    1 Podium Driveway & Car Parking

    a Plain Cement Concrete: Supply, placing and

    leveling of plain cement concrete 1:2:4 mix

    100mm thk with trowel as base , cost including all

    materials at site, all labor charges ,Transportation

    ,loading , unloading charges and other necessary

    charges to complete the work as per drawingspecification and as instructed by PIC

    188.24 Cum

    SUB TOTAL

    2 Basket Ball Court

    A Steps Connecting to Basket ball court

    a Crusher run: Supply, placing, leveling and

    compaction with mechanical rammer for base to

    100mm thick cost including all materials at site, all

    labor charges and other necessary charges to

    complete

    0.47 Sqm

    b Plain Cement Concrete: Supply, placing and

    leveling of plain cement concrete 1:2:4 mix 50mm

    thk, cost including all materials at site, all labor

    charges and other necessary charges to complete

    0.11 Cum

    c Reinforced Cement Concrete : Supply, placing

    and leveling of pre-mix cement concrete of grade

    M20, cost including materials conveyance to site,

    machine mixing, vibratory, centering, curing &

    formwork, all labor charges and necessary

    charges to complete. * For Steps

    0.92 Cum

    d Reinforcement: Supply and tying of steel

    reinforcement including cutting and bending as per

    Structural Engr's design cost including all

    materials at site, necessary machineries, all labor

    charges and other necessary charges to complete

    0.05 Tons

    3 Basket Ball Court

    a Plain Cement Concrete: Supply, placing andleveling of plain cement concrete 1:2:4 mix 60mm

    thk, with trowel as base , cost including all

    materials at site, all labor charges,Transportation

    ,loading , unloading charges and other necessary

    charges to complete the work as per drawing

    specification and as instructed by PIC

    3.29 Cum

    b Reinforced Cement Concrete : Supply, placing

    and leveling of pre-mix cement concrete of grade

    M20, cost including materials conveyance to site,

    machine mixing, vibratory, centering, curing &

    formwork, all labor charges and necessary

    charges ,Transportation , loading , unloading

    charges to complete. * For retaining wall for

    pedestal as per drawing specification and as

    instructed by PIC

    1.04 Cum

    c Reinforcement: Supply and tying of steel

    reinforcement including cutting and bending as per

    Structural Engr's design cost including all

    materials at site, necessary machineries, all labor

    charges and other necessary charges

    ,Transportation ,loading , unloading charges to

    complete as per drawing specification and as

    instructed by PIC

    0.03 Tons

    d Vacuum dewatered Flooring : Providing and

    laying 50mm thick Vacuum dewatered flooring

    using 40mm thk. (1:2:4) concrete mix to proper

    levels & slopes and finishing top with 10mm thk

    cement mortar 1:3mix, cost including all materialsat site, all labor charges and other necessary

    charges ,Transportation , loading , unloading

    charges to complete as per drawing (LSCD 11.1

    R2) specification and as instructed by PIC

    54.86 Sqm

    e Light wieght filling (cynder filling) : supply, placing,

    leveling and compaction with mechanical rammer

    for base including cost of all materials at site all

    lbourcharges,transporation,loading,unloading

    charges and other necessary charges to complete

    the work as per drawing, specification and as

    instructed by PIC

    RO cum

    4 Kid's Play Area

    A Kid's Play Area

    Landscaping work Rev-BOQ for Purva Grandbay, Kochi

    Site Concepts Pvt Ltd. 1/6Rev-BOQ for Purva Grandbay, Kochi

  • 7/27/2019 First Floor Only

    2/6

    Landscaping work Rev-BOQ for Purva Grandbay, Kochi

    a Water proofing: Supplying and applying of

    approved water proof membrane two coats as per

    manufacturers direction and one productive layer

    of cement sand screed 12mm thick cost including

    all materials at site, all labor

    charges,Transportation, loading , unloading and

    other necessary charges to complete the work as

    per the drawing,specification and as instructed by

    PIC

    Sqm

    b Plain Cement Concrete: Supply, placing and

    leveling of plain cement concrete 1:2:4 mix

    125mm thk with trowel as base , cost including all

    materials at site, all labor charges and other

    necessary charges ,Transportation ,loading ,

    unloading charges to complete the work as per

    drawing specification and as instructed by PIC

    21.53 Cum

    d Light wieght filling (cynder filling) : supply, placing,

    leveling and compaction with mechanical rammer

    for base including cost of all materials at site all

    lbourcharges,transporation,loading,unloading

    charges and other necessary charges to complete

    the work as per drawing, specification and as

    instructed by PIC

    RO cum

    5 Veiwing deck

    A Paving

    a Crusher run: Supply, placing, leveling and

    compaction with mechanical rammer for base to

    470mm thick cost including all materials at site, all

    labor charges and other necessary charges to

    complete

    2.41 Sqm

    b Plain Cement Concrete: Supply, placing and

    leveling of plain cement concrete 1:2:4 mix

    150mm thk, cost including all materials at site, all

    labor charges and other necessary charges to

    complete

    0.77 Cum

    c Reinforced Cement Concrete : Supply, placing

    and leveling of pre-mix cement concrete of gradeM20, cost including materials conveyance to site,

    machine mixing, vibratory, centering, curing &

    formwork, all labor charges and necessary

    charges to complete. * For retaining wall

    0.53 Cum

    d Reinforcement: Supply and tying of steel

    reinforcement including cutting and bending as per

    Structural Engr's design cost including all

    materials at site, necessary machineries, all labor

    charges and other necessary charges to complete

    0.02 Tons

    e Light wieght filling (cynder filling) : supply, placing,

    leveling and compaction with mechanical rammer

    for base including cost of all materials at site all

    lbourcharges,transporation,loading,unloading

    charges and other necessary charges to complete

    the work as per drawing, specification and as

    instructed by PIC (aprox high 500 mm )

    3.50 cum

    6 Water feature

    A Water Feature

    a Plain Cement Concrete: Supply, placing and

    leveling of plain cement concrete 1:2:4 mix

    100mm thk, cost including all materials at site, all

    labor charges and other necessary charges to

    complete

    0.57 Cum

    b Reinforced Cement Concrete : Supply, placing

    and leveling of pre-mix cement concrete of gradeM20, cost including materials conveyance to site,

    machine mixing, vibratory, centering, curing &

    formwork, all labor charges and necessary

    charges to complete. * For retaining wall

    1.02 Cum

    c Reinforcement: Supply and tying of steel

    reinforcement including cutting and bending as per

    Structural Engr's design cost including all

    materials at site, necessary machineries, all labor

    charges and other necessary charges to complete

    0.08 Tons

    Site Concepts Pvt Ltd. 2/6Rev-BOQ for Purva Grandbay, Kochi

  • 7/27/2019 First Floor Only

    3/6

    Landscaping work Rev-BOQ for Purva Grandbay, Kochi

    d Water proofing: Supplying and applying of

    approved water proof membrane two coats as per

    manufacturers direction and one productive layer

    of cement sand screed 12mm thick cost including

    all materials at site, all labor charges and other

    necessary charges to complete

    10.12 Sqm

    7 Planter Box (3 nos)

    a Reinforced Cement Concrete : Supply, placing

    and leveling of pre-mix cement concrete of grade

    M20, cost including materials conveyance to site,

    machine mixing, vibratory, centering, curing &

    formwork, all labor charges and necessary

    charges to complete. * For Planter walls

    1.34 Cum

    b Reinforcement: Supply and tying of steel

    reinforcement including cutting and bending as per

    Structural Engr's design cost including all

    materials at site, necessary machineries, all labor

    charges and other necessary charges to complete

    0.04 Tons

    c Water proofing: Supplying and applying of

    approved water proof membrane two coats as per

    manufacturers direction and one productive layer

    of cement sand screed 12mm thick cost including

    all materials at site, all labor charges and othernecessary charges to complete

    7.43 Sqm

    d Plastering: Plastering for side walls in cement

    mortar 1:6mix 12mm thick sponge finish for walls

    cost including all material to site, all labor charges

    and other necessary charges to complete

    5.54 Sqm

    8 Planter Boxes (2 nos)

    a Reinforced Cement Concrete: Supply, placing

    and leveling of pre-mix cement concrete of grade

    M20, cost including materials conveyance to site,

    machine mixing, vibratory, centering, curing &

    formwork, all labor charges and necessary

    charges to complete. * For Planter walls

    1.05 Cum

    b Reinforcement: Supply and tying of steelreinforcement including cutting and bending as per

    Structural Engr's design cost including all

    materials at site, necessary machineries, all labor

    charges and other necessary charges to complete

    0.03 Tons

    c Water proofing: Supplying and applying of

    approved water proof membrane two coats as per

    manufacturers direction and one productive layer

    of cement sand screed 12mm thick cost including

    all materials at site, all labor charges and other

    necessary charges to complete

    9.48 Sqm

    d Plastering: Plastering for wall surfaces in cement

    mortar 1:6mix 12mm thick; finish for wall cost

    including all material to site, all labor charges and

    other necessary charges to complete.

    14.04 Sqm

    9 Planter Boxes

    a Reinforced Cement Concrete: Supply, placing

    and leveling of pre-mix cement concrete of grade

    M20, cost including materials conveyance to site,

    machine mixing, vibratory, centering, curing &

    formwork, all labor charges Transportation

    ,loading , unloading and necessary charges to

    complete. * For Planter walls as per drawing

    ,specification and instructed PICbut exculding

    cost of reinforcement steel

    24.26 Cum

    b Reinforcement: Supply and tying of steel

    reinforcement including cutting and bending as per

    Structural Engr's design cost including all

    materials at site, necessary machineries, all labor

    charges ,Transportation ,loading , unloading

    charges and other necessary charges to

    complete as per drawing specification and as

    instructed by PIC

    0.73 Tons

    c Water proofing: Supplying and applying of

    approved water proof membrane two coats as per

    manufacturers direction and one productive layer

    of cement sand screed 12mm thick cost including

    all materials at site, all labor

    charges,Transportation, loading , unloading and

    other necessary charges to complete as per the

    drawing,specification and as instructed by PIC

    161.70 Sqm

    Site Concepts Pvt Ltd. 3/6Rev-BOQ for Purva Grandbay, Kochi

  • 7/27/2019 First Floor Only

    4/6

    Landscaping work Rev-BOQ for Purva Grandbay, Kochi

    d Plastering: Plastering for wall surfaces in cement

    mortar 1:6mix 12mm thick; finish for wall cost

    including all material to site, all labor charges

    Transportation ,loading , unloading and other

    necessary charges to complete the work as per

    drawing,specification and as instruced by PIC

    323.40 Sqm

    SUB TOTAL

    TOTAL FIRST FLOOR

    GRANITE AND TILING WORK

    1 Feature Steps

    a Granite work (Black Granite): Supply and fixing

    of Black Granite as per dig on cement mortar

    1:3mix cost including all materials to site, all labor

    charges ,Transportat ion , loading , unloading

    chargesand other necessary charges to complete

    the work as per drawing (LSCD 3.1 R2 )

    specification and as instructed by PIC

    i) Cut to size x 20mm thick antique finish with

    sandwich edge for step threads

    49.12 Sqm 42.36

    ii) Cut to size x 20mm thick antique finish for step

    landing

    60.31 Sqm

    b Granite work (Black Granite): Supply and fixing

    of Black Granite as per dig on cement mortar

    1:3mix cost including all materials to site, all labor

    charges ,Transportat ion , loading , unloading

    chargesand other necessary charges to complete

    the work as per drawing (LSCD 3.1 R2 )

    specification and as instructed by PIC

    i) 150 x L x 20mm thick polished finish for step

    risers

    21.18 Sqm

    2 Basket Ball Court

    A Steps Connecting to Basket ball court

    a Granite work (Black granite): Supply and fixing

    of Black granite as per dig on cement mortar

    1:3mix cost including all materials to site, all laborcharges and other necessary charges to complete

    i) 300 x L x 20mm thk antique finish with sandwich

    edge for step tread

    3.15 Sqm

    b Granite work(Grey granite): Supply and fixing of

    Grey granite as per dig on cement mortar 1:3mix

    cost including all materials to site, all labor

    charges and other necessary charges to complete

    i) 150x L x 20mm thk polished finish for step riser 1.58 Sqm

    3 Kid's Play Area

    a Granite work (Sadarahalli Grey granite): Supply

    and fixing of Sadarahalli grey granite as per drg

    on cement mortar 1:3mix and applying of

    impregnable clear colour sealer two coats onecoat before installation and one coatafter

    installation with necessary pointing work, cost

    including all materials to site, all labor

    charges,Transportation ,loading , unloading and

    all other necessary charges to complete the work

    as per drawing,specification and as instruced by

    PICi) 250 x L x 40mm thk flamed finish for banding 3.11 Sqm

    4 Veiwing deck

    a Granite work (Royal Brown granite): Supply

    and fixing of Royal Brown granite as per dig on

    cement mortar 1:3mix cost including all materials

    to site, all labor charges and other necessary

    charges to complete

    i) Cut to size x 20mm thk antique finish for paving 5.94 Sqm

    ii) 100 x L x 20mm thk antique finish for external

    cladding

    0.58 Sqm

    5 Water feature

    a Granite work (Black Granite): Supply and fixing

    of Black Granite as per dig on cement mortar

    1:3mix and applying of impregnable clear color

    sealer two coats one coat before installation and

    one coat after installation cost including all

    materials to site, all labor charges and other

    necessary charges to complete

    Site Concepts Pvt Ltd. 4/6Rev-BOQ for Purva Grandbay, Kochi

  • 7/27/2019 First Floor Only

    5/6

    Landscaping work Rev-BOQ for Purva Grandbay, Kochi

    i) 200 x L x 40mm thk polished finish both edge

    chamfered for coping (without clear color sealer)

    2.60 Sqm

    ii) Cut to size x 20mm thk polished finish for

    internal cladding

    3.51 Sqm

    iii) Cut to size x 20mm thk polished finish for

    external cladding (without clear color sealer)

    1.83 Sqm

    6 Planter Boxes (3nos)

    a Granite work (Black Granite): Supply and fixing

    of Black Granite as per dig on cement mortar

    1:3mix, cost including all materials to site, all labor

    charges and other necessary charges to complete

    i) 200 x L x 20mm thk polished finish with

    sandwich & both edge for coping

    1.99 Sqm

    7 Stepping stones

    a Stepping stonework (Grey granite): Supply and

    fixing of 50mm thk Grey granite stepping stone as

    per dig on 50mm sand bed cost including all

    materials to site, all labour charges and other

    necessary charges to complete

    i) 1200 x 450 x 50mm thk antique finish with grassjoints for stepping stones

    4.86 Sqm

    8 Planter Boxes (2 nos)

    a Granite work (Black granite): Supply and fixing

    of Black granite as per dig on cement mortar

    1:3mix cost including all materials to site, all labor

    charges and other necessary charges to complete

    i) 200 x L x 40mm thk polished finish with

    sandwich & both edge chamfered for coping

    2.34 Sqm

    9 Planter Boxes

    a Granite work (Black granite): Supply and fixing

    of Black granite as per dig on cement mortar

    1:3mix and applying of impregnable clear colour

    sealer two coats one coat before installation and

    one coatafter installation with necessary pointing

    work cost including all materials to site, all labor

    charges Transportation ,loading , unloading and

    other necessary charges to complete the work as

    per drawing,specification and as instruced by PIC

    i) 200 x L x 20mm thk polished finish with

    sandwich edge for coping

    53.90 Sqm

    TOTAL 1ST FLOOR

    GRAND TOTAL (Total Civil and granite work)

    Site Concepts Pvt Ltd. 5/6Rev-BOQ for Purva Grandbay, Kochi

  • 7/27/2019 First Floor Only

    6/6

    No. Description of work Quantity Unit Rate Amount Remarks

    1 Basket Ball Court

    a

    Synthetic paint finish: Providing synthetic paint

    finish over basketball court area color: Blue, cost

    including all materials to site, necessary

    machineries, all labor charges and other

    necessary charges ,Transportation ,loading ,

    unloading charges to complete as per drawing

    (LSCD 11.1 R2) specification and as instructedby PIC

    54.86 Sqm

    i Ditto but red color Sqm

    ii50 mm wide court white marker (dashed line as

    per drg no LSCD11.1 R2Sqm

    2 Planter Box (3 nos)

    a

    Painting: Painting for plastered surface in

    textured finish, color: match to building color, one

    base coat and two finishing coats cost including all

    materials at site, all labor charges and other

    necessary charges to complete

    - Sqm

    3 Planter Boxes (2 nos)

    a

    Painting: Painting for external plastered surface

    in textured paint finish, color: match to building

    color, one base coat and one finishing coat costincluding all materials at site, all labor charges and

    7.02 Sqm

    4 Planter Boxes

    a

    Painting: Painting for external plastered surface

    in textured paint finish, color: match to building

    color, one base coat and one finishing coat cost

    including all materials at site, all labor charges

    Transportation ,loading , unloading and other

    necessary charges to complete the work as per

    drawing,specification and as instruced by PIC

    151.95 Sqm

    TOTAL -

    Landscaping work Rev-BOQ for Purva Grandbay, Kochi