21
www.sgh.com Lesson Learned from the Installation of a Flexible Seismic Product Pipeline Mitigation System Presented by: William Bruin, P.E. Simpson Gumpertz & Heger, Inc. October 7, 2014 Prevention First 2014, Long Beach, California

Transcript of Flexible Seismic Product Pipeline...

  • www.sgh.com

    Lesson Learned from the Installation of a Flexible Seismic Product Pipeline Mitigation System

    Presented by:

    William Bruin, P.E. Simpson Gumpertz & Heger, Inc.

    October 7, 2014

    Prevention First 2014, Long Beach, California

  • Prevention First 2014 2

    The story you are about to see is true.

    The names have been changed to protect the

    innocent.

  • Marine Oil Terminal X Edge of Shoreline Bulkhead

    Island wharf Mid-1950s design Concrete piles & deck 70,000 DWT capacity

    Pipeway Ramp

    Prevention First 2014 3

  • Terminal Xs MOTEMS History

    Medium Risk MOT 2010 Initial Audit Completed

    Complicated kinematic situation Seismically deficient wharf but vague on reasons/mitigations Pipelines = spill risk in seismic condition

    2011-2012 Subsequent Seismic Mitigation Development Goal = Develop mitigation plan Wharf Level 2 compliance verified as-is, except

    Ramp Damage = Pipeline spill risk Large Seismic Displacements

    44 inches (+/- 22 inches) Perpendicular to Shore 40 inches (+/- 20 inches) Parallel to Shore 12 inches (+/- 6 inches) Vertical Moment

    2012-2014 Implementation of Mitigation

    Prevention First 2014 4

  • Level 2 Kinematic Seismic Movements

    ~3-in. Kinematic

    ~16-in. Total Lateral Wharf

    Displacement

    Prevention First 2014 5

  • Terminal X Impacted Wharf Pipelines

    Prevention First 2014 6

  • www.sgh.com

    Terminal X Very Congested

    Prevention First 2014 7

  • Terminal Xs Seismic Compliance Challenges

    Large seismic displacements Extensive existing infrastructure in project area Traditional piping expansion loops would not work !

    Limited working footprint Convention loops to big

    No clear regulatory path to introduce new technologies or non-traditional approaches

    What would State Lands accept?

    Prevention First 2014 8

  • Terminal Xs Mitigation Attack Plan

    1) Brainstorm solutions Include all stakeholders

    2) Work out the technical issues Avoid the unproven concepts Apply available technologies Minimize regulatory issues

    3) Concept ranking Risk reduction & overall safety Present & future cost Regulatory risk

    4) Develop regulatory path forward Concept driven Regulator participation Stepped approach

    Prevention First 2014 9

  • Concept 1 - Conventional Hose Approach

    Prevention First 2014 10

  • Think Vessel-to-Vessel

    Prevention First 2014 11

  • Think Vessel-to-Vessel

    Prevention First 2014 12

  • Concept 2 - Flex-Hose Loop Approach

    Prevention First 2014 13

  • 3D Concepts Swivel Option Concept 3a - Swivel Joints Nested Approach

    Prevention First 2014 14

  • Concept 3b Swivel Joints Distributed Approach

    Prevention First 2014 15

  • Terminal Xs Final Decision

    Flex-hose was selected over swivel joint designs Equal safety & spill risk reduction Greater displacement flexibility / More robust Quicker installation Flex-hoses significantly less costly

    ~ (even with periodic replacement) No swivel joint maintenance / exercising

    State Lands Concessions Conduct Hazard & Risk Assessment of Concept Flex-hose treated like convention transfer hoses

    Follow existing hose regulations Annual hydrotesting Maximum replacement interval

    Prevention First 2014 16

  • Flex-Hose Loop Design

    Prevention First 2014 17

  • Flex-Hose Loop

    Stainless steel double braided hose

    Hard piped hose saddle

    Prevention First 2014 18

  • Lessons Learned

    Dont exclude Operators from design! They know a lot ! Regulatory approval process takes time Plan for it !

    New systems require extra thought Communicate with State Lands often

    Educate them on goals / problems / constraints Listen to their concerns (often defines path forward) Update them on progress

    Critical systems assessment and hazard & risk assessment are effective tools

    to define mitigation scope Pipelines are the only systems requiring post-event operability Not all systems require flexibility

    to identify design risks to address regulators concerns to document design process

    Prevention First 2014 19

  • Prevention First 2014 20

    The story you have just seen is true.

    The names have been changed to protect the

    innocent.

  • Questions?

    Prevention First 2014 21

    and special thanks to Terminal X

    for allowing SGH to share their story!

    Lesson Learned from the Installation of a Flexible Seismic Product Pipeline Mitigation SystemSlide Number 2Marine Oil Terminal XTerminal Xs MOTEMS HistoryLevel 2 Kinematic Seismic MovementsTerminal X Impacted Wharf PipelinesTerminal X Very CongestedTerminal Xs Seismic Compliance ChallengesTerminal Xs Mitigation Attack PlanConcept 1 - Conventional Hose ApproachThink Vessel-to-VesselThink Vessel-to-VesselConcept 2 - Flex-Hose Loop ApproachConcept 3a - Swivel Joints Nested ApproachConcept 3b Swivel Joints Distributed ApproachTerminal Xs Final DecisionFlex-Hose Loop DesignFlex-Hose LoopLessons LearnedSlide Number 20Questions?