FITMAN Support Webinar to A16-November 2014
-
Upload
fitman-fi -
Category
Small Business & Entrepreneurship
-
view
235 -
download
0
description
Transcript of FITMAN Support Webinar to A16-November 2014
![Page 1: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/1.jpg)
FITMAN Support Webinar to A16
Katerina Achinioti1, Clare Hooper2,
Jesus Benedicto Cirujeda3
(1 Innovalia Association, 2IT Innovation, 3ATOS)
20 November 2014
FITMAN Support Webinar to A16120/11/2014
![Page 2: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/2.jpg)
FITMAN A16 Support Webinar: Purpose
• Provide an overview of FITMAN deliverables, technologies, methodologies for SME and WE engagement, and other support relevant for the A16
• Support A16 by:
- Contributing to Open Call texts
- Attracting the right SMEs/WEs
- Providing technical and non-technical support
(Promoting successful Phase III projects withinthe context of ICT for manufacturing)
20/11/2014 2FITMAN Support Webinar to A16
![Page 3: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/3.jpg)
Agenda
• Introducing FITMAN
• FITMAN Phase III Package
• FITMAN Specific Enablers and Platforms
• SME Engagement Methodologies –Methodology for raising technology awareness
320/11/2014 FITMAN Support Webinar to A16
![Page 4: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/4.jpg)
FITMAN: Future Internet Technologies for MANufacturing industriesThe mission of the FITMAN project is to provide the FI PPP Core Platform with 10 industry-led use case trials in the domains of Smart, Digital and Virtual Factories of the FutureFITMAN Trials (4 conducted by Large Enterprises, 6 by SMEs) will test and assess the suitability, openness and flexibility of FI-WARE Generic Enablers while contributing to the STEEP (social-technological-economical-environmental-political) sustainability of EU Manufacturing Industries.The use case trials belong to several manufacturing sectors such as automotive, aeronautics, white goods, furniture, textile/clothing, LED lighting, plastic, construction, and manufacturing assets management.
420/11/2014 FITMAN Support Webinar to A16
![Page 5: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/5.jpg)
FITMAN Phase III Packagefitman-fi.eu/phase-iii-package
Clare Hooper
IT Innovation
20/11/2014 5(C) 2014 University of Southampton IT Innovation Centre and other FITMAN partners
![Page 6: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/6.jpg)
The FITMAN Phase III Package
20/11/2014 6(C) 2014 University of Southampton IT Innovation Centre
and other FITMAN partners
![Page 7: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/7.jpg)
User registration
• Please register to access the consultation documents and forum
• Visit fitman-fi.eu/phase-iii-package
720/11/2014 (C) 2014 University of Southampton IT Innovation Centre and other FITMAN partners
![Page 8: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/8.jpg)
• Summaries of ‘verification and validation’ (V&V) outputs
– V&V method and criteria
– Business and technical indicators
– Assessment package and its instantiation
• Summaries of ‘SMEs innovation preparation’ outputs
– Ways to identify best practices and lessons learned
– SME and WE engagement methods
Phase III Package Content: Methodologies and Tools
802/04/2014(C) 2014 University of Southampton IT Innovation Centre
and other FITMAN partners
![Page 9: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/9.jpg)
Phase III Package Content:Architecture and Trials
• Summaries of ‘baseline system’ outputs
– Use Case Scenarios and Business Requirements
– Trials IT Requirements
– Generic Enablers Selection
– FI-WARE Platform Instantiation
– Reference Architecture
– FI PPP Capacity Building Analysis
• Summaries of ‘experimentation sites’ outputs
– Trials IT infrastructure/platforms
– Trials Business Cases
– Competencies / Capability Gaps and Open Call Specifications
920/11/2014 (C) 2014 University of Southampton IT Innovation Centre and other FITMAN partners
![Page 10: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/10.jpg)
Phase III Package Content:Further materials
• T&Cs for FITMAN Specific Enablers
• Checklists
– legal issues
– business models
– external resources
• Intermediaries’ best practices and lessons learned for Phase III
• The consultation documents themselves
1020/11/2014 (C) 2014 University of Southampton IT Innovation Centre and other FITMAN partners
![Page 11: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/11.jpg)
Services
• Support
– please send questions to [email protected]
– Questions and answers will be hosted on the FAQ fitman-fi.eu/phase-iii-package/support/faq
• Notification of updates
– Via social media (twitter.com/FitmanFI and linkedin.com/groups?gid=4986259)
– Via email (please request this by contacting us on the email address above)
20/11/2014 11(C) 2014 University of Southampton IT Innovation Centre
and other FITMAN partners
![Page 12: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/12.jpg)
Phase III Package: Summary
• The Package provides information and services for Phase III Participants– Information based on FITMAN
deliverables, plus supporting materials such as checklists and Specific Enabler T&Cs
– Services including an email address for queries, an FAQ, and notification of updates
• fitman-fi.eu/phase-iii-package
20/11/2014 12(C) 2014 University of Southampton IT Innovation Centre
and other FITMAN partners
![Page 13: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/13.jpg)
FITMAN Specific Enablers and Platforms
Jesus Benedicto Cirujeda
ATOS
20/11/2014 13FITMAN Support Webinar to A16
![Page 14: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/14.jpg)
1420/11/2014
FITMAN Assets
Generic Enablers
(GEs)
Specific Enablers
(SEs)
Reference Platforms
Manufacturing sector
Generi
c
Com
ponents S
pecific
Com
ponents
Domain Specific Platforms
FITMAN Support Webinar to A16
![Page 15: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/15.jpg)
15FITMAN presentation for FABulous26/11/2014
Open SourceComponents for Manufacturing
http://catalogue.fitman.atosresearch.eu/
FITMAN Specific Enablers
![Page 16: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/16.jpg)
1620/11/2014
FITMAN Specific Enablers
FITMAN Support Webinar to A16
![Page 17: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/17.jpg)
1720/11/2014
Real-time data collection & processingfor Shop-floor operations
FITMAN Reference Platforms
![Page 18: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/18.jpg)
1820/11/2014
Connecting people to information,advanced data visualization
FITMAN Reference Platforms
FITMAN Support Webinar to A16
![Page 19: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/19.jpg)
1920/11/2014
Cross-enterprise collaboration,tangible/intangible asset management
FITMAN Reference Platforms
FITMAN Support Webinar to A16
![Page 20: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/20.jpg)
2026/11/2014
References & Support
http://www.fitman-fi.eu/phase-iii-package/
FITMAN support:
FITMAN SEs: http://catalogue.fitman.atosresearch.eu/enablersFITMAN Platforms: http://www.fitman-fi.eu/fitman-reference-
platforms
FITMAN Support Webinar to A16
![Page 21: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/21.jpg)
SME Engagement Methodologies
FITMAN Support Webinar to A16 2120/11/2014
Katerina Achinioti
Innovalia Association
![Page 22: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/22.jpg)
Overview of methodologies• Creating technology awareness
• Support for service/application development:- Definition of lean start-up principle and Minimum Viable
Product (MVP) concept in FITMAN
- Definition of co-creation concept applied in FITMAN
- Definition of local service hypothesis and trial
- Local FITMAN ICT infrastructure deployment
- Data gathering and feedback
• Communicating Phase III achievements
20/11/2014 FITMAN Support Webinar to A16 22
Open CallsBeginning of project-Product development
(Application/service)Project end
![Page 23: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/23.jpg)
Methodology for creating technology awareness
20/11/2014 FITMAN Support Webinar to A16 23
http://businesssearch.dnb.com/small-business-tips/marketing-your-small-business-online-and-off/
Stage 5: Continuous monitoring of the activities
Stage 4: Establishment of an active dialogue with the interested stakeholders
Stage 3: Ranking of the networks’ potential impact and matching the networks with communication means
Stage 1: Definition of the overall scope and target groups related to the awareness activities
Stage 2: Identification of SME networks and detection of possible communication means
A 5-stage methodology
![Page 24: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/24.jpg)
Stage 1: Definition of the overall scope and target groups related to the awareness activities
Definition of the overall scope
- Definition of number of SMEs/web entrepreneurs/sectors to be addressed
- Definition of the geographical scope
- Definition of timeframes
- Definition of expected outcomes
Definition of target groups
- Categories of group
- Type of activities
20/11/2014 FITMAN Support Webinar to A16 24
![Page 25: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/25.jpg)
Stage 2: Identification of SME networks and detection of possible communication means
- Database of relevant networks including all info (Name, geograph.scope, link to website, contact details etc.)
- Detection of communication means (News webpage, Newsletters, Events, Social media accounts)
20/11/2014 FITMAN Support Webinar to A16 25
![Page 26: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/26.jpg)
Stage 3: Ranking of the networks’ potential impact and matching the networks with communication means
• Ranking of the identified networks based on a set or criteria (size, type of organisation etc.)
• Matching of networks with communications means: depending on the profile of the networks and the channels in place
20/11/2014 FITMAN Support Webinar to A16 26
![Page 27: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/27.jpg)
Stage 4: Establishment of an active dialogue with the interested stakeholders
• The quality/relevance of the information provided
• The choice of the right communication means
• The schedule of the communication plan
20/11/2014 FITMAN Support Webinar to A16 27
![Page 28: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/28.jpg)
Stage 5: Continuous monitoring of the activities
Establishment of indicators in order to monitor and measure the progress of the activities:
• Indicators attached to the overall objectives of the plan for the technology awareness activities
• Indicators attached to the different components of the activities
• Indicators measuring the progress of the actions undertaken in order to reach the expected outcomes
20/11/2014 FITMAN Support Webinar to A16 28
![Page 29: FITMAN Support Webinar to A16-November 2014](https://reader035.fdocuments.us/reader035/viewer/2022081401/559c137d1a28abb1098b45df/html5/thumbnails/29.jpg)
Questions?
20/11/2014 FITMAN Support Webinar to A16 29