATEE AVE) FROM SR 789 TO PERICO
BAY BOULEVARD
Project Length: 1.936
Desc: BRIDGE REPLACEMENT
Comments:
Begin Mile Post: 0.216 End Mile Post: 2.152
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $36,280
ENV DDR $825,000
$36,280 $825,000Project Total:
FPN: 4366841 Project/Location: SR 64 (MANATEE AVE) FROM E OF 7TH STREET W
TO E OF 5TH STREET W
Project Length: 0.106
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 1.194 End Mile Post: 1.300
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $6,611
ENV DDR $10,000
ENV DS $50,000
RRU DS $250,000
CST DDR $336,755
CST DIH $10,250
$326,861 $336,755Project Total:
FPN: 1960225 Project/Location: SR 64 AT RYE ROAD
Project Length: 0.501
Desc: INTERSECTION IMPROVEMENT
Comments:
Begin Mile Post: 10.340 End Mile Post: 10.841
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE DIH $1,867
PE DIH $5,306
ROW DIH $24,720
ROW DS $77,250
CST DSB1 $3,389,100
$109,143 $3,389,100Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 108/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
FPN: 4351361 Project/Location: SR 64 FROM MARTINIQUE DR TO EAST OF 107TH
CT WEST
Project Length: 0.987
Desc: BIKE LANE/SIDEWALK
Comments:
Begin Mile Post: 1.583 End Mile Post: 2.570
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE TALU $28,014
CST DS $22,767
CST TALT $10,270
CST TALU $319,820
$28,014 $352,857Project Total:
FPN: 4371451 Project/Location: SR 684 (CORTEZ ROAD) AT 43RD STREET
WEST
Project Length: 0.001
Desc: ADD TURN LANE(S)
Comments:
Begin Mile Post: 5.979 End Mile Post: 5.980
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $1,000
PE LFP $31,350
PE TRIP $31,350
CST DIH $1,000
CST LFP $240,300
CST TRIP $177,631
CST TRWR $62,669
$63,700 $481,600Project Total:
FPN: 4365511 Project/Location: SR 684 FROM 119TH ST WEST TO 86TH ST
WEST
Project Length: 2.068
Desc: SKID HAZARD OVERLAY
Comments:
Begin Mile Post: 1.188 End Mile Post: 3.256
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $10,000
CST DIH $52,800
CST DS $52,967
CST HSP $2,735,881
$10,000 $2,841,648Project Total:
FPN: 4302042 Project/Location: SR 684 FROM SR 789 (GULF DRIVE) TO 123RD
STREET WEST
Project Length: 0.900
Desc: REPLACE MOVABLE SPAN BRIDGE
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.900
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DDR $7,250,000
PE DIH $42,870
ROW DSB1 $3,161,553
$7,292,870 $3,161,553Project Total:
FPN: 4369241 Project/Location: SR 70 AT 30TH STREET EAST
Project Length: 0.200
Desc: INTERSECTION IMPROVEMENT
Comments:
Begin Mile Post: 1.148 End Mile Post: 1.348
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $150,000
$150,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 118/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
FPN: 4388431 Project/Location: SR 70 AT US 301
Project Length: 0.002
Desc: ADD RIGHT TURN LANE(S)
Comments:
Begin Mile Post: 1.001 End Mile Post: 1.002
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $245,000
$245,000Project Total:
FPN: 4145062 Project/Location: SR 70 FROM LORRAINE RD TO CR
675/WATERBURY ROAD
Project Length: 6.091
Desc: PD&E/EMO STUDY
Comments:
Begin Mile Post: 9.476 End Mile Post: 15.567
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE DDR $1,200,000
PDE DIH $435,920
PE DDR $3,580,000
PE DIH $20,000
ROW DSB1 $10,945,385
$5,235,920 $10,945,385Project Total:
FPN: 4365461 Project/Location: SR 70 FROM US 41 TO 540' EAST OF US
41
Project Length: 0.102
Desc: INTERSECTION IMPROVEMENT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.102
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE ACSA $9,687
PE DIH $874
CST DS $4,497
CST HSP $166,300
CST SA $21,659
$10,561 $192,456Project Total:
FPN: 4366761 Project/Location: SR 789 (LONGBOAT KEY) FROM NORTH SHORE
RD TO COQUINA PARK ENT
Project Length: 0.710
Desc: PD&E/EMO STUDY
Comments:
Begin Mile Post: 4.467 End Mile Post: 5.177
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE SA $2,325,000
$2,325,000Project Total:
FPN: 4279952 Project/Location: SR43 (US 301) FROM CR 675 TO MOCCASIN
WALLOW ROAD
Project Length: 1.212
Desc: LANDSCAPING
Comments:
Begin Mile Post: 10.457 End Mile Post: 11.669
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST DDR $462,220
$462,220Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 128/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
FPN: 4366821 Project/Location: US 301 (10TH STREET) FROM 5TH AVENUE DR W.
TO 3RD AVENUE W.
Project Length: 0.328
Desc: RAIL SAFETY PROJECT
Comments:
Begin Mile Post: 0.196 End Mile Post: 0.524
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DDR $40,000
PE DIH $5,443
RRU DDR $650,000
CST DDR $1,304,495
CST DIH $20,540
$45,443 $670,540 $1,304,495Project Total:
FPN: 4352861 Project/Location: US 301 AT ERIE RD/OLD TAMPA HWY
Project Length: 0.200
Desc: ADD LEFT TURN LANE(S)
Comments:
Begin Mile Post: 6.127 End Mile Post: 6.327
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $178,000
CST SU $562,290
$178,000 $562,290Project Total:
FPN: 4345051 Project/Location: US 301 AT SR 70
Project Length: 0.500
Desc: INTERSECTION IMPROVEMENT
Comments:
Begin Mile Post: 3.810 End Mile Post: 4.310
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SA $7,793
ENV ACSA $30,000
CST ACSA $10,250
CST DDR $35,576
CST HSP $491,883
$575,502Project Total:
FPN: 4295061 Project/Location: US 41 / SR 45 FROM 63RD AVE W TO 53RD AVE
W
Project Length: 1.247
Desc: LIGHTING
Comments:
Begin Mile Post: 3.019 End Mile Post: 4.266
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ROW DIH $27,290
ROW HSP $879,919
CST SA $2,755
$909,964Project Total:
FPN: 4365091 Project/Location: US 41 BUSINESS (9TH STREET WEST) FROM 3RD
AVENUE TO MANATEE AVE (SR64)
Project Length: 0.134
Desc: ADD RIGHT TURN LANE(S)
Comments:
Begin Mile Post: 0.213 End Mile Post: 0.347
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $7,719
CST DDR $1,256,785
CST DIH $53,348
CST DS $5,135
$7,719 $1,315,268Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 138/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
FPN: 4335471 Project/Location: US 41 BUSINESS AT 3RD AVE
Project Length: 0.048
Desc: ADD RIGHT TURN LANE(S)
Comments:
Begin Mile Post: 0.323 End Mile Post: 0.371
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $13,855
CST DS $5,135
CST SU $154,690
$13,855 $159,825Project Total:
FPN: 4383741 Project/Location: US 41 FROM 301 BLVD TO 21ST AVE
Project Length: 1.038
Desc: SAFETY PROJECT
Comments:
Begin Mile Post: 0.220 End Mile Post: 1.258
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $10,000
PE HSP $242,790
CST DIH $21,120
CST DS $35,930
CST HSP $721,390
$252,790 $778,440Project Total:
FPN: 4335921 Project/Location: US 41 FROM 69TH AVE (BAY DRIVE) TO CORTEZ
ROAD
Project Length: 3.032
Desc: SIDEWALK
Comments:
Begin Mile Post: 2.252 End Mile Post: 5.284
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE TALU $21,958
ROW DSB1 $4,737,000
$21,958 $4,737,000Project Total:
FPN: 4353491 Project/Location: US 41 GREEN BRIDGE MULTI-USE
PATH
Project Length: 1.032
Desc: BIKE PATH/TRAIL
Comments:
Begin Mile Post: 0.347 End Mile Post: 1.379
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE TALU $15,473
ENV TALU $15,000 $30,000
CST DS $51,350
CST TALT $2,166,103
$30,473 $2,247,453Project Total:
HIGHWAYS TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$107,110,676 $25,124,764 $39,044,599 $6,515,320 $9,163,652
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 148/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
MISCELLANEOUS
FPN: 4368021 Project/Location: ATMS BLUETOOTH SYSTEM AT VARIOUS
LOCATIONS THROUGHOUT THE COUNTY
Project Length: 0.001
Desc: ATMS - ARTERIAL TRAFFIC MGMT
Comments:
Begin Mile Post: 0.001 End Mile Post: 0.002
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP ACSU $76,631
$76,631Project Total:
FPN: 4371021 Project/Location: ATMS MASTERPLAN & CONCEPT OF
OPERATIONS FOR REGIONAL TRAFFIC MGMT
SYST
Project Length: 0.001
Desc: ATMS - ARTERIAL TRAFFIC MGMT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE ACSU $10,000
$10,000Project Total:
FPN: 4369541 Project/Location: ATMS PROJECT TRAVELER INFORMATION
WEBSITE FOR THE RTMC
Project Length: 0.001
Desc: ATMS - ARTERIAL TRAFFIC MGMT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE ACSU $500
$500Project Total:
MISCELLANEOUS TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$87,131
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 158/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
FLP: SEAPORT
FPN: 4333021 Project/Location: PORT MANATEE RAIL TO DOCKSIDE CAPITAL
IMPROVEMENTS
Project Length: 0.000
Desc: SEAPORT CAPACITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP GMR $2,000,000
CAP LF $2,000,000
$4,000,000Project Total:
FPN: 4390771 Project/Location: STATE FUNDED SIB LOAN TO MANATEE
PORT
Project Length: 0.000
Desc: SEAPORT CAPACITY PROJECT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP SIB1 $4,000,000
$4,000,000Project Total:
FLP: SEAPORT TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$4,000,000 $4,000,000
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 168/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
FLP: TRANSIT
FPN: 4378391 Project/Location: BUS STOPS IN MANATEE COUNTY VARIOUS
LOCATIONS
Project Length: 0.000
Desc: PUBLIC TRANSPORTATION SHELTER
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP FTAT $292,082
CAP SU $292,082
$584,164Project Total:
FPN: 4345172 Project/Location: MANATEE CO./SAR-BRADENTON UZA FTA
SECTION 5339 CAPITAL ASSISTANCE
Project Length: 0.000
Desc: CAPITAL FOR FIXED ROUTE
Comments: MANATEE COUNTY MCAT- DESIGNATED RECIPIENT
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP FTA $825,269 $408,943 $408,943 $408,943 $416,326
CAP LF $206,317 $102,236 $102,236 $102,236 $104,081
$1,031,586 $511,179 $511,179 $511,179 $520,407Project Total:
FPN: 4108951 Project/Location: MANATEE COUNTY AREA TRANSIT - OPERATING
ASSISTANCE - CORRIDOR
Project Length: 0.000
Desc: URBAN CORRIDOR IMPROVEMENTS
Comments: STATE TRANSIT CORRIDOR PROGRAM
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DPTO $756,831 $807,140 $813,451 $837,864 $837,864
OPS LF $756,831 $807,140 $813,451 $837,864 $837,864
$1,513,662 $1,614,280 $1,626,902 $1,675,728 $1,675,728Project Total:
FPN: 4308451 Project/Location: MANATEE COUNTY AREA TRANSIT (MCAT)
OPERATING ASSISTANCE
Project Length: 0.000
Desc: OPERATING FOR FIXED ROUTE
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DPTO $1,087,500
OPS LF $1,087,500
$2,175,000Project Total:
FPN: 4390351 Project/Location: MANATEE COUNTY AREA TRANSIT (MCAT) BUS
PURCHASES
Project Length: 0.000
Desc: PURCHASE VEHICLES/EQUIPMENT
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP FTAT $1,780,000
CAP SU $1,780,000
$3,560,000Project Total:
FPN: 4101481 Project/Location: MANATEE COUNTY FTA SECTION 5307 CAPITAL
ASSISTANCE
Project Length: 0.000
Desc: CAPITAL FOR FIXED ROUTE
Comments: SECTION 5307 - CAPITAL
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP FTA $6,151,466 $2,843,935 $2,843,935 $3,002,710 $3,307,531
CAP LF $1,537,867 $710,984 $710,984 $750,678 $826,883
$7,689,333 $3,554,919 $3,554,919 $3,753,388 $4,134,414Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 178/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYMANATEE
FPN: 4101482 Project/Location: MANATEE COUNTY FTA SECTION 5307
OPERATING ASSISTANCE
Project Length: 0.000
Desc: OPERATING FOR FIXED ROUTE
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS FTA $1,350,000 $850,000 $850,000 $750,000 $500,000
OPS LF $1,350,000 $850,000 $850,000 $750,000 $500,000
$2,700,000 $1,700,000 $1,700,000 $1,500,000 $1,000,000Project Total:
FPN: 4101411 Project/Location: MANATEE COUNTY STATE TRANSIT BLOCK
GRANT OPERATING ASSISTANCE
Project Length: 0.000
Desc: OPERATING FOR FIXED ROUTE
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $1,324
OPS DPTO $884,836 $907,711 $937,678 $984,562 $1,033,790
OPS LF $886,160 $907,711 $937,678 $984,562 $1,033,790
$1,772,320 $1,815,422 $1,875,356 $1,969,124 $2,067,580Project Total:
FLP: TRANSIT TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$16,881,901 $9,195,800 $9,268,356 $9,993,583 $12,958,129
COUNTY TOTALSMANATEE
Phase Fund Total2016/17 2017/18 2018/19 2019/20 2020/21
$128,079,708 $38,320,564 $48,312,955 $16,508,903 $22,121,781COUNTY Total: $253,343,911
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 188/18/2016Run Date: SnapShot Date: 7/20/2016