flexi_lite_quick_guide-0900d80580a0ba9f.pdf
-
Upload
alex-enrique-chavez-gonzalez -
Category
Documents
-
view
20 -
download
0
Transcript of flexi_lite_quick_guide-0900d80580a0ba9f.pdf
-
Flexi BTSQuickGuide
Lite
Thisguide quickreferencefor Liteinstallation .
canbemountedon walloron pole.
isa Flexi BTS1900(FQFA)and2100(FQGA),cabling,andmaintenance
Flexi BTS a aLite
GroundingCablingruleforinterfacesSFP cablingAntennacablingPowercabling
1Contentsofdelivery andneededtools
Clearances2 Preparinginstallation Wallinstallation4
Poleinstallation5
3
12
11
8
7
6
Mountingbracketassembly
Optionalstackedinstallation
Cabling
Frontcoverinstallation
Optionalitemsinstallation
Poweringupand
commissioning
Installationchecklist
10Deploying
insmallspace(specialcase)
9 Maintenance
-
-2-
Theinformationinthisdocumentissubjecttochangewithoutnoticeanddescribesonlytheproductdefinedintheintroductionofthisdocumentation. ThisdocumentationisintendedfortheuseofNokiaSolutionsandNetworkscustomersonlyforthepurposesoftheagreementunderwhichthedocumentissubmitted,andnopartofitmaybeused,reproduced,modifiedortransmittedinanyformormeanswithoutthepriorwrittenpermissionofNokiaSolutionsandNetworks. Thedocumentationhasbeenpreparedtobeusedbyprofessionalandproperlytrainedpersonnel,andthecustomerassumesfullresponsibilitywhenusingit.NokiaSolutionsandNetworkswelcomescustomercommentsaspartoftheprocessofcontinuousdevelopmentandimprovementofthedocumentation.Theinformationorstatementsgiveninthisdocumentationconcerningthesuitability,capacity,orperformanceofthementionedhardwareorsoftwareproductsaregiven"asis"andallliabilityarisinginconnectionwithsuchhardwareorsoftwareproductsshallbedefinedconclusivelyandfinallyinaseparateagreementbetweenNokiaSolutionsandNetworksandthecustomer.However,NokiaSolutionsandNetworkshasmadeallreasonableeffortstoensurethattheinstructionscontainedinthedocumentareadequateandfreeofmaterialerrorsandomissions.NokiaSolutionsandNetworkswill,ifdeemednecessaryNokiaSolutionsandNetworks,explainissueswhichmaynotbecoveredbythedocument.NokiaSolutionsandNetworkswillcorrecterrorsinthisdocumentationassoonaspossible.INNOEVENT WILL NOKIA SOLUTIONS ANDNETWORKSBELIABLEFORERRORSIN THISDOCUMENTATIONORFOR ANY DAMAGES,INCLUDINGBUT NOT LIMITED TOSPECIAL,DIRECT,INDIRECT,INCIDENTAL ORCONSEQUENTIAL OR ANY LOSSES,SUCH ASBUT NOT LIMITEDTOLOSSOFPROFIT,REVENUE,BUSINESSINTERRUPTION,BUSINESSOPPORTUNITYORDATA,THAT MAY ARISEFROM THEUSEOF THISDOCUMENT OR THEINFORMATIONINIT.
NSNisatrademarkofNokiaSolutionsandNetworks.NokiaisaregisteredtrademarkofNokiaCorporation.Otherproductnamesmentionedinthisdocumentmaybetrademarksoftheirrespectiveowners,andtheyarementionedforidentificationpurposesonly.
Copyright201 NokiaSolutionsandNetworks. Allrightsreserved
DN09145917Issue0 , Approvaldate201 - -
4
2 4 07 04
-
W Riskofeyedamagecausedbyinvisiblelaserbeam.ARNING!Dangerofeye damagecausedby invisiblelaser beam!Make sure thatthelaser beamis switchedoffwhenoptical cables areinstalled.
NOTICE: appropriateingressU 6 SN
requiredforboth and
Incorrectcables andseals may notprovide protection.se only tested IP 5class outdoorcables withseals provided by N .
This is indoor installations .
Electrostatic discharge(ESD)may damagethemodules.WearanESDwrist strap oruse acorrespondingmethodwhenhandlingthemodules.NOTICE
NOTICE
NOTICE
NOTICE
NOTICE:
:
:
:
:
r
50/ 1.97/ 76
Installing andcommissioning ofBTSproducts must beperformedby anexpertfamiliarwithelectronic devices, toavoid damagecausedby improperhandling.
Overbending theoptical fibe cables damages thecables andcan detachordamagetheconnectors. Donotbendoptical fibrecables toaradiussmaller thantheminimumradius of 70mm( 2. inches).
Theoptical fibreconnectoris fragile.Handleitwithcare.Always routetheoptical cables totheleftfromtheconnector.Donotconnectoptical cables inatemperaturelowerthan-20C.
Optical fibres aresensitive. Thepresenceofcontaminants willlowerthemechanicalstrength oftheoptical fibreandmay dampenthetransmission oflightinthefibres. Cleanalloptical fibreconnectors beforeinstallationusing anoptical fibreconnectorcleaning kit.
,including theoutdoorcabinetoutdoor
WARNING!Riskofelectricshock.BeforeturningRFpoweron,RFportsshouldbeterminatedbynominal50 load(forexample,feederwithantenna).However,iftheseconditionsarenotmet,theplasticcapsthataredeliveredwithintheunusedRFportsshouldremaininplace.TheplasticcapsisolateRFpowerfromtheenvironment,andthusprovideelectricshocksecurityincaseRFpowerisaccidentallyon.
CAUTION! personalinjuryRiskof .Always stop transmission beforedetaching theoptical fibefromanoptical fibreconnectormarked withawarningtriangle.
r
-3-
Deliveriesarecomplete andequipmentisnotdamaged.
Contentsofdelivery andneededtools1
Checklist
DeliveryContens Salescode
FlexiLite2100(FQGA) 472467A
Optionalitems
Mountingbracket 472469A
Optional2100Internal
Antenna(FAGQ)
472590A
Topcover 472470A
Neededtools
TORXscrewdrivers:T10,T15,T20,
T25,T45Flat-headscrewdriverSocketoropen-endedspanners
(wrenches):13mm(1/2in.),
19mm(13/16in.)
Torquewrenchforantennacables
Cableties
Drill
Marker,pen,orcomparabletool
Level
Allen(Hexagon)key8mm(5/16in.)
ESDwriststrapandcable
FlexiLite1900(FQFA) 472751A
Optional1900Internal
Antenna(FAFQ)
473019A
-
4 Wallinstallation
Preparinginstallation3
Clearances2
Fixingstuds
a) b) c)
Fixingstuds
Mountingbracketassembly
Fixthetwobracketpartstogetherandscrewinthefourfixingstuds.Therearethreewaystoconnectthebracketparts:
a)
b)
c)
Middleposition-usedinthedocument
Shortposition-recommendedforpoleinstallations
Longposition
- -4
Checklist
Sitemeetstheminimumclearances.
Markinganddrillingholes
185mm(7.3in.)
*)
1
*)
1.Mark onthewallusingthebracketasatemplate
rilltheholes.*) Thedistancebetweenupperandlowerholesdependson chosenbracketconnectionlength.
thelocationsofmountingholes.
.2.Notethattheupperpartoftheholedefinesthemaximumfixingscrewsize.3.D
the
Marktheupperholesfirst
T
a
t
hefixingmethodmustbesufficientto
keeptheunitatitsposition. Alwayschoose
methodandfixingscrewsthatare
adequateothesurface
constructiontype/material.
CAUTION! personalinjuryRiskof .
185mm(7.3in.)
C andfixingpointslearances
Top
Left
Walls/roofs/floors/otherobjects
Right
CAUTION!personal
injuryRiskof
.
Ensurethat installation
surfaceandselectedfasteners
can deviceunder
requiredcircumstances
thewall
sustainthe
the .
L =431mm(16.97in.)
2
3
NOTICE: Theunitcoolingairflow
goesfromtheleft-handsideto
theright-handsideoftheunit.
unitis
installedinaroomthatenables
properventilation.
Makesurethatthe
Bottom
*200mmneededforfans'maintenancewhenmoduleisinitsinstallationposition
**60mm(2.36in)istheminimumwheninstallinginasmallspace(specialcase)
Middle
and
long
position
Short
position
Cabinet
installa-
tion
Left*
50mm
(1.97in.)
50mm
(1.97in.)50mm
(1.97in.)
Right
50mm
(1.97in.)
50mm
(1.97in.)
Top50mm
(1.97in.)
20mm
(0.78in.)
Bottom**
200mm
(7.87in.)
200mm
(7.87in.)
200mm
(7.87in.)
Mounting
bracket
assembly
positioning
50mm
(1.97in.)
50mm
(1.97in.)
-
Fixingmoduletothebracket
1.Connectthemodulewithbracket. Aligntheholesonmodule'sbacktothefixingstudsonmountingbracket.
2.Pushthemoduledownuntilitstops3.FixthefourM8x12screws.
.Connectthewrist rap.
.
4.FixthetwoM5(T25)screwsbythefrontpanel.5 st
1 2
1
Placingmoduleonawall
1. .2.L andpositionitagainstthewall, ting on3.4.
Fixtheuppermountingscrewsiftthemodule
fit it thescrews.Tightentheupperscrews.Insertthelowerscrewsand
tightenthem.
-5-
2
3
4
4 Wallinstallation(continued)
Checklist
Moduleisfirmlyandproperlyfixedtothesurface.
ESDwriststrapisconnected.
3
Wriststrap
toESDstud
54
-
Stackedinstallationonawall (Optional)4- -6
Poleinstallation5
1.FixthemoduletothebracketasinFixingmoduletothebra ket .2.Threadthejubilee throughthemountingbracketsholes.3.Lift unit thepole
ightenthejubileeclips usingaflat screwdriver.
sectionc onpreviouspage
clips
the on .
NOTE:Fixtworopestothehoistingpoints(oneropeoneachsideofthebracket)andconnecttheminthemiddle,thattheyformatriangle. Thisallowsforabalancedlifting.Liftingtheunitwithonlyonehoistingpointisalsopossible,butinsuchacasetheunitisoutofbalance.
4. T to5Nm(3.7lbft)-head
2
1 3 4
Shortpositioninstallationonawall (Optional)4
1.Knockout holes.
2Screwfourfixingstudstothetopcover .
3.FitthesecondFQGA module.
4.FixthesecuringM screws.
allthe 'blindsusingaflat-headscrewdriver
.ofthefirstunit
tothestudsandpushitdownfirmly
4
43
2
1
1a1b
1c
1d
3
1.Setthemountingbrackettoitsshortposition.Fixthebracket.a. .b.Pc.d.
2. k thethe
3. .4.FixthetwoM5(T25)screwsbythefrontpanel.
Fixtheuppermountingscrewsositionthebracketagainstthewall,fittingittothescrews.
Tightentheupperscrews.Insertthelowerscrewsandtightenthem.
Connectthemodulewithbrac et. Aligntheholesonmodule'sbacktothefixingstudson mountingbracket.Pushthemoduledownuntilitstops
NOTEUsethemodulefrontbracketsashoistingpoints.
:
2
4
-
6 Cabling
1.Connectthegroundingcabletothegrounding
pointandscrew withM5(torx25)screw.
2.(Optional)Securethecablewithacable .
itin
tie
1.RemovetheIP seal
2.Insert SFP transceiver.
3.Connect opticalcable.
4
.Routethecabletotheleftandsecureitwith
dedicatedNSNstrainrelief.
.
the
the
.
5
a Usea T20
screwdriver.
Pushtheconnectorsealfirmlyinplace.
1.Removethecoveringcaps.
2.Connectantennacables
3.Tightenthe to Nm( . lbf)
.
cables 1.2 089 t .
1
2
1 2 3
Cleanwithswaborwipe alcohol.s with
Grounding
Opticaltransmissioncabling(SFP)
NOTICE:Makesurethattheopticalcableconnectorshavebeencleaned.
NOTICE: Useonlystraightorleft-bentopticalcablesandalwaysroutethecablesleftwards.
NOTICE:Donotbendopticalcablesbeyondtheminimumradiusof
70mm:
- (2.76in.),whencablediameteris7mm(0.28in.)-50mm(1.97in.),whencablediameteris5mm(0.20in.)
Antennacabling
1 2 3
-7-
Theopticalcableconnectorsarecleaned.
Theopticalcableisproperlyinstalledandtheminimumbendingradiusisnotviolated.
Doublecheckthat correctopticalinterfaceisinstalledthe .
4
5
1.RemovetheIP seal.
2.Putthecablefirmly (forLMP and TRStillitclicks)
3.Pushtheconnectorsealfirmlyinplace.
in .
22
1
3
CablingruleforEAC,LMP,TRS,andSYNC
-
Checklist
Powersupplywiresareconnectedcorrectly.
Powersupplycableisconnectedandsecuredcorrectly.
Cabling (continued)6
Strainreliefbar
I the
(T15)
nstall strainreliefbarandscrewitwithtwo
M5 screws.
ACpowercable
20m
m(0
.79in.)
1 2
4
5
7
8
1.RemovetheIP bootfromthemodule.
2.ThreadthecablethroughtheIP boot.
Stripthecableshieldingandpeelthewires
(NOTE: shouldbelongerthanothers)
.Insertwires tothe ACinputconnector
3. .
groundingwire
4 in .
(N-Neutral,PE-Earth,L -Line)
-8-
WARNING!Riskofpowersupplyfailureand,inrarecases,ofshortcircuit.Checkthatthepolarityiscorrectaccordingtothemarkingsonthecable.
.Threadthecablearoundthestrainreliefbarand
throughthestrainreliefclamp eave 20 m
fthecable .
.Fixtheclamp'sscrews.
.Insert ACinputconnectorandfixitsscrews.
.PushtheIP bootfirmlyinplace.
5
;l about 0m (7.87in.)
o forconnectionpurposes
NOTE:themaximum ACwirecross-sectionalareais
2.5mm (AWG3).
6 Usea T10screwdriver.
7
8
2
6
3
N PE L
-
Cabling(continued)6
Securingcables
Installingthefrontcover
Frontcoverinstalling
Frontcovermaintenance traps
7
-9-
1
3
1.
.
2.
3.Fixthecoverwithwo
screws .
Fittheupperpartofthecover
tothemodule
Swingthecoverandpushitfirmly.
pre-installed
(T15)
3
1.Tiethetworopestocreat
maintenance trap.
2. Threadthe traparoundthe
strainreliefbar.
3.Fix tohefrontcover.
e
a s
s
thestrap t
2
Securethecableswith
cableties,ifneeded.
Ensurethatthecable
routingallowsforproper
frontcoverinstallation.
Checklist
Cablesarethreadedinawaythatdoesnotobstructinstallationofthefrontcover.
Frontcoveranditsmaintenancestrapareinstalledproperly.
2
NOTE:Beforefixingmake
surethatthewashersare
atthebottomofthescrew.
Otherwise,fixingthescrews
maybedifficult.
2 3
1
-
Installingoptionalitems8
Antenna
-10-
1.Removethetopandfrontcovers,if
theyarealreadyinstalled.
2.Knockout screwhole
nsert studs holes.
.Fixtheantennascrews .
.Fixtheantennacables.
.K theupperpartofthefront
cover.
.Installthefrontcover.
thesix blinds.
3.I the inthemiddle
4 (Torx15)
5
6 nockout
7
1
2
6
7
3
4
4
5
-
Replacingfans
1.Removesixscrewsfromthefanplate.
2.Removethefanplate.
3. Takeanewfanplateandconnect
ans cables.
4.Pla e newplateandfixit
withthescrews.
thef
c the
3
1
4
1.Installthemaintenance trapasdescribed
inchapter ront over.
2.Fixthetwo orx .
s
Installingthef c
screws(T 15)
Maintenance9
Installingoptionalitem (continue )s d8
2
NOTICE: akesurethattheconnectorsarefacingeachotherproperly
M
(seemarkingsontheconnectors).Improperconnectionmightcauseafanfailure.
Topcover
- -11
1
22
NOTE:Ifthereisatleast200mm(7.87in.)
maintenancespace,theprocedure
canbedonewithoutuninstallingthemodule.
-
1.PowerupFlexiLiteBTSandchecktheLEDstoensurethatthemoduleworksproperly.2.CommisiontheBTS.Seethe forfurtherinformation.CommissioningFlexiLiteBTS
Poweringupandcommissioning
10
Installationchecklist
Performthesecheckstomakesurethattheinstallationiscomplete.
Thegroundingcableisconnectedtoagroundingpoint.
Allthecablesareproperlyinstalled(andsecured,ifneeded).
Siteiscleanandistallationiscompleted.
Deliveryiscompleteandundamaged.
Sitemeetstheminimumclearances.
Module'scover(s)is(are)installedwiththemaintenance trap.s
Themodule(s)is(are)correctlyinstalledonawall/pole.
12
-12-
11
Deployinginsmallspace(specialcase)
1.Dothecablingfirst,thenattachthemoduletothemountingbrackets(middleposition).2.Installtheunitinplace.Handlethecableswithcareinordernottobreakthem.3.Routeallthecablestotheleft.Minimum60mm(2.36in.)spaceatthebottomoftheunitisneededforcablerouting.
NOTICE:Donotbendopticalcablesbeyondtheminimumradiusof70mm
:- (2.76in.),whencablediameteris7mm(0.28in.)-50mm(1.97in.),whencablediameteris5mm(0.20in.)
Thespecialcasecanbeappliedwhenthereisaverylimitedspaceandyoucannotmeettheregular200mm(7.87in.)unitbottomclearance.