December 12, 2013
Mr. Mark Dimondstein President American Postal Workers
Union, AFL-CIO 1300 L Street, NW Washington, DC 20005-4128
Dear Mark:
Certified Mail Tracking Number: 7013 1090 0002 4435 5297
As information, attached is a copy of the first Post Implementation Review for the Staten Island, New York Processing & Distribution Facility (P&DF) Area Mail Processing (AMP).
In accordance with the Non-Disclosure Agreement dated February 11, 2013, the Postal Service is providing both redacted and unredacted copies of the PIR.
If you have any questions, please contact Rickey Dean at extension 7412.
Sincerely,
Patrick M. Devine Manager Contract Administration (APWU)
Enclosures
(CA2013-1 054)
Type of Distribution Consolidated: Destinating
Facility Name & Type: Staten Island P&DF
Street Address: 550 Manor Road
City: Staten Island
State: NY
50 Facility ZIP Code: 10314 District: Triboro
Area: Northeast Finance Number: 358172
Current 3D ZIP Code(s): 103
Miles to Gaining Facility: 16
EXFC office: Yes
Postmaster: Carmen Fede
Senior Plant Manager: Mychal Sledge (A)
District Manager: Frank Calabrese
Facility Name & Type: Brooklyn P&DC
Street Address: 1050 Forbell St
City: Brooklyn
State: NY
50 Facility ZIP Code: 11256
District: Triboro
Area: Northeast
Finance Number: 350996
Current 30 ZIP Code(s): 112. 116
EXFC office: Yes
Plant Manager: Mychal Sledge (A)
Senior Plant Manager: Mychal Sledge (A)
District Manager: Frank Calabrese
Approval Date: January 13, 2011
Implementation Date: Apr-01-2013
PIR Type: 1st PIR
REDACTED
Date Range of Data: Apr-01-2013: Sep-30-2013
Processing Days per Year: 310
Bargaining Unit Hours per Year: 1,742
EAS Hours per Year: 1,819 Date of DAR Factors/Cost of Borrowing!
New Facility Start-up Costs Update May 7, 2010
Date & Time this workbook was last saved: I 11-08-2013 07:51
Area Vice President: Richard P. Uluski
Vice President, Network Operations: David E. Williams
Area AMP Coordinator: Stu Teger/Adyani Torres
NAI Contact: Monique Packer/Barbara Brewington
PIR Data Entry Page
2
Executive Summary Last Saved November 8, 2013 Date Range of Data
Losing Facility Name and Type: Street Address:
City:
State:
Current SCF ZIP Code(s):
Type of Distribution Consolidated:
Gaining Facility Name and Type: Street Address:
City:
Savings/Costs
Staffing
Service
Function 1 Workhour Savings
Non-Processing Craft Workhour Savings (less Maint!Trans)
PCESIEAS Workhour Savings
TransP?rtation Savings
Maintenance Savings
Space Savings
Total Annual Savings
Total One-Time Costs
Total First Year Savings
Craft Position Loss
PCESIEAS Position Loss
FCM Service Performance (EXFC & PFCM OIN)
FCM Service Performance (EXFC & PFCM 2 Day)
FCM Service Performance (EXFC & PFCM 3 Day)
Customer Experience Measurement Overall Satisfaction Residential at PFC level
Customer Experience Measurement Overall Satisfaction Small Business at PFC level
3
1st PIR vs Pre AMP 1st PIR vs Approved
Losing Current Qtr Gaining Current Qtr
92.94% 93.57%
96.57% 96.45%
94.78% 94.52%
PIR Type: 1st PIR Apr-01-2013 - Sep-30-2013
from Workhour Costs • Combined
from Other Curr vs Prop
from Other Curr vs Prop
from Transportation HCR and Transportation PVS
from Maintenance
from Space Evaluation and Other Costs
from Space Evaluation and Other Costs
from Staffing-Graff
from Staffing-PCESIEAS
from Service Performance & CSM
from Service Performance & CSM
from Service Performance & CSM
from Service Performance & CSM
from Service Performance & CSM
PIR Executive Summary
Calculation Befenmces Combined Losing and Gaining Facility Data: PreAMP Proposed 1st PIR
Function 1 Workhour Costs $56,582,892 $55,686,642 $47,888,976 Non-Processing Craft Workhour Costs $1,548,762 $1,530,613 $1,487,132 (!ess Maintenance & Transportation)
PCES/EAS Workhour Costs $8,757,018 $8,485,904 $7,568,049 Transportation Costs $17,923,879 $18,435,398 $17,847,814
Maintenance Costs $21,703,493 $21,482,597 $17,990,224 Space Savings
Total Annual Cost
Total One-Time Costs $0 $150,000 $255,876
Total First Year Costs $106,516,043 $1 154 $93,038,070
Staffing
Craft Position Total On-Rolls 1,201 1,168 1 '120 PCES/EAS Position Total On-Rolls 85 82 72
1st PIR vs Proposed 1st PIR vs Pre-AMP (A~~roved) AMP Approved AMP
Function 1 Workhour Savings $8,693,916 $7,797,666 $896,249 Non-Processing Craft Workhour Savings $61,630 $43,482 $18,148 (less Maint!Trans)
PCES/EAS Workhour Savings $1,188,969 $917,855 $271,114 Transportation Savings $76,066 $587,584 1 8)
Maintenance Savings $3,713,269 $3,492,374 $220,896 Space Savings $0 $0
Total Annual Savings $12,838,961 $894,889
Total One-Time Costs
Total First Year 3,477,974 $12,733,085 $744,889
Staffing Craft Position Loss 81 48 33
PCES/EAS Position Loss 13 10 3
PIR Executive Summary 4
Summary Narrative Last Saved: November 8, 2013
Losing Facility Name and Type: Staten Island P&DF Current SCF ZIP Code(s): 103
Type of Distribution Consolidated: Destinating
Gaining Facility Name and Type: Brooklyn P&DC Current SCF ZIP Code(s): 112, 116
Background:
The Triboro District with assistance from the Northeast Area office implemented the Staten Island Area Mail Processing (AMP} in February 2013. Staten Island Processing & Distribution Facility (P&DF) processed destinating volume for SCF 103, and it was housed it the same building as the Staten Island Main Post Office. Staten Island P&DFs mail operations were consolidated into Brooklyn NY Processing & Distribution Center (P&DC}. Staten Island Main Post Office (MPO} platform operation now serves as a hub for all SCF 103 stations. Data collected for the pre-AMP period represents operational activity from April1, 2010 to March 31, 2011, while data for the period April 1, 2013 through September 30, 2013 will be used for the first Post Implementation Review (PIR}.
In the twenty three (23} month period between pre-AMP data collection and AMP implementation, staffing levels were impacted by the early retirement initiatives offered to craft employees. The workhours reported in the first PIR were also impacted by Network Rationalization activities at Brooklyn P&DC prior to the AMP implementation. During the first PIR data period, Brooklyn NY P&DC (Brooklyn} outgoing operations were partially consolidated into Morgan NY P&DC (Morgan) as part of a separate on-going AMP. The maintenance work load at Brooklyn was also reduced by the Brooklyn AMP because it involved the relocation of six (6) AFCS200 machines, two (2) VFS units and the removal of two (2) BDS units from the facility. This concurrent activity had a direct impact on the workhours reported in this first PIR.
Financial Summary:
Combined Losing and Gaining Facility Data:
Function 1 Workhour Costs
Non-Processing Craft Workhour Costs (less Mamtenance & Transportation)
PCES/EAS Workhour Costs
Transportation Costs
Maintenance Costs
Space Savings
Total Annual Cost
Total One-Time Costs
Total First Year Costs
Total Annual Savings Total One-Time Cost Total First Year Savings
PreAMP
$56,582,892
$1,548,762 $8,757,018
$17,923,879 $21,703,493
$0 $106,516,043
$0
$106,516,043
PIR vs. Pre-AMP $13,733,850
($255,876) $13,477,974
Proposed 1st PIR
$55,686,642 $47,888,976
$1,530,613 $1,487,132 $8,485,904 $7,568,049
$18,435,398 $17,847,814 $21,482,597 $17,990,224
$0 $0 $105,621,154 $92,782,194
$150,000 $255,876
$105,771,154 $93,038,070
PIR vs. Atmroved $12,838,961
($105,876) $12,733,085
This first PIR identifies savings of $13,477,924, which exceeds the projected savings of $744,889 for the approved AMP. Impacts in this first PIR can be attributed to regular attrition, organizational changes during the pre-implementation period and concurrent AMP activities during the postimplementation period.
PIR Summary Narrative
5
6
- AMP of Brooklyn NY P&DC originating mail to Morgan NY P&DC was partially implemented in July 2013. Approximately 60% of this AMP was implemented with a proposed decrease to Brooklyn's costs of approximately $1,395,966.
Adjusting for the various activities and initiatives, which total $1,395,966, the adjusted first year savings is $12,082,008, above the expected savings of $744,889 for the AMP.
Customer Service Impacts:
Staten Island Main Office's Customer Service operations are housed in the same building in which the Staten Island P&DF was located. The Main Office serves as a Post Office and as a hub for the Staten Island associate offices. PVS transportation is used to transfer mail between Staten Island and Brooklyn. EXFC overnight mail service performance at Brooklyn and Staten Island has fluctuated since the AMP was implemented; however, 2-day and 3-day service performance has improved. Brooklyn continues to monitor various initiatives, such as increased DPS percentages and earlier dispatches for Staten Island, which were emphasized to help improve overnight service.
Staffing and Workhour Impacts:
The approved AMP proposed a decrease of 33 craft positions and a decrease of three management positions. The PIR shows a decrease of 81 craft and a decrease of 13 management positions.
There are maintenance positions that still fall within the Staten Island P&DF finance number. The clerks and mail handlers that work the hub as well as the management of the hub falls under the post office finance numbers. The PIR shows that the staffing is below proposed. The Staten Island Post Office is undergoing a function 4 review. The hub operation will likely be considered in this review to ensure staffing and workload aligns.
Staffing complement data at the end of the first PIR period shows Brooklyn's total complement at 41 craft employees under the proposed staffing. The on rolls staffing for Brooklyn is impacted by the Brooklyn to Morgan originating AMP.
1 Craft= Career+ Non-career
PIR Summary Narrative
7
Maintenance Impacts:
Annual Maintenance savings were projected to be $220,896 in the approved AMP. The first PIR projects annual savings of $3,713,269. One DBCS machine was transferred from Staten Island to Brooklyn P&DC to support the AMP. The Staten Island AMP triggered implementation of MM0-057-12 which reduced Maintenance Operations Support (MOS) clerk staffing at Brooklyn P&DC by three (3) positions and by one (1) at Staten Island. Regular attrition and the APWU incentive accounted for twenty (20) craft vacancies in Brooklyn: 10 ET, 6MPE and 4 MM. These positions remain vacant because of the pending impact of the Morgan AMP, with some premium work hours being utilized.
Some Maintenance savings can also be attributed to a reduced work load due to the Outgoing mail move to Morgan P&DC. The Morgan AMP necessitated the relocation or deactivation of six (6) AFCS200s, two (2) VFSs, two (2) BDS units, two (2) DPRCs and the 010 conveyor system at Brooklyn P&DC. The resulting Operational and Preventative Maintenance work hour reduction will be reflected in the new WHEP as six (6) fewer ET and four (4) less MPE positions in Brooklyn.
The Maintenance MOU from the recent APWU contract negotiations returned contracted custodial work to the craft. Twelve (12) vacancies in the custodial craft due to regular attrition, the APWU incentive and, the influx of custodial work from previously contracted stations have resulted in the increased hiring of non-career employees. These non-career employees are assigned to cover custodial vacancies at stations and in the P&DC. These non-career employees are used on a part-time basis enabling additional savings to be realized. Maintenance craft numbers for Staten Island are two (2) less than the proposed AMP staffing, while Brooklyn exceeds its approved number by two (2).
Transportation Impacts:
Planned transportation from New Dorp Station and South Shore Annex in Staten Island to nearby stations was cancelled along with the plans for mail hubs at both locations. Transportation costs in Staten Island have been reduced through normal attrition, one (1) driver retired, and through route consolidation. However, additional PVS transportation was added in Brooklyn to accommodate the extra mail volume being sent to the Station Island Main hub.
Morgan P&DC provides some transportation to move the collection mail from Brooklyn P&DC to Morgan P&DC. As a result, some Brooklyn schedules have been adjusted which contributed to the Transportation savings listed in this PIR.
One-Time Costs:
Relocation of an AFSM1 00/ATHS/AI machine from Mid-Island P&DC to Brooklyn P&DC cost $106,926. Modification of the fixed mechanization equipment at Brooklyn was necessary to allow direct bucket dispatch from the new AFSM1 00/ATHS/AI machine which costs $148,950. Total one-time costs necessary for the AMP was $255,876. A deviation in the amount of $255,876 was approved for this AMP.
PIR Summary Narrative
Service Performance and Customer Satisfaction Measurement Last Saved: November 8, 2013
PIRType: 1st PIR Implementation Date: 04/01/13
Losing Facility: Staten Island P&DF District: Triboro
~~~---------------------------
..... ··overrli9ht 2oay
Fiscal Quarter
' Percentage Percentage ; Percentage
03 2012 93.66% 97.50% 96,79%
MP 04 2012 95.57% 96.46% 93.49% 01 2013 95.06% 94.52% 86.96% 02 2013 97.21% 92.58% 91.66%
03 2013 94.95% 94.98% 94.16%
After AM p 04 2013 92.94% 9657% 9478% 01 2014
02 2014 \ l
Gaining Facility: _B_r..;.o..;.ok..;.l._yn_P..;.&..;.D..;.C;;,.__ _________ _
8
District: _T:...:.r~ib:..:o:.:..ro.::._ _____________ _
(15) Notes _____________________ _
60.02%
iCustomer Satisfaction Measurement (CSM) became Customer Experience Measurement .. 2010. Data reftects most recently completed quarter available in CEM.
Overall Satisfaction (Overall Experience)
Satisfaction with Receiving (Experience with receiving)
Satisfaction with Sending (Experience with sending)
Satisfaction with most frequently visited PO (Experience with most frequently visited PO)
Satisfaction with most recent contact with USPS (Experience with most recent contact witt
~--;;:.,;..:._ __ ..;._..;._:...:.;..:...:..;.;_ ___ ;.::;..:c:..:.:_--'Likely to reccmmend the USPS
PIR Service Performance and Customer Satisfaction Measurement
Workhour Costs -Combined Facilities r- Combined Facilities I last Saved November 8, 2013
PIR Type": -);;,~\S;~~~R ,..,.,1,,,.,,.,., "" """''" 1:·;·;:;·:::i"~IR
Type of Distribution Consolidated: _. ___ . .Qestinating ____ _ Date Range of Data: Apr..(l1-2013 to Sep·3.0·201_3 __ _
PIR Work.hour Costs- Combined Facilities
P!R Workhour Costs+ Combined Facilities
{27}NOTES:~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ 1'1):1>''11~
11
PJR Workhour Costs- Combined Facilities
Workhour Costs - Losing Facility Last Saved November 8, 2013
Losing Facility -~~ten ls!~~d.. P&D~"··---PIR Type*: .. ~::.~.: '~ ~, 0 ~~• ~~~ ~~..:-.:;--~ PID
Type of Distribution Consolidated:_ ... ___ .. Destlnati~_g --~- Date Range of Data: ~-~~~9~ to ~.~~:.~1_3 __ _
PIR Workhour Costs - Losing
13 P!R Workhour Costs- Losing
Workhour Costs - Gaining Facility Last Saved November B. 2013
Gaining Facility: "~rookly_~-_P&DC -·~·-~~-·~·~~~ .. ~·--··- .. ·-~~- .. ·-···-~~ ~-~-PIR Type*: -;~~-~ .~ ::,10 ... ,.,~ .. ~~~ ,r ~"~:.-;;o::;;;;·~·-~;;;-DlR
Type of Distribution Consolidated: Destinating Date Range of Data: ~._ ..... _~pr-01-2013 to Sep~30-20~·-·-~
P!R Workhour Costs- Gaining
P!R Workhour Costs- Gaining
~7)NOTES: ________________________________________________________________________ ~----------------------------------------------------------------------- ----------------------
16 PlR Workhour Costs ~Gaining
I Other Workhour Move Analysis I
Pl R Other Work hour Costs
18
P!R Other Workhour Costs
P!R Other Workhour Costs
20
PI R Other Workhour Costs
I Distribution to Other PIR Worksheet Tabs ]
21
PI R Other Work hour Costs
Adjustments at the Losing Facility
Proposed Prop...,d Ptopo$ed MOllS Annual
-operation Annuat Workhour Nutnbef
Workhour$ Cost($)
Proposed Ptopo$ed
0 0 $0 0 0 $0 0 0 $0 0 0 $0 0 0 $0 0 0 $0 0 0 $0 0 0 $0 0 0 $0 0 0 $0 0 0 $0 0 0 $0
Tota~ __() $0
22
Pl R Other Work hour Costs
Staffing - Craft Last Saved: November 8, 2013
PIR Type: 1st PIR Data Extraction Date: 09/24/13
Losing Facility: Staten Island P&DF
Craft Positions
PIR data provided by management in Staten Island hub operation
Gaining Facility: Brooklyn P&DC
Craft Positions
r~-~-~-~-~-~-,-~-~-~-~-~-, , (23) , (24) ,
I 1st PIR vs Pre AMP I 1st PIR vs Proposed I , Total Craft Position Loss:! 81 , !
~-----------~-----------~ (Above numbers are carried forward to the Executive Summary)
23
358172 P&DF
Finance #: 358183 MPO
Finance #: 350996
PIR Staffing -Craft
Staffing - PCES/EAS
Losing Facility: Staten Island P&DF Data Extraction Date· 9/2412013
PCES/EAS Positions Authorized Staffing
(1) (2) \31 (4)
line Position Title Level PreAMP 1st PIR
1 MGR PROCESSING/DISTRIBUTION FCL TY EAS-24 1 0 2 MGR DISTRIBUTION OPERATIONS EAS-19 1 0
3 MGR MAINTENANCE EAS-19 1 0
4 SUPV DISTRIBUTION OPERATIONS EAS-17 5 0
~MAINTENANCE OPERATIONS EAS-17 2 0 TRANSPORTATION OPERATIONS EAS-17 2 0
7 SECRETARY (FLD) EAS-12 1 0
8 SUPV CUSTOMER SERVICE 0
9 ; 0
10 0 11 Data provided by management of hub operations at Staten Island 0
12 0 13 0 14 0 15 0 16 --:- 0
17 0
181 I-;-·:-·_- 0
191 0 20 0
21 0
22 0 23 0 24 0
25 0
26 0 27 0
28 0
29 0
30 ·: 0
31 :.- .. : 0
32 0
33 0 34 0
35 •\_-_- 0 36 _-- .. -- 0 37 ' 0 38 _,',' 0 39 0 40 0 41 0 42 0 43 ,::' 0 44 .----_ 0 45 _:- 0 46 '',: 0 47 0 48 0 49 0 50 -: 0 51 0 52 0 53 0 54 0 55 0 56 0 57 0 58 0 59 0 60 0
Totals 13 0
24
Last Saved: November 8. 2013
PIR Type: 1st PIR
Finance # 358172 -------
On-Rolls
(6) (6) (7)
PreAMP Proposed 1st PIR
1 ,'-_, 0 0 1 ' 0 0
1 1 0 4 1 0
2 'c 1 0 2 2 1
1 () 0 3
'' 0
-·--0 0 0 0
.. - 0 0 0
' 0
:_ ' 0
0
' 0
0 0 0 0 0 0 0 0 0 0
_._ 0 _· 0
0 ' 0
: 0 ,,, 0
:; 0 0 0
-· .. 0 _.-,;.- 0
0 0
''- 0 0
' 0 0
::·',, '' 0 ,,
0 0 0 0 0 0 0 0 0 0 0 0
12 5 4
~><I Variances Total On"Rolls
(15) (16)
Change 1st PIR vs 1st PIR vs Analysis Pre AMP Proposed
Positions (8) (1) Percent ·66,7% -20.0%
PIR Staffing- P ES/EAS
Gaining Facility: ..:B::.r.::oo.::k:.:;I:Ly.:.:n...:P_:&::.:D:_C~------------- Finance# _3..;..50_9'-'9_6 ____ _ Data Extraction Date: 9/24/2013
PCES/EAS Positions Authorized On-Rolls
Staffing
{19) (20) Pr~21~, · ..• · (22)
.Pt:;~p (24) (25)
Line Position Title Level 1stP!R Proposed 1st P!R
r 1 PLANT MANAGER (METRO) PCES-01 1 0 1 1 0
~R IN-PLANT SUPPORT EAS-25 1 1 0 1 1 R MAINTENANCE (LEAD) EAS-25 1 1 1 1 1
4 SR MGR DISTRIBUTION OPERATIONS ~25 1 1 0 1 1 5 MGR DISTRIBUTION OPERATIONS -24 4 1 3 4 3
6 MGR MAINTENANCE OPERATIONS EAS-23 3 .. 3 <+=+ 2 7 MGR TRANSPORTATION/NETWORKS EAS-23 i · .. 0 1 1
8 OPERATIONS INDUSTRIAL ENGINEER (FI EAS-22 2 0 .2 I 2 0 9 MGR MAINT ENGINEERING SUPPORT EAS-20 .... 1 1 1 .l 1 1 10 MGR MAINTENANCE OPERATIONS SUPPT EAS-20 . 1 1 1 I 1 1
11 OPERATIONS SUPPORT SPECIALIST EAS-20 1 1 ___]_c ( 1 1
12 MAINTENANCE ENGINEERING SPECIALIST EAS-19 1 1 0. 1 1 13 MGR FIELD MAINT OPRNS (LEAD) EAS-19 1 1 1 1 1 14 MGR PVS OPERATIONS EAS-19 1 0 · .... 1 1 1 15 OPERATIONS SUPPORT SPECIALIST EAS-18 . ·' 2 0 2 2 2 16 OPERATIONS SUPPORT SPECIALIST EAS-17 4 4 .· .. r" 4 4 17 SUPV DISTRIBUTION OPERATIONS EAS-17 29 23 30 30 27 18 SUPV MAINTENANCE OPERATIONS EAS-17 12 . · ... 13 12' •.• 12 11 19 SUPV TRANSPORTATION OPERATIONS EAS-17
•
8. 6 - 6 ••••
6 5 20 NETWORKS SPECIALIST EAS-16 .. 2 0 • •. 2 ... 2 2 21 SECRETARY (FLD) EAS-12 , ..... 1 0 I 1 1 0 22 SR PLANT MANAGER (2) PCES-01 1 c. 1
23 OPERATIONS INDUSTRIAL ENGINEER (FI EAS-23 .····
1 . 0 24 MGR DISTRIBUTION OPERATIONS EAS-22 1
•••• 0
25 MGR TRANSPORTATION/NETWORKS EAS-21 1 .. 0 26 OPERATIONS INDUSTRIAL ENGINEER (FI EAS-21 2 .... 0
~TION OPERATIONS EAS-20 1 0 CIALIST EAS-17 1 0
VE ASSISTANT (FLD) EAS-12 1 ..... ·.·. • 1
30
::t± L 0 31 I 0 32 L 0 33
. 0 p 0
34 0 0 35 0 0
ti± 0 -- 0
••• 0 0 0 0 0 ... 0
40 .. ·. 0 0 41 0 0 42 .. · 0 0 43
• 0 .· 0
44 0 0 45 0 .. 0 46 0 0 47 0 0 48 0 0 49 .· 0 0 50 ... 0 0 51 .··•·. 0 0 52 ·. 0 0 53 . 0 ..... 0 54 .·•··· 0 ··. · .... 0 55 . 0 0 56 . 0 .. 0 57 0 0 58 0 0 59 0 . 0 60 0 0
Totals f6 67 J3 b8
~ Variances Total On~Rolls
(33) (34)
Change 1st PIR vs 1st PIR vs Analysis Pre AMP Proposed
Positions (5) (9) Percent ~6.8% -11.7%
r·-·-·-·-·-·-·-·-·~·-·-·-·-·-·-·-1-·-·-·-·-·-·-· I Total PCES/EAS' 137) '
138) :
25 I Position Lossl 13 I 10 I ~~-----·-·--------~~-----------·-j-·-----------~ (Above numbers are carried forward to the Executive Summary)
PIR Staffing- PCES/EAS
Transportation - PVS Last Saved: November 8, 2013
Losing Facility: Staten Island P&DF
Finance Number: ..::3..::::5;:;;..8.:...17-=2=--------
(1) (2)
PreAMP Proposed · .. ··
PVS Owned Equipment Seven Ton Trucks 8 8 Eleven Ton Trucks 2 2 Single Axle Tractors 2 2 Tandem Axle Tractors · ... 0 0 Spotters 0 0
PVS Transportation :
Number of Schedules 18 18 Total Annual Mileage ·. 269,889 269,889
Total Mileage Costs $396,737 $396,737 ... ·.·
PVS Leases Total Vehicles Leased 0 0
Total Lease Costs . $0 $0
PVS Workhour Costs .. :
LDC 31 (617, 679, 764) $0 $0 LDC 34 (765, 766) $1,618,457 $1,618,457
Total Workhour Costs $1,618,457 $1,618,457
-
(3) (4) (5) Variance 1st Variance 1st
1st PIR PIR vs Pre PIRvs AMP Prooosed
8 0 0 2 0 0 2 0 0 0 0
15 {31 (3)
263,142 ($6,747) ($6,747)
$386,818 (59,919) 1$9,919)
0 $0 $0 $0
$0 $522,027 ($1,0913,429) ($1 ,0913/129
$522,027 ($1 nqn 4'NI {$1 ,096,;j29
(11) Total 1st PIR vs Pre AMP Transportation-PVS Savings: {$776,874) (This number added to the Executive Summary
PIR Type: 1st PIR --------~--------
DateRangeofData: Apr-01-2013 -- to -- Sep-30-20 13
Gaining Facility:-;B:-;:ro.:;:.o:;::k;21y~n:...P:....&::.D=C----------------Finance Number: -=3..::5;:;;..0.:..99:..:6=--------
(6) (7) (8) (9) (10) -Variance 1st Variance 1st
PreAMP Proposed PIR PIR vs Pre PIRvs AMP Prooosed i
PVS Owned Equipment • Seven Ton Trucks 43 43 42 (!) (1 )!
Eleven Ton Trucks 8 10 8 0 (:2)
Single Axle Tractors 16 18 13 (3) (5)
Tandem Axle Tractors 9 9 9 0 0
Spotters 3 3 3 0 0
PVS Transportation Number of Schedules 198 206 212 14 6
Total Annual Mileage 1,807,077 1,857,783 1,878,279 71,202 20,496
Total Mileage Costs 2,656,403 $2,788,220 $2,818,981 $162,578 $30,761 1
••••••• •• PVS Leases
Total Vehicles Leased 0 0 0
Total Lease Costs .· .. $0 $0 $0 $0 $OJ
.. PVS Workhour Costs
LDC 31 (617, 679, 764) $536,218 $536,218 $407,988 ($1:16 230) ($!28,2:l0)i
LDC 34 (765, 766) $11,131,480 $11,131,480 $11,426,606 $295,126 $295,126
Total Workhour Costs $11,667,698 $12,034,540 $11,834,594 $166,896 {$199~
Includes Adustment from AMP -'-
(12) Total 1st PIR vs Proposed Transportation-PVS Savings: ($1 ,275,533) (This number added to the Executive Summary)
(13) Notes=------------------------------------------------
rev.1/8/2008
26 PIR Transportation- PVS
Losing Facility: Staten Island P&DF
Type of Distribution Consolidated: Destinating
Data of HCR Data File: 09/01/13
PreAMP Route#
27
(3) (4)
1st PIR
Transportation - HCR Last Saved: November 8, 2013
(5)
1st PIR Annual Cost
PIR Type: 1st PIR
CT for Outbound Dock:
(9)
1st PIR
PIR Transportation HCR- Losing
Change Analysis 1st PIR vs Pre AMP I 1st PIR vs Proposed
Notes:
28 PIR Transportation HCR- Losing
Transportation - HCR Last Saved: November 8, 2013
Gaining Facility: _B_ro_o_k_:ly:_n_P_&_o_c ____________________ _
Type of Distribution Consolidated: Destinating
Date of HCR Data File: 09/01/13
(1)
Route#
CET for Inbound Dock:
CET for Cancellations:
(7)
1st PIR Annual Cost
PIR Type: 1st PIR
CETforOGP:
CT for Outbound Dock:
Proposed Annual
------
1st PIR Annual Cost/Mile
PIR Transportation HCR- Gaining
Notes:
30
Summary HCR Losing & Gaining
(11} (12} Change Analysis
1st PIR vs Pre AMP I 1st PIR vs Proposed
Losing
Gaining
(13) Total 1st PIR vs Pre AMP Transportation-HeR Savings: (from losing and gaining facilities)
$700,808
(14) Total 1st PIR vs Proposed Transportation-HeR Savings: (from losing and gaining facilities)
Total Transportation
(15}
1st PIR vs Pre AMP
HCR
PVS
(15) Total 1st PIR vs Pre AMP Transportation (PVS & HeR): (This number carried forward to the Executive Summary)
(16) Total 1st PIR vs Proposed Transportation (PVS & HeR): (This number carried forward to the Executive Summary)
(16)
1st PIR vs Proposed
PIR Transportation HCR- Gaining
MPE Inventory Last Saved: November 8, 2013
Data Extraction Date: 10/07/13 PIR Type: 1st PIR Date Range of Data: Apr-01-2013 -- to -- Sep-30-2013
Losing Facility: Staten Island P&DF Gaining Facility: ...:B:...r.:..oo.:..k.;.;.,ly'-'-n;....;P...;&:;;.;D::...C=------------
(1) (2) (3) (4) (5) (6) (7) (8) (9)
PreAMP Proposed 1st PIR Equipment
..... Proposed 1st PIR Variance in
PreAMP Proposed 1st PIR Relocation Relocation Costs
Equipment Costs Costs
AFCS 0 .. 0 0 AFCS 8 8 0 $0 $0 $()
AFCS 200 ···.·· 0 0 0 AFCS 200 0 0 0
AFSM-ALL 1 0 1 AFSM-ALL · .. 2 3 3 $150,000 $106,926 ($43,074;
APPS <O····•· 0 0 APPS 1 1 1 $0 $0 $0
ClOSS 0 0 0 ClOSS •.· 1 1 1 $0 $0 $0 !
CSBCS 0 0 0 CSBCS 0 0 0 $0 $0 $0
DBCS 6 0 4 DBCS 30 30 31 $0 $0 so DBCS-OSS 0 0 0 DBCS-OSS 6.· •... 6 6 $0 $0 so
DIOSS 0 0 0 DIOSS 0 0 0 $0 $0 $0
FSS 0 0 0 FSS 0 0 1 $0 $0 $()
SBPSIAPBS o. 0 0 SBPSIAPBS 0 0 0 $0 $0 so UFSM 0 0 0 UFSM 0 0 0 $0 $0 so
FC I MICRO MARK 0 •• 0 0 FC I MICRO MARK · .. 0 .·. 0 0 $0 $0 so ROBOT GANTRY 0 0 0 ROBOT GANTRY 2 2 4 $0 $0 $0
HSTS I HSUS . 0 0 0 HSTSIHSUS .•· 0 0 0 $0 $0 so LCTS I LCUS 0 0 0 LCTS I LCUS 2 2 2 $0 $0 M
LIPS 0 0 0 LIPS 0 0 0 $0 $0 so MLOCR-ISS 0 ··.·.·• 0 0 MLOCR-ISS 0 0 0 $0 $0 $0
MPBCS-OSS 0 0 0 MPBCS-OSS 0 ••.. 0 0 $0 $0 so TABBER 0 0 0 TABBER 0 0 0 $0 $0 so
POWERED POWERED INDUSTRIAL 0 0 0 INDUSTRIAL 0 0 0 $0 $0 so
VEHICLE VEHICLE
LCREM ·. 0 .......... 0 0 LCREM 0 0 1
... .··
. ···. I
. .· .. 7 ·. 0 .. · 5 Totals .··.·• 52 .. •· 53 50 $150,000 $106,926 ($43,074
':::. ..:::: ":::.. (10) Notes:
Carried to Space Evaluation and
Other Costs
:51 PIR MPE Inventory
Maintenance Last Saved November 8, 2013
PIR Type*: _1_s_t P_I_R ______ _
Date Range of Data: Apr-01-2013 : Sep-30-2013
Losing Facility: Staten Island P&DF Gaining Facility: P&DC
LDC36
LDC 38
Worktlour Activi~
Building Equipment $
Building Services $ (Custod~al Cfeanmg)
LDC 39 Maintenance Operations $
Suooort
Parts and Supplies
(1)
1,240,164 $
-·--$
566,853 $
---162,069 $
--$
$
$
0 $
Grand \fotal $ 2,848,41)'
(2)
576,505 $
225,994 $
566,853 $
162,069 $
0 $
1,531,421
356,119 $
0 $
1,887,540
(3)
1st PIR Costs
14,114 $
0 $
44,353 $
$
0 $
58,467 $
277,250 $
0 $
335,717
(4) Variance 1st
PIR to Pre AMP
(5) Variance 1st
PIR to Proposed
(11) 1st PIR vs Pre AMP- Maintenance Savings:
(12) 1st PIR vs Proposed- Maintenance Savings:
LDC 36
LDC 38
Worktlour Acthtl~
Building Equipment $
Building Services $ (Custodial Cleanmg}
LDC 39 Maintenance Operations $ Suooort
---------------------------------------(7) (8) (9) (10)
Variance 1st Variance 1st Pre AMP I I Proposed 1st PIR PIR to Pre PIR to Pre
Costs Costs AMP Proposed
$ 8,196,811 $ 6,892,887 $
$ 2,152,480 $ 2,247.669 $
3,359,546 $ 3,359,546 $ 3,642,862 $
--1,113,014 $ 1,113,014 $ 1,099,165 $
306,267 $ 354,015 $ 135,966 $
$ 14,538,867 15,175,846 14,018,549 $
Parts and Supplies
Grand "f"otal
4,316,206 4,419,211 $ 3,635,958 $
$ 0 $ 0 .$
$ 19,595,057 17,654,507 $
(These numbers carried forward to the Executive Summary)
(These numbers carried forward to the Executive Summary)
$
(13)Notes: _______________________________________________________________ -==================================================
"Data m PIR columns IS annualized for Fnst PIR
rev-1/8:12008
32
PIR Maintenance
(1)
Distribution Changes Last Saved: November 8, 2013
Losing Facility : Staten Island P&DF PIR Type: 1st PIR
Type of Distribution Consolidated: Destinating Date Range of Data: Apr-01-2013 --to-- Sep-30-2013
Place a "X" next to the DMM labeling list(s) revised as result of the approved AMP.
DMM L001 DMM L011
X DMM L002 DMM L201
DMM L003 DMM L601
DMM L004 DMM L602
X DMM L005 DMM L603
DMM L006 DMM L604
DMM L007 DMM L605
DMM L008 DMM L606
DMM L009 DMM L607
DMM L010 DMM L801
Identify the date of the Postal Bulletin that contained DMM labeling list revisions.
<2l Postal Bulletin 22352, December 13,2012
Was the Service Standard Directory updated for the approved AMP?
(3) Yes
(4) Drop Shipments for Destination Entry Discounts
FAST Appointment Summary Report NASS
Facility Name Total No-Show Late Arrival Open
Month Losing I Gaining Facility Code Schd Count % Count % Count % Count
Aug '13 Losing Facility 103 Staten Island N/A
Sept '13 Losing Facility 103 Staten Island N/A
Aug '13 Gaining Facility 112 Brooklyn 904 310 34.29% 347 38.38% 0 0.00% 593
Sept '13 Gaining Facility 112 Brooklyn 852 302 35.45% 326 38.26% 0 0.00% 549
(5) Notes: Staten Island dropped at Brooklyn.
33
Closed %
65.60%
64.44%
rev 1/8/2008
Unschd I Count
I
11 I 5
PIR Distribution Changes
Customer Service Issues Last Saved: November 8, 2013
5-Digit ZIP Code: Data Extraction Date:-==-:-:-::------
3-Digit ZIP Code: 103 3-Digit ZIP Code: 3-Digit ZIP Code:
PreAMP PIR PreAMP PIR PreAMP ······ PIR 1. Collection Points Mon.-Fri. Sat. Mon. -Fri. Sat. Mon .. -Fri. ·• Sat; Mon.- Fri. Sat. Mon .. •Fri. Sat. Mon.-Fri. Sat.
Number picked up before 1 p.m. 286 31!3 266 315 0 .··· 0 0 0
Number picked up between 1-5 p.m. 151 69 151 69 0 0 0 0
Number picked up after 5 p.m. 3 0 3 0 0 0 0 0
Total Number of Collection Points 420 385 420 384 0 0 0 0 0 0 0 0 --
2. How many collection boxes are currently designated for "local delivery"?
3. How many "local delivery" boxes were removed as a result of AMP?
4. Delivery Performance Report PreAMP 1st PIR
OuarterlfY Percent Ouarter/FY Percent
% Carriers returning after 1700 03 2012 24.3% 03 2013 38_6%
04 2012 35.0% 04 2013 49.3%
01 201$ 34.9% 01 2014
02 2013 38.4% 02 2014
5. Retail Unit Inside Losing Facility (Window Service Times) 6. Business (Bulk) Mail Acceptance Hours
Monda
Tuesda
Wednesda
Thursda
Frida
Saturda
I Start
1 8:30
1 ·. lk30
I 8:30
I .• 8:30
I ... 8;30
1 8:30
PreAMP End
17:00
L 17:00
17:00
17:00
1.7:00
15:30
Proposed 1st PIR Start End Start End
8:30 17:00 830 1700
8:30 17:00 8:30 1700
8:30 17:00 830 1700 Tuesday!
Wednesday
8:30 17:00 830 1700
8:30 17:00 8:30 17:00
8:30 15:30 830 1530 Saturday!
7. Can customers obtain a local postmark in accordance with applicable policies in the Postal Operations Manual?
8. Notes:
Gaining Facility: ~~,~~!'1!''.:._:_=:.:::..----------------9. What postmark is printed on collection mail?
[ ~ ~] ~
34
Proposed 1st PIR Start I End Start I End 9:00 I 17:00 900 I 1700
9:00 I 17:00
11 9:00 17:00
9:00 17:00 9:00 17:00
900 1700
900 1700
9:00 17:00 900 1700
9:00 17:00 900 1700
closed I closed II closed closed closed dosed
Yes
rev_ 1/9/2008
3-Digit ZIP Code:
PreAMP ... PIR
Mon.-Fri. Sat. Mon.- Fri. Sat. 0 0
0 0
0 0
0 0 0 0
PIR Customer Service Issues
Space Evaluation and Other Costs Last Saved November 8, 2013
Losing Facility: Staten Island P&DF
1. Affected Facility
2. One-Time Costs
Enter any one-time costs: __ _.;.$0;... __
3. Savings Information
Space Savings ($): ___ $;;.;0;.... __
4. Did you utilize the acquired space as planned? Explain.
Staten Island is both a Post Office and hub as planned in the AMP.
5. Notes: $148,950 to relocate and integrate spiral and tray conveyor
Employee Relocation Costs
Mail Processing Equipment Relocation Costs (from MPE lnventof}' I
Facility Costs (from above)
Total One-Time Costs
$150,000
$150,000
Date: -----"'1-'-0/.;;.3_;,.1/-'-13.:..-__
$148,950 $148,950 (These numbers shown below under One-Time Costs section )
$0 $0 (These numbers carried forward to the Executive Summaf}')
$148,950
$255,876 $105,876 PIR costs carried forward to Executive Summary)
Gaining Facility: .o:B,;,ro'-'o'-k""ly-'-n,_P""&"'D'-C;:__ ______ _ Losing Facility: Staten Island P&DF
Pre-AMP FY 2011 Range of Report PIR FY 2013
{1)
Product
35
PreAMP Associated REC
PreAMP CO$tper 1r000
ImageS
{4)
1st PIR Associated REC
(5)
1st PIR Cost per 1,000 Images
(6)
Product P"'AMP
(9)
1stPIR
(10)
1st PIR Cost per 1 ,000 Images
rev 11'912008
PIR Space Evaluation and Other Costs