First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1...

45
National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 • Fax: 617-770-0700 • www.nfpa.org MEMORANDUM To: NFPA Technical Committee on Fire Doors and Windows From: Kelly Carey, Project Administrator Date: December 8, 2014 Subject: NFPA 105 Second Draft TC FINAL Ballot Results (A2015 Cycle) According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. 30 Members Eligible to Vote 9 Not Returned (R. Cravy, L. Durand, S. Groesbeck, H. Hicks, Jr., J. Mathews, V. Patton, S. Reynolds, R. G. Sack, S. Schreiber) 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) 0 Members Voted Negative on one or more Revisions 1 Member Abstained on one or more Revisions: (W. Koffel) The attached report shows the number of affirmative, negative, and abstaining votes as well as the explanation of the vote for each second revision. There are two criteria necessary for each second revision to pass ballot: (1) simple majority and (2) affirmative 2 /3 vote. The mock examples below show how the calculations are determined. (1) Example for Simple Majority: Assuming there are 20 vote eligible committee members, 11 affirmative votes are required to pass ballot. (Sample calculation: 20 members eligible to vote ÷ 2 = 10 + 1 = 11) (2) Example for Affirmative 2 /3: Assuming there are 20 vote eligible committee members and 1 member did not return their ballot and 2 members abstained, the number of affirmative votes required would be 12. (Sample calculation: 20 members eligble to vote 1 not returned 2 abstentions = 17 x 0.66 = 11.22 = 12 ) As always please feel free to contact me if you have any questions.

Transcript of First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1...

Page 1: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

National Fire Protection Association

1 Batterymarch Park, Quincy, MA 02169-7471

Phone: 617-770-3000 • Fax: 617-770-0700 • www.nfpa.org

M E M O R A N D U M

To: NFPA Technical Committee on Fire Doors and Windows

From: Kelly Carey, Project Administrator

Date: December 8, 2014

Subject: NFPA 105 Second Draft TC FINAL Ballot Results (A2015 Cycle)

According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

30 Members Eligible to Vote

9 Not Returned (R. Cravy, L. Durand, S. Groesbeck, H. Hicks, Jr., J. Mathews, V. Patton, S. Reynolds, R.

G. Sack, S. Schreiber)

20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods)

0 Members Voted Negative on one or more Revisions

1 Member Abstained on one or more Revisions: (W. Koffel)

The attached report shows the number of affirmative, negative, and abstaining votes as well as the explanation of

the vote for each second revision.

There are two criteria necessary for each second revision to pass ballot: (1) simple majority and (2) affirmative 2/3 vote. The mock examples below show how the calculations are determined.

(1) Example for Simple Majority: Assuming there are 20 vote eligible committee members, 11 affirmative votes

are required to pass ballot. (Sample calculation: 20 members eligible to vote ÷ 2 = 10 + 1 = 11)

(2) Example for Affirmative 2/3: Assuming there are 20 vote eligible committee members and 1 member did not

return their ballot and 2 members abstained, the number of affirmative votes required would be 12. (Sample

calculation: 20 members eligble to vote – 1 not returned – 2 abstentions = 17 x 0.66 = 11.22 = 12 )

As always please feel free to contact me if you have any questions.

Page 2: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Second Revision No. 13-NFPA 105-2014 [ Section No. 2.2 ]

2.2 NFPA Publications.

National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471.

NFPA 72®, National Fire Alarm and Signaling Code, 2016 edition.

NFPA 80, Standard for Fire Doors and Other Opening Protectives, 2016 edition.

NFPA 92, Standard for Smoke Control Systems, 2015 edition.

NFPA 252, Standard Methods of Fire Tests of Door Assemblies, 2012 edition.

Submitter Information Verification

Submitter Full Name: Kristin Bigda

Organization: National Fire Protection Assoc

Street Address:

City:

State:

Zip:

Submittal Date: Tue Oct 07 16:26:02 EDT 2014

Committee Statement

Committee Statement: Reference publication update.

Response Message:

Ballot Results

This item has passed ballot

30 Eligible Voters

9 Not Returned

21 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cravy, Richard L.

Durand, Luc

Groesbeck, Scott

Hicks, Jr., Harold D.

Mathews, John S.

Patton, Vernon J.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

1 of 44 12/8/2014 2:33 PM

Page 3: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Reynolds, Steven P.

Sack, Grayson

Schreiber, Steve

Affirmative All

Campbell, Bruce G.

Conner, William

Gorrell, Jerrold S.

Gould, Jeffrey E.

Guffey, William F.

Hahn, Steven C.

Holt, Charles C.

Janicak, Thomas R.

Kenney, Lynn

Koffel, William E.

Kokesh, Nancy L.

Peterkin, James S.

Rispoli, Ronald

Rubright, Thomas M.

Salamone, Thomas A.

Savage, Sr., Michael L.

Tierney, Michael

Tom, Garrett S.

Utiskul, Yunyong P.

Woods, Luke C.

Yuen, Anthony W.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

2 of 44 12/8/2014 2:33 PM

Page 4: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Second Revision No. 1-NFPA 105-2014 [ Section No. 2.3.1 ]

2.3.1 ANSI BHMA Publications.

American National Standards Institute, Inc., 25 West 43 rd Street, 4 th Floor, New York,NY Builders Hardware Manufacturers Association, 355 Lexington Avenue, 15th floor, NewYork, NY 10036 10017 .

ANSI/BHMA A 156.1 A156.1 , Standard for Butts and Hinges, 2006 2013 .

ANSI/BHMA A 156.4 A156.4 , Door Controls – Closer Closers , Grade 1, 2008 2013 .

Submitter Information Verification

Submitter Full Name: [ Not Specified ]

Organization: [ Not Specified ]

Street Address:

City:

State:

Zip:

Submittal Date: Tue Sep 30 19:08:13 EDT 2014

Committee Statement

Committee Statement: Revision update

Response Message:

Ballot Results

This item has passed ballot

30 Eligible Voters

9 Not Returned

21 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cravy, Richard L.

Durand, Luc

Groesbeck, Scott

Hicks, Jr., Harold D.

Mathews, John S.

Patton, Vernon J.

Reynolds, Steven P.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

3 of 44 12/8/2014 2:33 PM

Page 5: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Sack, Grayson

Schreiber, Steve

Affirmative All

Campbell, Bruce G.

Conner, William

Gorrell, Jerrold S.

Gould, Jeffrey E.

Guffey, William F.

Hahn, Steven C.

Holt, Charles C.

Janicak, Thomas R.

Kenney, Lynn

Koffel, William E.

Kokesh, Nancy L.

Peterkin, James S.

Rispoli, Ronald

Rubright, Thomas M.

Salamone, Thomas A.

Savage, Sr., Michael L.

Tierney, Michael

Tom, Garrett S.

Utiskul, Yunyong P.

Woods, Luke C.

Yuen, Anthony W.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

4 of 44 12/8/2014 2:33 PM

Page 6: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Second Revision No. 3-NFPA 105-2014 [ Section No. 2.3.2 ]

2.3.2 UL Publications.

Underwriters Laboratories Inc., 333 Pfingsten Road, Northbrook, IL 60062-2096.

ANSI/UL 10B, Standard for Fire Tests of Door Assemblies , 2009.

ANSI/UL 10C, Standard for Positive Pressure Fire Tests of Door Assemblies , 2009.

ANSI/UL 1784, Air Leakage Tests of Door Assemblies, 2001, Revised 2009.

Submitter Information Verification

Submitter Full Name: [ Not Specified ]

Organization: [ Not Specified ]

Street Address:

City:

State:

Zip:

Submittal Date: Tue Sep 30 19:10:24 EDT 2014

Committee Statement

Committee Statement: Referenced publication update.

Response Message:

Ballot Results

This item has passed ballot

30 Eligible Voters

9 Not Returned

20 Affirmative All

1 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cravy, Richard L.

Durand, Luc

Groesbeck, Scott

Hicks, Jr., Harold D.

Mathews, John S.

Patton, Vernon J.

Reynolds, Steven P.

Sack, Grayson

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

5 of 44 12/8/2014 2:33 PM

Page 7: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Schreiber, Steve

Affirmative All

Campbell, Bruce G.

Conner, William

Gorrell, Jerrold S.

Gould, Jeffrey E.

Guffey, William F.

Hahn, Steven C.

Holt, Charles C.

Janicak, Thomas R.

Kenney, Lynn

Koffel, William E.

Kokesh, Nancy L.

Peterkin, James S.

Rispoli, Ronald

Rubright, Thomas M.

Salamone, Thomas A.

Savage, Sr., Michael L.

Tierney, Michael

Tom, Garrett S.

Utiskul, Yunyong P.

Yuen, Anthony W.

Affirmative with Comment

Woods, Luke C.

Add ANSI/UL10D, Fire Tests of Fire Protective Curtain Assemblies.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

6 of 44 12/8/2014 2:33 PM

Page 8: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Second Revision No. 14-NFPA 105-2014 [ Section No. 2.4 ]

2.4 References for Extracts in Mandatory Sections.

NFPA 72©, National Fire Alarm and Signaling Code, 2016 edition.

NFPA 80, Standard for Fire Doors and Other Opening Protectives, 2016 edition.

NFPA 92, Standard for Smoke Control Systems, 2015 edition.

NFPA 101 ® , Life Safety Code ® , 2015 edition.

Submitter Information Verification

Submitter Full Name: Kristin Bigda

Organization: National Fire Protection Assoc

Street Address:

City:

State:

Zip:

Submittal Date: Tue Oct 07 16:31:02 EDT 2014

Committee Statement

Committee Statement: Extract update.

Response Message:

Ballot Results

This item has passed ballot

30 Eligible Voters

9 Not Returned

21 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cravy, Richard L.

Durand, Luc

Groesbeck, Scott

Hicks, Jr., Harold D.

Mathews, John S.

Patton, Vernon J.

Reynolds, Steven P.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

7 of 44 12/8/2014 2:33 PM

Page 9: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Sack, Grayson

Schreiber, Steve

Affirmative All

Campbell, Bruce G.

Conner, William

Gorrell, Jerrold S.

Gould, Jeffrey E.

Guffey, William F.

Hahn, Steven C.

Holt, Charles C.

Janicak, Thomas R.

Kenney, Lynn

Koffel, William E.

Kokesh, Nancy L.

Peterkin, James S.

Rispoli, Ronald

Rubright, Thomas M.

Salamone, Thomas A.

Savage, Sr., Michael L.

Tierney, Michael

Tom, Garrett S.

Utiskul, Yunyong P.

Woods, Luke C.

Yuen, Anthony W.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

8 of 44 12/8/2014 2:33 PM

Page 10: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Second Revision No. 10-NFPA 105-2014 [ Section No. 3.3.1 ]

3.3.1 Qualified Person.

A person who, by possession of a recognized degree, certificate, professional standing, orskill, and who, by knowledge, training, and experience, has demonstrated the ability to dealwith the subject matter, the work, or the project.

Submitter Information Verification

Submitter Full Name: Kristin Bigda

Organization: National Fire Protection Assoc

Street Address:

City:

State:

Zip:

Submittal Date: Tue Oct 07 09:58:18 EDT 2014

Committee Statement

CommitteeStatement:

Qualified person is a term used in NFPA 105 and should be defined in Chapter 3 toclarify its intent. The addition of this definition will assist in the application of inspection,testing, and maintenance provisions for doors and smoke dampers. The definition isconsistent with that used in NFPA 80.

ResponseMessage:

Public Comment No. 14-NFPA 105-2014 [Section No. 6.5.1]

Public Comment No. 2-NFPA 105-2014 [Section No. 6.5.1]

Ballot Results

This item has passed ballot

30 Eligible Voters

9 Not Returned

20 Affirmative All

1 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cravy, Richard L.

Durand, Luc

Groesbeck, Scott

Hicks, Jr., Harold D.

Mathews, John S.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

9 of 44 12/8/2014 2:33 PM

Page 11: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Patton, Vernon J.

Reynolds, Steven P.

Sack, Grayson

Schreiber, Steve

Affirmative All

Campbell, Bruce G.

Conner, William

Gorrell, Jerrold S.

Gould, Jeffrey E.

Guffey, William F.

Hahn, Steven C.

Holt, Charles C.

Janicak, Thomas R.

Kenney, Lynn

Koffel, William E.

Kokesh, Nancy L.

Peterkin, James S.

Rispoli, Ronald

Rubright, Thomas M.

Salamone, Thomas A.

Savage, Sr., Michael L.

Tierney, Michael

Tom, Garrett S.

Utiskul, Yunyong P.

Yuen, Anthony W.

Affirmative with Comment

Woods, Luke C.

include reference to ensure the qualified person is approved by the AHJ?

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

10 of 44 12/8/2014 2:33 PM

Page 12: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Second Revision No. 6-NFPA 105-2014 [ New Section after 3.3.3 ]

3.3.4 Smoke Protective Curtain Assembly.

Assembly typically consisting of a fabric curtain, bottom bar, guides, coil, operating andclosing system.

Submitter Information Verification

Submitter Full Name: Kristin Bigda

Organization: National Fire Protection Assoc

Street Address:

City:

State:

Zip:

Submittal Date: Mon Oct 06 16:02:06 EDT 2014

Committee Statement

CommitteeStatement:

The new definition represents the work of a task group that was established during theFirst Draft meeting to further explore and evaluate the necessary requirements forsmoke curtains. The language is an expansion of the work completed at the First Draftmeeting and is in response to the developed committee inputs. The task group workedtogether to develop requirements that address the installation, inspection, and testing ofthese fire and smoke curtain products.

ResponseMessage:

Ballot Results

This item has passed ballot

30 Eligible Voters

9 Not Returned

21 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cravy, Richard L.

Durand, Luc

Groesbeck, Scott

Hicks, Jr., Harold D.

Mathews, John S.

Patton, Vernon J.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

11 of 44 12/8/2014 2:33 PM

Page 13: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Reynolds, Steven P.

Sack, Grayson

Schreiber, Steve

Affirmative All

Campbell, Bruce G.

Conner, William

Gorrell, Jerrold S.

Gould, Jeffrey E.

Guffey, William F.

Hahn, Steven C.

Holt, Charles C.

Janicak, Thomas R.

Kenney, Lynn

Koffel, William E.

Kokesh, Nancy L.

Peterkin, James S.

Rispoli, Ronald

Rubright, Thomas M.

Salamone, Thomas A.

Savage, Sr., Michael L.

Tierney, Michael

Tom, Garrett S.

Utiskul, Yunyong P.

Woods, Luke C.

Yuen, Anthony W.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

12 of 44 12/8/2014 2:33 PM

Page 14: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Second Revision No. 11-NFPA 105-2014 [ Chapter 5 ]

Chapter 5 Inspection, Testing, and Maintenance of Smoke Door Assemblies

5.1 General.

This chapter covers the inspection, testing, and maintenance of smoke door assemblies.

5.1.1 Application.

5.1.1.1

This chapter shall cover the inspection, testing, and maintenance of smoke door assemblies.

5.1.1.2

The requirements of this chapter shall apply to new and existing installations.

5.1.2

The requirements of this chapter shall apply to new and existing installations.

5.1.2 Removal of Smoke Doors.

Where a smoke door no longer functions as an opening or is removed and not replaced, theopening shall be filled with construction to maintain the fire protection rating smoke partition orsmoke barrier properties of the wall.

5.1.3 Operability.

Smoke doors shall be operable at all times.

5.1.3.1*

Smoke doors shall be operable at all times.

5.1.3.2

Smoke doors shall be kept closed or arranged for automatic closing, unless otherwisepermitted.

5.1.3.3

Where required, the doors shall be positively latched.

5.1.4 Replacement.

Where it is necessary to replace all or part of a smoke door assembly, replacementcomponents shall be installed to meet the requirements of this standard and themanufacturer's instructions.

5.1.5 Field Modifications.

5.1.5.1

Field modifications of fire-rated smoke door assemblies shall be made in accordance withNFPA 80.

5.1.5.2*

Field modifications of smoke door assemblies without fire ratings shall be permitted to bemade, provided the modifications are performed in accordance with the applicablerequirements of this standard.

5.1.5.3

Upon completion of field modification work, smoke door assemblies shall be inspected inaccordance with Section 5.2 5.4 .

5.2 Inspections and Testing.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

13 of 44 12/8/2014 2:33 PM

Page 15: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

5.2.1

Upon installation, smoke door assemblies shall be inspected and tested in accordance withthe following:

(1) Fire-rated smoke door assemblies shall be inspected and tested in accordance with thisstandard and also in accordance with Chapter 5 of NFPA 80.

(2) Door assemblies without fire ratings shall be inspected in accordance with therequirements of this standard.

(3) Inspections of smoke door assemblies without fire ratings shall be permitted to beperformed at the same time as inspections for door assemblies subject to inspectionunder NFPA 80.

(4) All functional tests shall be conducted after the building’s mechanical ventilation systemhas been balanced and is operating.

(5) All functional tests shall be conducted after the closing mechanism has been adjusted forthe applicable maximum allowable opening force.

5.2.2*

A record of all inspections and testing shall be signed by the inspector and kept for inspectionby the AHJ.

5.2.2.1

Records of the acceptance tests shall be retained for the life of the assembly.

5.2.2.2*

Unless a longer period is required by NFPA 80, records shall be retained for a period of atleast 3 years.

5.2.2.3*

The records shall be on a medium that will survive the retention period. Paper or electronicmedia shall be permitted. [72:14.6.2.3]

5.2.2.4

A record of all inspections and testing shall be provided that includes, but is not limited to, thefollowing information:

(1) Date of inspection

(2) Name of facility

(3) Address of facility

(4) Name of person(s) performing inspections and testing

(5) Company name and address of inspecting company

(6) Signature of inspector of record

(7) Individual record of each inspected and tested [ smoke] door assembly

(8)

(9)

(10)

(11) Listing of deficiencies in accordance with 5.2.4

[80:5.2.2.4]

5.2.3 Maintenance Records.

Upon completion of maintenance, smoke door assemblies shall be inspected and tested inaccordance with 5.2.4 .

* Opening identifier and location of each inspected and tested [ smoke] door assembly

* Type and description of each inspected and tested [ smoke] door assembly

* Verification of visual inspection and functional operation

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

14 of 44 12/8/2014 2:33 PM

Page 16: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

5.2.3.1

Upon completion of maintenance, smoke door assemblies shall be inspected and tested inaccordance with 5.2.4

A record of these inspections and testing shall be made in accordance with 5.2.2 . A recordof maintenance performed on existing smoke door assemblies shall be provided that includes,but is not limited to, the following information:

Date of maintenance

Name of facility

Address of facility

Name of person(s) performing maintenance

Company name and address of maintenance personnel

Signature of maintenance personnel performing the work

Individual listings of each maintained smoke door assembly

Opening identifier and location of each repaired smoke door assembly

Type and description of each repaired smoke door assembly

Description or listing of the work performed on each smoke door assembly

5.2.3.2

A record of these inspections and testing shall be made in accordance with 5.2.2 .

5.2.3.3

A record of maintenance performed on existing smoke door assemblies shall be providedthat includes, but is not limited to, the following information:

(1) Date of maintenance

(2) Name of facility

(3) Address of facility

(4) Name of person(s) performing maintenance

(5) Company name and address of maintenance personnel

(6) Signature of maintenance personnel performing the work

(7) Individual listings of each maintained smoke door assembly

(8) Opening identifier and location of each repaired smoke door assembly

(9) Type and description of each repaired smoke door assembly

(10) Description or listing of the work performed on each smoke door assembly

5.2.4* Acceptance Testing.

Acceptance testing of smoke door assemblies shall be performed by a qualified person withknowledge and understanding of the operating components of the type of assembly subject totesting.

5.2.4.1*

Before testing, a visual inspection shall be performed to identify any damaged or missing partsthat can create a hazard during testing or affect operation or resetting.

5.2.4.2

Acceptance testing shall include the closing of the door by all means.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

15 of 44 12/8/2014 2:33 PM

Page 17: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

5.2.4.2.1

Acceptance testing shall be conducted after the building’s mechanical ventilation system hasbeen balanced, in accordance with 5.2.1.

5.2.4.2.2

Acceptance testing shall be conducted after the closing mechanism has been adjusted for theapplicable maximum allowable opening force.

5.2.4.3

A record of these inspections and testing shall be made in accordance with 5.2.2.

5.2.4.4 Swinging Smoke Door Assemblies.

5.2.4.4.1

Smoke door assemblies shall be visually inspected from both sides to assess the overallcondition of the assembly.

5.2.4.4.2

As a minimum, the following items shall be verified:

(1) Labels on fire-rated smoke door assemblies are clearly visible and legible and bear the"S" label marking.

(2) Door leaves without fire protection ratings comply with 6.3.1 7.3.1 .

(3) Door frames comply with 6.3.2 7.3.2 .

(4) Gasketing along the vertical edges of the door and across the top of the door and, whererequired, at meeting edges of pairs of doors forms a continuous seal that is not cut,notched, or otherwise modified to accommodate other hardware items.

(5) Gasketing materials, where required, are intact and close the gaps between the door andframe to seal the door opening against the passage of smoke.

(6) Doors installed in pressurized applications have a bottom seal, where required.

(7) Doors equipped with bottom seals that automatically project to fully seal the gap underthe door in the closed position do not interfere with the swinging of the door whenretracted or the closing of the door when projected.

(8) No open holes or breaks exist in the surfaces of either the door or the frame.

(9) Glazing, vision light frames, and glazing beads are intact and securely fastened in place,if so equipped.

(10) Glazing materials and vision light kits comply with Sections 6.5 7.5 and 6.6 7.6 .

(11) Glazing materials, vision light kits, and glazing beads are continuously sealed.

(12) The door, frame, hinges, and other hardware are secured, aligned, and in working orderwith no visible signs of damage.

(13) No parts are missing or broken.

(14) Door clearances do not exceed dimensions listed in 6.3.3 7.3.3 when measured on thepull side of the door(s).

(15) The self-closing device is operational; that is, the active door completely closes whenoperated from the full open position.

(16) If a coordinator is installed, the inactive leaf closes before the active leaf.

(17) Where positive latching is required, latching hardware operates and secures the doorwhen the door is in the closed position.

(18) Where door leaves, other than doors arranged for automatic closing, are permitted to beheld open with friction door holder devices, the door holder devices comply with6.3.6.6 7.3.6.6 .

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

16 of 44 12/8/2014 2:33 PM

Page 18: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

5.2.4.5 Horizontally Sliding, Vertically Sliding, and Rolling Doors.

5.2.4.5.1

Fire Smoke door assemblies shall be visually inspected from both sides to assess the overallcondition of the door assembly.

5.2.4.5.2

The following items shall be verified:

(1) Labels are clearly visible and legible.

(2) No open holes or breaks exist in surfaces of either the door or the frame.

(3) Slats, endlocks, bottom bar, guide assembly, curtain entry, hood, and flame baffle arecorrectly installed and intact for rolling steel fire doors.

(4) Gasketing along the perimeter of the door forms a continuous seal that is not cut,notched, or otherwise modified.

(5) Glazing, vision light frames, and glazing beads are intact and securely fastened in place,if so equipped.

(6) Curtain, barrel, and guides are aligned, level, plumb, and true for rolling steel fire doors.

(7) Expansion clearance is maintained in accordance with manufacturer’s listing.

(8) Drop release arms and weights are not blocked or wedged.

(9) Mounting and assembly bolts are intact and secured.

(10) Attachments to jambs are with bolts, expansion anchors, or as otherwise required by thelisting.

(11) Smoke detectors, if equipped, are installed and operational.

(12) No parts are missing or broken.

(13)

(14) Auxiliary hardware items that interfere or prohibit operation are not installed on the dooror frame.

(15) No field modifications to the door assembly that void the label have been performed.

(16) Doors have an average closing speed of not less than 6 in./sec (152 mm/sec) or morethan 24 in./sec (610 mm/sec).

5.2.5 Periodic Inspection and Testing.

5.2.5.1

Periodic inspection and testing shall be performed not less than annually.

5.2.5.2

As a minimum, the provisions of 5.2.4 shall be included in the periodic inspection and testingprocedure.

5.2.5.3

Inspection shall include an operational test for automatic-closing doors to verify that theassembly will close under fire conditions.

5.2.5.4

The assembly shall be reset after each test.

5.2.5.5

Resetting of the release mechanism shall be done in accordance with the manufacturer'sinstructions.

* Fusible links, if so equipped, are in the location; chain/cable, s-hooks, eyes, and soforth, are in good condition; the cable or chain is not kinked, pinched, twisted, orinflexible; and links are not painted or coated with dust or grease.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

17 of 44 12/8/2014 2:33 PM

Page 19: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

5.2.5.6

Hardware and gaskets shall be inspected annually, and any parts found to be damaged orinoperative shall be replaced without delay.

5.2.5.7

Tin-clad and Kalamein doors shall be inspected regularly for dry rot.

5.3* Performance-Based Option.

5.3.1

As an alternative means of compliance with 5.2.5, subject to the AHJ, smoke door assembliesshall be permitted to be inspected, tested, and maintained under a written performance-basedprogram.

5.3.2

Goals established under a performance-based program shall provide assurance that thesmoke door assembly will perform its intended function when exposed to fire conditions.

5.3.3

The technical justification for inspection, testing, and maintenance intervals shall bedocumented in writing.

5.3.4

The performance-based option shall include historical data acceptable to the AHJ.

5.4 Maintenance.

5.4.1*

Repairs shall be made, and defects that could interfere with operation shall be correctedwithout delay.

5.4.2

Fire-rated smoke door assemblies shall also be maintained in accordance with NFPA 80.

5.4.3

Damaged glazing material shall be replaced in accordance with the applicable codes.

5.4.4

Replacement glazing material shall be installed in accordance with its individual listing, whererequired, and the manufacturer’s listing.

5.4.5

Where holes are left in a door or frame due to changes or removal of hardware or plant-ons,the holes shall be repaired by either of the following methods: sealed to resist the passage ofsmoke at ambient and elevated temperatures up to 400°F (204°C).

Installation of steel fasteners that completely cover the holes

Filling of the screw or bolt holes with the same material as the door or frame

5.4.6

Where a smoke door, frame, or any part of its appurtenances is damaged to the extent that itcould impair the door assembly's proper emergency function, the following actions shall beperformed:

(1) The door, frame, door assembly, or any parts of its appurtenances shall be replaced withparts obtained from the original manufacturer.

(2) The door shall be tested to ensure emergency operation and closing upon completion ofthe repairs, in accordance with 5.2.3.

5.4.7

If repairs cannot be made with parts obtained from the original manufacturer or retrofitted, thedoor, the door assembly, or appurtenances shall be replaced.

5.5 Prevention of Door Blockage.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

18 of 44 12/8/2014 2:33 PM

Page 20: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

5.5.1

Door openings and the surrounding areas shall be kept clear of anything that could obstruct orinterfere with the free operation and full closure of the door.

5.5.2

Blocking or wedging of doors in the open position shall be prohibited.

5.6 Maintenance of Closing Mechanisms.

5.6.1

Self-closing and automatic closing devices shall be kept in working condition at all times.

5.6.2

Care shall be taken to prevent paint accumulation on any movable parts such as, but notlimited to, hinges, pivots, closer arms, and latching hardware.

Supplemental Information

File Name Description

Chapter_5_SR_11_edited_KB_review.docxCh 5 (SR 11) reviewed by SL, queries answered 10/21/14

A_Ch_5_SR_11_edited_10.15_KB_review.docxAnnex A for Ch 5 (SR 11) reviewed by SL, queries answered 10/21/14

Submitter Information Verification

Submitter Full Name: Kristin Bigda

Organization: National Fire Protection Assoc

Street Address:

City:

State:

Zip:

Submittal Date: Tue Oct 07 15:22:15 EDT 2014

Committee Statement

CommitteeStatement:

Chapter 5 is the result of task group work that took place throughout the revision cycle.A draft of Chapter 5 was included as a First Revision and additional changes were madein the final draft text presented in this Second Revision. All task group work wasdiscussed voted on by the Technical Committee.

Chapter 5 brings into NFPA 105, expanded requirements for the inspection, testing, andmaintenance of smoke door assemblies. As stated during the First Draft, proposedchanges to Chapter 5 accomplish several objectives: First, the changes make NFPA 105more consistent with the requirements in NFPA 80 regarding inspection, testing, andmaintenance of smoke doors Secondly, the proposed changes expand the currentrequirements to address different types of smoke doors (swinging, rolling, sliding, etc)and fully address all three types of testing: operational, acceptance, and periodic.)

Annex A material is also being added.

ResponseMessage:

Ballot Results

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

19 of 44 12/8/2014 2:33 PM

Page 21: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

This item has passed ballot

30 Eligible Voters

9 Not Returned

21 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cravy, Richard L.

Durand, Luc

Groesbeck, Scott

Hicks, Jr., Harold D.

Mathews, John S.

Patton, Vernon J.

Reynolds, Steven P.

Sack, Grayson

Schreiber, Steve

Affirmative All

Campbell, Bruce G.

Conner, William

Gorrell, Jerrold S.

Gould, Jeffrey E.

Guffey, William F.

Hahn, Steven C.

Holt, Charles C.

Janicak, Thomas R.

Kenney, Lynn

Koffel, William E.

Kokesh, Nancy L.

Peterkin, James S.

Rispoli, Ronald

Rubright, Thomas M.

Salamone, Thomas A.

Savage, Sr., Michael L.

Tierney, Michael

Tom, Garrett S.

Utiskul, Yunyong P.

Woods, Luke C.

Yuen, Anthony W.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

20 of 44 12/8/2014 2:33 PM

Page 22: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Second Revision No. 9-NFPA 105-2014 [ Sections 6.6, 6.7 ]

7.6 Periodic Inspection and Testing.

7.6.1 General.

Smoke dampers for dedicated and nondedicated smoke control systems shall be inspectedand tested in accordance with NFPA 92 .

7.6.1.1

Smoke dampers for dedicated and nondedicated smoke control systems shall be inspectedand tested in accordance with NFPA 92

7.6.1.2

Combination fire/smoke dampers shall be inspected and tested in accordance with NFPA80 .

7.6.2* Testing Frequency.

Each damper shall be tested and inspected 1 year after installation.

7.6.2.1

Each damper shall be tested and inspected 1 year after installation.

7.6.2.2*

In buildings not containing a hospital, each damper shall be tested and inspected every 4years thereafter. The test and inspection frequency shall then be every 4 years, except inbuildings containing a hospital, where the frequency shall be every 6 years.

7.6.2.3*

In buildings containing a hospital, each damper shall be tested and inspected every 6 yearsthereafter.

7.6.3 Test Method.

Care shall be exercised that all tests are completed in a safe manner by personnel wearingthe appropriate personal protective equipment.

7.6.3.1

All tests shall be completed in a safe manner by personnel wearing personal protectiveequipment (PPE).

7.6.3.2

Fans shall not be permitted to be shut down during the test.

7.6.3.3 Dampers with Motorized Actuators.

Testing of dampers with actuators shall comply with the following procedure:

(1) Visually confirm that the damper is in the fully-open position.

(2) Verify that all obstructions, including hands, are out of the path of the damper bladesand then remove electrical power or air pressure from the actuator to allow theactuator’s spring return feature to close the damper.

(3) Visually confirm that the damper closes completely.

(4) Reapply electrical power or air pressure to reopen the damper.

(5) Visually confirm that the damper is in the fully-open position.

7.6.4 Documentation.

Full unobstructed access to the damper shall be verified and corrected as required.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

21 of 44 12/8/2014 2:33 PM

Page 23: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

7.6.4.1

All inspections and testing shall be documented indicating the location of the damper, dateof inspection, name of inspector, and deficiencies discovered.

7.6.4.2

The documentation shall have space to indicate when and how the deficiencies werecorrected.

7.6.4.3

All documentation shall be maintained for at least three test cycles and made available forreview by the AHJ.

7.6.6 Periodic Testing for Fusible Link – Operated Dampers.

Testing of fusible link–operated dampers shall comply with the following procedures:

For safety considerations, the fan shall be off.

The fusible link shall be removed with the damper in the full-open position. Before thefusible link is removed, it shall be verified that all obstructions, including hands, areout of the path of the damper blades.

The damper shall close completely without assistance once the fusible link isremoved. If the damper is designed with a latch to hold the damper in the full-closedposition, the damper shall latch properly.

The damper shall be returned to the full-open position and the fusible link shall bereplaced. If the link appears damaged, it shall be replaced with a functionallyequivalent link.

7.6.7 Periodic Testing for Dampers That Do Not Use a Fusible Link to Operate.

7.6.7.1

Testing of dampers with position indication wired to indication lights, control panels, orBuilding Automation System (BAS) shall comply with the following procedure:

The signal from the damper’s position indicator device shall be used to confirm thatthe damper is in the full-open position.

The damper shall be commanded to the closed position.

The signal from the damper’s position indicator device shall be used to confirm thatthe damper reaches its full-closed position.

The damper shall be commanded to the open position.

The signal from the damper’s position indicator device shall be used to confirm thatthe damper reaches its full-open position.

7.6.7.2

Testing of dampers without position indicators shall comply with the following procedure:

It shall be visually confirmed that the damper is in the full-open position.

It shall be verified that all obstructions, including hands, are out of the path of thedamper blades, and then electrical power or air pressure shall be removed from theactuator to allow the actuator’s spring return feature to close the damper.

It shall be visually confirmed that the damper closes completely.

Electrical power or air pressure shall be reapplied to reopen the damper.

It shall be visually confirmed that the damper is in the full-open position.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

22 of 44 12/8/2014 2:33 PM

Page 24: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

7.6.5

All inspections and testing shall be documented indicating the location of the damper, dateof inspection, name of inspector, and deficiencies discovered. The documentation shall havespace to indicate when and how the deficiencies were corrected.

7.6.6

All documentation shall be maintained by the property owner and available for review by theAHJ.

7.7 Maintenance.

7.7.1

Any reports of abrupt changes in airflow or noise from the duct system shall be investigated toverify that it is not related to damper operation.

7.7.2*

All exposed moving parts of the damper shall be dry lubricated as required by themanufacturer.

7.7.3

If the damper is not operable, repairs shall begin as soon as possible.

7.7.4

Following any repairs, the damper shall be tested for proper operation in accordance withSection 7.6.

7.7.5

Smoke damper actuation shall be initiated at a time interval recommended by the actuatormanufacturer.

7.7.6

All maintenance shall be documented and records shall be retained in accordance with7.6.4 7.6.4.1 and 7.6.4.3 .

Supplemental Information

File Name Description

Sec_6.6_6.7_SR_9_edited_KB_review.docxSec 6.6, 6.7 (SR 9) reviewed by SL, queries answered 10/21/14

Submitter Information Verification

Submitter Full Name: Kristin Bigda

Organization: National Fire Protection Assoc

Street Address:

City:

State:

Zip:

Submittal Date: Tue Oct 07 09:34:57 EDT 2014

Committee Statement

CommitteeStatement:

The revised provisions for the periodic inspection and testing of smoke dampers is aresults of a task group that was assembled after the First Draft meeting to continue thework of addressing current industry issues related to the this issue. The frequencies forinspection have not changed, but additional clarification has been provided related to thetest method for dampers with motorized actuators. The new text will provide necessary

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

23 of 44 12/8/2014 2:33 PM

Page 25: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

clarification as to what steps need to be taken during the inspection and testing;guidance that was not provided in earlier editions of NFPA 105.

ResponseMessage:

Public Comment No. 7-NFPA 105-2014 [Section No. 6.6.6.1]

Public Comment No. 8-NFPA 105-2014 [Section No. 6.6.6.1]

Public Comment No. 3-NFPA 105-2014 [Section No. 6.6.5]

Public Comment No. 4-NFPA 105-2014 [Section No. 6.6.6.1]

Ballot Results

This item has passed ballot

30 Eligible Voters

9 Not Returned

21 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cravy, Richard L.

Durand, Luc

Groesbeck, Scott

Hicks, Jr., Harold D.

Mathews, John S.

Patton, Vernon J.

Reynolds, Steven P.

Sack, Grayson

Schreiber, Steve

Affirmative All

Campbell, Bruce G.

Conner, William

Gorrell, Jerrold S.

Gould, Jeffrey E.

Guffey, William F.

Hahn, Steven C.

Holt, Charles C.

Janicak, Thomas R.

Kenney, Lynn

Koffel, William E.

Kokesh, Nancy L.

Peterkin, James S.

Rispoli, Ronald

Rubright, Thomas M.

Salamone, Thomas A.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

24 of 44 12/8/2014 2:33 PM

Page 26: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Savage, Sr., Michael L.

Tierney, Michael

Tom, Garrett S.

Utiskul, Yunyong P.

Woods, Luke C.

Yuen, Anthony W.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

25 of 44 12/8/2014 2:33 PM

Page 27: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Second Revision No. 12-NFPA 105-2014 [ Chapter 7 ]

Chapter 6 Swinging Doors

6.1* General.

This chapter shall covers the installation of side-hinged and side- pivoted swinging smokedoor assemblies.

6.2 Swinging Doors with Fire Protection Ratings.

Fire door assemblies that are intended for use as smoke door assemblies shall also complywith NFPA 80.

6.3* Swinging Doors Without Fire Protection Ratings.

Doors without fire protection ratings shall be permitted to be used as smoke door assembliesin door openings not required to be protected by fire doors.

6.3.1* Doors.

Non-fire-rated door leaves shall not be less than 1¾ in. (44 mm) thick, solid-bonded woodcore or of equivalent design that resists fire for a minimum of 20 minutes. Non-fire-rated doorleaves shall be of a design that resists the passage of smoke.

6.3.1.1*

Vertical edges of new composite and wood door leaves shall be square edged or beveled.

6.3.1.2

Doors installed in pairs shall be beveled or have astragals or rabbets at meeting edges.

6.3.1.3

Doors shall be flush mounted in door frames.

6.3.1.4

Dutch doors shall be permitted to be used, provided they comply with the following:

(1) Both the upper leaf and the lower leaf are equipped with a latching device.

(2) The meeting edges of the upper and lower leaves are equipped with an astragal or arabbet.

6.3.1.5

Louvers and transfer grilles shall not be permitted in doors.

6.3.2 Door Frames.

Door frames shall be labeled or comply with 6.3.2.1.

6.3.2.1

Where permitted by other standards, door frames shall be of steel construction or shall be ofother designs that have been tested and reported by a nationally recognized testing agency inaccordance with NFPA 252; ANSI/UL 10B, Standard for Fire Tests of Door Assemblies; and orANSI/UL 10C, Standard for Positive Pressure Fire Tests of Door Assemblies.

6.3.2.2*

Door frames with terminated stops shall be permitted, provided that the lowest portion of theterminated stops is not greater than 6 in. (152 mm) above the bottom of the frame.

6.3.2.3 Supporting Construction.

Wall openings shall be constructed to readily accept the door frames.

6.3.2.4

The door frames shall be considered to be non–load bearing.

6.3.2.5

Frames shall be securely anchored to the wall construction.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

26 of 44 12/8/2014 2:33 PM

Page 28: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

6.3.3* Clearances.

Doors in smoke partitions shall have clearances in accordance with NFPA 80.

6.3.3.1*

Doors in smoke barriers shall close the opening, leaving only the minimum clearancenecessary for proper operation. The clearance under the bottom of a new door shall be amaximum of 3⁄4 in. (19 mm).

6.3.3.2

The maximum clearance between the bottom of side-hinged or -pivoted swinging smokedoors and the finished floor shall be not greater than 3⁄4 in. (19 mm), unless otherwisepermitted.

6.3.3.3

Where the bottom of the door is more than 38 in. (965 mm) above the finished floor, themaximum clearance under the door shall not exceed 3⁄8 in. (9.5 10 mm).

6.3.4* Latching Hardware.

Where required, smoke doors without fire protection rating shall be provided with hardwarethat provides positive latching.

6.3.5 Operation of Doors.

Doors shall be arranged to be either self-closing or automatic closing, where required, unlessotherwise exempted.

6.3.5.1* Self-Closing.

Self-closing doors shall swing easily and freely and shall be equipped with a closing devicethat closes and latches the door , the door, causing it to latch, each time it is opened the doorcloses .

6.3.5.2

The closing mechanism shall not have a hold-open feature.

6.3.5.3 Automatic Closing.

Automatic-closing doors shall be permitted to close automatically by means of the installationof a closing device and one of the following:

(1) A separate, labeled, fail-safe door holder/release device(s) or a hold-open mechanismthat shall be permitted to be an integral part of the basic closing device and a doorholder device that manually releases the door when pulled or pushed Upon release ofthe hold-open mechanism, the leaf becomes self-closing.

(2) An integral closing device that allows the doors to swing freely and that automaticallycloses the doors during an alarm condition, provided the hold-open mechanisms arereleased by one or a combination of automatic fire detectors acceptable to the AHJ, anda hold-open mechanism that manually releases the door when pulled or pushed Therelease device is designed so that the leaf instantly releases manually and, uponrelease, becomes self-closing, or the leaf can be readily closed.

(3) The automatic releasing mechanism or medium is activated by the operation ofapproved smoke detectors installed in accordance with the requirements for smokedetectors for door leaf release service in NFPA 72 .

(4) Upon loss of power to the hold-open device, the hold-open mechanism is released andthe door leaf becomes self-closing.

(5) The release by means of smoke detection of one door leaf in a smokeproof enclosure ora stair enclosure results in closing all door leaves serving the enclosure.

(6) Where required, doors properly latch upon closing.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

27 of 44 12/8/2014 2:33 PM

Page 29: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

6.3.5.4 Power-Operated Doors.

Power-operated doors shall be equipped with a releasing device that automaticallydisconnects the power operator at the time of fire, allowing a self-closing or automatic deviceto close the door regardless of power failure or manual operation, provided all the followingcriteria are met:

(1) The door is equipped with a means for keeping the door closed that is acceptable to theAHJ.

(2) The device used is capable of keeping the door fully closed if a force of 5 lbf (22 N) isapplied to the latch edge of swinging doors, whether or not power is applied.

6.3.6* Builders Hardware

6.3.6.1 Conventional Hinges.

Conventional hinges used on doors with closing devices shall have ball bearings oranti-friction bearings and meet the requirements of ANSI/BHMA A156.1, Standard for Buttsand Hinges.

6.3.6.1.1

Hinges shall be sized in thickness, height, and width in accordance with the hingemanufacturer's recommended guidelines. Hinges shall have brass/bronze or steel basematerials or be stainless steel.

6.3.6.1.2

Hinges shall have brass/bronze or steel base materials or be stainless steel.

6.3.6.1.3

Doors up to 60 in. (1.52 m) in height shall be provided with two hinges and an additional hingefor each additional 30 in. (0.76 m) of door height or fraction thereof.

6.3.6.1.4

The distance between hinges shall be permitted to exceed 30 in. (0.76 m).

6.3.6.1.5

Where spring hinges are used, at least two shall be provided.

6.3.6.2 Pivots.

Pivots shall be in compliance with NFPA 80.

6.3.6.3 Continuous Hinges.

Continuous hinges shall be in compliance with NFPA 80.

6.3.6.4* Locks and Latches.

Locking and latching shall comply with NFPA 80.

6.3.6.4.1 Panic Hardware.

Where panic hardware is utilized, the latching device shall not be permitted to bemechanically held in the retracted position.

6.3.6.4.2 Roller Latches.

Where permitted, roller latches that are capable of keeping the doors closed when a force of 5lbf (22 N) is applied to the latch edge of the door shall be permitted to be used. Latchingarrangements that do not provide positive latching in the normal mode shall be permitted tobe used provided that, in a fire emergency, the door becomes positively latched by means ofan automatic fail-safe device that is activated by an automatic fire detector. [ 80: 6.4.4.3.3]

6.3.6.4.3

Strike plates for locks and latches on pairs of doors shall not have extended lips that preventastragals from sealing the gap at the meeting edges of the doors.

6.3.6.5 Door-Closing Devices.

Door-closing devices, other than spring hinges, shall meet the requirements of ANSI/BHMAA156.4, Door Controls — Closers, Grade 1.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

28 of 44 12/8/2014 2:33 PM

Page 30: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

6.3.6.5.1

Where non-fire-rated doors are permitted to be held open, the door closing device shall bepermitted to have an integral friction hold-open feature that permits the door to be closed whenpulled or pushed.

6.3.6.5.2

Doors arranged for automatic closing shall have a closing device that meets the requirementsof 6.3.5.3.

6.3.6.6 Door Holder/Release Devices.

6.3.6.6.1

Door holder/release devices for automatic-closing doors shall be installed in accordance withthe manufacturer's instructions and in conformance with the individual manufacturer'spublished listings.

6.3.6.6.2

Where required for non-fire-rated smoke doors without door closers, only door holder devicesthat release when pushed or pulled shall be permitted.

6.3.6.7* Protection Plates.

Doors without fire protection rating are permitted to have non-rated, factory- or field-appliedprotection plates of unlimited size, unless otherwise restricted by the door or protection platemanufacturers' specifications.

6.3.6.8* Attaching Hardware to Doors and Frames.

Hardware items shall be attached to doors and frames in accordance with NFPA 80.

6.4 Vision Panels in Doors.

6.4.1

The perimeter of the glazing material and vision panel frames shall be sealed to resist thepassage of smoke. Glazing materials shall be capable of resisting the passage of smoke.

6.4.2

Vision panels in smoke doors required to have a fire protection rating shall comply with NFPA80 and shall not exceed the sizes tested in accordance with the door manufacturer'spublished listings. The perimeter of the glazing material and vision panel frames shall besealed to resist the passage of smoke at temperatures up to 400°F (204°C).

6.4.3

Vision panels in smoke doors required to have a fire protection rating shall comply withNFPA 80 .

6.5 Glazing in Sidelight and Transom Light Frames.

6.5.1

The perimeter of the glazing material shall be sealed to resist the passage of smoke. Glazingmaterials shall be capable of resisting the passage of smoke.

6.5.2*

Glazing in sidelight and transom light frames shall comply with NFPA 80 and shall notexceed the sizes tested in accordance with the door manufacturer's published listings. Theperimeter of the glazing material and sidelight and transom frames shall be sealed to resistthe passage of smoke at temperatures up to 400°F (204°C).

6.5.3

Glazing in sidelight and transom light frames that are required to be fire rated shall complywith NFPA 80 .

6.6 Side Panel and Transom Panel Frames.

6.6.1

The perimeter of fixed solid panels used in side panel and transom panel frames shall besealed to resist the passage of smoke.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

29 of 44 12/8/2014 2:33 PM

Page 31: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

6.6.2

Removable panels shall be permitted, provided they are gasketed in compliance with Section6.7 to resist the passage of smoke .

6.7* Gasketing and Astragals.

6.7.1 Gasketing.

The Where required by the door listing, the gaps between the top and vertical edges of thedoor and frame and between the meeting edges of pairs of doors shall be closed with labeledgasketing material in accordance with the gasketing manufacturer's published listings.

6.7.1.1*

Gasketing material shall form a continuous seal along the top and vertical edges of the doorsand at meeting edges of pairs of doors.

6.7.1.2*

Where mortising of doors to receive hardware items creates a void along the vertical or topedges of doors, soffit-mounted gasketing shall be required.

6.7.1.3

Where required, gaps between the bottom of the doors and the floor shall be closed withlabeled gasketing in accordance with the gasketing manufacturer's published listing.

6.7.1.4

Automatic door bottoms that close the gap between the bottom of the door and the floor orthreshold shall be permitted to be installed.

6.7.2

Where required, gaps between the bottom of the doors and the floor shall be closed withlabeled gasketing in accordance with the gasketing manufacturer's published listing.

6.7.2.1

Where required, automatic door bottoms that close the gap between the bottom of the doorand the floor or threshold shall be permitted to be installed.

6.7.2 Astragals.

Doors swinging in pairs, where located with a means of egress, shall not be equipped withastragals that inhibit the free use of either leaf.

Supplemental Information

File Name Description

Chapter_7_SR_12_edited_KB_review.docxCh 7 (SR 12) reviewed by SL, queries answered 10/21/14

A_for_Ch_7_SR_12_edited_10.15_KB_review.docxAnnex A for Ch 7 (SR 12) reviewed by SL, queries answered 10/21/14

Submitter Information Verification

Submitter Full Name: Kristin Bigda

Organization: National Fire Protection Assoc

Street Address:

City:

State:

Zip:

Submittal Date: Tue Oct 07 15:47:30 EDT 2014

Committee Statement

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

30 of 44 12/8/2014 2:33 PM

Page 32: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

CommitteeStatement:

Proposed Chapter 7 is a new chapter for inclusion in NFPA 105 specifically for theinstallation of swinging smoke door assemblies. This chapter is a result of task groupwork and was continued from the First Draft. The task group work wads discussed andvoted on by the committee. Additional refinements were made to the First Draft text toaddress any additional outstanding issues. Prior to this edition of the standard, littleguidance was provided in NFPA 105 to address the installation of smoke doorassemblies. In addition, the current installation requirements provide minimal differencesbetween the types of smoke doors that are present in the field. Chapter 7 introducesNFPA 105 to providing door specific installation criteria, consistent in format to what isfound in NFPA 80 in the door specific chapters. One unique aspect of smoke doors that isaddressed in the proposed language is that smoke doors may or may not have beentested to be fire-rated. The proposed text addressed both types of smoke doorassemblies: fire-rated and non-fire rated.

Chapter 7 will now be Chapter 6 and vice versa.

Annex A Material is also being added.

ResponseMessage:

Public Comment No. 11-NFPA 105-2014 [Section No. 7.3.1 [Excluding any Sub-Sections]]

Public Comment No. 12-NFPA 105-2014 [Section No. 7.3.5.1]

Public Comment No. 13-NFPA 105-2014 [Section No. 7.3.5.3]

Ballot Results

This item has passed ballot

30 Eligible Voters

9 Not Returned

21 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cravy, Richard L.

Durand, Luc

Groesbeck, Scott

Hicks, Jr., Harold D.

Mathews, John S.

Patton, Vernon J.

Reynolds, Steven P.

Sack, Grayson

Schreiber, Steve

Affirmative All

Campbell, Bruce G.

Conner, William

Gorrell, Jerrold S.

Gould, Jeffrey E.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

31 of 44 12/8/2014 2:33 PM

Page 33: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Guffey, William F.

Hahn, Steven C.

Holt, Charles C.

Janicak, Thomas R.

Kenney, Lynn

Koffel, William E.

Kokesh, Nancy L.

Peterkin, James S.

Rispoli, Ronald

Rubright, Thomas M.

Salamone, Thomas A.

Savage, Sr., Michael L.

Tierney, Michael

Tom, Garrett S.

Utiskul, Yunyong P.

Woods, Luke C.

Yuen, Anthony W.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

32 of 44 12/8/2014 2:33 PM

Page 34: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Second Revision No. 7-NFPA 105-2014 [ New Section after 7.7.3 ]

Chapter 8 Smoke Protective Curtain Assemblies

8.1 General.

8.1.1*

This chapter shall cover the installation, inspection, testing, and maintenance of smokeprotective curtain assemblies installed to protect vertical openings.

8.1.2

Smoke protective curtain assemblies that are protecting vertical openings shall be airleakage tested in accordance with ANSI/UL 1784, Air Leakage Tests of Door Assemblies .

8.1.3

Smoke protective curtain assembles shall be identified by an “S” label attached to the

bottom bar of the curtain indicating a maximum air leakage rate of 3 ft 3 /min/ft 2 (0.9

m 3 /min /m 2 ) and the tested pressure differential of 0.1 in., 0.2 in., or 0.3 in. of water (25Pa, 50 Pa, 75 Pa).

8.2 Mounting of Smoke Protective Curtain Assemblies.

8.2.1

Smoke protective curtain assemblies shall be mounted to supporting construction inaccordance with their listing and with the manufacturer’s installation instructions.

8.2.2

Items that are not a part of a smoke protective curtain assembly shall not be field attached toany component of a smoke protective curtain assembly.

8.2.3

Access to, and clearances between, surrounding construction and a smoke protectivecurtain assembly shall allow for required testing and maintenance.

8.3 Assembly Components.

8.3.1

Smoke protective curtain assemblies shall be either self-closing or automatic-closing.

8.3.1.1

Smoke protective curtain assemblies shall not have a delay in the initiation of closing ofmore than 10 seconds.

8.3.1.2

Smoke protective curtain assemblies shall have an average closing speed of not less than 6in./sec (152 mm/sec) or more than 24 in./sec (610 mm/sec).

8.3.2*

Curtains shall be permitted to be sewn by qualified persons in accordance with themanufacturer’s instructions.

8.4 Power Operators.

Power operators shall be provided with a standby or an emergency power source to closethe curtain upon activation or shall be capable of closing the curtain without power.

8.5 Installation.

Smoke protective curtain assemblies shall be installed in accordance with their listing andwith the manufacturer's installation instructions.

8.6 Inspection, Testing, and Maintenance.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

33 of 44 12/8/2014 2:33 PM

Page 35: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

8.6.1

Following completion of installation, smoke protective curtains shall be inspected and testedin accordance with Section 8.7 .

8.6.2

A record of all inspections and testing shall be signed by the inspector and kept forinspection by the AHJ.

8.6.2.1

Records of acceptance testing following completion of installation shall be retained for thelife of the assembly.

8.6.2.2

Records of periodic inspections and testing shall be retained for a period of at least 3 years.

8.6.2.3

The records shall be on a medium that will survive the retention period. Paper or electronicmedia shall be permitted. [ 72: 14.6.2.3]

8.6.2.4

A record of all inspections and testing shall be provided that includes, but is not limited to,the following information:

(1) Date of inspection

(2) Name of facility

(3) Address of facility

(4) Name of person(s) performing inspections and testing

(5) Company name and address of inspecting company

(6) Signature of inspector of record

(7) Individual record of each inspected and tested smoke protective curtain assembly

(8) Opening identifier and location of each inspected and tested smoke protective curtain

(9) Type and description of each inspected and tested smoke protective curtain

(10) Verification of visual inspection and functional operation

(11) Listing of any deficiencies

8.6.2.5

Upon completion of maintenance work, smoke protective curtain assemblies shall beinspected and tested in accordance with Section 8.7 .

8.7 Acceptance Testing.

8.7.1

Acceptance testing of smoke protective curtain assemblies shall be performed by a qualifiedperson with knowledge and understanding of the operating components of the type ofassembly being subject to testing.

8.7.2

Before testing, a visual inspection shall be performed to identify any damaged or missingparts that can create a hazard during testing or affect operation or resetting.

8.7.3

Acceptance testing shall include the closing of the smoke protective curtain assembly by allmeans of activation.

8.7.4

A record of these inspections and testing shall be made in accordance with Section 8.6 .

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

34 of 44 12/8/2014 2:33 PM

Page 36: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

8.7.5

The following items shall be verified:

(1) Labels are clearly visible and legible.

(2) No open holes or breaks exist in surfaces of the curtain or in the stitching of thecurtain.

(3) Curtain, guides, and coil are aligned, level, plumb, and true.

(4) Mounting and assembly bolts are intact and secured.

(5) Attachments to jambs are with bolts, expansion anchors, or as otherwise required bythe listing.

(6) Smoke detectors, if equipped, are installed, operational, and in accordance withNFPA 72

(7) No parts are missing or broken.

(8) Auxiliary hardware items that interfere or prohibit operation are not installed on thecurtain or frame.

(9) No field modifications to the smoke protective curtain assembly have been performedthat void the label.

(10) Smoke protective curtain assemblies have an average closing speed of not less than6 in./ sec (152 mm/sec) or more than 24 in./sec (610 mm/sec).

8.7.6

Smoke protective curtain assemblies shall be drop-tested twice.

8.7.7

Fusible links, release devices, and other movable parts shall not be painted or coated withother materials that could interfere with the operation of the assembly.

8.8 Closing Devices.

8.8.1

Smoke protective curtain assemblies shall be inspected and tested to check for properoperation and full closure.

8.8.2

Resetting of the automatic-closing device shall be performed in accordance with themanufacturer’s instructions.

8.9 Periodic Inspection and Testing.

8.9.1

Periodic inspections and testing of smoke protective curtain assemblies shall be performednot less than annually.

8.9.2

As a minimum, the provisions of Section 8.7 shall be included in the periodic inspectionand testing procedure.

8.10 Maintenance.

8.10.1

Repairs shall be made, and defects that could interfere with operation shall be correctedwithout delay.

8.10.2

Any breaks in the face covering of curtains shall be repaired in accordance withmanufacturer’s requirements without delay.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

35 of 44 12/8/2014 2:33 PM

Page 37: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

8.10.3

Where a smoke protective curtain assembly or any part of its appurtenances is damaged tothe extent that it could impair the assembly’s proper emergency function, the followingactions shall be performed:

(1) The smoke protective curtain assembly or any part of its appurtenances shall berepaired with labeled parts or parts obtained from the original manufacturer.

(2) The smoke protective curtain assembly shall be tested to ensure emergency operationand closing upon completion of the repairs.

8.10.4

If repairs cannot be made with labeled components or parts obtained from the originalmanufacturer, the smoke protective curtain assembly or appurtenances shall be replaced.

Supplemental Information

File Name Description

Annex_material_for_SR-7.docx

Chapter_8_SR_7_edited_KB_review.docx

Submitter Information Verification

Submitter Full Name: Kristin Bigda

Organization: National Fire Protection Assoc

Street Address:

City:

State:

Zip:

Submittal Date: Tue Oct 07 08:49:48 EDT 2014

Committee Statement

CommitteeStatement:

Smoke protective curtain assemblies are being used in the field to protect openings fromthe passage of smoke, thus NFPA 105 should provide guidance on these type of openingprotectives. New Chapter 8 represents the work of a task group that was establishedduring the First Draft meeting to further explore and evaluate the necessary requirementsfor fire and smoke curtains. The language is an expansion of the work completed at theFirst Draft meeting and is in response to the developed committee inputs. The task groupworked together to develop requirements that address the installation, inspection, andtesting of these fire and smoke curtain products. An associated definition, and Annexmaterial were also developed to clarify the application of the new chapter.

For the annex:

New Chapter 8 represents the work of a task group that was established during the FirstDraft meeting to further explore and evaluate the necessary requirements for fire andsmoke curtains. The language is an expansion of the work completed at the First Draftmeeting and is in response to the developed committee inputs. The task group workedtogether to develop requirements that address the installation, inspection, and testing ofthese fire and smoke curtain products.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

36 of 44 12/8/2014 2:33 PM

Page 38: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

ResponseMessage:

Public Comment No. 15-NFPA 105-2014 [New Section after 7.7.3]

Ballot Results

This item has passed ballot

30 Eligible Voters

9 Not Returned

20 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

1 Abstention

Not Returned

Cravy, Richard L.

Durand, Luc

Groesbeck, Scott

Hicks, Jr., Harold D.

Mathews, John S.

Patton, Vernon J.

Reynolds, Steven P.

Sack, Grayson

Schreiber, Steve

Affirmative All

Campbell, Bruce G.

Conner, William

Gorrell, Jerrold S.

Gould, Jeffrey E.

Guffey, William F.

Hahn, Steven C.

Holt, Charles C.

Janicak, Thomas R.

Kenney, Lynn

Kokesh, Nancy L.

Peterkin, James S.

Rispoli, Ronald

Rubright, Thomas M.

Salamone, Thomas A.

Savage, Sr., Michael L.

Tierney, Michael

Tom, Garrett S.

Utiskul, Yunyong P.

Woods, Luke C.

Yuen, Anthony W.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

37 of 44 12/8/2014 2:33 PM

Page 39: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Abstention

Koffel, William E.

In accordance with the policy of the Standards Council, I have abstained from voting on this item.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

38 of 44 12/8/2014 2:33 PM

Page 40: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Second Revision No. 2-NFPA 105-2014 [ Section No. C.1.2.3 ]

C.1.2.4 UL Publications.

Underwriters Laboratories Inc., 333 Pfingsten Road, Northbrook, IL 60062-2096.

ANSI/UL 1784, Air Leakage Tests of Door Assemblies, 2004 2009 .

Submitter Information Verification

Submitter Full Name: [ Not Specified ]

Organization: [ Not Specified ]

Street Address:

City:

State:

Zip:

Submittal Date: Tue Sep 30 19:09:17 EDT 2014

Committee Statement

Committee Statement: Revision update.

Response Message:

Ballot Results

This item has passed ballot

30 Eligible Voters

9 Not Returned

21 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cravy, Richard L.

Durand, Luc

Groesbeck, Scott

Hicks, Jr., Harold D.

Mathews, John S.

Patton, Vernon J.

Reynolds, Steven P.

Sack, Grayson

Schreiber, Steve

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

39 of 44 12/8/2014 2:33 PM

Page 41: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Affirmative All

Campbell, Bruce G.

Conner, William

Gorrell, Jerrold S.

Gould, Jeffrey E.

Guffey, William F.

Hahn, Steven C.

Holt, Charles C.

Janicak, Thomas R.

Kenney, Lynn

Koffel, William E.

Kokesh, Nancy L.

Peterkin, James S.

Rispoli, Ronald

Rubright, Thomas M.

Salamone, Thomas A.

Savage, Sr., Michael L.

Tierney, Michael

Tom, Garrett S.

Utiskul, Yunyong P.

Woods, Luke C.

Yuen, Anthony W.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

40 of 44 12/8/2014 2:33 PM

Page 42: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Second Revision No. 4-NFPA 105-2014 [ Section No. C.1.2.5 ]

C.1.2.6 Window and Door Manufacturers Association WDMA Publications.

Window and Door Manufacturers Association, 2025 M Street, NW, Suite 800, Washington,DC, 20036-3309.

ANSI/ WDMA I.S. 1A, Industry Standard for Architectural Wood Flush Doors, 2011 2013 .

ANSI/ WDMA I.S. 6A, Industry Standard for Interior Architectural Wood Stile and Rail Doors,2013.

Submitter Information Verification

Submitter Full Name: [ Not Specified ]

Organization: [ Not Specified ]

Street Address:

City:

State:

Zip:

Submittal Date: Tue Sep 30 19:11:00 EDT 2014

Committee Statement

Committee Statement: Revision update.

Response Message:

Ballot Results

This item has passed ballot

30 Eligible Voters

9 Not Returned

21 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cravy, Richard L.

Durand, Luc

Groesbeck, Scott

Hicks, Jr., Harold D.

Mathews, John S.

Patton, Vernon J.

Reynolds, Steven P.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

41 of 44 12/8/2014 2:33 PM

Page 43: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Sack, Grayson

Schreiber, Steve

Affirmative All

Campbell, Bruce G.

Conner, William

Gorrell, Jerrold S.

Gould, Jeffrey E.

Guffey, William F.

Hahn, Steven C.

Holt, Charles C.

Janicak, Thomas R.

Kenney, Lynn

Koffel, William E.

Kokesh, Nancy L.

Peterkin, James S.

Rispoli, Ronald

Rubright, Thomas M.

Salamone, Thomas A.

Savage, Sr., Michael L.

Tierney, Michael

Tom, Garrett S.

Utiskul, Yunyong P.

Woods, Luke C.

Yuen, Anthony W.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

42 of 44 12/8/2014 2:33 PM

Page 44: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Second Revision No. 5-NFPA 105-2014 [ Section No. C.1.2.6 ]

C.1.2.7 Other Publications.

HMMA 840-07, Guide Specification for Installation and Storage of Hollow Metal Doors andFrames, 2007.

ANSI/ SDI A250.8, Recommended Specifications for Standard Steel Doors and Frames(SDI-100) , 2008 2014 .

Submitter Information Verification

Submitter Full Name: [ Not Specified ]

Organization: [ Not Specified ]

Street Address:

City:

State:

Zip:

Submittal Date: Tue Sep 30 19:11:37 EDT 2014

Committee Statement

Committee Statement: Reference update.

Response Message:

Ballot Results

This item has passed ballot

30 Eligible Voters

9 Not Returned

21 Affirmative All

0 Affirmative with Comments

0 Negative with Comments

0 Abstention

Not Returned

Cravy, Richard L.

Durand, Luc

Groesbeck, Scott

Hicks, Jr., Harold D.

Mathews, John S.

Patton, Vernon J.

Reynolds, Steven P.

Sack, Grayson

Schreiber, Steve

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

43 of 44 12/8/2014 2:33 PM

Page 45: First Draft Meeting PPT - NFPA · 2014. 12. 8. · 20 Members Voted Affirmative on All Revisions (1 with comment, L. Woods) ... NFPA 92, Standard for Smoke Control Systems, 2015 edition.

Affirmative All

Campbell, Bruce G.

Conner, William

Gorrell, Jerrold S.

Gould, Jeffrey E.

Guffey, William F.

Hahn, Steven C.

Holt, Charles C.

Janicak, Thomas R.

Kenney, Lynn

Koffel, William E.

Kokesh, Nancy L.

Peterkin, James S.

Rispoli, Ronald

Rubright, Thomas M.

Salamone, Thomas A.

Savage, Sr., Michael L.

Tierney, Michael

Tom, Garrett S.

Utiskul, Yunyong P.

Woods, Luke C.

Yuen, Anthony W.

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentPara...

44 of 44 12/8/2014 2:33 PM