Final Results Presentation, Aug 2016

36
FINAL RESULTS PRESENTATION AUGUST 2016 | LONDON

Transcript of Final Results Presentation, Aug 2016

Page 1: Final Results Presentation, Aug 2016

FINAL RESULTS PRESENTATION AUGUST 2016 | LONDON

Page 2: Final Results Presentation, Aug 2016

Presentation Contents:

• Key Financial Results

• Products

• Power-to-Gas Projects

• Clean Fuel Projects

• Hydrogen Transportation

• Detailed Financials | Andy Allen

£15.81m under contract | £0.51m in negotiation | total £16.32m

FINAL RESULTS PRESENTATION AUGUST 2016 | LONDON

Page 3: Final Results Presentation, Aug 2016

Pipeline (£m) up 61% Total Income (£m) up 56% Losses (£m) down 24%

FINANCIALS: OVERVIEW

ENERGY STORAGE | CLEAN FUEL

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

2014 2015 2016-8.0

-7.0

-6.0

-5.0

-4.0

-3.0

-2.0

-1.0

0.0

2014 2015 2016

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

2014 2015 2016

Cash + Debtors | £10.75m | 2.5x Losses

Page 4: Final Results Presentation, Aug 2016

REFUELLING STATIONS | P2G UNITS

Power-to-Gas

Refuelling Stations

ENERGY STORAGE | CLEAN FUEL

Page 5: Final Results Presentation, Aug 2016

SNAPSHOT

SNAPSHOT£15.81m under contract | £0.51m in negotiation | total £16.32m

Power-to-Gas Energy Storage

• Reference plant in Germany with The Thuga Group

• Reference plant in Germany to RWE

• Contracts with National Grid

• Technology Collaboration with BOC Linde

Clean Fuel

• Siting agreement with Shell

• Fuel contract with Toyota

• Refueller siting with Hyundai US

• Siting and BD agreement with Arup

Corporate

• Strategic investment from JCB

ENERGY STORAGE | CLEAN FUEL

Page 6: Final Results Presentation, Aug 2016

MARKET OFFERING

MARKET OFFERINGRapid Response | High Pressure | High Efficiency | MW scale

• Rapid response: less than 1s; for primary grid balancing

• High pressure: up to 80bar; for direct injection

• High efficiency: 75% measured by Thuga Group; 87% measured by RWE (with heat recovery)

• MW scale: 1MW modules available today

• Compliant: EU and USA

• Operations: 2yrs in the field

ENERGY STORAGE | CLEAN FUEL

Page 7: Final Results Presentation, Aug 2016

STANDARD PRODUCTS

PEM OFFERING

85kg/day215kW

255kg/day670kW

545kg/day1.4MW

1,365kg/day3.5MW

ENERGY STORAGE | CLEAN FUEL

Page 8: Final Results Presentation, Aug 2016

FLEXIBLE PLATFORM

PEM OFFERING

23.5 tonnes/day30MW

1,365kg/day3.5MW

ENERGY STORAGE | CLEAN FUEL

Page 9: Final Results Presentation, Aug 2016

REGULATIONS, CODES & STANDARDS

A leading role in shaping hydrogen deployment

• Secretary of BCGA Technical Steering Committee 9

• Secretary and UK Expert to ISO Technical Committee 197

• UK Expert to ISO working groups…

• …for electrolysers, dispensers & H2 quality

• Next Chair of BSI PVE/3/8

HYDROGEN ENERGY SYSTEMS

COMPLIANCE

Code of Practice 41: H2 Fuelling StationsDesign & ConstructionMaintenance & Operation

ISO 19880-1: H2 Fuelling StationsISO 22734: ElectrolyserISO 14687: H2Quality

BSI PVE/3/8: H2 Systems StandardisationProduction & StorageTransport, Measurement & Use

Page 10: Final Results Presentation, Aug 2016

P2G PROJECTS

WHY P2G

THE THÜGA GROUP

RWE

ZEAG

Page 11: Final Results Presentation, Aug 2016

WHY POWER-TO-GAS?

POWER-TO-GAS RATIONALE

Electricity cannot be stored easily | Hydrogen can be stored easily in the gas grid

Source: ITM Power plc

ENERGY STORAGE | CLEAN FUEL

Page 12: Final Results Presentation, Aug 2016

ENERGY STORAGE | CLEAN FUEL

ENERGY STORAGE TECHNOLOGIES

ENERGY STORAGE TECHNOLOGIES

Power-to-gas is efficient | long term | low energy cost

Source: ITM Power plc

Page 13: Final Results Presentation, Aug 2016

32MWH BATTERY | P2G COST COMPARISON

BATTERY | P2G COST COMPARISON

HYDROGEN ENERGY SYSTEMS

Lithium Ion System (6,300 sqft)

• Project will cost $53.5m

• 8MW with 4hr duration | 32MWh

• $6.7m/MW | $1.67m/MWh

Power-to-Gas System (3,530 sqft)

• Project will cost $21.6m

• 8MW with 4hr duration | 32MWh

• $2.7m/MW | $0.67m/MWh

• 8MW with 12hr duration | 192MWh

• $2.7m/MW | $0.22m/MWh

The Tehachapi Energy Storage Project features 604,832 lithium-ion battery cells, housed in

10,872 modules of 56 cells each, stacked in 604 racks arranged in rows.Tehachapi Energy Storage Project

Page 14: Final Results Presentation, Aug 2016

ENERGY STORAGE | CLEAN FUEL

POWER-TO-GAS

Page 15: Final Results Presentation, Aug 2016

ENERGY STORAGE | CLEAN FUEL

POWER-TO-GAS

Page 16: Final Results Presentation, Aug 2016

ENERGY STORAGE | CLEAN FUEL

1MW SALE TO ZEAG | DLR

1MW SALE TO ZEAG | DLR

Sale in Germany by competitive tender

• 1MW of electrolysis plus compressor for tube trailer filling

• Indoor deployment

• 5 year maintenance contract

Page 17: Final Results Presentation, Aug 2016

BIG HIT | Orkney

Eday: Curtailed wind and tidal turbines

• 0.5 MW of electrolysis | 500kg storage

• Heating of school

Shapinsay: Curtailed wind

• 1MW of electrolysis

• Heating of school

Orkney Mainland:

• 75 kW FC: heat and power to harbour and marina

• H2 refuelling station | 10x FC vans

• Transport: 5x 250 kg tube trailers

ENERGY STORAGE | CLEAN FUEL

POWER-TO-GAS IN UK

POWER-TO-GAS | ORKNEY

Page 18: Final Results Presentation, Aug 2016

CLEAN FUEL

CARS

Page 19: Final Results Presentation, Aug 2016

FUEL CELL CAR ROLLOUT

1

AWA I T I N G

A N N O U N C E M E N T

ENERGY STORAGE | CLEAN FUEL

Page 20: Final Results Presentation, Aug 2016

FUEL CELL VEHICLES

VEHICLES | ROLL OUT

WHAT IS A FUEL CELL VEHICLE?

An EV drive train that’s refuelled rather than recharged

Page 21: Final Results Presentation, Aug 2016

ITM POWER | TOYOTA FUEL CONTRACT

HYDROGEN ENERGY SYSTEMS

£10/kg | Lowest cost hydrogen for cars in UK | 1595 kg/day by the end of 2018

ITM POWER | TOYOTA FUEL CONTRACT11 UK stations | 1595 kg/day by the end of 2018

Page 22: Final Results Presentation, Aug 2016

HYDROGEN ENERGY SYSTEMS

ITM EXISTING AND PLANNED HRS SITES

STATION LOCATIONS

ITM Power |Owned StationsNumber Project Funding Match Location Ely Dispenser Planning Build Status Delivery Notes

HRS 001 M1 TSB OLEV AMP Sheffield 80 350/700 approved Operational Delivered OLEV upgrade

HRS 002 Riverside CEC USA 33 700 approved Operational Delivered US power (60 herz)

HRS 003 HyFive_1 FCH JU OLEV NPL 80 350/700 approved Operational Delivered Public Access

HRS 004 HyFive_2 FCH JU OLEV CEME 80 350/700 approved In build Oct-16 Opening October 11 2016

HRS 005 HyFive_3 FCH JU OLEV Shell Cobham 80 700 approved In build Dec-16 Civils complete Aug 16

HRS 006 BIG HIT FCH JU Orkney 450 350 pre planning In design Apr-17

HRS 007 H2ME OLEV FCH JU Shell Beaconsfield 150 350/700 pre planning In build Aug-17 Full forecourt integration

HRS 008 H2ME OLEV FCH JU Shell Gatwick 150 350/700 approved In build Aug-17 Toyota preferred site

HRS 009 H2ME2_1 FCH JU Site TBC 164 350/700 pre planning Contracts 2017

HRS 010 H2ME2_2 FCH JU Site TBC 164 350/700 pre planning Contracts 2017

HRS 011 H2ME2_3 FCH JU Swindon 164 350/700 approved Contracts Mar-17

Build own and operate model

• 5 operational HRS by 2016 year end

• 2 further HRS sales (Chino and HDF)

• Collaboration wth BOC Linde

Page 23: Final Results Presentation, Aug 2016

FCEV REFUELLING STATION

VEHICLES | ROLL OUT

WHAT IS AN FCEV REFUELLING STATION?

Page 24: Final Results Presentation, Aug 2016

FCEV REFUELLING STATION

VEHICLES | ROLL OUT

WHAT IS AN FCEV REFUELLING STATION?

ITM Power Electrolyser

80kg/day expandable to

500kg/day in 20ft container

Dispenser

350 and 700 bar refuelling point

Buffer Tank

20bar 15m3 tank

BOC | Linde Compression

Ionic Compressor and gas storage,

600kg/day

Payment Unit

Card reader, touchscreen and

printer for cash register receipt

Tube trailer connection

Off take of hydrogen for back up

supply and other applications

Page 25: Final Results Presentation, Aug 2016

SHELL COBHAM

UK INFRASTRUCTURE ROLL OUT

ENERGY STORAGE | CLEAN FUEL

Page 26: Final Results Presentation, Aug 2016

HYDROGEN ENERGY SYSTEMS

SHELL EXTRA SERVICES AT COBHAM (M25)

SHELL FORECOURT AGREEMENT

*Source: ITM Power

Page 27: Final Results Presentation, Aug 2016

BUS HRS CONFIGURATIONS

BUS REFUELLING STATIONS

Page 28: Final Results Presentation, Aug 2016

FINANCES

Page 29: Final Results Presentation, Aug 2016

DEAL PIPELINE

ENERGY STORAGE | CLEAN FUEL

DEAL PIPELINE

£15.81m under contract | £0.51m in negotiation | total £16.32m

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

31/07/2014 31/07/2015 31/07/2016

£m

Results announcements

Pipeline at Year end - Progress

Under Contract In Negotiation

0m

2m

4m

6m

8m

10m

12m

14m

16m

18m

20m

22m

24m

Contract Pipeline

Under Contract In Negotiation

Page 30: Final Results Presentation, Aug 2016

PRODUCT SALES | PROJECT INCOME

ENERGY STORAGE | CLEAN FUEL

PRODUCT SALES | PROJECT INCOME

£15.81m under contract | £0.51m in negotiation | total £16.32m

For year ending April 30th 2014

• £3.12m total inflow

• £1.16m product sales

• £1.96m project funding

For year ending April 30th 2015

• £5.06m total inflow

• £1.63m product sales

• £3.43m project funding

For year ending April 30th 2016

• £8.18m total inflow

• £1.93m product sales

• £6.25m project funding -

2,000,000

4,000,000

6,000,000

8,000,000

10,000,000

12,000,000

14,000,000

16,000,000

2010 2011 2012 2013 2014 2015 2016 2017Brokernote

2018Brokernote

Sales Revenue

Project Income

Page 31: Final Results Presentation, Aug 2016

PROJECT INCOME

ENERGY STORAGE | CLEAN FUEL

PROJECT INCOME

£0

£1,000,000

£2,000,000

£3,000,000

£4,000,000

£5,000,000

£6,000,000

£7,000,000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

Collaborative Project Funding

In negotiation

Secured

Paid

£15.81m under contract | £0.51m in negotiation | total £16.32m

For year ending April 30th 2014

• £3.12m total inflow

• £1.16m product sales

• £1.96m project funding

For year ending April 30th 2015

• £5.06m total inflow

• £1.63m product sales

• £3.43m project funding

For year ending April 30th 2016

• £8.18m total inflow

• £1.93m product sales

• £6.25m project funding

Page 32: Final Results Presentation, Aug 2016

LOSSES | FINANCIAL ASSETS

ENERGY STORAGE | CLEAN FUEL

LOSSES | FINANCIAL ASSETS

£15.81m under contract | £0.51m in negotiation | total £16.32m

• Post 2014, starting with Mainova

• Continued cost control

• Reductions in losses

• 2016 Financial Assets = 2x losses

Page 33: Final Results Presentation, Aug 2016

COMPANY RESEARCH

COMPANY RESEARCH

HYDROGEN ENERGY SYSTEMS

Zeus Capital

• In-house broker and NOMAD

• Tom McColm

Roth Capital

• US placing agent

• Craig Irwin

Align Research

• Equity holder

• Mark Parfitt

Page 34: Final Results Presentation, Aug 2016

Key Financial Results for the period ended 30 April 2015:

Total Revenue & Grant Funding of £8.19m (2015: £5,061m) up 56%, comprising:

Revenue - £1.930m (2015: £1.635m) up 18%

Grant income - £3.188m (2015: £1.777m) up 80%

Grants receivable for capital projects - £3.069m (2015: £1.649), up 86%

Increase in property, plant and equipment to £3.024m from £2.546m, up 19%

Loss from operations £4.359m (2015: £5.723m), down 24%

Cash balance £3.336m (2015: £6.576m), down 49%

Debtors £6.487m (2015: 4.113m), up 58%

Development costs of £0.252m recognised in the year

FINAL RESULTS PRESENTATION AUGUST 2016 | LONDON

Page 35: Final Results Presentation, Aug 2016

Commercial progress to date:

A Total of £16.32m of projects under contract or in the final stages of negotiation

£15.81m of projects under contract

£0.51m of contracts in the final stages of negotiation

Strongly developing pipeline of commercial sales and funded projects

FINAL RESULTS PRESENTATION AUGUST 2016 | LONDON

Page 36: Final Results Presentation, Aug 2016

FINAL RESULTS PRESENTATION AUGUST 2016 | LONDON