Final Year Design Thesis- Reconception of a Train Station

76
RE-CONCEPTION OF A TRAIN STATION RESEARCH AND PROPOSAL REDFERN FUTURE PROJECTION SIMON CHAN

description

Redfern Future Projection: a documentation of my final year design thesis, the research and the proposal of a new train station in Redfern, Sydney Australia. The book is presented in 4 parts, part 1 is the study of 3 different public events in Sydney in relation to the use of public transport; part 2 is the study of a benchmark project; part 3 is the analysis of the selected site area with mapping exercises and part 4 is the intervention of the design proposal.

Transcript of Final Year Design Thesis- Reconception of a Train Station

Page 1: Final Year Design Thesis- Reconception of a Train Station

RE-CONCEPTION OF A TRAIN STATION

RESEARCH AND PROPOSAL

REDFERN FUTURE PROJECTION

SIMON CHAN

Page 2: Final Year Design Thesis- Reconception of a Train Station

Content Page

part 1_event studies NYE, Regular Day & Anzac Day

part 2_ benchmark study Stuttgart Main Station

part 3_ site analysis Redfern

part 4_ intervention University of Sydney Station

Page 3: Final Year Design Thesis- Reconception of a Train Station

THE

BACK

DRO

P O

F EV

ENTS

Maj

or ro

ad in

fras

truc

ture

Topo

grap

hy

Even

t are

as a

ndSt

atio

n in

terc

hang

e

Und

ergr

ound

Tr

ain

lines

Page 4: Final Year Design Thesis- Reconception of a Train Station

THE

BACK

DRO

P O

F EV

ENTS

Maj

or ro

ad in

fras

truc

ture

Topo

grap

hy

Even

t are

as a

ndSt

atio

n in

terc

hang

e

Und

ergr

ound

Tr

ain

lines

THE

BACK

DRO

P O

F EV

ENTS

Maj

or ro

ad in

fras

truc

ture

Topo

grap

hy

Even

t are

as a

ndSt

atio

n in

terc

hang

e

Und

ergr

ound

Tr

ain

lines

Page 5: Final Year Design Thesis- Reconception of a Train Station

PUBL

IC T

RAN

SPO

RT N

ETW

ORK

PUBL

IC T

RAN

SPO

RT N

ETW

ORK

NEW

YEA

RS E

VE

09:30Crowd competing for best spots

13:00More crowds gather around the Harbour

17:00More crowds starting to gather, people off work join-in

00:00Fireworks commence

01:30People going home after the fireworks

-The peak hours on NYE are slightly shorter then a regular day, some people will take a day off for celebration. -People who don’t work on the day will gather around the harbour early to fight for a good spot for fireworks. -After work and fireworks, some will stay back for party till the next day. -Huge crowds going home after the fireworks.Train service will go on until 04:27 the next day.

Page 6: Final Year Design Thesis- Reconception of a Train Station

PUBL

IC T

RAN

SPO

RT N

ETW

ORK

PUBL

IC T

RAN

SPO

RT N

ETW

ORK

NEW

YEA

RS E

VE

09:30Crowd competing for best spots

13:00More crowds gather around the Harbour

17:00More crowds starting to gather, people off work join-in

00:00Fireworks commence

01:30People going home after the fireworks

-The peak hours on NYE are slightly shorter then a regular day, some people will take a day off for celebration. -People who don’t work on the day will gather around the harbour early to fight for a good spot for fireworks. -After work and fireworks, some will stay back for party till the next day. -Huge crowds going home after the fireworks.Train service will go on until 04:27 the next day.

Page 7: Final Year Design Thesis- Reconception of a Train Station

07:45Morning queue at Artarmon Station

08:00Milsons point

08:15Working force at North Sydney

08:30Going out of Wynyard Station

8:45Heading to office at CBD

REG

ULA

R D

AY

On an average day, the morning peak (07:30- 09:30) and the afternoon peak (17:30-19:30) accounts for most of the train line activities.

The packed cabins and platforms presents a different sense of public space. People try to be at ease in this spontaneous and intimate distances, escape into various anti-social behaviour, such as napping, texting and listening to music.

03:00Refreshment at Wynyard

03:30Before dawn service, Martin Place

04:15Dawn Service in the rain

09:30Morning Parade along George Street

12:45Afternoon Commemoration at Hyde Park

AN

ZAC

DAY

On Anzac Day, Dawn service at Martin Place starts 04:15, trains services start at 3:00 to Accommodate the crowd. Major events on the day include: 09:30 Morning Parade on George Street 12:30 Commemoration at Hyde park 13:00 Indigenous Anzac March at Redfern 17:00 Sunset Service at Martin Place.

The general public will also gather around RSLs and bars for commemoration.

Page 8: Final Year Design Thesis- Reconception of a Train Station

07:45Morning queue at Artarmon Station

08:00Milsons point

08:15Working force at North Sydney

08:30Going out of Wynyard Station

8:45Heading to office at CBD

REG

ULA

R D

AY

On an average day, the morning peak (07:30- 09:30) and the afternoon peak (17:30-19:30) accounts for most of the train line activities.

The packed cabins and platforms presents a different sense of public space. People try to be at ease in this spontaneous and intimate distances, escape into various anti-social behaviour, such as napping, texting and listening to music.

03:00Refreshment at Wynyard

03:30Before dawn service, Martin Place

04:15Dawn Service in the rain

09:30Morning Parade along George Street

12:45Afternoon Commemoration at Hyde Park

AN

ZAC

DAY

On Anzac Day, Dawn service at Martin Place starts 04:15, trains services start at 3:00 to Accommodate the crowd. Major events on the day include: 09:30 Morning Parade on George Street 12:30 Commemoration at Hyde park 13:00 Indigenous Anzac March at Redfern 17:00 Sunset Service at Martin Place.

The general public will also gather around RSLs and bars for commemoration.

Page 9: Final Year Design Thesis- Reconception of a Train Station

we were warned at the very beginning, a project in this scale requires a different kind of thinking...decisions of demolitions should be done if necessary, but wisely.

BEING BRUTAL MIGHT BE THE WAY OUT

Page 10: Final Year Design Thesis- Reconception of a Train Station

BENCH MARK CASE STUDYStuttgart Main Station - part of the Stuttgart 21 DevelopmentIngenhowen and Partners, in collaboration with Frei Otto

Page 11: Final Year Design Thesis- Reconception of a Train Station

URBAN DISCONNECTION: Old Stuttgart Main Station

URBAN CONNECTOR: New Stuttgart Main Station

The old station track cuts off the connection of the city centre, sacrificing pedestrian flow between the two sides. The main road in front of the station lies on a wiped-out plaza, rendering the station an island.

The new proposal creates a public space in place of the original track to re-integrate the urban fabric. It also facilitates connection across the road, bringing the station and the Kings Street pedestrian zone together. The new design serves as the meeting point between the old city and the new development.

SEWING THE URBAN FABRICStuttgart Main Station

RAIL LINE PLAN OF STUTTGART

Page 12: Final Year Design Thesis- Reconception of a Train Station

URBAN DISCONNECTION: Old Stuttgart Main Station

URBAN CONNECTOR: New Stuttgart Main Station

The old station track cuts off the connection of the city centre, sacrificing pedestrian flow between the two sides. The main road in front of the station lies on a wiped-out plaza, rendering the station an island.

The new proposal creates a public space in place of the original track to re-integrate the urban fabric. It also facilitates connection across the road, bringing the station and the Kings Street pedestrian zone together. The new design serves as the meeting point between the old city and the new development.

SEWING THE URBAN FABRICStuttgart Main Station

RAIL LINE PLAN OF STUTTGART

Page 13: Final Year Design Thesis- Reconception of a Train Station

URBANISM X INFRASTRUCTUREThe precious underground mineral water is taken into consideration during the design of the rail line, in order to preserve such important natural feature and minimize the destruction of the construction to the nature.

Minimize Environmental Impact Underground water of Stuttgart

Page 14: Final Year Design Thesis- Reconception of a Train Station

URBANISM X INFRASTRUCTUREThe precious underground mineral water is taken into consideration during the design of the rail line, in order to preserve such important natural feature and minimize the destruction of the construction to the nature.

Minimize Environmental Impact Underground water of Stuttgart

Page 15: Final Year Design Thesis- Reconception of a Train Station

Vertical Circulation Major Network of City Centre of Stuttgart

New Railway Line

Main traffic routes

Pedestrian Path

Important Heritages

Proposed Alteration The two wings of the original station and the tracks are demolished for mixed use development, leading to controversies.

Page 16: Final Year Design Thesis- Reconception of a Train Station

Vertical Circulation Major Network of City Centre of Stuttgart

New Railway Line

Main traffic routes

Pedestrian Path

Important Heritages

Proposed Alteration The two wings of the original station and the tracks are demolished for mixed use development, leading to controversies.

Page 17: Final Year Design Thesis- Reconception of a Train Station

The new Stuttgart Central Station is a forward looking station; it integrates the fabric of existing city, protects the country side, requires no land use and promotes future development

REDFERN - SITE ANALYSIS

Page 18: Final Year Design Thesis- Reconception of a Train Station

The new Stuttgart Central Station is a forward looking station; it integrates the fabric of existing city, protects the country side, requires no land use and promotes future development

REDFERN - SITE ANALYSIS

Page 19: Final Year Design Thesis- Reconception of a Train Station

Existing Redfern StationMono functional Station

Movement and Activities Congestion and focal points

3 AM 6 AM 9 AM 12 PM

Pedestrian Movements

3 AM 6 AM 9 AM 12 PM

Active Street Frontage

Page 20: Final Year Design Thesis- Reconception of a Train Station

Existing Redfern StationMono functional Station

Movement and Activities Congestion and focal points

3 AM 6 AM 9 AM 12 PM

Pedestrian Movements

3 AM 6 AM 9 AM 12 PM

Active Street Frontage

Page 21: Final Year Design Thesis- Reconception of a Train Station

3 PM 6 PM 9 PM 12 AM

3 PM 6 PM 9 PM 12 AM

The study shows the point of congestion within the study perimeter, the congestion focuses around the vicinity of the train station, along Lawson Street towards the Sydney University

HOUSE RETAIL / CONVENIENCE STORE INDUSTRIALTERRACE HOUSE CAFE / RESTAURANT EDUCATIONALAPARTMENT OFFICE PUBLIC BUILDINGSPUBLIC HOUSING

Existing Program in Redfern

HOUSETERRACE HOUSEAPARTMENTPUBLIC HOUSING

Residential

Page 22: Final Year Design Thesis- Reconception of a Train Station

3 PM 6 PM 9 PM 12 AM

3 PM 6 PM 9 PM 12 AM

The study shows the point of congestion within the study perimeter, the congestion focuses around the vicinity of the train station, along Lawson Street towards the Sydney University

HOUSE RETAIL / CONVENIENCE STORE INDUSTRIALTERRACE HOUSE CAFE / RESTAURANT EDUCATIONALAPARTMENT OFFICE PUBLIC BUILDINGSPUBLIC HOUSING

Existing Program in Redfern

HOUSETERRACE HOUSEAPARTMENTPUBLIC HOUSING

Residential

Page 23: Final Year Design Thesis- Reconception of a Train Station

Commercial RETAIL / CONVENIENCE STORECAFE / RESTAURANTOFFICE

Heritage HERITAGE BUILDINGHERITAGE CONSERVATION AREA

Redfern Station Displacement Lack of urban cohesion, causing in-efficient pedestrian flow

GENERIC DISPLACEMENT REDFERN DISPLACEMENT

5min W

alking

10min Walking

5min Cycling

5min W

alking

10min Walking

5min Cycling

Page 24: Final Year Design Thesis- Reconception of a Train Station

Commercial RETAIL / CONVENIENCE STORECAFE / RESTAURANTOFFICE

Heritage HERITAGE BUILDINGHERITAGE CONSERVATION AREA

Redfern Station Displacement Lack of urban cohesion, causing in-efficient pedestrian flow

GENERIC DISPLACEMENT REDFERN DISPLACEMENT

5min W

alking

10min Walking

5min Cycling

5min W

alking

10min Walking

5min Cycling

Page 25: Final Year Design Thesis- Reconception of a Train Station

Existing Proposal for Redfern

Sydney University Expansion in 2030

LITTLE EVELEIGH PARK

NORTH EVELEIGH RAIL YARD

AUSTRALIAN TECHNOLOGY PARK

USYD 2030 MASTERPLANRESIDENTIAL

RAIL SERVICE

PUBLIC OPEN SPACE

PEDESTRIAN BRIDGE

RETAIL / OFFICE

UNDERGROUND VEHICLE BRIDGE

Serving the Virtual Communities

The current Redfern Station serves mainly for the students of the Sydney University, which had 47,775 students in 2009 and the Australian Technology Park with Channel 7 office housing up to 2000 employees. Causing a huge demand of transport during the peak hours. there is also an influx of new residents and workers set to result from the Redfern- Waterloo urban renewal project.

Page 26: Final Year Design Thesis- Reconception of a Train Station

Existing Proposal for Redfern

Sydney University Expansion in 2030

LITTLE EVELEIGH PARK

NORTH EVELEIGH RAIL YARD

AUSTRALIAN TECHNOLOGY PARK

USYD 2030 MASTERPLANRESIDENTIAL

RAIL SERVICE

PUBLIC OPEN SPACE

PEDESTRIAN BRIDGE

RETAIL / OFFICE

UNDERGROUND VEHICLE BRIDGE

Serving the Virtual Communities

The current Redfern Station serves mainly for the students of the Sydney University, which had 47,775 students in 2009 and the Australian Technology Park with Channel 7 office housing up to 2000 employees. Causing a huge demand of transport during the peak hours. there is also an influx of new residents and workers set to result from the Redfern- Waterloo urban renewal project.

Page 27: Final Year Design Thesis- Reconception of a Train Station

Why a New Station?

The Current Redfern Station is a traffic knot, caused by the conflagration of pedestrian, vehicular, cyclist and commuter traffics. The troublesome situation is compelling for a major change, with the consideration of the future expansion of both Sydney University and Australian Technology Park in 2030.

Existing Redfern Station An Invisible knot

University of Sydney Station A New Station for Sydney University and ATP in 2030

Page 28: Final Year Design Thesis- Reconception of a Train Station

Why a New Station?

The Current Redfern Station is a traffic knot, caused by the conflagration of pedestrian, vehicular, cyclist and commuter traffics. The troublesome situation is compelling for a major change, with the consideration of the future expansion of both Sydney University and Australian Technology Park in 2030.

Existing Redfern Station An Invisible knot

University of Sydney Station A New Station for Sydney University and ATP in 2030

Why a New Station?

The Current Redfern Station is a traffic knot, caused by the conflagration of pedestrian, vehicular, cyclist and commuter traffics. The troublesome situation is compelling for a major change, with the consideration of the future expansion of both Sydney University and Australian Technology Park in 2030.

Existing Redfern Station An Invisible knot

University of Sydney Station A New Station for Sydney University and ATP in 2030

Page 29: Final Year Design Thesis- Reconception of a Train Station

Proposing New Station Untying the knot

“Infrastructure should be a projection of the future, hence the expansion of both Sydney Uni and ATP will be the major concern for the relocation of station.”

Page 30: Final Year Design Thesis- Reconception of a Train Station

Proposing New Station Untying the knot

“Infrastructure should be a projection of the future, hence the expansion of both Sydney Uni and ATP will be the major concern for the relocation of station.”

Page 31: Final Year Design Thesis- Reconception of a Train Station

The expansion of University of Sydney into the North Eveleigh site, the new master plan will include education building, residential abundant greens pace and retail facilities; the ATP site is also great potential for future development, which will induce a large demand of transportation, exceeding the current situation.

A Design for the Future

USYD 2030 ATP future expansion

Existing Condition

Disconnection of Pedestrian Flow

Page 32: Final Year Design Thesis- Reconception of a Train Station

The expansion of University of Sydney into the North Eveleigh site, the new master plan will include education building, residential abundant greens pace and retail facilities; the ATP site is also great potential for future development, which will induce a large demand of transportation, exceeding the current situation.

A Design for the Future

USYD 2030 ATP future expansion

Existing Condition

Disconnection of Pedestrian Flow

Page 33: Final Year Design Thesis- Reconception of a Train Station

Demolishing Mcdonaldtown station which can be serve by both Newtown and Erskineville

Inefficient coverage of neighbouring stations

Conditioning the Station

Separation of human and vehicle traffic

Demolishing Mcdonaldtown station which can be serve by both Newtown and Erskineville

Inefficient coverage of neighbouring stations

Conditioning the Station

Separation of human and vehicle traffic

Page 34: Final Year Design Thesis- Reconception of a Train Station

Demolishing Mcdonaldtown station which can be serve by both Newtown and Erskineville

Inefficient coverage of neighbouring stations

Conditioning the Station

Separation of human and vehicle traffic

Page 35: Final Year Design Thesis- Reconception of a Train Station

Integration of new bus route

Locating the Station

Page 36: Final Year Design Thesis- Reconception of a Train Station

Integration of new bus route

Locating the Station

Page 37: Final Year Design Thesis- Reconception of a Train Station

“The New Sydney University Station aligns along the Axis which cuts through Codrington Street to the Channel 7 Building and the ATP, providing the most direct access to the two most dominant body of users.”

The University of Sydney

USYD 2020

Australian Technology Park

Master Plan

Car free Streetscapes

ATP Future Development

Sydney University

New Sydney University Station

Adaptive Re-use

New Vehicle Access in ATP

Parks / green space

Sydney University 2020

Existing Redfern Station

New Bus Interchange

ATP

Page 38: Final Year Design Thesis- Reconception of a Train Station

“The New Sydney University Station aligns along the Axis which cuts through Codrington Street to the Channel 7 Building and the ATP, providing the most direct access to the two most dominant body of users.”

The University of Sydney

USYD 2020

Australian Technology Park

Master Plan

Car free Streetscapes

ATP Future Development

Sydney University

New Sydney University Station

Adaptive Re-use

New Vehicle Access in ATP

Parks / green space

Sydney University 2020

Existing Redfern Station

New Bus Interchange

ATP

“The New Sydney University Station aligns along the Axis which cuts through Codrington Street to the Channel 7 Building and the ATP, providing the most direct access to the two most dominant body of users.”

The University of Sydney

USYD 2020

Australian Technology Park

Master Plan

Car free Streetscapes

ATP Future Development

Sydney University

New Sydney University Station

Adaptive Re-use

New Vehicle Access in ATP

Parks / green space

Sydney University 2020

Existing Redfern Station

New Bus Interchange

ATP

Page 39: Final Year Design Thesis- Reconception of a Train Station
Page 40: Final Year Design Thesis- Reconception of a Train Station
Page 41: Final Year Design Thesis- Reconception of a Train Station

The Station that Connects and Entertain, before and after the train operates

The project consists of two bridge buildings linked by an open pedestrian bridge; each bridge contains its own program. The first bridge contains the train station and an accessible roof, with gallery space and a nightclub, access via a ramp that is open 24 hours before and after the train operates. The choice of program is a protest against the current time-table system of train operation, and the mixing of activities that have previously been perceived as incompatible. The second bridge is the University Learning hub, containing small collections of books and digital media, reading room, class-rooms and lecture theatre, allowing both individual and collective uses.

Page 42: Final Year Design Thesis- Reconception of a Train Station

The Station that Connects and Entertain, before and after the train operates

The project consists of two bridge buildings linked by an open pedestrian bridge; each bridge contains its own program. The first bridge contains the train station and an accessible roof, with gallery space and a nightclub, access via a ramp that is open 24 hours before and after the train operates. The choice of program is a protest against the current time-table system of train operation, and the mixing of activities that have previously been perceived as incompatible. The second bridge is the University Learning hub, containing small collections of books and digital media, reading room, class-rooms and lecture theatre, allowing both individual and collective uses.

Page 43: Final Year Design Thesis- Reconception of a Train Station

The choice of program is a protest against the current timetable system of train operation, and the mixing of activities that have previously been perceived as incompatible

Page 44: Final Year Design Thesis- Reconception of a Train Station

The choice of program is a protest against the current timetable system of train operation, and the mixing of activities that have previously been perceived as incompatible

Page 45: Final Year Design Thesis- Reconception of a Train Station

Design Process

Splitting program masses with pedestrian walkway in the middle

Page 46: Final Year Design Thesis- Reconception of a Train Station

Design Process

Splitting program masses with pedestrian walkway in the middle

Page 47: Final Year Design Thesis- Reconception of a Train Station

Visual Connection to the future access route from ATP Extending the bridges to connect with urban artefacts

Learning Hub 1F

Learning Hub 2F

Station Concourse

Gallery Space and Night Club

Public Roof Terrace

Page 48: Final Year Design Thesis- Reconception of a Train Station

Visual Connection to the future access route from ATP Extending the bridges to connect with urban artefacts

Learning Hub 1F

Learning Hub 2F

Station Concourse

Gallery Space and Night Club

Public Roof Terrace

Page 49: Final Year Design Thesis- Reconception of a Train Station

Operating Hours After Hours

a

b b

d

a

c d

c

1F PLAN

Page 50: Final Year Design Thesis- Reconception of a Train Station

Operating Hours After Hours

a

b b

d

a

c d

c

1F PLAN

Page 51: Final Year Design Thesis- Reconception of a Train Station

a

b b

d

ac d

c

2F PLAN

a

b b

a

d

c d

c

ROOF PLAN

Page 52: Final Year Design Thesis- Reconception of a Train Station

a

b b

d

ac d

c

2F PLAN

a

b b

a

d

c d

c

ROOF PLAN

Page 53: Final Year Design Thesis- Reconception of a Train Station

Lets meet at the roof top benches, what about 9 o’clock tonite?

Page 54: Final Year Design Thesis- Reconception of a Train Station

SECTION d-d

SECTION a-a

Page 55: Final Year Design Thesis- Reconception of a Train Station

SECTION d-d

SECTION a-a

Page 56: Final Year Design Thesis- Reconception of a Train Station

SECTION b-b

SECTION c-c

Page 57: Final Year Design Thesis- Reconception of a Train Station

SECTION b-b

SECTION c-c

Page 58: Final Year Design Thesis- Reconception of a Train Station

Entrance Staircases

There are many stairs/ benches space along the journey through the bridge, these spaces, almost like a little stadia, hang out space, are places where you can say, ‘ Let’s meet there!’ within the scale of a city.

Page 59: Final Year Design Thesis- Reconception of a Train Station
Page 60: Final Year Design Thesis- Reconception of a Train Station
Page 61: Final Year Design Thesis- Reconception of a Train Station
Page 62: Final Year Design Thesis- Reconception of a Train Station

Entrance Staircases

There are many stairs/ benches space along the journey through the bridge, these spaces, almost like a little stadia, hang out space, are places where you can say, ‘ Let’s meet there!’ within the scale of a city.

Page 63: Final Year Design Thesis- Reconception of a Train Station

University Learning Hub

The university learning hub allows a wonderful combination of different intensions, consist of both individual and collective uses, including lecture theatre, classrooms, meeting rooms and abundant of reading spaces.

Page 64: Final Year Design Thesis- Reconception of a Train Station

University Learning Hub

The university learning hub allows a wonderful combination of different intensions, consist of both individual and collective uses, including lecture theatre, classrooms, meeting rooms and abundant of reading spaces.

University Learning Hub

The university learning hub allows a wonderful combination of different intensions, consist of both individual and collective uses, including lecture theatre, classrooms, meeting rooms and abundant of reading spaces.

Page 65: Final Year Design Thesis- Reconception of a Train Station

Learning Hub 2F

The shallow floor plans maximise available sunlight, creating ideal reading environment which is crucial to a library

Page 66: Final Year Design Thesis- Reconception of a Train Station

Learning Hub 2F

The shallow floor plans maximise available sunlight, creating ideal reading environment which is crucial to a library

Page 67: Final Year Design Thesis- Reconception of a Train Station

A new public domain- the pedestrian bridge aligns with the strong axis linking the north and the south Eveleigh

Pedestrian Bridge

Page 68: Final Year Design Thesis- Reconception of a Train Station

A new public domain- the pedestrian bridge aligns with the strong axis linking the north and the south Eveleigh

Pedestrian Bridge

Page 69: Final Year Design Thesis- Reconception of a Train Station

Station Concourse

the two skylights on the roof of the station visually connects the levels below and above, enriching the experience as one approaches the station from the platform

View from Platform

Page 70: Final Year Design Thesis- Reconception of a Train Station

Station Concourse

the two skylights on the roof of the station visually connects the levels below and above, enriching the experience as one approaches the station from the platform

View from Platform

Station Concourse

the two skylights on the roof of the station visually connects the levels below and above, enriching the experience as one approaches the station from the platform

View from Platform

Page 71: Final Year Design Thesis- Reconception of a Train Station

“The station in other words becomes a place to stop, to contemplate, to listen and see, to rest and refresh, to talk and exchange.”

Utopian Station by Hans Ulrich Obrist

Page 72: Final Year Design Thesis- Reconception of a Train Station

“The station in other words becomes a place to stop, to contemplate, to listen and see, to rest and refresh, to talk and exchange.”

Utopian Station by Hans Ulrich Obrist

Page 73: Final Year Design Thesis- Reconception of a Train Station

IMAGINATION

is the root of all change

Page 74: Final Year Design Thesis- Reconception of a Train Station

behind the scene

P.S.

Page 75: Final Year Design Thesis- Reconception of a Train Station

behind the scene

P.S.

Page 76: Final Year Design Thesis- Reconception of a Train Station

RE-CONCEPTION OF A TRAIN STATION

RESEARCH AND PROPOSAL

REDFERN FUTURE PROJECTION

SIMON CHAN

Simon Chan [email protected]