Fixed Lines

download Fixed Lines

of 16

Transcript of Fixed Lines

  • 8/10/2019 Fixed Lines

    1/16

    FIXED LINES

    PREPARED BY :

    NURUL FALDLZYANA LAILY BINTI NOR SANY

    HASNIDA BINTI HANAPI

    NUR ADIBAH AMNI BINTI ABDUL HADI

    NINA AQILAH BINTI MOHD HISHAM

  • 8/10/2019 Fixed Lines

    2/16

    Also known as Telephone lines

    Telephone is telecommunication devices that transmits and receive sound,

    most commonly the human voice which allow two people separated by

    large distance to talk to each other.

    Conducted by Telekom Malaysia (TM) which also provides cabled

    infrastructure consists of:

    i) Telephone lines

    ii) Main Exchanger

    iii) Distribution frames and telephone cabinetsiii) Distribution point

    Basic requirements for a one-way line telecommunication channel.

  • 8/10/2019 Fixed Lines

    3/16

    Buildings are put into 3 categories by based on the below

    condition :

    a) The number of phone needed in the area, building, or residential area.b) The size of incoming underground cable into the building: the number of

    pair needed.

    c) Total floor area of the building or residential area.

  • 8/10/2019 Fixed Lines

    4/16

    Category 1 Buildings

    (> 5 storey/ high rise building)

    This type is suit for high rise building which morethan 5 storey. A jointing chamber will be buildafter the telephone cables is bury enters the

    buildings.

    This jointing chamber can either be a manhole(for a cable with more than 400 lines) or joint box

    (for cable with less than 400 lines) and is used tohelp in the linking of the cable from the buildingto the TM underground cable.

  • 8/10/2019 Fixed Lines

    5/16

    CATEGORY 1 & CATEGORY 2

  • 8/10/2019 Fixed Lines

    6/16

    Category 2 ( 2>5 storey )

    &

    Category 3 buildings ( Residential, Bungalow &Terrace house)

    Underground cables

    The main telephone cables are laid in conduits with

    surface joint boxes. In minor roads, the cables are usually buried directly in

    the ground under the footpath or under the road.

    The necessary cross-connection between underground

    cables are provided at cabinets above ground. The cable for the house is brought inside, as close as

    possible to the position of the telephone at ground-floor level

  • 8/10/2019 Fixed Lines

    7/16

    Overhead Cables

    Cheaper and smaller than an underground cables

    Its involve a cable along one side of the road only to

    another both side of the road

    More convenient to provides additional lines to

    existing premises Easy to maintenance

  • 8/10/2019 Fixed Lines

    8/16CATEGORY 2 & CATEGORY 3

  • 8/10/2019 Fixed Lines

    9/16

  • 8/10/2019 Fixed Lines

    10/16

  • 8/10/2019 Fixed Lines

    11/16

    DOMESTIC BUILDING

    1.MAIN EXCHANGES

    From main exchanges, it will be distributed to the cabinet.

    In exchanger , there is a large main distribution Frame (MDF)

    Main cable will be installed underground through manholes that arranged

    with a maximum distance of 180m from each other direct to the cabinet.

    Function of Main exchange :

    A) As a connector for service network

    B) Supplies power to telephone ,

    C) As a connection network bettween

    D) local users and international usersE) or in different areas/ branch coide

  • 8/10/2019 Fixed Lines

    12/16

    2. MAIN DISTRIBUTION FRAME

    a main distribution frame (MDF) is a distribution frame on one

    part of which the external trunk cables entering a facilityterminate, and on another part of which the internal user

    subscriber lines and trunk cabling to any intermediate

    distribution frames terminate.

    The MDF is used to cross-connect any

    outside line with any desired terminal of

    the multiple cabling or any other outside l

    line

    Location Requirements for placingthe MDF is, the room shall be situated

    at the street or first floor level.

  • 8/10/2019 Fixed Lines

    13/16

    3. TESTING POINT

    A test to make sure the cabled is well functioning

    The connection between MDF and main exchanger will be testby Tm manpower.

    Test Center (Test Point) is the test where it made using a

    meter.

    If the connection is good functioning, it will proceed to thesubscriber distribution point.

  • 8/10/2019 Fixed Lines

    14/16

    4. SDF ( SUBCRIBER DISTRIBUTION POINT)

    Then, the cabinet will be connected to a distribution (SDF)through poles by using a cable distribution (SA).

    The maximum distance between poles is 35m.

    Usually 1 pole 5 houses.

    Before the installation apply to houses, the authorities (TM)must make sure whether the installation is well installed.

    After that, the extension of SDF is directly connect to the

    residential building if the connection is kept short. If too long,

    it would require poles for support the cables. The room have to be operates 24/7 unless maintenance

    session.

  • 8/10/2019 Fixed Lines

    15/16

    THE INSTALLATION OF TELEPHONE IN DOMESTIC

    BUILDING

  • 8/10/2019 Fixed Lines

    16/16

    UNDERGROUNDCABLES

    OVERHEAD

    CABLES