Transcript of First Single-storey Bungalow Project after 9 years since 2008.
![Page 1: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/1.jpg)
HC PRECAST SYSTEM IBS Superstructure In Malaysia 3in1
Load Bearing Wall + Modular Shear Keys Wet Joint + Box System
Completed In 10 Days With 6 Workers : Speed, Quality & Environment
INDUSTRIALISED BUILDING SYSTEM (IBS)
It is a system which suits all architectural demands & not a machine or component
- The wall is designed to provide adequate fire resistance according to demand (with minimum 2hours as per BS8110)
- The system is designed and approved by PE and endorsed by independent checker
- Thickness of the wall can be customized according to requirement
- Our design and casting are following strictly to British Standard
ONE OF THE WAYS TO IMPROVE THE OUTFLOW OF CURRENCY IS THE
UTILIZATION OF INDUSTRIAL BUILDING SYSTEM ( IBS ) Part 1
![Page 2: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/2.jpg)
TRAINING UNIT
8 years expose precast wall, precast staircase,
half slab & precast beam with in-situ column.
- No touch-up - No water proofing
- No leaking - No crack
![Page 3: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/3.jpg)
FACTORY CAPACITY : 21 ACRES
Existing production 8 acres : 1,800 to 2,500 units
of single storey (1000 ft2) per year
Future development 13 acres : 2,500 to 3,500 units of
single storey (1000 ft2) per year
![Page 4: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/4.jpg)
Mobilization To Site
![Page 5: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/5.jpg)
Mobilization To Site
![Page 6: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/6.jpg)
Proper Storage Precast Panel & Column Mould On Site
1. 2.
![Page 7: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/7.jpg)
Proper Storage Precast Panel & Column Mould On Site
1. 2.
![Page 8: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/8.jpg)
Setting Out & Levelling Panel Location
1. 2.
![Page 9: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/9.jpg)
Panel Wall Guide
1. 2.
![Page 10: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/10.jpg)
Panel Installation
![Page 11: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/11.jpg)
Temporary Wall Prop Installation
![Page 12: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/12.jpg)
Temporary Panel Guide & Wall Support
Guide
![Page 13: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/13.jpg)
Temporary Wall Support
![Page 14: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/14.jpg)
Wall Plug Installation
1. 2.
3. 4. 3.
![Page 15: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/15.jpg)
Panel Wall Verticality
1. 2. 3.
![Page 16: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/16.jpg)
Modular Wet Joint Shear Keys
![Page 17: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/17.jpg)
Modular Wet Joint Shear Keys
![Page 18: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/18.jpg)
Modular Wet Joint Shear Keys
![Page 19: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/19.jpg)
Modular Wet Joint Shear Keys
![Page 20: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/20.jpg)
Wet Joint Shear Keys
![Page 21: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/21.jpg)
Modular Wet Joint Shear Keys
![Page 22: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/22.jpg)
Expanding Cement Motar
![Page 23: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/23.jpg)
Expanding Cement Motar
![Page 24: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/24.jpg)
Wet joint View After Casting
![Page 25: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/25.jpg)
Expanding Cement Motar
![Page 26: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/26.jpg)
Wet Joint Shear Keys Rebar Installation
![Page 27: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/27.jpg)
Wet Joint Shear Keys Rebar Installation
![Page 28: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/28.jpg)
Wet Joint Shear Keys Rebar Installation
1. 2.
![Page 29: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/29.jpg)
Wet Joint Shear Keys Rebar Installation
![Page 30: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/30.jpg)
Wet Joint Modular Mould Installation
![Page 31: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/31.jpg)
Wet Joint Modular Mould Installation
![Page 32: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/32.jpg)
Wet joint modular mould installation
![Page 33: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/33.jpg)
Wet Joint Modular Mould Installation
![Page 34: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/34.jpg)
Precast Beam & In-Situ Beam Installation
![Page 35: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/35.jpg)
Wet Joint Modular Mould, Precast Beam & In-Situ Beam Installation
![Page 36: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/36.jpg)
Precast Beam & In-Situ Beam Installation
1. 2.
Part 2
![Page 37: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/37.jpg)
Precast Beam & In-Situ Beam Installation
1. 2.
![Page 38: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/38.jpg)
Precast Beam & In-Situ Beam Installation
![Page 39: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/39.jpg)
Precast Beam & In-Situ Beam Installation
1. 2.
![Page 40: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/40.jpg)
Precast Beam & In-Situ Beam Installation
1. 2.
![Page 41: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/41.jpg)
Wet Joint Concreting
![Page 42: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/42.jpg)
Wet Joint Concreting
1. 2. .
![Page 43: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/43.jpg)
Beam Concreting
![Page 44: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/44.jpg)
Watering Before Mould Dismantle
1. 2. 3.
![Page 45: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/45.jpg)
Wet Joint Mould Dismantle
1. 2. 3.
![Page 46: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/46.jpg)
Wet Joint Mould Dismantle
1. 2. 3.
![Page 47: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/47.jpg)
Column Mould Dismantle
![Page 48: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/48.jpg)
Verticality Of Column
1. 2. 3.
![Page 49: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/49.jpg)
Verticality Of Wall
1. 2. 3.
![Page 50: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/50.jpg)
Installation Of Scaffolding For Half Slab
![Page 51: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/51.jpg)
Installation Of Scaffolding For Half Slab
![Page 52: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/52.jpg)
Installation Of Scaffolding For Half Slab
![Page 53: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/53.jpg)
Installation Of Scaffolding For Half Slab
![Page 54: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/54.jpg)
Installation Of Scaffolding For Half Slab
![Page 55: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/55.jpg)
Grinding Uneven Surface “ If Any”
1. 2. 3.
![Page 56: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/56.jpg)
Grinding Uneven Surface “ If Any”
1. 2.
![Page 57: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/57.jpg)
RC Flat Roof Half Slab Installation
1.
2.
3.
4.
5.
6.
![Page 58: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/58.jpg)
Cantilever Corridor Modular Mould Installation
1.
2.
![Page 59: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/59.jpg)
Cantilever Corridor Modular Mould Installation
1.
2.
![Page 60: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/60.jpg)
Cantilever Corridor Modular Mould Installation
1.
2.
![Page 61: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/61.jpg)
Cantilever Corridor Modular Mould Installation
4.
5.
6.
1.
2.
3.
![Page 62: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/62.jpg)
RC Flat Roof Rebar Installation
![Page 63: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/63.jpg)
RC Flat Roof Rebar Installation
![Page 64: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/64.jpg)
RC Flat Roof Rebar Installation
1. 2. 3.
![Page 65: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/65.jpg)
RC Flat Roof Conduit Installation
![Page 66: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/66.jpg)
RC Flat Roof Conduit Installation
1. 2. 3.
![Page 67: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/67.jpg)
RC Flat Roof To Receive Concrete
![Page 68: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/68.jpg)
RC Flat Roof Concreting Level Checking
1. 2.
![Page 69: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/69.jpg)
RC Flat Roof Concreting Level Checking
1. 2.
![Page 70: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/70.jpg)
RC Flat Roof
![Page 71: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/71.jpg)
RC Flat Roof
Part 3
![Page 72: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/72.jpg)
RC Flat Roof
![Page 73: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/73.jpg)
RC Flat Roof
![Page 74: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/74.jpg)
Cantilever Corridor
1.
2.
![Page 75: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/75.jpg)
Cantilever Corridor
1.
2.
![Page 76: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/76.jpg)
Corner & Edge
1. 2.
![Page 77: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/77.jpg)
Internal View
1. 2.
![Page 78: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/78.jpg)
Internal View
1. 2.
![Page 79: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/79.jpg)
Cantilever Corridor
1. 2.
![Page 80: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/80.jpg)
Cantilever Corridor After Mould Dismantle
1. 2.
![Page 81: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/81.jpg)
Cantilever Corridor After Mould Dismantle
1. 2.
![Page 82: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/82.jpg)
Cantilever Corridor
1. 2.
![Page 83: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/83.jpg)
Chequer Plate To Receive Tiling Work
![Page 84: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/84.jpg)
Chequer Plate To Receive Tiling Work
1. 2.
![Page 85: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/85.jpg)
Internal Edge
![Page 86: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/86.jpg)
Internal Edge
1. 2.
![Page 87: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/87.jpg)
Internal Edge
1. 2.
![Page 88: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/88.jpg)
Internal Edge
![Page 89: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/89.jpg)
Internal Edge
![Page 90: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/90.jpg)
Precast Panel With RC Coping
1. 2.
![Page 91: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/91.jpg)
Precast Panel With RC Coping
1. 2.
![Page 92: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/92.jpg)
Cement Mortar To Cover The Form Tile Hole & Prop Hole
1. 2.
![Page 93: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/93.jpg)
Precast Panel With Electric Socket
1. 2.
![Page 94: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/94.jpg)
Precast Panel With Electric Socket
1. 2.
![Page 95: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/95.jpg)
Completed Demobilise Back To Rasah Factory
![Page 96: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/96.jpg)
Skim Coat & Smooth Surface
1. 2.
![Page 97: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/97.jpg)
Skim Coat & Smooth Surface
1. 2.
![Page 98: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/98.jpg)
Skim Coat & Smooth Surface
1. 2.
![Page 99: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/99.jpg)
Skim Coat & Smooth Surface
1. 2.
![Page 100: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/100.jpg)
Skim Coat & Smooth Surface
1. 2.
![Page 101: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/101.jpg)
Skim Coat & Smooth Surface
1. 2.
![Page 102: First Single-storey Bungalow Project after 9 years since 2008.](https://reader033.fdocuments.us/reader033/viewer/2022042907/587319911a28ab673e8b5e17/html5/thumbnails/102.jpg)
DESIGNED BY YOU
PRODUCED BY
HC PRECAST SYSTEM
THANK YOU