First commercial PtG-plant with biological methanation goes live ...

18
© Viessmann Werke First commercial PtG-plant with biological methanation goes live Technical forum h2fc fair 14.04.2015 at Hannover Messe

Transcript of First commercial PtG-plant with biological methanation goes live ...

Page 1: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

First commercial PtG-plant with biological methanation goes live

Technical forum h2fc fair14.04.2015 at Hannover Messe

Page 2: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

1. Viessmann Group and MicrobEnergy GmbH

2. BioPower2Gas – Project Allendorf (Eder)

3. System operation and results

14.0

4.20

15Pa

ge 2

Mic

robE

nerg

y G

mbH

-Bi

olog

ical

met

hani

satio

n -P

tG-p

roje

ct A

llend

orf (

Eder

)

Agenda

Page 3: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

Company foundation

Employees

Billion EUR turnover

Production companiesin 11 countries

Countries withsales activities and distribution partners

Branchesworldwide

Percent of turnover derived from export activities

Branches

Distribution partners

1917

2,1

11.400

55

27

74

120

14.0

4.20

15Pa

ge 3

Mic

robE

nerg

y G

mbH

-Bi

olog

ical

met

hani

satio

n -P

tG-p

roje

ct A

llend

orf (

Eder

)

Viessmann Group

Page 4: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

Viessmann Group

Heating technology Industrial solutions Cooling technology

Supervisory Board

14.0

4.20

15Pa

ge 4

Mic

robE

nerg

y G

mbH

-Bi

olog

ical

met

hani

satio

n -P

tG-p

roje

ct A

llend

orf (

Eder

)

Company StructureThree company divisions

Page 5: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

Established: 2012

Headquater: Schwandorf (Bavaria / Opf.)

Employees: 20

Services:

• Power-to-Gas and Biological Methanation Research

• Microbiological know-how and laboratories

• Biogas Technology Develpoment

14.0

4.20

15Pa

ge 5

Mic

robE

nerg

y G

mbH

-Bi

olog

ical

met

hani

satio

n -P

tG-p

roje

ct A

llend

orf (

Eder

)

MicrobEnergy GmbHMember of the Viessmann Group

Page 6: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

Agenda

1. Viessmann Group and MicrobEnergy GmbH

2. BioPower2Gas – Project Allendorf (Eder)

3. System operation and results

14.0

4.20

15Pa

ge 6

Mic

robE

nerg

y G

mbH

-Bi

olog

ical

met

hani

satio

n -P

tG-p

roje

ct A

llend

orf (

Eder

)

Page 7: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

Project BioPower2Gas

Demonstration and comparison of optimally controlable biogas technologies

01.09.2013 – 31.08.2016

7

Page 8: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

Demonstration PlantFunctional Principle

14.0

4.20

15Pa

ge 8

Mic

robE

nerg

y G

mbH

-Bi

olog

ical

met

hani

satio

n -P

tG-p

roje

ct A

llend

orf (

Eder

)

Bivalent operation

Biogas Upgradingof raw biogas in order to adapt

flexibility to CHPs of biogas plants

Energy StorageOf surplus power by using

raw biogas as source for CO2

Monovalent operation

Energy Storageof surplus renewable power by using

seperated CO2 of the Biomethaneupgrading plant

BGPH

2PSA

50% CH450% CO2

95% CH4

SET3% CH4

97% CO2

95% CH4Gas grid

BGP = Biogas PlantSET = Stand-Alone-TankPSA = Pressure swing adsorption

50% CH450% CO2

95% CH4BGP

H2

Gas grid

SET

Power grid

CHP

Page 9: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

Demonstration PlantPlant Design

14.0

4.20

15Pa

ge 9

Mic

robE

nerg

y G

mbH

-Bi

olog

ical

met

hani

satio

n -P

tG-p

roje

ct A

llend

orf (

Eder

)

1

4

3

2

(1) PEM-electrolyzer(2) Biological methanation (5m³-tank)(3) Process and system control(4) Measuring and mechanical process technology

Page 10: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

Demonstration PlantPlant Design PEM-electrolyzer

14.0

4.20

15Pa

ge 1

0

Mic

robE

nerg

y G

mbH

-Bi

olog

ical

met

hani

satio

n -P

tG-p

roje

ct A

llend

orf (

Eder

)

rectifier

2x 150 kW Stack

1/3 MW Stack

control

H2- buffer

O2- separator

Process air

Water treatment

Phase I 60 Nm³/h H2 (5,4 kg/h) 2 stacks á 150kWPhase II +60 Nm³/h H2 1/3 MW-stackSystem pressure 40 barCurrent density 3.000 mA/cm²

Page 11: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

Demonstration PlantLocation biogas plant Allendorf (Eder)

14.0

4.20

15Pa

ge 1

1

Mic

robE

nerg

y G

mbH

-Bi

olog

ical

met

hani

satio

n -P

tG-p

roje

ct A

llend

orf (

Eder

)

Page 12: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

Demonstration PlantRun-in phase

14.0

4.20

15Pa

ge 1

2

Mic

robE

nerg

y G

mbH

-Bi

olog

ical

met

hani

satio

n -P

tG-p

roje

ct A

llend

orf (

Eder

)

Page 13: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

Agenda

1. Viessmann Group and MicrobEnergy GmbH

2. BioPower2Gas – Project Allendorf (Eder)

3. System operation and results

14.0

4.20

15Pa

ge 1

3

Mic

robE

nerg

y G

mbH

-Bi

olog

ical

met

hani

satio

n -P

tG-p

roje

ct A

llend

orf (

Eder

)

Page 14: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

Demonstration PlantInjection of biologically produced methane into gasgrid

14.0

4.20

15Pa

ge 1

4

Mic

robE

nerg

y G

mbH

-Bi

olog

ical

met

hani

satio

n -P

tG-p

roje

ct A

llend

orf (

Eder

)

Input

Flow H2

Flow CO2

OutputQuality

cCH4

cH2

Output

Flow Product

cH2 0,8%

cH4 96%

fH2 15Nm³/h

First injectioninto

national gas grid

02.03.2015

Page 15: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

Demonstration PlantGreenhouse gas reduction potential

14.0

4.20

15Pa

ge 1

5

Mic

robE

nerg

y G

mbH

-Bi

olog

ical

met

hani

satio

n -P

tG-p

roje

ct A

llend

orf (

Eder

)

Page 16: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

Demonstration PlantCertification and gas sales

14.0

4.20

15Pa

ge 1

6

Mic

robE

nerg

y G

mbH

-Bi

olog

ical

met

hani

satio

n -P

tG-p

roje

ct A

llend

orf (

Eder

)

Modell proWindgasSource: Greenpeace Energy

Source: Erdgas Mobil Source: Audi

Heat Market Biofuel Market Fleet Emissions

Page 17: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

first-time gas injection into natural gas grid 2nd March 2015

finishing certification April 2015

plant tours available from April 2015

Contact details:

Thomas HellerTechnical project leader

MicrobEnergy GmbH

Bayernwerk 892421 Schwandorf

phone: +49 (0)9431 751-190fax: +49 (0)9431 751-5190mobile: +49 (0)151 195 55 230e-mail: [email protected]: www.microbenergy.com

14.0

4.20

15Pa

ge 1

7

Mic

robE

nerg

y G

mbH

-Bi

olog

ical

met

hani

satio

n -P

tG-p

roje

ct A

llend

orf (

Eder

)

Demonstration PlantProject Schedule

Page 18: First commercial PtG-plant with biological methanation goes live ...

© V

iess

man

n W

erke

14.0

4.20

15Pa

ge 1

8

Mic

robE

nerg

y G

mbH

-Bi

olog

ical

met

hani

satio

n -P

tG-p

roje

ct A

llend

orf (

Eder

)