Page 1 of 12 FLOOD CONTROL FEASIBILITY PLAN Project ID: CEEn-02016CPST-007 by BYU Storm Water Engineers Christian Kesler Matt Johnson Donald Anderson Fabian Zamorano A Capstone project submitted to Travis Jockumsen City of Payson Department of Civil and Environmental Engineering Brigham Young University 14 November 2016

Transcript of FLOOD CONTROL FEASIBILITY PLAN BYU Storm Water...

Page 1: FLOOD CONTROL FEASIBILITY PLAN BYU Storm Water Engineerscecapstone.groups.et.byu.net/sites/default/files/2016Capstone/2016... · water system for the Ridge Lane area. AutoCAD 3D Civil

Page 1 of 12

FLOOD CONTROL FEASIBILITY PLAN

Project ID: CEEn-02016CPST-007

by

BYU Storm Water Engineers

Christian Kesler

Matt Johnson

Donald Anderson

Fabian Zamorano

A Capstone project submitted to

Travis Jockumsen

City of Payson

Department of Civil and Environmental Engineering

Brigham Young University

14 November 2016

Page 2: FLOOD CONTROL FEASIBILITY PLAN BYU Storm Water Engineerscecapstone.groups.et.byu.net/sites/default/files/2016Capstone/2016... · water system for the Ridge Lane area. AutoCAD 3D Civil

Page 2 of 12

MEMORANDUM TO: City of Payson Public Works Department

Travis Jockumsen – Public Works Director

FROM: Brigham Young University

DATE: 14 November, 2016

SUBJECT: Flood Control Feasibility Plan for Payson Area

Brigham Young University is presenting the following proposal for the design of new flood

control feasibility plan as per the RFP issued by graduate student, Christian Kesler. The project

team is committed to providing a high level of service that will uphold the standards of Brigham

Young University. Included in this proposal will be:

Introduction

Scope of Work and Plan Outline

Design Schedule

Facilities, Tools, Data and Equipment

Project Budget

Deliverables and Performance Standards

Statement of Qualifications

For any questions or concerns about this proposal, please contact us at

[email protected] (503)530-6486.

Thank you for giving us this opportunity. We look forward to hearing from you.

Sincerely,

Matt Johnson

Donald Anderson

Fabian Zamorano

Page 3: FLOOD CONTROL FEASIBILITY PLAN BYU Storm Water Engineerscecapstone.groups.et.byu.net/sites/default/files/2016Capstone/2016... · water system for the Ridge Lane area. AutoCAD 3D Civil

Page 3 of 12

Introduction

PROJECT TITLE: Flood Control Feasibility Plan

PROJECT ID: CEEn-2016CPST-007

PROJECT SPONSOR: City of Payson

TEAM NAME: BYU Storm Water Engineers

Overview

The Ridge Lane area currently does not have a storm water system. As a result, homes in the area

experience flooding during major rain events. To fix this problem, we propose to design a storm

water system for the Ridge Lane area. AutoCAD 3D Civil will be used to analysis our design to

ensure that the storm water system can handle a 100-year storm for the city of Payson, Utah. The

new storm water system will prevent any future flooding of homes in the Ridge Lane Area.

Scope of Work

The main tasks of the project are:

Develop a storm water system that includes: drainage basins, a storm water pipe

system, and a filtration system

Design a retention basin

Stop flooding that affects the homes in the area

Schedule

We will carefully complete each task according to the schedule provided in the following pages

in the proposal. Each team member will dedicate 8 hours a week towards working on the project.

We will start working on the project starting in the beginning of January 2017 through the end of

March 2017.

Deliverables

There will be a monthly status report documenting the current challenges,

solutions, and progress

A final report with design alternatives for the project that includes economic and

environmental consideration

A presentation to the sponsor and a poster session for students, faculty, and other

interested individuals will be organized

Page 4: FLOOD CONTROL FEASIBILITY PLAN BYU Storm Water Engineerscecapstone.groups.et.byu.net/sites/default/files/2016Capstone/2016... · water system for the Ridge Lane area. AutoCAD 3D Civil

Page 4 of 12

Proposed Work Plan

The primary tasks associated with this project with consist of an AutoCAD 3d Civil design of a

working storm water conveyance system for the area shown in figure 1. This system will consist

of a retention basin, storm water pipe, filtration system, and several drainage basins. In addition,

several options will be considered to find an optimum value for effectiveness, cost, and time of

construction. The design work will be done primarily at the Brigham Young University Campus

during the winter semester of 2017. The proposed conditions that signal the successful completion

of this project will consist of: a working order storm water system, a design that is easy to

implement and understand, an effective yet financially acceptable system, and prevention of any

future flooding.

Tasks to be performed:

o Analysis of the utility lines in the subject area.

o Determination of unlisted underground lines such as cable.

o Determination of max water flow during a 100-year storm

o Analysis of water flow

o Analysis of best locations to place drainage basins and the number.

o Research on drainage basin specifications and styles

o Analysis of alternative systems

o Research on Man hole specifications

o Compatibility and adjustment due to utility lines.

o Determination of maximum storm water pipe for water flow

o Research of different filtration systems and their viability

o Research on different types of drainage basins and their viability

o Review to ensure adequate soil –water absorption

o Ensure no negative effects on downhill residents.

Figure 1 Aerial view of project site that indicates flow of water

Page 5: FLOOD CONTROL FEASIBILITY PLAN BYU Storm Water Engineerscecapstone.groups.et.byu.net/sites/default/files/2016Capstone/2016... · water system for the Ridge Lane area. AutoCAD 3D Civil

Page 5 of 12

Schedule

Below is the proposed work schedule for all team members. This project is anticipated to begin in

early January and will finish in early March. There will be biweekly team meetings to discuss the

progress of the project. A monthly progress report will be sent out. The following is a weekly work

schedule showing the times that all team members will spend on the project and the various time

distributions.

Weekly work schedule

Monday Tuesday Wednesday Thursday Friday Saturday

Weekly 1 hr/individual - 3 hr/team - 3 hr/team 1 hr/individual

The project will consist of three distinct phases. All group members will be actively engaged in

research and analysis. Also the technical report will be a team effort. Figure 2 shows the

expected tasks of each phase.

Proposed project design flow:

Figure 2 Project Phases

Research:

• Location specifics

• Storm Drain systems

• Retention Basin options

• Water flow and drainage basins.

Analysis• Flood prevention requirements

• Soil capacity

• Potential effects of retention basin

Technical Report

• Deliverables

• Final Presentation

• Revisions and graphics

Page 6: FLOOD CONTROL FEASIBILITY PLAN BYU Storm Water Engineerscecapstone.groups.et.byu.net/sites/default/files/2016Capstone/2016... · water system for the Ridge Lane area. AutoCAD 3D Civil

Page 6 of 12

Facilities, Tools, Data and Equipment

Several tools will be required to complete this project. The tools associated with the design phase

will be the primary focus of this section. The secondary construction phase will require typical

construction vehicles associated with storm water system creations.

AutoCAD Civil 3d: A engineering design program which allows for storm water planning.

Combines surveying data, underground utilities, and general surface conditions to allow for

maximum design potential.

Payson City. Standard Specifications and Standard Plans: Gives several codes to assist is creating

an acceptable storm water conveyance system. Will be heavily referenced and used for analysis of

the various options.

Project Budget

This section outlines the estimated completion date and time required for each segments of the

design phase. The project is expected to run between early January to mid-March. Numbers

represent estimated hours of work time per team member. (1 = 1 hour, 3= 3 hour, etc).

Week Jan

9-

16

16-

23

23-

30

30-

Feb

6

6-13 13-20 20-27 27-6

Mar

6-13 13-

20

Research 6 4 2 1 1 0 0 0 0 -

Analysis 1 2 4 5 1 1 0 0 0 -

Group

Meetings

1 1 1 2 1 2 2 2 2 3

Status

Report

1 1 - - - 1 1 - -

Final

Technical

Report

- - - - 5

/draft1

5

/draft1

3

/revision

2

/revision

2 /draft

2

2

/final

draft

Final

Presentation

- - - - - - 2 /draft1 3 /draft

1

4

/revision

3

/final

draft

Overall

Time

8 8 8 8 8 8 8 8 8 8

Page 7: FLOOD CONTROL FEASIBILITY PLAN BYU Storm Water Engineerscecapstone.groups.et.byu.net/sites/default/files/2016Capstone/2016... · water system for the Ridge Lane area. AutoCAD 3D Civil

Page 7 of 12

Deliverables

Resources will be made available throughout the development of this project that will give insight

into the design and progress the team has made. These resources include short monthly status

reports that document the challenges, solutions, and progress that the project team has made. These

status reports will answer several questions about the development of this project which will

include:

What challenges the team encountered during the development of the project

What actions the team decided to do to overcome challenges

What progress the team made to overcome these challenges

Whether the project is on schedule

The team will also use these status reports to summarize the progress and status of the project. It

will also show if the challenges negatively affected the progress of the project and if there were

plans made to get back on schedule.

Once the project is completed, a final report that will also consists of design and cost analysis of

the project will be made available. The final report will also have design alternatives for the project

that include economic and environmental considerations. The final report will be made available

as a PDF.

Along with a final report, a poster will also be made that describes the design and objective of the

project. This poster will be intended for anyone including students, faculty, and other individuals

who are interested in the project. A PowerPoint presentation that summarizes the project will also

be used for the presentation to the sponsor. All deliverable will be done and made available by

April 10, 2017.

Performance Standards

Team will provide work for this Capstone project “as is” using best practices and with best effort.

Project results cannot be construed as work performed by licensed professionals and cannot be

used as “stamped deliverables” without first being reviewed, approved and stamped by a qualified

and relevant license professional engineer.

The team will be guided by Christian Kesler who is a graduate student mentor at Brigham Young

University. There will also be several university faculty members who will also guide students

including Dr. James E. Nelson who is a professor of civil engineering at BYU. The sponsor of the

project is Travis Jockumsen who is the Public Works Director, Development Services Director,

and City Engineer of the City of Payson in Utah.

The project team consists of three undergraduate civil engineering students attending Brigham

Young University. All three undergraduate students in the project team are close to earning their

bachelor degrees in civil engineering. The team plans on setting hours each week to work together

on project. Collaboration on the project will consists of each team member utilizing skills learned

from educational experiences at BYU.

Page 8: FLOOD CONTROL FEASIBILITY PLAN BYU Storm Water Engineerscecapstone.groups.et.byu.net/sites/default/files/2016Capstone/2016... · water system for the Ridge Lane area. AutoCAD 3D Civil

Page 8 of 12

Statement of Qualification

The following is a list of key personnel and outside consultants that may be involved during the

process of the design project:

Christian Kesler – Brigham Young University, Graduate Mentor

o Bachelor of Science, Civil Engineering, Brigham Young University,

Travis Jockumsen – City of Payson, Public Works Director/Development Services

Director/City Engineer

o Bachelor of Science, Engineering, Idaho State University, 1996

o Senior Engineer, City of Orem, 2006-2013

o Corporate Engineer, Geneva Pipe, 2003-2006

o Design Engineer, ProCube Consultants, 2003

o Design Engineer, Hubble Engineering, 1999-2003

Dr. James E. Nelson – Brigham Young University, Professor, Faculty Advisor

o Ph.D., Civil and Environmental Engineering, Brigham Young University, 1994

o Master of Science, Civil and Environmental Engineering, Brigham Young

University, 1990

o Bachelor of Science, Civil and Environmental Engineering, Brigham Young

University, 1989

o Professor, Civil and Environmental Engineering, BYU, 2008-2016

o Associate Professor, Civil and Environmental Engineering, BYU, 2003-2008

o Assistant Professor, Civil and Environmental Engineering, BYU, 1996-2003

o Research Lab Manager, Environmental Modeling Research Laboratory (EMRL)

at Brigham Young University, 1989-1996

o BYU Ira A. Fulton College of Engineering Outstanding Citizenship Award, 2009

o BYU Civil and Environmental Engineering Outstanding Faculty Award, 2006

o BYU Ira A. Fulton College of Engineering Global Study Fellowship, 2006

o BYU Office of Research and Creative Activities Technology Transfer Award,

2003

While the project progresses, the team will use several concepts learned from university courses.

The university courses that the members in the team have taken include fluid mechanics,

hydraulics, technical writing, engineering drafting, surveying and GIS, and soil mechanics. There

are also several software programs that the team is familiar with that include GIS, AutoCAD,

and Microsoft Office.

The project team plans to collaborate by assigning each team member with certain objectives.

Matt Johnson will be the team leader and will organize meetings, assignments, and will make

sure that the team maintains expectations. Donald Anderson will do research and focus on

compiling information and data for technical papers that will include charts, figures, etc. Fabian

Zamorano will collaborate with Donald to do research and get the information and data for

technical papers organized while also performing analysis for the design. Each objective will be

focused intensively by each team member.

Page 9: FLOOD CONTROL FEASIBILITY PLAN BYU Storm Water Engineerscecapstone.groups.et.byu.net/sites/default/files/2016Capstone/2016... · water system for the Ridge Lane area. AutoCAD 3D Civil

Page 9 of 12

Appendix A

Page 10: FLOOD CONTROL FEASIBILITY PLAN BYU Storm Water Engineerscecapstone.groups.et.byu.net/sites/default/files/2016Capstone/2016... · water system for the Ridge Lane area. AutoCAD 3D Civil

Page 10 of 12

Donald Anderson 665 N 500 E #15 Provo, UT 84606

703-300-0354

[email protected]

SUMMARY

Civil Engineering student with planning, problem solving, and teamwork skills. Able to learn,

adapt, and work efficiently with others in solving problems and completing projects. Naturally

curious and eager to learn new skills and meet new people.

EDUCATION

Brigham Young University Provo, UT

B.A. in Civil Engineering. Graduation date, December 2017.

GPA: 3.32

EXPERIENCE

Schoolwork:

Experience with ArcGIS, CAD, Revit, Inventor, Visual Basic.

Coursework includes: Materials Testing, Soils Testing, and Statistical Analysis.

Laboratory Experience in Soils, materials testing, and concrete mixing.

Proficient in Microsoft Office

Experience in team projects and able to communicate simply and effectively.

Work: Bakery Employee, Summer of 2016

Demonstrated reliability and consistency by no missing a single day.

Managed well under stress and a heavy workload.

Worked hard everyday.

Service:

Taught at an after school program for young elementary school children.

Eagle Scout Award

Organized a blood drive for the community at local church Volunteer and service mission in Japan, 2013~2015

Cooperated with diverse people and adapted to new situations and groups. Planned, organized, and conducted English classes in Japan for two years

SKILL HIGHLIGHTS

Statistical Analysis

Experience in CAD, REVIT, Inventor, ArcGIS, Microsoft Office

Proficient in Japanese

Experience in technical communication and lab reports

Page 11: FLOOD CONTROL FEASIBILITY PLAN BYU Storm Water Engineerscecapstone.groups.et.byu.net/sites/default/files/2016Capstone/2016... · water system for the Ridge Lane area. AutoCAD 3D Civil

Page 11 of 12

Fabian Zamorano 787 Crest Drive, Orem, UT 84057

[email protected] (801) 368-0956

OBJECTIVE

Transportation engineering position where my skills as a civil engineering student can be used to assist

engineers in traffic engineering studies, reports, and designs.

EDUCATION

B.S. Civil Engineering, Minor: Mathematics (Anticipated) April 2017

Brigham Young University, Provo, UT

GPA: 3.48/4.0

RELEVANT COURSEWORK

Geometric Design of Highways January-April 2016

Gained proficiency in AutoCAD Civil 3D to design highways and intersections through a

collaboration term project

Prepared technical reports to describe and explain the reasoning of the design of a new highway

which included improving safety and meeting traffic needs

Intro to Transportation Engineering September-December 2015

Determined when intersections warranted installation of traffic signals so that drivers don’t face

dilemma zones while minimizing the effects of congestion and delays

Conducted activities to measure traffic flow characteristics of local streets

Performed procedures for geometric design of highways including horizontal and vertical

alignments of roadway sections using safe stopping distance and superelevation

Engineering Draft w/ CAD Applications January-April 2013

Gained proficiency in several CAD software programs including AutoCAD & Revit

Collaborated with a team to design a structural model for a building using these CAD programs

Developed skills in manual drafting techniques to draw sketches of design plans

WORK EXPERIENCE

Electrical Apprentice April-August 2015

Westec Electric, Orem, UT

Analyzed technical drawings in order to perform hands-on work and use power tools during

electrical industrial projects with the direction of experienced electricians

Worked alongside construction workers and saw first-hand some engineering design issues and

how these problems were solved

Assembly Line Worker June-August 2013

Blendtec, Orem, UT

Worked together with a team to quickly and effectively assemble blenders and package them

SKILLS

Computer skills including proficiency in Microsoft Word, Excel, and PowerPoint

Good Communication Skills and very cooperative in teams during design projects

Page 12: FLOOD CONTROL FEASIBILITY PLAN BYU Storm Water Engineerscecapstone.groups.et.byu.net/sites/default/files/2016Capstone/2016... · water system for the Ridge Lane area. AutoCAD 3D Civil

Page 12 of 12

Matthew Reed Johnson 31440 SW Olympic Drive, Wilsonville, OR 97070

Cell: (503) 530-6486

Email: [email protected]

Education Brigham Young University, Provo, Utah

Bachelor of Science in Civil Engineering 2012-2017

Relevant Coursework

ENG Draft w/CAD Apps

ENG Mechanics: Materials

ENG Measurements

Structure Analysis

Experience

Xerox (Technician) 2016

(Summer)

Communicated and worked closely with engineers

Reliability testing

Took precise measurements

Honey Baked Ham (Courtesy Clerk) 2010-2015

(Holidays & Fall of 2013)

Worked on the cash register

Provided customer service

Assisted with ham production

Computer Skills

AutoCAD, Revit, ArcGIS, Visual Basic, Mathcad, Microsoft Word and Excel

Achievements/Activities

Eagle Scout

National Honor Society 2010-2012

Member of American Society of Civil Engineers 2014-Present

Intramurals teams 2013-2016

Volunteer

Wilsonville W.E.R.K. 2007-2016

Habitat for Humanity 2014

Toys for Joy 2013-2014