FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the...

55
FINAL TESTING AND SEALING ACTIVITIES

Transcript of FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the...

Page 1: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

FINAL TESTING AND SEALING ACTIVITIES

Page 2: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 3: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS:

• Checklist of contents of the box

• PCOS machine and its power adaptor

• 10 test ballots

• 13 rolls of official thermal paper

• 1 envelope containing the back-up memory

• 3 labeled PINS of the BEI

• 1 labeled PIN for Re-Zeroing

• Modem/bridge or BGAN, if any.

Page 4: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 5: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 6: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 7: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 8: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 9: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

REPUBLICOF THE PHILIPPINES

AUTOMATED ELECTIONS

BEI AUTHENTICATION

Please insert security key for authentication

LCD SW ver 103,15

The Chairman shall place the iButton security key on top of the security key receptacle.

PCOS will beep to indicate that it is ready to accept instructions from the BEI

Page 10: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

******

Page 11: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

REPUBLICOF THE PHILIPPINES

AUTOMATED ELECTIONS

BEI Security Key verified

LCD SW ver 103,15

ERROR VALIDATING SECURITY KEY

Please try again and remember to press firmly

against the reader

LCD SW ver 103,15

Page 12: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

IS THIS THECORRECT TIME?

2013:02:1910:00:00

YES NO

Select “YES” if the date and time is correct, and enter such fact in the minutes.

Page 13: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

SET YEAR

2013:02:1910:00:00

+++

Select “NO” if the date and time is incorrect. Then screen will ask the BEI to set the correct date and time, and ask for the correct:

A. YEAR. If year is correct, press “DONE”. If not,

+++ / ---- button until the year displayed the current year.

B. MONTH. If month is correct, press “DONE”. If not,

+++ / ---- button until the month displayed the current month.

C. DAY. If day is correct, press “DONE”. If not,

+++ / ---- button until the day displayed the current day.

DONE

---

Page 14: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

Select “NO” if the date and time is incorrect. Then screen will ask the BEI to set the correct date and time, and ask for the correct:

D. HOUR. If hour is correct, press “DONE”. If not,

+++ / ---- button until the hour displayed the current hour

E. MINUTE. If minute is correct, press “DONE”. If not,

+++ / ---- button until the minute displayed the current minute.

SET HOUR

2013:02:1910:00:00

+++ DONE

---

Page 15: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

Wait until the MAIN MENU is displayed

SET HOUR

2013:02:1910:00:00

+++ DONE

---

Page 16: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 17: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 18: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 19: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 20: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 21: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 22: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 23: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 24: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 25: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

TESTING MODEM DEVICE

PLEASE WAIT

PCOS shall automatically test the modem device and displayed the message.

MODEM FAILED(1015)

Ignore this message during the FTS since the modem is not connected to the PCOS

Page 26: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 27: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 28: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 29: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

When DISPLAY is selected, PCOS shall display theDiagnostics Report

When this message appears during FTS, ignore this since the modem is not connected to the PCOS.

Page 30: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

After printing the Diagnostic Report, the PCOS will display a message, press the NO option.

Page 31: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 32: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 33: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

INITIALIZING VOTECOUNTERS

(Ensuring that vote counters are

set to zero)

PLEASE WAIT…

RESULTS HAVE BEEN ZEROED

Page 34: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

WOULD YOU LIKE TO PRINT MORE COPIES OF THE ZERO TAPE?

PRINTING INITIALIZATION

REPORT

PLEASE WAIT…

YES NO

Press “NO” if you do not want to print more copies of

Zero Tape.

Page 35: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 36: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 37: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 38: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 39: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 40: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 41: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 42: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 43: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

READY TO TRANSMIT

PLEASE PLUG IN TRANSMISSION CABLE TO ELECTRONICALLY

TRANSMIT THE ELECTION RESULTS AND PRESS OK TO CONTINUE

Do not plug transmission cable. Press “SKIP” option.

Page 44: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 45: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 46: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 47: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 48: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 49: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 50: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 51: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.
Page 52: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

a. Disconnect the battery cable - from the PCOS machine;b. - from the battery;c. Disconnect the power adaptor - from the electrical outlet;d. - from the PCOS machine;e. Insert the Back-up memory card in the Administrator slot and seal with plastic security seal;f. Place iButton inside the printer compartment of the PCOS, g. Cover the printer and seal with plastic security seal;

Page 53: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

h. Record in the Minutes the serial numbers of the plastic security seals used;

i. Place the battery and its peripherals inside the battery box;

j. Place inside the PCOS box the following:• The PCOS and its power adaptor• PINs for re-zeroing and • 2 copies of the Minutes in their envelopes

k. Seal the PCOS box with the paper seal provided for the purpose, and

l. Allow the watchers of the PPCRV to place their own seal.

Page 54: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

FINAL TESTING AND SEALING ACTIVITIES

ReceptionInstallationDiagnosticsAccessing Main MenuOpen Voting – InitializationOpen Voting – Test VotingClose VotingPrinting of 8ERs Nat’l. & Local(No Transmission)ZeroingShutdownInstall Backup MemorySealing

Page 55: FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

THANK YOU!