Flexible Seismic Product Pipeline...
Transcript of Flexible Seismic Product Pipeline...
-
www.sgh.com
Lesson Learned from the Installation of a Flexible Seismic Product Pipeline Mitigation System
Presented by:
William Bruin, P.E. Simpson Gumpertz & Heger, Inc.
October 7, 2014
Prevention First 2014, Long Beach, California
-
Prevention First 2014 2
The story you are about to see is true.
The names have been changed to protect the
innocent.
-
Marine Oil Terminal X Edge of Shoreline Bulkhead
Island wharf Mid-1950s design Concrete piles & deck 70,000 DWT capacity
Pipeway Ramp
Prevention First 2014 3
-
Terminal Xs MOTEMS History
Medium Risk MOT 2010 Initial Audit Completed
Complicated kinematic situation Seismically deficient wharf but vague on reasons/mitigations Pipelines = spill risk in seismic condition
2011-2012 Subsequent Seismic Mitigation Development Goal = Develop mitigation plan Wharf Level 2 compliance verified as-is, except
Ramp Damage = Pipeline spill risk Large Seismic Displacements
44 inches (+/- 22 inches) Perpendicular to Shore 40 inches (+/- 20 inches) Parallel to Shore 12 inches (+/- 6 inches) Vertical Moment
2012-2014 Implementation of Mitigation
Prevention First 2014 4
-
Level 2 Kinematic Seismic Movements
~3-in. Kinematic
~16-in. Total Lateral Wharf
Displacement
Prevention First 2014 5
-
Terminal X Impacted Wharf Pipelines
Prevention First 2014 6
-
www.sgh.com
Terminal X Very Congested
Prevention First 2014 7
-
Terminal Xs Seismic Compliance Challenges
Large seismic displacements Extensive existing infrastructure in project area Traditional piping expansion loops would not work !
Limited working footprint Convention loops to big
No clear regulatory path to introduce new technologies or non-traditional approaches
What would State Lands accept?
Prevention First 2014 8
-
Terminal Xs Mitigation Attack Plan
1) Brainstorm solutions Include all stakeholders
2) Work out the technical issues Avoid the unproven concepts Apply available technologies Minimize regulatory issues
3) Concept ranking Risk reduction & overall safety Present & future cost Regulatory risk
4) Develop regulatory path forward Concept driven Regulator participation Stepped approach
Prevention First 2014 9
-
Concept 1 - Conventional Hose Approach
Prevention First 2014 10
-
Think Vessel-to-Vessel
Prevention First 2014 11
-
Think Vessel-to-Vessel
Prevention First 2014 12
-
Concept 2 - Flex-Hose Loop Approach
Prevention First 2014 13
-
3D Concepts Swivel Option Concept 3a - Swivel Joints Nested Approach
Prevention First 2014 14
-
Concept 3b Swivel Joints Distributed Approach
Prevention First 2014 15
-
Terminal Xs Final Decision
Flex-hose was selected over swivel joint designs Equal safety & spill risk reduction Greater displacement flexibility / More robust Quicker installation Flex-hoses significantly less costly
~ (even with periodic replacement) No swivel joint maintenance / exercising
State Lands Concessions Conduct Hazard & Risk Assessment of Concept Flex-hose treated like convention transfer hoses
Follow existing hose regulations Annual hydrotesting Maximum replacement interval
Prevention First 2014 16
-
Flex-Hose Loop Design
Prevention First 2014 17
-
Flex-Hose Loop
Stainless steel double braided hose
Hard piped hose saddle
Prevention First 2014 18
-
Lessons Learned
Dont exclude Operators from design! They know a lot ! Regulatory approval process takes time Plan for it !
New systems require extra thought Communicate with State Lands often
Educate them on goals / problems / constraints Listen to their concerns (often defines path forward) Update them on progress
Critical systems assessment and hazard & risk assessment are effective tools
to define mitigation scope Pipelines are the only systems requiring post-event operability Not all systems require flexibility
to identify design risks to address regulators concerns to document design process
Prevention First 2014 19
-
Prevention First 2014 20
The story you have just seen is true.
The names have been changed to protect the
innocent.
-
Questions?
Prevention First 2014 21
and special thanks to Terminal X
for allowing SGH to share their story!
Lesson Learned from the Installation of a Flexible Seismic Product Pipeline Mitigation SystemSlide Number 2Marine Oil Terminal XTerminal Xs MOTEMS HistoryLevel 2 Kinematic Seismic MovementsTerminal X Impacted Wharf PipelinesTerminal X Very CongestedTerminal Xs Seismic Compliance ChallengesTerminal Xs Mitigation Attack PlanConcept 1 - Conventional Hose ApproachThink Vessel-to-VesselThink Vessel-to-VesselConcept 2 - Flex-Hose Loop ApproachConcept 3a - Swivel Joints Nested ApproachConcept 3b Swivel Joints Distributed ApproachTerminal Xs Final DecisionFlex-Hose Loop DesignFlex-Hose LoopLessons LearnedSlide Number 20Questions?