Flood Control in Mandaluyong River
-
Upload
kim-agonos -
Category
Documents
-
view
233 -
download
0
Transcript of Flood Control in Mandaluyong River
-
7/24/2019 Flood Control in Mandaluyong River
1/15
FLOOD CONTROL IN
MANDALUYONG RIVER
SUBMITTED BY:
AGONOS, KIM NICOLE
MAGCALAS, GLENN ARVIN
POSADAS, ROCHELLE ANNE
TRITASCO, KATRINA NOELLE
YABUT, KRYZTELLE MARIE
SUBMITTED TO:
ENGR. AL DOMINGUEZ
-
7/24/2019 Flood Control in Mandaluyong River
2/15
UNIT I: INTRODUCTION
*BACKGROUND OF STUDY
The flood i M!d!l"#o$ h!d %ee ! e&e' (o)i"i$ *'o%le+ fo' )he
(o++"i)#. The !'e! h!d of)e %ee (i)ed o) *!!%le -hee&e' ! )o'+ i )o *!
)he (o")'#.
E$'. Delo Re#e, oe of )he *'oe() he!d i )he M!d!l"#o$ /lood
Co)'ol of DP0H, )!)ed i hi *'o$'e 'e*o') )h!) )he 'e!o ! )o -h# )he
&ol"+e of -!)e' $oi$ i )he Boi A&e"e i """!ll# %"l1, i %e(!"e of )he
do+e)i( -!)e f'o+ )he diffe'e) ho"ehold "e of -!)e' 2 -hi(h i -h# )he-!)e' (o+i$ )o !d f'o+ )he !'e! i e+i))i$ "*le!!) odo'. Beide )hi, )he
-!)e' i +o'e o' le (lo$$ed %e(!"e of )he (loi$ of )he diffe'e) *!') of S!
/'!(i(o 3 )o !&oid )he %'e!1!$e of )he %o4 ("l&e') !d 'e)!ii$ -!ll 3 -he'e
)he -!)e' (o"ld e!il# *! )h'o"$h.
/o' o-, )he e4i)i$ (!!l !d d'!i!$e i S! /'!(i(o i h!&i$ ! h!'d
)i+e -i)h d'!ii$ !ll of )he flood %e(!"e of i) +ii+!l i5e (o+*!'ed )o )he %"l1
&ol"+e of )he -!)e' i di*o!l, $i&e )h!) !ll of -!)e' &ol"+e i )o ed "* i
P!i$ Ri&e'. Ho-e&e', )he de(lo$$i$ i )he e4i)i$ (!!l $oi$ )o P!i$ Ri&e' i+!de )o %e i+"l)!eo" i o'de' )o !i) -i)h )he di(h!'$e of )he -!)e'.
-
7/24/2019 Flood Control in Mandaluyong River
3/15
*OBJECTIVES OF THE STUDY
OBJECTIVES OF THE STUDY
After the huge flood events brought about so many typhoons, respectively, that
caused severe damage in Mandaluyong and surrounding areas, It is provided that we
take a step to make a solution to flooding in the said area.
A flood risk assessment study for the entire Mandaluyong city and surrounding
basin area was undertaken from August 201 to !ctober 201, to prepare a
comprehensive flood risk management plan for the same and to determine a set of
priority structural measures, which will still undergo individual feasibility studies anddetailed design prior to implementation, including nonstructural measures that will
provide sustainable flood management up to a designated safety level and serve as the
roadmap"vision of the government until 20# $20 years from now%.
PROFILE OF THE STUDY AREA
&he study area covers the entire Mandaluyong 'ity with a total area of 21.2(km2 or ).21 s* mi, which is comprised of 2+ barangays 1- in istrict I and 1# in istrictII. &he study area has an estimated total population of 2+),-+-, accounting for about2.)/ of the total population of the ational 'apital egion which is ,#2,(0. 3ith anaverage household si4e of -.(, it has a household population of 2+,110 which may alsobe considered as the nighttime population of the city.
Guiding principles !r "#s$er pl#n de%el!p"en$&
1. Adopt the principles of integrated water resources management and river basinapproach2. evelop a safe society with resiliency to floods through
5tructural measures for the river basins and waterways
5tructural measures for the Mandaluyong river, and
Improvement of the urban drainage system
-
7/24/2019 Flood Control in Mandaluyong River
4/15
#. Improvement of the 6lood Information and 3arning 5ystem $6I35%-. 7stablish an integrated and consistent flood risk management $6M% institutionalsystem. 5trengthen community8based flood risk management9land use and solid waste(. :tili4ation of runoff waters as water resources, etc.
&hree ma;or flooding occurrences
1.
-
7/24/2019 Flood Control in Mandaluyong River
5/15
6CONCEPTUAL FRAMEWORK
-
7/24/2019 Flood Control in Mandaluyong River
6/15
-
7/24/2019 Flood Control in Mandaluyong River
7/15
-
7/24/2019 Flood Control in Mandaluyong River
8/15
-
7/24/2019 Flood Control in Mandaluyong River
9/15
-
7/24/2019 Flood Control in Mandaluyong River
10/15
-
7/24/2019 Flood Control in Mandaluyong River
11/15
-
7/24/2019 Flood Control in Mandaluyong River
12/15
-
7/24/2019 Flood Control in Mandaluyong River
13/15
-
7/24/2019 Flood Control in Mandaluyong River
14/15
*SIGNIFICANCE OF THE STUDY
Thi )"d# -ill %e ! i$ifi(!) ede!&o' i *'o+o)i$ )he ol")io )o)he flood *'o%le+ i M!d!l"#o$. Thi )"d# -ill !lo %e %eefi(i!l )o
)he )"de) !d i)'"()o' i -!)e' +!!$e+e) -he )he# e+*lo#
effe()i&e le!'i$ i )hei' (l!'oo+ e))i$ *!')i("l!'l# i diffe'e)
(o(e*) 'el!)ed )o flood (o)'ol. . B# "de')!di$ )he eed of )he
)"de) !d %eefi) of 7"!li)# ed"(!)io, )hee i)'"()o' !d )"de)
%e !"'ed of ! (o+*e)i)i&e !d&!)!$e. Mo'eo&e', )hi 'ee!'(h -ill
*'o&ide 'e(o++ed!)io o ho- )o (o)'ol floodi$ !'o"d )he +e)'o.
Thi )"d# -ill %e hel*f"l )o )he e$iee'i$ id")'# !d (i&il e$iee'i )'!ii$ !d ifo'+i$ )he+ i )he !'e! of flood (o)'ol, o%e()i&e,
!d )'!)e$ie. I) -ill !lo e'&e ! ! f")"'e 'efe'e(e fo' 'ee!'(he' o
)he "%e() of h#d'olo$#, -!)e' !d -!)e -!)e' +!!$e+e), !d
(o'*o'!)e (o+*!ie. Ad i+*o')!)l#, )hi 'ee!'(h ide)ifie e&e'!l of
)he +o) i$ifi(!) (o)'!i) !ffe()i$ )he !%ili)# )o i+*le+e) flood
(o)'ol *'oe() !d *'o*oe +e)hod !d )'!)e$ie )o !dd'e )he
(h!lle$e. A -i)h +o) *'o%le+ !d e*e(i!ll# -i)h floodi$,
)!1eholde' i&ol&e+e) i ee)i!l. The i)e) of )hi )"d# i )o
*'o&ide $"id!(e i )he *'o(e of i+*le+e)i$ "(h +e)hod !d
)'!)e$ie )o !dd'e )hee *'o%le+.
-
7/24/2019 Flood Control in Mandaluyong River
15/15