    Financing Analisys

    PLTM Pugeran Project 2 x 3,98 MWKendal

    Developer

    PT. Pembangkit Listrik Tirta Anugrah

  • 8/11/2019 Financial Analisys.xls

    2/12

    COMPANY INFORMATION

    .

    .

  • 8/11/2019 Financial Analisys.xls

    3/12

    Site Conditions

    Project InformationProject name PugeranProject IDProject location

    Sub-district PugeranCity KendalProvince Jawa Tengah

    Latitude of project location NLongitude of project location ERain Intensity mm/year 4500River Basin Area km2 145

    9.413671875

    Site CharacteristicsGross head m 100Forbay Elevation m 657Normal tailwater Elevation m 557Maximum flood tailwater elevation m 562Residual flow m/sFirm flow m/s 9.0Channel Lenght m 2900

    Penstock Diameter m 2Penstock Lenght m 320Road construction/Access Road m 1000Design Number of Turbine Turbine 2

    Financial Assumptions

    Water retribution Rp/KWhAverage Cost of Electricity (Rp/kWh) Rp 656.00Nominal Electricity Escalation Rate %/Year 0%Infation Rate % 6%Discount Rate % 12.5%Interest Rate % 11Debt Term Year 7Debt Ratio % 70Project life Year 15Depreciation Term Year 20Exchange Rate Rp/USD 8700Salvage Value 0.1Tax % 25Hydro plant capacity factor 55Land Acquisition m2 5000 9.4Land Acquisition Price Rp/m2(1000) 20

    PLTM Pugeran Project

    KendalJawa Tengah

    2 x 3,98 MW

    Project Location

  • 8/11/2019 Financial Analisys.xls

    4/12

    System Characteristics

    El. 657

    1. Open Channel2. Forebay3. Penstock 4. Power House5. Turbine6. Tailrace

    El. 557

    Grid type -Design flow m/s 9.413671875Number of turbines turbine 2Turbine peak efficiency % 0.86Turbine efficiency at design flow % 0.83Maximum hydraulic losses % 6Generator efficiency % 95Transformer losses %Parasitic electricity losses %Annual downtime losses % 80

    1

    Level I

    Level II

    2

    3

    45

    6

    H Friction

    H Pressure

    Tank

    Turbine

  • 8/11/2019 Financial Analisys.xls

    5/12

    Small Hydro Turbine Characteristics

    Turbine type Horizontal axis Francis turbine Horizontal axis, 2 jet, 1 runner Pelton impulse turbineNumber of turbines turbine 2 2Flow Rate Per Unit m3/s/Unit 4.706835938 4.706835938Energy Delivery per unit MW/Unit 3.9735 3.614Total Hydro plant capacity MW 7.947 7.228Rated head m 97.46 89.96Peak eff. (Francis) Or Peak eff. Q/jet (Pelton) m3/s 4.20 1.77Design flow m/s 9.413671875 9.413671875Turbine efficiency curve data source - Standard StandardHydro turbine manufacturer MW Voith Siemens Voith SiemensGenerator Rate for 2 Turbine MW 3.974 3.614Turbine manufacture/design coefficient - 4.5 4.5Efficiency adjustment % 0% 0.00Turbine peak efficiency % 93.21 26 0.91Turbine efficiency at design flow % 85.8% 0.86Speed rpm 750 187.50Calculated number of runner blades 13 2.53Calculated runner throat diameter (d) meter 0.84Calculated minimum shaft centerline elevation, m = 564.53Jet diameter (m) = 0.27Penstock Diameter meter 2 2.00Wall Tickness (mm) 19 19Pipe Material 2 2.00Penstock lenght meter 320 320.00Velocity in Penstock 2.996 3.00

    Specific Roughness () 0.00000150 0.00Reynold number 5992929.646 5992929.65Darcy Friction Factor 0.018 0.02

    Loss Coefficient, Zeta Value of Valve 0.13 0.13Total friction Loss (Hfriction) 2.545 2.55

    Max Surge Pressure when turbine off/valve close at ToP = difference in pressure Bar 31.26 @ closing time 0 secSurge Pressure In Systems when Suddenly close Bar 41.00 @ closing time 0 secTime of pressure surge (critical time) in sec Sec 0.70 @ closing time 0 secValve Closing time to avoid water hammer sec 2.30 Max. pressure in System will be 10,3 Bar Min Pressure will be10,1 bar

  • 8/11/2019 Financial Analisys.xls

    6/12

    Horizontal axis Francis turbine Horizontal axis , 2 jet , 1 runner Pelton impulse turbine Turbine Efficiency Curve Data Turbine Efficiency Curve Data

    Flow Turbine Combined Flow Turbine Combinedefficiency running turbine efficiency running turbine

    (%) # efficiency (%) # efficiency

    0% 0.00 0.00 0% 0.00 0.005% 1.00 0.37 5% 1.00 0.86 10% 1.00 0.56 10% 1.00 0.86 15% 1.00 0.70 15% 1.00 0.86

    Turbine Type Sugestion Horizontal axis Francis turbine 20% 1.00 0.75 20% 1.00 0.87 Comment 25% 1.00 0.79 25% 1.00 0.87

    30% 1.00 0.82 30% 1.00 0.87 35% 1.00 0.84 35% 1.00 0.86 40% 1.00 0.86 40% 1.00 0.86 45% 1.00 0.87 45% 1.00 0.86 50% 1.00 0.88 50% 1.00 0.86

    55% 2.00 0.88 55% 2.00 0.86 60% 2.00 0.88 60% 2.00 0.86

    Total Hydro plant capacity MW 7.947 65% 2.00 0.89 65% 2.00 0.86 Energy Equipment Set Rp (1.000,-) 16,857,981 70% 2.00 0.89 70% 2.00 0.86 Hydro plant capacity kW 7946.61 75% 2.00 0.89 75% 2.00 0.86

    MW 7.947 80% 2.00 0.88 80% 2.00 0.86 hydro plant firm capacity kW 85% 2.00 0.88 85% 2.00 0.86 Available flow adjustment factor - 0 90% 2.00 0.88 90% 2.00 0.86 Small hydro plant capacity factor % 55.00 95% 2.00 0.87 95% 2.00 0.86 Annual energy delivered MWh 37,762.30 100% 2.00 0.86 100% 2.00 0.86

    Combination of capacity, head and flow issuitable for this type of turbine. otherwiseHorizontal axis, 2 jet, 1 runner impulse turbineCombination of capacity, head and flow NOTsuitable for this type of turbine.

    0.00

    0.50

    1.00

    0 %

    1 5 %

    3 0 %

    4 5 %

    6 0 %

    7 5 %

    9 0 %

    Combined turbineefficiency

    0.00

    0.50

    1.00

    0 %

    1 5 %

    3 0 %

    4 5 %

    6 0 %

    7 5 %

    9 0 %

    Combined turbineefficiency

    0.000.100.200.30

    0.400.500.600.700.800.901.00

    Efficiency Comparison

    Horizontal axis Francis turbine

    Horizontal axis, 2 jet, 1 runner Pelton impulse turbine

  • 8/11/2019 Financial Analisys.xls

    7/12

    Initial costs (credits) Unit Quantity Unit cost (Rp) Amount (Rp) Costs Companent Ratio

    Rp1,000 Rp. 1000Feasibility study

    Site investigation p-d 30 1,000 30,000 0.07% 3%Resource assessment project 1 10,000 10,000 0.02% 1%Environmental assessment p-d 30 1,200 36,000 0.08% 4%Preliminary design p-d 30 1,200 36,000 0.08% 4%Detailed cost estimate p-d 15 1,200 18,000 0.04% 2%GHG baseline study & MP project 1 1,200 1,200 0.00% 0%Report preparation p-d 1 25,000 25,000 0.06% 3%Project management M 12 60,000 720,000 1.67% 77%Travel & accommodation p-trip 60 1,000 60,000 0.14% 6%

    Sub-total: 936,200

    Development - 0.00%Contract negotiations p-d 1 50,000 50,000 0.12% 4%Permits & approvals p-d 1 15,000 15,000 0.03% 1%Site survey & land rights p-d 1 160,000 160,000 0.37% 14%GHG validation & registrati project 1 250,000 250,000 0.58% 22%

    Project financing p-d 1 500,000 500,000 1.16% 44%Legal & accounting p-d 1 75,000 75,000 0.17% 7%Project management p-d 1 25,000 25,000 0.06% 2%Travel & accommodation p-trip 50 1,000 50,000 0.12% 4%

    Sub-total: 1,125,000

    Engineering - 0.00%Site & building design p-d 60 1,000 60,000 0.14% 7%Mechanical design p-d 60 1,000 60,000 0.14% 7%

    Electrical design p-d 60 1,000 60,000 0.14% 7%Civil design p-d 60 1,000 60,000 0.14% 7%Tenders & contracting p-d 60 250 15,000 0.03% 2%Construction supervision p-d 360 1,750 630,000 1.46% 71%

    Sub-total: 885,000 0.00%

    Power system - 0.00%Hydro turbine kW 7.95 16,857,981 16,857,981 39.02% 94%Transmission line km 200 5,000 1,000,000 2.31% 6%

    Substation project 1 - - 0.00% 0%Energy efficiency measures project 1 - - 0.00% 0%

    Sub-total: 17,857,981 0.00%

    0% 20% 40% 60% 80% 100%

    Site investigationEnvironmental assessment

    Detailed cost estimateReport preparation

    Travel & accommodation

    Feasibility study

    0% 10% 20% 30% 40% 50%

    Contract negotiations

    Site survey & land rights

    Project financing

    Project management

    Development

    0% 20% 40% 60% 80%

    Site & building design

    Civil design

    Engineering

    0% 20% 40% 60% 80% 100%Hydro turbine

    Power system

  • 8/11/2019 Financial Analisys.xls

    8/12

    Balance of system & miscellaneous - 0.00%Delivery equipment project 1 1,300,000 1,300,000 3.01% 6%Road construction km 1,000 3,000 3,000,000 Preparation equipment project 1 - - 0.00% 0%Storage equipment project 1 - - 0.00% 0%Distribution equipment project 1 - - 0.00% 0%Clearing m2 5,000.0 12 60,000 0.14% 0%Earth excavation m3 600.0 20 12,000 0.03% 0%Rock excavation m3 - - 0.00% 0%Concrete dam unit 1 900,000 900,000 2.08% 4%Earthfill dam m3 500 18 9,000 0.02% 0%Dewatering - 0.00% 0%Spillway unit 1 200,000 200,000 0.46% 1%Canal m' 2,900 1,500 4,350,000 10.07% 20%Intake m3 - - 0.00% 0%Tunnel m' - - 0.00% 0%Penstock kg 296,884.39 25 7,422,110 17.18% 35%Powerhouse civil m2 1,000 3,000 3,000,000 6.94% 14%Fishway m3 - - 0.00% 0%Building & yard constructio m2 200 3,000 600,000 1.39% 3%

    Spare parts % 3.0% - - 0.00% 0%Transportation project 1 300,000 300,000 0.69% 1%Land Acquisition m2 5,000 20 100,000 0.23% 0%

    Sub-total: 21,253,110 0.00%

    Miscellaneous 0.00%Training & commissio p-d 5 30,000 150,000 0.35% 13%Contingencies % 2.3% 1,000,000 1,000,000 2.31% 87%

    Sub-total: 1,150,000 93.06%

    Total initial costs 43,207,291

    os ummary

    Feasibility study 3.0% 2.17% 936,200 Development 5.5% 2.60% 1,125,000 Engineering 2.3% 2.05% 885,000 Power system 19.8% 41.33% 17,857,981 Balance of system & mis 58.4% 49.19% 21,253,110 Miscellaneous 11.0% 2.66% 1,150,000

    Total Inital Costs 43,207,291 Cost Per MW 5,437,196

    2.17% 2.60% 2.05%

    41.33% 49.19%

    2.66%

    Feasibility study Development Engineering Power system Balance of system& miscellaneous

    Miscellaneous

    Cost Summary

    0% 10% 20% 30% 40%

    Delivery equipmentRoad construction

    Preparation equipmentStorage equipment

    Distribution equipmentClearing

    Earth excavationRock excavation

    Concrete damEarthfill dam

    DewateringSpillway

    Canal

    IntakeTunnel

    PenstockPowerhouse civil

    FishwayBuilding & yard construction

    Spare partsTransportation

    Balance of system & miscellaneous

    0% 20% 40% 60% 80% 100%

    Training & commissioning

    Miscellaneous

  • 8/11/2019 Financial Analisys.xls

    9/12

    0.00%

    5.00%

    10.00%

    15.00%

    20.00%

    25.00%

    30.00%

    35.00%

    40.00%

    45.00%

    S i t e i n v e s t i g a t i o n

    R e s o u r c e a s s e s s m e n t

    E n v i r o n m e n t a

    l a s s e s s m e n t

    P r e l i m i n a r y d e s i g n

    D e t a i

    l e d c o s t e s t i m a t e

    G H G

    b a s e l i n e s t u

    d y & M P

    R e p o r t p r e p a r a t i o n

    P r o j e c t m a n a g e m e n t

    T r a v e l & a c c o m m o d a t i o n

    C o n t r a c t n e g o t i a t i o n s

    P e r m i t s & a p p r o v a

    l s

    S i t e s u r v e y &

    l a n d r i g h t s

    G H G v a

    l i d a t i o n & r e g i s t r a t i o n

    P r o j e c t

    f i n a n c i n g

    L e g a

    l & a c c o u n t i n g

    P r o j e c t m a n a g e m e n t

    T r a v e l & a c c o m m o d a t i o n

    S i t e &

    b u i l d i n g d e s i g n

    M e c

    h a n i c a l d e s i g n

    E l e c t r i c a l d e s i g n

    C i v i l d e s i g n

    T e n

    d e r s & c o n t r a c t i n g

    C o n s t r u c t i o n s u p e r v i s i o n

    S u b

    - t o t a

    l :

    H y d r o t u r b i n e

    T r a n s m i s s i o n

    l i n e

    S u b s t a t i o n

    E n e r g y e f

    f i c i e n c y m e a s u r e s

    D e l i v e r y e q u i p m e n t

    R o a d c o n s t r u c t i o n

    P r e p a r a t i o n e q u i p m e n t

    S t o r a g e e q u i p m e n t

    D i s t r i b u t i o n e q u i p m e n t

    C l e a r i n g

    E a r t

    h e x c a v a t i o n

    R o c k e x c a v a t i o n

    C o n c r e t e

    d a m

    E a r t

    h f i l l d a m

    D e w a t e r i n g

    S p i l l w a y

    C a n a l

    I n t a

    k e

    T u n n e l

    P e n s t o c k

    P o w e r

    h o u s e c i v i

    l

    F i s h w a y

    B u i l d i n g & y a r d c o n s t r u c t i o n

    S p a r e

    p a r t s

    T r a n s p o r t a t i o n

    L a n

    d A c q u i s i t i o n

    S u b

    - t o t a

    l :

    T r a i n i n g & c o m m i s s i o n i n g

    C o n t i n g e n c i e s

    A x i s T i t

    l e

    Axis Title

    Initial costs (credits)

  • 8/11/2019 Financial Analisys.xls

    10/12

    Estimated Project Cash Flows

    Average Cost of Electricity (Rp/kWh) Rp/Kwh 656.0 Initial costs Rp 43,207,291 RE delivered MWh 7.95 Debt interest rate % 11%

    Debt term Year 7.0 Annual energy delivered MWh 37,762 Term Depreciation Year 20.0 Debt ratio % 0.7 Salvage Value 0.10

    Rp 30,245,103 Tax % 25

    0 1 2 3 4 5 6 7 8 9Cash Out

    Capital CostsFeasibility study 936,200 Development 1,125,000 Engineering 885,000 Power system 17,857,981 Balance of system & mi 21,153,110 Miscellaneous - 1,150,000

    Total Capital Costs 41,957,291 1,150,000 - - - - - - - - Operating Costs

    Water retribution - - - - - - - - Fuel Transportation 1,625 1,625 1,625 1,625 1,625 1,625 1,625 1,625

    Total Operating Costs - - 1,625 1,625 1,625 1,625 1,625 1,625 1,625 1,625 Plant Operating Costs

    Wages & Benefits 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000 Maintenance 60,000 60,000 60,000 60,000 60,000 60,000 60,000

    Total Plant Operating Cos - 1,200,000 1,200,000 1,260,000 1,260,000 1,260,000 1,260,000 1,260,000 1,260,000 1,260,000 Debt Service

    Interest 4,752,802 4,073,830 3,394,859 2,715,887 2,036,915 1,357,943 678,972 Principal Repayment 6,172,470 6,172,470 6,172,470 6,172,470 6,172,470 6,172,470 6,172,470

    Total Debt Service - 6,172,470 10,925,272 10,246,300 9,567,329 8,888,357 8,209,385 7,530,414 678,972 - Depreciation 1,950,555 1,950,555 1,950,555 1,950,555 1,950,555 1,950,555 1,950,555 1,950,555 1,950,555

    Total Cash Out 41,957,291 10,473,025 14,077,452 13,458,480 12,779,508 12,100,536 11,421,565 10,742,593 3,891,151 3,212,180

    Cash InRevenueFirm Energy Revenue 17,340,449 24,772,070 24,772,070 24,772,070 24,772,070 24,772,070 24,772,070 24,772,070 24,772,070 2 Other RevenueTotal Revenue - 17,340,449 24,772,070 24,772,070 24,772,070 24,772,070 24,772,070 24,772,070 24,772,070 24,772,070 2

    Total Cast In - 17,340,449 24,772,070 24,772,070 24,772,070 24,772,070 24,772,070 24,772,070 24,772,070 24,772,070 2

    Net Before Tax Cash Flow (41,957,291) 6,867,425 10,694,619 11,313,590 11,992,562 12,671,534 13,350,505 14,029,477 20,880,919 21,559,891 2

    Tax (Pajak Penghasilan ) - 1,716,856 2,673,655 2,828,398 2,998,141 3,167,883 3,337,626 3,507,369 5,220,230 5,389,973

    Net After Tax Cash Flow (41,957,291) 5,150,568 8,020,964 8,485,193 8,994,422 9,503,650 10,012,879 10,522,108 15,660,689 16,169,918 1 (41,957,291) (36,806,722) (28,785,758) (20,300,566) (11,306,144) (1,802,494) 8,210,385 18,732,493 34,393,182 50,563,100 6

    1.00 1.00 1.00 1.00 1.00 0.18 - - -

  • 8/11/2019 Financial Analisys.xls

    11/12

    Internal Rate Return (IRR) = 18,03 Initial costs = Rp 43207300

    Financial FeasibilityInitial costs (credits) 43,207,291 Hydraulic losses (Design) 2.55% 2% to 7%RE delivered MW 7.95 Generator efficiency % 95 93% to 97%Annual energy delivered MWh 37,762.30 Transformer losses % 1% to 2%Water retribution Rp/KWh 0.00 Parasitic electricity losses % 1% to 3%Average Cost of Electricity (Rp/kWh) Rp/KWh 656.00 Annual downtime losses % 40% to 90%Nominal Electricity Escalation Rate % 0.00 Hydro plant capacity factor % 55.00 2% to 7%Infation Rate % 6%Discount Rate % 12.5%Debt Term Year 7.00Payback Period Year 5.18Year To Positive Cash Flow Year to 6.00Initial Cost to Energy Delivery Ratio Rp/MW 5,437,196 Operating Cost Rp/kW 0.33 Exchange Rate Rp/1USD 8,700.00 Debt interest rate 11%Net Present Value (NPV) Rp (1.000,-) 54,001,910 Internal Rate Return (IRR) 18.02%MRR 41,957,291 B/C 2.29

    (60,000,000)

    (40,000,000)

    (20,000,000)

    -

    20,000,000

    40,000,000

    60,000,000

    80,000,000

    0 1 2 3 4 5 6 7 8 9 10

    Project Cumulative Cash Flow

    Estimated Project Cash Flows

  • 8/11/2019 Financial Analisys.xls

    12/12

    Risk Analysis for IRR and ROI

    Rate -20% -10% 0% 10% 20%Ratio 80% 90% 100% 110% 120%Annual energy delivered to IRR 7.74% 12.17% 18.02% 20.32% 24.12%Initial costs to IRR 24.14% 20.66% 18.02% 15.22% 13.02%Debt interest rate to IRR 18.87% 18.45% 18.02% 17.60% 17.18%

    Annual energy delivered to IRR 80% 90% 100% 110% 120%Annual energy delivered -20% -10% 0% 10% 20%IRR 7.74% 12.17% 18.02% 20.32% 24.12%

    Initial costs to IRR 80% 90% 100% 110% 120%Initial costs -20% -10% 0% 10% 20%IRR 24.14% 20.66% 18.02% 15.22% 13.02%

    Debt interest rate to IRR 80% 90% 100% 110% 120%Debt interest rate -20% -10% 0% 10% 20%IRR 18.87% 18.45% 18.02% 17.60% 17.18%

    0.00%

    5.00%

    10.00%

    15.00%

    20.00%

    25.00%

    30.00%

    -30% -20% -10% 0% 10% 20% 30%

    Risk Analysis for IRR and ROI

    Annual energy delivered to IRR Initial costs to IRR Debt interest rate to IRR