Finish Flooring Finish flooring is any material used as the
final surface of a floor.
Hardwoods and Softwoods are available as
strip flooring and as random width planks or
unit blocks.
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 5/29
Wood Flooring
Mostly used inresidential flooring,
wood floors have thestrength and durabilityto withstand wear.
Popular hardwoods:
oak, maple, birch, and beech
Popular softwoods: pine and fir.
Planking flooring: laidwith random widths.
This type of flooring hastongue and groove edges.
Block flooring: laid withthe graining at rightangles.
Square and rectangle unitsare produced, that are heldtogether by glue, metalsplines, or other fasteners.
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 6/29
Wood flooring (continued)
Strip flooring: laid in
random pattern of end
joints. The design is reffered
to as side-and-end
matched .
USE PICTURE: 16-2
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 7/29
Subfloors This adds strength to the structure and
serves as an attaching base for the finish
floor.
Inadequate or improper nailing of subfloors
usually results in squeaky floors.
Most commonly used product is plywood.
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 8/29
InstallingW
ood Strip Flooring After the subfloor is laid
and checked, you must put
down a wall to wall layer of building paper.
Covering the heating plant
or hot air ducts with
double weight paper.
Then chalk line the joistson the paper.
USE PICTURE: 16-4
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 9/29
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 10/29
Nailing The nails used should go through the subfloor and
into the joist.
The first strip should be started along either wall. Leave a ½´ for expansion, the grooved edge next
to the wall.
After perfectly aligning the strip, face nail it. This
means the nail is set below the face and the holefilled.(see illustration on the next slide)
USE PICTURE: 16-6
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 11/29
Nailing (continued) Succeeding strips are
blind nailed.
Remember to arrange the pieces so the joints arewell distributed, and blendcolor and grain.
The pattern should run
uninterrupted throughdoorways and adjoiningrooms.
USE PICTURE: 16-8 inthe bottom box.
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 12/29
Multiroom Layout A setup line is first laid out two flooring widths.
Starter courses are lined up with the setup line
before any nailing. A spline is set in the groove of the starter strip in
order to allow you to lay the strips in either diection.
The last strip will usually need to be ripped, andthe last few strips may be face nailed.
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 13/29
Estimating Strip Flooring First calculate the are in
square feet.
Then add the percentagelisted for the particular
size being used.
This gives you the number
of board feet of strip
flooring needed.
USE FIGURE:16-10
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 14/29
Wood Flooring Over Concrete
Suspended concrete with an air space below do
not require a moisture barrier.
Slab-on-grade installation requires sleepers or screeds. These are wood strips attached to the
concrete surface, which serve as a nailing base.
Concrete on grade or below ground level requires
an approved membrane moisture barrier.
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 15/29
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 16/29
Wood Block Flooring
Also called parquet flooring almost alwaysrequires the use of mastic.
Sometimes asphalt-saturated felt is laid and coatedwith mastic.
If the blocks are to be nailed, procedure is thesame as nailing plank and strip floors, they should
still be laid in the coat of mastic. Due to the difference in manufacturers detailed
instruction should be secured from the productmanufacturer.
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 17/29
PrefinishedW
ood Flooring This the last step in the interior finish
sequence, if chosen.
All trim must be in place with accepted
allowance before this finish floor will be
set. Unless prefinished baseboards are being
used.
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 18/29
Underlayment This prevents finish flooring from checking or
cracking when slight movement takes place in a
wood subfloor. Cementitous Underlayment: suited for use under
ceramic tile floors, it impervious to water.
Hardboard and Particleboard: bridges small gaps,
cups, and cracks. This applied by starting in onecorner and nailing each before the next is laid.Stagger the joints, and should be at right angles tothose in the subfloor. Special adhesives may also be used.
Pl wood: serves the same ur ose as hardboard or
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 19/29
Resilient Floor Tile In order to reduce telegraphing, showing
irregularities on the surface, the underlayment
must be smooth. Often a base layer of felt is laid over the
underlayment to help with this as well.
Laying Tile: after cleaning the surface start at the
center of the room with a chalk line. Snap another chalk line at right angle. Spread adhesive uptocenterlines, butt each tile to the adjoining tile.
Lastly remove any excess adhesive, carefully
following manufacturers¶ directions.
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 20/29
Installing Resilient Tile Over
Concrete Concrete must be dry, smooth, and sound.
Remove any paint or other substance.
Fill in any joints or cracks.
Cover with one coat of primer before
spreading adhesive.
Spread adhesive and follow general tiel
laying instructions.
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 21/29
Self-Adhering Tiles Again flooring must be smooth and free of any
substance.
These tiles should be kept in a warm room 24hours prior to installment.
Remove paper backing, position, and press downfirmly.
Sheeting Vinyl Flooring: only fastened downaround center and seams.While making sure thatthe pattern is matching up trim and fit the sheets.Then the edges are secured with a staple gun.
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 22/29
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 23/29
For Roof
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 24/29
For W
all
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 25/29
JejalurKayu
Mozek JubinWallPaper
GypsumBoard
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 26/29
Gypsum Board digunakan untuk sekatan pada ruang-ruang
yang luas seperti di dalam pejabat, dewan,
surau atau masjid.
Ia boleh dialih-alihkan di mana-mana tempat
yang dikehendaki. Ia diperbuat dari bahan-
bahan gypsum yg sesuai iaitu bahan kapur dan gypsum serta berbentuk kepingan.
Sifatnya tidak terlalu keras tetapi ringan.
8/8/2019 Finish Flooring
http://slidepdf.com/reader/full/finish-flooring 27/29
Kertas binaan
(Wall Paper) Kertas berwarna-warni, kain, plastik dan
sebagainya.