FLAME SCANNER AND COOLING AIR FAN SYSTEM For 4360MW UCCHPINDA THERMAL POWER PLANT CONTRACT BETWEEN MIPP INTERNATIONAL LTD AND BEIJING EASTERN TRANSIT CONTROL TECHNOLOGY Co, LTD.

VOLUME 2 OF 2

CONTRACT FOR FLAME SCANNER AND COOLING AIR FAN SYSTEM FOR 4360 MW UCCHPINDA THERMAL POWER PLANT IN CHHATTISGARH STATE, INDIA

FLAME SCANNER AND COOLING AIR FAN SYSTEM FOR 4360MW UCCHPINDA THERMAL POWER PLANT CONTRACT BETWEEN MIPP INTERNATIONAL LTD AND BEIJING EASTERN TRANSIT CONTROL TECHNOLOGY Co, LTD. .

CONTRACT NO. MIPP/PES/10/013

VOLUME 2 OF 2

Page2of4

CONTRACT FOR FLAME SCANNER AND COOLING AIR FAN SYSTEM FOR 4360 MW UCCHPINDA THERMAL POWER PLANT IN CHHATTISGARH STATE, INDIA

VOLUME - 2 TECHNICAL AGREEMENTSAMPLE OF INITIALS: S. Nandakumar (Employer) Yu Haisheng (Contractor) Menglili (NEPDI)

NEPDI Northeast Electric Power Design Institute

Page3of4

CONTRACT FOR FLAME SCANNER AND COOLING AIR FAN SYSTEM FOR 4360 MW UCCHPINDA THERMAL POWER PLANT IN CHHATTISGARH STATE, INDIA

PART-2 TECHNICAL AGREEMENT

CONTENTS VOLUME 2 TECHNICAL AGREEMENT Table of Contents: Volume 2Total No. of Pages SECTION AFLAME SCANNER AND COOLING AIR FAN SYSTEM S.19 SECTION B SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K SECTION L TESTS ............................................................................................................... 8 SCHEDULE OF GUARANTEES ....................................................................... 3 DELIVERY SCHEDULE .................................................................................... 6 PACKING AND TRANSPORTATION ................................................................ 6 DRAWINGS AND DOCUMENTS ...................................................................... 7 INSPECTION AND QUALITY .......................................................................... 5 LIAISON MEETINGS ........................................................................................ 6 TRAINING .......................................................................................................... 3 SITE SERVICES (NOT APPLICABLE) .............................................................. 1 SITE DATA ........................................................................................................ 3 ANNEXURES FOR TECHNICAL ....................................................................... 2

Page4of4

CONTRACT FOR FLAME SCANNER AND COOLING AIR FAN SYSTEM FOR 4360 MW UCCHPINDA THERMAL POWER PLANT IN CHHATTISGARH STATE, INDIA

SECTION A

FLAME SCANNER AND COOLING AIR FAN SYSTEMCONTENTS

1.0 2.0 3.0 4.0

Project Summary Scope of Agreement Design, Technical and Operational Requirements Scope of Supply and Services

ABBREVIATIONS

CCR DCS

Centralized Control Room Distributed Control System

SECTION A Page 1 of 17

CONTRACT NO.: MIPP/PES/10/021

CONTRACT FOR FLAME SCANNER AND COOLING AIR FAN SYSTEM FOR 4360 MW UCCHPINDA THERMAL POWER PLANT IN CHHATTISGARH STATE, INDIA

FLAME SCANNER AND COOLING AIR FAN SYSTEM 1. Project Summary R.K.M Powergen Private Limited (RKMPPL), Chennai, India has proposed to construct and operate a 4x360MW Coal based Power Plant at Ucchpinda in Janjgir Champa District in Chhattisgarh, India. This Technical Agreement covers the supply of Flame Scanner and Cooling Air Fan System and its accessories for the project. R.K.M Powergen Private Limited (RKMPPL) hereinafter referred to as 'Owner', has retained the services of M/s. MIPP INTERNATIONAL LTD (hereinafter referred to as "MIPPIL") incorporated under the laws of the Republic of Mauritius and having its registered office at 3rd Floor, Raffles Tower, 19, Cyber City, Ebene, Republic of Mauritius; and having its branch office at No. 32, 2nd Floor, Block D, Lim Eng Ming Building, Spg. 88, Kg. Kiulap, Bandar Seri Begawan BE1518, Negara Brunei Darussalam (hereinafter called the "Employer") to source the required equipment for this project. Beijing Eastern Transit Control Technology Co, Ltd having registered office at Suite 12 G, Building No 3, No 12 Xiaoying Road, Yayun Garden, Chaoyang District, and Beijing 100101 (hereinafter referred to as The Contractor has agreed to supply and provide supervision and commissioning assistance for the Flame Scanner and Cooling Air Fan System for the project. The Owner has retained the services of M/s Fichtner Consulting Engineers Pvt Ltd,CONTRACT NO.: MIPP/PES/10/021

Chennai as their engineers, hereinafter called 'Owner's Engineer'. The Employer has retained the services of Northeast Electric Power Design Institute, Changchun, China as their engineers, hereinafter called 'Employer's Engineer'. This Technical Agreement covers the supply of Flame Scanner and Cooling Air Fan System and its accessories for the project.

SECTION A Page 2 of 17

CONTRACT FOR FLAME SCANNER AND COOLING AIR FAN SYSTEM FOR 4360 MW UCCHPINDA THERMAL POWER PLANT IN CHHATTISGARH STATE, INDIA

2 Scope of Agreement2.1 The scope of this Agreement covers

a.

Design, manufacture, shop assembly, shop inspection and testing, and supply of Flame Scanner and Cooling Air Fan System Special Tools, Recommended Spares and consumable spares for the project.

b. c.

Remedy and defects therein; and Train the employers Representatives at Contractor /Subcontractors facilities.

2.2 Flame Scanner and Cooling Air Fan System and its accessories, Special Tools, Recommended Spares and Consumable Spares shall be utilized for the Project of 4x360 MW coal fired power plant in Ucchpinda, Janjgir Champa District, Chhattisgarh state, India. This has reference to the discussions had at Changchun on January 20th, 2011 and the subsequent emails exchanged between us and Forney Coporation and Beijing Eastern Transit Control Technology Co, Ltd., dated January 25th, February 14th, February 16th, March 25th, March 26th, April 1st, and April 7th 2011 on the subject. 2.3 The technical specifications of this Agreement shall be the minimum technical requirements, and do not cover all the technical details. The Contractor shall ensure all necessary technical specification to supply the latest industry standard products.

3 Project Related Information boilers to ensure the safe operation and forms a part of FSSS (Furnace Safety Supervision System). Based on the physical property of flame, the Scanner carries out a real-time detection on combustion situation. Once the flame combustion cannot meet the required conditions or flame is extinguished, the Scanner will give a signal as the judging condition for fault alarm to FSSS. According to the signal, the users can stop supplying the fuel into the boiler timely if the flame is extinguished, so that the boilers can be prevented from explosion resulting from accumulation of flammable materials in furnace. SECTION A Page 3 of 17CONTRACT NO.: MIPP/PES/10/021

Flame Scanner System is essential equipment for coal-fired, gas-fired and oil-fired

CONTRACT FOR FLAME SCANNER AND COOLING AIR FAN SYSTEM FOR 4360 MW UCCHPINDA THERMAL POWER PLANT IN CHHATTISGARH STATE, INDIA

4 Design, Technical and Operational Requirements a. Criterion and Standards for equipment design and manufacture. Standards and codes National Fire Protection Association (NFP) ANSI / NFPA70 National Electrical Code

ANSI / NFPA8502 Internal combustion and outer explosion prevention of boiler furnace with multiple burners ANSI / NFPA85F Installation and operation of coal- fired system National Electrical Manufactures Association (NEMA) ANSI / NEMA ICS4 Industrial control equipment and terminal blocks of system ANSI / NEMA ICS6 Industrial control equipment and casing of system Underwriters' Laboratories (UL) UL 44 Safety standards for rubber wires and cables

SECTION A Page 4 of 17

CONTRACT NO.: MIPP/PES/10/021

CONTRACT FOR FLAME SCANNER AND COOLING AIR FAN SYSTEM FOR 4360 MW UCCHPINDA THERMAL POWER PLANT IN CHHATTISGARH STATE, INDIA

1. The Standards and regulations above only give the basic technical requirements.

The

Contractor can adopt more economical and rational design, material, and manufacturing process such that the supplies shall meet the requirements of the Contract, and ensure continuous safe operation. 2. Within the period of manufacturing of Flame Scanner and Cooling Air Fan System, if standards or regulations have any modification or change, Employer has the right to ask for implementing them, and Contractor shall conform to these requirements.

3. Contractor shall provide Quality Management and Quality Assurance Plans as well as relevant standards and regulations to the Employer, before start manufacturing. 4. The power plant uses KKS coding system. The Contractor shall use KKS coding system forCONTRACT NO.: MIPP/PES/10/021

all the equipment covered in this Contract.

SECTION A Page 5 of 17

CONTRACT FOR FLAME SCANNER AND COOLING AIR FAN SYSTEM FOR 4360 MW UCCHPINDA THERMAL POWER PLANT IN CHHATTISGARH STATE, INDIA

5 Technical Requirements

5.1DesignrequirementsEquipment name: Flame Scanner and Cooling Air Fan System Quantity of coal burners: 24 per unit Quantity of oil burners: 12 per unit Input /output signals: The International standard signal system shall be adopted to connect signals between the system and DCS system, etc. The switching value is passive dry contact, 220V AC 2A, 24V DC 2A.The transmitter shall be two- wire system with 4~20mA output. 5.2 Design conditions and ambient conditions Technical parameters of the boiler Type of the boiler: subcritical steam drum boiler with natural circulation Maximum continuous evaporation rating of the boiler: 1223 t/h Distribution of burners: Contains six elevations