Floating Drydock
-
Upload
ahmed-tarek -
Category
Documents
-
view
232 -
download
0
Transcript of Floating Drydock
8/3/2019 Floating Drydock
http://slidepdf.com/reader/full/floating-drydock 1/1
As the peratng regn s nt ndustrall develped,the d has t be a sel-supprtng unt. Ths hasmpated n the desgn n the llwng was:
- The d s tted wth ts wn pwer generatnand mahner sstems. All mahner s latedn the sde walls the d. As the sdewalls areept small r maxmum lear wdth nsde thed, the mahner spaes are desgned t beextremel mpat.
- Whle mst latng ds are nneted texternal resures, ths d s able t stre anddstrbute ts wn nsumables (uel and resh
water) and stres.
- The d s tted wth ranes and repar altesas external equpment s hardl avalable n theperatng area. Ths nfuenes the arrangement the sde walls: a gantr rane s tted n eah sde.
- The ammdatn s tted nsde the sde walls.
G E N E R A L
FLoATiNG DRyDock
V u y
k E n g i n e e r i n g
R o t t e r d a m
1716
As earl as the end 2003 chng Fu Shpbuldng Tawan, ntrated Vu Engneerng Rtterdamr the desgn a fatng drd t be bult at ther shpard n kahsung. The d wll serveas a repar alt n the Republ Marshallislands. in ths regn shng s the man setrand therere the d s manl desgned rmantenane and repars purse seners andeeders.
our spe was the nept desgn, bas desgnand detaled engneerng the d, and part the equpment. The d has been desgnedardng t the rules r lassatn Det Nrse Vertas.
design and engineering
Dock particulars:
Length pntn 104.80 mBreadth extreme 28.52 m
Depth mld. 11.70 m
Docking Capacity:
Nett ltng apa t 3 500 tn
Maxmum length 96.00 m
Maxmum wdth 19.58 m
Maxmum draught 6.55 m
The arrangement/mahner the d s ptmzedr eas peratn and relablt. Ths resulted nan arrangement wth the pntn dvded nt
several tan znes, eah perated b ts wnpump rm. Fr redundan, eah pump an beb-passed t ther znes. The pumps are latednsde the pntn t maxmze the een the ballast sstem.
As the peratng regn s surrunded b prtetedrals, the d has been desgned t mnmzeenvrnmental pllutn. in rder t llet spra
water rm mantenane wr, the d s tted wth a mdern blge water lletn sstem. Thsnssts ur blge wells at the rners thepntn. These wells llet all waste water rmthe d fr. Frm there the water s dstrbutedt a blge water lletng tan, whh s nnetedt a separatn unt.
Ater sme delas n the buldng press, thed suessull perrmed ts rst dng n2007. in the llwng perd the d was usedmultple tmes at the shpard n Tawan, beausethe enm grwth requred extra altes. inths perd the wner, wth Vu EngneerngRtterdam as a nsultant, nvestgated the best sutable latn r the d. Fr several pssblelatns n the ntended lagn, we engneereda mrng sstem t whh the d wll beattahed n the uture.