Fixed budget

43
7/21/2019 Fixed budget http://slidepdf.com/reader/full/fixed-budget 1/43 © 2012 McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & Yuen Flexible Budgets and Performance Analysis Chater !!

description

Fixed budget analysis

Transcript of Fixed budget

Page 1: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 1/43

© 2012 McGraw-Hill Education (Asia)Garrison, Noreen, Brewer, Cheng & Yuen

Flexible Budgets and

Performance AnalysisChater !!

Page 2: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 2/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 2

"earning #b$ecti%e !

Prepare a fei!lePrepare a fei!le

!ud"et#!ud"et#

Page 3: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 3/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 3

Characteristics of Flexible Budgets

  Planning budgetsare reared for 

a single, lannedle%el of acti%ity

Performancee%aluation is difficultwhen actual acti%ity

differs from thelanned le%el of

acti%ity

'mm( Comaringstatic lanning budgets

 with actual costsis li)e comaring

ales and oranges

Page 4: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 4/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 4

*mro%e erformance e%aluation

+ay be reared for any acti%ityle%el in the rele%ant range

how costs that should ha%e beenincurred at the actual le%el of acti%ity, enabling -ales to ales.cost comarisons

'el managers control costs

Let’s look at Larry’s Lawn Service.

Characteristics of Flexible Budgets

Page 5: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 5/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 5

"arry/s "awn er%ice ro%ides lawn care in a lannedcommunity where all lawns are aroximately the same si0e At the end of +ay, "arry reared his 1une budget based onmowing 233 lawns ince all of the lawns are similar in si0e,"arry felt that the number of lawns mowed in a month wouldbe the best way to measure o%erall acti%ity for his business

"arry/s "awn er%ice ro%ides lawn care in a lannedcommunity where all lawns are aroximately the same si0e At the end of +ay, "arry reared his 1une budget based onmowing 233 lawns ince all of the lawns are similar in si0e,

"arry felt that the number of lawns mowed in a month wouldbe the best way to measure o%erall acti%ity for his business

 Larry’s Budget

4eficiencies of the tatic Planning Budget

Page 6: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 6/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 6

4eficiencies of the tatic Planning BudgetLarry’s Planning Budget

Page 7: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 7/43McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 7

4eficiencies of the tatic Planning BudgetLarry’s Actual Results

Page 8: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 8/43McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 8

4eficiencies of the tatic Planning BudgetLarry’s Actual Results Compared with the Planning Budget

Page 9: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 9/43McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 9

4eficiencies of the tatic Planning BudgetLarry’s Actual Results Compared with the Planning Budget

F Favora!le variance that occurs whenactual costs are less than !udgeted costs.

" "n#avora!le variance that occurs whenactual costs are greater than !udgeted costs.

F Favora!le variance that occurs when actualrevenue is greater than !udgeted revenue.

Page 10: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 10/43McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 10

4eficiencies of the tatic Planning BudgetLarry’s Actual Results Compared with the Planning Budget

Since these variances are #avora!le$ hasLarry done a good %o! controlling costs&

Since these variances are un#avora!le$ hasLarry done a poor %o! controlling costs&

Page 11: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 11/43McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 11

* don/t thin) *can answer the5uestions usinga static budget

 Actual acti%ity is abo%elanned acti%ity

o, shouldn/t the %ariable

costs be higher if actualacti%ity is higher6

4eficiencies of the tatic Planning Budget

Page 12: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 12/43

Page 13: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 13/43McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 13

'ow a Flexible Budget 8or)s

  7o a budget we need to )now that9

7otal %ariable costs change

in direct roortion tochanges in acti%ity

7otal fixed costs remainunchanged within the

rele%ant range Fixed

  : a  r  i a

  b  l e

Page 14: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 14/43McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 14

Let’s prepare a

  !udget#or Larry’s LawnService.

Let’s prepare a  !udget#or Larry’s Lawn

Service.

'ow a Flexible Budget 8or)s

Page 15: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 15/43McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 15

Prearing a Flexible BudgetLarry’s Fle*i!le Budget

Page 16: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 16/43McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 16

;uic) Chec)

  8hat should the total wages and salaries costbe in a flexible budget for <33 lawns6

a =!>,333

b =?3,333c =?@,333

d =?2,333

  8hat should the total wages and salaries costbe in a flexible budget for <33 lawns6

a =!>,333

b =?3,333c =?@,333

d =?2,333

Page 17: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 17/43McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 17

;uic) Chec)

  8hat should be the total wages and salariescost in a flexible budget for <33 lawns6

a =!>,333

b =?3,333c =?@,333

d =?2,333

  8hat should be the total wages and salariescost in a flexible budget for <33 lawns6

a =!>,333

b =?3,333c =?@,333

d =?2,333

7otal wages and salaries cost

  =2,333 =@3 er lawn  <33 lawnsD

  =2,333 =!>,333 =?@,333

  8hat should the total wages and salaries costbe in a flexible budget for <33 lawns6

a =!>,333

b =?3,333c =?@,333

d =?2,333

  8hat should the total wages and salaries costbe in a flexible budget for <33 lawns6

a =!>,333

b =?3,333c =?@,333

d =?2,333

Page 18: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 18/43McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 18

"earning #b$ecti%e ?

Prepare a reportPrepare a report

s$owin" acti%it&s$owin" acti%it&

%ariances#%ariances#

Page 19: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 19/43McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 19

 Acti%ity :ariances

Planning budget re%enues

 and exenses

Flexiblebudget re%enues

and exenses

7he differences between7he differences betweenthe budget amounts arethe budget amounts are

called acti%ity %ariancescalled acti%ity %ariances

Page 20: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 20/43McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 20

Let’s use !udgeting

concepts to compute activityvariances #or Larry’s Lawn Service.

Let’s use !udgeting

concepts to compute activityvariances #or Larry’s Lawn Service.

 Acti%ity :ariances

Page 21: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 21/43McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 21

 Acti%ity :ariancesLarry’s Fle*i!le Budget Compared with the Planning Budget

Page 22: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 22/43McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 22

 Acti%ity :ariancesLarry’s Fle*i!le Budget Compared with the Planning Budget

 Acti%ity and re%enue increase by !3 ercent, but net oerating incomeincreases by more than !3 ercent due to the resence of fixed costs

Page 23: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 23/43McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 23

"earning #b$ecti%e @

Prepare a reportPrepare a report

s$owin" re%enue ands$owin" re%enue and

spendin" %ariances#spendin" %ariances#

Page 24: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 24/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 24

Ee%enue and ending :ariances

Flexible budget re%enue Actual re%enue

+he di##erence is a revenue variance.+he di##erence is a revenue variance.

Flexible budget cost Actual cost

+he di##erence is a spending variance.+he di##erence is a spending variance.

Page 25: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 25/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 25

,ow$ let’s use !udgeting

concepts to compute revenue andspending variances #or Larry’s Lawn

Service.

,ow$ let’s use !udgeting

concepts to compute revenue andspending variances #or Larry’s Lawn

Service.

Ee%enue and ending :ariances

Page 26: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 26/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 26

Ee%enue and ending :ariancesLarry’s Fle*i!le Budget Compared with the Actual Results

-$/01 #avora!le-$/01 #avora!le

revenue variancerevenue variance

Page 27: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 27/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 27

Larry’s Fle*i!le Budget Compared with the Actual Results

Ee%enue and ending :ariances

Spendingvariances

Page 28: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 28/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 28

"earning #b$ecti%e

Prepare a per'orancePrepare a per'orance

report t$at co!inesreport t$at co!ines

acti%it& %ariances andacti%it& %ariances and

re%enue and spendin"re%enue and spendin"%ariances#%ariances#

Page 29: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 29/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 29

,ow$ let’s use !udgeting

concepts to com!ine the revenue andspending variances reports #or Larry’s

Lawn Service.

,ow$ let’s use !udgeting

concepts to com!ine the revenue andspending variances reports #or Larry’s

Lawn Service.

 A Performance Eeort Combining Acti%ityand Ee%enue and ending :ariances

Page 30: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 30/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 30

 A Performance Eeort Combining Acti%ityand Ee%enue and ending :ariances

Page 31: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 31/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 31

 A Performance Eeort Combining Acti%ityand Ee%enue and ending :ariances

23 lawns =H2 er lawn 23 lawns =@3 er lawn

Page 32: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 32/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 32

 A Performance Eeort Combining Acti%ityand Ee%enue and ending :ariances

=@,333 actual I =!,?23 budget

Page 33: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 33/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 33

Performance Eeorts in NonIProfit#rgani0ations

NonIrofit organi0ations may recei%e funding fromsources other than the sale of goods and ser%ices,

so re%enues may consist of both fixed and

%ariable elements

NonIrofit organi0ations may recei%e funding fromsources other than the sale of goods and ser%ices,

so re%enues may consist of both fixed and

%ariable elements

Jni%ersities

7uition and fees

4onationstate funding

Kndowments

Page 34: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 34/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 34

Performance Eeorts in Cost Centers

Performance reorts are often rearedfor cost centers 7hese reorts should be

reared using the same rinciles

discussed so far, excet for the fact thatthese reorts will not contain re%enue or

net oerating income %ariances

Performance reorts are often rearedfor cost centers 7hese reorts should be

reared using the same rinciles

discussed so far, excet for the fact thatthese reorts will not contain re%enue or

net oerating income %ariances

Page 35: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 35/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 35

"earning #b$ecti%e 2

Prepare a fei!lePrepare a fei!le

!ud"et wit$ ore t$an!ud"et wit$ ore t$an

one cost dri%er#one cost dri%er#

Page 36: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 36/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 36

2ore than one costdriver may !e needed toade3uately e*plain all o# 

the costs in an organi4ation.

2ore than one costdriver may !e needed toade3uately e*plain all o# 

the costs in an organi4ation.

+he cost #ormulas used

to prepare a #le*i!le!udget can !e ad%ustedto recogni4e multiple

cost drivers.

+he cost #ormulas usedto prepare a #le*i!le

!udget can !e ad%ustedto recogni4e multiple

cost drivers.

Flexible Budgets with +ultile Cost 4ri%ers

Page 37: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 37/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 37

Because of the large unfa%orable wages and salaries sending%ariance, "arry decided to add an additional cost dri%er for

wages and salaries 7he %ariance is due rimarily to the numberof hours re5uired for the additional edging and trimming o

"arry estimates the additional hours and builds those hours intoboth his re%enue and exense budget formulas

Because of the large unfa%orable wages and salaries sending%ariance, "arry decided to add an additional cost dri%er for

wages and salaries 7he %ariance is due rimarily to the numberof hours re5uired for the additional edging and trimming o

"arry estimates the additional hours and builds those hours intoboth his re%enue and exense budget formulas

 Larry’s ,ew Budget

Flexible Budgets with +ultile Cost 4ri%ers

Page 38: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 38/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 38

Flexible Budgets with +ultile Cost 4ri%ers

Larry’s Budget Based on 2ore than 5ne Cost 6river 

Page 39: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 39/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 39

"earning #b$ecti%e <

nderstand coonnderstand coon

errors ade inerrors ade in

preparin" per'orancepreparin" per'orance

reports !ased onreports !ased on!ud"ets and actual!ud"ets and actual

results#results#

Page 40: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 40/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 40

ome Common Krrors

7he most common errors in rearing erformancereorts are to imlicitly assume that9! All costs are fixed or that? All costs are %ariable

7he most common errors in rearing erformancereorts are to imlicitly assume that9! All costs are fixed or that? All costs are %ariable

Assume all costs are #i*ed.

Page 41: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 41/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 41

Common Krror !9 Assuming All Costs AreFixed

Faulty Analysis Comparing Budgeted Amounts to Actual Amounts

Page 42: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 42/43

McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & YuenMcGraw-Hill/Irwin Slide 42

Common Krror ?9 Assuming All Costs Are:ariableFaulty Analysis that Assumes All !udget 7tems Are 8aria!le

Page 43: Fixed budget

7/21/2019 Fixed budget

http://slidepdf.com/reader/full/fixed-budget 43/43

Knd of Chater !!