Flood Proposal for : Building Commissioning Services State College Area School District High School Project Centre County, Pa. Kevin Little—President 718 Limekiln Road New Cumberland, Pa 17070 Phone: 717.232.0529 Fax: 717.232.1797 [email protected] January 6, 2015 & Sterling, Inc.

Transcript of Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers...

Page 1: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Flood

Proposal for : Building Commissioning Services

State College Area School District High School Project

Centre County, Pa.

Kevin Little—President

718 Limekiln Road New Cumberland, Pa 17070

Phone: 717.232.0529 Fax: 717.232.1797

[email protected]

January 6, 2015

& Sterling, Inc.

Page 2: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

1

2

3

4

5

Firm History, Personnel & Qualifications

Building Commissioning Experience

Commissioning General Approach

Work Samples

Proposal and Sample Form of Agreement

INDEX

10

Page 3: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Flood & Sterling, Inc. 718 Limekiln Road · New Cumberland, Pa 17070 · Tel. (717) 232-0529 · Fax.(717) 232-1797

History Flood & Sterling has been in the Testing and Adjusting Business since 1969 and providing Commissioning services since 1985. We have provided direct Independent 3rd Party Testing services since our company formed. Our goal has always been to assure the owner of a properly operating system including control function. In 1985 Merck Pharmaceuticals requested that we “Commission” all the HVAC and Non-HVAC Components recently installed in Building 48 and Building 78 (both lab buildings) at the Lansdale site in Pennsylvania. This was Flood & Sterling’s first official Commissioning project (a lab building) This project was a complete success for Merck as well as Flood & Sterling, Inc. We have continued to provide Commissioning Services for many sectors of the industry including,

Primary Educational Facilities Hospitals Universities

We currently have contracts in place to provide commissioning services for,

Geisinger Medical Center – Grays Woods II – LEED Project Connellsville High School – LEED Project Flight 93 - Shanksville, Pa - LEED Project Army National Guard, Newtown Square, Pa – LEED Project

Our continuing goal is to provide professional independent TAB and Commissioning services that assure the “owner” receives a system that was properly installed and functions as intended. We do this by monitoring the project through design document review, submittal review, installation inspections and functional testing. All of which is documented for proof of performance. Flood & Sterling, Inc. would consider it an honor to be of service to The State College School District Our President Kevin Little and Dan Acri will be the primary contact on this project and can be reached at our main email address [email protected] and directly at [email protected], [email protected]

Page 4: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Flood & Sterling, Inc Personnel - 2015

Daniel J. Acri - AABC (Associated Air Balance Council) Test and Balance Certified

Engineer - 40+ years experience testing, adjusting and balancing. Has completed certified cooling tower performance testing and cleanroom performance testing. President of F&S – ACG Certified Commissioning Agent – Former President of ACG – AABC Commissioning Group. – Past Vice President of Zone 1 of the AABC, past Secretary Treasurer of AABC. Currently President of AABC, Certified Energy Management Professional.

Kevin K. Little - President of Flood & Sterling - 25 years experience testing, adjusting and balancing. – AABC (Associated Air Balance Council) Test and Balance Certified Engineer

Charles D. Evens - Technician - 31 years experience testing, adjusting and balancing. Certified AABC Testing and Balancing technician, BA degree in Marketing – Secretary of Flood & Sterling

Bret Morgan - Technician - 20 years experience testing, adjusting and balancing,

AABC (Associated Air Balance Council) Test and Balance Certified Engineer. ACG Certified Commissioning Agent, Associate Degree from Penn State University in Mechanical Engineering Technology. BS degree from York College in Business Management. – Vice President of Flood & Sterling

Joe Zapotoczny – Technician – 25 years experience TAB. – Lead Certifying Agent

for the Pittsburgh University Project- Vice President of Flood & Sterling Brett Frey – Technician – 15 years experience testing, adjusting and balancing.

Don Farr - Technician – 29 years experience testing, adjusting and balancing.

Daniel M. Acri – 8th Period Apprentice – 6 years experience testing, adjusting and

balancing - These Seven men have been certified by the Associated Air Balance Council for TAB

Technicians.

Page 5: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Office Personnel

Joe Acri - Estimator - Evaluating building blue prints. Determining cost of Jobs. Attend meetings scheduled by Contractors.

Tara L. Little - Accountant – Dubois Business College, Associate Degree; Business Admin and Accounting. Accounts Receivable and Payable; Accounts Billing and Payroll, Job Costing, Tax Preparation John W. Martz III – Admin Service/IT Manager - Computer Specialist Degree (Thompson Institute) Handling, organizing all Misc office needs, including Inventory, Report Forms, Shipping/Receiving. Pay Roll Preparation and Union Forms.

Page 6: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

DANIEL J. ACRI

FLOOD & STERLING, INC. 718 LIMEKILN ROAD

NEW CUMBERLAND, PA 17070 Dan Acri has a 40+ year career in the HVAC industry. He began as an estimator/office assistant in 1972 with Flood & Sterling. In 1975 Dan entered the field as a balancing technician, working in that capacity until 1990. In 1990, then-owner, Joseph R. Flood requested Dan lead Flood & Sterling as Manger of Operations. With Joe Flood nearing retirement, Dan was named President of the corporation in 1995. Dan and 4 fellow employees purchased Flood & Sterling, Inc. in 1999. Education: Graduate of Red Land High School, Etters, PA – 1971 Harrisburg Area Community College, Harrisburg, PA – 1972 Graduate of Sheet Metal Workers Local 19 Apprenticeship School – 1984

Certifications: TABB Certification, Chicago, IL – 1985 AABC TBE Exam Certification, Washington, D.C. – 1997 ACG Certified Commissioning Agent, Washington D.C. – 2001 EMP Energy Management Professional - 2012

Other: Completed training requirements for Cooling Tower Performance Testing, Baltimore,

MD - 1989 Completed Clean Room Performance Testing, University of Arizona, Tempe, AZ - 1991

AABC Commitments: AABC Energy Advantage Committee Chairman Vice President of the Associated Air Balance Council (2012-2014) Secretary Treasurer of AABC (2012) Executive Vice President (2012-2014) President (2015)

Membership: Harrisburg Chapter of ASHRAE Member of Central Pennsylvania Green Building Association Member of BCA Member of Associated Air Balance Council AABC Member of ACG AABC Commissioning Group Member of USGBC

Page 7: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

BRET E. MORGAN, VICE-PRESIDENT

FLOOD & STERLING, INC. 718 LIMEKILN ROAD

NEW CUMBERLAND, PA 17070

After graduating college, Bret Morgan entered the HVAC industry as an apprentice in Sheet Metal Workers Local #19. Following two years of layout, fabrication and installation of industrial and commercial ductwork systems, Bret shifted his career path to the testing and balancing field. The remaining two years of his apprenticeship were served at Flood & Sterling under the tutelage of Joseph Flood, acquiring the necessary skills and experience to successfully balance and commission a wide range of systems. Bret achieved Journeyman status in 1998 and the following year, after Mr. Floods’ retirement, Bret and 4 fellow employees purchased Flood & Sterling, in which he became Vice-President. In addition to performing office based balancing and commissioning activities - quotations, design reviews & reports, Bret enjoys a hands-on approach and routinely works in the field. Education: Graduate of Spring Grove Area High School, College Preparatory - 1987 Graduate of Penn State University, Mechanical Engineering Technology - 1989 Graduate of York College of Pennsylvania, Business Management - 1994 Graduate of Sheet Metal Workers Local #19 Apprenticeship School - 1998

Certifications: AABC Certified Test & Balance Technician, Washington D.C. - 2001 TABB Air & Water Certified Technician, Philadelphia, PA - 2003 AABC Certified Test & Balance Engineer, Washington D.C. - 2005 ACG Certified Commissioning Agent, Washington D.C. - 2008 LEED – Green Advantage Certification, Penn State University - 2010

Other: National Energy Control Corp: Advanced DDC Controls - 1997 The Crosby Group: Comprehensive Jobsite Safety & Risk Management - 1997 ITI: Advanced Environmental Training - 1998 OSHA 30: US Dept. of Labor, Occupational Safety and Health Admin. - 2004 Ebtron Inc: Airflow Measurement for Acceptable Indoor Air Quality - 2010

Page 8: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

KEVIN K. LITTLE, PRESIDENT

FLOOD & STERLING, INC. 718 LIMEKILN ROAD

NEW CUMBERLAND, PA. 17070

Kevin Little quickly started his career after graduating from high school. Kevin enrolled into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years of the apprentice program and being educated in the science of testing balancing and commissioning by many of the best seasoned Professionals in the industry like Joe Flood, Bob Duncan, Walt Little, Dave Walter, and Dan Acri. Kevin acquired all the necessary skills to successfully balance and commission many different types of systems. In 1995 Kevin completed his apprenticeship and gained journeyman status as he continued to work with previous mentioned Professionals. Kevin continued to work under the guidance of Joe Flood up until Joe’s retirement in 1999. Kevin then decided to become a partner in the company and continued to work under the guidance of Dan Acri for 15 years until Dan’s decision to step down from the day to day operations of Flood & Sterling, Inc. in 2014. At this point in Kevin’s career he was appointed president of Flood & Sterling, Inc. to handle the daily operations of the business. Kevin continues to return to the field for balancing and problem solving when needed. Education: Graduate of East Pennsboro Area High School – 1991 Graduate of Sheet Metal Workers Local # 19 Apprenticeship – 1995

Certifications: AABC Certified Test & Balance Engineer (TBE) Washington, D.C. National Energy Control Corp. Advanced DDC Controls

OSHA 30 US Department of Labor, Occupational and Health Administration

Page 9: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

F

low

Cha

rt

Bre

t M

orga

n C

xA

Chu

ck E

vens

F

ield

Tec

hni

cian

D

on F

arr

Fie

ld T

ech

nici

an

Bre

tt F

rey

Fie

ld T

ech

nici

an

Kev

in L

ittle

P

resi

dent

Bre

t M

orga

n D

an A

cri

Fin

al R

epor

t

Dan

Acr

i P

rinci

pal

C

xA

Cus

tom

er

Page 10: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 11: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 12: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 13: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 14: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Flood & Sterling, Inc. 718 Limekiln Road · New Cumberland, Pa 17070 · Tel. (717) 232-0529 · Fax.(717) 232-1797

Projects Completed

1. DEP in Harrisburg

Approximately 100,000 sqft. of laboratory / office space. Variable volume fume hood operation with constant volume supply Co-Gen chillers with heat reclaims and redundant components for all HVAC

components LEED Field Technician – Kevin Little Contact – Frank Baxter @ Vartan Group, (717) 909-8200 2. University of Pittsburgh Classroom Building

Approximately 150,000 sqft. of class room space 3 stories variable volume with constant volume exhaust

LEED Field Technician – Joe Zapotoczny Contact – Richard Meyer @ University of Pittsburgh, Facilities Management, (412) 624-4984 3. Midd-West School District, Middleburg Middle School

Approximately 50,000 sqft. VAV supply with 4 pipe chilled water Hot water system constant volume exhaust

LEED Technician – George Reis Contact – Gary Thomas @ Midd-West School District, (570) 837-0046 4. Scranton Army Reserve Center - (LEED Certified)

Approximately 75,000 sqft. Training Center 7 AHU’s Variable volume 12 Exh Fans

LEED Technician – George Reis Contact – Tom Jackson @ lobar, Inc., (717) 877-9797, [email protected]

Page 15: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

2

5. Danville Army Reserve Center - (LEED Certified)

Approx 60,000 sqft training Center 7 AHU’s Variable Volume 11 Exhaust Fans

LEED Technician – George Reis Contact – Tom Jackson @ lobar, Inc., (717) 877-9797, [email protected] 6. Catasauqua High School

Approximately 200,000 sqft of Class Room Office Space 37 Rooftop Units with Heat Recovery (VAV) 28 Exhaust Fan 130 GRD’s

LEED Technician – Bret Morgan Contact – Frank Dehaut @ Quality Assurance Plus (717) 458-0238 7. Geisinger Medical Center – Sports Medicine (Danville, Pa)

40,000 sqft of Medical Facility 1 Story 4 Pipe Hot & Chilled Water Rehab Facility

LEED Technician – George Reis Contact – Larry Pardoe @ Geisinger (570) 271-6938 8. Connellsville High School (Connellsville, Pa)

320,000 sqft of Medical Space 2 Story Heat Pump

LEED Technician – George Reis Contact – Keith Gingrich @ Quality Assurance Plus (717) 458-0272

Page 16: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

. . . . . . . . .

. . .

. . .

. . .

. . .

. . .

. . .

. . .

. . .

. . .

.

FLO

OD

& S

TE

RL

ING

, IN

C.

Flo

od &

Ste

rlin

g h

as p

rovi

ded

TA

B a

nd

Com

mis

sion

ing

serv

ices

for

th

e fo

llow

ing

faci

liti

es:

Pro

ject

Loc

atio

n

C

ost

Sq.

Foo

tage

C

om. D

ate

C

onta

ct

Eis

enho

wer

Ele

m S

choo

l - T

AB

Cam

p H

ill,

Pa

$42

,000

.00

32

,000

20

12

F

rank

DeH

aut

(

717)

458

-023

8 E

isen

how

er E

lem

Sch

ool -

Cx

C

amp

Hil

l, P

a

$4

8,00

0.00

3

2,00

0

20

12

Fra

nk D

eHau

t

(71

7) 4

58-0

238

Qua

lity

Ass

uran

ce P

lus

Q

uali

t y A

ssur

ance

Plu

s

Gar

den

Spo

t Mid

dle

Sch

ool –

TA

B

N

ew H

olla

nd, P

a

$14

4,00

0.00

20

0,00

0

2

012

Fra

nk D

eHau

t

(71

7) 4

58-0

238

Q

uali

ty A

ssur

ance

Plu

s

Hil

lsid

e E

lem

Sch

ool –

TA

B

N

ew C

umbe

rlan

d, P

a

$35,

000.

00

48,0

00

201

1 F

rank

DeH

aut

(

717)

458

-023

8 H

ills

ide

Ele

m S

choo

l - C

x

New

Cum

berl

and,

Pa

$37,

000.

00

48,0

00

201

1

F

rank

DeH

aut

(

717)

458

-023

8

Qua

lity

Ass

uran

ce P

lus

Jam

es B

ucha

nan

Hig

h S

choo

l - T

AB

M

erce

rsbu

rg, P

a $7

2,00

0.00

14

8,00

0

2

012

Fra

nk D

eHau

t

(71

7) 4

58-0

238

Qua

lity

Ass

uran

ce P

lus

Qua

lity

Ass

uran

ce P

lus

Jam

es B

ucha

nan

Hig

h S

choo

l – C

x M

erce

rsbu

rg, P

a $7

5,00

0.00

148

,000

2

012

Fra

nk D

eHau

t

(71

7) 4

58-0

238

Q

uali

ty A

ssur

ance

Plu

s

Let

terk

enny

Mis

sile

Fac

ilit

y

Cha

mbe

rsbu

rg, P

a $7

2,00

0.00

40

,000

2

010

Tim

Phi

pps

(

717)

432

-972

8 G

eisi

nger

– H

AM

D

anvi

lle,

Pa

$2

80,0

00.0

0

35

0,00

0

2

010

Jas

on F

eric

o

(

215)

923

-202

0 L

obar

, Inc

.

Ew

ing

Col

e

“Com

mitt

ed to

Exc

elle

nce”

Page 17: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

. . . . . . . . .

. . .

. . .

. . .

. . .

. . .

. . .

. . .

. . .

. . .

.

FLO

OD

& S

TE

RL

ING

, IN

C.

Flo

od &

Ste

rlin

g h

as p

rovi

ded

TA

B a

nd

Com

mis

sion

ing

serv

ices

for

th

e fo

llow

ing

faci

liti

es:

Pro

ject

Loc

atio

n

C

ost

Sq.

Foo

tage

C

om. D

ate

C

onta

ct

Red

Lan

d H

igh

Sch

ool -

TA

B

Lew

isbe

rry,

Pa

$

67,0

00.0

0

2

08,0

00

2

012

Fra

nk D

eHau

t

(71

7) 4

58-0

238

Red

Lan

d H

igh

Sch

ool -

Cx

L

ewis

berr

y, P

a

$6

9,00

0.00

20

8,00

0

20

12

Fra

nk D

eHau

t

(71

7) 4

58-0

238

Qua

lity

Ass

uran

ce P

lus

Q

uali

t y A

ssur

ance

Plu

s

Red

Lio

n H

igh

Sch

ool –

Cx

Red

Lio

n, P

a

$10

7,00

0.00

16

0,00

0

2

009

Fra

nk D

eHau

t

(71

7) 4

58-0

238

Q

uali

ty A

ssur

ance

Plu

s

“Com

mitt

ed to

Exc

elle

nce”

Page 18: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Flood & Sterling, Inc. 718 Limekiln Road · New Cumberland, Pa 17070 · Tel. (717) 232-0529 · Fax.(717) 232-1797

Commissioning Approach for All Equipment Systems and Subsystems included in RFP To accomplish the scope of commissioning, each team member must be an active, positive force in the process. As the Commissioning agent, Flood & Sterling will bring these team members together in a transparent process of goal attainment through scheduling coordination and problem resolution. By working closely with the design team early on, an open line of communication is formed as a solid foundation for construction related design issues. By working closely with the general contractor on the commissioning schedule an alliance is formed to maintain the construction schedule and the commissioning schedule. This schedule coordination helps the mechanical, controls, test and balance, and electrical contractors meet the major milestones and eliminates conflicts that could affect the schedule. Bringing the team members together at the “kick off” meeting assures their understanding for the commissioning process. Providing the system verification checklists (SVC) and start-up reports at the initial meeting clearly identifies the testing to be accomplished during the construction phase. The regularly scheduled commissioning meetings will keep all parties on track and working together. Using this approach and including all team members in the process has proven to be the most thorough, efficient and effective method for delivering the commissioning process. Itemized below are the interactions and activities at each major milestone in the scope of work: Design Review – The Design Intent Document (DID) represents plans and specifications at 90%/100% completion. These documents have been reviewed with special attention to adherence of selected equipment to the design intent, optimization of performance, accessibility, TAB provisions, O&M considerations, and other aspects that relate to the commissioning process. Commissioning Meeting Leadership – As the commissioning agent, Flood & Sterling will schedule and lead all commissioning meetings. These meetings will keep the commissioning progress on track and will be a forum to resolve any conflicts with schedule or construction issues. Minutes will be maintained by Flood & Sterling and all problems will be recorded on the Resolution Tracking Form. This report will track all issues through to their completion. Field Inspections – Flood & Sterling will perform periodic field inspections to review the general construction quality and progress. Witness Test – Flood & Sterling will witness all field tests such as hydronic piping leak tests, duct leakage tests, smoke purge tests, etc. The results of these tests will be included in the final commissioning report.

Page 19: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

System Verification Checklists (SVC) – Flood & Sterling will develop SVC’s based on the DID. These checklists will be created for all systems and subsystems. Draft copies will be submitted to the DE and the contractor for review and comments prior to placement on the jobsite. These SVC’s will be bound in the three-ring binder and placed on the jobsite for use by the installing contractor. No system will be started until the appropriate SVC’s have been completed and verified by Flood & Sterling. Functional Performance Tests (FPT) – Flood & Sterling will develop FPT’s based upon the DID. These tests will be created for all systems and subsystems. Manufacturer’s Pre-Start Checklists/Start-up Procedures – The manufacturers pre-start checklist and start-up procedures will be supplied by installing contractor to Flood & Sterling. These lists will be included in the three-ring binder along with the SVC’s for use by the installing contractor. Preliminary TAB Review – The preliminary TAB report set-up and TAB procedures will be reviewed prior to HVAC equipment start-up this will ensure that the final TAB report format and content is acceptable and meets the referenced standards. Equipment Start-Up – Start-up for major systems will be witness by Flood & Sterling. The appropriate contractors and/or manufacturer’s representative will be required on site to perform start-up. No system will be started until the manufacturer checklists have been completed. Start-up will be performed according to the manufacturer recommended procedures. Flood & Sterling will visit the site regularly to review completeness of the installation. These visits are usually in conjunction with progress meetings prior to starting equipment. TAB Review – A draft copy of the TAB report will be reviewed prior to submission of the final TAB report. A written review will be submitted to the TAB contract and to the DE for their comments. An acceptable TAB report will be required before functional performance testing can be carried out. Flood & Sterling will visit the site during the TAB process in order to observe both the test and balance and control contractor’s activities. Functional Performance Testing – Each major system will be tested when deirected. A random sample of each subsystem will be tested. This will be coordinated and witnessed by a Flood & Sterling representative and the Owner’s maintenance staff. Witnessing the FPT’s will constitute part of the O&M training. No FPT’s will be performed until the system sand related subsystems have been started, the TAB work has been completed and control contractor pre-commissioning is complete.

2

Page 20: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

3

Building Turnover/O&M Training – Owner training will be coordinated through Flood & Sterling. The training will be provided by the installing contractor and/or manufacturer’s representative, and witnessed by Flood & Sterling. This training will include both classroom training and hands-on operations training. Flood & Sterling will videotape this training for future use. Flood & Sterling will visit the site to retest any failed FPT’s and ensure the systems are maintaining desired levels during the Owner staffing and move-in. Seasonal Testing – Flood & Sterling will revisit the site at the change of seasons to verify the systems are maintaining the desired comfort levels, perform seasonal performance tests, and verify the systems are operating properly. 11 Month Test – One month prior to the expiration of the contractor’s warranty, Flood & Sterling will visit the project to review the operation of all equipment. Defective equipment will be reported for repair by the contractor.

Page 21: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 22: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 23: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 24: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 25: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 26: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 27: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 28: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 29: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 30: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 31: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 32: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 33: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 34: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 35: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 36: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 37: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 38: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 39: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 40: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 41: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 42: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 43: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 44: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 45: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 46: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 47: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 48: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 49: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 50: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 51: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 52: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 53: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 54: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 55: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 56: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 57: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 58: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 59: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 60: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 61: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years
Page 62: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Page 1 of 2

January 8, 2015 Ed Poprik State College Area School District 131 West Nittany Ave. State College, Pa 16801 RE: State College High School SUB: Commissioning Proposal Mr. Poprik: This proposal is in response to the RFP dated December 15, 2014 Flood & Sterling will perform our services in compliance with the RFP, in accordance with LEED 2009 for Schools with the Goal of Gold Certification We offer the following breakdown of costs to perform our services incompliance with documents noted above. Enhanced Commissioning = Eighty Two Thousand Five Hundred Dollars ($82,500.00) Fundamental Commissioning = Three Hundred Ninety Thousand Dollars ($390,000.00) Total Cost = Forty Nine Thousand Two Hundred Seventy Dollars ($473,500.00) Alternate Envelope Commissioning Costs = Fifty Five Thousand Dollars ($55,000.00) SYSTEMS TO BE COMMISSIONED The following systems, including all components and controls, are to be commissioned by the CPO (Flood & Sterling, Inc.) as part of the Scope of Work in accordance with the process will be assumed. 1. Central building automation systems, including linkage to remote monitoring and control sites (this excludes and security-related control systems or interlocks. 2. All equipment of the heating, ventilating and air conditioning (HVAC) Systems 3. Refrigeration Systems 4. Life Safety Systems (fire alarm, fire protection) 5. Service Water Systems, including rainwater harvesting systems 6. Domestic hot water systems

Page 63: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Page 2 of 2

7. Emergency power and uninterruptible power supply (UPS) systems and/or emergency generator 8. Communication and paging systems 9. Daylight harvesting, and central and local lighting control systems (including occupancy sensor sampling) 10. Building envelope systems to help ensure against bulk water intrusion, water infiltration, and air infiltration. 11. Additional systems depending upon the LEED credits pursued

Page 64: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Page  10  of  11  

Provider Organization, proposed terms and conditions, and a statement of insurance coverage(s) to be carried by the Commissioning firm. E. FEE PROPOSAL INFORMATION 1. Submit a Lump Sum Fee Proposal in the following format: ___________________________________________ proposes to provide Building Commissioning services to the State College Area School District for the High School construction project based on the Scope of Work described in Part B of this Request for Proposal and the Form of Agreement and its terms and conditions attached to the Proposal, for a fixed fee of: $______________________________. 2. In addition to the above referenced services, an additional fee is proposed to complete the Building Envelope Commissioning services, also described in Part B of this Request for Proposal as follows: $______________________________. 2. Provide a breakdown of the Lump Sum Fee Proposal, stating recommended sampling rates, and detailing tasks, hours, and costs for the following phases: a. Design Phase. b. Construction Phase 1- New. c. Construction Phase 2 – New/Renovation. d. Construction Phase 3 – North construction. e. Warranty/Acceptance Phase. 3. Provide a Fee Schedule of Hourly Rates used to calculate the above fees that will be used for any Additional Services that may be required on the project. 4. Reimbursable Expenses: The proposed Lump Sum Fee should include all reimbursable expenses. The Commissioning Provider Organization will not be reimbursed for the following: −Accounting −Telecommunications and Postage −Mileage, Transportation, and Parking −Travel Expenses −Photocopying and Office Supplies F. SELECTION AND CONTRACT AWARD 1. Evaluation and selection criteria: The submitted proposals will be evaluated according to the following criteria: Firm Experience 20 points CxA and Staff Experience 20 points Similar project experience 20 points Management approach 20 points Fee proposal 20 points Total 100 points Reference checks will not be scored individually, but will be used to supplement all categories. The

Page 65: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

. . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . .

718 LIMEKILN ROAD NEW CUMBERLAND, PA 17070 717.232.0529 717.232.1797-fax

FLOOD & STERLING, INC.

State College High School LEED GOLD Project

Estimated Cost Breakdown: A. Design Phase = $57,000.00 @ 450 Hours B. Construction Phase 1 New = $180,000.00 @ 1440 Hours C. Construction Phase 2 New/Reno = $180,000.00 @ 1440 Hours D. Construction Phase 3 North = $31,500.00 @ 252 Hours E. Warranty/Acceptance Phase = $25,000.00 @ 200 Hours The breakdown above is inclusive of 100% of the installed components. Our belief is random sampling puts the owner at risk. While sampling is of monetary value it assumes all components were manufactured and installed identically. Flood & Sterling highly recommends 100% Cx, due to the duration of this project as well as renovation and new construction, we have priced the project for 100% Component Commissioning. Signature

Kevin Little - President cc: Dan Acri

“Committed to Excellence”

Page 66: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Commissioning_Contract_20060718 1

AGREEMENT FOR HVAC COMMISSIONING SERVICES This Agreement for the Commissioning is made as of the ____ day of _______________________, 200___, by and between Owner Name ("Owner") and Flood & Sterling, Inc. ("Consultant").

Recitals

A. Owner has entered into a Commissioning Agreement with Flood & Sterling, Inc. ("Commissioning Agent") for the commissioning of __________________ (the "Project"). A general description of the Project is attached as __________________. The Owner will select the mechanical contractor ("Contractor"), which will install the heating, ventilation and air conditioning equipment and related controls for the Project.

B. Owner desires to engage Consultant to provide commissioning services relating to the installation, construction, integration, commissioning and start up of the equipment to be supplied, delivered and tested by Contractor, and Consultant desires to accept such engagement and perform such services for Owner.

Agreement

NOW, THEREFORE, Owner and Consultant agree as follows:

1. DEFINITIONS

The following terms when used in this Agreement shall have the meanings herein assigned to them unless the context of their use in this Agreement is inconsistent with such meanings:

1.1 AGREEMENT means this Agreement for Commissioning between Owner and Consultant including the Construction Schedule, and other documents included as addenda or exhibits hereto, and all other documents to which reference is made within this Agreement.

1.2 COMMISSION OR COMMISSIONING means the process of inspecting, verifying, documenting start up, testing performance and training of the Supply Package that meets the design intent and Owner's operational needs.

1.3 COMMISSIONING PLAN means the plan for commissioning of the Project to be created by the Consultant as required by Section 2.6(a) hereof.

1.4 COMMISSIONING SPECIFICATIONS means the commissioning specifications for the Project to be created by the Consultant as required by Section 2.6(b) hereof.

1.5 COMMISSIONING TEAM. The Commissioning Team (the "CT") shall consist of key parties involved in design, construction, and testing of this facility. It is necessary for each agency to appoint team members that will have long-term commitments to the Project. Switching team members during the Project will

Page 67: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Commissioning_Contract_20060718 2

reduce the ability of the CT to provide continuity and acceptable results to Owner. Team members must maintain an ongoing supervisory position on the Project. One team member shall be provided by each of the parties listed below:

a. Owner

b. Architect/Engineer (“AE”)

c. Construction Manager (“CM”)

d. Mechanical Contractor (“MC”)

e. Temperature Controls Contractor (“TCC”)

f. Test and Balance Contractor (“TABC”)

g. Electrical Contractor (“EC”)

h. Commissioning Agent (“CA”)

1.6 CONSTRUCTION SCHEDULE means the Schedule and Budget

1.7 CONTRACT means the Agreement between Owner and Consultant, including the Drawings and Specifications, Project Schedule, and other documents included as addenda thereto, the General Conditions of the Contract for Construction as amended by Owner's Supplementary Conditions, and all other documents to which reference is made within the Contract to ascertain the rights and obligations of the parties under the Contract, as amended from time to time as provided for therein.

1.8 CONTRACT SPECIFICATIONS means the HVAC Specifications incorporated in the Contract and any amendments thereto.

1.9 FINAL ACCEPTANCE means the issuance by Owner of a written certificate (the "Final Acceptance Certificate") confirming Owner's approval of a written report to be prepared by Consultant (the “Commissioning Report") documenting the results of the execution of each of the Performance Tests and demonstrating compliance of the Supply Package with the requirements of the Contract.

1.10 FORCE MAJEURE shall have the meaning ascribed to that term in Section 7.1 of this Agreement.

1.11 INTEGRATE OR INTEGRATION means that the equipment in the Supply Package effectively connects to and interfaces and communicates with each other, operationally and mechanically, as a single unit and effectively connects to and interfaces and communicates with the other components of the Project.

1.12 PERFORMANCE GUARANTEES means the minimum acceptable standards for operating performance of the Supply Package as required by the Contract.

1.13 PERFORMANCE TESTS means the various testing procedures to be developed in accordance with Section 2.2(i) hereof, satisfactory completion of which are required to demonstrate compliance with the Performance Guarantees.

1.14 SUPPLY PACKAGE means the heating, ventilation and air conditioning equipment and controls to be supplied, installed and placed into operation

Page 68: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Commissioning_Contract_20060718 3

pursuant to the Contract. The Supply Package will be integrated into the Project as part of the Contract and this Agreement.

1.15 PRECONSTRUCTION PHASE means the activities that will occur from the start of the Project through the Award of Bids to Contractors for construction of the Work.

1.16 CONSTRUCTION ACCEPTANCE PHASE means the activities that will occur from the Award of Bid to Contractors for Construction of the Work through the completion of construction and Acceptance of Final Pay Application.

2.0 SCOPE OF AGREEMENT

2.1 Consultant shall provide all services necessary to perform and complete, in a professional manner and in accordance with the Construction Schedule, verification and documentation that the performance of the Supply Package meets the Performance Guarantees and the Contract Specification. The Work shall include:

a. Providing details of the Commissioning process and coordinating with the CT to implement Commissioning requirements.

b. Preparing the Commissioning Plan, test plans, and final report.

c. Preparing Commissioning Specifications.

d. Performing and documenting system verification and functional performance tests.

e. Submitting resolution tracking forms at regular intervals to Construction Manager, Owner, and Architect on the status, integration, and performance of the Supply Package within the facility.

f. Reviewing submittals and operation and maintenance ("O & M") manuals for completeness as related to the Commissioning plan.

g. Coordinating and facilitating on-site Owner orientation and user training for Owner's personnel engaged in the operation, maintenance and routine service of the Supply Package. Review of all operational, maintenance and service instructions relating to the Supply Package necessary to operate, maintain and service the Supply Package, including, without limitation, all technical data and information, engineering data and information, production data and information, specifications, technical literature, special knowledge and other know-how and information described in the Contract Specifications.

h. Recommending acceptance of the Supply Package system.

i. Maintaining throughout the Project, Resolution Tracking Forms, as required by 2.6(c).

j. The work of the Consultant shall be performed in phases as indicated below which shall correspond to phases in the Architect and Construction Manager contracts.

Page 69: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Commissioning_Contract_20060718 4

k. Consultant to utilize Owner’s web-based project management system or by email and other conventional methods if no web-based project management system is available. Training for the system will be provided by the Owner.

2.2 Pre-construction Phase. Consultant shall perform the following during the Pre-Construction Phase:

a. At each of the Design Development and Construction Documents phases, provide a focused design review in writing, including the following design areas identified in 2.2(b) through (f) below. Participate in a minimum of two design review meetings, one at Design Development and one at Construction Document Phase.

b. Commissioning facilitation: Provide input to make the Supply Package easier to commission.

c. Energy Efficiency: Provide input on general efficiency of building shell, building layout, HVAC system types, etc.

d. Operation and Maintenance: Provide input on how O & M of the Supply Package can be made easier (accessibility and system control).

e. Functional Performance: Provide input on how the design can be changed to improve performance of the Supply Package for the occupants.

f. Facility Performance and Design Intent: Identify flaws, oversights, or insufficient detail in the design, relevant to the Supply Package being able to meet the Performance Guarantees.

g. Work with Architect and Construction Manager to provide that the following shall be adequately addressed in the Plans and Specifications:

(1) Clear and rigorous design documentation, including detailed and complete sequences of operation.

(2) Access for reading gauges, entering doors and panels, observing and replacing filters, coils, etc.

(3) Required isolation valves, dampers, interlocks, piping, etc., to allow for manual overrides, simulating failures, seasons and other testing conditions.

(4) Sufficient monitoring points in the automatic temperature control ("ATC") system, even beyond those necessary to control the systems, to facilitate performance verification and O&M.

(5) Pressure and temperature plugs close to controlling sensors for verifying their calibration.

(6) Pressure gauges, thermometers and flow meters in strategic areas to facilitate verifying system performance and ongoing O&M.

Page 70: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Commissioning_Contract_20060718 5

(7) Adequate balancing valves/circuit setters and dampers, flow metering, and control stations and control system functions to facilitate and verify reliable test and balance.

h. Create the Commissioning Plan, in accordance with Section 2.6(a) hereof.

i. Establish the system verification process and specific Performance Tests, including testing conditions and acceptance criteria for each system or piece of equipment being commissioned. Provide reporting and documentation requirements, including formats, testing requirements, and deficiency resolution.

j. Develop Commissioning Specifications, in accordance with Section 2.6(b) hereof, for all Commissioned systems. The Commissioning Specifications will be inserted into the contract documents for use in bidding and construction.

k. Provide a Preconstruction Commissioning Report for the Owners approval.

l. At the end of the Pre-Construction Phase, provide Owner with an evaluation of the other members of the CT as to the items identified in the attached Exhibit C (the "Evaluation").

2.3 Construction Phase. Consultant shall perform the following during the Construction Phase:

a. Host a kick-off meeting of the CT early in the construction schedule to focus on scheduling issues and reviewing each CT members' responsibilities. Coordinate Commissioning work with Construction Manager and Owner to ensure that Commissioning activities are included in the master schedule.

b. Attend selected planning and job-site meetings to obtain information on construction progress. Perform site visits, as necessary, to observe component, system installations, and project conditions.

c. Review Contractor's and/or subcontractors' submittals applicable to systems being Commissioned for compliance with Commissioning needs and Performance Guarantees, concurrent with Architect's reviews.

d. Review construction phase documentation, e.g., Requests for Information, Change Orders, meeting minutes, other correspondence, etc., required to plan and perform Commissioning tasks.

e. As necessary, review construction meeting minutes and other construction phase documentation for revisions/substitutions relating to the Commissioning process. Identify problems and assist in resolving any discrepancies.

f. Provide a Construction Phase Commissioning Report for the Owner’s approval.

Formatted: Bullets and Numbering

Page 71: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Commissioning_Contract_20060718 6

g. At the end of the Construction Phase, provide a second Evaluation (reference Exhibit C).

2.4 Acceptance Phase. Consultant shall perform the following responsibilities after substantial completion of the Project:

a. Coordinate and direct the Commissioning activities in a logical, sequential, and efficient manner using standardized protocols and forms, centralized documentation, clear and regular communications and consultations with all necessary parties, frequently updated timelines and schedules, and technical expertise.

b. Plan and conduct Commissioning planning meetings.

c. Observe and document start-up of major Supply Package systems. Review completeness of installation and SVC’s in conjunction with progress meetings prior to starting HVAC equipment.

d. Due to the importance of the controls systems to the proper operation of the mechanical and electrical systems, control submittals should be carefully reviewed to ensure that they include all of the information required by the operations and maintenance staff. Review Project Record Documents and point-to-point documentation.

e. Prepare Functional Performance Tests ("FPT"), in accordance with Section 2.6(c) hereof. Test each major system through FPT's. A random sample of each subsystem will also be tested. The testing will be coordinated and witnessed by the Consultant's representative and Owner's maintenance staff. Witnessing the FPT's will constitute part of the O&M Training. Review preliminary Testing and Balancing ("TAB") and System Verification Checklist ("SVC") reports prior to HVAC equipment start-up to ensure that the SVC has been completed and the final TAB report format and content is acceptable. No FPT's will be performed until the system and related subsystems have been started, TAB work has been completed, and the TAB report has been submitted and reviewed.

f. Analyze verification test trend logs and monitoring data to verify performance.

g. Witness selected pressure tests of the piping and duct systems and observe major start-up testing, adjusting and balancing, and calibration activities.

h. Maintain a test deficiency and resolution log and an FPT log, including failures and corrective action. Provide to Owner's Program Manager written progress reports and test results with recommended actions.

i. Coordinate, oversee, and facilitate the training of Owner's O&M staff. Visit the site during the Turn - Over and Training Period to ensure that any on-going Supply Package related problems are being addressed and corrected in a timely and efficient manner. Review the preparation of the O&M manuals prior to scheduling training.

Page 72: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Commissioning_Contract_20060718 7

j. Compile and maintain organized and completed final Commissioning report.

k. Submit a Final Commissioning Report to Owner, in accordance with the requirements of Section 2.6(d) hereof.

l. Review and verify Project Record Documents.

m. Review and verify the completion of the following items that must be included in the O&M manuals for this Project:

(1) Design Intent

(2) Variances from Design Intent

(3) Equipment ID

(4) Manufacturer Performance Data sheets

(5) Preventive maintenance information

(6) Repair and service information

(7) Automatic Temperature Controls, submittals, drawings and Project Record Documents

(8) Control system schematics

(9) Sequences of operation

(10) Manufacturer's test reports

(11) Test results required by specification

(12) Point-to-point documentation

2.5 Post Acceptance Phase Responsibilities: Consultant shall perform the following responsibilities after final completion of the Project:

a. Track HVAC Warranty issues

b. Enforce off-season mode testing per construction specifications.

c. Document corrections

d. 11th month warranty walk-through

e. Testing in all seasons must be accommodated to ensure performance guarantees.

f. O&M Staff review of usage changes, set point changes, operational concerns, maintenance and service issues, nuisance complaints and chronic problems.

g. Review of maintenance practices

h. Evaluate system conditions and operation

i. Evaluate system performance and energy usage based on Design criteria

Page 73: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Commissioning_Contract_20060718 8

j. Sample readings for comparison with TAB report

k. Update commissioning reports by adding supplements

l. Specific tasks should include

(1) O&M Staff review of usage changes, set point changes, operational concerns, maintenance and service issues, nuisance complaints and chronic problems

(2) Review of maintenance practices

(3) Evaluate system conditions and operation

(4) Evaluate system performance and energy usage based on design criteria

(5) Compare system performance with 11th month data

(6) Sample readings for comparison with TAB report

(7) Update commissioning reports by adding supplements

2.6 Documentation Consultant shall prepare the following documentation as part of this Project:

a. Commissioning Plan, containing the following information

b. Commissioning objective

c. Roles and responsibilities of all participants

d. Commissioning Schedule coordinated with the design and construction schedule

e. Communication and reporting protocols

f. Documentation requirements and responsibilities

g. Identify required construction permitting and associated fees relating to commissioning services

h. Level of testing and verification procedures

i. Outline of the commissioning events

2.7 Commissioning Specifications, containing the following information:

a. Coordinate the section requirements with the Architect's general and technical specification sections, and include in construction document package

b. A detailed description of the responsibilities of all parties included in the Commissioning process

c. Details of the Commissioning process

d. List of equipment to be commissioned and sampling strategies

e. Reporting and documentation requirements, including formats, deficiency resolution, and startup requirements

Page 74: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Commissioning_Contract_20060718 9

f. SVC's, FPT's, and RTF’s

g. Coordinate that O&M documentation and manufacturer start-up requirements and test and balance provisions are in the specifications

2.8 Verification checks, performance tests, and resolution logs:

a. System Verification Checklists (SVC) / Manufacturer's Checklists: Consultant will write SVC's based on the DID. These checklists will be created for HVAC systems and subsystems. This includes, but is not limited to, Air Handling Units, Variable Air Volume Boxes, Unit/Cabinet Heaters, Exhaust Fans, HVAC Pumps, Chillers, and Boilers. Draft copies will be submitted to Architect and Construction Manager for review and comments before placement on the job site. These SVC's will be placed on the job site and completed by the installing contractors. No system will be started until the appropriate SVC's have been completed.

b. FPT: Consultant will write FPT's based on the Design Intent Documents ("DID"). These tests will be created for HVAC systems and subsystems. This includes, but is not limited to, Air Handling Units, Variable Air Volume Boxes, Unit/Cabinet Heaters, Exhaust Fans, HVAC Pumps, Chillers, and Boilers.

c. Resolution Tracking Forms (RTF): Resolution tracking is a method to monitor and record problems, their causes, and solutions. The use of these lists prevents problems uncovered during commissioning from being forgotten, and expedites their resolution. The use of RTF's helps ensure that problems or questions will be resolved in a timely manner.

2.9 Commissioning Report, containing the following information:

a. Project name

b. Name, address, firm, and phone number of Consultant

c. Executive summary of HVAC system and commissioning strategy

(1) Recommendations for system recommissioning and final acceptance

(2) Recommendations for monitoring the ongoing performance of the systems

(3) Recommendations for system improvements

(4) Summary of Commissioning findings

d. Detail list of installing contractors and vendors with contact names, addresses, email and phone numbers

e. Description of the building (size, location, use, construction envelope, HVAC and other installed system)

f. Summary of commissioning tasks

g. Commissioning plan

Page 75: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Commissioning_Contract_20060718 10

h. Resolution tracking forms

i. Completed manufacturer checklists

j. Completed SVC checklists

k. Completed functional performance tests

2.10 Consultant and Owner will each take all actions reasonably requested by the other to facilitate coordination of the activities of Consultant under this Agreement with the activities of the Team. Consultant will also notify Owner in writing of any action, inaction or other circumstances promptly after Consultant becomes aware thereof that could reasonably be expected to cause (i) any Final Acceptance to be delayed for any reason, (ii) the Supply Package, or any part thereof, to fail to satisfy any Performance Test or Final Acceptance, (iii) the Supply Package, or any part thereof, to fail to meet any Performance Guarantees, (iv) the Supply Package, or any part thereof, to fail to be covered by a warranty during the Warranty Period (as defined in the Contract), or (v)any delay, shortfall or failure of performance by Consultant under this Agreement.

3.0 PAYMENT

3.1 Owner shall pay Consultant in current funds, as compensation for the performance of the Work and its services under this Agreement, the amount of $__________________.

3.2 Payment shall be due and payable five (5) business days after approval thereof by the Owner. Owner will make payments only once per month. Submission of requests for payment shall be made in accordance with a schedule of Board meetings to be provided by Owner.

3.3 Payments may be withheld by Owner in the event of (i) filing or threatened filing of a mechanic's lien, (ii) failure of Consultant to make payments properly to Subcontractors or for labor, materials, supplies, appliances, fixtures or equipment, (iii) failure of Consultant to carry out the Work in accordance with the requirements of this Agreement, (iv) Owner's determination that the Work covered by the Consultant's application for payment has not been performed, or (v) damage to Owner or any person performing any part of the construction of the Project.

3.4 Payments due and unpaid under this Agreement and costs incurred by Owner as a result of Consultant's failure to fulfill its obligations under this Agreement shall bear interest from the date payment is due at the Prime Rate as established from time to time by the Owners bank, however, interest payable by Owner shall not exceed that permitted by law.

4.0 ERECTION AND COMMISSIONING WORK AT SITE

4.1 Consultant shall coordinate with the CT and the other Project participants to ensure efficient implementation and Integration of the Supply Package.

4.2 Consultant shall provide the services of a competent site manager to advise in connection with the following matters:

Page 76: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Commissioning_Contract_20060718 11

a. Advise the owner if improper unpacking and storing of the Supply Package at the Site is observed.

b. Completion of the Performance Tests of the Supply Package under the Contract.

c. Consultant's site manager shall be subject to Owner's reasonable approval.

4.3 Consultant shall provide documentation and information relating to the Construction Schedule as shall be reasonably requested by Owner from time to time. Consultant shall provide project site status updates to Owner on a regular basis.

4.4 Owner shall provide, at its cost and expense, such supervisors and personnel as are required, in accordance with applicable industry standards, to assist Consultant in performing its obligations under this Agreement

5.0 INSURANCE

5.1 During the Commissioning, the Consultant will provide certain insurance coverage. These include in part:) amounts satisfactory to the Owner, Comprehensive General Liability, Auto Liability, and Worker’s Compensation.

5.1.1 General Liability – $1,000,000

5.1.2 Auto Liability - $300,000 / $1,000,000

5.1.3 Personal Injury / $500,000 /$1,000,000

5.1.4 Workers Comp - $100,000

5.1.5 Professional Liability/E & O - $1,000,000 / $1,000,000

6.0 ASSIGNMENT AND SUBCONTRACTING

6.1 Except as otherwise provided herein, neither party shall, without the consent in writing of the other party, assign or transfer the Agreement or the benefits or obligations thereof or any part thereof to any other person. Any placing of sub-orders shall not relieve the Consultant from its obligations under this Agreement.

7.0 FORCE MAJEURE.

7.1 If the progress of the Work or the Project is delayed as the result of the occurrence of any event in the following list, Owner may, upon Consultant's written request, extend the time of completion of the portion of the Work directly affected by such delay: adverse weather conditions not reasonably anticipatable, flood, cyclone, hurricane, tornado, earthquake, or other similar catastrophe; acts of a public enemy or the Government; fires, epidemics, quarantine restrictions, or other casualty for which Consultant is not responsible; or any act of omission of Owner. No other extensions of time shall be granted for labor disputes or delays resulting from normal weather conditions or interruptions of Consultant's work to permit performance by other Consultants. No extension shall be granted for delays which could have been avoided by Consultant by the exercise of diligence or which resulted, in whole or in part, from the fault or negligence of Consultant.

Page 77: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Commissioning_Contract_20060718 12

Adverse weather conditions shall provide a basis for extension only if such conditions are beyond normal weather conditions for the time during which the Work is being performed and cause an actual delay in the progress of the Work. Consultant shall only be allowed to claim weather delay days for weather delay days each month in excess of the days for each month set forth on the attached Exhibit F. If the Work has progressed to the point that inclement weather does not effect the progress of Consultant, no delay can be claimed. No delay is allowed for the effect of inclement weather. Consultant shall make provisions to overcome the effect of inclement weather (i.e. mud, snow, etc.).

7.2 Consultant shall include in its bid a sufficient amount of money to cover the required manpower, equipment, protection, etc. to complete its Work in accordance with the Project Schedule, accounting for inclement weather. It is Consultant's obligation to provide a copy of the "National Climatic Center" report with any weather delay filed. Construction Manager shall document weather conditions on a daily basis throughout the period of construction.

7.3 As to a specific occurrence which caused delay, Consultant shall notify Owner within forty-eight (48) hours of its discovery of the occurrence, and any request for an extension under Section 7.1 shall be made within seven (7) days of the time Consultant learns of the occurrence. As to a condition or continuing occurrence which causes delay, Consultant shall notify Owner within forty-eight (48) hours of determining that a delay is likely, and any request for an extension under Section 7.1 shall be made within seven (7) days of the time Consultant determines that a delay is likely to occur. Such request shall (a) state the cause for the delay; (b) describe the portion of the Work affected thereby; (c) estimate the duration of the delay; and (d) provide all details pertinent thereto. Failure to provide timely notice shall be deemed a waiver of any claim for an extension. Notice shall be provided by Consultant to Owner within forty-eight (48) hours after the cause for the delay has ceased to exist.

7.4 The right to request an extension shall be Consultant's only remedy against Owner, and Consultant shall have no claim against Owner for an increase in Consultant's Compensation hereunder or for damage, loss, or expense resulting from delays, nor a claim against Owner for a payment or allowance of any kind of damage, loss, or expense resulting from delays, nor shall Consultant have any claim for damage, loss, or expense resulting from interruptions or suspension of his work to enable other consultants or contractors to perform their work. Consultant shall indemnify Owner for all loss, damage and expense caused by or resulting from a delay of any other Consultant that is caused by or results from any act or omission of Consultant, including failure to meet schedules and completion dates under this Agreement.

7.5 In the event the project is suspended for a period of ninety (90) consecutive days due to an event of Force Majeure, either party may terminate this agreement by written notice to the other.

Page 78: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Commissioning_Contract_20060718 13

8.0 GOVERNING LAW

8.1 This Agreement shall be interpreted in accordance with the laws of the State of Indiana without regard to the conflicts of law principles thereof.

9.0 TERMINATION

9.1 If Consultant should become insolvent, commence an action under Title 11 of the United States Code, be the subject of an involuntary petition under Title 11 of the United States Code that is not dismissed within ninety (90) days of its filing, make a proposal to creditors or a general assignment for the benefit of creditors or if a receiver is appointed on account of Consultant's insolvency, or Consultant is or becomes a debtor under any federal or state insolvency laws, Owner may, at its option, forthwith terminate this Agreement.

9.2 If Consultant:

a. fails to prosecute or fails to prosecute in good faith any portion of the Work, or delays such prosecution or fails to timely perform diligently any provisions hereof consistent and in compliance with the Construction Schedule; or

b. is otherwise in breach of any of its obligations under this Agreement.

Consultant shall, within seven (7) days of receipt from Owner of notice of default, correct or cause to be corrected such default or make or cause to be made provision satisfactory to Owner for correcting such default within a reasonable time thereafter, failing which Owner may at its option terminate this Agreement without prejudice to any of its rights hereunder.

9.3 If Consultant is impeded from fulfilling any of its obligations under this Agreement for reasons of Force Majeure for a period of more than thirty (30) days in the aggregate, then Owner may, at its option, terminate this Agreement without prejudice to any of its rights hereunder.

9.4 Upon termination pursuant to Sections 9(a) or 9(b) Owner may, without prejudice to any other right or remedy it may have, but shall not be obligated to:

a. Complete the Work by whatever method it may deem expedient

b. Owner may, at its option, terminate this Agreement, without cause, upon three (3) days prior written notice, in which case Consultant shall be paid for all work performed through the date of termination.

9.5 Owner shall be entitled to damages equal to the cost to complete the Work in excess of the amount that would have been payable to Consultant if Consultant had completed the Work.

a. If Owner is in breach of any of its obligations under this Agreement, Owner shall, within thirty (30) days of receipt from Consultant of notice of default under this Section 9(e), correct or cause to be corrected such default or make or cause to be made provision satisfactory to Consultant for correcting such default within a reasonable time thereafter, failing

Page 79: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Commissioning_Contract_20060718 14

which Consultant may at its option terminate this Agreement without prejudice to any of its rights hereunder.

b. Owner may, at its option, terminate this Agreement, without cause, upon three (3) days prior written notice.

c. The representations, warranties, and indemnity obligations of the parties (and the parties' remedies with respect to any breach of the foregoing) made, created, or arising under this Agreement shall survive the termination or expiration of this Agreement for an indefinite period of time.

10.0 CONFIDENTIALITY

10.1 Owner and Consultant shall treat all documents, data, materials and information supplied by one to the other confidentially and shall not disclose the above to any third party and shall not use the above for any other purpose than for the performance of this Agreement or for the operation and maintenance of the system, without prior consent in writing from the other party, except as required by law or in connection with any litigation. The provisions of this Article 10 shall survive the expiration or earlier termination of this Agreement.

11.0 LOCAL LAW COMPLIANCE

11.1 Consultant shall comply and secure compliance by its employees and subcontractors with all laws applicable to this Agreement and the performance of this Agreement by Consultant.

12.0 NOTICE

12.1 Notices by either party required or permitted to be given hereunder shall be given by certified mail, return receipt requested, overnight courier by a nationally recognized courier service, or confirmed telefax. Any such notices shall be deemed to have been given upon their documented date of receipt, or in the case of telefax, upon the date of confirmation of the transmission.

a. Any party may change its address by giving prior notice to the other party in the manner provided for herein.

Owner's address: Owner Name Street Address City, State Zip

Consultant's address: Flood & Sterling, Inc. 718 Limekiln Road New Cumberland, Pa 17070

13.0 ADDITION AND AMENDMENT

13.1 No prior agreement or communication by either party shall alter the meaning or interpretation of this Agreement. No modification, alteration, addition or change in the terms hereof shall be binding on the parties unless it is expressed in writing and duly executed by the parties in the same manner as the execution of this

Page 80: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Commissioning_Contract_20060718 15

Agreement and subject to such government approval as may be required under the applicable laws and regulations of the countries concerned.

14.0 INDEMNIFICATION AND LIMITATIONS ON SELLER'S LIABILITIES

14.1 Consultant agrees to indemnify and save Owner, its officers, directors, agents and employees, harmless from all liability, claims, losses, damages and costs (including reasonable attorneys' fees and court costs) (collectively, a "Loss"), however arising, for injury to or death of any person or damage to any property (including that of Owner) that is due to or arises out of any negligent or improper act or acts, whether of omission or commission, of Consultant or any of its officers, directors, agents or employees. This indemnity shall not be construed to negate, abridge or otherwise reduce any other right or obligation of indemnity which would otherwise exist as to any party or person described in this Section 14(a). In any and all claims against Owner or any of its officers, directors, agents or employees by any employee of Consultant, the indemnification obligation of Consultant under this Section 14(a) shall not be limited in any way by limitation on the amount or type of damages, compensation or benefits payable by Consultant under workmen's compensation, disability benefit or other employee benefit acts. Owner agrees that if it asserts an indemnification claim against Consultant pursuant to this Section 14(a), it shall (without relieving Consultant of liability for such claim) use commercially reasonable efforts to satisfy all or part of such claim under any insurance maintained pursuant to this Agreement. In the event Owner obtains insurance funds in partial satisfaction of its indemnification claim against Consultant, Consultant shall remain liable for the balance of such claim. Consultant shall pay or reimburse to Owner any "deductible" and other administrative expenses incurred by Owner in pursuing such insurance claim.

a. In any and all claims against Owner or any of its officers, directors, agents or employees by any employee of Consultant, the indemnification obligation of Consultant under this Section 14(b) shall not be limited in any way by limitation on the amount or type of damages, compensation or benefits payable by Consultant under workmen's compensation, disability benefit or other employee benefit acts.

b. The indemnity contained in this Article shall continue notwithstanding the expiration or early termination of this Agreement or final payment.

15.0 MISCELLANEOUS

15.1 Consultant shall not discriminate against any qualified employee or qualified applicant available for employment to be employed in the performance of this Agreement with respect to employment, tenure or terms, conditions and privileges of employment because of race, color, religion, national origin, sex or ancestry.

15.2 If Consultant employs any person, firm or corporation to perform any of the services described in this Agreement, payment for such services or performance shall be the sole responsibility of Consultant.

15.3 In the event Owner shall have the right to withhold payments to Consultant under this Agreement, Owner may withhold such payments from any other amounts

Formatted: Bullets and Numbering

Page 81: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Commissioning_Contract_20060718 16

which might be owed to Consultant by Owner and provide notice thereof to Consultant.

15.4 No failure on the part of Owner or Consultant to insist upon the strict performance of any term or condition of this Agreement or to exercise any right, remedy, power or privilege provided for therein or afforded by law shall operate as a waiver or release thereof, nor shall any single or partial exercise of any such right, remedy, power or privilege by Owner or Consultant preclude any other or further exercise thereof.

FLOOD & STERLING, INC. OWNER NAME By: ________________________________ By: ______________________________ Printed: ____________________________ Printed: ___________________________ Title: ______________________________ Title: _____________________________

Page 82: Flood Sterling, Inc. · into the HVAC industry entering as an apprentice in the Sheet Metal Workers Local #19 as a balancing technician at Flood & Sterling, Inc. serving the 4 years

Proposed Fee:

The following pricing is on a lump sum fixed fee basis for work performed associated with this proposal inclusive of expenses associated with travel such as mileage, lodging, and other related out of town expenses. Some months will include a trip every week and some months no trips will be necessary Hourly Rate Schedule: 1. Professional $125.00 / hr 2. Technical $110.00 / hr 3. Administrative / Clerical $50.00 / hr Billing The client will be billed for the fee, plus any additional requested services rendered which have been excluded from the Scope of Services. This work is based on the design as of the date of this proposal including all LEED related credits and prerequisites. All changes in scope will be evaluated and may constitute additional services. This project will be billed monthly based on percentage of completion. Payments are due upon receipt of invoice. After 30 days, interest will be charged at a rate of 1.5% per month on all unpaid invoices or portions thereafter. Flood & Sterling has the right to suspend services for non-payment. We do NOT, as Flood & Sterling, provide direct design or construction services. Thank you for giving us the opportunity to submit this proposal. We look forward to working with you and your firm on this exciting project. Sincerely, Daniel J. Acri Flood & Sterling, Inc. 718 Limekiln Road New Cumberland, PA 17070 717-232-0529 717-232-1797 fax [email protected]

Page 4 of 5