Transcript of Flight Procedures Programme (FPP)
COSCAP 2011-02 FPP Programme Update 1
Flight Procedures Programme(FPP)
4th ARAST Meeting
Bangkok, Thailand
21 to 25 February 2011
COSCAP 2011-02 FPP Programme Update 2
FPP Member States
Active Participating States User Participating States
ChinaHong Kong, ChinaMacao, ChinaDemocratic People's Republic of KoreaFrench Polynesia (France)MongoliaRepublic of KoreaSingaporeThailandAustraliaPhilippines
BangladeshCambodiaMalaysiaMyanmarNepalPakistanSri LankaTimor-LesteAfghanistanLaosVietnamMaldives
COSCAP 2011-02 FPP Programme Update 3
FPP Training Plan
2011
Date Course Duration (Class Days)
Q1 3-28 Jan Pans-Ops PD Initial Course1 20
21-25 Feb PBN Airspace Concept Instructor Workshop 5
15-31 Mar PBN PD Course1 13
TBN or on request PBN Airspace Concept Workshop2 5
On request Procedure Design OJT1 15
Q2 18-21 Apr RNP AR PD Course (tentative)1 4
TBN or on request PBN Airspace Concept Workshop2 5
On request Procedure Design OJT1 15
COSCAP 2011-02 FPP Programme Update 4
FPP Training PlanQ3 4-29 Jul Pans-Ops PD Initial Course1 20
TBN or on request PBN Airspace Concept Workshop2 5
On request Procedure Design OJT1 15
Q4 10-11 Oct PBN Recurrent Training Workshop-Beijing 2
12-14 OctPANS OPS Recurrent Training Workshop- Beijing 3
17-18 Oct PBN Recurrent Training Workshop-Brisbane 2
19-21 OctPANS OPS Recurrent Training Workshop- Brisbane 3
1-17 Nov PBN PD Course1 13
TBN GeoTITAN 15
TBN or on request PBN Airspace Concept Workshop2 5
On request Procedure Design OJT1 15
COSCAP 2011-02 FPP Programme Update 5
FPP Training Plan
2012
Date Course Duration (Class Days)
Q1 6 Feb - 2 Mar Pans-Ops PD Initial Course1 20
TBN or on request PBN Airspace Concept Workshop2 5
On request Procedure Design OJT1 15
Q2 8-24 May PBN PD Course1 13
TBN or on request PBN Airspace Concept Workshop2 5
On request Procedure Design OJT1 15
COSCAP 2011-02 FPP Programme Update 6
FPP Training Plan
Q3 2-27 Jul Pans-Ops PD Initial Course1 20
10-14 Sep PANS OPS Recurrent Training Workshop3 5
TBN or on request PBN Airspace Concept Workshop2 5
On request Procedure Design OJT1 15
Q4 9-25 Oct PBN PD Course1 13
12-23 Nov RNP AR PD Course 10
TBN or on request PBN Airspace Concept Workshop2 5
On request Procedure Design OJT1 15
COSCAP 2011-02 FPP Programme Update 7
Notes1. This training will be conducted at the FPP facilities in Beijing, China
2. This workshop, once available, may be conducted on request in a State or in a sub-Regional area
3. This workshop will be open to all in the Region and will be conducted at a suitable location based on offers to host
4. For training and workshops not covered under notes 1 to 3, location and/or dates have not yet been determined as the training is still under development. This training plan will be updated as more information is available.
5. Development of additional training in helicopter criteria, safety assessment, quality assurance and for flight validation pilots is planned for 2011 and 2012 as resources permit and the guidance material and expertise becomes available.
COSCAP 2011-02 FPP Programme Update 8
Contact Flight Procedures Programme
Capt. David Van Ness [email protected] Liu Ying (Yolanda) [email protected]
COSCAP 2011-02 FPP Programme Update 9
Questions?