JO/HC092/FE09
WAFRA TRUNKLINES REPLACEMENT
Doc. No. FKS/HC092-ARP-001
Rev A
ASPHALT ROAD CUTTIN! AND
REMEDIATION PROCEDUREP"#e Page 1 of 9
TA$LE OF CONTENTS
1.0 PURPOSE
2.0 SCOPE
%.0 CODES AND STANDARDS
&.0 PROJECT SPECIFICATION
'.0 RELATED WORKS
(.0 MATERIALS
).0 PROCEDURES
7/17/2019 FKS-HC092-ARP-001 Rev a Final Asphalt Road Cutting Rev.A
http://slidepdf.com/reader/full/fks-hc092-arp-001-rev-a-final-asphalt-road-cutting-reva 2/9
JO/HC092/FE09
WAFRA TRUNKLINES REPLACEMENT
Doc. No. FKS/HC092-ARP-001
Rev A
ASPHALT ROAD CUTTIN! AND
REMEDIATION PROCEDUREP"#e Page 2 of 9
1.0 PURPOSE
1.1 The purpose of this procedure is to provide the minimum requirement for asphalt road
cutting and paving for the pipeline construction.
2.0 SCOPE
2.1 This procedure is applicable for Joint Operation “W"*+" T+,e Re"cee34
P+o5ec3 No.JO/HC092/FE09 which covers the general requirements for asphalt pave
road crossing.
%.0 CODES AND STANDARDS
.1 !O"#$#%%2 & !O" 'tandard Practice for the protection of !O" services
.2 (OT # 'pecification for )ighwa* +or,s -)'O/
. 0'T (22# # ethod for Particle 'i3e 0nal*sis of 'oils # 4e#approved 1952
-00') TO T#66 'tandard/
. 0'T (177# # 4e#approved 195 -00') TO 191/ # 'tandard ethods of test
for densit* soil in place b* 'and "one ethod
.7 0'T (1775#5% -00') TO T#16%/ # 'tandard ethods of test for moisture densit*
relations of soils
. 0'T (166.65 -00') TO 19/ # 'tandard Test ethod for "alifornia bearing
ration of laborator* compacted soil
.5 0'T (265 -00') TO .17/ # 'tandard Test ethod for classification of soils
for engineering purposes
.6 0'T ( 27#6 # 'tandards test method for ma8imum inde8 densit* of soils using
a vibrator* table.
.9 0'T ( 16#6 -00') TO T.69 T.9%/ # 'tandard test method for liquid plastic
limit and plastic limit and plasticit* inde8 of soils
7/17/2019 FKS-HC092-ARP-001 Rev a Final Asphalt Road Cutting Rev.A
http://slidepdf.com/reader/full/fks-hc092-arp-001-rev-a-final-asphalt-road-cutting-reva 3/9
JO/HC092/FE09
WAFRA TRUNKLINES REPLACEMENT
Doc. No. FKS/HC092-ARP-001
Rev A
ASPHALT ROAD CUTTIN! AND
REMEDIATION PROCEDUREP"#e Page of 9
.1% !O"#"#%%7 & !O" 'tandard for aterials and +or,manship & 'ite preparation and
earthwor,s.
.11 !O" & 61:1 Part 1 & "rossing 4oads and otorwa*s under construction
.12 4efer to "ontract 'pecifications
.1 Joint Operations ;ire 'afet* regulations at all times shall be adhered to.
&.0 PROJECT SPECIFICATIONS
.1 4efer to "ontract 'pecifications
'.0 RELATED WORKS
7.1 'ub#surface <nvestigation
7.2 =ac,filling and "ompaction
7. 'horing and strutting wherever required
7. Obtain >8cavation Permit
(.0 MATERIALS
.1 'horing materials wherever required
.2 'afet* ;lag
. 'afet* =arricade
. 'tring line
).0 PROCEDURE
5.1 Prior to an* wor, commencing all drawings and specifications shall be chec,ed.
5.2 +or, permits and e8cavation as per contract must be sought and approved in
advance of commencement of wor,s from Joint Operation and other governmentagencies? as and if required.
7/17/2019 FKS-HC092-ARP-001 Rev a Final Asphalt Road Cutting Rev.A
http://slidepdf.com/reader/full/fks-hc092-arp-001-rev-a-final-asphalt-road-cutting-reva 4/9
JO/HC092/FE09
WAFRA TRUNKLINES REPLACEMENT
Doc. No. FKS/HC092-ARP-001
Rev A
ASPHALT ROAD CUTTIN! AND
REMEDIATION PROCEDUREP"#e Page of 9
5. 0ll necessar* steps will be ta,en to protect an* e8isting services? drains? oil? water
and gas mains? power and telephone cables and the li,e which ma* be encountered
b* e8cavations b* e8cavations and or slips and falls.
5. etal pipeline detectors and trenches or e8cavations will be utili3ed to locate an*
e8isting lines if an* such utilities are encountered the pipes? cables etc? shall be
protected.
5.7 0ll e8cavations shall onl* be carried out b* hand within 7 meters either side of an*
anticipated pipelines? cable or other detected obstructions. This shall be strictl*
enforced.
5. "ontinuous and safe access for vehicular traffic shall be maintained at all road
crossings b* the provision and l*ing of detour road as approved b* client
representative or competent authorit*.
5.5 0ll the approved material will be required for restoration of a road surface shall be
readil* available at site if the road crossing is to be e8cavated and bac,filled within
the same da*.
5.6 The width and depth of all e8cavation : trenches which will be crossing roads shall
be carefull* controlled and shall be in accordance with specification and approved
construction drawing.
5.9 0ll desert road crossings shall at all times meet the requirements of approvaldrawings.
5.1% 4oad crossing design shall compl* with the requirements of the concerned road
authorities.
5.11 0ll pipes that are required to cross paved? unpaved and desert roads ma* be carried
out b* the open cut method? unless it is otherwise specified b* the owner or another
relevant authorit*.
7/17/2019 FKS-HC092-ARP-001 Rev a Final Asphalt Road Cutting Rev.A
http://slidepdf.com/reader/full/fks-hc092-arp-001-rev-a-final-asphalt-road-cutting-reva 5/9
JO/HC092/FE09
WAFRA TRUNKLINES REPLACEMENT
Doc. No. FKS/HC092-ARP-001
Rev A
ASPHALT ROAD CUTTIN! AND
REMEDIATION PROCEDUREP"#e Page 7 of 9
5.12 0 minimum cover of 1.2% meter of ground shall be maintained at all times where the
pipe crosses an* unpaved road. This shall be ta,en from the original ground level.
5.1 @round shall not be built up to obtain cover. The minimum cover shall be measured
from the top of the pipe to the level of the ground surface of the soil.
5.1 0ll bac,filling for unpaved road crossing shall be thoroughl* compacted to 97A of
its ma8imum dr* densit* in 2%% mm la*ers up to the surface where it shall be
restored to original trac, conditions. Testing shall be as per !O" 'tandard !O"#"#
%%7 clause 1. bac,filling and compaction shall be in accordance with !O"#"#%%7.
5.17 0ll roads crossings in the desert area shall be e8cavated and bac,filled in the same
da* if possible. <f this is not possible? suitable safet* arrangements and alternative
routes shall be made available. Proper warning signs and barricades shall be placed
and maintained while road crossing and open.
5.1 0ll paved road crossings shall at all times meet the minimum requirements of
approved drawings.
5.15 0ll paved road crossing ma* be carried out b* the open cut method.
5.16 0ll paved road crossings shall be carried out with approved casing materials
according to the relevant drawings.
5.19 Proper warning signs and barricades shall be placed and maintained as long as the
paved road crossing remains open. The warning signs shall be visible from 1%%
meters from the e8cavated road crossing in both directions. (anger signs shall be
both in >nglish and 0rabic. <n addition? flic,ering light also shall be provided on
both sides of the road 1%% meters from the e8cavated location.
5.2% 0 minimum cover of 1.2% meter of ground shall be maintained at all times where the
pipe crosses an* traffic road? paved and rig road. The cover shall be measured from
the top of the level of the ground surface of the soil.
7/17/2019 FKS-HC092-ARP-001 Rev a Final Asphalt Road Cutting Rev.A
http://slidepdf.com/reader/full/fks-hc092-arp-001-rev-a-final-asphalt-road-cutting-reva 6/9
JO/HC092/FE09
WAFRA TRUNKLINES REPLACEMENT
Doc. No. FKS/HC092-ARP-001
Rev A
ASPHALT ROAD CUTTIN! AND
REMEDIATION PROCEDUREP"#e Page of 9
5.21 0dequate grading shall have been carried out on both sides of the paved to be
crossed which will allow safe passage of all vehicles and equipment which ma* be
used during the operation.
5.22 Prior to ma,ing road crossing b* cutting e8isting asphalt road a detailed s,etch of
proposed temporar* diversion road to be made and maintained during this operation
shall be submitted to client for approval.
5.2 0fter getting client approval? temporar* diversion roads consisting of 1% meter in
width divided b* barrels shall be made. This road shall be constructed of 17% mm
thic, la*er of gatch compacted using pneumatic roller.
5.2 0s per Joint OperationBs ;ire 'afet* regulations? the required number of barriers?
warning tapes? warning flashing light? traffic signs and signals shall be provided at
road crossing area.
5.27 <f the road diversions pass over underground services the finished level of road
diversion shall be 1.% meter above the crown level of such services.
5.2 The whole length of the road diversion shall be prepared such a manner to facilitate
smooth and safe uninterrupted flow of traffic during this road crossing operations.
5.25 The entire diversion road shall be well maintained during the period of use of this
diversion road and after completion of road crossing wor, all disturbed wor, shall be
removed and re#instate the ground for the satisfaction of the Joint Operation.
5.26 0fter cutting to be detailed out with equipment ? width etc. the e8isting asphalt road
at location where the new pipeline is crossing? the required e8cavation shall be
carried out to the required level and prepared as per specification.
5.29 0fter installation of pipe sleeves? as per approved for ocedure including coating?
wrapping and h*dro testing as required the road shall be repaired and re#instated to
the original condition of the e8isting road using following procedure.
7/17/2019 FKS-HC092-ARP-001 Rev a Final Asphalt Road Cutting Rev.A
http://slidepdf.com/reader/full/fks-hc092-arp-001-rev-a-final-asphalt-road-cutting-reva 7/9
JO/HC092/FE09
WAFRA TRUNKLINES REPLACEMENT
Doc. No. FKS/HC092-ARP-001
Rev A
ASPHALT ROAD CUTTIN! AND
REMEDIATION PROCEDUREP"#e Page 5 of 9
-=ac,filling the e8cavation using approved gatch shall be done in la*ers not
e8ceeding 2%% mm thic,ness and compacting? up to bottom of the asphalt
base course. "ompaction shall be minimum 97A of the modified proctor
value.
- Then over the compacted gatch surface "#5% bituminous emulsion shall be
applied at the rate of .57 C 1.7 ,g:mD.
-Then base course of asphalt concrete mi8? T*pe << shall be applied and
compacted to a base course.
- Then tac, coat over base course shall be applied using ''#1h or "''#1h at
the rate of %.27 C %.57 ,g:mD.
- Then wearing course of asphalt concrete mi8? T*pe <<< shall be applied and
compacted to wearing course.
5.% The re#instating:repair of asphalt pavement shall be carried out strictl* as per !O"
'pecification? !O"#"#%2 Part 1? aterial +or,manship & 4oadwa*s? Paving and
hard standing E Part #1 ;le8ible pavement.
5.1 ;or line crossing rig roads? e8cavation and preparation of the e8cavation as per client
specification and then installation of the pipe sleeves and vent pipes as per
standard drawings shall be carried out. Then bac,fill shall be carried out using
approved gatch in la*er of 2%% mm thic,ness and each la*er compacted to 97A of modified proctor densit*.
5.2 The numbers and location of the pipe sleeve shall be as per contract approved
pipeline drawing.
5. 0ll safet* aspects of the e8cavation:trenching wor, will be supervised b* the
competent person and shall meet the contractorFs )ealth and 'afet* anual.
5. 0ll wor, carried out within the 7% meter limit from the center of high voltage
s*stems shall also compl* with the safe limits.
7/17/2019 FKS-HC092-ARP-001 Rev a Final Asphalt Road Cutting Rev.A
http://slidepdf.com/reader/full/fks-hc092-arp-001-rev-a-final-asphalt-road-cutting-reva 8/9
JO/HC092/FE09
WAFRA TRUNKLINES REPLACEMENT
Doc. No. FKS/HC092-ARP-001
Rev A
ASPHALT ROAD CUTTIN! AND
REMEDIATION PROCEDUREP"#e Page 6 of 9
5.7 Go wor, shall commence till the safe measures were ta,en care b* the authorities
who operate and control the high voltage s*stem.
5. Procedure and safe wor,ing s*stems must be adopted to prevent e8cavating and
lifting machiner* from approaching high voltage power lines to within the specified
below.
5.5 These minimum distances are dependent on the s*stem voltage. ;or individual
connections? the minimum encroachment distance must be.
- 2%% to 6% !H # 'hould be at least 6.% meters
- % to 2%% !H # 'hould be at least 7.% meters
- % to 7% !H # 'hould be at least .% meters
5.6 0ll labor force shall wear safet* shoes and helmets at all time on site. =arricades?
warning devices? temporar* crossing etc? shall be required to protect the public and
labour force.
5.9 <nspection and testing requirement and preparation of qualit* records related to
0sphalt 4oad "utting and 4emediation shall be in accordance with <TP.
6.0 ATTACHMENTS
0ttachment # 0sphalt 4oad "utting and 4emediation 4eport
7/17/2019 FKS-HC092-ARP-001 Rev a Final Asphalt Road Cutting Rev.A
http://slidepdf.com/reader/full/fks-hc092-arp-001-rev-a-final-asphalt-road-cutting-reva 9/9
JO/HC092/FE09
WAFRA TRUNKLINES REPLACEMENT
Doc. No. FKS/HC092-ARP-001
Rev A
ASPHALT ROAD CUTTIN! AND
REMEDIATION PROCEDUREP"#e Page 9 of 9
ASPHALT ROAD CUTTIN! INSPECTION REPORT
Ce3 Jo3 Oe+"3o
Co3+"c3o+ F 7 K I8+" A - S,:";e+ 7 P"+3e+<
P+o5ec3 No. JO/HC092/FE09
P+o5ec3 N"e W"*+" T+,e< Re"cee3<
Reo+3 No Re*. D+":# No.
D"3e Loc"3o
De<c+3o
No De<c+3oCo3+"c3o+
=A/=C
1 >8cavation ;ormation "hec,
2 >8cavation To 4equired $evel : "oordinates -'urve* 4eport /
;inished 'urface of >8cavation -;ree from particle? (ebris? 4ubbish/
Hehicle (iversion road : access : (etour
7 @round $evel "over from Top of Pipe 1.% met. depth =ac,filling for 'and =edding : Padding
5 =ac,filling : "ompaction thic,ness 2%% mm
6 "ompaction <nspection
9=ituminous >mulsion 0pplication -%.57C1.7,g:mD/ -for paved road
crossing/
1%=ase course of asphalt concrete mi8 application? - for paved road
crossing/
11 Trac, coat application -%.27 C %.57 !g:mD / - for paved road crossing/
12 +earing "ourse of 0sphalt "oncrete i8
1 ;inal 'urface 0ppearance
4emar,s E
A+ove> $; Co3+"c3o+ Re+e<e3"3ve Co"; Re+e<e3"3ve
N"e
S#"3,+e
D"3e