Floating head heat exchanger - Maintainance
-
Upload
abhishek-srivastav -
Category
Engineering
-
view
636 -
download
24
Transcript of Floating head heat exchanger - Maintainance
2
FLOATING HEAD Heat Exchanger
General Assembly view
Shell side Inlet
Shell side Outlet
Tube side Inlet
Tube side Outlet
Shell
Back Cover
Distributor
Tube Sheet
Gaskets
Gasket
Saddle
Floating HeadBundle
3
Floating Head Heat Exchanger
Cross Sectional View
BaffleShell
Distributor Back cover
Tube Bundle
Floating Head
4
Split ring
FLOATING HEAD Heat Exchanger
Split View of Parts
Distributor Back CoverFloating
Head
Gasket
SpacerGasket GasketGasket
Shell
Floating Head Detail
Tube Bundle
Tube sheet Tube sheet
5
Do Not Start The Job Without A Safety Plan
6
Bundle Puller
FLOATING HEAD Heat ExchangerMaintenance Activity Description
Blind Inlets-Outlets at plant area
Disconnect and remove Distributor with gasket
Disconnect and remove Back cover with gasket
Disconnect and remove Floating Head with gasket
Install the bundle puller
Pull the bundle out
Ground level
7
Bundle Puller
FLOATING HEAD Heat ExchangerMaintenance Activity Description…..Continuation
Clean Shell and covers
Lift the bundle puller with clean bundle and new gasket, ready for reinstallation
Lower the bundle and take to hydro-jetting area
Ground level
8
Bundle Puller
FLOATING HEAD Heat ExchangerMaintenance Activity Description…..Continuation
Reinsert the bundle by bundle puller
Lower the bundle puller to the ground and take it away
Ground level
9
FLOATING HEAD Heat ExchangerMaintenance Activity Description…..Continuation
Install front Test Ring with gasket
Install back Test Ring with gasket Fill the shell by water
Install Pressure Gauge
Ground level
Shell Side Hydro-test
PG
Install Blinds in shell
Water Pump
Connect water pump Check leakages from tubes
Raise the pressure up to value given by Inspection
10
Water
Water
FLOATING HEAD Heat Exchanger
Shell Side Hydro-test …Check leakages from tubes continuation
PG
“A” “B”
View “B”
View “A”
11
Tube leak elimination Details
Detail “B”
[By Plug both sides]
Detail “A”
[By Expansion both sides]
Leak
Leak
FLOATING HEAD Heat Exchanger Shell Side Hydro-test ….Continuation Details
Tube Expander Tool
PG
“A” “B”Shell under pressure
12
FLOATING HEAD Heat ExchangerFLOATING HEAD Heat ExchangerMaintenance Activity Description…..Continuation
PG
Remove Test Ring & gasket [distributor side]
Reinstall distributor with new gasket & tight bolts
Remove Test Ring & gasket [floating head side]Reinstall Floating Head with split flange, new gasket & tight bolts
Blind Distributor in & out
Discharge water from shell drain
Drain
13
FLOATING HEAD Heat Exchanger
PG
Check distributor gasket sealing
Check floating head gasket sealing
PG
Fill tube side by water
Drain
Install PG in distributor top nozzle
FLOATING HEAD Heat Exchanger Tube Side Hydro-test ….Continuation Details
Connect water pump
Water Pump
Raise the pressure up to value given by Inspection
Discharge the water, remove PG and water pump
Remove blinds form distributor nozzle and tight bolts
14
FLOATING HEAD Heat Exchanger
PG
Check bundle to shell gasket sealing
Check Back cover gasket sealing
Fill Shell side by water
Drain
FLOATING HEAD Heat Exchanger Shell Side Final Hydro-test ….Continuation Details
Install Back cover with Gasket
Water Pump
Raise the pressure up to value given by Inspection
Discharge the water, remove PG and water pump
Remove blinds form shell nozzles and tight bolts
Connect water pump
15
FLOATING HEAD Heat ExchangerFLOATING HEAD Heat Exchanger
Handover & Final House Keeping Close Work permit Remove tools and equipment
Clean and wash the area Remove scaffold after unit start-up
By Maintenance