BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking to Continue Implementation and Administration of California Renewables Portfolio Standard Program. ) ) ) ) R.11-05-005 (Filed May 5, 2011) SOUTHERN CALIFORNIA EDISON COMPANY’S (U 338-E) SECOND COMPLIANCE REPORT ON THE RENEWABLE AUCTION MECHANISM PROGRAM (PUBLIC VERSION) ATTACHMENT C REDACTED WILLIAM V. WALSH JONI TEMPLETON Attorneys for SOUTHERN CALIFORNIA EDISON COMPANY 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770 Telephone: (626) 302-6210 Facsimile: (626) 302-3990 E-mail: [email protected] Dated: February 2, 2015

Transcript of FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is...

Page 1: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE

STATE OF CALIFORNIA

Order Instituting Rulemaking to Continue Implementation and Administration of California Renewables Portfolio Standard Program.

) ) ) )

R.11-05-005 (Filed May 5, 2011)

SOUTHERN CALIFORNIA EDISON COMPANY’S (U 338-E) SECOND COMPLIANCE

REPORT ON THE RENEWABLE AUCTION MECHANISM PROGRAM

(PUBLIC VERSION) ATTACHMENT C REDACTED

WILLIAM V. WALSH JONI TEMPLETON

Attorneys for SOUTHERN CALIFORNIA EDISON COMPANY

2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770 Telephone: (626) 302-6210 Facsimile: (626) 302-3990 E-mail: [email protected]

Dated: February 2, 2015

Page 2: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

1

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE

STATE OF CALIFORNIA

Order Instituting Rulemaking to Continue Implementation and Administration of California Renewables Portfolio Standard Program.

) ) ) )

R.11-05-005 (Filed May 5, 2011)

SOUTHERN CALIFORNIA EDISON COMPANY’S (U 338-E) SECOND COMPLIANCE

REPORT ON THE RENEWABLE AUCTION MECHANISM PROGRAM

Pursuant to Decision (“D.”) 10-12-048,1 Southern California Edison Company (“SCE”)

respectfully submits its Second Compliance Report on the Renewable Auction Mechanism

Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public

Utilities Commission’s (“CPUC”) confidentiality rules.

I.

INTRODUCTION

In Decision (“D.”) 10-12-048 (“Decision”), the CPUC adopted a new procurement process,

called the Renewable Auction Mechanism (“RAM”), to procure renewable energy from projects

20 megawatts (“MW”) or less that are eligible under the California Renewables Portfolio Standard

(“RPS”). The Decision ordered SCE, Pacific Gas and Electric Company (“PG&E”), and San

Diego Gas and Electric Company (“SDG&E”) to implement the RAM program by (1) procuring

a total of 1,000 MW allocated across the utilities consistent with the “Existing FIT” (feed-in-tariff)

allocation; and (2) holding four competitive auctions over a two year period using standard, non-

negotiable contracts.2 The Decision instructed the three investor-owned utilities (“IOUs”) to

1 D.10-12-048 at 95 (Ordering Paragraph (“OP”) 4). 2 In D.12-02-035, the CPUC moved 225 MW (AC) from SCE’s Solar Photovoltaic Program (“SPVP”) into RAM

and, in D.13-05-033, moved 31 MW (AC) from SCE’s SPVP into RAM. This increased SCE’s total RAM procurement goal from 498.4 MW to 754.4 MW of capacity.

Page 3: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

2

consult with the Energy Division to develop a compliance report regarding the status of the RAM

program.3

The Decision also directed the IOUs to submit their bidding protocols and standard

contracts through a Tier 3 advice letter (“AL”) in order to implement the Decision’s requirements.

Pursuant to the Decision, on February 25, 2011, SCE filed AL 2557-E seeking approval of its

bidding protocols and standard power purchase agreement (“PPA”) and recommending

implementation details. On August 18, 2011, the CPUC issued Resolution E-4414 adopting

implementation details, bidding protocols and standard PPAs for each IOU.

On September 19, 2011, SCE submitted AL 2631-E, which included RAM Request for

Offer (“RFO”) Instructions and its RAM PPA, as directed by D.10-12-048 and Resolution E-4414.

On November 15, 2011, SCE accepted offers for its first RAM auction (“RAM 1”).

On April 19, 2012, the CPUC adopted Resolution E-4489, which approved changes to the

RAM program. On April 26, 2012, SCE submitted AL 2720-E, which included the RAM program

forum agenda, modified RFO Instructions and a modified standard PPA demonstrating compliance

with the RAM program changes ordered by Resolution E-4489. On May 11, 2012, SCE held its

first RAM program forum. On May 31, 2012, SCE accepted offers for its second RAM auction

(“RAM 2”).

On November 8, 2012, the CPUC adopted Resolution E-4546, which approved additional

changes to the RAM program. On November 15, 2012, SCE submitted AL 2810-E, which

included modified RFO Instructions and a modified standard PPA demonstrating compliance with

the RAM program changes ordered by Resolution E-4546. On December 21, 2012, SCE accepted

offers for its third RAM auction (“RAM 3”).

On May 9, 2013, the CPUC adopted Resolution E-4582, which modified the capacity

allocation targets for a fourth RAM auction (“RAM 4”) and authorized a fifth RAM auction

(“RAM 5”). On May 16, 2013, SCE submitted AL 2902-E, which included modified RFO

3 D.10-12-048 at 95 (OP 4).

Page 4: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

3

Instructions and a modified standard PPA demonstrating compliance with the RAM program

changes ordered by Resolution E-4582. On June 28, 2013, SCE accepted offers for RAM 4. On

January 17, 2014, SCE submitted its first RAM compliance report. On January 24, 2014, SCE

held its second RAM program forum.

On May 15, 2014, the CPUC adopted Resolution E-4655, approving certain changes to the

program for RAM 5. On May 29, 2014, SCE submitted AL 3045-E, which included modified

RFO instructions and a modified standard contract for the RAM 5 RFO pursuant to Resolution E-

4655. On June 27, 2014, SCE accepted offers for RAM 5.

In Section II of this RAM Report, SCE responds to each category of requested information

about the RAM program as set forth by the Decision.4

II.

INFORMATION REGARDING SCE’S RAM

A. Documentation of All Solicitations Issued for Power Purchase Agreements

Auction Design:

SCE has completed five competitive RFOs under the RAM program.

Auction Timing:

1) On November 15, 2011, SCE accepted offers for RAM 1; 2) on May 31, 2012, SCE

accepted offers for RAM 2; 3) on December 21, 2012, SCE accepted offers for RAM 3; 4) on

June 28, 2013, SCE accepted offers for RAM 4; and 5) on June 27, 2014, SCE accepted offers for

RAM 5.

Time necessary to complete projects:

RAM 1 PPAs require commercial operation dates no more than 18 months from CPUC

approval, plus up to six months extension for regulatory delays not caused by seller. RAM 2,

4 D.10-12-048 at 95 (OP 4).

Page 5: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

4

RAM 3, RAM 4, and RAM 5 PPAs require commercial operation dates no more than 24 months

from CPUC approval, plus up to six months extension for regulatory delays not caused by seller.5

B. A Description of All Offers Received from the RAM Solicitations, Including:

a. For all Offers:

i. Name of Offeror: Please see public Attachment A;

ii. Number of Bids per Offeror/Number of Shortlisted Bids per Offeror:

Please see public Attachment A;

iii. Location of Offer (map): Please see public Attachment B;

iv. Offer Price, Transmission Upgrade Costs, Resource Adequacy

Benefits, Bid Ranking Price: Please see the confidential version of

Attachment C;

v. Project Size: Please see the public version of Attachment C;

vi. Technology: Please see the public version of Attachment C;

vii. Summary of How Many Projects Passed Each Eligibility Screen:

Please see public Attachment D.

b. For Executed Contracts:

i. Achievement of Project Development Milestones: Please see public

Attachment E for reporting on project development milestones (current as

of 30 days prior to report filing); and

ii. Identification of Winning Offers: Please see public Attachment E.

C. A Description of the Results from the RAM Program Forum Held on January 24,

2014

SCE hosted its second RAM Program Forum (“Forum”) on January 24, 2014. During

the Forum, SCE presented ideas for RAM program improvement and solicited comments from

stakeholders. SCE received limited written comments from stakeholders before the Forum, and

5 In this context, “regulatory delays” include permitting delays or interconnection delays beyond seller’s control

that delay the commercial operation date (COD) of a generating facility.

Page 6: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

5

limited suggestions during the Forum itself. SCE addressed all of the comments and submitted

AL 3003-E on February 7, 2014, proposing a set of changes to the RAM PPA and the RFO

Instructions to be used in RAM 5.

Resolution E-4655 adopted some of SCE’s proposed changes, as well as some proposed

by other IOUs and stakeholders. Specifically, the Resolution approved the following changes

proposed by SCE in the pro forma RAM 5 power purchase agreement: a provision addressing

safety, requiring an independent engineer report regarding a written safety plan for the project;

a termination right if network upgrade costs increase and the seller does not exercise a “buy-

down right;” simplified curtailment provisions; payment using time-of-delivery factors for full

capacity deliverability status starting on the date the seller bid (rather than the date achieved);

and provisions related to shared facilities. Resolution E-4655 authorized the RAM 5 solicitation

to be held in accordance with the adopted changes.

D. A Description of: (a) Market Competition, (b) Market Power, and (c) Seller

Concentration.

(a) Market Competition:

One indicator of market competition within the RAM Program is a low ratio of offers

accepted versus offers received. Table 1 demonstrates that in the five SCE RAM auctions

conducted to date, the offers selected, in terms of both number of offers and megawatts, were a

small percentage of offers received. SCE believes this is a good indication of a robust and

competitive market.

Page 7: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

6

Table 1 Offers Received vs. Number of Contracts, SCE RAM 1 – RAM 5

The results are different if viewed in relation to the three prescribed product buckets for

RAM auctions (Baseload; Peaking, As-Available; and Non-Peaking, As-Available). Table 2

outlines the offers received in each product bucket for each RAM auction to date. In all RAM

auctions to date, SCE has received significantly fewer offers, and especially conforming offers, in

the Non-Peaking, As-Available and Baseload buckets compared to the Peaking, As-Available

bucket. Overall, the Non-Peaking, As Available and Baseload buckets have not been as

competitive as the Peaking, As-Available bucket.

Table 2

Offers Received vs. Number of Contracts by Product Bucket, SCE RAM 1 – RAM 5

(b) Market Power:

RAM auctions minimize market power by requiring competitive bidding and use of an

Independent Evaluator. SCE has seen no evidence that any firms bidding into RAM auctions to

Offers MW Offers MW Offers MW Offers MW Offers MW

# Offers 92 1,260 142 2,133 130 1,928 126 2,021 109 1,193

# Contracts 7 67 6 97 13 202 10 164 21 330.5

Percent 8% 5% 4% 5% 10% 10% 8% 8% 19% 28%

RAM 1 RAM 2 RAM 3   RAM 4 RAM 5

Offers MW Offers MW Offers MW Offers MW Offers MW

Baseload

# Offers 0 0 5 61 5 64 4 67 4 53

# Contracts 0 0 0 0 0 0 0 0 1 18

Percent ‐‐‐ ‐‐‐ 0% 0% 0% 0% 0% 0% 25% 34%

Peaking, As‐Available

# Offers 91 1,255 133 2,023 108 1,712 97 1,637 94 1,018

# Contracts 7 67 6 97 12 194 8 92.2 16 280

Percent 8% 5% 5% 5% 11% 11% 8% 6% 17% 28%

Non‐Peaking, As‐Available

# Offers 1 5 4 49 17 152 25 317 11 122

# Contracts 0 0 0 0 1 7.5 2 35.8 4 33

Percent 0% 0% 0% 0% 6% 5% 8% 11% 36% 27%

RAM 5RAM 1 RAM 2 RAM 3   RAM 4

Page 8: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

7

date have significant market power. Offer prices at the low end of the price curves within each

auction have been competitive and, over the three years to date, offer prices have shown a

downward trend from RAM 1 to RAM 5.

(c) Seller Concentration:

Although some firms generate substantially more RAM offers than others, seller

concentration does not appear to be a significant issue impacting RAM auctions. SCE does not

currently apply a specific seller concentration limit for the RAM auctions.

Between 28 and 40 firms participated in each of the RAM auctions. Table 3 shows an

overview of the number of offers received and number of firms participating in each RAM auction.

Table 3 Numbers of Offers, Contracts, and Participating Firms,

SCE RAM 1 – RAM 5

In general, firms that submit a large number of offers in RAM auctions have not received

a disproportionately high share of contracts. Table 4 shows the top three firms, in terms of the

number of offers submitted, per RAM auction and the number of contracts that they received. In

all RAM auctions except RAM 1 the top three firms (collectively) received a near-equal or

smaller proportion of contracts compared to their collective share of the total offer pool (i.e., the

top three firms received a near-equal or disproportionately low share of contracts).

RAM 1 RAM 2 RAM 3 RAM 4 RAM 5# Offers 92 142 130 126 109# Firms 28 39 40 39 28

# Contracts 7 6 13 10 21# Firms Receiving Contracts 4 3 9 8 12

Page 9: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

8

Table 4 Top Three Firms by Number of Offers Submitted, SCE RAM 1 – RAM 5

Additionally, as shown in Table 5, no one firm has dominated RAM solicitations in terms

of awarded megawatts.

RAM 1 RAM 2 RAM 3 RAM 4 RAM 5Number of Offers 92 142 130 126 109# Offers by "Top 3" 35 50 51 38 45"Top 3" % in Offer Pool 38% 35% 39% 30% 41%

Top 3 - # of OffersSilverado Power 15 14 24 16

Recurrent Energy 15 15 12First Solar, Inc. 10

GCL Solar Energy 12 19Republic Solar Highways 8

Solar Reserve 21 12NextEra Energy Resources 14

EDF Renewable Energy 12

# Winning Offers - "Top 3" 3 1 5 2 9Total Winning Offers 7 6 13 10 21% Winning Offers - "Top 3" 43% 17% 38% 20% 43%

Page 10: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

9

Table 5 Executed PPA MWs of Developer/Seller Compared to Total RAM PPA MWs,*

SCE RAM 1 – RAM 5

*A total of 859.81 MW of original bid capacity has been executed in the RAM program,

including both active and terminated contracts.

Developer/SellerTotal PPA MW with

Developer/SellerPercent

BP Solar Energy 20 2.3%Brookfield Energy Marketing LP 3 0.3%Bull Moose Energy, LLC 18 2.1%CleanPath 12 1.4%E.ON Climate and Renewables 18 2.1%EC&R NA Solar PV, LLC 20 2.3%EDF Renewable Energy 57.8 6.7%First Solar 20 2.3%GCL-SR 75 8.7%Infigen Energy 95 11.0%NextEra Energy Resources 80 9.3%NRG Solar 20 2.3%Recurrent Energy 59 6.9%Silverado Power 85 9.9%Solar Electric Solutions 56 6.5%Solar Projects Solutions 20 2.3%SunEdison 48 5.6%Terra-Gen 21.7 2.5%Trina Solar 20 2.3%Valos Solar Ventures, LLC 10 1.2%Windland, Inc. 15.31 1.8%EDP Renewables North America 30 3.5%67RK 8ME 20 2.3%Pacific Valley 20 2.3%New Dimension Energy Company 16 1.9%

Page 11: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

10

III.

CONCLUSION

SCE respectfully submits this RAM Report (including Attachments A-E hereto)

summarizing the status of the RAM Program.

Respectfully submitted, WILLIAM V. WALSH JONI TEMPLETON

/s/ Joni Templeton By: Joni Templeton

Attorneys for SOUTHERN CALIFORNIA EDISON COMPANY

2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770 Telephone: (626) 302-6210 Facsimile: (626) 302-3990 E-mail: [email protected]

Dated: February 2, 2015

Page 12: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

VERIFICATION

I am the Principal Manager of the Market Compliance & Cost Recovery Department of

Southern California Edison Company and am authorized to make this verification on its behalf. I

am informed and believe that the matters stated in the foregoing pleading are true.

I declare under penalty of perjury that the foregoing is true and correct.

Executed this 28th of January, 2015, at Rosemead, California.

/s/ Thomas G. Ware By: Thomas G. Ware

SOUTHERN CALIFORNIA EDISON COMPANY 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770

Page 13: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

APPENDIX A Name of Offeror

Number of Bids per Offeror/Number of Short-Listed Bids per Offeror

 

Page 14: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Table A‐1. Overview of RAM 1

1 AES Solar Power, LLC 1 0 0

2 Avalon Development, LLC 3 0 0

3 BP Solar Energy North America, LLC 2 1 1

4 Clean Path ventures, LLC 2 0 0

5 Commercial Solar Power, Inc 2 0 0

6 Enfinity SPV Holding, Inc 1 0 0

7 EnXco 3 0 0

8 First Solar Development, Inc 5 0 0

9 Fotowatio Renewable Ventures, Inc/Sun Edison 5 0 0

10 GCL Solar Energy 12 0 0

11 Gestamp Solar North America, Inc. 6 0 0

12 GWF Solar, LLC 1 0 0

13 Infigen Asset Management, LLC 1 0 0

14 Lincoln Renewable Energy, LLC 4 0 0

15 LS Power 1 0 0

16 NRG Solar LLC 2 0 0

17 Pioneer Green Energy 1 0 0

18 Rcurrent Energy 5 0 0

19 Republic Solar Highways, LLC 8 0 0

20 Rockland Capital 1 0 0

21 Sempra Generation 1 0 0

22 Silverado Power 15 4 3

23 Solar Electric Solutions, LLC 3 2 2

24 Solar Monkey 1 0 0

25 Solar Project Solutions, LLC 1 0 0

26 STS Hydro Power, Ltd. 1 1 0

27 Trina Solar US Development 2 1 1

28 Valos Solar Ventures, LLC 2 0 0

Totals 92 9 7

Offeror's NameNumber of bids 

submitted

Number of bids 

shortlisted

Number of 

contracts

Page 15: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Table A‐2. Overview of RAM 2

1 AES Solar Power, LLC 1

2 Ag Power Visalia, LLC 1

3 Aikyum, Inc. 1

4 Avalon Development, LLC 1

5 Beautiful Earth Group 1 1

6 BP Solar Energy North America LLC 5

7 Bull Moose Energy, LLC 2

8 CleanPath Ventures 3

9 Commercial Solar Power Inc. 2

10 E.ON Climate and Renewables, N.A. 1

11 enXco 4 1

12 First Wind 1

13 Frontier Renewables LLC 2

14 Gestamp Solar North America, Inc. 6 1

15 Inupiat Energy Marketing, LLC 2

16 Lincoln Renewable Energy, LLC 6 1 1

17 NextEra Energy Resources 2

18 NRG Solar LLC 1

19 Ormat Nevada, Inc. 2

20 Painted Hills Wind Developers 1

21 Phoenix Solar 1

22 Pumpjack Solar I, LLC 2

23 Recurrent Energy 15 1 1

24 Republic Solar Highways I LLC 8

25 Rugraw, Inc. 1

26 SEPV Mission Creek LLC 2

27 Silverado Power 14

28 Solar Monkey 2

29 Solar Power Inc. 2

30 Solar Projects Solutions LLC 3

31 Solarpack Development Inc 3

32 SolarReserve 21

33 SunEdison 13 4 3

34 Trina solar 3

35 Valos Solar Ventures 1 1

36 WDG Capital Partners 1

37 Wildwood Solar I, LLC 2

38 Windland Refresh, LLC 1

39 Z Global 2

Totals 142 10 5

Offeror's NameNumber of bids 

submitted

Number of bids 

shortlisted

Number of 

contracts

Page 16: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Table A‐3. Overview of RAM 3

1 8minutenergy renewables 2 1 1

2 Adera Solar, LLC 1 1

3 AES Solar 1

4 Bull Moose Energy, LLC 2

5 CAL SP XV, LLC 1

6 CalWind Resources, Inc. 1

7 CleanPath 1 1 1

8 CRES, Inc 1

9 EDF Renewable Energy 2 1 1

10 Energy Matters 1

11 EOn Climate and Renewable North America 2

12 First Solar 2

13 First Wind 1

14 Gestamp Solar 5

15 Gradient Resources Inc 1

16 Hanwha SolarEnergy America 2

17 Helios Renewables LLC 2

18 Infigen Energy US Development, LLC 2 2 2

19 Integrated Resource Development LLC 1

20 Los Angeles County Sanitation Districts 1

21 Madera Solar Farm 1, LLC  1

22 Meridian Energy USA 1

23 Metropolitan Water District of Southern California 3

24 New Dimension Energy Company 3

25 NextEra Energy Resources 6 1 1

26 NorthLight Power 2 2

27 Pristine Sun LLC 5 1

28 Recurrent Energy 15 2 1

29 Silverado Power 24 6 4

30 Soitec 1

31 Solar Electric Solutions 2 2 1

32 Solar Projects Solutions, LLC 1

33 SolarReserve 12

34 SunEdison 8

35 Tenaska Solar Ventures 2

36 Terra‐Gen Power 5

37 Terra‐Gen Power, LLC 3

38 Trina solar 1

39 Volt Energy, LLC 2 1 1

40 Windland, Inc. 1 1

Totals 130 22 13

Offeror's NameNumber of bids 

submitted

Number of bids 

shortlisted

Number of 

contracts

Page 17: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Table A‐4. Overview of RAM 4

Offeror's NameNumber of offers 

submitted

Number of offers 

shortlisted

Number of contracts 

executed

1 8minutenergy 1

2 AES Tehachapi Wind, LLC 4

3 Altamont Winds Inc. 1

4 Brookfield Renewable Energy Partners 2

5 Bull Moose Energy, LLC 1

6 CalWind Resources, Inc. 2

7 Celtic Energy Corporation 1

8 E.ON Climate and Renewables 2 1 1

9 EDF‐Renewable Energy 9 1 1

10 EDP Renewables North America LLC 1

11 EE Kettleman Land LLC 1

12 Element Power 1

13 First Solar, Inc. 10 1

14 Frontier Renewables LLC 6

15 Gestamp Solar North America, Inc. 4

16 Hanwha Q Cells USA 1

17 Infigen Energy US Development LLC 2

18 Montauk Energy 2

19 New Dimension Energy Company (NDEC) 6 1 1

20 NextEra Energy Resources 6

21 North American Power Group, Ltd 1

22 NorthLight Power LLC 2 1

23 NRG Solar 2 1 1

24 Pacific Valley, LLC 1 1

25 Painted Hills Wind Developers 1

26 Pristine Sun 3

27 Recurrent Energy 12

28 Sempra USGP 1 1

29 Sierra Power Corporation 1

30 Silverado Power 16 1 2

31 Solar Electric Solutions 2 2

32 Solar Projects Solutions 1 1 1

33 SolarReserve 6

34 Terra‐Gen Power 8

35 Trina Solar 1

36 Valos Solar Ventures, LLC 1

37 W Power, LLC 1

38 WDG Capital Partners 2 1

39 Windland, Inc. 1

Totals 126 10 10

Page 18: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Table A‐5.  Overview of RAM 5

Offeror's Name

Number of 

offers 

submitted

Number of 

offers 

shortlisted

Number of 

shortlisted 

offers 

waitlisted*

Number of 

contracts 

executed

1 8minutenergy Renewables, LLC 1

2 Brookfield Energy Marketing LP 1 1 1

3 Bull Moose Energy, LLC 1 1 1

4 Cogentrix 2

5 Community Recycling 1

6 Consolidated Edison Development, Inc 1

7 EC&R NA Solar PV, LLC (E.ON) 8 2 1 1

8 EDF Renewable Energy 12 1 1

9 First Solar 6 1 1

10 Frontier Renewables LLC 1

11 GCL‐SR (SolarReserve) 19 4 4 4

12 Gestamp Asetym Solar North America, Inc. (GASNA) 5 1 1

13 IHI Power Services 1

14 Infigen Energy 3 3 3

15 Lucerne Valley Solar One, LLC 1

16 New Dimension Energy Company 4

17 NextEra Energy Resources, LLC 14 5 1 4

18 NM Mid Valley Genco LLC 1

19 NRG Renew LLC 1

20 Pacific Solar & Power 1

21 Recurrent Energy 2 1 1

22 SunEdison LLC 4

23 Sustainable Power Group LLC 8

24 Terra‐Gen Power, LLC 5 4 2

25 US Topco Energy, Inc. 1

26 Valos Solar Ventures, LLC 1 1 1

27 W Power, LLC 3 1

28 Windland, Inc. 1 1 1

Totals 109 27 7 21

Note: "Offer" or "Offeror" is synonymous with "Bid" or "Bidder"

* Waitlisted offers were selected in the event that any of the orginally selected offers withdrew, in which case 

they would replace the withdrawn offers.  This process was new to RAM 5.

Page 19: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

APPENDIX B Location of Offeror

 

Page 20: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s
Page 21: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s
Page 22: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s
Page 23: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s
Page 24: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s
Page 25: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

CONFIDENTIAL

APPENDIX C Project Size and Technology (Public)

with

Offer Price, Transmission Upgrade Costs, Resource Adequacy Benefits, Bid Ranking Price

(Confidential)  

Page 26: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Confidential Table C‐1

SCE RAM 1 ‐ All Offers Received

Row # Offer No. Offer Type Offeror Company Project Name Technology Selected Product Project Location[City]

Offer Price ($/MWh)

Post-TOD PTA

($/MWh)*

TOD-Adjusted Levelized Offer Price ($/MWh)

Transmission Adder

($/MWh)

Project Size (MW)

1 48-1 Individual AES Wind Generation Mountain View Solar, LLC Photovoltaic [Solar PV] Peaking As-available Palm Springs 8.000

2 106-1 Individual Amonix Lucerne CPV 1 Photovoltaic [Solar PV] Peaking As-available Twentynine Palms-Morongo Valley 19.940

3 106-2 Individual Amonix Industry Solar Power Generating Station 1 Photovoltaic [Solar PV] Peaking As-available Adelanto 1.490

4 106-3 Individual Amonix Otoe Solar Power Generation Station 1 LLC Photovoltaic [Solar PV] Peaking As-available Apple Valley 1.490

5 148-1 Individual BP Solar Energy North America Westside Solar Project Photovoltaic [Solar PV] Peaking As-available Westside 20.000 6 148-2 Individual BP Solar Energy North America Joshua Tree Solar Farm Photovoltaic [Solar PV] Peaking As-available Joshua Tree 20.000 7 91-1 Individual CleanPath Ventures PVUSA Photovoltaic [Solar PV] Peaking As-available Davis 12.000 8 91-2 Individual CleanPath Ventures CP Plainfield Yolo Photovoltaic [Solar PV] Peaking As-available Davis 20.000 9 55-1 Individual Commercial Solar Power Inc. CSP Adera LLC Photovoltaic [Solar PV] Peaking As-available Chowchilla 20.000 10 55-3 Individual Commercial Solar Power Inc. CSP Excelsior LLC Photovoltaic [Solar PV] Peaking As-available Fresno County 14.000 11 60-1 Individual Enfinity Corporation Pumpjack Solar 1 Photovoltaic [Solar PV] Peaking As-available McKittrick 20.000 12 166-1 Individual enXco Little Rock Solar Photovoltaic [Solar PV] Peaking As-available Palmdale 3.680

13 166-2 Individual Excludes: 166-3 Excluded By:166-3 enXco SNC Solar 20MW Photovoltaic [Solar PV] Peaking As-available Rosamond 19.420

14 166-3 Individual Excludes: 166-2 Excluded By:166-2 enXco SNC Solar 10 Photovoltaic [Solar PV] Peaking As-available Rosamond 9.360

15 165-1 Individual First Solar Blackwell Solar Photovoltaic [Solar PV] Peaking As-available Lost Hills 12.000 16 165-2 Individual First Solar Lost Hills Solar Photovoltaic [Solar PV] Peaking As-available Lost Hills 20.000 17 165-3 Individual First Solar Cuyama Solar Photovoltaic [Solar PV] Peaking As-available Cuyama 20.000 18 165-4 Individual First Solar Seventh Standard Solar Photovoltaic [Solar PV] Peaking As-available Rio Bravo 20.000 19 165-5 Individual First Solar Portal Ridge Solar Photovoltaic [Solar PV] Peaking As-available Los Angeles County 20.000 20 110-1 Individual GCL-SR Vestal Almond Photovoltaic [Solar PV] Peaking As-available Ducor 20.000 21 110-10 Individual GCL-SR Huron Photovoltaic [Solar PV] Peaking As-available Huron 20.000 22 110-11 Individual GCL-SR Oro Loma Photovoltaic [Solar PV] Peaking As-available Fresno County 20.000 23 110-12 Individual GCL-SR Oro Loma Teresina Photovoltaic [Solar PV] Peaking As-available County of Fresno 20.000 24 110-13 Individual GCL-SR Rocket Photovoltaic [Solar PV] Peaking As-available Avenal 15.800 25 110-2 Individual GCL-SR SR Solis Vestal Fireman Photovoltaic [Solar PV] Peaking As-available Ducor 20.000 26 110-3 Individual GCL-SR Vestal Herder Photovoltaic [Solar PV] Peaking As-available Ducor 20.000 27 110-4 Individual GCL-SR Rector Photovoltaic [Solar PV] Peaking As-available Visalia 20.000 28 110-5 Individual GCL-SR Terra Bella Photovoltaic [Solar PV] Peaking As-available Terra Bella 20.000 29 110-6 Individual GCL-SR Alta Photovoltaic [Solar PV] Peaking As-available Reedley 9.000 30 110-7 Individual GCL-SR Firebaugh Photovoltaic [Solar PV] Peaking As-available Firebaugh 7.500 31 110-8 Individual GCL-SR Gooselake Photovoltaic [Solar PV] Peaking As-available Kern County 11.000

32 144-1 Individual Gestamp Solar North America, Inc. GASNA7P, LLC [ Photovoltaic [Solar PV] Peaking As-available San Joaquin 20.000

33 144-2 Individual Gestamp Solar North America, Inc. GASNA 6P, LLC Photovoltaic [Solar PV] Peaking As-available Helm 20.000

34 144-3 Individual Gestamp Solar North America, Inc. GASNA 11P, LLC Photovoltaic [Solar PV] Peaking As-available Firebaugh 20.000

35 144-4 Individual Gestamp Solar North America, Inc. GASNA 13P, LLC Photovoltaic [Solar PV] Peaking As-available Firebaugh 20.000

36 144-5 Individual Gestamp Solar North America, Inc. GASNA 28P, LLC Photovoltaic [Solar PV] Peaking As-available San Joaquin 11.750

37 144-6 Individual Gestamp Solar North America, Inc. GASNA 26P, LLC Photovoltaic [Solar PV] Peaking As-available Mendota 8.000

38 129-1 Individual GWF Solar LLC GWF Henrietta Solar Photovoltaic Plant Photovoltaic [Solar PV] Peaking As-available Lemoore 20.000 39 149-1 Individual Infigen Energy Kumeyaay Solar LLC Photovoltaic [Solar PV] Peaking As-available Boulevard 10.000 40 128-1 Individual Lincoln Renewable Energy, LLC LRE Marathon, LLC Photovoltaic [Solar PV] Peaking As-available Lucerne Valley 20.000 41 128-2 Individual Lincoln Renewable Energy, LLC LRE Agincourt, LLC Photovoltaic [Solar PV] Peaking As-available Lucerne Valley 10.000 42 128-3 Individual Lincoln Renewable Energy, LLC LRE Alamo, LLC Photovoltaic [Solar PV] Peaking As-available Oro Grande 11.500

* Post‐TOD PTAR ($/MWh) is the bid ranking price. Page 1 of 3

Page 27: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Confidential Table C‐1

SCE RAM 1 ‐ All Offers Received

Row # Offer No. Offer Type Offeror Company Project Name Technology Selected Product Project Location[City]

Offer Price ($/MWh)

Post-TOD PTA

($/MWh)*

TOD-Adjusted Levelized Offer Price ($/MWh)

Transmission Adder

($/MWh)

Project Size (MW)

43 128-4 Inclusive (128-1, 128-2) Lincoln Renewable Energy, LLC 0 Photovoltaic [Solar PV] Peaking As-available 0 30.000 44 112-2 Individual LS Power LA Solar 20 Photovoltaic [Solar PV] Peaking As-available Lancaster 20.000 45 102-1 Individual NRG Solar Blythe 20 Photovoltaic [Solar PV] Peaking As-available Blythe 20.000 46 102-2 Individual NRG Solar Alpine II Photovoltaic [Solar PV] Peaking As-available Near Lancaster 20.000 47 142-1 Individual Pioneer Green Energy Wildwood Solar I Photovoltaic [Solar PV] Peaking As-available Wasco 20.000 48 115-2 Individual Recurrent Energy RE Grangeville Photovoltaic [Solar PV] Peaking As-available Lemoore 20.000 49 115-4 Individual Recurrent Energy RE Adams East Photovoltaic [Solar PV] Peaking As-available Tranquillity 19.000 50 115-5 Individual Recurrent Energy RE Old River One Photovoltaic [Solar PV] Peaking As-available Bakersfield 20.000 51 115-6 Individual Recurrent Energy RE Jayne East Photovoltaic [Solar PV] Peaking As-available Coalinga 10.000 52 115-8 Individual Recurrent Energy RE Kansas Photovoltaic [Solar PV] Peaking As-available Lemoore 20.000 53 90-1 Individual Republic Solar Highways I LLC Republic Solar Highways Photovoltaic [Solar PV] Peaking As-available San Jose 3.320 54 90-2 Individual Republic Solar Highways I LLC Republic Solar Highways Photovoltaic [Solar PV] Peaking As-available San Jose 1.660 55 90-3 Individual Republic Solar Highways I LLC Republic Solar Highways Photovoltaic [Solar PV] Peaking As-available San Jose 3.140 56 90-4 Individual Republic Solar Highways I LLC Republic Solar Highways Photovoltaic [Solar PV] Peaking As-available Morgan Hill 1.040 57 90-5 Individual Republic Solar Highways I LLC Republic Solar Highways Photovoltaic [Solar PV] Peaking As-available Morgan Hill 1.560 58 90-6 Individual Republic Solar Highways I LLC Republic Solar Highways Photovoltaic [Solar PV] Peaking As-available Santa Clara County 1.040 59 90-7 Individual Republic Solar Highways I LLC Republic Solar Highways Photovoltaic [Solar PV] Peaking As-available Santa Clara County 1.820

60 90-9 Inclusive (90-1, 90-2, 90-3, 90-4, 90-5, 90-6, 90-7) Republic Solar Highways I LLC 0 Photovoltaic [Solar PV] Peaking As-available 0 13.580

61 152-1 Individual Rockland Capital Sun Gen 1 Photovoltaic [Solar PV] Peaking As-available McKittrick 20.000

62 70-1 Individual Sempra Generation Rosamond Solar Photovoltaic [Solar PV] Peaking As-available Unincorporated Kern [Rosamond] 20.000

63 122-1 Individual SEPV8, LLC SEPV8 LLC Photovoltaic [Solar PV] Peaking As-available Twentynine Palms 12.000 64 122-2 Individual SEPV8, LLC SEPV9 LLC Photovoltaic [Solar PV] Peaking As-available Twentynine Palms 9.000 65 122-4 Inclusive (122-1, 122-2) SEPV8, LLC 0 Photovoltaic [Solar PV] Peaking As-available 0 21.000 66 65-1 Individual Silverado Power Adelanto Greenworks A Photovoltaic [Solar PV] Peaking As-available Adelanto 2.000 67 65-11 Individual Silverado Power Western Antelope Dry Ranch Photovoltaic [Solar PV] Peaking As-available Lancaster 10.000 68 65-12 Individual Silverado Power Western Antelope Blue Sky Ranch A Photovoltaic [Solar PV] Peaking As-available Lancaster 20.000 69 65-13 Individual Silverado Power Western Antelope Blue Sky Ranch B Photovoltaic [Solar PV] Peaking As-available Lancaster 20.000 70 65-14 Individual Silverado Power Silver Sun Greenworks Photovoltaic [Solar PV] Peaking As-available Lancaster 20.000 71 65-15 Individual Silverado Power Summer Solar Photovoltaic [Solar PV] Peaking As-available Lancaster 20.000 72 65-16 Individual Silverado Power Antelope Big Sky Ranch Photovoltaic [Solar PV] Peaking As-available Lancaster 20.000 73 65-2 Individual Silverado Power Adelanto Greenworks B Photovoltaic [Solar PV] Peaking As-available Adelanto 2.000 74 65-3 Individual Silverado Power Expressway Solar A Photovoltaic [Solar PV] Peaking As-available Victorville 2.000 75 65-4 Individual Silverado Power Expressway Solar B Photovoltaic [Solar PV] Peaking As-available Victorville 2.000 76 65-5 Individual Silverado Power Victor Mesa Linda A Photovoltaic [Solar PV] Peaking As-available Victorville 2.000 77 65-6 Individual Silverado Power Victor Mesa Linda B Photovoltaic [Solar PV] Peaking As-available Victorville 5.000 78 65-7 Individual Silverado Power American Solar Greenworks Photovoltaic [Solar PV] Peaking As-available Lancaster 15.000 79 65-8 Individual Silverado Power Central Antelope Dry Ranch C Photovoltaic [Solar PV] Peaking As-available Lancaster 20.000 80 65-9 Individual Silverado Power North Lancaster Ranch Photovoltaic [Solar PV] Peaking As-available Lancaster 20.000 81 156-1 Individual Solar Monkey Three Rocks Photovoltaic [Solar PV] Peaking As-available Three Rocks 13.000 82 164-1 Individual Solar Projects Solutions LLC SPS Atwell Island West LLC Photovoltaic [Solar PV] Peaking As-available Alpaugh 20.000 83 157-1 Individual STS HydroPower, Ltd. Kekawaka Creek Hydroelectric Facility Small hydroelectric Non-Peaking As-available near Alderpoint 4.950

84 53-1 Individual SunEdison Rigel Solar Photovoltaic [Solar PV] Peaking As-available Unincorporated Kern County 20.000

85 53-2 Individual SunEdison Orion Solar II Photovoltaic [Solar PV] Peaking As-available Unincorporated Kern County 8.000

86 53-3 Individual SunEdison Vega Solar Photovoltaic [Solar PV] Peaking As-available Los Banos 20.000 87 53-4 Individual SunEdison Cascade Solar II Photovoltaic [Solar PV] Peaking As-available Joshua Treet 10.000 88 53-5 Individual SunEdison CAL SP VI Photovoltaic [Solar PV] Peaking As-available Le Grand 15.000 89 134-1 Individual Trina Solar Brannon Solar Photovoltaic [Solar PV] Peaking As-available Firebaugh 20.000 90 134-2 Individual Trina Solar Placer Solar Photovoltaic [Solar PV] Peaking As-available San Joaquin 20.000

* Post‐TOD PTAR ($/MWh) is the bid ranking price. Page 2 of 3

Page 28: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Confidential Table C‐1

SCE RAM 1 ‐ All Offers Received

Row # Offer No. Offer Type Offeror Company Project Name Technology Selected Product Project Location[City]

Offer Price ($/MWh)

Post-TOD PTA

($/MWh)*

TOD-Adjusted Levelized Offer Price ($/MWh)

Transmission Adder

($/MWh)

Project Size (MW)

91 32-1 Individual Excludes: 32-2 Excluded By:32-2 Valos Solar Ventures, LLC VSV SKIC Solar 1 Photovoltaic [Solar PV] Peaking As-available unincorporated area near

Taft 20.000

92 32-2 Individual Excludes: 32-1 Excluded By:32-1 Valos Solar Ventures, LLC VSV SKIC Solar 2 Photovoltaic [Solar PV] Peaking As-available unincorporated area near

Taft 10.000

* Post‐TOD PTAR ($/MWh) is the bid ranking price. Page 3 of 3

Page 29: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Confidential Table C‐2

SCE RAM 2 ‐ All Offers Received

Row # Offer No. Offer Type Offeror Company Project Name Technology Selected Product Project Location[City]

Offer Price ($/MWh)

Post-TOD PTAR

($/MWh)*

TOD-Adjusted Levelized

Offer Price ($/MWh)

Transmission Adder

($/MWh)

RA Benefits ($/MWh)

Project Size (MW)

1 61-1 Individual AES Solar Power, LLC Mountain View Solar Photovoltaic [Solar PV] Peaking As-available North Palm Springs 10.500 2 121-1 Individual Ag Power Visalia, LLC Ag Power Visalia Digester gas Baseload Visalia 1.000 3 111-1 Individual Aikyum, Inc. Deep Creek Photovoltaic [Solar PV] Peaking As-available Apple Valley 0.980

4 103-1 Individual Avalon Development, LLC Lucerne Valley CPV 1 Photovoltaic [Solar PV] Peaking As-available Twentynine Palms-Morongo Valley 20.000

5 112-1 Individual Beautiful Earth Group Del Sur Solar Photovoltaic [Solar PV] Peaking As-available Lancaster 20.000

6 116-1 Individual BP Solar Energy North America LLC Adelanto Solar Farm LLC Photovoltaic [Solar PV] Peaking As-available Adelanto 20.000

7 116-4 Individual Excludes: 116-5 BP Solar Energy North America LLC Shafter Solar Farm LLC Photovoltaic [Solar PV] Peaking As-available Shafter 20.000

8 116-2 Individual BP Solar Energy North America LLC San Jacinto Solar Farm LLC Photovoltaic [Solar PV] Peaking As-available San Jacinto 20.000

9 116-3 Individual BP Solar Energy North America LLC Westside Solar, LLC Photovoltaic [Solar PV] Peaking As-available Westside 20.000

10 116-5 Individual Excluded By:116-4 BP Solar Energy North America LLC Shafter Solar Farm LLC Photovoltaic [Solar PV] Peaking As-available Shafter 20.000

11 53-1 Individual Excludes: 53-2 Bull Moose Energy, LLC Bull Moose Energy of San Diego Biomass Baseload San Diego 20.000 12 53-2 Individual Excluded By:53-1 Bull Moose Energy, LLC Bull Moose Energy of Otay Mesa Biomass Baseload San Diego 20.000 13 134-2 Individual CleanPath Ventures CP Plainfield Yolo, LLC Photovoltaic [Solar PV] Peaking As-available Davis 20.000 14 134-1 Individual CleanPath Ventures CPV PVUSA, LLC Photovoltaic [Solar PV] Peaking As-available Davis 12.000 15 134-3 Individual CleanPath Ventures CPV PVUSA, LLC Photovoltaic [Solar PV] Peaking As-available Davis 12.000 16 120-1 Individual Commercial Solar Power Inc. CSP Adera LLC Photovoltaic [Solar PV] Peaking As-available Chowchilla 20.000 17 120-2 Individual Commercial Solar Power Inc. CSP Excelsior Photovoltaic [Solar PV] Peaking As-available Fresno County 14.000

18 95-1 Individual E.ON Climate and Renewables, N.A. Maricopa West Solar PV, LLC Photovoltaic [Solar PV] Peaking As-available Maricopa 19.900

19 80-4 Individual enXco SNC 1 Solar PV Project Photovoltaic [Solar PV] Peaking As-available Rosamond 18.000 20 80-2 Individual enXco Little Rock Solar PV Project Photovoltaic [Solar PV] Peaking As-available Little Rock 4.560

21 80-1 Individual enXco Corcoran Irrigation District Solar PV Project Photovoltaic [Solar PV] Peaking As-available Corcoran 19.760

22 80-3 Individual enXco City of Corcoran Solar PV Project Photovoltaic [Solar PV] Peaking As-available Corcoran 12.160

23 50-1 Individual First Wind Painted Hills IV Wind Non-Peaking As-available City of Desert Hot Springs 17.500

24 65-2 Individual Frontier Renewables LLC Blackwell Solar Park Photovoltaic [Solar PV] Peaking As-available Lost Hills 20.000 25 65-1 Individual Frontier Renewables LLC Giffen Solar Park Photovoltaic [Solar PV] Peaking As-available Cantua Creek 20.000

26 117-1 Individual Gestamp Solar North America, Inc. Peabody RBJ Photovoltaic [Solar PV] Peaking As-available Unincorporated area of Solano County 14.000

27 117-6 Individual Gestamp Solar North America, Inc. San Joaquin 1B FIT 1 Photovoltaic [Solar PV] Peaking As-available Helm 1.500

28 117-7 Individual Gestamp Solar North America, Inc. Camden 1 FIT Photovoltaic [Solar PV] Peaking As-available Riverdale 1.500

29 117-2 Individual Gestamp Solar North America, Inc. San Joaquin 1A Photovoltaic [Solar PV] Peaking As-available Helm 20.000

30 117-3 Individual Gestamp Solar North America, Inc. San Joaquin 2A Photovoltaic [Solar PV] Peaking As-available Helm 20.000

31 117-4 Individual Gestamp Solar North America, Inc. Oro Loma IV Photovoltaic [Solar PV] Peaking As-available Firebaugh 20.000

32 124-1 Individual Inupiat Energy Marketing, LLC Huron Solar Energy LLC Photovoltaic [Solar PV] Peaking As-available Huron 20.000 33 124-2 Individual Inupiat Energy Marketing, LLC Huron Solar Energy LLC Photovoltaic [Solar PV] Peaking As-available Huron 20.000

34 60-8 Individual Excludes: 60-6, 60-10 Excluded By:60-6 Lincoln Renewable Energy, LLC Agincourt Solar Photovoltaic [Solar PV] Peaking As-available Lucerne Valley 10.000

35 60-7 Individual Excludes: 60-5, 60-9 Excluded By:60-5 Lincoln Renewable Energy, LLC Marathon Solar Photovoltaic [Solar PV] Peaking As-available Lucerne Valley 20.000

36 60-10 Individual Excludes: 60-6, 60-8 Excluded By:60-6 Lincoln Renewable Energy, LLC Agincourt Solar Photovoltaic [Solar PV] Peaking As-available Lucerne Valley 10.000

* Post‐TOD PTAR ($/MWh) is the bid ranking price. Page 1 of 4

Page 30: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Confidential Table C‐2

SCE RAM 2 ‐ All Offers Received

Row # Offer No. Offer Type Offeror Company Project Name Technology Selected Product Project Location[City]

Offer Price ($/MWh)

Post-TOD PTAR

($/MWh)*

TOD-Adjusted Levelized

Offer Price ($/MWh)

Transmission Adder

($/MWh)

RA Benefits ($/MWh)

Project Size (MW)

37 60-9 Individual Excludes: 60-5, 60-7 Excluded By:60-5 Lincoln Renewable Energy, LLC Marathon Solar Photovoltaic [Solar PV] Peaking As-available Lucerne Valley 20.000

38 60-6 Individual Excludes: 60-8, 60-10 Excluded By:60-8 Lincoln Renewable Energy, LLC Agincourt Solar Photovoltaic [Solar PV] Peaking As-available Lucerne Valley 10.000

39 60-5 Individual Excludes: 60-7, 60-9 Excluded By:60-7 Lincoln Renewable Energy, LLC Marathon Solar Photovoltaic [Solar PV] Peaking As-available Lucerne Valley 20.000

40 132-2 Individual Excludes: 132-3, 132-4, 132-5 Excluded By:132-3 NextEra Energy Resources Sirius Solar Array Photovoltaic [Solar PV] Peaking As-available Bakersfield 19.890

41 132-3 Individual Excludes: 132-2, 132-4, 132-5 Excluded By:132-2 NextEra Energy Resources Sirius Solar Array Photovoltaic [Solar PV] Peaking As-available Bakersfield 19.890

42 62-1 Individual NRG Solar LLC NRG Solar Blythe II LLC Photovoltaic [Solar PV] Peaking As-available Blythe 20.000 43 75-2 Individual Ormat Nevada, Inc. Mammoth G2 Geothermal Baseload Mammoth Lakes 12.000 44 75-3 Individual Ormat Nevada, Inc. Mammoth G1 Geothermal Baseload Mammoth Lakes 7.500 45 97-1 Individual Painted Hills Wind Developers Painted Hills Wind Developers Wind Non-Peaking As-available Riverside County 19.075 46 118-2 Individual Phoenix Solar Castaic Mesa Photovoltaic [Solar PV] Peaking As-available Valencia 6.000

47 109-2 Individual Excludes: 109-1 Excluded By:109-1 Pumpjack Solar I, LLC Pumpjack Solar I, LLC Photovoltaic [Solar PV] Peaking As-available McKittrick 20.000

48 109-1 Individual Excludes: 109-2 Excluded By:109-2 Pumpjack Solar I, LLC Pumpjack Solar Photovoltaic [Solar PV] Peaking As-available McKittrick 20.000

49 126-6 Individual Excludes: 126-12 Recurrent Energy RE Adams East Photovoltaic [Solar PV] Peaking As-available Tranquillity 19.000 50 126-5 Individual Excludes: 126-15 Recurrent Energy RE Old River One Photovoltaic [Solar PV] Peaking As-available Bakersfield 20.000 51 126-3 Individual Excludes: 126-14 Recurrent Energy RE Lincoln Photovoltaic [Solar PV] Peaking As-available Lemoore 12.000 52 126-9 Individual Excludes: 126-10 Recurrent Energy RE Grangeville Photovoltaic [Solar PV] Peaking As-available Lemoore 20.000 53 126-1 Individual Recurrent Energy RE Great Lakes Photovoltaic [Solar PV] Peaking As-available Rosamond 5.000 54 126-4 Individual Excludes: 126-13 Recurrent Energy RE Jayne East Photovoltaic [Solar PV] Peaking As-available Coalinga 10.000 55 126-12 Individual Excluded By:126-6 Recurrent Energy RE Adams East Photovoltaic [Solar PV] Peaking As-available Tranquillity 19.000 56 126-8 Individual Excludes: 126-11 Recurrent Energy RE Kent South Photovoltaic [Solar PV] Peaking As-available Stratford 20.000 57 126-15 Individual Excluded By:126-5 Recurrent Energy RE Old River One Photovoltaic [Solar PV] Peaking As-available Bakersfield 20.000 58 126-10 Individual Excluded By:126-9 Recurrent Energy RE Grangeville Photovoltaic [Solar PV] Peaking As-available Lemoore 20.000 59 126-7 Individual Excludes: 126-16 Recurrent Energy RE Orion Photovoltaic [Solar PV] Peaking As-available Lemoore 20.000 60 126-14 Individual Excluded By:126-3 Recurrent Energy RE Lincoln Photovoltaic [Solar PV] Peaking As-available Lemoore 12.000 61 126-13 Individual Excluded By:126-4 Recurrent Energy RE Jayne East Photovoltaic [Solar PV] Peaking As-available Coalinga 10.000 62 126-11 Individual Excluded By:126-8 Recurrent Energy RE Kent South Photovoltaic [Solar PV] Peaking As-available Stratford 20.000 63 126-16 Individual Excluded By:126-7 Recurrent Energy RE Orion Photovoltaic [Solar PV] Peaking As-available Lemoore 20.000 64 87-2 Individual Republic Solar Highways I LLC Republic Solar Highways I LLC Photovoltaic [Solar PV] Peaking As-available San Jose 3.320

65

87-1Inc 87-2Inc 87-3Inc 87-4Inc 87-5Inc 87-6Inc 87-7Inc

Inclusive Republic Solar Highways I LLC Republic Solar Highways I LLC Photovoltaic [Solar PV] Peaking As-available San Jose; Morgan Hill; Santa Clara County

1.660 3.320 3.140 1.040 1.560 1.820

66 87-1 Individual Republic Solar Highways I LLC Republic Solar Highways I LLC Photovoltaic [Solar PV] Peaking As-available San Jose 1.660 67 87-3 Individual Republic Solar Highways I LLC Republic Solar Highways I LLC Photovoltaic [Solar PV] Peaking As-available San Jose 3.140 68 87-7 Individual Republic Solar Highways I LLC Republic Solar Highways I LLC Photovoltaic [Solar PV] Peaking As-available Santa Clara County 1.820 69 87-4 Individual Republic Solar Highways I LLC Republic Solar Highways I LLC Photovoltaic [Solar PV] Peaking As-available Morgan Hill 1.040 70 87-5 Individual Republic Solar Highways I LLC Republic Solar Highways I LLC Photovoltaic [Solar PV] Peaking As-available Morgan Hill 1.560 71 87-6 Individual Republic Solar Highways I LLC Republic Solar Highways I LLC Photovoltaic [Solar PV] Peaking As-available Santa Clara County 1.040 72 122-1 Individual Rugraw, Inc. Lassen Lodge Hydro. Project Small hydroelectric Non-Peaking As-available Mineral 5.000 73 99-1 Individual SEPV Mission Creek LLC SEPV Mission Creek Photovoltaic [Solar PV] Peaking As-available Desert Hot Springs 11.000 74 99-2 Individual SEPV Mission Creek LLC SEPV5 Photovoltaic [Solar PV] Peaking As-available Palmdale 10.000 75 64-23 Individual Silverado Power Patriot Solar B Photovoltaic [Solar PV] Peaking As-available Firebaugh 20.000 76 64-21 Individual Silverado Power Patriot Solar A Photovoltaic [Solar PV] Peaking As-available Firebaugh 20.000

77 64-25 Individual Excluded By Aggregation: 64-30 Silverado Power Adelanto Greenworks B Photovoltaic [Solar PV] Peaking As-available Victorville 2.000

* Post‐TOD PTAR ($/MWh) is the bid ranking price. Page 2 of 4

Page 31: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Confidential Table C‐2

SCE RAM 2 ‐ All Offers Received

Row # Offer No. Offer Type Offeror Company Project Name Technology Selected Product Project Location[City]

Offer Price ($/MWh)

Post-TOD PTAR

($/MWh)*

TOD-Adjusted Levelized

Offer Price ($/MWh)

Transmission Adder

($/MWh)

RA Benefits ($/MWh)

Project Size (MW)

78 64-24Agg 64-25Agg Aggregated Silverado Power Adelanto Greenworks A, Adelanto

Greenworks B Photovoltaic [Solar PV] Peaking As-available Victorville 2.0002.000

79 64-24 Individual Excluded By Aggregation: 64-30 Silverado Power Adelanto Greenworks A Photovoltaic [Solar PV] Peaking As-available Victorville 2.000

80 64-26 Individual Silverado Power Western Antelope Blue Sky Ranch B Photovoltaic [Solar PV] Peaking As-available Lancaster 20.000 81 64-27 Individual Silverado Power Citizen Solar B Photovoltaic [Solar PV] Peaking As-available Mendota 5.000

82 64-16Inc 64-17Inc Inclusive Silverado Power Aspiration Solar G, Aspiration Solar F Photovoltaic [Solar PV] Peaking As-available Cantua Creek 9.000

3.000 83 64-16 Individual Silverado Power Aspiration Solar G Photovoltaic [Solar PV] Peaking As-available Cantua Creek 9.000 84 64-19 Individual Silverado Power Inspiration Solar E Photovoltaic [Solar PV] Peaking As-available San Joaquin-Tranquility 20.000 85 64-18 Individual Silverado Power Inspiration Solar C Photovoltaic [Solar PV] Peaking As-available San Joaquin-Tranquility 20.000 86 64-20 Individual Silverado Power Inspiration Solar F Photovoltaic [Solar PV] Peaking As-available San Joaquin-Tranquility 20.000 87 64-17 Individual Silverado Power Aspiration Solar F Photovoltaic [Solar PV] Peaking As-available Cantua Creek 3.000 88 64-28 Individual Silverado Power Zodiac Solar Photovoltaic [Solar PV] Peaking As-available Potrero 20.000 89 119-2 Individual Excluded By:119-1 Solar Monkey Three Rocks Solar Photovoltaic [Solar PV] Peaking As-available Three Rocks Solar 13.000 90 119-1 Individual Excludes: 119-2 Solar Monkey Three Rocks Solar Photovoltaic [Solar PV] Peaking As-available Three Rocks 13.000 91 45-2 Individual Solar Power Inc. Colusa Photovoltaic Solar Energy Facility Photovoltaic [Solar PV] Peaking As-available Colusa 16.000

92 45-1 Individual Solar Power Inc. Red Bluff Photovoltaic Solar Energy Facility Photovoltaic [Solar PV] Peaking As-available Red Bluff 17.500

93 77-3 Individual Solar Projects Solutions LLC SPS White River West Photovoltaic [Solar PV] Peaking As-available Alpaugh 19.750

94 77-2 Individual Excludes: 77-1 Excluded By:77-1 Solar Projects Solutions LLC SPS, Atwell Island West, LLC Photovoltaic [Solar PV] Peaking As-available Alpaugh 20.000

95 77-1 Individual Excludes: 77-2 Excluded By:77-2 Solar Projects Solutions LLC SPS, Atwell Island West, LLC Photovoltaic [Solar PV] Peaking As-available Alpaugh 20.000

96 66-2 Individual Solarpack Development Inc CAL SP V Photovoltaic [Solar PV] Peaking As-available Madera 20.000 97 66-6 Individual Excluded By:66-5 Solarpack Development Inc CAL SP XV Photovoltaic [Solar PV] Peaking As-available Exeter 4.000 98 66-5 Individual Excludes: 66-6 Solarpack Development Inc CAL SP XV Photovoltaic [Solar PV] Peaking As-available Exeter 4.000

9970-10Inc 70-11Inc 70-12Inc

Inclusive SolarReserve Vestal Almond, Vestal Fireman, Vestal Herder Photovoltaic [Solar PV] Peaking As-available Ducor

20.00020.00020.000

100 70-10 Individual SolarReserve Vestal Almond Photovoltaic [Solar PV] Peaking As-available Ducor 20.000 101 70-12 Individual SolarReserve Vestal Herder Photovoltaic [Solar PV] Peaking As-available Ducor 20.000 102 70-9 Individual SolarReserve Terra Bella Photovoltaic [Solar PV] Peaking As-available Tulare County 20.000 103 70-7 Individual SolarReserve Oro Loma Photovoltaic [Solar PV] Peaking As-available Oro Loma 20.000 104 70-11 Individual SolarReserve Vestal Fireman Photovoltaic [Solar PV] Peaking As-available Ducor 20.000 105 70-5 Individual SolarReserve Gustine Photovoltaic [Solar PV] Peaking As-available Gustine 20.000 106 70-13 Individual SolarReserve Alta Photovoltaic [Solar PV] Peaking As-available Reedley 9.000

10770-23Inc 70-24Inc 70-25Inc

Inclusive SolarReserve Vestal Herder -FCDS, Vestal Fireman - FCDS, Vestal Almond - FCDS Photovoltaic [Solar PV] Peaking As-available Ducor 20 | 20 |

20

108 70-14 Individual SolarReserve Firebaugh Photovoltaic [Solar PV] Peaking As-available Firebaugh 7.500 109 70-19 Individual SolarReserve Oro Loma - FCDS Photovoltaic [Solar PV] Peaking As-available Oro Loma 20.000 110 70-16 Individual SolarReserve ALTA FCDS Photovoltaic [Solar PV] Peaking As-available Reedley 9.000 111 70-8 Individual SolarReserve Rocket Photovoltaic [Solar PV] Peaking As-available Kings County 15.800 112 70-23 Individual SolarReserve Vestal Herder -FCDS Photovoltaic [Solar PV] Peaking As-available Ducor 20.000 113 70-25 Individual SolarReserve Vestal Almond - FCDS Photovoltaic [Solar PV] Peaking As-available Ducor 20.000 114 70-24 Individual SolarReserve Vestal Fireman - FCDS Photovoltaic [Solar PV] Peaking As-available Ducor 20.000 115 70-27 Individual SolarReserve Paso Robles - Energy Only Photovoltaic [Solar PV] Peaking As-available Kern County 20.000 116 70-22 Individual SolarReserve Terra Bella -FCDS Photovoltaic [Solar PV] Peaking As-available Tulare County 20.000 117 70-17 Individual SolarReserve Firebaugh - FCDS Photovoltaic [Solar PV] Peaking As-available Firebaugh 7.500 118 70-20 Individual SolarReserve Rocket - FCDS Photovoltaic [Solar PV] Peaking As-available Kings County 15.800 119 70-26 Individual SolarReserve Gustine - FCDS Photovoltaic [Solar PV] Peaking As-available Gustine 20.000 120 114-5 Individual SunEdison Cascade Solar Photovoltaic [Solar PV] Peaking As-available Joshua Tree 18.500 121 114-2 Individual SunEdison AP North Lake II Solar Photovoltaic [Solar PV] Peaking As-available City of Hemet 5.000

* Post‐TOD PTAR ($/MWh) is the bid ranking price. Page 3 of 4

Page 32: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Confidential Table C‐2

SCE RAM 2 ‐ All Offers Received

Row # Offer No. Offer Type Offeror Company Project Name Technology Selected Product Project Location[City]

Offer Price ($/MWh)

Post-TOD PTAR

($/MWh)*

TOD-Adjusted Levelized

Offer Price ($/MWh)

Transmission Adder

($/MWh)

RA Benefits ($/MWh)

Project Size (MW)

122 114-1 Individual Excludes: 114-11 SunEdison AP North Lake Solar Photovoltaic [Solar PV] Peaking As-available City of Hemet 20.000 123 114-10 Individual SunEdison Victorville Solar Photovoltaic [Solar PV] Peaking As-available Victorville 10.000 124 114-9 Individual SunEdison Vega Solar Photovoltaic [Solar PV] Peaking As-available Los Banos 20.000

125 114-7 Individual Excludes: 114-12 SunEdison Orion Solar II Photovoltaic [Solar PV] Peaking As-available Unincorporated Kern County 8.000

126 114-8 Individual SunEdison Twissleman Solar Photovoltaic [Solar PV] Peaking As-available Lost Hills 20.000 127 114-3 Individual SunEdison CAL SP VI Photovoltaic [Solar PV] Peaking As-available Legrand 15.000 128 114-13 Individual SunEdison SunEdison - Cottonwood Photovoltaic [Solar PV] Peaking As-available Lucerne Valley 3.000 129 114-6 Individual SunEdison Mayberry Solar Photovoltaic [Solar PV] Peaking As-available Hemet-San Jacinto 5.000 130 114-4 Individual SunEdison Cameron Solar Photovoltaic [Solar PV] Peaking As-available Campo 7.500

131 114-12 Individual Excluded By:114-7 SunEdison Orion Solar II Photovoltaic [Solar PV] Peaking As-available Unincorporated Kern County 8.000

132 114-11 Individual Excluded By:114-1 SunEdison AP North Lake Solar Photovoltaic [Solar PV] Peaking As-available City of Hemet 20.000 133 105-2.2 Individual Excludes: 105-2, 105-2.1 Trina solar Rose Solar, LLC Photovoltaic [Solar PV] Peaking As-available San Jose 20.000

134 105-2 Individual Excludes: 105-2.1, 105-2.2 Trina solar Rose Solar, LLC Photovoltaic [Solar PV] Peaking As-available San Jose 20.000

135 105-2.1 Individual Excludes: 105-2, 105-2.2 Trina solar Rose Solar, LLC Photovoltaic [Solar PV] Peaking As-available San Jose 20.000

136 47-1 Individual Valos Solar Ventures SKIC Solar 1 Photovoltaic [Solar PV] Peaking As-available unincorporated area near Taft 20.000

137 115-2 Individual WDG Capital Partners Alamo Solar Photovoltaic [Solar PV] Peaking As-available Oro Grande 20.000

138 110-2 Individual Excludes: 110-1 Excluded By:110-1 Wildwood Solar I, LLC Wildwood Solar I Photovoltaic [Solar PV] Peaking As-available Wasco 20.000

139 110-1 Individual Excludes: 110-2 Excluded By:110-2 Wildwood Solar I, LLC Wildwood Solar Photovoltaic [Solar PV] Peaking As-available Wasco 20.000

140 107-1 Individual Windland Refresh, LLC Windland Refresh Wind Non-Peaking As-available Mojave 7.335 141 123-3 Individual Z Global Azimuth Solar Project Photovoltaic [Solar PV] Peaking As-available Lakeport 1.500 142 123-4 Individual Z Global Quasar Solar Project Photovoltaic [Solar PV] Peaking As-available Kelseyville 1.500

* Post‐TOD PTAR ($/MWh) is the bid ranking price. Page 4 of 4

Page 33: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Confidential Table C‐3

SCE RAM 3 ‐ All Offers Received

Row # Offer No. Offer Type Offeror Company Project Name Technology Selected Product Project Location[City]

Offer Price ($/MWh)

Post-TOD PTAR

($/MWh)*

TOD-Adjusted Levelized

Offer Price ($/MWh)

Transmission Adder

($/MWh)

RA Benefits ($/MWh)

Project Size (MW)

1 170-1 Individual 8minutenergy renewables Redcrest Solar Farm Photovoltaic [Solar PV] Peaking As-available Edison 20.0 2 170-2 Individual 8minutenergy renewables Redcrest Solar Farm Photovoltaic [Solar PV] Peaking As-available Edison 20.0 3 194-1 Individual Adera Solar, LLC Chowchilla Solar Project Photovoltaic [Solar PV] Peaking As-available Chowchilla 20.0 4 202-1 Individual AES Solar Mountain View Solar Photovoltaic [Solar PV] Peaking As-available North Palm Springs 10.5 5 198-1 Individual Bull Moose Energy, LLC Bull Moose Energy Biomass Baseload San Diego 20.0 6 198-2 Individual Bull Moose Energy, LLC Bull Moose Energy of San Diego Biomass Baseload San Diego 7.0 7 210-1 Individual CAL SP XV, LLC CAL SP XV LLC Photovoltaic [Solar PV] Peaking As-available EXETER 4.0 8 197-1 Individual CalWind Resources, Inc. Pajuela Peak - Wind Resource III Wind Non-Peaking As-available Tehachapi 17.5 9 207-1 Individual CleanPath CPV - PVUSA, LLC Photovoltaic [Solar PV] Peaking As-available Davis 12.0 10 181-1 Individual CRES, Inc Dinuba Energy Biomass Baseload Reedley 12.0 11 171-2 Individual EDF Renewable Energy Catalina Solar 2 PV Project Photovoltaic [Solar PV] Peaking As-available Rosamond 18.0 12 171-1 Individual EDF Renewable Energy Little Rock Solar PV Project Photovoltaic [Solar PV] Peaking As-available Little Rock 4.6 13 149-1 Individual Energy Matters Kekawaka Creek Hydroelectric Facility Small hydroelectric Non-Peaking As-available Zenia 5.5

14 199-1 Individual Excludes: 199-2 EOn Climate and Renewable North America Maricopa West Solar PV, LLC Photovoltaic [Solar PV] Peaking As-available Maricopa 19.8

15 199-2 Individual Excluded By:199-1 EOn Climate and Renewable North America Maricopa West Solar PV, LLC Photovoltaic [Solar PV] Peaking As-available Maricopa 19.8

16 154-1 Individual First Solar Kingbird Solar Project Photovoltaic [Solar PV] Peaking As-available Unincorporated Kern County 19.8

17 154-2 Individual First Solar Cielo Del Sol Project Photovoltaic [Solar PV] Peaking As-available Unincorporated Imperial County 10.9

18 169-1 Individual First Wind Painted Hills IV Wind Non-Peaking As-available City of Desert Hot Springs 17.5

19 200-1 Individual Gestamp Solar Twisselman 1 Photovoltaic [Solar PV] Peaking As-available Los Hills [Kern County] 15.0 20 200-5 Individual Gestamp Solar Twisselman 1 Photovoltaic [Solar PV] Peaking As-available Lost Hills [Kern County] 15.0 21 200-2 Individual Gestamp Solar San Joaquin 1A Photovoltaic [Solar PV] Peaking As-available Helm 20.0 22 200-4 Individual Gestamp Solar San Joaquin 2A Photovoltaic [Solar PV] Peaking As-available Helm 20.0 23 200-3 Individual Gestamp Solar Oro Loma IV Photovoltaic [Solar PV] Peaking As-available Firebaugh 20.0 24 186-1 Individual Gradient Resources Inc Honey Lake Geothermal Project Geothermal Baseload Wendel 19.1 25 140-1 Individual Excludes: 140-2 Hanwha SolarEnergy America Three Rocks Solar Photovoltaic [Solar PV] Peaking As-available Three Rocks 13.0 26 140-2 Individual Excluded By:140-1 Hanwha SolarEnergy America Three Rocks Solar Photovoltaic [Solar PV] Peaking As-available Three Rocks 13.0 27 182-3 Individual Helios Renewables LLC Kettleman Solar Project Photovoltaic [Solar PV] Peaking As-available Kettleman City 20.0 28 182-2 Individual Helios Renewables LLC Kettleman Solar Project Photovoltaic [Solar PV] Peaking As-available Kettleman City 20.0

29 166-1 Individual Infigen Energy US Development, LLC Pumpjack Solar I Photovoltaic [Solar PV] Peaking As-available McKittrick 20.0

30 166-2 Individual Infigen Energy US Development, LLC Wildwood Solar I Photovoltaic [Solar PV] Peaking As-available Wasco 20.0

31 211-1 IndividualIntegrated Resource Development LLC, a wholly owned affiliate of SolarGen USA LLC

McFarland Photovoltaic [Solar PV] Peaking As-available McFarland 20.0

32 188-1 Individual Los Angeles County Sanitation Districts Calabasas Landfill Gas-to-Energy Facility Landfill gas Baseload Agoura 5.6

33 205-1 Individual Madera Solar Farm 1, LLC [MSF1] Madera Solar Farm 1 Photovoltaic [Solar PV] Peaking As-available Madera 20.0

34 175-1 Individual Meridian Energy USA LAUREL WEST SOLAR FARM Photovoltaic [Solar PV] Peaking As-available STRATFORD 20.0

35 196-1Inc|196-2Inc Inclusive Metropolitan Water District of

Southern CaliforniaRed Mountain Hydroelectric Plant, Venice Hydroelectric Plant Conduit hydroelectric Non-Peaking As-available Fallbrook; Culver City 16.0

36 136-2 Individual New Dimension Energy Company Sand Hill Wind Dyer Road Wind Non-Peaking As-available Tracy 3.2 37 136-1 Individual New Dimension Energy Company Sand Hill Wind Altamont Midway Wind Non-Peaking As-available Tracy 3.1 38 136-3 Individual New Dimension Energy Company Sand Hill Wind Pass Road Wind Non-Peaking As-available Tracy 8.2 39 185-1 Individual NextEra Energy Resources Adelanto I Photovoltaic [Solar PV] Peaking As-available Adelanto 20.0 40 185-6 Individual Excluded By:185-4 NextEra Energy Resources Westside Solar Photovoltaic [Solar PV] Peaking As-available Fresno County 20.0 41 185-4 Individual Excludes: 185-6 NextEra Energy Resources Westside Solar Photovoltaic [Solar PV] Peaking As-available Fresno County 20.0 42 185-2 Individual NextEra Energy Resources San Jacinto Photovoltaic [Solar PV] Peaking As-available San Jacinto 20.0

* Post‐TOD PTAR ($/MWh) is the bid ranking price. Page 1 of 3

Page 34: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Confidential Table C‐3

SCE RAM 3 ‐ All Offers Received

Row # Offer No. Offer Type Offeror Company Project Name Technology Selected Product Project Location[City]

Offer Price ($/MWh)

Post-TOD PTAR

($/MWh)*

TOD-Adjusted Levelized

Offer Price ($/MWh)

Transmission Adder

($/MWh)

RA Benefits ($/MWh)

Project Size (MW)

43 185-3 Individual NextEra Energy Resources Shafter Solar Photovoltaic [Solar PV] Peaking As-available Shafter 20.0 44 185-5 Individual NextEra Energy Resources Whitney Point Solar Photovoltaic [Solar PV] Peaking As-available Fresno County 20.0 45 209-2 Individual NorthLight Power A78 Solar Photovoltaic [Solar PV] Peaking As-available Ramona 5.0 46 209-1 Individual NorthLight Power C908 Solar, LLC Photovoltaic [Solar PV] Peaking As-available Valley Center 7.0 47 157-6 Individual Pristine Sun LLC ClearVista Energy Q537A Wind Non-Peaking As-available Tehachapi 9.0 48 157-7 Individual Pristine Sun LLC ClearVista Energy Q537A Wind Non-Peaking As-available Tehachapi 19.5 49 157-5 Individual Pristine Sun LLC ClearVista Energy Q537A Photovoltaic [Solar PV] Peaking As-available Tehachapi 19.5 50 157-4 Individual Pristine Sun LLC ClearVista Energy Q537A Photovoltaic [Solar PV] Peaking As-available Tehachapi 10.0 51 157-3 Individual Pristine Sun LLC ClearVista Energy Q537A Photovoltaic [Solar PV] Peaking As-available Tehachapi 9.5 52 183-4 Individual Recurrent Energy RE Yakima Photovoltaic [Solar PV] Peaking As-available Mojave 20.0 53 183-3 Individual Recurrent Energy RE Clearwater Photovoltaic [Solar PV] Peaking As-available Mojave 20.0 54 183-5 Individual Recurrent Energy Re Columbia Two Photovoltaic [Solar PV] Peaking As-available Mojave 15.0 55 183-8 Individual Excluded By:183-7 Recurrent Energy RE Old River One Photovoltaic [Solar PV] Peaking As-available Bakersfield 20.0 56 183-1 Individual Recurrent Energy RE Antelope 1 Photovoltaic [Solar PV] Peaking As-available Lancaster 10.0 57 183-7 Individual Excludes: 183-8 Recurrent Energy RE Old River One Photovoltaic [Solar PV] Peaking As-available Bakersfield 20.0 58 183-13 Individual Excludes: 183-14 Recurrent Energy RE Kamm Photovoltaic [Solar PV] Peaking As-available San Joaquin 20.0 59 183-11 Individual Excludes: 183-12 Recurrent Energy RE Grangeville Photovoltaic [Solar PV] Peaking As-available Lemoore 20.0 60 183-2 Individual Recurrent Energy RE Great Lakes Photovoltaic [Solar PV] Peaking As-available Rosamond 5.0 61 183-15 Individual Excludes: 183-16 Recurrent Energy RE Jayne East Photovoltaic [Solar PV] Peaking As-available Coalinga 10.0 62 183-6 Individual Recurrent Energy RE Lincoln Photovoltaic [Solar PV] Peaking As-available Lemoore 12.0 63 183-12 Individual Excluded By:183-11 Recurrent Energy RE Grangeville Photovoltaic [Solar PV] Peaking As-available Lemoore 20.0 64 183-9 Individual Excludes: 183-10 Recurrent Energy RE Orion Photovoltaic [Solar PV] Peaking As-available Stratford 20.0 65 183-16 Individual Excluded By:183-15 Recurrent Energy RE Jayne East Photovoltaic [Solar PV] Peaking As-available Coalinga 10.0 66 183-14 Individual Excluded By:183-13 Recurrent Energy RE Kamm Photovoltaic [Solar PV] Peaking As-available San Joaquin 20.0 67 142-18 Individual Excluded By:142-2 Silverado Power Apex Greenworks LLC Photovoltaic [Solar PV] Peaking As-available Lancaster 20.0 68 142-2 Individual Excludes: 142-18 Silverado Power Apex Greenworks LLC Photovoltaic [Solar PV] Peaking As-available Lancaster 20.0 69 142-21 Individual Excluded By:142-13 Silverado Power Western Antelope Dry Ranch Addition LLC Photovoltaic [Solar PV] Peaking As-available Lancaster 20.0 70 142-13 Individual Excludes: 142-21 Silverado Power Western Antelope Dry Ranch Addition LLC Photovoltaic [Solar PV] Peaking As-available Lancaster 20.0 71 142-24 Individual Excluded By:142-5 Silverado Power Aspiration Solar G LLC Photovoltaic [Solar PV] Peaking As-available Cantua Creek 9.0 72 142-22 Individual Excluded By:142-10 Silverado Power Patriot Solar B LLC Photovoltaic [Solar PV] Peaking As-available Firebaugh 20.0 73 142-25 Individual Excluded By:142-9 Silverado Power Patriot Solar A LLC Photovoltaic [Solar PV] Peaking As-available Firebaugh 20.0 74 142-5 Individual Excludes: 142-24 Silverado Power Aspiration Solar G LLC Photovoltaic [Solar PV] Peaking As-available Cantua Creek 9.0 75 142-10 Individual Excludes: 142-22 Silverado Power Patriot Solar B LLC Photovoltaic [Solar PV] Peaking As-available Firebaugh 20.0 76 142-9 Individual Excludes: 142-25 Silverado Power Patriot Solar A LLC Photovoltaic [Solar PV] Peaking As-available Firebaugh 20.0 77 142-29 Individual Excluded By:142-6 Silverado Power Citizen Solar B LLC Photovoltaic [Solar PV] Peaking As-available Mendota 5.0 78 142-6 Individual Excludes: 142-29 Silverado Power Citizen Solar B LLC Photovoltaic [Solar PV] Peaking As-available Mendota 5.0 79 142-20 Individual Excluded By:142-3 Silverado Power Aspiration Solar D LLC Photovoltaic [Solar PV] Peaking As-available Tranquillity 20.0 80 142-23 Individual Excluded By:142-4 Silverado Power Aspiration Solar E LLC Photovoltaic [Solar PV] Peaking As-available Tranquillity 20.0 81 142-27 Individual Excluded By:142-8 Silverado Power Citizen Solar D LLC Photovoltaic [Solar PV] Peaking As-available Tranquillity 20.0 82 142-30 Individual Excluded By:142-7 Silverado Power Citizen Solar C LLC Photovoltaic [Solar PV] Peaking As-available Tranquillity 20.0 83 142-3 Individual Excludes: 142-20 Silverado Power Aspiration Solar D LLC Photovoltaic [Solar PV] Peaking As-available Tranquillity 20.0 84 142-4 Individual Excludes: 142-23 Silverado Power Aspiration Solar E LLC Photovoltaic [Solar PV] Peaking As-available Tranquillity 20.0 85 142-7 Individual Excludes: 142-30 Silverado Power Citizen Solar C LLC Photovoltaic [Solar PV] Peaking As-available Tranquillity 20.0 86 142-8 Individual Excludes: 142-27 Silverado Power Citizen Solar D LLC Photovoltaic [Solar PV] Peaking As-available Tranquillity 20.0 87 142-19 Individual Excluded By:142-14 Silverado Power Zodiac Solar LLC Photovoltaic [Solar PV] Peaking As-available Potrero 20.0 88 142-14 Individual Excludes: 142-19 Silverado Power Zodiac Solar LLC Photovoltaic [Solar PV] Peaking As-available Potrero 20.0 89 142-28 Individual Excluded By:142-26 Silverado Power Aspiration Solar F LLC Photovoltaic [Solar PV] Peaking As-available Cantua Creek 3.0 90 142-26 Individual Excludes: 142-28 Silverado Power Aspiration Solar F LLC Photovoltaic [Solar PV] Peaking As-available Cantua Creek 3.0 91 187-2 Individual Soitec Rugged Solar Photovoltaic [Solar PV] Peaking As-available Boulevard 19.5 92 172-1 Individual Solar Electric Solutions SEPV Mojave West Photovoltaic [Solar PV] Peaking As-available Mojave 20.0 93 172-2 Individual Solar Electric Solutions SEPV Palmdale East Photovoltaic [Solar PV] Peaking As-available Palmdale 10.0

94 163-1 Individual Solar Projects Solutions, LLC Atwell Island West PV Solar Generating Facility Photovoltaic [Solar PV] Peaking As-available Alpaugh 20.0

95 147-16 Individual SolarReserve White Water [FCDS] Photovoltaic [Solar PV] Peaking As-available White Water 9.0

* Post‐TOD PTAR ($/MWh) is the bid ranking price. Page 2 of 3

Page 35: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Confidential Table C‐3

SCE RAM 3 ‐ All Offers Received

Row # Offer No. Offer Type Offeror Company Project Name Technology Selected Product Project Location[City]

Offer Price ($/MWh)

Post-TOD PTAR

($/MWh)*

TOD-Adjusted Levelized

Offer Price ($/MWh)

Transmission Adder

($/MWh)

RA Benefits ($/MWh)

Project Size (MW)

96 147-15 Individual SolarReserve White Water Solar project Photovoltaic [Solar PV] Peaking As-available White Water 9.0 97 147-1 Individual SolarReserve Oro Loma Photovoltaic [Solar PV] Peaking As-available Oro Loma 18.0

98

147-11Inc|147-13Inc|147-9Inc

Inclusive SolarReserve Vestal Fireman [EO], Vestal Herder [EO], Vestal Almond [EO] Photovoltaic [Solar PV] Peaking As-available Ducor 60.0

99 147-11 Individual SolarReserve Vestal Fireman [EO] Photovoltaic [Solar PV] Peaking As-available Ducor 20.0 100 147-13 Individual SolarReserve Vestal Herder [EO] Photovoltaic [Solar PV] Peaking As-available Ducor 20.0 101 147-9 Individual SolarReserve Vestal Almond [EO] Photovoltaic [Solar PV] Peaking As-available Ducor 20.0 102 147-7 Individual SolarReserve Firebaugh [EO] Photovoltaic [Solar PV] Peaking As-available Firebaugh 10.0 103 147-3 Individual SolarReserve Alta [EO] Photovoltaic [Solar PV] Peaking As-available Reedley 9.0 104 201-5 Individual SunEdison Arco Solar Photovoltaic [Solar PV] Peaking As-available Lost Hills 20.0 105 201-8 Individual SunEdison Victorville Landfill Solar Photovoltaic [Solar PV] Peaking As-available Victorville 10.0 106 201-1 Individual SunEdison SunEdison - Cottonwood Photovoltaic [Solar PV] Peaking As-available Lucerne Valley 3.0 107 201-11 Individual SunEdison SunEdison - Brown Field Photovoltaic [Solar PV] Peaking As-available San Diego 5.0 108 201-10 Individual SunEdison CAL SP VI Photovoltaic [Solar PV] Peaking As-available Le Grand 15.0 109 201-6 Individual SunEdison Mayberry Solar Photovoltaic [Solar PV] Peaking As-available Hemet-San Jacinto 5.0 110 201-2 Individual SunEdison SunEdison - Delano Photovoltaic [Solar PV] Peaking As-available Delano 3.0 111 201-4 Individual SunEdison AP North Lake II Solar Photovoltaic [Solar PV] Peaking As-available Hemet 5.0

112 203-2 Individual Tenaska Solar Ventures Silverleaf Solar Energy Center Photovoltaic [Solar PV] Peaking As-available Seeley [Imperial County] 20.0

113 203-3 Individual Tenaska Solar Ventures Wistaria Ranch Solar Energy Center Photovoltaic [Solar PV] Peaking As-available Seeley [Imperial County] 20.0

114 152-1 Individual Terra-Gen Power Zephyr Park Wind Non-Peaking As-available Mojave 3.5 115 152-2 Individual Terra-Gen Power Ridgetop Energy, LLC Wind Non-Peaking As-available Mojave 13.7 116 152-5 Individual Terra-Gen Power Zephyr Park Wind Non-Peaking As-available Mojave 3.5 117 152-4 Individual Terra-Gen Power Phoenix Wind Non-Peaking As-available Palm Springs 12.9 118 152-3 Individual Terra-Gen Power San Gorgonio Westwinds II, LLC Wind Non-Peaking As-available Palm Springs 11.2 119 193-1 Individual Terra-Gen Power, LLC Alta Solar I Photovoltaic [Solar PV] Peaking As-available Mojave 20.0 120 193-2 Individual Terra-Gen Power, LLC Alta Solar II Photovoltaic [Solar PV] Peaking As-available Mojave 20.0 121 193-3 Individual Terra-Gen Power, LLC Basin Solar Photovoltaic [Solar PV] Peaking As-available Colton 20.0 122 190-1 Individual Trina solar Lovern Solar Photovoltaic [Solar PV] Peaking As-available Lemoore 19.9 123 208-2 Individual Volt Energy, LLC Oasis Solar Photovoltaic [Solar PV] Peaking As-available Palmdale 20.0 124 208-1 Individual Volt Energy, LLC Blythe Solar II Photovoltaic [Solar PV] Peaking As-available Blythe 20.0

125* 184-3 Individual Excludes: 184-2, 184-4 Excluded By:184-2 Windland, Inc. Windland Refresh 1 Wind Non-Peaking As-available Mojave 7.5

*125 total offers are shown here, consisting of 123 individual offers and 2 inclusive offer groups that consist of 7 total component offers. Other sections of this report indicate that there were 130 total offers, consisting of 123 individual offers and 7 mutually inclusive offers. The underlying data is the same, and this difference simply reflects varying ways to sum the total offers.

* Post‐TOD PTAR ($/MWh) is the bid ranking price. Page 3 of 3

Page 36: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Confidential Table C‐4

SCE RAM 4 ‐ All Offers Received

Row # Offer No. Offer Type Offeror Company Project Name Technology Selected Product Project Location[City]

Offer Price

($/MWh)

Post-TOD PTAR

($/MWh)*

TOD-Adjusted Levelized

Offer Price ($/MWh)

Transmission Adder ($/MWh)

RA Benefits ($/MWh)

Project Size (MW)

1 213-1 Individual 8minutenergy Woodmere Solar Farm Solar PV Peaking As-available Edison 15.0 2 202-2 Individual AES Tehachapi Wind, LLC Tehachapi Pass Wind- Existing Wind Non-Peaking As-available Tehachapi 14.7 3 202-3 Individual AES Tehachapi Wind, LLC Tehachapi Wind- Repower Wind Non-Peaking As-available Tehachapi 14.7 4 202-4 Individual AES Tehachapi Wind, LLC Tehachapi Pass Wind- Existing Wind Non-Peaking As-available Tehachapi 8.0 5 202-5 Individual AES Tehachapi Wind, LLC Tehachapi Pass Wind- Repower Wind Non-Peaking As-available Tehachapi 8.0 6 236-1 Individual Altamont Winds Inc. 20 MW Summit Wind Project Wind Non-Peaking As-available Livermore 20.0 7 224-3 Individual Excluded By:224-2 Brookfield Renewable Energy Partners Brookfield Tehachapi 3B (also CELLC) Wind Non-Peaking As-available Tehachapi 7.5 8 224-2 Individual Excludes: 224-3 Brookfield Renewable Energy Partners Brookfield Tehachapi 3B (also CELLC) Wind Non-Peaking As-available Tehachapi 7.5 9 232-1 Individual Bull Moose Energy, LLC Bull Moose Energy-San Diego Biomass Baseload San Diego 20.0 10 216-2 Individual Excludes: 216-1 Excluded By:216-1 CalWind Resources, Inc. Wind Resource III Wind Non-Peaking As-available Tehachapi 16.2 11 216-1 Individual Excludes: 216-2 Excluded By:216-2 CalWind Resources, Inc. Wind Resource III Wind Non-Peaking As-available Tehachapi 16.2 12 206-1 Individual Celtic Energy Corporation Lucerne Valley Solar Solar PV Peaking As-available Lucerne Valley 20.0 13 179-2 Individual Excluded By:179-1 E.ON Climate and Renewables Maricopa East Solar PV 2, LLC Solar PV Peaking As-available Maricopa 18.0 14 179-1 Individual Excludes: 179-2 E.ON Climate and Renewables Maricopa East Solar PV 1, LLC Solar PV Peaking As-available Maricopa 20.0 15 163-2 Individual EDF-Renewable Energy BAR 13 Solar PV Project Solar PV Peaking As-available Rosamond 18.0 16 163-8 Individual EDF-Renewable Energy Valentine Solar PV Project Solar PV Peaking As-available Rosamond 20.0 17 163-9 Individual EDF-Renewable Energy Maverick Solar PV Project Solar PV Peaking As-available Rosamond 20.0 18 163-10 Individual EDF-Renewable Energy Champagne Solar PV Solar Solar PV Peaking As-available Rosamond 20.0 19 163-6 Individual EDF-Renewable Energy Silver Valley Solar PV Project Solar PV Peaking As-available Daggett 20.0 20 163-4 Individual EDF-Renewable Energy Long Boat Solar, LLC Solar PV Peaking As-available Barstow 20.0 21 163-5 Individual EDF-Renewable Energy Little Rock Solar PV Project Solar PV Peaking As-available Littlerock 4.8 22 163-11 Individual EDF-Renewable Energy Smyrna Solar PV Project Solar PV Peaking As-available Wasco 8.0 23 163-1 Individual EDF-Renewable Energy Patterson Pass Repower Project Wind Non-Peaking As-available Livermore 19.8 24 171-1 Individual EDP Renewables North America LLC Rising Tree Wind Farm Wind Non-Peaking As-available Mojave 19.8 25 248-1 Individual EE Kettleman Land LLC Kettleman Solar Solar PV Peaking As-available Kettleman 20.0

26 227-1 Individual Element Power California Flats Solar Solar PV Peaking As-available Unincorporated Monterey County 20.0

27 196-7 Individual Excluded By:196-2 First Solar, Inc. Kingbird Solar A - Escalator Solar PV Peaking As-available Unincorporated Kern County 20.0

28 196-9 Individual Excluded By:196-8 First Solar, Inc. Kingbird Solar B - Escalator Solar PV Peaking As-available Unincorporated Kern County 20.0

29 196-2 Individual Excludes: 196-7 First Solar, Inc. Kingbird Solar A - Fixed Solar PV Peaking As-available Unincorporated Kern County 20.0

30 196-8 Individual Excludes: 196-9 First Solar, Inc. Kingbird Solar B - Fixed Solar PV Peaking As-available Unincorporated Kern County 20.0

31 196-5 Individual Excluded By:196-1 First Solar, Inc. Portal Ridge Solar A - Escalator Solar PV Peaking As-available Lancaster 20.0 32 196-1 Individual Excludes: 196-5 First Solar, Inc. Portal Ridge Solar A - Fixed Solar PV Peaking As-available Lancaster 20.0 33 196-12 Individual Excluded By:196-6 First Solar, Inc. Portal Ridge Solar B - Escalator Solar PV Peaking As-available Lancaster 15.0 34 196-6 Individual Excludes: 196-12 First Solar, Inc. Portal Ridge Solar B - Fixed Solar PV Peaking As-available Lancaster 15.0 35 196-11 Individual Excluded By:196-4 First Solar, Inc. Madera Solar Farms 1 - Escalator Solar PV Peaking As-available Madera 20.0 36 196-4 Individual Excludes: 196-11 First Solar, Inc. Madera Solar Farms 1 - Fixed Solar PV Peaking As-available Madera 20.0

37 235-4 Individual Excludes: 235-1, 235-2, 235-3, 235-5, 235-6 Excluded By:235-1 Frontier Renewables LLC Blackwell Solar Park, LLC Solar PV Peaking As-available Lost Hills 20.0

38 235-3 Individual Excludes: 235-1, 235-2, 235-4, 235-5, 235-6 Excluded By:235-1 Frontier Renewables LLC Blackwell Solar Park, LLC Solar PV Peaking As-available Lost Hills 20.0

39 235-2 Individual Excludes: 235-1, 235-3, 235-4, 235-5, 235-6 Excluded By:235-1 Frontier Renewables LLC Blackwell Solar Park, LLC Solar PV Peaking As-available Lost Hills 20.0

40 235-6 Individual Excludes: 235-1, 235-2, 235-3, 235-4, 235-5 Excluded By:235-1 Frontier Renewables LLC Giffen Solar Park, LLC Solar PV Peaking As-available Cantua Creek 20.0

41 235-5 Individual Excludes: 235-1, 235-2, 235-3, 235-4, 235-6 Excluded By:235-1 Frontier Renewables LLC Giffen Solar Park, LLC Solar PV Peaking As-available Cantua Creek 20.0

* Post‐TOD PTAR ($/MWh) is the bid ranking price. Page 1 of 3

Page 37: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Confidential Table C‐4

SCE RAM 4 ‐ All Offers Received

Row # Offer No. Offer Type Offeror Company Project Name Technology Selected Product Project Location[City]

Offer Price

($/MWh)

Post-TOD PTAR

($/MWh)*

TOD-Adjusted Levelized

Offer Price ($/MWh)

Transmission Adder ($/MWh)

RA Benefits ($/MWh)

Project Size (MW)

42 235-1 Individual Excludes: 235-2, 235-3, 235-4, 235-5, 235-6 Excluded By:235-2 Frontier Renewables LLC Giffen Solar Park, LLC Solar PV Peaking As-available Cantua Creek 20.0

43 220-5 Individual Gestamp Solar North America, Inc. Helm 1-EO Solar PV Peaking As-available San Joaquin 20.0 44 220-1 Individual Gestamp Solar North America, Inc. San Joaquin 1A-EO Solar PV Peaking As-available Helm 20.0 45 220-3 Individual Gestamp Solar North America, Inc. San Joaquin 2A-EO Solar PV Peaking As-available Helm 20.0 46 220-4 Individual Gestamp Solar North America, Inc. Oro Loma IV-EO Solar PV Peaking As-available Firebaugh 20.0 47 233-1 Individual Hanwha Q Cells USA Three Rocks Solar Solar PV Peaking As-available Three Rocks 13.0 48 186-1 Individual Infigen Energy US Development LLC Rio Bravo Solar I Solar PV Peaking As-available McKittrick 20.0 49 186-2 Individual Infigen Energy US Development LLC Wildwood Solar II Solar PV Peaking As-available Wasco 15.0 50 187-2 Individual Montauk Energy Bowerman Power LFG, LLC Landfill gas Baseload Irvine 19.8 51 187-1 Individual Montauk Energy Bowerman Power LFG, LLC Landfill gas Baseload Irvine 19.8

52 201-3 Individual Excludes: 201-2, 201-4, 201-5, 201-6, 201-7 Excluded By:201-7 New Dimension Energy Company (NDEC) Smoke Tree- Repower Wind Non-Peaking As-available Desert Hot Springs 16.0

53 201-7 Individual Excludes: 201-2, 201-3, 201-4, 201-5, 201-6 Excluded By:201-3 New Dimension Energy Company (NDEC) Smoke Tree- Existing Wind Non-Peaking As-available Desert Hot Springs 16.0

54 201-2 Individual Excludes: 201-7, 201-3, 201-4 Excluded By:201-3 New Dimension Energy Company (NDEC) Smoke Tree- Existing Wind Non-Peaking As-available Desert Hot Springs 8.2

55 201-4 Individual Excludes: 201-2, 201-3, 201-7 Excluded By:201-3 New Dimension Energy Company (NDEC) Smoke Tree- Repower Wind Non-Peaking As-available Desert Hot Springs 8.2

56 201-5 Individual Excludes: 201-3, 201-7, 201-6 Excluded By:201-3 New Dimension Energy Company (NDEC) Smoke Tree- Existing Wind Non-Peaking As-available Desert Hot Springs 7.7

57 201-6 Individual Excludes: 201-3, 201-7, 201-5 Excluded By:201-3 New Dimension Energy Company (NDEC) Smoke Tree- Repower Wind Non-Peaking As-available Desert Hot Springs 7.7

58 208-2 Individual Excluded By:208-1 NextEra Energy Resources Joshua Tree Solar Solar PV Peaking As-available Joshua Tree 20.0 59 208-1 Individual Excludes: 208-2 NextEra Energy Resources Joshua Tree Solar Solar PV Peaking As-available Joshua Tree 20.0

60 208-6 Individual Excluded By:208-5 NextEra Energy Resources Westside Solar Solar PV Peaking As-available Five Points (Unincorporated) 20.0

61 208-5 Individual Excludes: 208-6 NextEra Energy Resources Westside Solar Solar PV Peaking As-available Five Points (Unincorporated) 20.0

62 208-4 Individual Excluded By:208-3 NextEra Energy Resources Sirius Solar Solar PV Peaking As-available Bakersfield (primary) and Arvin (preferred) 20.0

63 208-3 Individual Excludes: 208-4 NextEra Energy Resources Sirius Solar Solar PV Peaking As-available Bakersfield (Primary) and Arvin (Preferred) 20.0

64 218-1 Individual North American Power Group, Ltd McFarland Project Solar PV Peaking As-available McFarland 18.3 65 174-2 Individual NorthLight Power LLC Porter Ranch G18 Solar PV Peaking As-available Bradley 6.0 66 174-1 Individual NorthLight Power LLC NLP Granger A82, LLC Solar PV Peaking As-available Valley Center 5.0 67 199-1 Individual NRG Solar NRG Solar Oasis LLC Solar PV Peaking As-available Palmdale 20.0 68 199-2 Individual NRG Solar NRG Solar Blythe II LLC Solar PV Peaking As-available Blythe 20.0 69 226-1 Individual Pacific Valley, LLC Chowchilla Solar Project Solar PV Peaking As-available Chowchilla 20.0 70 229-1 Individual Painted Hills Wind Developers Painted Hills Wind Project Wind Non-Peaking As-available White Water 19.3 71 234-2 Individual Pristine Sun Clearvista Energy Project Solar PV Peaking As-available Tehachapi 5.0 72 234-3 Individual Pristine Sun Clearvista Energy Project Wind Non-Peaking As-available Tehachapi 19.5 73 234-4 Individual Pristine Sun Clearvista Energy Project Wind Non-Peaking As-available Tehachapi 10.0 74 173-9 Individual Excluded By:173-2 Recurrent Energy RE Clearwater Solar PV Peaking As-available Mojave 20.0 75 173-2 Individual Excludes: 173-9 Recurrent Energy RE Clearwater Solar PV Peaking As-available Mojave 20.0 76 173-10 Individual Excluded By:173-3 Recurrent Energy RE Columbia Two Solar PV Peaking As-available Mojave 15.0 77 173-3 Individual Excludes: 173-10 Recurrent Energy RE Columbia Two Solar PV Peaking As-available Mojave 15.0 78 173-11 Individual Excluded By:173-5 Recurrent Energy RE Lincoln Solar PV Peaking As-available Lemoore 12.0 79 173-5 Individual Excludes: 173-6, 173-11, 173-12 Recurrent Energy RE Lincoln Solar PV Peaking As-available Lemoore 12.0 80 173-7 Individual Excluded By:173-1 Recurrent Energy RE Antelope 1 Solar PV Peaking As-available Lancaster 10.0 81 173-1 Individual Excludes: 173-7 Recurrent Energy RE Antelope 1 Solar PV Peaking As-available Lancaster 10.0

* Post‐TOD PTAR ($/MWh) is the bid ranking price. Page 2 of 3

Page 38: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Confidential Table C‐4

SCE RAM 4 ‐ All Offers Received

Row # Offer No. Offer Type Offeror Company Project Name Technology Selected Product Project Location[City]

Offer Price

($/MWh)

Post-TOD PTAR

($/MWh)*

TOD-Adjusted Levelized

Offer Price ($/MWh)

Transmission Adder ($/MWh)

RA Benefits ($/MWh)

Project Size (MW)

82 173-8 Individual Excluded By:173-4 Recurrent Energy RE Grangeville Solar PV Peaking As-available Lemoore 20.0 83 173-4 Individual Excludes: 173-8 Recurrent Energy RE Grangeville Solar PV Peaking As-available Lemoore 20.0 84 173-12 Individual Excluded By:173-5 Recurrent Energy RE Lincoln Solar PV Peaking As-available Lemoore 12.0 85 173-6 Individual Excluded By:173-5 Recurrent Energy RE Lincoln Solar PV Peaking As-available Lemoore 12.0

86 214-2 Individual Sempra USGP SGS Antelope Valley Development, LLC (Rosamond Solar) Solar PV Peaking As-available Rosamond 20.0

87 203-2 Individual Sierra Power Corporation Sierra Power Corporation Biomass Baseload Terra Bella 7.0 88 172-14 Individual Silverado Power Zodiac Solar Solar PV Peaking As-available Potrero 20.0 89 172-19 Individual Silverado Power Western Antelope Dry Ranch Addition Solar PV Peaking As-available Lancaster 20.0 90 172-13 Individual Silverado Power Lancaster Little Rock C Solar PV Peaking As-available Palmdale 5.0 91 172-15 Individual Silverado Power Apex Greenworks Solar PV Peaking As-available Lancaster 20.0 92 172-10 Individual Silverado Power Aspiration Solar G Solar PV Peaking As-available Cantua Creek 9.0 93 172-16 Individual Silverado Power Victor Mesa Linda B Solar PV Peaking As-available Victorville 5.0 94 172-20 Individual Silverado Power Patriot Solar A Solar PV Peaking As-available Mendota 20.0 95 172-21 Individual Silverado Power Patriot Solar B Solar PV Peaking As-available Mendota 20.0 96 172-22 Individual Silverado Power Citizen Solar B Solar PV Peaking As-available Mendota 5.0 97 172-17 Individual Silverado Power Western Antelope Blue Sky Ranch A Solar PV Peaking As-available Lancaster 20.0 98 172-18 Individual Silverado Power Western Antelope Dry Ranch Solar PV Peaking As-available Lancaster 10.0 99 172-8 Individual Silverado Power Aspiration Solar D Solar PV Peaking As-available Tranquility 20.0 100 172-9 Individual Silverado Power Aspiration Solar E Solar PV Peaking As-available Tranquility 20.0 101 172-11 Individual Silverado Power Citizen Solar C Solar PV Peaking As-available Tranquility 20.0 102 172-12 Individual Silverado Power Citizen Solar D Solar PV Peaking As-available Tranquility 20.0 103 172-7 Individual Silverado Power Lancaster Little Rock D Solar PV Peaking As-available Palmdale 5.0 104 210-1 Individual Solar Electric Solutions SEPV Mojave West Solar PV Peaking As-available Mojave 20.0 105 210-2 Individual Solar Electric Solutions SEPV Boulevard Solar PV Peaking As-available Boulevard 5.0 106 209-1 Individual Solar Projects Solutions Atwell West PV Solar Generating Facility Solar PV Peaking As-available Alpaugh 20.0 107 162-1 Individual SolarReserve Oro Loma Solar PV Peaking As-available Oro Loma 18.0 108 162-2 Individual SolarReserve White Water- FCDS Solar PV Peaking As-available White Water 9.0 109 162-6 Individual SolarReserve Rocket Solar PV Peaking As-available Avenal 15.8 110 162-3 Individual SolarReserve Vestal Almond Solar PV Peaking As-available Ducor 20.0 111 162-4 Individual SolarReserve Vestal Fireman Solar PV Peaking As-available Ducor 20.0 112 162-5 Individual SolarReserve Vestal Herder Solar PV Peaking As-available Ducor 20.0 113 164-1 Individual Terra-Gen Power Alta Solar I, LLC Solar PV Peaking As-available Mojave 20.0 114 164-2 Individual Terra-Gen Power Alta Solar II, LLC Solar PV Peaking As-available Mojave 20.0 115 164-4 Individual Terra-Gen Power Alta Solar B2, LLC Solar PV Peaking As-available Mohave 20.0 116 164-3 Individual Terra-Gen Power Alta Solar B1, LLC Solar PV Peaking As-available Mohave 20.0 117 225-2 Individual Excludes: 225-4 Terra-Gen Power San Gorgonio Westwinds II, LLC - Windustries Wind Non-Peaking As-available Palm Springs 9.8 118 225-3 Individual Excludes: 225-5 Terra-Gen Power San Gorgonio Westwinds II, LLC - San Jacinto Wind Non-Peaking As-available Palm Springs 12.6 119 225-5 Individual Excluded By:225-3 Terra-Gen Power San Gorgonio Westwinds II, LLC - San Jacinto Wind Non-Peaking As-available Palm Springs, CA 12.6 120 225-4 Individual Excluded By:225-2 Terra-Gen Power San Gorgonio Westwinds II, LLC - Windustries Wind Non-Peaking As-available Palm Springs 9.8 121 221-2 Individual Trina Solar Lovern Solar Interconnection Solar PV Peaking As-available Lemoore 20.0 122 161-1 Individual Valos Solar Ventures, LLC SKIC Solar 2 Solar PV Peaking As-available Taft 10.0 123 245-1 Individual W Power, LLC Tulare Solar Center #1 Solar PV Peaking As-available Ducor 6.0 124 231-1 Individual Excludes: 231-2 WDG Capital Partners Gettysburg Solar, LLC Solar PV Peaking As-available Rosamond 20.0 125 231-2 Individual Excluded By:231-1 WDG Capital Partners Gettysburg Solar, LLC Solar PV Peaking As-available Rosamond 20.0 126 183-1 Individual Windland, Inc. Windland Refresh 2 Wind Non-Peaking As-available Mojave 7.8

* Post‐TOD PTAR ($/MWh) is the bid ranking price. Page 3 of 3

Page 39: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Confidential Table C‐5

SCE RAM 5 ‐ All Offers Received

Row # Offer No. Offer Type Offeror Company Project Name Technology Selected ProductProject Location 

[City]

Offer Price 

($/MWh)

Post‐TOD 

PTAR 

($/MWh)*

TOD‐Adjusted 

Levelized Offer 

Price ($/MWh)

Transmissi

on Adder 

($/MWh)

RA 

Benefits 

($/MWh)

Project 

Size (MW)

1 178‐01  Individual  8minutenergy Renewables, LLC Borden Solar Farm Photovoltaic [Solar PV] Peaking As‐available Madera County  20.00       

2 239‐01  Individual  Brookfield Energy Marketing LP Brookfield Tehachapi 3 Wind Non‐Peaking As‐available Tehachapi  3.00         

3 250‐01  Individual  Bull Moose Energy, LLC Bull Moose Energy of San Diego Biomass Baseload San Diego  18.00       

4 198‐03  Individual  Cogentrix Sunray ‐ 13.8 Photovoltaic [Solar PV] Peaking As‐available Daggett  13.80       

5 198‐04  Individual  Cogentrix Sunray ‐ 20 Photovoltaic [Solar PV] Peaking As‐available Daggett  20.00       

6 226‐02  Individual  Community Recycling Dinuba Energy Biomass Baseload Reedley  11.50       

7 199‐02  Individual Excluded By:199‐1  Consolidated Edison Development, Inc CED Corcoran Solar 3, LLC Photovoltaic [Solar PV] Peaking As‐available Corcoran  19.80       

8 184‐01  Individual Excludes: 184‐2  EC&R NA Solar PV, LLC Maricopa West Solar PV 2 Photovoltaic [Solar PV] Peaking As‐available Maricopa  20.00       

9 184‐02  Individual Excluded By:184‐1  EC&R NA Solar PV, LLC Maricopa West Solar PV 2 Photovoltaic [Solar PV] Peaking As‐available Maricopa  20.00       

10 184‐03  Individual Excludes: 184‐4  EC&R NA Solar PV, LLC Three Rocks Solar, LLC Photovoltaic [Solar PV] Peaking As‐available Mendota  13.00       

11 184‐04  Individual Excluded By:184‐3  EC&R NA Solar PV, LLC Three Rocks Solar, LLC Photovoltaic [Solar PV] Peaking As‐available Mendota  13.00       

12 184‐05  Individual Excludes: 184‐06  EC&R NA Solar PV, LLC Kasson Manteca Solar LLC Photovoltaic [Solar PV] Peaking As‐available Tracy  20.00       

13 184‐06  Individual  EC&R NA Solar PV, LLC Kasson Manteca Solar LLC Photovoltaic [Solar PV] Peaking As‐available Tracy  20.00       

14 184‐07  Individual Excludes: 184‐08  EC&R NA Solar PV, LLC Valley Center Solar Photovoltaic [Solar PV] Peaking As‐available Valley Center  20.00       

15 184‐08  Individual Excludes: 184‐07  EC&R NA Solar PV, LLC Valley Center Solar Photovoltaic [Solar PV] Peaking As‐available Valley Center  20.00       

16 176‐01  Individual  EDF Renewable Energy BAR 13 Solar Photovoltaic [Solar PV] Peaking As‐available Rosamond  18.00       

17 176‐02  Individual  EDF Renewable Energy Long Boat Solar Photovoltaic [Solar PV] Peaking As‐available Barstow  20.00       

18 176‐03  Individual  EDF Renewable Energy Dif VI Repower Wind Non‐Peaking As‐available Mojave  19.20       

19 176‐04  Individual Excludes: 176‐08, 176‐09, 176‐10, 176‐11  EDF Renewable Energy Valentine Solar LLC Photovoltaic [Solar PV] Peaking As‐available Mojave  20.00       

20 176‐05  Individual  EDF Renewable Energy BAR 13 Solar Photovoltaic [Solar PV] Peaking As‐available Rosamond  18.00       

21 176‐07  Individual  EDF Renewable Energy Bravo Solar, LLC Photovoltaic [Solar PV] Peaking As‐available Calexico  20.00       

22 176‐08  Individual Excludes: 176‐04, 176‐09, 176‐10, 176‐11  EDF Renewable Energy Maverick Solar, LLC Photovoltaic [Solar PV] Peaking As‐available Mojave  20.00       

23 176‐09  Individual Excludes: 176‐04, 176‐08, 176‐10, 176‐11  EDF Renewable Energy Champagne Solar, LLC Photovoltaic [Solar PV] Peaking As‐available Mojave  20.00       

24 176‐10  Individual Excludes: 176‐08, 176‐09, 176‐10, 176‐11  EDF Renewable Energy Dragon Solar, LLC Photovoltaic [Solar PV] Peaking As‐available Mojave  20.00       

25 176‐11

 Individual Excludes: 176‐04, 176‐08, 176‐09, 176‐10, 176‐

11  EDF Renewable Energy Gold Mine Solar, LLC Photovoltaic [Solar PV] Peaking As‐available  Mojave  20.00       

26 176‐12  Inclusive  EDF Renewable Energy Dragon Solar, LLC Photovoltaic [Solar PV] Peaking As‐available Mojave  20.00       

27 176‐12  Inclusive  EDF Renewable Energy Gold Mine Solar, LLC Photovoltaic [Solar PV] Peaking As‐available Mojave  20.00       

28 202‐01  Individual Excludes: 202‐4  First Solar Portal Ridge Solar B, LLC Photovoltaic [Solar PV] Peaking As‐available Lancaster  20.00       

29 202‐02  Individual  First Solar Windhub Solar, LLC Photovoltaic [Solar PV] Peaking As‐available Kern County  20.00       

30 202‐03  Individual  First Solar Windhub Solar, LLC Photovoltaic [Solar PV] Peaking As‐available Kern County  20.00       

31 202‐04  Individual Excludes: 202‐1  First Solar Portal Ridge Solar B, LLC Photovoltaic [Solar PV] Peaking As‐available Lancaster  20.00       

32 202‐05  Individual Excludes: 202‐6  First Solar Portal Ridge Solar C, LLC Photovoltaic [Solar PV] Peaking As‐available Lancaster  12.00       

33 202‐06  Individual Excludes: 202‐5  First Solar Portal Ridge Solar C, LLC Photovoltaic [Solar PV] Peaking As‐available Lancaster  12.00       

34 241‐01  Individual  Frontier Renewables LLC Giffen Solar Park Photovoltaic [Solar PV] Peaking As‐available Cantua Creek  20.00       

35 227‐01  Individual  GCL‐SR Oro Loma Photovoltaic [Solar PV] Peaking As‐available Oro Loma  17.00       

36 227‐03  Individual  GCL‐SR Oro Loma Teresina Photovoltaic [Solar PV] Peaking As‐available Oro Loma  20.00       

37 227‐04  Individual  GCL‐SR Vestal Almond Photovoltaic [Solar PV] Peaking As‐available Ducor  20.00       

38 227‐05  Individual  GCL‐SR Vestal Herder Photovoltaic [Solar PV] Peaking As‐available Ducor  20.00       

39 227‐06  Individual  GCL‐SR Vestal Fireman Photovoltaic [Solar PV] Peaking As‐available APN 339‐040‐001  20.00       

40 227‐07  Individual  GCL‐SR Crown Photovoltaic [Solar PV] Peaking As‐available Ducor  15.00       

41 227‐08  Individual  GCL‐SR Rocket Photovoltaic [Solar PV] Peaking As‐available Avenal  15.80       

42 227‐12  Inclusive  GCL‐SR Vestal Almond Photovoltaic [Solar PV] Peaking As‐available Ducor  20.00       

43 227‐13  Inclusive  GCL‐SR Vestal Almond Photovoltaic [Solar PV] Peaking As‐available Ducor  20.00       

44 227‐14  Inclusive  GCL‐SR Vestal Almond Photovoltaic [Solar PV] Peaking As‐available Ducor  20.00       

45 227‐15  Inclusive  GCL‐SR Vestal Almond Photovoltaic [Solar PV] Peaking As‐available Ducor  20.00       

46 227‐12  Inclusive  GCL‐SR Vestal Herder Photovoltaic [Solar PV] Peaking As‐available Ducor  20.00       

47 227‐13  Inclusive  GCL‐SR Vestal Herder Photovoltaic [Solar PV] Peaking As‐available Ducor  20.00       

48 227‐14  Inclusive  GCL‐SR Vestal Herder Photovoltaic [Solar PV] Peaking As‐available Ducor  20.00       

49 227‐15  Inclusive  GCL‐SR Vestal Herder Photovoltaic [Solar PV] Peaking As‐available Ducor  20.00       

50 227‐12  Inclusive  GCL‐SR Vestal Fireman Photovoltaic [Solar PV] Peaking As‐available APN 339‐040‐001  20.00       

* Post‐TOD PTAR ($/MWh) is the bid ranking price. Page 1 of 3

Page 40: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Confidential Table C‐5

SCE RAM 5 ‐ All Offers Received

Row # Offer No. Offer Type Offeror Company Project Name Technology Selected ProductProject Location 

[City]

Offer Price 

($/MWh)

Post‐TOD 

PTAR 

($/MWh)*

TOD‐Adjusted 

Levelized Offer 

Price ($/MWh)

Transmissi

on Adder 

($/MWh)

RA 

Benefits 

($/MWh)

Project 

Size (MW)

51 227‐15  Inclusive  GCL‐SR Vestal Fireman Photovoltaic [Solar PV] Peaking As‐available APN 339‐040‐001  20.00       

52 227‐12  Inclusive  GCL‐SR Crown Photovoltaic [Solar PV] Peaking As‐available Ducor  15.00       

53 227‐14  Inclusive  GCL‐SR Crown Photovoltaic [Solar PV] Peaking As‐available Ducor  15.00       

54 234‐01  Individual Excludes: 234‐05  Gestamp Asetym Solar North America, Inc. (GASNA) Helm 1 Photovoltaic [Solar PV] Peaking As‐available San Joaquin  20.00       

55 234‐02  Individual  Gestamp Asetym Solar North America, Inc. (GASNA) Oro Loma IV Photovoltaic [Solar PV] Peaking As‐available Firebaugh  20.00       

56 234‐03  Individual  Gestamp Asetym Solar North America, Inc. (GASNA) San Joaquin 1A Photovoltaic [Solar PV] Peaking As‐available Helm  20.00       

57 234‐04  Individual  Gestamp Asetym Solar North America, Inc. (GASNA) San Joaquin 2A Photovoltaic [Solar PV] Peaking As‐available Helm  20.00       

58 234‐05  Individual Excludes: 234‐01  Gestamp Asetym Solar North America, Inc. (GASNA) Helm 1 Photovoltaic [Solar PV] Peaking As‐available San Joaquin  20.00       

59 196‐01  Individual  IHI Power Services Pacific Ultrapower Chinese Station Biomass Baseload Jamestown  19.80       

60 210‐08  Individual  Infigen Energy Rio Bravo Solar I Photovoltaic [Solar PV] Peaking As‐available McKittrick  20.00       

61 210‐09  Individual  Infigen Energy Rio Bravo Solar II Photovoltaic [Solar PV] Peaking As‐available McKittrick  20.00       

62 210‐10  Individual  Infigen Energy Wildwood Solar II Photovoltaic [Solar PV] Peaking As‐available Wasco  15.00       

63 229‐01  Individual  Lucerne Valley Solar One, LLC Lucerne Valley Solar One Photovoltaic [Solar PV] Peaking As‐available Lucerne Valley  20.00       

64 177‐01  Individual  New Dimension Energy Company Coachella Flats Wind Non‐Peaking As‐available Palm Springs  15.10       

65 177‐02  Individual  New Dimension Energy Company Altech III Wind Non‐Peaking As‐available Palm Springs  20.00       

66 177‐03  Individual  New Dimension Energy Company Coachella Flats II Wind Non‐Peaking As‐available Palm Springs  7.90         

67 177‐04  Individual  New Dimension Energy Company San Jacinto Wind Non‐Peaking As‐available Palm Springs  4.70         

68 212‐01  Individual Excludes: 212‐3  NextEra Energy Resources, LLC San Jacinto Solar 14.5 Photovoltaic [Solar PV] Peaking As‐available San Jacinto  14.50       

69 212‐02  Individual Excludes: 212‐4  NextEra Energy Resources, LLC San Jacinto Solar 5.5 Photovoltaic [Solar PV] Peaking As‐available San Jacinto  5.50         

70 212‐03  Individual Excluded By:212‐1  NextEra Energy Resources, LLC San Jacinto Solar 14.5 Photovoltaic [Solar PV] Peaking As‐available San Jacinto  14.50       

71 212‐04  Individual Excluded By:212‐2  NextEra Energy Resources, LLC San Jacinto Solar 5.5 Photovoltaic [Solar PV] Peaking As‐available San Jacinto  5.50         

72 212‐05  Individual Excludes: 212‐6  NextEra Energy Resources, LLC Jacumba Solar Photovoltaic [Solar PV] Peaking As‐available Jacumba  20.00       

73 212‐06  Individual Excluded By:212‐5  NextEra Energy Resources, LLC Jacumba Solar Photovoltaic [Solar PV] Peaking As‐available Jacumba  20.00       

74 240‐01  Individual Excludes: 240‐3  NextEra Energy Resources, LLC Joshua Tree Solar Farm Photovoltaic [Solar PV] Peaking As‐available Joshua Tree  20.00       

75 240‐03  Individual Excluded By:240‐1  NextEra Energy Resources, LLC Joshua Tree Solar Farm Photovoltaic [Solar PV] Peaking As‐available Joshua Tree  20.00       

76 240‐06  Individual Excludes: 240‐7  NextEra Energy Resources, LLC Westside Solar Photovoltaic [Solar PV] Peaking As‐available Fresno County  20.00       

77 240‐07  Individual Excluded By:240‐6  NextEra Energy Resources, LLC Westside Solar Photovoltaic [Solar PV] Peaking As‐available Fresno County  20.00       

78 212‐07  Inclusive  NextEra Energy Resources, LLC San Jacinto Solar 14.5 Photovoltaic [Solar PV] Peaking As‐available San Jacinto  14.50       

79 212‐07  Inclusive  NextEra Energy Resources, LLC San Jacinto Solar 5.5 Photovoltaic [Solar PV] Peaking As‐available San Jacinto  5.50         

80 212‐08  Inclusive  NextEra Energy Resources, LLC San Jacinto Solar 14.5 Photovoltaic [Solar PV] Peaking As‐available San Jacinto  14.50       

81 212‐08  Inclusive  NextEra Energy Resources, LLC San Jacinto Solar 5.5 Photovoltaic [Solar PV] Peaking As‐available San Jacinto  5.50         

82 247‐01  Individual  NM Mid Valley Genco LLC Mid Valley Energy 2 Landfill gas Baseload Rialto  4.00         

83 190‐01  Individual  NRG Renew LLC NRG Solar Blythe II LLC Photovoltaic [Solar PV] Peaking As‐available Carlsbad  20.00       

84 235‐04  Individual  Pacific Solar & Power Brannon Solar LLC Photovoltaic [Solar PV] Peaking As‐available Fresno  20.00       

85 225‐01  Individual  Recurrent Energy RE Garland A LLC Photovoltaic [Solar PV] Peaking As‐available Rosamond  20.00       

86 225‐02  Individual Excludes: 225‐01  Recurrent Energy RE Garland A LLC Photovoltaic [Solar PV] Peaking As‐available Rosamond  20.00       

87 230‐01  Individual  SunEdison LLC SunEdison ‐ Brown Field Photovoltaic [Solar PV] Peaking As‐available San Diego  3.00         

88 230‐02  Individual  SunEdison LLC West Riverside Landfill Solar Photovoltaic [Solar PV] Peaking As‐available Jurupa Valley  8.00         

89 230‐03  Individual  SunEdison LLC Arco Solar Project Photovoltaic [Solar PV] Peaking As‐available Lost Hills  20.00       

90 230‐04  Individual  SunEdison LLC Gettysburg Solar Project Photovoltaic [Solar PV] Peaking As‐available Rosamond  20.00       

91 201‐04  Individual  Sustainable Power Group LLC Aspiration Solar G Photovoltaic [Solar PV] Peaking As‐available Canuta Creek  9.00         

92 201‐05  Individual  Sustainable Power Group LLC Central Antelope Dry Ranch B Photovoltaic [Solar PV] Peaking As‐available Lancaster  5.00         

93 201‐06  Individual  Sustainable Power Group LLC Lancaster WAD B Photovoltaic [Solar PV] Peaking As‐available Lancaster  5.00         

94 201‐07  Individual  Sustainable Power Group LLC Patriot Solar A Photovoltaic [Solar PV] Peaking As‐available Firebaugh  20.00       

95 201‐08  Individual  Sustainable Power Group LLC Patriot Solar B Photovoltaic [Solar PV] Peaking As‐available Firebaugh  20.00       

96 201‐09  Individual  Sustainable Power Group LLC Victor Mesa Linda B Photovoltaic [Solar PV] Peaking As‐available Victorville  3.00         

97 201‐10  Individual  Sustainable Power Group LLC Western Antelope Blue Sky Ranch B Photovoltaic [Solar PV] Peaking As‐available Lancaster  20.00       

98 201‐11  Individual  Sustainable Power Group LLC Western Antelope Dry Ranch Photovoltaic [Solar PV] Peaking As‐available Lancaster  10.00       

99 223‐02  Individual  Terra‐Gen Cameron Ridge II Wind Non‐Peaking As‐available Mojave  11.90       

100 223‐03  Individual  Terra‐Gen San Gorgonio Westwinds II ‐ Windustries Wind Non‐Peaking As‐available Palm Springs  9.80         

101 223‐04  Individual  Terra‐Gen San Gorgonio Westwinds II ‐ San Jacinto Wind Non‐Peaking As‐available Palm Springs  12.60       

102 223‐05  Individual  Terra‐Gen San Gorgonio Westwinds II ‐ Altech Wind Non‐Peaking As‐available Palm Springs  9.80         

* Post‐TOD PTAR ($/MWh) is the bid ranking price. Page 2 of 3

Page 41: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Confidential Table C‐5

SCE RAM 5 ‐ All Offers Received

Row # Offer No. Offer Type Offeror Company Project Name Technology Selected ProductProject Location 

[City]

Offer Price 

($/MWh)

Post‐TOD 

PTAR 

($/MWh)*

TOD‐Adjusted 

Levelized Offer 

Price ($/MWh)

Transmissi

on Adder 

($/MWh)

RA 

Benefits 

($/MWh)

Project 

Size (MW)

103 211‐02  Individual  Terra‐Gen Power, LLC Alta Solar I Photovoltaic [Solar PV] Peaking As‐available Mojave  20.00       

104 233‐01  Individual  US Topco Energy, Inc. Soccer Center Solar Photovoltaic [Solar PV] Peaking As‐available Lancaster  5.00         

105 181‐01  Individual  Valos Solar Ventures, LLC SKIC Solar Photovoltaic [Solar PV] Peaking As‐available Taft  10.00       

106 243‐01  Individual  W Power, LLC Tulare Solar Center 3 Photovoltaic [Solar PV] Peaking As‐available Ducor  6.00         

107 243‐03  Individual  W Power, LLC Tulare Solar Center 4 Photovoltaic [Solar PV] Peaking As‐available Ducor  20.00       

108 243‐04  Individual  W Power, LLC Muscat Solar Farm Photovoltaic [Solar PV] Peaking As‐available Kerman  14.50       

109 189‐01  Individual  Windland, Inc. Windland Refresh 2 Wind Non‐Peaking As‐available Mojave  7.81         

* Post‐TOD PTAR ($/MWh) is the bid ranking price. Page 3 of 3

Page 42: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

APPENDIX D Summary of How Many Projects Passed Each

Eligibility Screen  

Page 43: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Table D‐1

Summary of Projects Passing Each Eligiblity Screen,  RAM 1 ‐ 5

Dev. 

Exp.

Site 

Control

Commercialized 

Tech. Interconnection COD <18mos

Baseload 0 0 0 0 0 0 0

Non‐Peaking As‐Available 1 1 0 0 0 0 0

Peaking As‐Available 91 45 0 0 0 1 45

Dev. 

Exp.

Site 

Control

Commercialized 

TechnologyInterconnection COD <24mos

Existing 

Contract 

Size 

>20MW

Baseload 5 2 0 0 0 1 0 2 0

Non‐Peaking As‐Available 4 2 0 0 0 0 0 2 0

Peaking As‐Available 133 109 0 0 0 1 22 0 1

Dev. 

Exp.

Site 

Control

Commercialized 

TechnologyInterconnection COD <24mos

Existing 

Contract 

Size 

>20MWOther

1

Baseload 5 3 0 0 0 1 0 0 1 0

Non‐Peaking As‐Available 17 8 0 0 0 0 0 4 0 5

Peaking As‐Available 108 82 0 0 0 8 16 0 2 0

RAM 4 Product Category Total # of Offers into RFO Total # of Eligible Offers

Dev. 

Exp.

Site 

Control

Commercialized 

TechnologyInterconnection COD >24mos

Existing 

Contract 

Size 

>20MWOther2

Baseload 4 2 0 0 0 0 2 0 0 0

Non‐Peaking As‐Available 25 20 0 0 0 0 0 1 0 4

Peaking As‐Available 97 58 0 0 0 6 28 3 0 2

RAM 5 Product Category Total # of Offers into RFO Total # of Eligible Offers

Dev. 

Exp.

Site 

Control

Commercialized 

TechnologyInterconnection COD >24mos

Existing 

Contract 

Size 

>20MWOther

3

Baseload 4 1 0 0 0 3 0 0 0 0

Non‐Peaking As‐Available 11 5 0 0 0 6 0 0 0 0

Peaking As‐Available 94 75 0 0 0 8 3 1 6 1

Notes:1 Failed to provide conforming documents; offerors were given opportunity to cure.2 Failed to provide conforming documents; offerors were given opportunity to cure.3  Project is located in IID territory

No. of RFO Offers that Failed Viability Screen

Total # of Bids into RFO Total # of Eligible Bids

RAM 1 Product Category

RAM 2 Product Category

No. of RFO Offers that Failed Viability Screen

Total # of Bids into RFO Total # of Eligible Bids

No. of RFO Bids that Failed Each Viability Screen*

RAM 3 Product Category

No. of RFO Bids that Failed Each Viability Screen

Total # of Bids into RFO Total # of Eligible Bids

No. of RFO Bids that Failed Each Viability Screen

Page 44: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

APPENDIX E Achievement of Project Development

Milestones

Identification of Winning Offers  

Page 45: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Table E‐1

Project Development Milestones, Current as of January 2, 2015

RAMRAP 

ID #

RFO 

Offer 

#

Project Name Company Name

Project Status (On 

Schedule/Delayed/ 

Terminated)

Product CategoryTechnology 

TypeLocation (City / County)

Original Bid 

Capacity (MW)

Installed 

Capacity (MW)

Full Buy/Sell or 

Excess Sales

CPUC Non‐Appealable 

Approval Date

RAM 1 5568 122‐1 Highlander Solar 1 (f/k/a SEPV8) Highland Solar I, LLC Online Peaking As‐available Solar PV Twenty Nine Palms, CA / San Bernardino 12 11.7 Full Buy 5/15/2012

RAM 1 5569 122‐2 Highlander Solar 2 (f/k/a SEPV9) Highland Solar 2, LLC Online Peaking As‐available Solar PV Twenty Nine Palms, CA / San Bernardino 9 8.7 Full Buy 5/15/2012

RAM 1 5566 134‐2 Placer Solar Trina Solar Terminated Peaking As‐available Solar PV San Joaquin, CA / Fresno 20 Terminated Full Buy Terminated

RAM 1 5567 148‐2 Joshua Tree Solar BP Solar Energy  Terminated Peaking As‐available Solar PV Joshua Tree, CA / San Bernardino 20 Terminated Full Buy Terminated

RAM 1 5477 65‐3 FTS Master Tenant I (f/k/a Expressway Solar A) FTS Master Tenant I, LLC Online Peaking As‐available Solar PV Victorville, CA / San Bernardino 2 2 Full Buy 5/15/2012

RAM 1 5478 65‐4 FTS Master Tenant I (f/k/a Expressway Solar B) FTS Master Tenant I, LLC Online Peaking As‐available Solar PV Victorville, CA / San Bernardino 2 2 Full Buy 5/15/2012

RAM 1 5470 65‐5 Victor Mesa Linda A Silverado Power Terminated Peaking As‐available Solar PV Victorville, CA / San Bernardino 2 Terminated Full Buy Terminated

RAM 2 5621 60‐6 Lone Valley Solar Park I  Lone Valley Solar Park I, LLC Online Peaking As‐available Solar PV Lucerne Valley, CA / San Bernardino 10 10 Full Buy 11/27/2012

RAM 2 5622 60‐7 Lone Valley Solar Park II  Lone Valley Solar Park II, LLC Online Peaking As‐available Solar PV Lucerne Valley, CA / San Bernardino 20 20 Full Buy 11/27/2012

RAM 2 5626 114‐7 Orion Solar II Orion Solar II, LLC Online Peaking As‐available Solar PV Arvin, CA / Kern 8 8 Full Buy/Sell 11/27/2012

RAM 2 5630 126‐6 RE Adams East RE Adams East, LLC Online Peaking As‐available Solar PV Tranquillity, CA / Fresno 19 19 Full Buy 11/27/2012

RAM 2 5627 114‐8 Coronal Lost Hills (f/k/a Twisselman Solar) Coronal Lost Hills, LLC Delayed Peaking As‐available Solar PV Lost Hills, CA / Kern 20 ‐‐‐‐ Full Buy/Sell 11/27/2012

RAM 2 5628 114‐9 Vega Solar Vega Solar, LLC Delayed Peaking As‐available Solar PV Los Banos, CA / Merced 20 ‐‐‐‐ Full Buy/Sell 11/27/2012

RAM 3 5758 185‐1 Adelanto Solar Adelanto Solar, LLC Delayed Peaking As‐available Solar PV Adelanto, CA / San Bernardino 20 ‐‐‐‐ Full Buy 6/14/2013

RAM 3 5742 142‐24 Aspiration Solar Silverado Power Terminated Peaking As‐available Solar PV Cantua Creek, CA / Fresno 9 Terminated Full Buy Terminated

RAM 3 5755 171‐2 Catalina Solar 2 Catalina Solar 2, LLC On Schedule Peaking As‐available Solar PV Rosamond, CA / Kern 18 ‐‐‐‐ Full Buy/Sell 6/14/2013

RAM 3 5756 142‐29 Citizen Solar B Citizen B Solar, LLC On Schedule Peaking As‐available Solar PV Mendota, CA / Fresno 5 ‐‐‐‐ Full Buy 6/14/2013

RAM 3 5749 207‐1 CPV ‐ PVUSA CleanPath Terminated Peaking As‐available Solar PV Davis, CA / Yolo 12 Terminated Full Buy/Sell Terminated

RAM 3 5743 142‐25 Patriot Solar A Silverado Power Terminated Peaking As‐available Solar PV Firebaugh, CA 20 Terminated Full Buy Terminated

RAM 3 5741 142‐22 Patriot Solar B Silverado Power Terminated Peaking As‐available Solar PV Firebaugh, CA 20 Terminated Full Buy Terminated

RAM 3 5753 166‐1 Pumpjack Solar I Pumpjack Solar I, LLC On Schedule Peaking As‐available Solar PV McKittrick, CA / Kern 20 ‐‐‐‐ Full Buy 6/14/2013

RAM 3 5754 183‐4 RE Yakima Recurrent Energy Terminated Peaking As‐available Solar PV Mojave, CA / Kern 20 Terminated Full Buy Terminated

RAM 3 5759 170‐1 67RK 8ME (f/k/a Redcrest Solar Farm) 67RK 8ME LLC  On Schedule Peaking As‐available Solar PV Edison, CA / Kern 20 ‐‐‐‐ Full Buy 6/14/2013

RAM 3 5745 172‐2 SEPV Palmdale East SEPV Palmdale East, LLC Delayed Peaking As‐available Solar PV Palmdale / Los Angeles 10 ‐‐‐‐ Full Buy 6/14/2013

RAM 3 5757 166‐2 Wildwood Solar I Wildwood Solar, LLC On Schedule Peaking As‐available Solar PV Wasco, CA / Kern 20 ‐‐‐‐ Full Buy 6/14/2013

RAM 3 6367 184‐3 Windland Refresh 1 Windland Refresh, LLC Online Non‐Peaking As‐available Wind Mojave, CA / Kern 7.5 7.5 Full Buy 6/14/2013

RAM 4 5777 209‐1 CED Atwell Island West CED Atwell Island West, LLC On Schedule Peaking As‐available Solar PV Alpaugh / Tulare 20 ‐‐‐‐ Full Buy 12/28/2013

RAM 4 5781 226‐1 Chowchilla Solar Project Chowchilla Solar, LLC On Schedule Peaking As‐available Solar PV Chowchilla / Madera 20 ‐‐‐‐ Full Buy 12/28/2013

RAM 4 5767 172‐13 Lancaster Little Rock C Lancaster Little Rock C, LLC Delayed Peaking As‐available Solar PV Palmdale / Los Angeles 5 ‐‐‐‐ Full Buy 12/28/2013

RAM 4 5772 179‐2 Maricopa East Solar PV 2 Maricopa East Solar PV2, LLC On Schedule Peaking As‐available Solar PV Maricopa / Kern 18 ‐‐‐‐ Full Buy 12/28/2013

RAM 4 5774 199‐1 NRG Solar Oasis  NRG Solar Oasis, LLC On Schedule Peaking As‐available Solar PV Palmdale / Los Angeles 20 ‐‐‐‐ Full Buy 12/28/2013

RAM 4 6370 163‐1 Patterson Pass Wind Farm Patterson Pass Wind Farm, LLC On Schedule Non‐Peaking As‐available Wind Livermore, CA / Alameda 19.8 ‐‐‐‐ Full Buy/Sell 12/28/2013

RAM 4 5779 210‐2 SEPV Boulevard Solar Electric Solutions Terminated Peaking As‐available Solar PV Boulevard / San Diego 5 Terminated Full Buy Terminated

RAM 4 5778 210‐1 SEPV Mojave West SEPV Mojave West, LLC On Schedule Peaking As‐available Solar PV Mojave / Kern 20 ‐‐‐‐ Full Buy 12/28/2013

RAM 4 6396 201‐7 Smoke Tree Wind Smoke Tree Wind, LLC  On Schedule Non‐Peaking As‐available Wind Desert Hot Springs / Riverside 16 16 Full Buy 12/28/2013

RAM 4 5769 172‐19 Western Antelope Dry Ranch Addition Silverado Power Terminated Peaking As‐available Solar PV Lancaster / Los Angeles 20 Terminated Full Buy Terminated

RAM 5 5822 176‐02 Longboat Solar Longboat Solar, LLC On Schedule Peaking As‐available Solar PV Barstow / San Bernardino 20 ‐‐‐‐ Full Buy Pending

RAM 5 5823 181‐01 TC Valos Solar TC Valos Solar Energy, LLC On Schedule Peaking As‐available Solar PV Taft, CA / Kern 10 ‐‐‐‐ Full Buy Pending

RAM 5 5825 184‐06 Kasson Manteca Solar Kasson Manteca Solar, LLC Terminated Peaking As‐available Solar PV Tracy, CA / San Joaquin 20 Terminated Full Buy Terminated

RAM 5 6397 189‐01 Windland Refresh 2 Windland Refresh 2, LLC On Schedule Non‐Peaking As‐available Wind Mojave, CA / Kern 7.81 7.81 Full Buy Pending

RAM 5 5826 202‐01 Portal Ridge Solar B Portal Ridge Solar B, LLC On Schedule Peaking As‐available Solar PV Lancaster, CA / Los Angeles 20 ‐‐‐‐ Full Buy Pending

RAM 5 5827 210‐08 Rio Bravo Solar I Rio Bravo I, LLC On Schedule Peaking As‐available Solar PV McKittrick, CA / Kern 20 ‐‐‐‐ Full Buy Pending

RAM 5 5828 210‐09 Rio Bravo Solar II Rio Bravo II, LLC On Schedule Peaking As‐available Solar PV McKittrick, CA / Kern 20 ‐‐‐‐ Full Buy Pending

RAM 5 5829 210‐10 Wildwood Solar II Wildwood Solar II, LLC On Schedule Peaking As‐available Solar PV Wasco, CA / Kern 15 ‐‐‐‐ Full Buy Pending

RAM 5 5833 212‐05 Jacumba Solar NextEra Energy Resources, LLC On Schedule Peaking As‐available Solar PV Jacumba, CA / San Diego 20 ‐‐‐‐ Full Buy Pending

RAM 5 6391 223‐02 Cameron Ridge II Terra‐Gen On Schedule Non‐Peaking As‐available Wind Mojave, CA / Kern 11.9 11.9 Full Buy Pending

RAM 5 6358 223‐03 San Gorgonio Westwinds II ‐ Windustries Terra‐Gen On Schedule Non‐Peaking As‐available Wind Palm Springs, CA / Riverside 9.8 9.8 Full Buy Pending

RAM 5 5834 225‐01 RE Garland A LLC Recurrent Energy On Schedule Peaking As‐available Solar PV Rosamond, CA / Kern 20 ‐‐‐‐ Full Buy Pending

RAM 5 6355 239‐01 Brookfield Tehachapi 3 Coram Energy, LLC On Schedule Non‐Peaking As‐available Wind Tehachapi, CA / Kern 3 3 Full Buy Pending

RAM 5 5840 240‐01 Joshua Tree Solar Farm NextEra Energy Resources, LLC On Schedule Peaking As‐available Solar PV Joshua Tree / San Bernardino 20 ‐‐‐‐ Full Buy Pending

RAM 5 1237 250‐01 Bull Moose Energy of San Diego Bull Moose Energy, LLC Terminated Baseload Biomass San Diego, CA / San Diego 18 Terminated Full Buy Terminated

RAM 5 5831 212‐07 San Jacinto Solar 14.5 NextEra Energy Resources, LLC On Schedule Peaking As‐available Solar PV City of San Jacinto / Riverside 14.5 ‐‐‐‐ Full Buy Pending

RAM 5 5832 212‐07 San Jacinto Solar 5.5 NextEra Energy Resources, LLC On Schedule Peaking As‐available Solar PV City of San Jacinto / Riverside 5.5 ‐‐‐‐ Full Buy Pending

RAM 5 5835 227‐12 Vestal Almond SR Solis Vestal Almond, LLC On Schedule Peaking As‐available Solar PV Ducor, CA / Tulare 20 ‐‐‐‐ Full Buy Pending

RAM 5 5836 227‐12 Vestal Herder SR Solis Vestal Herder, LLC On Schedule Peaking As‐available Solar PV Ducor, CA / Tulare 20 ‐‐‐‐ Full Buy Pending

RAM 5 5837 227‐12 Vestal Fireman SR Solis Vestal Fireman, LLC On Schedule Peaking As‐available Solar PV Ducor, CA / Tulare 20 ‐‐‐‐ Full Buy Pending

RAM 5 5838 227‐12 Crown SR Solis Crown, LLC On Schedule Peaking As‐available Solar PV Ducor, CA / Tulare 15 ‐‐‐‐ Full Buy Pending

Project Overview

Page 46: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Table E‐1

Project Development Milestones, Current as of January 2, 2015

RAMRAP 

ID #

RFO 

Offer 

#

Project Name

RAM 1 5568 122‐1 Highlander Solar 1 (f/k/a SEPV8)

RAM 1 5569 122‐2 Highlander Solar 2 (f/k/a SEPV9)

RAM 1 5566 134‐2 Placer Solar

RAM 1 5567 148‐2 Joshua Tree Solar

RAM 1 5477 65‐3 FTS Master Tenant I (f/k/a Expressway Solar A)

RAM 1 5478 65‐4 FTS Master Tenant I (f/k/a Expressway Solar B)

RAM 1 5470 65‐5 Victor Mesa Linda A

RAM 2 5621 60‐6 Lone Valley Solar Park I 

RAM 2 5622 60‐7 Lone Valley Solar Park II 

RAM 2 5626 114‐7 Orion Solar II

RAM 2 5630 126‐6 RE Adams East

RAM 2 5627 114‐8 Coronal Lost Hills (f/k/a Twisselman Solar)

RAM 2 5628 114‐9 Vega Solar

RAM 3 5758 185‐1 Adelanto Solar

RAM 3 5742 142‐24 Aspiration Solar

RAM 3 5755 171‐2 Catalina Solar 2

RAM 3 5756 142‐29 Citizen Solar B

RAM 3 5749 207‐1 CPV ‐ PVUSA

RAM 3 5743 142‐25 Patriot Solar A

RAM 3 5741 142‐22 Patriot Solar B

RAM 3 5753 166‐1 Pumpjack Solar I

RAM 3 5754 183‐4 RE Yakima

RAM 3 5759 170‐1 67RK 8ME (f/k/a Redcrest Solar Farm)

RAM 3 5745 172‐2 SEPV Palmdale East

RAM 3 5757 166‐2 Wildwood Solar I

RAM 3 6367 184‐3 Windland Refresh 1

RAM 4 5777 209‐1 CED Atwell Island West

RAM 4 5781 226‐1 Chowchilla Solar Project

RAM 4 5767 172‐13 Lancaster Little Rock C

RAM 4 5772 179‐2 Maricopa East Solar PV 2

RAM 4 5774 199‐1 NRG Solar Oasis 

RAM 4 6370 163‐1 Patterson Pass Wind Farm

RAM 4 5779 210‐2 SEPV Boulevard

RAM 4 5778 210‐1 SEPV Mojave West

RAM 4 6396 201‐7 Smoke Tree Wind

RAM 4 5769 172‐19 Western Antelope Dry Ranch Addition

RAM 5 5822 176‐02 Longboat Solar

RAM 5 5823 181‐01 TC Valos Solar

RAM 5 5825 184‐06 Kasson Manteca Solar

RAM 5 6397 189‐01 Windland Refresh 2

RAM 5 5826 202‐01 Portal Ridge Solar B

RAM 5 5827 210‐08 Rio Bravo Solar I

RAM 5 5828 210‐09 Rio Bravo Solar II

RAM 5 5829 210‐10 Wildwood Solar II

RAM 5 5833 212‐05 Jacumba Solar

RAM 5 6391 223‐02 Cameron Ridge II

RAM 5 6358 223‐03 San Gorgonio Westwinds II ‐ Windustries

RAM 5 5834 225‐01 RE Garland A LLC

RAM 5 6355 239‐01 Brookfield Tehachapi 3

RAM 5 5840 240‐01 Joshua Tree Solar Farm

RAM 5 1237 250‐01 Bull Moose Energy of San Diego

RAM 5 5831 212‐07 San Jacinto Solar 14.5

RAM 5 5832 212‐07 San Jacinto Solar 5.5

RAM 5 5835 227‐12 Vestal Almond

RAM 5 5836 227‐12 Vestal Herder

RAM 5 5837 227‐12 Vestal Fireman

RAM 5 5838 227‐12 Crown

6‐Month Regulatory 

Delay (Yes/No)

Reason for Reg. 

Delay Contract GCOD

Estimated 

CODActual COD

Construction 

Started (Y/N)

Necessary 

Permits/Govt 

Approvals 

Received (Y/N)

Necessary 

Permits/Govt 

Approvals 

Filed (Y/N)

If Filed but not 

Approved, Expected 

Date for Permits/Govt 

Approval

If not Filed, Expected 

File Date

IC Agreement 

Signed (Y/N)

IC Application 

Deemed 

Complete 

(Y/N)

Stage in IC Process 

(Study/Agreement/

Construction)

No ‐‐‐‐ 11/15/2013 ‐‐‐‐ 6/12/2013 Y Y Y ‐‐‐‐ ‐‐‐‐ Y Y Online

No ‐‐‐‐ 11/15/2013 ‐‐‐‐ 6/11/2013 Y Y Y ‐‐‐‐ ‐‐‐‐ Y Y Online

‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ Y Y Terminated

‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ Terminated

Yes Permitting 11/15/2013 ‐‐‐‐ 5/7/2014 Y Y Y ‐‐‐‐ ‐‐‐‐ Y Y Online

Yes Permitting 11/15/2013 ‐‐‐‐ 5/7/2014 Y Y Y ‐‐‐‐ ‐‐‐‐ Y Y Online

‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ Feb‐14 ‐‐‐‐ Y Y Agreement

No ‐‐‐‐ 11/27/2014 ‐‐‐‐ 11/26/2014 Y Y Y ‐‐‐‐ ‐‐‐‐ Y Y Online

No ‐‐‐‐ 11/27/2014 ‐‐‐‐ 11/26/2014 Y Y Y ‐‐‐‐ ‐‐‐‐ Y Y Online

No ‐‐‐‐ 11/27/2014 ‐‐‐‐ 6/26/2014 Y Y Y ‐‐‐‐ ‐‐‐‐ Y Y Online

No ‐‐‐‐ 11/27/2014 ‐‐‐‐ 12/19/2014 Y Y Y ‐‐‐‐ ‐‐‐‐ Y Y Online

No ‐‐‐‐ 11/27/2014 4/15/2015 ‐‐‐‐ Y Y Y ‐‐‐‐ Y Y Construction

Yes Interconnection 11/27/2014 2/23/2015 ‐‐‐‐ Y Y Y ‐‐‐‐ Y Y Construction

Yes Interconnection 6/14/2015 8/31/2015 ‐‐‐‐ Y Y Y ‐‐‐‐ Y Y Construction

‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ Terminated

No ‐‐‐‐ 6/14/2015 5/29/2015 ‐‐‐‐ N Y Y ‐‐‐‐ ‐‐‐‐ Y Y Agreement

Yes Interconnection 6/14/2015 5/31/2015 ‐‐‐‐ Y Y Y ‐‐‐‐ ‐‐‐‐ Y Y Agreement

‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ Terminated

‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ Terminated

‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ Terminated

No 6/14/2015 1/15/2015 ‐‐‐‐ Y Y Y ‐‐‐‐ ‐‐‐‐ Y Y Construction

‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ Y Y Agreement

Yes Interconnection 6/14/2015 5/31/2015 ‐‐‐‐ Y Y Y ‐‐‐‐ ‐‐‐‐ Y Y Construction

Yes Interconnection 6/14/2015 12/13/2015 ‐‐‐‐ Y Y Y ‐‐‐‐ ‐‐‐‐ Y Y Construction

No 6/14/2015 1/31/2015 ‐‐‐‐ Y Y Y ‐‐‐‐ ‐‐‐‐ Y Y Construction

No ‐‐‐‐ 6/14/2015 6/3/2014 Y Y Y ‐‐‐‐ ‐‐‐‐ Y Y Online

No ‐‐‐‐ 12/28/2015 12/27/2015 ‐‐‐‐ N N Y ‐‐‐‐ Jan‐15 Y Y Agreement

No ‐‐‐‐ 12/28/2015 11/30/2015 ‐‐‐‐ N N Y ‐‐‐‐ Mar‐15 Y Y Agreement

No ‐‐‐‐ 12/28/2015 1/13/2015 ‐‐‐‐ Y Y Y ‐‐‐‐ ‐‐‐‐ Y Y Construction

No ‐‐‐‐ 12/28/2015 11/1/2015 ‐‐‐‐ N N Y ‐‐‐‐ Jan‐15 Y Y Agreement

No ‐‐‐‐ 12/28/2015 4/29/2015 ‐‐‐‐ N N N Mar‐15 Feb‐15 Y Y Agreement

No ‐‐‐‐ 12/28/2015 9/26/2015 ‐‐‐‐ N Y Y ‐‐‐‐ ‐‐‐‐ N N Study

‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ Terminated

No ‐‐‐‐ 12/28/2015 12/1/2015 ‐‐‐‐ N N N May‐15 Mar‐15 Y Y Agreement

No ‐‐‐‐ 12/28/2015 12/2/2015 ‐‐‐‐ Y Y Y ‐‐‐‐ ‐‐‐‐ Unknown N/A Conversion

‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ N N Terminated

No ‐‐‐‐ Pending 12/1/2016 ‐‐‐‐ N N Y Mar‐16 ‐‐‐‐ N Y Study

No ‐‐‐‐ Pending 12/15/2015 ‐‐‐‐ N N N ‐‐‐‐ Jan‐15 N Y Study

‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ Terminated ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ Terminated

No ‐‐‐‐ Pending 12/7/2015 ‐‐‐‐ Y Y Y ‐‐‐‐ ‐‐‐‐ N N Study

No ‐‐‐‐ Pending 10/31/2016 ‐‐‐‐ N Y Y ‐‐‐‐ ‐‐‐‐ Y Y Agreement

No ‐‐‐‐ Pending 12/1/2016 ‐‐‐‐ N N N Jun‐15 Apr‐15 Y Y Agreement

No ‐‐‐‐ Pending 12/1/2016 ‐‐‐‐ N N N Sep‐15 Jul‐15 N Y Study

No ‐‐‐‐ Pending 12/1/2016 ‐‐‐‐ N N N Jun‐15 Apr‐15 Y Y Agreement

No ‐‐‐‐ Pending 12/1/2016 ‐‐‐‐ N N N ‐‐‐‐ May‐16 Y Y Agreement

No ‐‐‐‐ Pending 12/31/2015 ‐‐‐‐ Y Y Y ‐‐‐‐ ‐‐‐‐ N Y Conversion

No ‐‐‐‐ Pending 11/24/2015 ‐‐‐‐ Y Y Y ‐‐‐‐ ‐‐‐‐ N Y Conversion

No ‐‐‐‐ Pending 12/1/2016 ‐‐‐‐ N N N ‐‐‐‐ Jun‐16 N Y Study

No ‐‐‐‐ Pending 12/1/2016 ‐‐‐‐ Y Y Y ‐‐‐‐ ‐‐‐‐ N Y Conversion

No ‐‐‐‐ Pending 12/1/2016 ‐‐‐‐ N N N ‐‐‐‐ Sep‐15 Y Y Agreement

No ‐‐‐‐ Terminated 12/1/2016 ‐‐‐‐ Terminated N N ‐‐‐‐ ‐‐‐‐ Y Y Terminated

No ‐‐‐‐ Pending 12/1/2016 ‐‐‐‐ N N N ‐‐‐‐ May‐16 Y Y Agreement

No ‐‐‐‐ Pending 12/1/2016 ‐‐‐‐ N N N ‐‐‐‐ May‐16 Y Y Agreement

No ‐‐‐‐ Pending 12/1/2016 ‐‐‐‐ N N N ‐‐‐‐ Nov‐14 Y Y Agreement

No ‐‐‐‐ Pending 12/1/2016 ‐‐‐‐ N N N ‐‐‐‐ Nov‐14 Y Y Agreement

No ‐‐‐‐ Pending 12/1/2016 ‐‐‐‐ N N N ‐‐‐‐ Nov‐14 Y Y Agreement

No ‐‐‐‐ Pending 12/1/2016 ‐‐‐‐ N N N ‐‐‐‐ Nov‐14 Y Y Agreement

Regulatory  Commecial Operation Date Necessary Permitting and Government Approvals Interconnection (IC) Status

Page 47: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE

STATE OF CALIFORNIA

Order Instituting Rulemaking to Continue Implementation and Administration of California Renewables Portfolio Standard Program

)))

Rulemaking 11-05-005 (Filed May 5, 2011)

CERTIFICATE OF SERVICE

I hereby certify that, pursuant to the Commission’s Rules of Practice and Procedure, I have this day served a true copy of SOUTHERN CALIFORNIA EDISON COMPANY’S (U 338-E) SECOND COMPLIANCE REPORT ON THE RENEWABLE AUCTION MECHANISM PROGRAM – PUBLIC VERSION (ATTACHMENT C REDACTED) on all parties identified on the attached service list(s) R.11-05-005. Service was effected by one or more means indicated below:

 ☒ Transmitting the copies via e-mail to all parties who have provided an e-mail address.

  

☒ Placing the copies in sealed envelopes and causing such envelopes to be delivered by hand or by overnight courier to the offices of the Commissioner(s) or other addressee(s).

  

ALJ Robert Mason ALJ Anne Simon CPUC CPUC 505 Van Ness Ave. 505 Van Ness Ave. San Francisco, CA 94102 San Francisco, CA 94102

  

Shannon O’Rourke Comm. Mark Ferron CPUC – ED (Electronic Service Only) 505 Van Ness Ave. San Francisco, CA 94102

  

☒ Placing copies in properly addressed sealed envelopes and depositing such copies in the United States mail with first-class postage prepaid to all parties for those listed on the attached non-email list.

  

Executed this 2nd day of February, 2015, at Rosemead, California.   

/S/ Cynthia Childs Cynthia Childs Project Analyst SOUTHERN CALIFORNIA EDISON COMPANY 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770

  

Page 48: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

PROCEEDING: R1105005 - CPUC - OIR TO CONTIN FILER: CPUC LIST NAME: LIST LAST CHANGED: JANUARY 30, 2015

DOWNLOAD THE COMMA-DELIMITED FILE ABOUT COMMA-DELIMITED FILES

Back to Service Lists Index

AUNDREA WILLIAMS CARRIE A. DOWNEY DIR.- REGULATORY AFFAIRS & STRATEGY LAW OFFICES OF CARRIE ANNE DOWNEY GEXA ENERGY , LP EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, TX 00000 FOR: IMPERIAL IRRIGATION DISTRICT FOR: GEXA ENERGY, LP

CHRIS LEVERIZA CRAIG LEWIS GLACIAL ENERGY RIGHTCYCLE ENTERPRISES EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 FOR: GLACIAL ENERGY FOR: RIGHTCYCLE

DANIEL W. DOUGLASS ELIZABETH KELLY DOUGLASS & LIDDELL LEGAL DIRECTOR EMAIL ONLY MARIN CLEAN ENERGY EMAIL ONLY, CA 00000 EMAIL ONLY FOR: DIRECT ACCESS CUSTOMER EMAIL ONLY, CA 00000 COALITION/WESTERN POWER TRADING FOR: MARIN ENERGY AUTHORITY FORUM/EDF RENEWABE ENERGY./RECURRENT ENERGY/EDF INDUSTRIAL POWER SERVICES (CA), LLC

ELIZABETH WRIGHT FREDERICK W. NOBLE OCCIDENTAL POWER SERVICES, INC. PRESIDENT/CEO EMAIL ONLY WINTEC ENERGY, INC. EMAIL ONLY, CA 00000 EMAIL ONLY

CPUC Home

CALIFORNIA PUBLIC UTILITIES COMMISSIONService Lists

Parties

Page 1 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 49: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

FOR: OCCIDENTAL POWER SERVICES, INC. EMAIL ONLY, CA 00000 FOR: WINTEC ENERGY, INC.

GABE PETLIN JEAN-CALUDE BERTET 3DEGREES DEPUTY CITY ATTORNEY EMAIL ONLY LOS ANGELES DEPT. OF WATER AND POWER EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000 FOR: LOS ANGELES DEPARTMENT OF WATER & POWER

JODY LONDON JOHN KERN JODY LONDON CONSULTING BLUESTAR ENERGY SERVICES EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, IL 00000 FOR: SUSTAINABLE CONSERVATION AND RCM FOR: BLUESTAR ENERGY SERVICES INTERNATIONAL

JOHN W. LESLIE, ESQ JUSTIN C. WYNNE MCKENNA LONG & ALDRIDGE LLP ATTORNEY AT LAW EMAIL ONLY BRAUN BLAISING MCLAUGHLIN, P.C. EMAIL ONLY, CA 00000 EMAIL ONLY FOR: SHELL ENERGY NORTH AMERICA (U.S.), EMAIL ONLY, CA 00000 L.P. FOR: CALIFORNIA MUNICIPAL UTILITIES ASSOCIATION

LES NELSON LYNN M. HAUG CALIFORNIA SOLAR ENERGY INDUSTRIES ASSN ELLISON, SCHNEIDER & HARRIS, L.L.P. EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 FOR: CALIFORNIA SOLAR ENERGY INDUSTRIES FOR: FUELCELL ENERGY, INC. ASSOCIATION (CSEIA)

M. GRADY MATHAI-JACKSON MADELON A. KUCHERA PACIFIC GAS & ELECTRIC COMPANY ASSOC. GEN. COUNSEL - VP REGULATORY EMAIL ONLY BLUESTAR ENERGY SOLUTIONS EMAIL ONLY, CA 00000 EMAIL ONLY FOR: PACIFIC GAS & ELECTRIC COMPANY EMAIL ONLY, IL 00000 FOR: BLUESTAR ENERGY SOLUTIONS

MATTHEW FREEDMAN MICHAEL MAZUR THE UTILITY REFORM NETWORK PRINCIPAL EMAIL ONLY 3 PHASES RENEWABLES, LLC EMAIL ONLY, CA 00000 EMAIL ONLY FOR: THE UTILITY REFORM NETWORK EMAIL ONLY, CA 00000 FOR: 3 PHASES RENEWABLES/3 PHASES ELECTRICAL CONSULTING

RICK NOGER ROBIN SMUTNY-JONES PRAXAIR PLAINFIELD, INC. DIR. - CALIFORNIA POLICY & REGULATION EMAIL ONLY IBERDROLA RENEWABLES, LLC EMAIL ONLY, CA 00000 EMAIL ONLY FOR: PRAXAIR PLAINFIELD, INC. EMAIL ONLY, OR 00000 FOR: IBERDROLA RENEWABLES, LLC

Page 2 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 50: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

SCOTT BLAISING TAM HUNT BRAUN BLAISING MCLAUGHLIN, P.C. HUNT CONSULTING EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 FOR: CITY OF CERRITOS FOR: CLEAN COALITION (FORMERLY FIT) / RIGHTCYCLE / COMMUNITY ENVIRONMENTAL COUNCIL /

TOM KIRK TRACY PHILLIPS EXECUTIVE DIRECTOR TIGER NATURAL GAS COACHELLA VALLEY ASSN. OF GOVERNMENTS EMAIL ONLY EMAIL ONLY EMAIL ONLY, TX 00000 EMAIL ONLY, CA 00000 FOR: TIGER NATURAL GAS FOR: COACHELLA VALLEY ASSOCIATION OF GOVERNMENTS

WILL PLAXICO LAURA WISLAND PROJECT DEVELOPMENT MGR UNION OF CONCERNED SCIENTISTS AXIO POWER, INC. EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000-0000 EMAIL ONLY, CA 00000 FOR: UNION OF CONCERNED SCIENTISTS FOR: AXIO POWER, INC.

NOAH LONG RANDALL W. HARDY ENERGY PROGRAM ATTORNEY HARDY ENERGY CONSULTING NATURAL RESOURCES DEFENSE COUNCIL EMAIL ONLY EMAIL ONLY EMAIL ONLY, WA 00000-0000 EMAIL ONLY, CA 00000-0000 FOR: RANDALL W. HARDY FOR: NRDC

ROBERT B. GEX ANDREW LUSCZ ATTORNEY AT LAW, GLACIAL ENERGY OF CALIFORNIA DAVIS WRIGHT TREMAINE LLP 5326 YACHT HAVEN GRANDE BOX 36 EMAIL ONLY ST. THOMAS, VI 00802 EMAIL ONLY, CA 00000-0000 FOR: GLACIAL ENERGY OF CALIFORNIA FOR: REPUBLIC CLOVERLEAF SOLAR LLC

JOHN B. HOWE DANIEL V. GULINO DIRECTOR OF PUBLIC AFFAIRS RIDGEWOOD POWER MANAGEMENT, LLC NEW DIMENSION ENERGY COMPANY, LLC 14 PHILIPS PKWY 221 CRESCENT ST., SUITE 103A MONTVALE, NJ 07645-1811 WALTHAM, MA 02453 FOR: RIDGEWOOD POWER MANAGEMENT, LLC FOR: NEW DIMENSION ENERGY COMPANY, LLC

ABRAHAM SILVERMAN THOMAS MELONE ASSIST. GEN. COUNSEL - REGULATORY PRESIDENT NRG ENERGY, INC. ALLCO RENEWABLE ENERGY LIMITED 211 CARNEGIE CENTER DRIVE 14 WALL STREET, 20TH FLOOR PRINCETON, NJ 08540 NEW YORK, NY 10005-2123 FOR: NRG COMPANIES, INC. (CABRILLO FOR: ALLCO RENEWABLE ENERGY LIMITED POWER I, LLC/CABRILLO POWER II, LLC/EL SEGUNDO POWER, LLC/LONG BEACH GENERATION, LLC/NRG SOLAR BLYTHE, LLC

Page 3 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 51: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

ROBERT PALMESE DANIEL PARKER MGR - REGULATORY AFFAIRS KRUGER ENERGY PALMCO POWER CA, LLC 330 MAY ROAD 1350 60 STREET POTSDAM, NY 13676 BROOKLYN, NY 11219 FOR: KRUGER ENERGY FOR: PALMCO POWER CA, LLC

JAMES P. WHITE JEFF MEYER TRANSCANADA CORPORATION PATHFINDER RENEWABLE WIND ENERGY, LLC 4547 RINCON PLACE 2720 PARK STREET, STE. 222 MONTCLAIR, VA 22025 JACKSONVILLE, FL 32205 FOR: CHINOOK POWER TRANSMISSION, FOR: PATHFINDER RENEWABLE WIND ENERGY, LLC/ZEPHYR POWER TRANSMISSION, LLC LLC

ALRINE WILLIAMS ERIN SZALSKOWSKI LIBERTY POWER HOLDINGS LLC CORPORATE COUNSEL 1901 WEST CYPRESS CREEK ROAD, STE. 600 CLEAN LINE ENERGY PARTNERS, LLC FORT LAUDERDALE, FL 33309 1001 MCKINNEY ST., STE. 700 FOR: LIBERTY POWER HOLDINGS LLC HOUSTON, TX 77002 FOR: CENTENNIAL WEST CLEAN LINE, LLC

GRETCHEN SCHOTT ANGELA GREGORY BP WIND ENERGY NORTH AMERICA INC. DIR - WHOLESALE COMPLIANCE, U.S. 700 LOUSIANA STREET, 33RD FLOOR DIRECT ENERGY BUSINESS HOUSTON, TX 77002 12 GREENWAY PLAZA, STE. 600 FOR: BP WIND ENERGY NORTH AMERICA, INC. HOUSTON, TX 77046 FOR: DIRECT ENERGY BUSINESS

KEVIN BOUDREAUX KARA MORGAN ENERCAL USA TRANSWEST EXPRESS LLC 7660 WOODWAY DRIVE, STE 471A 555 SEVENTEENTH STREET, STE. 2400 HOUSTON, TX 77063 DENVER, CO 80202 FOR: ENERCAL USA FOR: TRANSWEST EXPRESS, LLC

THOMAS LOQUVAM ADRIENNE SMITH SENIOR ATTORNEY VP - ADMINISTRATION PINNACLE WEST CAPITAL CORPORATION TRES AMIGAS, LLC 400 N. FIFTH STREET, MS 8695 119 EAST MARCY ST., STE. 104 PHOENIX, AZ 85004 SANTA FE, NM 87501 FOR: ARIZONA PUBLIC SERVICE COMPANY FOR: TRES AMIGAS, LLC

DAVID SAUL CHRISTOPHER A. HILEN PACIFIC SOLAR & POWER CORPORATION NV ENERGY 2850 W. HORIZON RIDGE PKWY, SUITE 200 6100 NEIL ROAD, MS A35 HENDERSON, NV 89052 RENO, NV 89511 FOR: SOLEL, INC. FOR: NV ENERGY

HEIDI BETHEL NORMAN A. PEDERSEN, ESQ. DIR. - POLICY & BUSINESS DEVELOPMENT HANNA AND MORTON LLP ORMAT TECHNOLOGIES INC. 444 S FLOWER ST., SUITE 1500 6225 NEIL ROAD LOS ANGELES, CA 90071-2916 RENO, NV 89511 FOR: SOUTHERN CALIFORNIA GENERATION FOR: ORMAT TECHNOLOGIES INC. COALITION

Page 4 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 52: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

DIANE MOSS ADAM GREEN FOUNDER, SECRETARY OF THE BOARD SOLARRESERVE, LLC RENEWABLES 100 POLICY INSTITUTE 2425 OLYMPIC BLVD., STE. 500E 35316 MULHOLLAND HWY SANTA MONICA, CA 90404 MALIBU, CA 90265 FOR: SOLARRESERVE, LLC FOR: RENEWABLES 100 POLICY INSTITUTE

MARK MCDANNEL INGER GOODMAN COUNTY SANITATION DISTRICT OF L.A. COMMERCE ENERGY INC 1955 WORKMAN MILL ROAD 1 CENTERPOINTE DRIVE, SUITE 350 WHITTIER, CA 90601 LA PALMA, CA 90623-2520 FOR: COUNTY SANITATION DISTRICT OF LOS FOR: COMMERCE ENERGY, INC. ANGELES (LOS ANGELES COUNTY SANITATION DISTRICTS)

ANGEL AYALA PAUL DELANEY AMONIX, INC. V.P. 1709 APOLLO COURT AMERICAN UTILITY NETWORK (A.U.N.) SEAL BEACH, CA 90740 10705 DEER CANYON DRIVE FOR: AMONIX, INC. ALTA LOMA, CA 91737 FOR: AMERICAN UTILITY NETWORK

CATHY A. KARLSTAD KEITH SWITZER ATTORNEY VP REGULATORY AFFAIRS SOUTHERN CALIFORNIA EDISON COMPANY GOLDEN STATE WATER COMPANY 2244 WALNUT GROVE AVE. 630 EAST FOOTHILL BLVD. ROSEMEAD, CA 91770 SAN DIMAS, CA 91773-9016 FOR: SOUTHERN CALIFORNIA EDISON COMPANY FOR: GOLDEN STATE WATER COMPANY

CHERYL PONDS THOMAS CORR OFFICE OF THE CITY ATTORNEY LAW OFFICE OF THOMAS CORR 276 FOURTH AVENUE 618 W. LEWIS STREET CHULA VISTA, CA 91910 SAN DIEGO, CA 92013 FOR: THE CITY OF CHULA VISTA FOR: NOBLE AMERICAS ENERGY SOLUTIONS, LLC

MARY C. HOFFMAN DANIEL A. KING PRESIDENT SEMPRA GENERATION SOLUTIONS FOR UTILITIES, INC. 101 ASH STREET, HQ 14 1192 SUNSET DRIVE SAN DIEGO, CA 92101 VISTA, CA 92081 FOR: SEMPRA GENERATION FOR: SOLUTIONS FOR UTILITIES, INC.

FREDERICK M. ORTLIEB PAUL SZYMANSKI DEPUTY CITY ATTORNEY ATTORNEY CITY OF SAN DIEGO SEMPRA ENERGY 1200 THIRD AVENUE, SUITE 1100 101 ASH STREET, HQ-12 SAN DIEGO, CA 92101 SAN DIEGO, CA 92101 FOR: CITY OF SAN DIEGO FOR: SAN DIEGO GAS AND ELECTRIC CO.

DONALD C. LIDDELL THOMAS R. DARTON DOUGLASS & LIDDELL PILOT POWER GROUP, INC. (1365) 2928 2ND AVENUE 8910 UNIVERSITY CENTER LANE, STE. 520 SAN DIEGO, CA 92103 SAN DIEGO, CA 92122 FOR: CALIF. ENERGY STORAGE ALLIANCE / FOR: PILOT POWER GROUP, INC.

Page 5 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 53: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

WALMART STORES, INC. AND SAM'S WEST, INC. / AGPOWER GROUP, LLC / CLEAN ENERGY RENEWABLE FUELS, LLC.

JAMES TURNER MARK S. SHIRILAU, PH.D, PE ENERGYSOURCE, LLC PRESIDENT & CEO 321 SOUTH WATERMAN AVE., STE. 200 ALOHA SYSTEMS, INCORPORATED EL CENTRO, CA 92243 8539 BARNWOOD LANE FOR: ENERGYSOURCE, LLC RIVERSIDE, CA 92508-7126 FOR: ALOHA SYSTEMS, INCORPORATED

GLORIA BRITTON MICHAEL LEVIN ANZA ELECTRIC COOPERATIVE, INC. (909) VICE PRESIDENT PO BOX 391909 / 58470 HWY 371 ENER-CORE, INC. ANZA, CA 92539 9400 TOLEDO WAY FOR: ANZA ELECTRIC COOPERATIVE IRVINE, CA 92618 FOR: ENER-CORE, INC.

TAM HUNT ANDREA MORRISON CONSULTING ATTORNEY MARKET DEVELOPMENT REGIONAL DIR. 629 W. VALERIO ST. DIRECT ENERGY SERVICES, LLC SANTA BARBARA, CA 93101 415 DIXON STREET FOR: ZANNON FOUNDATION ARROYO GRANDE, CA 93420 FOR: DIRECT ENERGY SERVICES, LLC

TOM WHEELER JOSEPH LANGENBERG SUPERVISOR - DISTRICT 5 CENTRAL CALIFORNIA POWER MADERA COUNTY BOARD OF SUPERVISORS 5125 NORTH MARTY AVENUE, NO.324 200 W. FOURTH STREET FRESNO, CA 93711 MADERA, CA 93637 FOR: COUNTY OF MADERA

DAVID ORTH SUE MARA SAN JOAQUIN VALLEY POWER AUTHORITY CONSULTANT ADMIN OFF @KINGS RIVER CONSERV DISTRICT RTO ADVISORS, LLC 4886 EAST JENSEN AVENUE 164 SPRINGDALE WAY FRESNO, CA 93725 REDWOOD CITY, CA 94062 FOR: SAN JOAQUIN VALLEY POWER FOR: RETAIL ENERGY SUPPLY ASSOCIATION AUTHORITY/KING'S RIVER CONSERVATION (RESA) DISTRICT

MARC D. JOSEPH IRYNA KWASNY ADAMS, BROADWELL, JOSEPH & CARDOZO CALIF PUBLIC UTILITIES COMMISSION 601 GATEWAY BLVD., STE. 1000 LEGAL DIVISION SOUTH SAN FRANCISCO, CA 94080 ROOM 4107 FOR: COALITION OF CALIFORNIA UTILITY 505 VAN NESS AVENUE EMPLOYEES SAN FRANCISCO, CA 94102-3214 FOR: ORA

JEANNE M. SOLE KEVIN P. BUNDY DEPUTY CITY ATTORNEY SR. ATTORNEY CITY AND COUNTY OF SAN FRANCISCO CENTER FOR BIOLOGICAL DIVERSITY 1 DR. CARLTON B. GOODLETT PLACE, RM. 234 351 CALIFORNIA ST., STE. 600 SAN FRANCISCO, CA 94102-4682 SAN FRANCISCO, CA 94104 FOR: CITY AND COUNTY OF SAN FRANCISCO FOR: CENTER FOR BIOLOGICAL DIVERSITY

Page 6 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 54: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

ERICA BRAND NORA SHERIFF PROJECT DIR. ALCANTAR & KAHL, LLP THE NATURE CONSERVANCY 33 NEW MONTGOMERY ST., STE. 1850 201 MISSION STREET, 4TH FL. SAN FRANCISCO, CA 94105 SAN FRANCISCO, CA 94105 FOR: CALIFONRIA LARGE ENERGY CONSUMERS FOR: THE NATURE CONSERVANCY ASSOCIATION (CLECA)

NORA SHERIFF REBERT PARKHURST ALCANTAR & KAHL DIRECTOR 33 NEW MONTGOMERY ST., STE. 1850 ENVIRONMENTAL DEFENSSE FUND SAN FRANCISCO, CA 94105 123 MISSION ST. FOR: ENERGY PRODUCERS AND USERS SAN FRANCISCO, CA 94105 COALITION. FOR: ENVIRONMENTAL DEFENSE FUND

BRIAN T. CRAGG JAMES D. SQUERI GOODIN, MACBRIDE, SQUERI, DAY & LAMPREY ATTORNEY AT LAW 505 SANSOME STREET, SUITE 900 GOODIN, MACBRIDE, SQUERI, DAY & LAMPREY SAN FRANCISCO, CA 94111 505 SANSOME STREET, SUITE 900 FOR: INDEPENDENT ENERGY PRODUCERS SAN FRANCISCO, CA 94111 ASSOCIATION (IEPA)/CAITHNESS CORPORATION FOR: POWEREX CORPORATION

JEANNE B. ARMSTRONG NANCY L. MURRAY ATTORNEY ATTORNEY AT LAW GOODIN MACBRIDE SQUERI DAY & LAMPREY LLP NATURENER USA, LLC. 505 SANSOME STREET, SUITE 900 394 PACIFIC AVENUE, SUITE 300 SAN FRANCISCO, CA 94111 SAN FRANCISCO, CA 94111 FOR: SOLAR ENERGY INDUSTRIES ASSOCIATION FOR: NATURENER USA, LLC

NANCY SARACINO PABLO OTIN ATTORNEY VP & COUNTRY MGR. CROWELL & MORING LLP GESTAMP ASETYM SOLAR NORTH AMERICA, INC.275 BATTERY ST., 23RD FL. 50 CALIFORNIA ST., STE. 820 SAN FRANCISCO, CA 94111 SAN FRANCISCO, CA 94111 FOR: STARWOOD ENERGY GROUP GLOBAL, INC. FOR: GESTAMP ASETYM SOLAR NORTH AMERICA, INC.

SETH D. HILTON SUZY HONG STOEL RIVES, LLP ATTORNEY AT LAW THREE EMBARCADERO CENTER, STE. 1120 GOODIN MACBRIDE SQUERI DAY & LAMPREY LLPSAN FRANCISCO, CA 94111 505 SANSOME STREET, SUITE 900 FOR: DUKE ENERGY SAN FRANCISCO, CA 94111 FOR: TERRA-GEN POWER, LLC

VIDHYA PRABHAKARAN MICHAEL B. DAY DAVIS WRIGHT & TREMAINE LLP ATTORNEY 505 MONTGOMERY STREET, SUITE 800 GOODIN MACBRIDE SQUERI DAY & LAMPREY LLPSAN FRANCISCO, CA 94111 505 SANSOME STREET, STE 900 FOR: THE LEAF EXCHANGE, LLC/LIBERTY SAN FRANCISCO, CA 94111-3133 UTILITIES, LLC (FORMERLY CALPECO) FOR: CALENERGY GENERATION/ABENGOA SOLAR, INC.

DAVID L. HUARD JOSEPH M. KARP ATTORNEY ATTORNEY AT LAW

Page 7 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 55: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

MANATT, PHELPS & PHILLIPS, LLP WINSTON & STRAWN LLP ONE EMBARCADERO CENTER, 30TH FL. 101 CALIFORNIA STREET SAN FRANCISCO, CA 94111-3736 SAN FRANCISCO, CA 94111-5894 FOR: COUNTY OF LOS ANGELES FOR: CALIFORNIA WIND ENERGY ASSN./ABENGOA SOLAR INC./AUSRA INC./BRIGHTSOURCE ENERGY INC.

JEFFREY P. GRAY STEVEN F. GREENWALD DAVIS WRIGHT TREMAINE, LLP ATTORNEY AT LAW 505 MONTGOMERY STREET, SUITE 800 DAVIS WRIGHT TREMAINE LLP SAN FRANCISCO, CA 94111-6533 505 MONTGOMERY STREET, SUITE 800 FOR: CALPINE POWER AMERICA-CA, LLC / SAN FRANCISCO, CA 94111-6533 CALPINE CORPORATION FOR: NEWBERRY GEOTHERMAL LLC / DAVENPORT NEWBERRY HOLDINGS, LLC / NORTHWEST ENERGY SYSTEMS CO./IDAHO WIND PARTNERS 1, LLC/CAPITAL POWER CORPORATION

SARA STECK MYERS GREGORY JOHN STANGL ATTORNEY AT LAW CEO LAW OFFICES OF SARA STECK MYERS PHOENIX ENERGY 122 28TH AVE. 950 LINCOLN BLVD. / BOX 29166 SAN FRANCISCO, CA 94121 SAN FRANCISCO, CA 94129 FOR: CENTER FOR ENERGY EFFICIENCY AND FOR: PHOENIX BIOMASS ENERGY RENEWABLE TECHNOLOGIES (CEERT)

PATRICK DOHERTY JOHN M. CUMMINS, ESQ. POLICY ASSOCIATE ASSOCIATE COUNSEL - DEPT OF THE NAVY PACIFIC FOREST TRUST FEDERAL EXECUTIVE AGENCIES 1001A OREILLY AVENUE 1 AVENUE OF THE PALMS, STE. 161 SAN FRANCISCO, CA 94129 SAN FRANCISCO, CA 94130 FOR: PACIFIC FOREST TRUST FOR: FEDERAL EXECUTIVE AGENCIES (FEA)

KERRY HATTEVIK MARK BYRON DIR - WEST MARKET AFFAIRS WHOLESALE ELECTRICITY PROGRAM MGR. NEXTERA ENERGY RESOURCES UNIV. OF CALIF. OFFICE OF THE PRESIDENT 829 ARLINGTON BLVD. 1111 FRANKLIN ST., 6TH FL. EL CERRITO, CA 94530 OAKLAND, CA 94607 FOR: NEXTERA ENERGY RESOURCES FOR: THE REGENTS OF THE UNIVERSITY OF CALIFORNIA (RUC)

DAVID WOOLEY JASON B. KEYES OF COUNSEL KEYES FOX & WIEDMAN, LLP KEYES FOX & WEIDMAN, LLP 436 14TH STREET, STE. 1305 436 14TH STREET, STE. 1305 OAKLAND, CA 94612 OAKLAND, CA 94612 FOR: SUNEDISON FOR: SUNPOWER CORPORATION

KEVIN T. FOX LAURENCE G. CHASET KEYES FOX & WIEDMAN, LLP COUNSEL 436 14TH STREET, SUITE 1305 KEYES FOX & WIEDMAN, LLP OAKLAND, CA 94612 436 14TH STREET, STE. 1305 FOR: SILVERADO POWER, LLC OAKLAND, CA 94612 FOR: TENASKA SOLAR VENTURES

Page 8 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 56: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

SKY STANFIELD TIM LINDL KEYES, FOX & WIEDMAN LLP COUNSEL 436 14TH ST., STE. 1305 KEYES FOX & WIEDMAN LLP OAKLAND, CA 94612 436 14TH STREET, STE. 1305 FOR: INTERSTATE RENEWABLE ENERGY COUNCIL OAKLAND, CA 94612 FOR: CLEAN FOCUS CORPORATION

ZEYNEP ERDAL PATRICK VAN BEEK CAL. WASTEWATER CLIMATE CHANGE GROUP DIR - OPER 155 GRAND AVE., STE. 800 COMMERCIAL ENERGY OF CALIFORNIA OAKLAND, CA 94612 7677 OAKPORT STREET, STE. 525 FOR: CALIFORNIA WASTEWATER CLIMATE OAKLAND, CA 94621 CHANGE GROUP FOR: COMMERCIAL ENERGY OF CALIFORNIA DBA COMMERCIAL ENERGY OF MONTANA

ANDY KATZ GREGG MORRIS SIERRA CLUB CALIFORNIA DIRECTOR 2150 ALLSTON WAY, STE. 400 THE GREEN POWER INSTITUTE BERKELEY, CA 94704 2039 SHATTUCK AVE., SUITE 402 FOR: SIERRA CLUB CALIFORNIA BERKELEY, CA 94704 FOR: THE GREEN POWER INSTITUTE

NEAL DE SNOO CLYDE MURLEY CITY OF BERKELEY CONSULTANT TO NRDC 2180 MILVIA STREET, 2ND FLOOR 1031 ORDWAY STREET BERKELEY, CA 94704 ALBANY, CA 94706 FOR: EAST BAY POWER AUTHORITY/CITY OF FOR: THE COMMUNITY COLLEGE LEAGUE OF BERKELEY CALIFORNIA

JULIA A. LEVIN R. THOMAS BEACH EXECUTIVE DIRECTOR PRINCIPAL CONSULTANT BIOENERGY ASSOCIATION OF CALIFORNIA CROSSBORDER ENERGY PO BOX 6184 2560 NINTH STREET, SUITE 213A ALBANY, CA 94706 BERKELEY, CA 94710-2557 FOR: BIOENERGY ASSOCIATION OF CALIFORNIA FOR: THE CALIFORNIA COGENERATION COUNCIL

ROY PHILLIPS PUSHKAR WAGLE PRESIDENT / CEO FLYNN RESOURCE CONSULTANTS, INC. REP ENERGY, INC. 2900 GORDON AVENUE, STE. 100-3 130 GARDEN AVE. SANTA CLARA, CA 95051 SAN RAFAEL, CA 94903 FOR: BAY AREA MUNICIPAL TRANSMISSION FOR: REP ENERGY, INC. GROUP

MAHLON ALDRIDGE L. JAN REID VP - STRATEGIC DEVELOPMENT COAST ECONOMIC CONSULTING ECOLOGY ACTION OF SANTA CRUZ 3185 GROSS ROAD 877 CEDAR STREET, STE. 240 SANTA CRUZ, CA 95062 SANTA CRUZ, CA 95060-3938 FOR: L. JAN REID FOR: ECOLOGY ACTION

MICHAEL E. BOYD JOHN R. REDDING PRESIDENT ARCTURUS ENERGY CONSULTING CALIFORNIANS FOR RENEWABLE ENERGY, INC. 44810 ROSEWOOD TERRACE 5439 SOQUEL DRIVE MENDOCINO, CA 95460 SOQUEL, CA 95073 FOR: SILICON VALLEY MANUFACTURERS GROUP

Page 9 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 57: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

FOR: CALIFORNIANS FOR RENEWABLE ENERGY, INC.

CHRISTIANA DARLINGTON JORDAN PINJUV DARLINGTON LEGAL SERVICES COUNSEL 110 MAPLE ST. CALIFORNIA ISO AUBURN, CA 95603 250 OUTCROPPING WAY FOR: PLACER COUNTY AIR POLLUTION FOLSOM, CA 95630 CONTROL DISTRICT FOR: CALIFORNIA ISO

MARTIN HERMANN CAROLYN KEHREIN 8MINUTENERGY RENEWABLES, LLC ENERGY MANAGEMENT SERVICES 111 WOODMERE ROAD, STE. 250 2602 CELEBRATION WAY FOLSOM, CA 95630-4752 WOODLAND, CA 95776 FOR: 8MINUTENERGY RENEWABLES, LLC FOR: ENERGY USERS FORUM

CHARLES WHITE DOROTHY ROTHROCK DIR. - REGULATORY AFFAIRS, WEST VP - GOVERNMENT RELATIONS WASTE MANAGEMENT CALIFORNIA MANUFACTURERS & TECHNO. ASSN.915 L STREET, SUITE 1430 1115 11TH STREET SACRAMENTO, CA 95814 SACRAMENTO, CA 95814 FOR: WASTE MANAGEMENT FOR: CA MANUFACTURERS & TECHNOLOGY ASSN.

J.P. CATIVIELA JAN MCFARLAND PROGRAM COORDINATOR CAEATFA DAIRY CARES 915 CAPITOL MALL, RM. 468 915 L STREET, NO. C-438 SACRAMENTO, CA 95814 SACRAMENTO, CA 95814 FOR: AMERICANS FOR SOLAR POWER FOR: DAIRY CARES

JULEE MALINOWSKI BALL KIMBERLEY DELFINO EXECUTIVE DIR. CALIF. PROGRAM DIR. CALIFORNIA BIOMASS ENERGY ALLIANCE DEFENDERS OF WILDLIFE 1015 K STREET 1303 J STREET, STE. 270 SACRAMENTO, CA 95814 SACRAMENTO, CA 95814 FOR: CALIFORNIA BIOMASS ENERGY ALLIANCE FOR: DEFENDERS OF WILDLIFE

TANYA M. DERIVI JEDEDIAH J. GIBSON DIRECTOR OF PUBLIC AFFAIRS ATTORNEY SO. CALIF. PUBLIC POWER AUTHORITY ELLISON, SCHNEIDER & HARRIS, L.L.P. 915 L ST., STE. 1410 2600 CAPITOL AVENUE, SUITE 400 SACRAMENTO, CA 95814 SACRAMENTO, CA 95816 FOR: SOUTHERN CALIFORNIA PUBLIC POWER FOR: BEAR VALLEY ELECTRIC SERVICE/SIERA AUTHORITY (SCPPA) PACIFIC COMPANY

SAMANTHA G. POTTENGER ANDREW B. BROWN ELLISON, SCHNEIDER AND HARRIS L.L.P. ELLISON SCHNEIDER & HARRIS, L.L.P. 2600 CAPITOL AVENUE, SUITE 400 2600 CAPITOL AVENUE, SUITE 400 SACRAMENTO, CA 95816 SACRAMENTO, CA 95816-5905 FOR: FORTISTAR METHANE GROUP FOR: CONSTELLATION NEWENERGY, INC./ALLIANCE FOR RETAIL ENERGY MARKETS (AREM)

DOUGLAS K. KERNER WILLIAM W. WESTERFIELD III

Page 10 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 58: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

ATTORNEY AT LAW SR. ATTORNEY - OFF. OF GEN. COUNSEL ELLISON, SCHNEIDER & HARRIS, LLP SACRAMENTO MUNICIPAL UTILITY DISTRICT 2600 CAPITOL AVENUE, SUITE 400 6201 S STREET, M.S. B402 SACRAMENTO, CA 95816-5905 SACRAMENTO, CA 95817 FOR: SIERRA PACIFIC INDUSTRIES FOR: SACRAMENTO MUNICIPAL UTILITY DISTRICT

RACHEL GOLD MARK HENWOOD LARGE-SCALE SOLAR ASSOCIATION HENWOOD ASSOCIATES, INC. 2501 PORTOLA WAY 7311 GREENHAVEN DRIVE, STE. 275 SACRAMENTO, CA 95818 SACRAMENTO, CA 95831 FOR: LARGE-SCALE SOLAR ASSOCIATION FOR: HENWOOD ASSOCIATES, INC.

KAREN NORENE MILLS ROB NEENAN ATTORNEY AT LAW CALIFORNIA LEAGUE OF FOOD PROCESSORS CALIFORNIA FARM BUREAU FEDERATION 1755 CREEKSIDE OAKS DRIVE, SUITE 250 2300 RIVER PLAZA DRIVE SACRAMENTO, CA 95833 SACRAMENTO, CA 95833 FOR: CALIFORNIA LEAGUE OF FOOD FOR: CALIFORNIA FARM BUREAU FEDERATION PROCESSORS

ANN L. TROWBRIDGE CORBY GARDNER DAY CARTER & MURPHY LLP PLUMAS-SIERRA RURAL ELECTRIC CO-OP 3620 AMERICAN RIVER DRIVE, SUITE 205 73233 STATE ROUTE 70 SACRAMENTO, CA 95864 PORTOLA, CA 96122-7069 FOR: AGRICULTURAL ENERGY CONSUMERS ASSOCIATION (AECA) / DAIRY CARES' (DC)

ETTA LOCKEY THOM A. FISCHER ATTORNEY PRESIDENT PACIFICORP TOLLHOUSE ENERGY COMPANY 825 NE MULTNOMAH ST., STE. 1800 3633 ALDERWOOD AVENUE PORTLAND, OR 97232 BELLINGHAM, WA 98225 FOR: PACIFICORP FOR: TOLLHOUSE ENERGY COMPANY

KIM MOORE NANCY NORRIS ARGUS MEDIA POWEREX CORPORATION EMAIL ONLY EMAIL ONLY EMAIL ONLY, UK 000 000 EMAIL ONLY, BC 000 000 UNITED KINGDOM CANADA

ADAM ATKINSON-LEWIS AGNES NG NATEL ENERGY AT&T SERVICES, INC. EMAIL ONLY LEGAL EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000

ALANA VOLSKAYA ALEX MARTIN PACIFIC GAS AND ELECTRIC COMPANY NEXTLIGHT RENEWABLE POWER, LLC EMAIL ONLY EMAIL ONL Y EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

Information Only

Page 11 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 59: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

AMBER RIESENHUBER ANDREA TORRES ENERGY ANALYST PACIFIC GAS AND ELECTRIC COMPANY INDEPENDENT ENERGY PRODUCERS ASSOC. EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

ANDREW WANG ANTHONY M. NICOLA SOLARRESERVE, LLC EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONL Y, CA 00000

ANU VEGE ARI CITRIN PACIFIC GAS & ELECTRIC COMPANY PROSOLIA SOLAR, CFO NORTH AMERICA EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

BARBARA R. BARKOVICH BEN REES BARKOVICH & YAP, INC. EVOLUTION MARKETS, INC. EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 FOR: .

BILLY BLATTNER BRADLEY A. ANDERSON SAN DIEGO GAS & ELECTRIC COMPANY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

BRENDON CUSSIO BREWSTER BIRDSALL, P.E., QEP EMAIL ONLY ASPEN ENVIRONMENTAL GROUP EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000

BRUCE MCLAUGHLIN CAITLIN COLLINS LIOTIRIS ATTORNEY AT LAW ENERGY STRATEGIES, LLC BRAUN & BLAISING P.C. EMAIL ONLY EMAIL ONLY EMAIL ONLY, UT 00000 EMAIL ONLY, CA 00000

CARLOS LAMAS-BABBINI CASE COORDINATION PROGRAM MGR. PACIFIC GAS AND ELECTRIC COMPANY COMVERGE, INC. EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

CATHERINE M. KRUPKA CATHIE ALLEN LS POWER ASSOCIATES, L.P. REGULATORY MGR. EMAIL ONLY PACIFICORP EMAIL ONLY, DC 00000 EMAIL ONLY EMAIL ONLY, OR 00000

CEDRIC O. CHRISTENSEN CHUCK GILFOY DIR - OPER & DEVELOPMENT DIR. - MARKETING & ASSET OPTIMIZATION

Page 12 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 60: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

STRATEGEN CONSULTING LLC CALENERGY OPERATING CORPORATION EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 FOR: CALIFORNIA ENERGY STORAGE ALLIANCE

CURTIS SEYMOUR DANIELLE OSBORN-MILLS SR. MANAGER - GOVERNMENT AFFAIRS REGULATORY AFFAIRS COORDINATOR SUNEDISON LLC CEERT EMAIL ONLY EMAIL ONLY EMAIL ON LY, CA 00000 EMAIL ONLY, CA 00000

DAVE AZZAM DAVID E. MORSE E.ON CLIMATE & RENEWABLES, NORTH AMERICA EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

DAVID TOWNLEY DIANE I. FELLMAN US SALES & MARKETING DIRECTOR, REGULATORY & GOV'T AFFAIRS INFINIA CORPORATION NRG WEST & SOLAR EMAIL ONLY EMAIL ONLY EMAIL ONLY, WA 00000 EMAIL ONLY, CA 00000

DOCKET COORDINATOR DONALD E. OSBORN KEYS AND FOX SPECTRUM ENERGY DEVELOPMENT INC. EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

DOUG DAVIE ELAINE SISON-LEBRILLA WELLHEAD ELECTRIC SACRAMENTO MUNICIPAL UTIILITY DISTRICT EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

ELI HARLAND ELIZABETH HADLEY CALIFORNIA ENERGY COMMISSION REDDING ELECTRIC UTILITY ENERGY RESEARCH & DEVELOPMENT DIV. EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

ERIN GRIZARD FRANK DE ROSA BLOOM ENERGY, INC. NEXTLIGHT RENEWABLE POWER, LLC EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

FRED W. NOBLE FREEMAN S. HALL PRESIDENT SOLAR ELECTRIC SOLUTIONS, LLC WINTEC ENERGY, LTD EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

GENE THOMAS GIBSON PETERS, P.E. ECOLOGY ACTION ENERGY STRATEGIES, LLC EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

Page 13 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 61: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

GREG KESTER GREGG FISHMAN PROG. MGR.-BIOSOLIDS ECOLOGY ACTION CALIF. ASSN. OF SANITATION AGENCIES EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000 FOR: CALIFORNIA ASSOCIATION OF SANITATION AGENCIES (CASA)

GREGORY S.G. KLATT GUINNESS MCFADDEN DOUGLASS & LIDDELL EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

GWENNETH O'HARA HAROLD M. ROMANOWITZ CALIFORNIA POWER LAW GROUP OAK CREEK ENERGY SYSTEMS, INC. EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

HARRY SINGH HUGH YAO GOLDMAN SACHS & CO. SOUTHERN CALIFORNIA GAS COMPANY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

JAMES B. WOODRUFF JAMIE L. MAULDIN ATTORNEY AT LAW ADAMS BROADWELL JOSEPH & CARDOZO, PC NEXTLIGHT RENEWABLE POWER, LLC EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

JAN MCFAR JAN MCFARLAND EMAIL ONLY SONIC EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL O NLY, CA 00000

JAN PEPPER JANICE LIN ELECTRIC DIV., MGR. MANAGING PARTNER SILICON VALLEY POWER STRATEGEN CONSULTING LLC EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

JAY CORRALES JENINE SCHENK TURNER REAL ESTATE APS ENERGY SERVICES EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, AZ 00000

JEREMY WAEN JESSICA HILGART REGULATORY ANALYST PACIFIC GAS & ELECTRIC COMPANY MARIN CLEAN ENERGY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

Page 14 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 62: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

JIAN ZHANG JIM FERGUSON GRIDX, INC. FERGUSON LAW FIRM EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EDMAIL ONLY, CA 00000

JIM ROSS JOHN BARNES RCS, INC. PRESIDENT / CEO EMAIL ONLY SOLAR LAND PARTNERS, INC. EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000

JOSH RICHMAN JUANCHO EEKHOUT BLOOM ENERGY CORPORATION SAN DIEGO GAS & ELECTRIC COMPANY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

JULIANNE SPEARS KELLY FOLEY ORRICK HERRINGTON & SUTCLIFFE, LLP CALIFORNIA CLEAN POWER EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

KELLY GIDDENS KENNETH SAHM WHITE ORRICK HERINTON & SUTCLIFFE CLEAN COALITION EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

KEVIN CHEN KEVIN J. SIMONSEN TRINA SOLAR ENERGY MANAGEMENT SERVICES EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CO 00000

KIMBERLY C. JONES LAUREN ROHDE REGULATORY CASE MANGER PACIFIC GAS AND ELECTRIC COMPANY PACIFIC GAS AND ELECTRIC COMPANY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

LESLIE E. SHERMAN LON W. HOUSE, PH.D ORRICK, HERRINGTON & SUTCLIFFE LLP WATER AND ENERGY CONSULTING (WEC) EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

MARCO LOPEZ MARCUS V. DA CUNHA EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

MARGARET BRUCE MARIA STAMAS ECOLOGY ACTION LEGAL FELLOW, ENERGY PROGRAM EMAIL ONLY NATURAL RESOURCES DEFENSE COUNCIL EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000

Page 15 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 63: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

MARJORIE OXSEN MARK CHEDIAK CALPINE CORPORATION ENERGY REPORTER EMAIL ONLY BLOOMBERG NEWS EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000

MARK FRAZEE MARK ROBERTS CITY OF ANAHEIM-PUBLIC UTILITIES DEPT. DIR - PROGRAM DEVELOPMENT EMAIL ONLY SUNLIGHT PARTNERS, LLC EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, AZ 00000

MATT KLOPFENSTEIN MATT SUHR GONZALEZ QUINTANA & HUNTER LLC CALPINE EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

MATTHEW VESPA MCE REGULATORY SENIOR ATTORNEY MARIN CLEAN ENERGY SIERRA CLUB ENVIRONMENTAL LAW PROGRAM EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

MEGAN COX MELISSA P. MARTIN CALIFORNIA POWER LAW GROUP SENIOR REGULATORY COUNSEL EMAIL ONLY STATESIDE ASSOCIATES EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, VA 00000

MELISSA P. MARTIN MICHAEL BASS STATESIDE ASSOCIATES ESOLAR, INC. EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

MICHAEL DEANGELIS MICHAEL THEROUX SACRAMENTO MUNICIPAL UTILITY DISTRICT V.P. EMAIL ONLY JDMT, INC. EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000

MICHAEL WHEELER NEDRA YOUNG RECURRENT ENERGY WINTEC ENERGY, LTD EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

NEIL BLACK NELLIE TONG CALIFORNIA BIOENERGY LLC SENIOR ANALYST EMAIL ONLY KEMA, INC. EMAIL ONLY, NY 00000 EMAIL ONLY EMAIL ONLY, CA 00000

OBADIAH BARTHOLOMY PAMELA L. BARBER, ESQ. SACRAMENTO MUNICIPAL UTILITY DISTRICT SR. ANALYST, COMPLIANCE

Page 16 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 64: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

EMAIL ONLY BEAR VALLEY ELECTRIC SERVICE EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000

PATRICK FERGUSON PETER TITTMANN DAVIS WRIGHT TREMAINE, LLP UC BERKELEY CENTER FOR FORESTRY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

PHILLIP REESE PRAMOD KULKARNI C/O REESE-CHAMBERS SYSTEMS CONSULTANTS, CUSTOMIZED ENERGY SOLUTIONS EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

RACHEL MCMAHON RANDY KELLER EMAIL ONLY DIRECTOR OF DEVELOPMENT EMAIL ONLY, CA 00000 CALENERGY OPERATING CORPORATION EMAIL ONLY EMAIL ONLY, CA 00000

RICHARD SMITH ROSS BUCKENHAM SAN FRANCISCO WATER, POWER & SEWER CALIFORNIA BIOENERGY LLC EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, TX 00000

RYAN BERNARDO RYAN HEIDARI BRAUN BLAISING MCLAUGHLIN, P.C. ENDIMENSIONS LLC EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

SALLY CHEN SARA BIRMINGHAM SETTLEMENTS & ADMINISTRATION MANAAGER DIRECTOR - WESTERN POLICY SAN DIEGO GAS & ELECTRIC COMPANY SOLAR ENERGY INDUSTRIES ASSOCIATION EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

SEAN GALLAGHER SEAN P. BEATTY MANAGING DIRECTOR-GOV'T RELATIONS DIRECTOR-WEST REGULATORY AFFAIRS K ROAD POWER NRG WEST EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

SEPHRA A. NINOW, J.D. SHALINI SWAROOP REGULATORY AFFAIRS MGR. REGULATORY COUNSEL CENTER FOR SUSTAINABLE ENERGY MARIN CLEAN ENERGY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

SHANNON EDDY SHIVANI BALLESTEROS LARGE-SCALE SOLAR ASSOCIATION SAN DIEGO GAS & ELECTRIC COMPANY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

Page 17 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 65: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

SNULLER PRICE STEPHEN SMITH ENERGY AND ENVIRONMENTAL ECONOMICS SOLVIDA ENERGY GROUP EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

STEVEN KELLY STEVEN ZHU INDEPENDENT ENERGY PRODUCERS ASSOCIATION TRINA SOLAR EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

TED KO THADEUS B. CULLEY COMPLETE SOCIETY CONSULTING KEYES FOX & WIEDMAN LLP EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

TIMOTHY N. TUTT TONY BRAUN SACRAMENTO MUNICIPAL UTILITIES DISTRICT BRAUN BALISING MCLAUGHLIN PC EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

UDI HELMAN VALERIE PUFFER HELMAN ANALYTICS POWER CONTRACTS MANAGER EMAIL ONLY GLENDALE WATER & POWER EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000

VALERIE SEYMOUR MRW & ASSOCIATES, LLC POLICY ASSOCIATE EMAIL ONLY CLEAN COALITION EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000

SPECTRUM ENERGY DEVELOPMENT INC. SILVERADO POWER LLC EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

DEREK DENNISTON IAN MCGOWAN EMAIL ONLY MANAGER - REGULATORY AFFAIRS EMAIL ONLY, CA 00000-0000 3DEGREES EMAIL ONLY EMAIL ONLY, CA 00000-0000

JIM STACK, PH.D. JOSEPH OLDHAM RESOURCE PLANNER PROGRAM DIRECTOR CITY OF PALO ALTO UTILITIES LOCAL GOVERNMENT COMMISSION EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000-0000 EMAIL ONLY, CA 00000-0000

JUDY PAU LILY M. MITCHELL DAVIS WRIGHT TREMAINE LLP HANNA AND MORTON LLP EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000-0000 EMAIL ONLY, CA 00000-0000

Page 18 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 66: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

MARTIN HOMEC MOHAN NIROULA REDWOOD RENEWABLES/CARE CALIF DEPT OF WATER RESOURCES EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000-0000 EMAIL ONLY, CA 00000-0000

NANCY RADER RICHARD W. RAUSHENBUSH EXECUTIVE DIRECTOR EMAIL ONLY CALIFORNIA WIND ENERGY ASSOCIATION EMAIL ONLY, CA 00000-0000 EMAIL ONLY EMAIL ONLY, CA 00000-0000 FOR: CALIFORNIA WIND ENERGY ASSOCIATION

ROBIN J. WALTHER RYAN PLETKA EMAIL ONLY RENEWABLE ENERGY PROJECT MANAGER EMAIL ONLY, CA 00000-0000 BLACK & VEATCH EMAIL ONLY EMAIL ONLY, CA 00000-0000

SHERIDAN J. PAUKER THOMAS HOBSON WILSON SONSINI GOODRICH & ROSATI GE ENERGY EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000-0000 EMAIL ONLY, CA 00000-0000

DAVIS WRIGHT TREMAINE, LLC COOL EARTH SOLAR EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000-0000 EMAIL ONLY, CA 00000-0000

JAMES MCMAHON TRACY REID 29 DANBURY ROAD FUELCELL ENERGY, INC. NASHUA, NH 03064 3 GREAT PASTURE ROAD DANBURY, CT 06810

ALI AMIRALI KAREN KOCHONIES SVP MORGAN STANLEY STARWOOD ENERGY GROUP, LLC 2000 WESTCHESTER AVE., 1ST FLOOR 591 W. PUTNAM AVENUE PURCHASE, NY 10577 GREENWICH, CT 06830

MORGAN HANSEN ARIEL LAGER MORGAN STANLEY - COMMODITIES CUSTOMIZED ENERGY SOLUTIONS 2000 WESTCHESTER AVE., 1ST FLOOR 1528 WALNUT STREET PURCHASE, NY 10577 PHILADELPHIA, PA 19102

ERIKA SCHMITT RHONE RESCH CUSTOMIZED ENERGY SOLUTIONS SOLAR ENERGY INDUSTRIES ASSOCIATION 1528 WALNUT STREET, 22ND FL. 505 9TH ST., N.W., STE. 800 PHILADELPHIA, PA 19102 WASHINGTON, DC 20004-2167

ALEXANDRA KONIECZNY MATTHEW HUDDLE SUTHERLAND ASHBILL & BRENNAN MCGUIREWOODS LLP 1275 PENNSYLVANIA AVENUE, NW 7 SAINT PAUL STREET, STE. 1000

Page 19 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 67: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

WASHINGTON, DC 20004-2415 BALTIMORE, MA 21202

PAUL ACKERMAN MICHAEL E. CARBOY SENIOR COUNSEL SIGNAL HILL CAPITAL LLC CONSTELLATION ENERGY RESOURCES, INC. 300 D. LOMBARD ST., STE. 1700 111 MARKET PLACE BALTIMORE, MD 21202-3243 BALTIMORE, MD 21202

TODD JAFFE RONALD M. CERNIGLIA ENERGY BUSINESS BROKERS AND CONSULTANTS DIRECTOR- NATIONAL ADVOCACY 3420 KEYSER ROAD DIRECT ENERGY SERVICES, LLC BALTIMORE, MD 21208 7240 RYEHILL DR. CARY, NC 27519-1570

YANIRA M. GOMEZ CHRISTOPHER SHERMAN LIBERTY POWER CORP. DIR - REGULATORY GOV'T AFFAIRS 1901 W. CYPRESS CREEK RD., STE. 600 NEXTERA ENERGY RESOURCES FORT LAUDERDALE, FL 33309 700 UNIVERSE BLVD. JUNO BEACH, FL 33408

WINTON KELLY SAMARA M. RASSI DIRECTOR OF POWER MARKETS REGULATORY AFFAIRS ANALYST NEXTERA ENERGY RESOURCES FELLON-MCCORD & ASSOCIATES 700 UNIVERSE BLVD. 10200 FOREST GREEN BLVD., STE. 601 JUNO BEACH, FL 33408 LOUISVILLE, KY 40223-5183

CATHY S. WOOLLUMS CAROLINE MEAD MIDAMERICAN ENERGY HOLDINGS COMPANY DIRECTOR, ORIGINATION 106 EAST SECOND STREET ELEMENTPOWER DAVENPORT, IA 52801 121 S. CNETRAL AVENUE HIGHWOOD, IL 60040

JASON ABIECUNAS ERIC OSBORN BLACK & BEATCH GLOBAL RENEWABLE ENERGY CALPINE POWER AMERICA-CA, LLC RENEWABLE ENERGY CONSULTANT 717 TEXAS AVENUE, STE 100 11401 LAMAR HOUSTON, TX 77002 OVERLAND PARK, KS 66211 FOR: CALPINE POWER AMERICA - CA,LLC

MARTY ROGERS MICHAEL D. HANSEN MANAGING ATTORNEY CHAIRMAN NEXTERA ENERGY RESOURCES IGNITE SOLAR 601 TRAVIS STREET, STE. 1900 2000 EDWARDS ST. HOUSTON, TX 77002 HOUSTON, TX 77007-4408

PETER MATHEY ED CHIANG PRESIDENT & CEO ELEMENT MARKETS, LLC IGNITE SOLAR 3555 TIMMONS LANE, STE. 900 2000 EDWARDS STREET HOUSTON, TX 77027-6453 HOUSTON, TX 77007-4408

COMMERCE ENERGY, INC. EDWIN DEARMAN 5251 WESTHEIMER RD., STE. 1000 SR. REGULATORY ANALYST HOUSTON, TX 77056-5414 GEXA ENERGY CALIFORNIA , LLC

Page 20 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 68: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

20455 STATE HIGHWAY 249, STE. 200 HOUSTON, TX 77070

JASON ROBERTSON JONATHAN JACOBS DIRECT ENERGY PA CONSULTING GROUP 12 GREENWAY PLAZA, SUITE 250 1700 LINCOLN ST STE 4600 HOUSTON, TX 77494 DENVER, CO 80203-4509

DAVID HURLBUT JEFF GULDNER NATIONAL RENEWABLE ENERGY LABORATORY ARIZONA PUBLIC SERVICE COMPANY 15013 DENVER WEST PARKWAY 400 N 5TH STREET, MS 9040 GOLDEN, CO 80401 PHOENIX, AZ 85004

MARK L. ETHERTON TIMOTHY CASTILLE POWER ENGINEERS, INC. LANDS ENERGY CONSULTING, INC. 7600 NORTH 16TH STREET, SUITE 130 1050 CRACKER BARREL CIRCLE PHOENIX, AZ 85020 MESQUITE, NV 89034-1017

DAVID BRANCHCOMB ELENA MELLO BRANCHCOMB ASSOCIATES, LLC SIERRA PACIFIC POWER COMPANY 475 PAISANO COURT 6100 NEIL ROAD RENO, NV 89511 RENO, NV 89520

TREVOR DILLARD JOE GRECO RATE REGULATORY RELATIONS SR. V.P. SIERRA PACIFIC POWER COMPANY TERRA-GEN POWER LLC 6100 NEAL ROAD, MS S4A50 / PO BOX 10100 9590 PROTOTYPE COURT, SUITE 200 RENO, NV 89520-0026 RENO, NV 89521-5916

RANDY HOWARD SARAH FRIEDMAN POWER ENGINEERING MGR. SIERRA CLUB LOS ANGELES DEPT. OF WATER & POWER 714 W. OLYMPIC BLVD., STE. 1000 111 N HOPE STREET, STE. 921 LOS ANGELES, CA 90015 LOS ANGELES, CA 90012

STEVEN ZURETTI LEILANI JOHNSON KOWAL DIR - REGULATORY AFFAIRS LOS ANGELES DEPT. OF WATER AND POWER BROOKFIELD ENERGY MARKETING PO BOX 51111, ROOM 1541 6171 RUBY PL LOS ANGELES, CA 90051-0100 LOS ANGELES, CA 90042

JEFF NEWMAN CARL STEEN CALTRANS FULBRIGHT & JAWORSKI L.L.P. 100 S. MAIN 555 SOUTH FLOWER STREET, 41ST FLOOR LOS ANGELES, CA 90068 LOS ANGELES, CA 90071

ANGELINA GALITEVA 3 PHASES RENEWABLES LLC FOUNDER, CHAIR OF THE BOARD 2100 SEPULVEDA BLVD, SUITE 37 RENEWABLES 100 POLICY INSTITUTE MANHATTAN BEACH, CA 90266 35316 MULHOLLAND HWY MALIBU, CA 90265

Page 21 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 69: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

HARVEY M. EDER FRED G. YANNEY PUBLIC SOLAR POWER COALITION YANNEY LAW OFFICE 1223 WILSHIRE BLVD. 17409 MARQUARDT AVE. UNIT C-4 SANTA MONICA, CA 90403-5406 CERRITOS, CA 90703

GURCHARAN BAWA JACK MCNAMARA PASADENA WATER AND POWER ATTORNEY AT LAW 150 S. LOS ROBLES, SUITE 200 MACK ENERGY COMPANY PASADENA, CA 91101 PO BOX 1380 AGOURA HILLS, CA 91376-1380

LINCOLN BLEVEANS YAREK LEHR POWER RESOURCES MANAGER AZUSA LIGHT & WATER BURBANK WATER & POWER 729 N. AZUSA AVENUE 164 W. MAGNOLIA BLVD. AZUSA, CA 91702 BURBANK, CA 91502

CASE ADMINISTRATION CURT RONEY SOUTHERN CALIFORNIA EDISON COMPANY SOUTHERN CALIFORNIA EDISON 2244 WALNUT GROVE AVENUE 2244 WALNUT GROVE, G01-C ROSEMEAD, CA 91770 ROSEMEAD, CA 91770

GEORGE WILTSEE JANICE WANG SOUTHERN CALIFORNIA EDISON COMPANY SOUTHERN CALIFORNIA EDISON COMPANY 2244 WALNUT GROVE AVENUE 2244 WALNUT GROVE AVE. ROSEMEAD, CA 91770 ROSEMEAD, CA 91770

JONI A. TEMPLETON LAURA I. GENAO ATTORNEY AT LAW SOUTHERN CALIFORNIA EDISON COMPANY SOUTHERN CALIFORNIA EDISON COMPANY PO BOX 800, 2244 WALNUT GROVE AVENUE 2244 WALNUT GROVE AVE. / PO BOX 800 ROSEMEAD, CA 91770 ROSEMEAD, CA 91770

MELISSA A. HOVSEPIAN ROSALIE ROTH SR. ATTORNEY SOUTHERN CALIFORNIA EDISON SOUTHERN CALIFORNIA EDISON COMPANY 2244 WALNUT GROVE AVE. 2244 WALNUT GROVE AVE. / PO BOX 800 ROSEMEAD, CA 91770 ROSEMEAD, CA 91770

JENNIFER TSAO SHIGEKAWA NGUYEN QUAN SR. ATTORNEY, CUSTOMER & TARIFF LAW MGR - REGULATORY AFFAIRS SOUTHERN CALIFORNIA EDISON COMPANY GOLDEN STATE WATER CO. - ELECTRIC OP. 2244 WALNUT GROVE AVE. / PO BOX 800 630 EAST FOOTHILL BOULEVARD ROSEMEAD, CA 91770-3714 SAN DIMAS, CA 91773

SOCAL WATER/BEAR VALLEY ELECTRIC CHAD CHAHBAZI 630 EAST FOOTHILL BLVD. BAP POWER CORPORATION D/B/A CENERGY SAN DIMAS, CA 91773 3176 LIONSHEAD AVE., STE. 11 CARLSBAD, CA 92010-4708

ROBERT J. GILLESKIE ARLEN BARKSDALE, PHD LIGHTPOINT CONSULTING SERVICES CEO / CTO 2570 PINEWOOD STREET DESMON ENERGY, LLC

Page 22 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 70: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

DEL MAR, CA 92014 1538 ENCINITAS BLVD. ENCINITAS, CA 92024

JEFF COX GEOREG GISEL 1557 MANDEVILLE PLACE INDEPENDENT ENERGY SOLUTIONS, INC. ESCONDIDO, CA 92029 1090 JOSHUA WAY VISTA, CA 92081

GREG BASS SHAWN BAILEY NOBLE AMERICAS ENERGY SOLUTIONS LLC DIRECTOR - PLANNING & ANALYSIS 401 WEST A STREET, SUITE 500 SEMPRA US GAS AND POWER SAN DIEGO, CA 92101-3017 101 ASH STREET SAN DIEGO, CA 92101-3017

THEODORE E. ROBERTS NOBLE AMERICAS ENERGY SOLUTIONS LLC SEMPRA GENERATION / SEMPRA BROADBAND 101 ASH STREET, HQ09 101 ASH STREET, HQ 12B SAN DIEGO, CA 92101-3017 SAN DIEGO, CA 92101-3017

TERRY FARRELLY CHRIS BURSAW 269 G AVENUE SR. ADVISOR, REGULATORY AFFAIRS WEST CORONADO, CA 92118 CAPITAL POWER CORPORATION 9255 TOWNE CENTRE DRIVE, STE. 900 SAN DIEGO, CA 92121

MARCIE MILNER JOHN S. FRIDERICHS SHELL ENERGY NORTH AMERICA (U.S.), L.P. DIRECTOR - ORIGINATION & DEVELOPMENT 4445 EASTGATE MALL, SUITE 100 PILOT POWER GROUP, INC. SAN DIEGO, CA 92121 8910 UNIVERSITY CENTER LANE, STE. 520 SAN DIEGO, CA 92122

CHRISTOPHER SUMMERS JENNIFER E. PIERCE REGULATORY CASE ADMIN. SAN DIEGO GAS & ELECTRIC COMPANY SAN DIEGO GAS & ELECTRIC COMPANY 8330 CENTURY PARK CT 8330 CENTURY PARK COURT, CP32D SAN DIEGO, CA 92123 SAN DIEGO, CA 92123

DEAN A. KINPORTS DESPINA NIEHAUS REGULATORY CASE ADMINISTRATOR SAN DIEGO GAS AND ELECTRIC COMPANY SAN DIEGO GAS & ELECTRIC COMPANY 8330 CENTURY PARK COURT, CP32H 8330 CENTURY PARK CT., CP32D SAN DIEGO, CA 92123-1530 SAN DIEGO, CA 92123-1530

CENTRAL FILES SCOTT HARDING SDG&E AND SOCALGAS ENERGY RESOURCE PLANNER, SR. 8330 CENTURY PARK COURT, CP31-E IMPERIAL IRRIGATION DISTRICT SAN DIEGO, CA 92123-1550 333 E. BARIONI BLVD. IMPERIAL, CA 92251

ROGER KROPKE PETER T. PEARSON BEAR VALLEY ELECTRIC SERVICE ENERGY SUPPLY SPECIALIST PO BOX 1547 BEAR VALLEY ELECTRIC SERVICE BIG BEAR LAKE, CA 92315 42020 GARSTIN DRIVE, PO BOX 1547

Page 23 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 71: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

FOR: BEAR VALLEY ELECTRIC SERVICE BIG BEAR LAKE, CA 92315-1547

CHARLES J. BLACK JOHN DEWEY RIVERSIDE PUBLIC UTILITIES THE DEWEY GROUP 3435 14TH STREET PO BOX 12913 RIVERSIDE, CA 92501 NEWPORT BEACH, CA 92658-5079

CARRIE THOMPSON CARRIE TOMPSON CITY OF ANAHEIM CITY OF ANAHEIM 201 S. ANAHEIM BLVD., STE. 802 201 S. ANAHEIM BLVD., STE. 802 ANAHEIM, CA 92805 ANAHEIM, CA 92805

JANIS LEHMAN MANDIP KAUR SAMRA CHIEF RISK OFFICER INTEGRATED RESOURCES PLANNER CITY OF ANAHEIM-PUBLIC UTILITIES DEPT. CITY OF ANAHEIM-PUBLIC UTILITIES DEPT. 201 S. ANAHEIM BLVD., STE.802 201 S. ANAHEIM BLVD., SUITE 802 ANAHEIM, CA 92805 ANAHEIM, CA 92805

YOLANDA LOCKHART JEFF HIRSCH CITY OF ANAHEIM JAMES J. HIRSCH & ASSOCIATES 201 S. ANAHEIM BLVD., STE. 802 12185 PRESILLA ROAD ANAHEIM, CA 92805 CAMARILLO, CA 93012-9243

HEATHER SWAN EVELYN KAHL LANCASTER POWER AUTHORITY ATTORNEY AT LAW CITY OF LANCASTER ALCANTAR & KAHL, LLP 44933 FERN AVE. 33 NEW MONTGOMERY STREET, SUITE 1850 LANCASTER, CA 93534 SAN FRANCISCO, CA 94015 FOR: OCCIDENTAL POWER SERVICES, INC./ENERGY PRODUCERS AND USERS COALITION.

ELIZABETH KLEBANER MICHAEL A. HYAMS ADAMS BROADWELL JOSEPH & CARDOZO POWER ENTERPRISE-REGULATORY AFFAIRS 601 GATEWAY BLVD., STE. 1000 SAN FRANCISCO PUBLIC UTILITIES COMM SOUTH SAN FRANCISCO, CA 94080 525 GOLDEN GATE AVE., 7TH FLOOR FOR: INTERNATIONAL BROTHERHOOD OF SAN FRANCISCO, CA 94102-3220 ELECTRICAL WORKERS LOCAL 569

AUSTIN M. YANG MARCEL HAWIGER DEPUTY CITY ATTORNEY ENERGY ATTY CITY AND COUNTY OF SAN FRANCISCO THE UTILITY REFORM NETWORK OFFICE OF CITY ATTORNEY DENNIS J.HERRERA 785 MARKET ST., STE. 1400 1 DR. CARLTON B. GOODLETT PL, RM 234 SAN FRANCISCO, CA 94103 SAN FRANCISCO, CA 94102-4682

DAN ADLER ANDRE DEVILBISS DIRECTOR, TECH AND POLICY DEVELOPMENT ASSOCIATE, DEVELOPMENT CALIFORNIA CLEAN ENERGY FUND RECURRENT ENERGY 5 THIRD STREET, SUITE 900 300 CALIFORNIA STREET, 8TH FLOOR SAN FRANCISCO, CA 94103-3226 SAN FRANCISCO, CA 94104

PETER MILLER POLLY SHAW

Page 24 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 72: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

NATURAL RESOURCES DEFENSE COUNCIL SUNEDISON 111 SUTTER STREET, 20TH FLOOR 44 MONTGOMERY STREET, SUITE 2200 SAN FRANCISCO, CA 94104 SAN FRANCISCO, CA 94104

CHARLES R. MIDDLEKAUFF ED LUCHA PACIFIC GAS AND ELECTRIC COMPANY CASE COORDINATOR LAW DEPT. PACIFIC GAS AND ELECTRIC COMPANY 77 BEALE STREET, B30A / PO BOX 7442 77 BEALE STREET, MC B9A, ROOM 991 SAN FRANCISCO, CA 94105 SAN FRANCISCO, CA 94105

FRED WELLINGTON KAREN TERRANOVA NAVIGANT CONSULTING, INC. ALCANTAR & KAHL, LLP 1 MARKET ST., SPEAR ST. TOWER, STE 1200 33 NEW MONTGOMERY STREET, SUITE 1850 SAN FRANCISCO, CA 94105 SAN FRANCISCO, CA 94105

MAGGIE CHAN PAUL ESFORMES PACIFIC GAS AND ELECTRIC COMPANY SR. REGULATORY CASE MGR. PO BOX 770000 PACIFIC GAS & ELECTRIC COMPANY 77 BEALE ST., MAIL CODE B9A 77 BEALE STREET, MC B9A SAN FRANCISCO, CA 94105 SAN FRANCISCO, CA 94105

PETER W. HANSCHEN WADE A. GREENACRE ATTORNEY AT LAW REGULATORY CASE COORDINATOR MORRISON & FOERSTER, LLP PACIFIC GAS AND ELECTRIC COMPANY 425 MARKET STREET 77 BEALE ST., MC B9A SAN FRANCISCO, CA 94105 SAN FRANCISCO, CA 94105

KIMBERLY J. GOLD SAMUEL GOLDING GENERAL ATTORNEY PRESIDENT AT&T SERVICES, INC. COMMUNITY CHOICE PARTNERS, INC. 525 MARKET ST., STE. 2025 58 MIRABEL AVENUE SAN FRANCISCO, CA 94105-2728 SAN FRANCISCO, CA 94110

DEVIN MCDONELL HANS ISERN BINGHAM MCCUTHCHEN VP - ENGINEERING THREE EMBARCADERO CENTER SILVERADO POWER LLC SAN FRANCISCO, CA 94111 2 EMBARCADERO CENTER, STE. 410 SAN FRANCISCO, CA 94111

JACK STODDARD JANINE L. SCANCARELLI MANATT PHELPS & PHILLIPS, LLP ATTORNEY AT LAW ONE EMBARCADERO CENTER, 30TH FL. CROWELL & MORING LLP SANFRANCISCO, CA 94111 275 BATTERY STREET, 23RD FLOOR SAN FRANCISCO, CA 94111

JILL N. JAFFE JONATHAN MALTA-WEINGARD NOSSAMAN LLP NATURENER USA, INC. 50 CALIFORNIA STREET, 34TH FLOOR 394 PACIFIC AVENUE, STE. 300 SAN FRNACISCO, CA 94111 SAN FRANCISCO, CA 94111

KATIE JORRIE LUISA F. ELKINS DAVIS WRIGHT TREMAINE, LLP GOODIN MACBRIDE SQUERI DAY & LAMPREY 505 MONTGOMERY STREET, SUITE 800 505 SANSOME ST., STE. 900

Page 25 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 73: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

SAN FRANCISCO, CA 94111 SAN FRANCISCO, CA 94111

NOELLE R. FORMOSA PATRICK FERGUSON WINSTON & STRAWN, LLP NATURENER USA 101 CALIFORNIA STREET 394 PACIFIC AVENUE, STE. 300 SAN FRANCISCO, CA 94111 SAN FRANCISCO, CA 94111

RAFI HASSAN SARAH M. KEANE SUSQUEHANNA FINANCIAL GROUP, LLLP MORGAN LEWIS & BOCKIUS, LLP 101 CALIFORNIA STREET, SUITE 3250 3 EMBARCADERO CENTER SAN FRANCISCO, CA 94111 SAN FRANCISCO, CA 94111

THOMAS W. SOLOMON KATHERINE RYZHAYA ATTORNEY AT LAW VP WINSTON & STRAWN LLP EVOLUTION MARKETS INC. 101 CALIFORNIA STREET 3 EMBARCADERO CENTER , STE. 1630 SAN FRANCISCO, CA 94111 SAN FRANCISCO, CA 94111-4041 FOR: EVOLUTION MARKETS INC.

MONICA SCHWEBS LISA A. COTTLE BINGHAM MCCUTCHEN LLP ATTORNEY AT LAW THREE EMBARCADERO CENTER, 28TH FLOOR WINSTON & STRAWN LLP SAN FRANCISCO, CA 94111-4067 101 CALIFORNIA STREET FOR: SOLAR RESERVE, LLC SAN FRANCISCO, CA 94111-5802

MICHAEL S. HINDUS HILARY CORRIGAN PILLSBURY WINTHROP SHAW PITTMAN LLP CALIFORNIA ENERGY MARKETS 4 EMBARCADERO CENTER, 22ND FLR. 425 DIVISADERO ST. SUITE 303 SAN FRANCISCO, CA 94111-5998 SAN FRANCISCO, CA 94117-2242 FOR: ALPAUGH IRRIGATION DISTRICT

LISA WEINZIMER JUDI K. MOSLEY PLATTS MCGRAW-HILL PACIFIC GAS AND ELECTRIC COMPANY 695 NINTH AVENUE, NO. 2 PO BOX 7442 SAN FRANCISCO, CA 94118 SAN FRANCISCO, CA 94120

REGULATORY FILE ROOM MEGAN M. MYERS PACIFIC GAS AND ELECTRIC COMPANY LAW OFFICES OF SARA STECK MYERS PO BOX 7442 122 - 28TH AVENUE SAN FRANCISCO, CA 94120 SAN FRANCISCO, CA 94121

MICHAEL WHEELER ROBIN QUARRIER RECURRENT ENERGY COUNSEL 300 CALIFORNIA STREET, 8TH FLOOR CENTER FOR RESOURCE SOLUTIONS SAN FRANCISCO, CA 94123 1012 TORNEY AVENUE, 2ND FL. SAN FRANCISCO, CA 94129

CHRIS DIGIOVANNI KAREN KHAMOU PACIFIC GAS AND ELECTRIC COMPANY PACIFIC GAS AND ELECTRIC COMPANY 77 BEALE STREET, MC B25J 245 MARKET ST., RM. 1255C SAN FRANCISO, CA 94177 SAN FRANCISCO, CA 94177-0001

Page 26 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 74: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

CHRIS KING JENNIFER CHAMBERLIN CHIEF REGULATORY OFFICER ENERGY POLICY ADVOCATES SIEMENS SMART GRID SOLUTIONS 2633 WELLINGTON CT 4000 E. 3RD AVE., STE 400 CLYDE, CA 94520 FOSTER CITY, CA 94404-4827

BETH VAUGHAN TONY CHEN EXE. DIR. SR. MANGER, BUSINESS DEVEL. CALIFORNIA COGENERATION COUNCIL COOL EARTH SOLAR 4391 NORTH MARSH ELDER CT. 4659 LAS POSITAS RD., STE. 94551 CONCORD, CA 94521 LIVERMORE, CA 94551

ANDREW J. VAN HORN AVIS KOWALEWSKI VAN HORN CONSULTING CALPINE CORPORATION 12 LIND COURT 4160 DUBLIN BLVD., SUITE 100 ORINDA, CA 94563 DUBLIN, CA 94568

JILL VAN DALEN MATTHEW BARMACK CALPINE CORPORATION CALPINE CORPORATION 4160 DUBLIN BLVD., STE. 100 4160 DUBLIN BLVD., STE. 100 DUBLIN, CA 94568 DUBLIN, CA 94568

MARK STOUT KATHY TRELEVEN PRINCIPAL 103 BANDOL CT. STOUT SOLAR CONSULTING SAN RAMON, CA 94582 484 SYBIL AVE. SAN LEANDRO, CA 94577

JENNIFER CHAMBERLIN ALEX KANG LS POWER DEVELOPMENT, LLC ITRON, INC. 5000 HOPYARD ROAD, SUITE 480 1111 BROADWAY, STE. 1800 PLEASANTON, CA 94588 OAKLAND, CA 94607

RAMONA GONZALEZ SHEHZAD WADALAWALA EAST BAY MUNICIPAL UTILITY DISTRICT ASSOC. WHOLESALE ELECTRICITY PROGRAM MGR375 ELEVENTH STREET, M/S NO. 205 UC OFFICE OF THE PRESIDENT OAKLAND, CA 94607 1111 FRANKLIN ST., 6TH FL. OAKLAND, CA 94607

ADAM BROWNING ERICA SCHROEDER MCCONNELL VOTE SOLAR KEYES FOX & WIEDMAN, LLP 360 22ND STREET, SUITE 730 436 14TH ST., STE. 1305 OAKLAND, CA 94612 OAKLAND, CA 94612

JASON B. KEYES SUSANNAH CHURCHILL COUNSEL ADVOCATE - SOLAR POLICY KEYES, FOX & WIEDMAN LLP VOTE SOLAR 436 14TH STREET, STE. 1305 360 22ND STREET, SUITE 730 OAKLAND, CA 94612 OAKLAND, CA 94612 FOR: CLEAN FOCUS CORPORATION

MATTHEW SCHAFER TANDY MCMANNES NEXTERA ENERGY RESOURCES ABENGOA SOLAR, INC.

Page 27 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 75: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

505 14TH STREET, SUITE 300 I KAISER PLAZA, STE. 1675 OAKLAND, CA 94612-1935 OAKLAND, CA 94612-3699 FOR: ABENGOA SOLAR, INC.

RAMESH RAMCHANDANI RON PERRY COMMERCIAL ENERGY CEO 7677 OAKPORT ST., STE. 525 COMMERCIAL ENERGY OAKLAND, CA 94621 7677 OAKPORT ST., STE. 525 OAKLAND, CA 94621

CYNTHIA WOOTEN REED V. SCHMIDT LUMENX CONSULTING, INC. BARTLE WELLS ASSOCIATES 1126 DELAWARE STREET 1889 ALCATRAZ AVENUE BERKELEY, CA 94702 BERKELEY, CA 94703-2714

JOSHUA BAR-LEV LINDA AGERTER BAR-LEV ASSOCIATES LARGE-SCALE SOLAR ASSOCIATION 84 GYPSY LANE 51 PARKSIDE DRIVE BERKELEY, CA 94705 BERKELEY, CA 94705

TIM MASON FELICIA L. BELLOWS TIM MASON CONSULTING KRUGER ENERGY 1000 FRESNO AVE. 1434 MILVIA STREET BERKELEYC, CA 94707 BERKELEY, CA 94709

GERALD T. ROBINSON ED SMELOFF LAWRENCE BERKLEY NATIONAL LABS SENIOR MANAGER ONE CYCLOTRON ROAD SUNPOWER CORPORATION BERKLEY, CA 94720 1414 HARBOUR WAY SOUTH RICHMOND, CA 94804

PHILLIP MULLER TOM FAUST PRESIDENT REDWOOD RENEWABLES LLC SCD ENERGY SOLUTIONS 6 ENDEAVOR DRIVE 436 NOVA ALBION WAY CORTE MADERA, CA 94925 SAN RAFAEL, CA 94903 FOR: KRUGER ENERGY

PETER MORITZBURKE PAUL FENN 80 ELM AVE. LOCAL POWER LARKSPUR, CA 94939-2009 22888 HIGHWAY 1 / PO BOX 744 MARSHALL, CA 94940-9701

ANDERS GLADER JOHN NIMMONS SVP, ORIGINATION COUNSEL IBERDROLA RENEWABLES JOHN NIMMONS & ASSOCIATES, INC. 114 MORNING SUN AVENUE 175 ELINOR AVE., STE. G MILL VALLEY, CA 94941 MILL VALLEY, CA 94941 FOR: RECURRENT ENERGY

JOHN M. SPILMAN EDWARD A. MAINLAND LAW OFFICE OF JOHN M. SPILMAN CO-CHAIR, ENERGY-CLIMATE COMMITTEE 22 FAIRWAY DRIVE SIERRA CLUB CALIFORNIA

Page 28 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 76: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

MILL VALLEY, CA 94941-1309 1017 BEL MARIN KEYS BLVD. NOVATO, CA 94949

KEITH WHITE JASON SIMON 312 KELLER ST DIR - POLICY STRATEGY PETALUMA, CA 94952 ENPHASE ENERGY 1420 N. MCDOWELL BLVD. PETALUMA, CA 94954

ERIC CHERNISS SHANI KLEINHAUS SOLARGEN ENERGY SANTA CLARA VALLEY AUDUBON SOCIETY 20400 STEVENS CREEK BLVD, SUITE 700 22221 MCLELLAN ROAD CUPERTINO, CA 95014 CUPERTINO, CA 95014

SOLAR SEMICONDUCTOR INC. JIM PIAZZO 4633 OLD IRONSIDES DRIVE, STE. 310 GREEN EARTH MANAGEMENT SANTA CLARA, CA 95054-1846 650 KINGS ROW SAN JOSE, CA 95112

C. SUSIE BERLIN THOMAS J. VICTORINE LAW OFFICES OF SUSIE BERLIN SAN JOSE WATER COMPANY 1346 THE ALAMEDA, SUITE 7, NO. 141 1221 S. BASCOM AVENUE SAN JOSE, CA 95126 SAN JOSE, CA 95128

MIKE JENSEN DAVID OLIVARES MERCED IRRIGATION DISTRICT ELECTRIC RESOURCE PO BOX 2288 MODESTO IRRIGATION DISTRICT MERCED, CA 95344-0288 PO BOX 4060 MODESTO, CA 95352

JOY A. WARREN LINDA FISCHER REGULATORY ADMINISTRATOR LEGAL DEPARTMENT MODESTO IRRIGATION DISTRICT MODESTO IRRIGATION DISTRICT 1231 11TH STREET 1231 11TH STREET MODESTO, CA 95354 MODESTO, CA 95354

NORMAN ROSS BURGESS DOUGLAS M. GRANDY, P.E. PO BOX 200 CALIFORNIA ONSITE GENERATION ZENIA, CA 95595 1220 MACAULAY CIRCLE CARMICHAEL, CA 95608

MARK BERMAN RICHARD MCCANN DAVIS ENERGY GROUP M.CUBED 123 C STREET 2655 PORTAGE BAY ROAD, SUITE 3 DAVIS, CA 95616 DAVIS, CA 95616

GEORGE SIMONS JACQUELINE M. DEROSA DIRECTOR DIRECTOR OF REGULATORY AFFAIRS - CA ITRON, INC. CUSTOMIZED ENERGY SOLUTIONS 330 MADSON PLACE 101 PARKSHORE DRIVE SUITE 100 DAVIS, CA 95618-6599 FOLSOM, CA 95630

Page 29 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 77: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

KENNY SWAIN KEVIN COFFEE NAVIGANT CONSULTING ZGLOBAL, INC. 35 IRON POINT CIRCLE, STE. 225 604 SUTTER STREET, STE. 250 FOLSOM, CA 95630 FOLSOM, CA 95630

PAUL D. MAXWELL SAEED FARROKHPAY NAVIGANT CONSULTING, INC. FEDERAL ENERGY REGULATORY COMMISSION 35 IRON POINT CIRCLE, STE. 225 1835 IRON POINT RD., SUITE 160 FOLSOM, CA 95630 FOLSOM, CA 95630-8771

LEGAL AND REGULATORY DEPARTMENT C. RICHARD WYLIE CALIFORNIA ISO BEUTLER CORPORATION 250 OUTCROPPING WAY 4700 LANG AVE. FOLSOM, CA 95630-8773 MCCLELLAN, CA 95652

BRIAN THEAKER RICK A. LIND NRG ENERGY SIERRA ECOSYSTEM ASSOCIATES 3161 KEN DEREK LANE PO BOX 2260 PLACERVILLE, CA 95667 PLACERVILLE, CA 95667

DANIEL KIM TOM POMALES WESTLANDS SOLAR PARK CALIFORNIA AIR RESOURCES BOARD 5226 LUTTIG CT. 1001 I STREET ELK GROVE, CA 95757-3506 SACRAMENTO, CA 95812

ADAM LINK ALLISON C. SMITH DIR. - LEGAL & REGULATORY AFFAIRS ATTORNEY CALIF. ASSN. OF SANITATION AGENCIES STOEL RIVES LLP 1215 K STREET, SUITE 940 500 CAPITOL MALL, SUITE 1600 SACRAMENTO, CA 95814 SACRAMENTO, CA 95814

ANTHONY BRUNELLO AUTUMN BERNSTEIN CALIFORNIA STRATEGIES LLC DIRECTOR 980 NINTH STREET, SUITE 2000 CLIMATE PLAN SACRAMENTO, CA 95814 717 K STREET, SUITE 330 SACRAMENTO, CA 95814

CURT BARRY KATE KELLY SENIOR WRITER DEFENDERS OF WILDLIFE CLEAN ENERGY REPORT 1303 J STREET, SUITE 270 717 K STREET, SUITE 503 SACRAMENTO, CA 95814 SACRAMENTO, CA 95814

KEVIN WOODRUFF LINDA CAREY JOHNSON WOODRUFF EXPERT SERVICES BRAUN BLAISING MCLAUGHLIN & SMITH P.C. 1100 K STREET, SUITE 204 915 L STREET, STE. 1270 SACRAMENTO, CA 95814 SACRAMENTO, CA 95814

MARK A. LOWDER NICOLE WRIGHT DIR - HOUSING FINANCE BRAUN BLAISING MCLAUGHLIN & SMITH CRHMFA HOMEBUYERS FUND 915 L STREET, SUITE 1270 1215 K STREET, STE. 1650 SACRAMENTO, CA 95814 SACRAMENTO, CA 95814

Page 30 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 78: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

STEVEN A. BRINK TANYA DERIVI VP - PUBLIC RESOURCES SO. CALIFORNIA PUBLIC POWER AUTHORITY CALIFORNIA FORESTRY ASSOCIATION 915 L STREET, STE. 1410 1215 K STREET, SUITE 1830 SACRAMENTO, CA 95814 SACRAMENTO, CA 95814

TIFFANY K. ROBERTS MICHAEL BOCCADORO CALIFORNIA LEGISLATURE AGRICULTURAL ENERGY CONSUMERS ASSN LEGISLATIVE ANALYST'S OFFICE 925 L STREET, SUITE 800 925 L STREET, SUITE 1000 SACRAMENTO, CA 95814-3704 SACRAMENTO, CA 95814 FOR: AGRICULTURAL ENERGY CONSUMERS ASSOCIATION

GREGGORY L. WHEATLAND CHRISTOPHER T. ELLISON ELLISON SCHNEIDER & HARRIS, L.L.P. ATTORNEY 2600 CAPTIOL AVENYE, SUITE 400 ELLISON, SCHNEIDER & HARRIS, L.L.P SACRAMENTO, CA 95816 2600 CAPITOL AVENUE, SUITE 400 FOR: ENERGYSOURCE, LLC SACRAMENTO, CA 95816-5905

ROB ROTH VIKKI WOOD SACRAMENTO MUNICIPAL UTILITY DISTRICT SACRAMENTO MUNICIPAL UTILITY DISTRICT 6201 S STREET MS 75 6301 S STREET, MS A204 SACRAMENTO, CA 95817 SACRAMENTO, CA 95817-1899

MICHAEL S. DAY BILL DI CAPO PRINCIPAL DI CAPO LEGAL ADVISORS ROCKWOOD CONSULTING 77 CAMPUS COMMONS ROAD, SUITE 200 2701 2ND AVE. SACRAMENTO, CA 95825 SACRAMENTO, CA 95818

CAROL J. HURLOCK LEE TERRY CALIFORNIA DEPT. OF WATER RESOURCES CALIFORNIA DEPARTMENT OF WATER RESOURCESJOINT OPERATIONS CENTER 2033 HOWE AVE., STE. 220 2033 HOWE AVE., STE. 220 SACRAMENTO, CA 95825-0181 SACRAMENTO, CA 95825-0181

ART RIVERA EMILIO E. VARANINI, III GEOSUN ENERGY, INC. 4660 NATOMAS BLVD. 3455 WILDWIND CT. SACRAMENTO, CA 95835 SACRAMENTO, CA 95827

STEVEN A. LIPMAN KAREN LINDH STEVEN LIPMAN CONSULTING CALIFORNIA ONSITE GENERATION 5350 DUNLAY DRIVE, STE. 811 7909 WALERGA ROAD, NO. 112, PMB 119 SACRAMENTO, CA 95835-1570 ANTELOPE, CA 95843

JANE E. LUCKHARDT JAMES L. BYARD PH.D. ATTORNEY AT LAW 11693 PHELPS HILL ROAD DAY CARTER & MURPHY LLP NEVADA CITY, CA 95959-9150 3620 AMERICAN RIVER DRIVE, STE. 205 SACRAMENTO, CA 95864

Page 31 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 79: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

KIM CARR LIBERTY UTILITIES LLC (FORMERLY CALPECO)SUSTAINABLE INITIATIVES COORDINATOR 933 ELOISE AVENUE SIERRA NEVADA CONSERVANCY SOUTH LAKE TAHOE, CA 96150 1061 3RD STREET SOUTH LAKE TAHOE, CA 96150

CHRISTIAN MENTZEL MICHAEL ALCANTAR CEM LLC ATTORNEY AT LAW 619 KUPULAU DR ALCANTAR & KAHL LLP KIHEI, HI 96753 1300 SW 5TH AVE., STE 1750 PORTLAND, OR 97201

DONALD SCHOENBECK VIRINDER SINGH RCS, INC. DIR - REGULATORY & LEGISLATIVE AFFAIRS 3426 SE CRYSTAL SPRINGS BLVD. EDF RENEWABLE ENERGY PORTLAND, OR 97202 1000 SW BROADWAY, STE. 1880 PORTLAND, OR 97205-3060

POOJA KISHORE DANIEL JURIJEW PACIFICORP CAPITAL POWER CORPORATION 825 NE MULTNOMAH, STE. 600 12TH FLOOR EPCOR TOWER PORTLAND, OR 97232 1200 - 10423 101 ST. NW EDMONTON, AB T5H 0E9 CANADA

LISA CHERKAS MORGAN STANLEY CAPITAL GROUP, INC. 200 BURRAND ST., STE. 610 VANCOUVER, BC V6C 3L6 CANADA

AL ALVARADO CHERYL LEE SR. TRANSMISSION PROGRAM ANALYST CALIFORNIA PUBLIC UTILITIES COMMISSION CALIFORNIA ENERGY COMMISSION EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

CLARE LAUFENBERG GALLARDO DARYL METZ STRATEGIC TRANSMISSION PLANNING OFFICE CALIFORNIA ENERGY COMMISSION CALIFORNIA ENERGY COMMISSION EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

DAVID PECK FRANZ C. CHENG ORA CPUC - ENERGY CALIFORNIA PUBLIC UTILITIES COMMISSION EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

State Service

Page 32 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 80: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

JASON PERKINS KEITH D. WHITE CALIFORNIA PUBLIC UTILITIES COMMISSION CPUC ENERGY DIVISION EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

LEWIS BICHKOFF MATT MILEY CPUC CPUC EMAIL ONLY LEGAL DIVISION EMAIL ONLY, CA 00000 EMAIL ONLY EMAIL ONLY, CA 00000 FOR: ORA

MICHAEL COLVIN MITCHELL SHAPSON ADVISOR STAFF ATTORNEY CPUC - ENERGY CALIFORNIA PUBLIC UTILITIES COMMISSION EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

NATALIE GUISHAR ROBERT BLACKNEY CALIFORNIA PUBLIC UTILITIES COMMISSION CALIFORNIA PUBLIC UTILITIES COMMISSION EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000

SARA M. KAMINS LORRAINE GONZALES CALIFORNIA PUBLIC UTILITIES COMMISSION CALIFORNIA ENERGY COMMISSION EMAIL ONLY EMAIL ONLY EMAIL ONLY, CA 00000 EMAIL ONLY, CA 00000-0000

ANDREW KOTCH ANNE E. SIMON CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION EXECUTIVE DIVISION DIVISION OF ADMINISTRATIVE LAW JUDGES ROOM 5301 ROOM 5104 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214

CHLOE LUKINS CHRISTOPHER DANFORTH CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION ELECTRICITY PLANNING & POLICY BRANCH ELECTRICITY PRICING AND CUSTOMER PROGRAMROOM 4102 ROOM 4209 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 FOR: ORA FOR: ORA

CHRISTOPHER MYERS COLIN RIZZO CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION ELECTRICITY PLANNING & POLICY BRANCH ELECTRICITY PLANNING & POLICY BRANCH ROOM 4104 ROOM 4102 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 FOR: ORA

DAVID SIAO DEVLA SINGH CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION

Page 33 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 81: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

UTILITY & PAYPHONE ENFORCEMENT BRANCH BROADBAND, POLICY & ANALYSIS BRANCH ROOM 455 AREA 3-F 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214

DIANA L. LEE JONATHAN J. REIGER CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION LEGAL DIVISION LEGAL DIVISION ROOM 4107 ROOM 5035 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 FOR: ORA

JOSEPH A. ABHULIMEN JULIE A. FITCH CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION ELECTRICITY PLANNING & POLICY BRANCH EXECUTIVE DIVISION ROOM 4209 ROOM 5214 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 FOR: ORA

JULIE HALLIGAN KARIN M. HIETA CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION DIVISION OF ADMINISTRATIVE LAW JUDGES DIVISION OF ADMINISTRATIVE LAW JUDGES ROOM 5041 ROOM 5010 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 FOR: SED

KE HAO OUYANG LINDA J. WOODS CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION UTILITY & PAYPHONE ENFORCEMENT BRANCH UTILITY & PAYPHONE ENFORCEMENT BRANCH AREA 2-E AREA 2-A 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 FOR: SED

MARCELO POIRIER MARIA AMPARO WORSTER CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION EXECUTIVE DIVISION ELECTRICITY PLANNING & POLICY BRANCH ROOM 5025 ROOM 4209 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214

MARK R. LOY MEGHA LAKHCHAURA CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION ENERGY COST OF SERVICE & NATURAL GAS BRA PROCUREMENT STRATEGY AND OVERSIGHT BRANCROOM 4205 AREA 4-A 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 FOR: ORA

NEHA BAZAJ NIKA ROGERS CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION ELECTRICITY PLANNING & POLICY BRANCH ELECTRICITY PLANNING & POLICY BRANCH

Page 34 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 82: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

AREA ROOM 4101 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214

NILGUN ATAMTURK NOEL OBIORA CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION POLICY & PLANNING DIVISION LEGAL DIVISION ROOM 5119 ROOM 5121 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214

PAUL DOUGLAS RACHEL MCMAHON CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION PROCUREMENT STRATEGY AND OVERSIGHT BRANC DEMAND RESPONSE, CUSTOMER GENERATION, ANAREA 4-A AREA 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214

RAJAN MUTIALU ROBERT MASON CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION ELECTRICITY PLANNING & POLICY BRANCH DIVISION OF ADMINISTRATIVE LAW JUDGES AREA 4-A ROOM 5107 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214

SCARLETT LIANG-UEJIO SEAN A. SIMON CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION DEMAND RESPONSE, CUSTOMER GENERATION, AN PROCUREMENT STRATEGY AND OVERSIGHT BRANCAREA 4-A AREA 4-A 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214

SHANNON O'ROURKE TRACI BONE CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION DEMAND RESPONSE, CUSTOMER GENERATION, AN LEGAL DIVISION AREA 4-A ROOM 5027 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214

XIAO SELENA HUANG YULIYA SHMIDT CALIF PUBLIC UTILITIES COMMISSION CALIF PUBLIC UTILITIES COMMISSION ELECTRICITY PLANNING & POLICY BRANCH ELECTRICITY PLANNING & POLICY BRANCH ROOM 4102 ROOM 4209 505 VAN NESS AVENUE 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3214 SAN FRANCISCO, CA 94102-3214 FOR: ORA

ZHEN ZHANG LINDA KELLY CALIF PUBLIC UTILITIES COMMISSION ELECTRICITY ANALYSIS OFFICE EXECUTIVE DIVISION CALIFORNIA ENERGY COMMISSION ROOM 5102 1516 9TH STREET, MS 20 505 VAN NESS AVENUE SACRAMENTO, CA 95614 SAN FRANCISCO, CA 94102-3214

Page 35 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 83: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

CLARK WILLIAMS SCOTT BECKNER CALRECYCLE CALRECYCLE 1001 I STREET 1001 I STREET SACRAMENTO, CA 95812 SACRAMENTO, CA 95812

GINA BARKALOW HEATHER RAITT CALIFORNIA ENERGY COMMISSION (CEC) CALIFORNIA ENERGY COMMISSION 1516 NINTH STREET MS-45 1516 9TH STREET, MS 45 SACRAMENTO, CA 95814 SACRAMENTO, CA 95814

MARC PRYOR MICHAEL JASKE CALIFORNIA ENERGY COMMISSION CALIFORNIA ENERGY COMMISSION 1516 9TH ST, MS 20 1516 9TH STREET, MS-21 SACRAMENTO, CA 95814 SACRAMENTO, CA 95814

OTTO TANG PAMELA DOUGHMAN CALIFORNIA ENERGY COMMISSION CALIFORNIA ENERGY COMMISSION 1516 NINTH STREET TECHNOLOGY SYSTEMS DIVISION SACRAMENTO, CA 95814 1516 9TH STREET, MS 45 SACRAMENTO, CA 95814

REBECCA TSAI-WEI LEE DAVID VIDAVER CALIF PUBLIC UTILITIES COMMISSION CALIFORNIA ENERGY COMMISSION ORA - ADMINISTRATIVE BRANCH 1516 NINTH STREET, MS-20 770 L Street, Suite 1250 SACRAMENTO, CA 95814-5512 Sacramento, CA 95814

GABRIEL HERRERA JAMES HAILE OFFICE OF CHIEF COUNSEL CALIFORNIA ENERGY COMMISSION CALIFORNIA ENERGY COMMISSION 1516 NINTH STREET, MS 45 1516 NINTH STREET, MS 14 SACRAMENTO, CA 95814-5512 SACRAMENTO, CA 95814-5512

JIM WOODWARD KEVIN CHOU ELECTRICITY SUPPLY ANALYSIS DIVISION ANALYST - ENERGY CALIFORNIA ENERGY COMMISSION CALIFORNIA ENERGY COMMISSION 1516 NINTH STREET, MS 20 1516 NINTH STREET, MS 45 SACRAMENTO, CA 95814-5512 SACRAMENTO, CA 95814-5512

ANGELA TANGHETTI CALIFORNIA ENERGY COMMISSION 1516 NINTH STREET, MS-20 SACRAMENTO, CA 95819

TOP OF PAGE BACK TO INDEX OF SERVICE LISTS

Page 36 of 36CPUC - Service Lists - R1105005

2/2/2015http://www.cpuc.ca.gov/service_lists/R1105005_79864.htm

Page 84: FINAL Second SCE RAM Compliance Report (Public Cover Page ... · Program (“RAM Report”). SCE is filing this RAM Report consistent with the California Public Utilities Commission’s

Non�email�Recipients��ANGEL�AYALA���AMONIX,�INC.��1709�APOLLO�COURT��SEAL�BEACH�CA�90740�

� MICHAEL�LEVIN��VICE�PRESIDENT��ENER�CORE,�INC.�9400�TOLEDO�WAY��IRVINE�CA�92618�

MARTIN�HERMANN���8MINUTENERGY�RENEWABLES,�LLC��111�WOODMERE�ROAD,�STE.�250��FOLSOM�CA�95630�4752�

� � � �

� � � �

� � � �

� � � �

� � � �

� � � �

� � � �

� � � �

� � � �