Final Report 2016€¦ · Prepared For Property NSW Base Date 1 July 2016 Version 1.1 Prepared...
Transcript of Final Report 2016€¦ · Prepared For Property NSW Base Date 1 July 2016 Version 1.1 Prepared...
Final Report 2016
Contract Area Orange
Contract No 4701773
LGA Cowra
Prepared For Property NSW
Base Date 1 July 2016
Version 1.1 Prepared Under Rating & Taxing
Procedure Manual 7.0
Final Report Cowra LGA 2016
Version 1.1 Page 2 of 23
Executive Summary
LGA Overview
Cowra Local Government Area (LGA) is located in the Central West region
of New South Wales, approximately 310 km south-west of Sydney.
Agriculture is considered to be the main industry within the LGA, as a result
of the secure water provided by the Lachlan River which runs through the
heart of the LGA. The area is well known for its food and wine production.
Wyangala Dam is another popular attraction for the LGA, especially for water
sports and recreational activities.
The area has an estimated population of 12,551 according to Regional
Development Australia (RDA)(2013) and is well serviced by educational
facilities and community infrastructure.
Number of Properties Valued this Year and the Total
Land Value in Dollars
The Cowra LGA comprises residential, rural, commercial, industrial,
infrastructure, environmental, forestry, village and both private and public
recreation zones.
7,429 properties were valued at the Base Date of 1 July 2016, and
valuations are reflective of the property market at that time. Previous Notices
of Valuation were issued to owners for the Base Date of 1 July 2014. The
Cowra LGA property market has generally seen stability in values over the
current base date.
Valuation changes in the LGA and percentage changes between the Council
Valuation years of 1 July 2014 and 1 July 2016 and the Land Tax Valuation
year of 2015 are as follows:
Final Report Cowra LGA 2016
Version 1.1 Page 3 of 23
Cowra LGA Properties Value and Total Land Value
Zone Zone Number of
Entries
2016 Total
Land Value
Prior Land
Value (2015) % Change
Prior LGA
Valuation
(2014)
% Change
Commercial
B1 16 $1,659,800 $1,628,300 1.93% $1,628,300 1.93%
B2 191 $20,360,900 $20,326,405 0.17% $20,326,405 0.17%
B5 96 $5,460,182 $6,000,200 -9.00% $6,00,200 -9.00%
B7 10 $1,280,900 $1,280,900 0.00% $750,900 70.58%
Environmental
E1 5 $472,000 $472,000 0.00% $472,000 0.00%
E2 10 $294,350 $294,350 0.00% $294,350 0.00%
E3 10 $659,380 $659,380 0.00% $659,380 0.00%
Industrial IN1 25 $2,752,200 $2,752,200 0.00% $2,752,200 0.00%
IN2 207 $14,139,945 $12,555,800 12.62% $12,369,700 14.31%
Residential R1 3,212 $167,759,711 $158,755,180 5.67% $157,720,780 6.37%
R5 678 $63,944,864 $63,741,980 0.32% $63,673,580 0.43%
Public
Recreation
RE1 33 $2,783,500 $2,783,500 0.00% $2,783,500 0.00%
RE2 12 $1,488,200 $1,488,200 0.00% $1,488,200 0.00%
Rural
RU1 2,245 $642,249,565 $641,350,850 0.14% $639,365,150 0.45%
RU3 3 $166,000 $166,000 0.00% $166,000 0.00%
RU4 37 $3,829,900 $3,829,900 0.00% $3,829,900 0.00%
Final Report Cowra LGA 2016
Version 1.1 Page 4 of 23
Cowra LGA Properties Value and Total Land Value
Zone Zone Number of
Entries
2016 Total
Land Value
Prior Land
Value (2015) % Change
Prior LGA
Valuation
(2014)
% Change
Village RU5 613 $16,495,761 $15,820,010 4.27% $15,997,730 3.11%
Infrastructure SP2 22 $1,460,840 $1,352,630 8.00% $1,352,630 8.00%
Final Report Cowra LGA 2016
Version 1.1 Page 5 of 23
State and Local Government Legislation for
LGA
The Cowra Local Environmental Plan (LEP) 2012 was gazetted on the 25th
January 2013. There have been three amendments made to the current LEP
since the previous valuation.
Table of Amendments
Year Amendment
Reference Description of Amendment
2016 (43) Standard Instrument (Local Environmental Plans)
Amendment (Maps) Order 2016. LW 27.1.2016. Date of
commencement, 27.1.2016, cl 2.
(126) Standard Instrument (Local Environmental Plans)
Amendment Order 2016. LW 11.3.2016. Date of
commencement, on publication on LW, cl 2.
(309) Standard Instrument (Local Environmental Plans)
Amendment (Observatory and Defence Facility) Order 2016.
LW 10.6.2016. Date of commencement, 56 days after
publication on LW, cl. 2.
The Cowra LGA is governed by the Cowra LEP 2012. The plan is based on
the standardised LEP prescribed by the NSW Legislation.
Final Report Cowra LGA 2016
Version 1.1 Page 6 of 23
Market Overview and Sales of Particular
Interest
Aspect has undertaken significant analysis of the Cowra district property
market to provide an accurate and reliable basis of valuation. A total of 289
sales have been analysed to enable the establishment and verification of
land values as at 1 July 2016. These analysed sales also support the
grading across components. Analysed sales reports are provided to Property
NSW on a consistent basis throughout the year. The added value of
improvements are also analysed to enable the accurate deduction of land
values. Aspect undertakes this process using the paired sales approach and
the replacement cost approach.
In analysed sales before or after 1 July it is necessary to adjust the contract
price in terms of market movement. Aspect Property Consultants analysed
289 sales to the current base date, this includes particular attention to recent
re-sales over properties which supported component factors applied. In the
Cowra district this year, sales indicated an increase to 1 July 2016 for
properties located within the village of Gooloogong and light industrial
properties within Cowra. Residential properties located in the west and
central parts of Cowra also so an overall increase. However, sales of
commercial properties within B5 zone indicated an overall slight decrease in
values. Values over the rural zoned properties within the LGA remained
relatively stable.
Final Report Cowra LGA 2016
Version 1.1 Page 7 of 23
Significant Issues and Developments
The main significant issues and developments in the Cowra LGA for the
period are:
New aviation development at Cowra Airport provides 21 freehold
allotments available for tender to maximise the potential of the land at
the airport as a benefit to aviation-related industries, job creation and
the economy of the local Cowra community.
Public comment is being sought on the Review of Environmental
Factors for Cowra’s Heavy Vehicle Bypass project, which indicates
Council’s commitment on the completion of a bypass for Cowra to
enhance the CBD and improved traffic flow.
Cowra Shire Council received a low-cost loan of $2.1 million through
the State Government’s Fit for the Future campaign which will be
utilised to address the infrastructure backlog across the Cowra Shire.
Please see related section in the body of the report for the full list of
significant issues and developments.
Final Report Cowra LGA 2016
Version 1.1 Page 8 of 23
Significant Value Changes
Summary of Valuation Changes to Residential Land
Changes since Previous General Valuation Year (2014)
The Cowra residential market has seen some increases since the last
General Valuation in 2014. Areas in central Cowra increased 11% and areas
in the west of Cowra saw increases of 22%. Village locations of Gooloogong,
Darby’s Falls, Woodstock and Morongla saw increases from 5-15% in
values; however, values within the village Wattamondara have seen
decreases of 8% during this period.
Sales volumes have remained relatively stable within the residential areas
over the 24 month period, since the previous general valuation year.
Overall the residential rental market within the Cowra area is considered to
be stable, however, the low vacancy rates driven by the lack of supply of
rental housing provides good yields for investors.
Changes since Previous Valuation Year (2015)
Residential land has generally seen a slight increase in the Cowra LGA over
the last 12 months. As addressed above the residential areas of central
Cowra saw an increase of 11% and areas in the west of Cowra a 22%
increase. In addition, further to its 10% increase at the 1 July 2015 base date
the village of Morongla saw another 5% increase in values which was
supported by market evidence. The villages of Gooloogong and Woodstock
also received increases from 5-10%.
Final Report Cowra LGA 2016
Version 1.1 Page 9 of 23
Summary of Valuation Changes to Rural Land
Changes since Previous General Valuation Year (2014)
The Cowra LGA is a well regarded rural locality due to its good quality
cultivation/irrigation country on the Lachlan and Belubula Rivers as well as
better quality soil types in the southern portion of the LGA towards Young.
The most common rural land uses in the Cowra LGA are cultivation and
grazing. Cowra also has a significant number of smaller rural home sites and
hobby farms in less productive areas to the east and west portions of the
LGA and also surrounding Wyangala Dam.
The broad acre rural property market has remained relatively stable since
the last general valuation year with no significant increases or decreases
across the LGA. This is also the case across the rural lifestyle/hobby farm
market with no significant changes in values.
Changes since Previous Valuation Year (2015)
As detailed above, the rural property market within the Cowra LGA across all
categories has remained relatively stable during the 12 month period from
the previous valuation year with no significant changes in values.
Final Report Cowra LGA 2016
Version 1.1 Page 10 of 23
Summary of Valuation Changes to Commercial Land
Changes since Previous General Valuation Year (2014)
The commercial areas in Cowra are made up of residential neighbourhood
centres, the CBD, a business park which is located nearby the Cowra Airport
and a commercial area surrounding Redfern Street in the north-west of
Cowra.
The commercial business park nearby the Cowra Airport is a small
commercial precinct and saw a large increase in value of 70% at the 1 July
2015 base date as a result of increases indicated by vacant sales within the
area.
The commercial area zoned B5 which surrounds Redfern Street has seen a
decrease of 9% since the previous General Valuation Year which was
supported by current market evidence.
The commercial areas which make up the Cowra CBD and residential
neighbourhood centres have seen no significant changes in values over the
24 month period.
Changes since Previous Valuation Year (2015)
As stated above, the commercial area zoned B5 which surrounds Redfern
Street has seen a decrease of 9% at the 1 July 2016 base date which was
supported by current market evidence.
All other commercial areas within the Cowra LGA have seen no significant
changes in values over the 12 month period.
Final Report Cowra LGA 2016
Version 1.1 Page 11 of 23
Summary of Valuation Changes to Industrial Land
Changes since Previous General Valuation Year (2015)
The industrial areas of Cowra are made up of both IN1 General Industrial
and IN2 Light Industrial properties.
Light industrial properties situated in the south-west of Cowra surrounding
Young and Grenfell Road have seen an increase of approximately 15% over
the 24 month period since the previous General Valuation year.
All other industrial properties within Cowra have remained stable during this
period.
Changes since Previous Valuation Year (2015)
As detailed above, light industrial properties situated in the south-west of
Cowra surrounding Young and Grenfell road have seen increases since the
previous Valuation year of approximately 13%.
The Ranken Street mixed residential and industrial area saw significant
increases over the 12 month period following vacant and improved sales
evidence showing increased interest from purchasers over the period.
All other industrial properties within Cowra have remained stable during this
period.
Final Report Cowra LGA 2016
Version 1.1 Page 12 of 23
Contents
Executive Summary ............................................................................................... 2
State and Local Government Legislation for LGA .................................................. 5
Market Overview and Sales of Particular Interest .................................................. 6
Significant Issues and Developments .................................................................... 7
Significant Value Changes ..................................................................................... 8
Contents ............................................................................................................... 12
Disclaimer – Purpose of this Report ..................................................................... 13
LGA Overview ...................................................................................................... 14
State and Local Government Legislation for the LGA .......................................... 16
Market Overview & Sales of Particular Interest .................................................... 17
Significant Issues and Developments .................................................................. 20
Significant Value Changes ................................................................................... 21
Overview of the Quality Assurance Process ........................................................ 23
Author .................................................................................................................. 23
Final Report Cowra LGA 2016
Version 1.1 Page 13 of 23
Disclaimer – Purpose of this Report
The purpose of this report is to describe the process and considerations for
the 1 July 2016 Valuation of the Cowra LGA. The report has been produced
on behalf of the Valuer General.
The land values have been specifically made for rating and taxing purposes.
Land values produced as part of this process should not be used for any
other purposes without the specific agreement of the Valuer General.
Land values must have regard to specific requirements and assumptions in
rating and taxing legislation. Consequently these valuations may vary from
market levels.
The land values have been determined using a methodology prescribed by
the Rating and Taxing Valuation Procedures Manual. The manual allows
mass valuation methodologies that involve assessing large numbers of
properties as a group to be utilised where appropriate. Mass valuation
methodologies are by their nature likely to be less accurate than individually
assessed valuations, however are utilised worldwide for rating and taxing
purposes to deliver valuations within an acceptable market range.
Town planning, land use and other market information contained in this
report has been compiled based on enquiries undertaken during the
valuation process. Third parties should make their own inquiries into these
details and should not rely on the contents of this report.
The Valuer General disclaims any liability to any person who acts or omits to
act on the basis of the information contained in this report.
More information on the valuation process is available from the Valuer
General’s website at www.valuergeneral.nsw.gov.au
Liability limited by a scheme approved under Professional Standards
Legislation.
Final Report Cowra LGA 2016
Version 1.1 Page 14 of 23
LGA Overview
Location of the District
The Cowra local government area (LGA) is located in the Central West
region of New South Wales, approximately 310 km south-west of Sydney
and has an estimated population of 12,551 (RDA 2013).
Cowra LGA includes a number of smaller villages such as Billimari, Darbys
Falls, Gooloogong, Morongla, Noonbinna, Wattamondara, Woodstock and
Wyangala.
Principal Towns
Cowra
Cowra is the principal town and farming and administrative centre for the
Cowra LGA. The town has an estimated population of 9,730 (2011 Census).
It is situated on an intersection of three major state highways, being the Mid-
Western Highway, the Olympic Highway and the Lachlan Valley Way.
Woodstock
Woodstock is the largest village within the Cowra LGA and was once a gold
and copper mining village. The village’s pub and railway station have
recently been restored and there are several B&B’s which are utilised for
accommodation by visitors to the area. At the 2011 Census the village had a
population of 812 people.
Final Report Cowra LGA 2016
Version 1.1 Page 15 of 23
Main Industries
According to Regional Development Australia (2013) the top five
employment sectors in the LGA are agriculture, manufacturing, health care,
education and training and wholesale trade.
Because of the rich soil types providing by the Lachlan Valley the region has
also developed into a prominent producer of food and wine in NSW.
Significant Retail Centres
The Cowra central business district provides the main retail centre for the
Cowra LGA. It features several larger supermarkets and department stores
which include ‘Target’, ‘Coles’, ‘Woolworths’, ‘Aldi’ and ‘The Reject Shop’. In
conjunction with these larger shopping destinations the town also provides a
lot of smaller boutique stores.
Although the Cowra CBD is sufficient for most day to day needs there are
many people who utilise the services of nearby Orange (92km) and
Canberra (189km) as their major retail destinations.
Types of Residential Development
The Cowra LGA predominantly comprises rural and residential properties,
with the majority of the developments located in and round the town of
Cowra itself. Most of the residential development within the town was
constructed approximately 80 years ago, however there have been newer
homes constructed in the North and West Cowra areas and in the rural
residential areas on the perimeter of the town.
The village areas such as Noonbinna, Woodstock and Wattamondara
primarily comprise residential and rural residential properties which are more
affordable than those within Cowra itself whilst still being within a close
proximity to the CBD.
Final Report Cowra LGA 2016
Version 1.1 Page 16 of 23
State and Local Government Legislation for the
LGA
The Cowra Local Environmental Plan (LEP) 2012 was gazetted on the 25 th
January 2013. There have been three amendments made to the current LEP
since the previous valuation.
Table of Amendments
Year Amendment
Reference Description of Amendment
2016 (43) Standard Instrument (Local Environmental Plans)
Amendment (Maps) Order 2016. LW 27.1.2016. Date of
commencement, 27.1.2016, cl 2.
(126) Standard Instrument (Local Environmental Plans)
Amendment Order 2016. LW 11.3.2016. Date of
commencement, on publication on LW, cl 2.
(309) Standard Instrument (Local Environmental Plans)
Amendment (Observatory and Defence Facility) Order 2016.
LW 10.6.2016. Date of commencement, 56 days after
publication on LW, cl. 2.
The Cowra LGA is governed by the Cowra LEP 2012. The plan is based on
the standardised LEP prescribed by the NSW Legislation.
In conjunction to the Cowra LEP, Cowra Shire Council has implemented the
Cowra Development Control Plan (DCP) 2014 primarily to meet the needs of
its local community. The DCP 2014 is made up of a number of different parts
which address different categories of development and planning issues.
Final Report Cowra LGA 2016
Version 1.1 Page 17 of 23
Market Overview & Sales of Particular Interest
Residential
The Cowra LGA prominently detached single storey residential dwellings,
with the majority of the developments located in and round the town of
Cowra itself.
Most of the residential development within the town was constructed
approximately 80 years ago; however there have been newer homes
constructed in the North and West Cowra areas and in the rural residential
areas on the perimeter of the town.
Cowra has all services available, including a reticulated town water supply,
reticulated sewerage and telecommunication services. Cowra also has a
wide range of facilities available including an airport, four child care centres,
three primary schools, two secondary schools, a hospital, a community bus
service, extensive shopping including major retail outlets such as Target,
Coles, Woolworths and Aldi and diverse sporting and aquatic facilities
including a heated Olympic pool and surrounding sporting fields.
Sales volumes have only slightly decreased within the past twelve months,
however value levels have remained generally stable over this period with
some slight increases in areas of Central and West Cowra.
Recent residential development within Cowra includes the Chardonnay Hills
Estate which is a 66 allotment subdivision, the estate is located in North
Cowra and there is also a 110 allotment subdivision adjoining, adjacent to
the Cowra High School.
Growth has been evident in the Central and West areas of Cowra since the
last General Valuation in 2011 with the Central areas experiencing an
increase of 11% and the West an increase of 22%.
The value levels adopted are supported by both vacant and improved sales
analysis.
Final Report Cowra LGA 2016
Version 1.1 Page 18 of 23
Villages
The Cowra LGA includes a number of smaller villages, such as Billimari,
Darbys Falls, Gooloogong, Morongla, Noonbinna, Wattamondara,
Woodstock and Wyangala.
These villages have seen a recent renewal in demand as purchasers seek a
rural lifestyle which is affordable and within a close proximity to services.
This is identified by the increase in sales volumes in the areas, with a 36%
increase from the previous valuation year and values indicating increases in
most areas.
Growth has been primarily evident in the village of Morongla which has seen
an increase of 15% in values since the 2011 General Valuation, along with
increases in Gooloogong, Darbys Falls and Woodstock of 5-13.5%.
However, the village of Wattamondara has experienced some decreases
within this period of approximately 8%.
Commercial
The Cowra LGA comprises 313 commercial zoned properties which are all
located within the town of Cowra.
The Cowra LGA commercial market had 18 market indicator sales
throughout the 1 July 2016 base date. These sales indicated a relatively
stable market with little variance to land values with the B5 zoned sales the
exception. The sales zoned B5 which surround the Redfern Street area of
Cowra indicated a decrease of approximately 9% to land values.
All sales occurred within the town of Cowra and most were supported with
the use of feasibility studies where possible.
Final Report Cowra LGA 2016
Version 1.1 Page 19 of 23
Industrial
The Cowra LGA includes 232 industrial zoned properties which are all
located within the town of Cowra. These properties are made up of both the
IN1 General Industrial and the IN2 Light Industrial zones and located
primarily in the north-west and south-west of Cowra, either surrounding main
arterial roads or railway lines.
The Cowra LGA industrial market had 12 market indicator sales throughout
the 1 July 2016 base date. Most of which were in the IN2 zoning in the area
to the south-west of Cowra around Young and Grenfell Road.
These sales predominantly indicated an increasing market with
approximately 10% in variance to land values.
Overall, since the last General valuation in 2014 there has been a moderate
increase to land values, predominantly over the IN2 zoned properties.
Rural
The Cowra LGA is a well regarded rural locality due to its good quality
cultivation/irrigation country on the Lachlan and Belubula Rivers and better
quality soil types in the southern portion of the LGA towards Young. The
most common rural land use in the Cowra LGA is cultivation and grazing.
Cowra also has a significant number of smaller rural home sites and hobby
farms in less productive areas to the east and west portions of the LGA and
surrounding the Wyangala Dam.
The broad acre rural property market has remained relatively stable since
the last general valuation year with no significant increases or decreases
across the LGA. This is also the case across the rural lifestyle/hobby farm
market with no significant changes in values.
Final Report Cowra LGA 2016
Version 1.1 Page 20 of 23
Significant Issues and Developments
Significant Developments – From Prior to Current Local Government
Council Rating Valuation
Below is a summary of significant Development Applications. Most of these
Development Applications are for developments permissible within the
current zoning therefore no special consideration is required.
New developments in discussion or underway include:
Approval for a 39 allotment residential subdivision in West Cowra on
the Grenfell Road (May 2015).
New aviation development at Cowra Airport provides 21 freehold
allotments available for tender to maximise the potential of the land at
the airport as a benefit to aviation-related industries, job creation and
the economy of the local Cowra community.
Public comment is being sought on the Review of Environmental
Factors for Cowra’s Heavy Vehicle Bypass project which indicates
Council’s commitment on the completion of a bypass for Cowra to
enhance the CBD and improved traffic flow.
Significant Developments – From Prior to Current Annual Valuation
New developments in discussion or underway include:
Approval for a 12 allotment residential subdivision in West Cowra, to
the north of Cowra Road (September 2016).
Final Report Cowra LGA 2016
Version 1.1 Page 21 of 23
Significant Value Changes
Significant Value Changes – From Prior to Current Local Government
Council Rating Valuation
Since the last General Valuation in 2014 the Cowra LGA as a whole saw an
increase of 1.68%. There were only eight components which saw a negative
change in value, with the greatest decrease being 9.00%. There were seven
components in the LGA which saw an increase of greater than 10% for the
current valuation year.
Components which saw significant increases in line with both improved and
vacant sales were:
The village of Morongla saw an increase of 15.88% as the village is
becoming an increasingly popular area for Cowra LGA residents to
move to and commute back to Cowra for work. This is also the case in
the village of Gooloogong which increased by 10.43% and Darbys Falls
which increased by 13.50%.
The residential component in West Cowra saw an increase of 21.96%.
The residential component in Central Cowra saw an increase of
11.03%.
The industrial component located in the south-west of Cowra
surrounding Young and Grenfell Road saw an increase of 14.60%.
The commercial business park component located nearby the Cowra
Airport which saw an increase of 70.58%, this is based on two vacant
sales indicating increases and a small component of only ten
properties.
Final Report Cowra LGA 2016
Version 1.1 Page 22 of 23
Significant Value Changes – From Prior to Current Annual Valuation
Since the previous annual valuation in 2015 the Cowra LGA as a whole saw
an increase of 1.28%. There were only eight components which saw a
negative change in value, with the greatest decrease being 9.00%. There
were four components in the LGA which saw an increase of greater than
10% for the current valuation year.
Components which saw significant increases in line with both improved and
vacant sales were:
The village of Gooloogong saw an increase of 10.60% as the village is
becoming an increasingly popular area for Cowra residents to move to
and commute to Cowra for work.
The residential component in West Cowra saw an increase of 21.96%.
The residential component in Central Cowra saw an increase of
11.03%.
The industrial component located in the south-west of Cowra
surrounding Young and Grenfell Road saw an increase of 12.87%.
Final Report Cowra LGA 2016
Version 1.1 Page 23 of 23
Overview of the Quality Assurance Process
LPI has been provided with a detailed Valuation Analysis Report, which
details the Quality Assurance Process of Aspect Property Consultants and
outlines the Verification process and certifies that Land Values meet all
Statistical Measures and Component Data Analysis. In addition, a Quality
Statement and lists of high value and high risk properties is also provided in
the Valuation Analysis Report. Checks have been undertaken to ensure that
all properties have been valued, land values are consistent with each other,
land value bases have been correctly determined and all concessions and
allowances have been supplied. Additionally, properties that had land values
amended through the objection or reascertainment process were individually
examined to reconcile surrounding land values and ensure accuracy of the
grading of surrounding land values. Benchmarks and Reference
Benchmarks are core elements of the quality assurance processes and are
identified and individually valued in accordance with the Rating and Taxing
Procedures Manual Version 7.0. Worksheets have been maintained on all
properties where calculations are required. We have also ensured that
adjustments and assumptions within the market analysis have been based
on market evidence and have been fully documented and rationalised.
Author
Report Prepared by:
Christopher C. Attenborough Registered Valuer 4012 FAPI, CPV B.Com (Land Economy) Contract Services Manager Aspect Property Consultants