Fitting a propeller

download Fitting a propeller

of 1

Transcript of Fitting a propeller

  • 7/30/2019 Fitting a propeller

    1/1

    AnA

    66titAnic mAnuAl

    Fitting a propeller

    T ask agg ad g a prprwas a assv drakg a rqrd sp b dr-dkd.

    t a sag ad assad

    bargs wr sad sr b w

    sp was sp br ag.

    Prv sag r avas ad

    aw gras a w av b wrappd

    ard ad aprd gs a

    prrdd r sr bs. A sa

    arg rd ar p s wr

    d pa pr r rads.

    t Titanic was a dr-dkd

    tps Gravg Dk ad dk pd.

    t w 38- wg prprs ad 22-

    r prpr wr brg r r srag

    ara b 200-- ag ra ad

    dpsd r dr dk ar

    sps sr. Sadg was rd

    ard ara a sas, gvg r

    r prprs b avrd pa.

    Br g, prv s wr rvd, avas ad aw sag rvd, ad

    ad sras ad p.

    usg 13 arg gs a wr prvdd

    r saks a wr b ras

    dr Titanics r sr ad a

    ba r pars bards

    r Pp Dk, add dd bard

    dksd, s ar ps wr

    sd sg bk ad aks a wd

    r rv Titanics prprs.

    i s k a r r-badd

    prpr was d rs, bg r awkward

    avr bw sr ra ad

    rddr ps. t d prpr sa,

    k prpr br, was aprd, ad

    br prpr a kwa was

    r a srag para grv w a

    rrspdg sa. t sa was

    psd s a kwa was a p,

    dad r, ad grv sa

    a d s k r ar was pad, ad

    a sa grasd ardg.

    t r prpr was sg b as

    pd ard w s bads ar b,

    w s kwa pprs ad argr br

    s apr ag a sa. W r

    prpr d b a ba sgs,

    srps ad bk ad aks r b sds

    sr, sgas ad ads r

    ra, prpr was asd sw

    vra ps ad axd s a

    wa a was rd p aprd sa.usg ba p bks ad

    apwr g rag b w rawa

    sprs, prpr was psd s

    ag aprd a sa.

    As r prpr rad kws,

    kg r asr, a arg -add ar

    was add b w s rspv

    a rad ad srwd p as ar as wd

    g b ad. i rdr sr was gd

    , r a bar was srd

    s s r rr

    ad barrd ard ( a sar ar a

    d sag sp apsa), r a sg-g c

    spar was sd w a pg a ad

    s ad a g ad r vrag. i

    ssar, rs wd g spar

    ad w sdgars was

    asd p ad prpr bss was ard

    p agas s ag spg a sa.

    t was prbab srd r wrkg

    s b a ar p srd rg a

    drd rg sa w s

    dara ppsd s prv

    wrkg bak. ovr a s a arg

    was srd pr s ad rads.

    ts rdd ss b ddg

    war ad prvd g rps.

    t w bard prprs d b b

    p b rs g bss ad bg

    a bad. t sgg b ps

    was ss pad, b sa sgs wr

    s rqrd Pp Dk bards.

    As wg prprs Titanic

    wrward rg, a-sa rad ad

    was -add sarbard prpr

    ad rg-add r pr prpr. i

    s ar prprs wr kp ard p

    w sas wr rag dr ra

    aad ds.

    above The Titanic,

    newly dry-docked,

    shows a view of

    her shell plating at

    the bilge area. The

    propeller boss collar

    nut is in place to

    protect the thread,

    while the tapered

    portion appears

    somewhat dull as

    it may have been

    sheathed in tallow

    and canvas before the

    launch to preserve

    its machined surface.

    (UFTM)

    above Titanics starboard tail shaft is fitted just before her la

    the rudder has been secured by braces in order to keep it in t

    position during the launch. The man on the shafts end is sittin

    taper and leaning over the propeller boss, securing the nut. Th

    has to be put into place to protect the threads, is of a round c

    about six holes in it so the nut might be tightened with a tomm

    spanner. Halfway along the shaft may be seen the bowler hat

    in charge of the gang, standing behind the shaft. (UFTM H185

    rightA close-up

    view of the central

    propeller shaft housingafter plating. In the

    background can be

    seen the port main

    engine propeller shaft

    housing and boss arm.

    (The Shipbuilder)

    belowTheOlympics centre propeller slung by chains. Note

    of the taper nearer the camera and the shafts keyway slot at

    position. (UFTM H1457)