Flood Control in Mandaluyong River

download Flood Control in Mandaluyong River

of 15

Transcript of Flood Control in Mandaluyong River

  • 7/24/2019 Flood Control in Mandaluyong River

    1/15

    FLOOD CONTROL IN

    MANDALUYONG RIVER

    SUBMITTED BY:

    AGONOS, KIM NICOLE

    MAGCALAS, GLENN ARVIN

    POSADAS, ROCHELLE ANNE

    TRITASCO, KATRINA NOELLE

    YABUT, KRYZTELLE MARIE

    SUBMITTED TO:

    ENGR. AL DOMINGUEZ

  • 7/24/2019 Flood Control in Mandaluyong River

    2/15

    UNIT I: INTRODUCTION

    *BACKGROUND OF STUDY

    The flood i M!d!l"#o$ h!d %ee ! e&e' (o)i"i$ *'o%le+ fo' )he

    (o++"i)#. The !'e! h!d of)e %ee (i)ed o) *!!%le -hee&e' ! )o'+ i )o *!

    )he (o")'#.

    E$'. Delo Re#e, oe of )he *'oe() he!d i )he M!d!l"#o$ /lood

    Co)'ol of DP0H, )!)ed i hi *'o$'e 'e*o') )h!) )he 'e!o ! )o -h# )he

    &ol"+e of -!)e' $oi$ i )he Boi A&e"e i """!ll# %"l1, i %e(!"e of )he

    do+e)i( -!)e f'o+ )he diffe'e) ho"ehold "e of -!)e' 2 -hi(h i -h# )he-!)e' (o+i$ )o !d f'o+ )he !'e! i e+i))i$ "*le!!) odo'. Beide )hi, )he

    -!)e' i +o'e o' le (lo$$ed %e(!"e of )he (loi$ of )he diffe'e) *!') of S!

    /'!(i(o 3 )o !&oid )he %'e!1!$e of )he %o4 ("l&e') !d 'e)!ii$ -!ll 3 -he'e

    )he -!)e' (o"ld e!il# *! )h'o"$h.

    /o' o-, )he e4i)i$ (!!l !d d'!i!$e i S! /'!(i(o i h!&i$ ! h!'d

    )i+e -i)h d'!ii$ !ll of )he flood %e(!"e of i) +ii+!l i5e (o+*!'ed )o )he %"l1

    &ol"+e of )he -!)e' i di*o!l, $i&e )h!) !ll of -!)e' &ol"+e i )o ed "* i

    P!i$ Ri&e'. Ho-e&e', )he de(lo$$i$ i )he e4i)i$ (!!l $oi$ )o P!i$ Ri&e' i+!de )o %e i+"l)!eo" i o'de' )o !i) -i)h )he di(h!'$e of )he -!)e'.

  • 7/24/2019 Flood Control in Mandaluyong River

    3/15

    *OBJECTIVES OF THE STUDY

    OBJECTIVES OF THE STUDY

    After the huge flood events brought about so many typhoons, respectively, that

    caused severe damage in Mandaluyong and surrounding areas, It is provided that we

    take a step to make a solution to flooding in the said area.

    A flood risk assessment study for the entire Mandaluyong city and surrounding

    basin area was undertaken from August 201 to !ctober 201, to prepare a

    comprehensive flood risk management plan for the same and to determine a set of

    priority structural measures, which will still undergo individual feasibility studies anddetailed design prior to implementation, including nonstructural measures that will

    provide sustainable flood management up to a designated safety level and serve as the

    roadmap"vision of the government until 20# $20 years from now%.

    PROFILE OF THE STUDY AREA

    &he study area covers the entire Mandaluyong 'ity with a total area of 21.2(km2 or ).21 s* mi, which is comprised of 2+ barangays 1- in istrict I and 1# in istrictII. &he study area has an estimated total population of 2+),-+-, accounting for about2.)/ of the total population of the ational 'apital egion which is ,#2,(0. 3ith anaverage household si4e of -.(, it has a household population of 2+,110 which may alsobe considered as the nighttime population of the city.

    Guiding principles !r "#s$er pl#n de%el!p"en$&

    1. Adopt the principles of integrated water resources management and river basinapproach2. evelop a safe society with resiliency to floods through

    5tructural measures for the river basins and waterways

    5tructural measures for the Mandaluyong river, and

    Improvement of the urban drainage system

  • 7/24/2019 Flood Control in Mandaluyong River

    4/15

    #. Improvement of the 6lood Information and 3arning 5ystem $6I35%-. 7stablish an integrated and consistent flood risk management $6M% institutionalsystem. 5trengthen community8based flood risk management9land use and solid waste(. :tili4ation of runoff waters as water resources, etc.

    &hree ma;or flooding occurrences

    1.

  • 7/24/2019 Flood Control in Mandaluyong River

    5/15

    6CONCEPTUAL FRAMEWORK

  • 7/24/2019 Flood Control in Mandaluyong River

    6/15

  • 7/24/2019 Flood Control in Mandaluyong River

    7/15

  • 7/24/2019 Flood Control in Mandaluyong River

    8/15

  • 7/24/2019 Flood Control in Mandaluyong River

    9/15

  • 7/24/2019 Flood Control in Mandaluyong River

    10/15

  • 7/24/2019 Flood Control in Mandaluyong River

    11/15

  • 7/24/2019 Flood Control in Mandaluyong River

    12/15

  • 7/24/2019 Flood Control in Mandaluyong River

    13/15

  • 7/24/2019 Flood Control in Mandaluyong River

    14/15

    *SIGNIFICANCE OF THE STUDY

    Thi )"d# -ill %e ! i$ifi(!) ede!&o' i *'o+o)i$ )he ol")io )o)he flood *'o%le+ i M!d!l"#o$. Thi )"d# -ill !lo %e %eefi(i!l )o

    )he )"de) !d i)'"()o' i -!)e' +!!$e+e) -he )he# e+*lo#

    effe()i&e le!'i$ i )hei' (l!'oo+ e))i$ *!')i("l!'l# i diffe'e)

    (o(e*) 'el!)ed )o flood (o)'ol. . B# "de')!di$ )he eed of )he

    )"de) !d %eefi) of 7"!li)# ed"(!)io, )hee i)'"()o' !d )"de)

    %e !"'ed of ! (o+*e)i)i&e !d&!)!$e. Mo'eo&e', )hi 'ee!'(h -ill

    *'o&ide 'e(o++ed!)io o ho- )o (o)'ol floodi$ !'o"d )he +e)'o.

    Thi )"d# -ill %e hel*f"l )o )he e$iee'i$ id")'# !d (i&il e$iee'i )'!ii$ !d ifo'+i$ )he+ i )he !'e! of flood (o)'ol, o%e()i&e,

    !d )'!)e$ie. I) -ill !lo e'&e ! ! f")"'e 'efe'e(e fo' 'ee!'(he' o

    )he "%e() of h#d'olo$#, -!)e' !d -!)e -!)e' +!!$e+e), !d

    (o'*o'!)e (o+*!ie. Ad i+*o')!)l#, )hi 'ee!'(h ide)ifie e&e'!l of

    )he +o) i$ifi(!) (o)'!i) !ffe()i$ )he !%ili)# )o i+*le+e) flood

    (o)'ol *'oe() !d *'o*oe +e)hod !d )'!)e$ie )o !dd'e )he

    (h!lle$e. A -i)h +o) *'o%le+ !d e*e(i!ll# -i)h floodi$,

    )!1eholde' i&ol&e+e) i ee)i!l. The i)e) of )hi )"d# i )o

    *'o&ide $"id!(e i )he *'o(e of i+*le+e)i$ "(h +e)hod !d

    )'!)e$ie )o !dd'e )hee *'o%le+.