    ents 4. eXeCUtIVe sUMMARY

    7. IntRoDUCtIon

    7. eConoMIC oUtLooK

    10. QUeensLAnD ConstRUCtIon oUtLooK

    12. QUeensLAnD enGIneeRInG ConstRUCtIon oUtLooK

    13. QUeensLAnD MAJoR PRoJeCts

    16. KeY PoInts, IMPLICAtIons AnD CHALLenGes

    19. APPenDIX: QMCA 2012 MAJoR PRoJeCts LIst

    Fbruary 2012 QMCA

    th cpyrigh i hi dcum blg h Qulad Majr Cracr Aciai QMCA.

    All righ rrvd.

    n par hi dcum may b rprducd r ramid i ay rm r by ay ma, icludig phcpyig, wihu h prir wri

    prmii h QMCA. All rqu b dircd h QMCA.

    exclui Liabiliy

    thi dcum i ricly prvidd h bai ha, h x prmiibl by law, ihr h QMCA r BIs shrapl r ay pr

    ivlvd i h prduci hi dcum: 1 warra i ay way h rliabiliy r accuracy ay rprai hri; 2 aum

    ay duy car r hr lgal duy ay pr wh may u r rly hi dcum ad pr uig r rlyig hi dcum

    d irly a hir w rik; 3 hall hav ay liabiliy ay pr wih rpc ay l r damag hwvr ariig, icludig

    i crac, r r udr au, r hrwi rm h u r rliac up hi dcum.

    Ackwldgm

    thi rpr ha b prpard by Adria Har, Alck schvr ad Kur Lmk a BIs shrapl ad Jam schirmr h QMCA.

    n: Alhugh gra car ha b ak ur accuracy ad cmpl hi rpr, BIs shrapl Py Ld d accp

    rpibiliy r h cmpl ad accuracy h acual irmai which i pii ad aumpi ar bad.

    BIs shrapl cac: Adria Har

    sir Maagr I rarucur & Miig

    BIs shrapl Py Limid

    Lvl 8, 99 Walkr sr

    nrh sydy nsW 2060

    Auralia

    t: +61 02 8458 4200

    F: +61 02 9959 5795

    e: [email protected]

    QMCA cac: Jam schirmr

    traurr

    Qulad Majr Cracr Aciai

    GPo Bx 3254

    Briba QLD 4001

    Auralia

    t: +61 07 3900 9005

    F: +61 07 3211 4900

  • 7/30/2019 Final Qmca Report 2012 2

    3/26

    2012MAJORPROJ

    ECTSREPORTQuEEnSlAndEn

    ginEERing

    COnSTRuCTiOnO

    uTlOOK

    3

    2012

    MAJORPROJECTSREPORTQuEEnSlAndEnginEERing

    COn

    STRuCTiOnOuTlOOK

    3

    FoReWoRD

    VeRsAtILItY DRIVInG sUCCess

    I wlcm h ppruiy cribu h urh Majr Prjc Rpr ad

    hak all ivlvd i h impra aalyi h ulk r Qulad girig

    cruci cr.

    th la dcad ha h cr ac igica challg, bu i ha al b a im

    wh Qulad irarucur cr ha hw i ha ad will ciu dlivr

    ad driv h grwh Qulad. I hav b rua prally wi h

    vluiary chag hrugh h dlivry vral majr irarucur prjc i my rl

    a CrdiarGral, ad currly i h rbuildig ad rcruci h a i

    h wak h wr aural diar rcrd. thi grwh ha b driv by h girig cruci cr

    vrailiy ad i abiliy m Qulad vr vlvig irarucur d.

    thi rpr idi ha Qulad girig cruci mark urd h crr i 2011, wih a 25% li i aciviy

    i h Ju quarr ad a vrall 18.5% icra r h acial yar.

    emrgig rurc iduri lik CsG ad LnG will ciu driv bui ivm grwh vr h mdium rm.thr majr CsGLnG prjc wrh arud $45 billi ar currly udr cruci i Qulad. I ccr

    wih mr radiial miig, h rurc cr will prvid a lid plarm r ciud ucc. thi i rcd

    by h calai i h lvl priva w girig cruci ivm. I 2010/11, hi icrad 42.5%

    $15.1 billi, alm dubl h 2007/08 gur i ral rm.

    Qulad i a sa climaic xrm. th arly 2000 aw h wr drugh i mr ha a cury ad ciad

    h dlivry h sa larg vr war irarucur prgram. nw, i a mar yar, h gra aural

    diar vr hi Qulad brugh abu a $7 billi rcruci prgram, agai h sa larg. twlv

    mh , hr i $3.6 billi i h rcruci pipli. thi rcruci aciviy will uppr mr ha 15,000

    jb hrugh 2014.

    A h cd larg cribur GsP ad h hird larg grar jb, girig cruci will ciu

    b a ladig drivr r Qulad. Hwvr, cmpii rm hr rurc rich sa ad h ciuig iraial

    dmad r prduc pr kill ad labur challg r h ir cruci idury. thi will rquir a ci

    puh r icrad mplym ad kill raiig ad grwh i h labur mark.

    thr ar challg ac a w mv rward, bu a h har hi rili a i a vrail, rg ad

    cmmid girig cruci cr. Wh Qulad xpricd i gra hrugh h ummr

    aural diar, yu d a h rady rig im, rgy, rurc, quipm, marial, acial

    aiac, ppl pwr ad cmpai hlp u llw Quladr i d. thi cr prvid h

    backb r a rg cmy ad rili cmmuii ad a ruddr r h uur prpriy ur sa,

    ad I lk rward wrkig wih yu hrugh h x xciig prid.

    Gram nw

    Chi excuiv ofcr

    Qulad Rcruci Auhriy

    Fbruary 2012

  • 7/30/2019 Final Qmca Report 2012 2

    4/26

    2012MAJORPROJ

    ECTSREPORTQuEEnSlAndEn

    ginEERing

    COnSTRuCTiOnO

    uTlOOK

    4

    2012

    MAJORPROJECTSREPORTQuEEnSlAndEnginEERing

    COn

    STRuCTiOnOuTlOOK

    4

    eXeCUtIVe sUMMARY

    thi i h 4h Qulad Majr Cracr Aciai QMCA Majr Prjc Rpr, llwig

    arlir rpr publihd i 2006, 2008 ad 2010. thi 4h rpr i cprd by Cruci skill

    Qulad CsQ, which i igica giv h imprac raiig ad upkillig iiiaiv

    m Qulad cruci dmad. th aim h rpr i prvid a rad ad

    hughul prpciv h ulk r majr girig cruci prjc i Qulad,

    ad h wrkrc rurcig rquirm hi ail r cracr ad gvrm agci.th aalyi al pr implicai ad challg r h idury a a rul h dig.

    By i aur, hi rpr i ccrd wih girig

    cruci aciviy. thi carily xclud ridial

    ad ridial buildig, alhugh mvm i buildig

    aciviy ca al impac h girig cruci

    mark i rm acc , ad c , marial ad

    labur. Cquly, m dicui i icludd i hi

    rpr h ulk r ridial ad ridial buildig

    aciviy i Qulad, alhugh h primary cu rmai h

    girig cruci gm.

    Furhrmr, h rpr i ccrd wih h ulk r

    majr prjc, which ar dd a prjc xcdig

    $100 milli i valu. thi mak up a ubaial prpri

    h al girig cruci mark i Qulad. th

    cmpl li majr prjc cidrd r hi aalyi,

    ad h xplici aumpi r ach prjc rgardig wrk

    d ad cruci wrkrc mplyd ach yar, ar

    prvidd i h Appdix a h rar hi rpr.

    I 2011/12, majr prjc wrk i rca amu $10.7

    billi i wrk d, r arud 37% h al girig

    cruci mark accrdig BIs shrapl rca.By 2014/15, aual majr prjc wrk i xpcd arly

    dubl ju udr $20 billi pr aum i 2013/14 ad

    2014/15. I ur, hi i xpcd driv a ubaial li i

    h majr prjc wrkrc rquirm, rm 15,300 pr

    i 2011/12 a pak 30,200 pr by 2014/15. thi i

    hw i Figur 1 blw, whr h clum rr lvl

    cruci wrk d i A$ Billi radig h l had

    id LHs axi ad h li rr imad majr prjc

    wrkrc rquird i huad pr radig h

    righ had id RHs axi.

    Qulad ac prud chag, driv by a ciagrai cmmdii bm which culd pially ru r

    dcad. Fr Qulad cruci idury, hi will driv

    a udamal ad uaid li i aciviy ad dmad r

    kill. th ulk pr challg h idury i rm

    avidig kill ad quipm hrag, blck ad

    riig c which hav characrid prviu bm. thi will

    rquir rarmaial hikig abu h way prjc ad

    kill ar dvlpd ad ivai i hw hy ar dlivrd.

    Much h icra ar big driv by miig ad rgy

    prjc, ju h mi ad prcig acilii dircly

    .g. LnG rai bu al h rapr ad uilii ym

    rquird by h prjc icludig rad, railway, harbur,

    war ad rgy irarucur. Whil majr prjc aciviyi prjcd wak i 2015/16 a m prjc mv

    cmpli ad h x rud prjc ar y b dd,

    i i ill xpcd b wll abv ha 2011/12. I i al

    likly b uaid a high lvl hrugh h ubqu

    v yar giv urhr ivm i rgy ad miral

    prjc ad highr urba irarucur rquirm.

    By cra, hr will b wr majr prjc ppruii

    rm h public cr vr h x w yar cmpard

    h prGFC ra a sa ad Fdral Gvrm k

    clida pdig. thi paricularly ac h rad

    ad bridg gm, giv h prmic public cr

    udig majr prjc, wih bh majr prjc wrk d

    ad wrkrc rquirm xpcd mv lwr vr h

    x w yar, a hw i Figur 2.

    thi i dpi a ubaial li i d rcruci

    udig r rad. I paricular, h Qulad Gvrm

    ha aucd vr $6 billi i udig maur r lcal

    ad a rad hrugh h Qulad Rcruci

    Auhriy bw 2011 ad 2013 icluiv. Hwvr, llwig

    a immdia rampig up aciviy llwig h d, i

    appar ha d rcruci wrk hav pakd adwill rd dwward rm hr. Furhr d rcruci

    wrk ar likly b dlivrd acr h a i rlaivly

    mall packag l ha $100 milli idividually ad

    a uch ar cidrd i hi rpr.

    0

    5

    10

    15

    20

    25

    30

    35

    0

    5

    10

    15

    20

    25

    2011/12 2012/13 2013/14 2014/15 2015/16

    TotalFunded(LHS) TotalNotFunded(LHS)TotalLabourDemand (RHS) TotalFundedLabourDemand (RHS)

    Thousands$Billions

    YearEndedJune Source:BIS Shrapnel,ABSData

    :

    FIGURe 1: MAJoR PRoJeCts WoRK Done & WoRKFoRCe DeMAnD FoReCAst.

    0

    1

    2

    3

    4

    5

    6

    0.0

    0.5

    1.0

    1.5

    2.0

    2.5

    2011/12 2012/13 2013/14 2014/15 2015/16

    Roads&BridgesFunded (LHS) Roads&BridgesUnfunded(LHS)TotalLabour Demand(RHS) FundedLabour Demand (RHS)

    Thousands$Billions

    YearEndedJune Source:BIS Shrapnel,ABSData

    :

    FIGURe 2: MAJoR RoADs AnD BRIDGes PRoJeCts WoRK Done & WoRKFoRCe DeMAnD FoReCAst.

  • 7/30/2019 Final Qmca Report 2012 2

    5/26

    2012MAJORPROJ

    ECTSREPORTQuEEnSlAndEn

    ginEERing

    COnSTRuCTiOnO

    uTlOOK

    5

    2012

    MAJORPROJECTSREPORTQuEEnSlAndEnginEERing

    COn

    STRuCTiOnOuTlOOK

    5

    By cra, much h grwh i majr prjc wrk will b

    driv by a rg upwig i miig ad rgy ivm i

    Qulad. thi ly ac miig ad havy idury

    cruci ad crrpdig wrkrc dmad, a

    hw i Figur 3, bu al ail ubaial cruci

    w rapr ad uilii irarucur, icludig railway,

    harbur, ga pipli, lcriciy grai ad upply,

    war ad wrag.

    By i aur, much hi ivm will b rgial,

    udd by h priva cr, ad driv by uaid

    grwh i dmad r mal, miral ad rgy

    i Aia. Whil hr ar ccr vr h uaiabiliy

    grwh i h glbal cmy giv h wak ulk r eur

    z cmi acd prdmialy by vrig db

    cri i Grc ad Ialy h ulk r Chia ad h Aia

    rgi rmai rlaivly rbu. Chi cmic grwh i

    xpcd lw a a rul wak i eurp ad h

    Uid sa, bu rmai upprd by gig dmic

    ivm i xpadig i idurial ba ad imprvig

    livig adard. thi will grwh uaid abv 8% pr

    aum hrugh h x v yar. thi i raably xpcd

    udrwri dmad ad ivm acr a rag

    cmmdii icludig cal, ir r, cppr ad hr ba

    mal. Mawhil, rg grwh i rgy dmad i Aia i

    al udrpiig larg ivm i LnG ad hrmal cal

    prjc i Auralia. Giv h lg ru aur hi dmad

    ad h high upr capial c dvlpm, i i highly

    ulikly ha h rgy prjc will b caclld, v i

    glbal cmic grwh wr lw by mr ha xpcd.

    th rgial cu may miig ad rgy prjc .g.

    h Bw ad sura Bai, h nrh W Prvic ad,

    pially, Wipa i ur will cra ubaial challg

    r h cruci idury. Fr iac, hw will kill

    b aracd uid h majr ppulai cr i h

    suh ea crr h a ad hr mrplia ara

    i h r Auralia i h rgi? Wha irarucur

    pla ar i plac ad big prgrd i h rgi

    accmmda ad prvid rvic r h larg umbr

    killd pr rquird i bh h cruci ad

    prduci pha h dvlpm? I ummary, h

    cmig miig ad rgy ivm cycl will driv

    a udamal hi i h way cruci wrk ardlivrd. thi will cia ubaial ivm

    i cial irarucur i h rgi, rm huig

    chl, hpial, park ad rcraial acilii arac

    wrkig amili p h mr udamal cmic

    irarucur rquirm acr rapr gm ad h

    uilii. Whil Fly i / Fly u r FIFo wrkig arragm

    will bcm mr prval, i will b a paaca r

    ivig i uaiabl cmmuii i h rgi.

    Furhrmr, h rg ulk r larg miig ad

    rgy prjc i Qulad i likly b mirrrd i

    hr radiial rurc a, icludig Wr

    Auralia, suh Auralia ad h nrhr trriry.thi i likly a bal ak plac r killd cruci

    labur ad quipm righ hrugh h x v yar.

    Qulad will d brig hm killd Quladr

    wh may wrk udr FIFo arragm i h hr a,

    a wll a aracig hr wrkr rm hr a ad

    vra, i h majr prjc pla daild i hi rpr ar

    b cmpld im. thi i likly rquir a cmpiiv

    piiig ly rgardig wag bu al cial, amily

    ridly liyl b which ivm i rgial cial

    irarucur ca addr. I hi rpc, h W Auralia

    gvrm rcly aucd pla iv $1.5 billi icial irarucur i h caal miig w Karraha,

    icludig h prvii 1,500 w dwllig, a hl, w

    w cr ad rcraial acilii. similar ivm

    pla huld b dvlpd r ky Qulad w hrugh

    h rca prid.

    A a bradr lvl, cmpii r killd labur ad

    quipm i likly puh up cruci wag ad

    pric r ipu ad quipm hrugh h x v

    yar. naially, girig cruci aciviy i a rcrd

    lvl, wih wrk d xcdig $87 billi i 2010/11, whil

    cruci cr mplym icludig ridial ad

    ridial buildig i a 1.03 milli pr. egirig

    cruci aciviy i xpcd xcd $100 billi pr

    aum rm 2012/13, wih cruci mplym riig

    1.18 milli pr by 2013/14. Giv xiig crai

    labur ad quipm, i i vry likly ha vrall cruci

    c will racclra hrugh h x v yar, whil

    rik c blwu ad dlay a pcic prjc will

    b highd.

    Ahr pial rik prjc imli i mig

    virmal adard dvlpm hrugh hvirmal apprval prc. Whil may majr

    prjc hav alrady rcivd virmal apprval, h

    im ak pa hi ag ad h quaum virmal

    cdii aachd dvlpm ha b, i m ca,

    ubaial. Furhrmr, m virmal apprval ar

    currly big challgd hrugh h lgal ym which

    will urhr dlay prjc implmai. Giv h iz

    ad cmplxiy may h majr prjc prpd r

    Qulad vr h x v yar, i i uraabl

    xpc ha m prjc may ac dlay a a rul h

    apprval prc. ovrall, hwvr, i prjc ar dlaydhrugh capaciy crai r apprval prc, hi i

    mr likly xd h upward cycl ad pakig i majr

    prjc wrk i Qulad byd ha uggd i hi

    rpr 2014/15.

    0

    5

    10

    15

    20

    25

    30

    35

    0

    5

    10

    15

    20

    25

    2011/12 2012/13 2013/14 2014/15 2015/16

    TotalFunded(LHS) TotalNotFunded(LHS)TotalLabour Demand(RHS) TotalFundedLabourDemand (RHS)

    Thousands$BillionsYearEndedJune Source:BIS Shrapnel,ABSData

    :

    FIGURe 3: MInInG AnD HeAVY InDUstRY PRoJeCts WoRK Done & WoRKFoRCe DeMAnD.

  • 7/30/2019 Final Qmca Report 2012 2

    6/26

    2012MAJORPROJ

    ECTSREPORTQuEEnSlAndEn

    ginEERing

    COnSTRuCTiOnO

    uTlOOK

    6

    2012

    MAJORPROJECTSREPORTQuEEnSlAndEnginEERing

    COn

    STRuCTiOnOuTlOOK

    6

    th aalyi r hi rpr idica ha h upwig i majr

    prjc girig cruci aciviy i Qulad will

    b uaid righ hrugh h x v yar alhugh

    all prjc hav y rcivd udig cmmim r

    virmal apprval. Furhrmr, whil aciviy may

    wak i 2015/16 a vral ubaial prjc mv

    i imulau cmpli, h ulk r h ubqu

    5 yar al rmai rg. I hi virm, ai

    killig hrugh ducai ad raiig iiiaiv will

    b crucial. I h hr rm, i will b difcul m h

    wrkrc rquirm majr prjc hrugh ducai

    ad raiig iiiaiv al, wih much h icrad

    wrkrc rquirm likly b m by highr ira ad

    vra migrai. Hwvr, hrugh h mdium lgr

    rm, argd ducai ad raiig prgram will b vial i

    big h availabl upply wrkr m dmad. I

    high kill ara, uch a h girig pri, ducai

    ad raiig iiiaiv will b cary imply rplac ldr

    wrkr wh ar ririg vr h cmig dcad, l al

    buildig up largr wrkrc capabilii m prjcddmad.

    Implicai ad Challg

    th ar imilar ucm ha rprd i h 2010

    Majr Prjc Rpr, alhugh h cal ad durai

    h girig cruci majr prjc pipli i w

    much grar ha rprd h, ad m prjc imig

    ad hr dvlpm hav chagd. A uch, m h

    implicai ad challg xprd i h 2010 rpr ill

    hld ru day; idd, v mr .

    ovrall, h ky implicai ad challg ar a llw:

    Construction activity is set to re-accelerate in

    Queensland . . .

    Grwh i Qulad cruci aciviy lwd

    ubaially bw 2008/09 ad 2009/10 a larg

    priva prjc wr pu hld i h wak h

    GFC. I ur hi ld a harp lwdw ad rci i

    h Qulad cmy.

    th la girig cruci daa rm h ABs

    ugg ha h Qulad girig cruci

    mark urd h crr i 2011, wih a 25% li iaciviy cmig hrugh i h Ju quarr ad a 18.5%

    icra i h 2010/11 acial yar. thi i likly b

    ju h ar a rg uaid upwig i girig

    cruci wrk.

    Frm hr, aual wrk d Qulad majr

    girig prjc i.. h wih a valu grar

    ha $100 milli i xpcd ri harply, rm

    $10.7 billi i 2011/12 ju udr $20 billi i

    bh 2013/14 ad 2014/15.

    th imprac miig ad rgy prjc

    h ulk, rlaiv h public cr, ma haQulad majr prjc ulk i w, mr

    ha vr, id h ru h glbal cmy,

    paricularly Chia ad h Aia rgi. Grwh hr,

    hwvr, i xpcd rmai rlaivly rbu dpi

    mrgig prblm i eurp ad wakr rd grwh i

    h Uid sa.

    . . . driving strong demand for construction

    workforces . . .

    th girig cruci wrkrc rquird

    dlivr Qulad majr prjc will d a

    la dubl vr h x ur yar. Frm arud

    15,300 pr i 2011/12, h majr prjc cruciwrkrc i xpcd ri ju vr 30,000 pr

    by 2014/15.

    . . . impacting on wages and broader construction

    costs . . .

    Thesharpincreaseinmajorengineeringprojectworkswill

    driv a ubaial icra i al buildig ad cruci

    aciviy. thi i likly urhr rg grwh i

    cruci wag i Qulad abv ha

    Auralia a wll a a racclrai i cruci

    c grally.

    Cquly, hr rmai a ubaial rik ha

    majr girig cruci prjc i Qulad

    will b placd udr c prur r culd b

    dlayd byd h imli currly prpd by

    h prp r uggd hr. I , h girig

    cruci cycl culd b xdd i durai, albi

    wih a wakr ramp up prid, i c prur r kill

    hrag bgi bi. ev , h majr prjc li,

    cmpild i cjuci wih Qulad cracr,

    rpr a balacd ad raabl xpcai majr

    prjc dvlpm i h a.

    . . . creating issues for skills resourcing and

    infrastructure . . .

    Intheabsenceof atransferof skills fromindustrieswithin

    Qulad, r h availabiliy killd girig

    gradua ad cruci labur, kill will d b

    imprd i h a. thi i likly driv a vrall

    racclrai i ppulai grwh, wih aual

    immigrai i Qulad likly ri rm ju

    udr 40,000 pr i 2010/11 vr 70,000

    pr by 2012/13.

    thi will hav implicai r h adquacy huigad irarucur dd uai ad uppr h

    ppulai icra, paricularly i h rgi uid

    Briba whr much h prjc wrk i.. miig

    ad havy idury rlad will b akig plac. I al ha

    implicai r cracr hirig ragi ad h abiliy

    urc ppl wh ar willig wrk i h rgi ad

    uid h suh ea crr.

    Muchof the increaseddemand for labour isbeing driven

    by LnG ad calrlad wrk i h sura ad Bw

    Bai, Glad ad Mackay rgi. Apar rm

    craig h p i h rgi i rm cad irarucur rquirm, h prjc will b

    i dirc cmpii r rurc wih hr imilar

    izd prjc i Wr Auralia, suh Auralia

    i.. olympic Dam, h nrhr trriry ad nw

  • 7/30/2019 Final Qmca Report 2012 2

    7/26

    2012MAJORPROJ

    ECTSREPORTQuEEnSlAndEn

    ginEERing

    COnSTRuCTiOnO

    uTlOOK

    7

    2012

    MAJORPROJECTSREPORTQuEEnSlAndEnginEERing

    COn

    STRuCTiOnOuTlOOK

    7

    suh Wal. thi will mak rurcig Qulad

    prjc mr challgig.

    . . . and driving other implications and challenges

    for contractor strategies . . .

    th x w yar will wr majr prjc

    ppruii prvidd by h public cr, a sa

    ad Fdral Gvrm k rr hir

    acial pii ar mvig i dci durigh GFC ad i armah. Furhrmr, whr public

    wrk ar rd, i will b l likly b aggrgad

    i vry larg packag a gvrm k prad

    wrk amg mdium izd ad mallr cracr ad

    ihu wrkrc ad k cmpiiv fcicy gai.

    thi will hav implicai r h prcurm ragi

    Qulad cracr.

    Bh aciviy ad majr prjc wrkrc rquirm

    ar xpcd a i 2015/16 a h x rud

    majr prjc bgi wid dw. ev , aciviy

    i prjcd rmai wll abv ha 2011/12.Furhrmr, hi ulk i bad a raabl

    am currly kw prjc ly h

    Appdix r a cmpl prjc li. I i highly likly ha

    mr majr prjc will b dvlpd ad idid vr

    h x w yar icludig urhr miig ad rgy

    prjc i h rgi ad w irarucur ivm i

    h urba cr which culd b aciviy i 2015/16

    ad byd. Cquly, ay dwur i 2015/16 may

    b hallwr ha prd hr ad rairy i aur.

    thi ha implicai r h lg rm dvlpm kill

    mach cruci idury dmad ar 2015/16.Cracr will d kp abra dvlpm i

    rdr pla r wrk i 2015/16 ad byd.

    1. IntRoDUCtIon

    th cruci idury i a majr mplyr ad a lad

    idicar h vrall halh h cmy, wih girig

    cruci dircly aligd wih cmic ad prduciviy

    ucm. Impraly, a rbu ad fci girig

    cruci cr i dpd cmpiiv ad

    uaiabl cracr.

    QMCA mmbr rpr cracr wh ar uiqulyplacd ad capabl dlivrig Qulad majr prjc.

    th bui uaiabiliy h QMCA mmbr cracr

    rli hir abiliy dvlp, dply ad rai rurc

    havig rgard r h aicipad dmad r hir rvic.

    t ai bh QMCA mmbr ad ky idury akhldr,

    h QMCA, i cjuci wih cpr CsQ, ha wrkd

    wih BIs shrapl dvlp h 2012 Majr Prjc Rpr

    ad Majr Prjc Li prvid a aph majr prjc

    ad h implicai ha h prjc hld r h Qulad

    girig cruci cr ad h bradr cmy.

    2. eConoMIC oUtLooK

    2.1 Wrld ad naial oulk

    Ulik may h dvlpd Wr cmi, Auralia

    did xpric a acial crii r rci llwig hGFC. thi i largly crdid i lid cmic pii

    prir h crii, a uppriv macr plicy rp, halhy

    bakig ym ad rg dmad rm Aia. Whil h wrld

    cmic rcvry i ill rugglig d raci, Auralia

    cmy i rlaivly ud, alhugh grwh wakd i h

    r hal 2011 du h impac aural diar ad a

    high Auralia dllar. thak hirically high cmmdii

    pric ad rbu ad uaiabl dmic dmad r

    cal ad ir r rm Chia ad hr rapidly idurializig

    uha Aia ai, Auralia i xpricig a rllig

    cmmdii ad aural rurc bm ha i hlrig h

    cmy rm urhr hck.

    I hi rgard, much dpd h ulk r cmic

    grwh i h Aia rgi, ad paricularly Chia. Chi

    cmic grwh i xpcd lw rm h rapid dubl

    digi grwh ra achivd durig h pa v yar, maily

    du wakr grwh i xpr. expr hav b a ky

    cmp h Chi grwh ry, bu maiaiig

    rapid grwh i xpr will b difcul cmpard h pr

    GFC ra.

    Wih a grar rliac dmic dmad a h primary

    gi grwh i Chia maily hrugh urhr idurialdvlpm, cmic grwh i xpcd mdra.

    nvrhl, h ciud urbaiai rural ara ad

    riig huhld icm ad pdig huld ill uppr

    rlaivly rg grwh dpi h wak ulk r eurp

    ad h Uid sa. I ur, uaid dmic dmad i

    Chia will b h primary drivr h miral ad rurc

    bm ha will ul Auralia grwh i h cmig yar.

    Australian growth outlook

    th Auralia cmy lwd hrugh caldar 2011.

    ecmic grwh 2.0% i w xpcd r h ull yar,

    cmpard grwh 2.5% i caldar 2010. Whil r,Auralia grwh i 2011 i ill xpcd xcd h

    avrag GDP grwh amg h hr advacd cmi.

    slwr Auralia grwh hrugh caldar 2011 wa largly a

    rul a mprary lack cumr cdc big

    huhld avig ra 15 yar high, a rg Auralia

    dllar impacig h rad xpd cr, h wihdrawal

    Fdral Gvrm imulu prgram acig public

    ivm ad a ri aural diar which ha acd

    prduci. I paricular, Qulad wa hi by xrardiary

    cycl ad d impacig cal xpr ha accud r

    a hird al aial xpr.

    tradiially, ivm i h majr drivr h cmy.

    Ivm add h cmy capaciy uppr

    icrad prduci ad i larg, cyclical wig ad vlailiy

    dlivr rg muliplir c. thrugh much h 2000

    Annual GDP Comparison

    Year Ended December 2010 2011e 2012f 2013f

    Australia 2.5% 2.0% 3.8% 3.8%

    Advanced Economies 3.1% 1.6% 1.9% 2.4%

    China 10.4% 9.1% 8.5% 8.4%

    Source: BIS Shrapnel, IMF World Economic Outlook 2011

    tABLe 1: seLeC teD GDP FoR eCAsts.

  • 7/30/2019 Final Qmca Report 2012 2

    8/26

    2012MAJORPROJ

    ECTSREPORTQuEEnSlAndEn

    ginEERing

    COnSTRuCTiOnO

    uTlOOK

    8

    2012

    MAJORPROJECTSREPORTQuEEnSlAndEnginEERing

    COn

    STRuCTiOnOuTlOOK

    8

    prir h glbal acial crii GFC, Auralia xpricd

    wi bm i priva ad public ivm. thi udrwr

    rg cmic grwh i Auralia durig h prid. Priva

    ivm bmd r, driv iiially by a rg huig

    upwig, cupld by larg priva ivm i cial ad

    cmic irarucur hrugh public/priva parrhip

    PPP. th, rm 2003 2008, priva ivm bmd,

    driv maily by ivm i miig ad rgy rurc

    prjc. By cra, grwh i public ivm wa

    rlaivly ubdud arly i h dcad ciuig a prid

    udrivm i irarucur which dd much h

    1980 ad 1990 bu pickd up rgly lar i h dcad

    h back high gvrm rvu ad a d r

    iv i irarucur.

    Up h h GFC i la 2008, priva ivm

    wakd a w prjc wr dlayd r caclld. t

    hr up cmic grwh, h Fdral Gvrm mbarkd

    a ubaial imulu prgram icludig h Buildig h

    educai Rvlui BeR chm, which drv a bm i

    public ivm. sa Gvrm, , ciud may

    hir igica irarucur prgram. Hwvr, h

    Fdral imulu prgram i w cmig a d ad, wih

    bh Fdral ad sa Gvrm lkig ward cal

    clidai, public ivm i dcli vr 2011/12

    ad ubqu yar.

    Lkig rward, Auralia GDP grwh i xpcd

    acclra 3.8% i bh caldr 2012 ad 2013 wll

    ahad hr advacd cmi. Grwh i hi prid will

    b driv by rcvrig priva ivm largly driv by h

    x rud miig ad rgy prjc ha ar ramp

    up hrugh 201114. Mark cdii ar y cduciv

    a majr pha cmmrcial ad idurial prpry

    buildig. Hwvr, cdii ar xpcd imprv hrugh

    2012 ad 2013 a udig crai a ad mplym,

    dmad ad pr rgh. Priva dwllig buildig

    ivm i likly hav bmd u i 2010/11 wih

    dubl digi grwh, albi rm a lw ba, xpcd llw

    i 2011/12. ovrall, priva ivm will p lid grwh,

    ig xpcd cu i public xpdiur a Fdral adsa gvrm mv back ward urplu.

    Ivm iclud cruci, h purcha pla,

    quipm ad iagibl uch a war, miral

    xplrai ad grwh i bilgical a i.. livck.

    o h, cruci ha h gra muliplir impac

    cmic aciviy giv i high uiliai dmic labur

    ad marial. th cruci gm ca il b brk

    dw i ridial buildig, ridial buildig ad

    girig cruci which iclud miig ad havy

    idury ubgm. ovrall, a dmrad i Figur 5,

    girig cruci havily driv by miig wa h ly

    cruci cr dmra ral grwh vr 2010/11

    a ridial ad ridial rmaid a, cribuig

    h curr pach h Auralia cmy.

    Ridial buildig i a caualy h cmbiai

    ucraiy ad rlaivly high ir ra. All h alk

    vrvalud huig mark cmpard wih vra ha

    pkd wrccupir ad huig ivr alik. Wihu

    h prpc capial gai, l al acig h pcr

    capial l, hy ar kpig hir pwdr dry. I m a,paricularly nw suh Wal, h hrag huig ha

    bcm criical. Mawhil, privaly udd ridial

    buildig ll harply i h wak h GFC ad rmai wak,

    wih al dwllig buildig aciviy upprd mprarily

    by h BeR imulu prgram. th x ag h buildig

    cycl i a upwig i ridial buildig ad cmmrcial ad

    idurial ridial buildig wrk bu, currly, mark

    ill rmai wak.

    Priva ivm cam pau i 2010/11 a dlayd cal

    ivm wrk rumd. Hwvr, apar rm rurc,

    priva ivm rmai a, blw h lvl rquird udrwri v mdra grwh, ig h c r uur

    capaciy crai. Bui rmai i c caim

    md rahr ha garig up r grwh. thi highligh

    h hrpd aur h Auralia cmy: cr

    xpd h rurc cr ar grwig, radhlrd

    cr xpd h high grwh rurc cr

    rmai ural whil radxpd cr ar hrad by

    rig cmpii ad a rg Auralia dllar.

    Hwvr, a bradig i mplym, pr ad ivm

    i xpcd rm 2012 a miig ivm ad icm

    imula widr cmic aciviy, liig cdc adpdig ad curagig bui wich u c

    caim md a xc capaciy i abrbd. th

    umplym ra i xpcd mv lwr hrugh 2012,

    wih a acclrai i wag grwh.

    :

    15

    10

    5

    0

    5

    10

    15

    20

    25

    00 01 02 03 04 05 06 07 08 09 10 11 12

    PublicInvestment PrivateInvestment Tota lInvestment

    Annual%Change

    YearEndedJune

    Source:BIS Shrapnel,ABSData

    Forecast

    FIGURe 4: totAL InVestMent, AUstRALIA, ReAL GRoWtH PeR AnnUM.

    0

    20

    40

    60

    80

    100

    120

    00 01 02 03 04 05 06 07 08 09 10 11 12

    ResidentialB ui ld in g N onResidentialBuilding Eng inee ringConstruction

    YearEndedJune ForecastSource:BISShrapnel,ABSData$Billions

    :

    FIGURe 5: ConstRUCtIon WoRK Done AUstRALIA.

  • 7/30/2019 Final Qmca Report 2012 2

    9/26

  • 7/30/2019 Final Qmca Report 2012 2

    10/26

    2012MAJORPROJ

    ECTSREPORTQuEEnSlAndEn

    ginEERing

    COnSTRuCTiOnO

    uTlOOK

    10

    2012

    MAJORPROJECTSREPORTQuEEnSlAndEnginEERing

    COn

    STRuCTiOnOuTlOOK

    10

    Bw 2012/13 ad 2015/16, Qulad GsP grwh

    i xpcd rmai rg ad uprrm h aial

    avrag, wih m agai i public ivm. thi will b

    mr ha by uaid icra i priva ivm,

    paricularly ivm i w rurc prjc, which will b

    h ky drivr h a cmy.

    2.4 Ppulai Grwh

    A igica crai acig Qulad i h x w yar

    will b a adqua ppulai ba ad killd labur upply

    car r h larg icra xpcd i priva ivm

    paricularly r cal ad LnGrlad prjc.

    Qulad ra ppulai grwh acclrad harply

    hrugh h 2000 a h miig ivm bm rampd up,

    drawig i much highr lvl immigrai rm hr a

    a wll a rm vra. th pau i ivm driv by

    h GFC aw a harp lwdw i h ra ppulai grwh

    vr 2009/10 ad 2010/11, paricularly hrugh immigrai.

    Hwvr, BIs shrapl rca Qulad ppulai

    grwh ra racclra vr h x v yar lvl

    imilar ha a h high h 2000 ivm

    bm. thi will hav implicai r huig aciviy ad h

    adquacy irarucur car r highr ppulai lvl,

    paricularly i h rural rgi whr may rurc prjc

    will arac labur. Wih aial ppulai grwh ra

    rdig dw durig hi prid, plu a agig cmpii,

    Qulad will d cmp rcly r lcal labur ad

    vra ad ira migra.

    3. QUeensLAnD ConstRUCtIon oUtLooK

    3.1 Cruci Aciviy

    tal cruci aciviy icrad mildly i Qulad

    durig 2010/11 bu i pick up rgly i 2011/12,

    wih al aciviy 23% highr ha 2007/08. th cruci

    cr ca b urhr brk dw i h ky ubgm

    icludig ridial buildig, ridial buildig ad

    girig cruci. th ar addrd idividually

    i ci 3.23.4 blw. Ay dicui h cruci

    cr wuld b cmpl wihu cidrig h ulk

    r cruci mplym ad wag a wll a crucic dicud i ci 3.53.6.

    3.2 Ridial Buildig

    Ridial buildig wrk d, icludig alrai ad

    addii, ha all r hr ccuiv yar: 9.8% i

    2008/09, 5.8% i 2009/10 ad a urhr 13% i 2010/11.

    Wak ral grwh ad md pric grwh i prvidig

    lil iciv iv. Wak i h vrall Qulad

    cmy ad rlaivly high lad pric ar acig limi

    wrccupir dmad. Wak ral ad pric grwh ad

    high lad pric will pri i 2011/12 drivig Qulad

    ridial buildig dw urhr. Hwvr, hi lvl buildig

    i wll blw udrlyig dmad. Wih a riig dcicy

    ridial ck, ad rbu ppulai grwh ad dmad

    r huig, bh ral ad capial grwh i xpcd

    pick up agai drivig ahr upwig i ridial buildig

    vr 2012/13 ad 2013/14. th prpc a rur

    riig ir ra hrugh hi prid cur iaiary

    prur dpi h rc ra cu will likly crai h

    upwig, hwvr.

    3.3 nRidial Buildig

    Ulik m hr a, ridial buildig wrk i

    Qulad did a harp lump i 2008/09, wih

    wrk d riig 9%. Cmmrcial ad idurial buildig

    hld rlaivly a, whil cial ad idurial buildig hwd

    rg grwh, hak h cmmcm a w majr

    prjc ad h BeR chm. Hwvr, ridial

    buildig wrk d i Qulad ha b aig u,

    wih grwh i 2009/10 a 2.3% ad 2010/11 a 1.8%. scial

    ad iiuial buildig grw rgly hrugh h yar

    h back h BeR chm, whil cmmrcial ad idurial

    wakd ubaially a w prjc wr dlayd. tal

    ridial buildig will dcli harply i 2011/12 a himpac h BeR chm i wihdraw. Hwvr, m halh

    prjc, a wll a a gradual rcvry i cmmrcial ad

    idurial buildig will ridial buildig rack highr

    vr ubqu yar.

    3.4 egirig Cruci

    Fllwig v yar backback grwh i xc 20%

    pr aum, Qulad girig cruci aciviy ll

    by 5.3% $20 billi ca 2008/09 pric i 2009/10.

    Aciviy wa primarily driv lwr by wakr rapr ad

    uilii cruci aciviy. Rad, railway, war ad

    lcriciy cr all ad i li wih h cmpli rar cmpli majr prjc, alhugh miig ad

    havy idury cruci ill grw 10% i h yar $6.7

    billi, maily driv by urgig il ad ga i.. cal am

    mha dvlpm.

    70

    80

    90

    100

    110

    120

    130

    140

    150

    160

    170

    2008 2009 2010 2011 2012

    ResidentialB ui ldi ng N onResidentialBuilding Engineeringconstruction TotalConstruction

    Index

    ForecastYearEndedJune Source:BISShrapnel,ABSData

    I

    :

    FIGURe 9: QUeensLAnD ConstRUCtIon WoRK Done JUne 2008=100.

    I

    :I

    0

    20

    40

    60

    80

    100

    120

    140

    00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

    NaturalInc rease Ove rse asMigration InterstateMigration

    YearEndedJune Source:BISShrapnel,ABSDataThousands

    Forecast

    FIGURe 8: QUeensLAnD PoPULAtIon GRoWtH net InCReAse.

  • 7/30/2019 Final Qmca Report 2012 2

    11/26

    2012MAJORPROJ

    ECTSREPORTQuEEnSlAndEn

    ginEERing

    COnSTRuCTiOnO

    uTlOOK

    11

    2012

    MAJORPROJECTSREPORTQuEEnSlAndEnginEERing

    COn

    STRuCTiOnOuTlOOK

    11

    Whil girig cruci aciviy abilid a a highr

    lvl hrugh h r hr quarr 2010/11 dpi h

    d ad cycl impac, hr wa a rmdu urg i

    aciviy rcrdd i h Ju quarr. Cquly, girig

    cruci wrk d i 2010/11 a a whl r 19%

    $23.6 billi; a w rcrd. th larg icra i h yar

    wa r miig ad havy idury cruci +$3.4 billi

    i wrk d, mly driv by w il ad ga +$2.7 billi

    ad cal +$500 milli prjc. thi d hrugh a riplig

    i bh ga pipli ad harbur cruci rpcivly

    ach vr $500 milli i wrk d r h yar, whil

    war, wrag, railway ad lcmmuicai wrk

    al r igicaly. By cra, rad cruci aciviy

    ll away i 2010/11 a majr priva ad publicly acd

    prjc wr cmpld h prviu yar.

    A ubaial ri i girig cruci wrk d i

    xpcd rm hr, wih al aciviy xpcd urg

    $35 billi by 2013/14. Aual miig ad havy idury

    cruci i rca dubl $20 billi by 2013/14.I addii rcrd lvl miig ivm, a igica

    rud ivm i aciad mly privaly udd

    irarucur i al aicipad. Railway, harbur,

    pipli, lcriciy, war ad wrag cr will all

    b ky bciari rm h x lg h rllig bm

    cmpaig miral ad rgy. I ac, h ly privaly

    udd cr ippd xpric cidrabl grwh

    i rad cruci a wrk wid dw h larg Airpr

    Lik prjc. By cra, publicly udd civil cruci wrk

    i xpcd pak i 2011/12 a d rcruci wrk

    cm hrugh, bu h abili ad dcli i ubquyar a bh sa ad Fdral Gvrm cu cal

    clidai maur.

    3.5 Qulad Cruci emplym ad Wag

    Giv uch a rbu ulk r cruci aciviy,

    h bigg challg acig Qulad i h x w yar

    will b urcig a adqua labur upply car r larg

    LnG ad cal prjc, plu h xpcd pick up i huig

    cruci ad huhld pdig.

    Qulad cruci mplym grwh ha b

    rgr ha h aial avrag r mr ha a dcad h huldr miig rlad prjc ha icrad

    migrai; big dmad r dwllig, cmmrcial ad

    idurial pac a wll a cial ad phyical irarucur.

    th acr cmbid aw Qulad cruci

    mplym ball 247,600 pr i 2008/09 rm ju

    136,000 pr durig h 2000/01 rugh, br aig

    235,000 pr wih h GFC i 2009/10. I 2010/11

    Qulad cruci mplym pickd up lighly by

    0.5% 237,000 pr whil AWote wag avrag

    wkly rdiary im arig i mial rm ralid rg

    grwh ju vr 10%. tak ghr, mplym adwag grwh i h cruci cr wa largly driv by

    h addii highly killd labur i prparai r igica

    prjc i h pipli whil ill maiaiig a lar prl

    amg lwr killd/lwr wag arr.

    Giv h rg ulk r cruci aciviy, cruci

    mplym grwh i xpcd acclra harply rm

    hr. emplym i xpcd avrag 243,000 pr

    hrugh 2011/12, bu h urg 278,000 pr i

    2012/13 ad vr 285,000 pr h ubqu yar

    accrdig BIs shrapl. emplym grwh will cmpri

    bh highly killd ad lwr killd labur a wag ad

    mplym imulauly ramp up. Qulad cruci

    mplym grwh will uprrm h aial avrag vr

    much h x v yar prid, alhugh mplym grwh

    will lw ad pibly crac hrugh h al yar h

    v yar rca a h curr rud majr prjc cm

    cmpli. Hwvr, durig hi prid wag grwh i

    xpcd rmai abv h aial avrag a cruci

    rm k rai ky prl i prparai r h x

    wav prjc.

    3.6 Cruci C

    3.6.1 Drivr Cruci C

    Grwh i cruci c d b likd h

    amu cruci aciviy gig a ay im. thr

    i a piiv crrlai bw cruci aciviy ad

    cruci c bcau high ad riig lvl dmad

    i.. cruci aciviy ly plac prur h

    xiig upply ipu, big ipu pric, bu al allw

    upplir margi icra. Whr capaciy crai

    xi, riig cruci aciviy ca lad rg icra

    i ipu pric a ivm i w capaciy i il cly

    ad ak im cm ram. Cruci c al

    vary du chag i cmmdiy pric drmid i glbal

    mark .g. l ad il. th pric chag may ccur

    idpd dmic cruci aciviy.

    3.6.2 egirig Cruci Implici Pric Dar

    Giv u imilar cruci marial ad killd labur,

    c r girig cruci ar likd bradr c

    rd i h buildig ad cruci idury. o gaug

    aggrga girig cruci c i h implici

    pric dar IPD r girig cruci wrk d.

    thi i drivd by dividig curr pric mial girig

    cruci daa rm h ABs by i crrpdig ca

    pric ral daa ri. thi civly ila chag i h

    pric cruci, a ppd chag i aciviy.

    thr d b rg crrlai bw h ral

    girig cruci IPD i.. CPI iai ad

    ral icra i cruci wrk d a h aial lvl.

    thrugh h 2000, cruci c r wll ahad

    CPI iai, ad rgly i li wih grally rgr

    cruci aciviy ad l / il prduc pric.

    5

    3

    1

    1

    3

    5

    7

    9

    11

    13

    2003 2005 2007 2009 2011 2013 2015

    QLDEmp QLDAWOTE AUSEmp AUSAWOTE

    YearEndedJune Source:BIS Shrapnel,ABSData

    Forecast

    Annual%Change

    FIGURe 10: ConstRUCtIon eMPLoYMent Vs. ConstRUCtIon WAGes GRoWtH.

  • 7/30/2019 Final Qmca Report 2012 2

    12/26

    2012MAJORPROJ

    ECTSREPORTQuEEnSlAndEn

    ginEERing

    COnSTRuCTiOnO

    uTlOOK

    12

    2012

    MAJORPROJECTSREPORTQuEEnSlAndEnginEERing

    COn

    STRuCTiOnOuTlOOK

    12

    Up h calai h glbal acial crii i la 2008,

    cruci c acually dclid, i li wih wakr

    cmmdiy pric ad girig cmmcm wih

    h xcpi h maiv Grg LnG prjc. Hwvr,

    rc radig r cruci c hw ha i i

    acclraig agai.

    Giv h ulk r Auralia dwllig cruci

    aciviy, a rur rgr, ad acclraig, grwh i

    cruci c vr h x 5 yar i xpcd. Frm

    a avrag ju 1.5% grwh hrugh 2010/11, grwh i

    xpcd mv back i h 45% pr aum rag durig

    h 201315 prid. thi i imilar ha xpricd i h

    prid rm 2005 2008.

    3.6.3 ovrall oulk r Cruci C

    Dpi rc v, h mdium lgr rm ulk r

    h glbal cmy rmai piiv. Whil glbal cmic

    grwh may a durig 2011/12, i i xpcd acclra

    agai vr 2012/13 ad 2013/14 alhugh grwh i GFC

    acd advacd cmi uch a h Us, UK ad par eurp will rmai craid r vral yar. th piiv

    mdium rm ulk r h glbal cmy, cmbid wih

    a rcvry i Auralia cruci aciviy i xpcd

    driv a racclrai i grwh i cruci c hrugh

    h middl h dcad. I Qulad, which ha

    h rg grwh prl r cruci ay a,

    cruci c grwh i likly b paricularly rbu.

    4. QUeensLAnD enGIneeRInG ConstRUCtIonoUtLooK

    4.1 srucur ad ovrviw egirig Cruci

    th girig cruci cr ci primarily v

    ubcr ir ha ciu h bulk h cagry:

    1 rad; 2 bridg, harbur ad rail; 3 lcriciy ad

    pipli; 4 war ad wrag; ad 5 miig ad havy

    idury. Fllwig v yar back back grwh i xc

    20% pr aum, Qulad girig cruci

    aciviy ll by 5.3% $20 billi ca 2008/09 pric

    i 2009/10. Rad, railway, war ad lcriciy cr all

    ad i li wih h cmpli r ar cmpli majr

    prjc. I cra, h miig ad havy idury cr

    ciud i lg rm rd xpai.

    tal girig cruci grw 18.5% i 2010/11. Grwh

    wa driv largly by a maiv icra i miig ad havy

    idury wrk d wih hlp rm war, wrag, bridg,

    railway ad harbur wrk bur all i rad, lcriciy

    ad pipli. tal girig cruci i rca

    urg a urhr 21% i 2011/12, wih rad, lcriciy

    ad ga pipli h majr cribur whil war ad

    wrag bgi mak a qui rra r h rmaidr

    h rca prid.

    Lkig ahad, miig ad havy idury will h rg

    grwh ay gm, wih aciviy riig $20 billi i2013/14. thi will p up a cidrabl gap bw hi

    gm ad h hr girig cruci gm,

    wih miig ad havy idury cruci rprig

    arly 60% up rm 25% i 2007/08 all girig

    cruci aciviy i Qulad. Whil miig ad havy

    idury cruci aciviy may a i 2015/16 a prjc

    ar cmpld, i will ill rmai a lvl arly hr im

    ha rcrdd i 2008/09. I may al d up highr ha

    hi ad uaid hrugh h rmaidr h dcad i

    ahr rud prjc a y uidid ar dvlpd

    d grwig dmad r rgy ad cmmdii i h

    Aia rgi.

    I i impra h igicac h cal idury

    vrall girig cruci aciviy i Qulad.

    Whil h dvlpm cal mi ad hadlig acilii

    currly mak up rughly hal all miig ad havy idury

    cruci apprximaly $5 billi i 2010/11, h cal

    idury al currly driv arud w hird all rail

    cruci a urhr $460 milli i 2010/11 ad 80%

    all harbur wrk arud $400 milli i 2010/11, bw

    $150200 milli i acc rad cruci a wll a a

    rag aciad uilii ad dam wrk.

    4.2 Rad

    Qulad rad cruci wrk d ll r h cd

    raigh yar i 2010/11, wih aciviy dw 12.7%

    $5 billi. th ig i aciviy cam ar wrk d

    urgd by vr 50% i 2008/09 ad rc h cmpli

    r ar cmpli a umbr majr priva ad public

    prjc. Rad cruci i xpcd ri i 2011/12 a

    h b rm d rbuildig ad immuiy wrk pak ad

    allig aciviy lwhr. th c i Qulad

    rad cruci will mv highr i 2011/12, br alligby arly hird vr h ubqu hr yar. A rcvry

    i xpcd clr h middl h dcad driv by h

    x v yar rud nai Buildig Prgram nBP prjc

    rm 2013/14.

    :

    85

    90

    95

    100

    105

    110

    115

    120

    0

    20

    40

    60

    80

    100

    120

    87 89 91 93 95 97 99 01 03 05 07 09 11 13 15

    EngineeringConstruction WorkDone,L HS E ng in ee ri ngConstruction 'Real'IPD,2004/05=100,RHS

    ForecastYearEndedJune Source:BISShrapnel,ABSData

    Index$Billions

    FIGURe 11: enGIneeRInG ConstRUCtIon IMPLICIt PRICe DeFLAtoR (2008/09=100).

    0

    5

    10

    15

    20

    2000 2002 2004 2006 2008 2010 2012 2014 2016

    Roads Electricity&Pipelines Water&SewerageBridges,Railways&Harbo urs R ecreat io n&Othe r Te le communicationsHeavyIndustry&Mining

    $Billion

    YearEndedJune Source:BISShrapnel,ABSData Forecast

    :

    FIGURe 12: enGIneeRInG ConstRUCtIon WoRK Done BY seGMent: QUeensLAnD $ BILLIon 2008/09 PRICes.

  • 7/30/2019 Final Qmca Report 2012 2

    13/26

    2012MAJORPROJ

    ECTSREPORTQuEEnSlAndEn

    ginEERing

    COnSTRuCTiOnO

    uTlOOK

    13

    2012

    MAJORPROJECTSREPORTQuEEnSlAndEnginEERing

    COn

    STRuCTiOnOuTlOOK

    13

    4.3 Bridg, Railway ad Harbur

    Hirically high lvl bridg cruci hav b

    udrak i Qulad vr rc yar, wih wrk d

    ragig bw $500 ad $750 milli i h pa ur yar

    al. ovrall, i h x v yar, aciviy i xpcd

    crac rm rughly $500 milli i 2010/11 arud

    $200 milli by 2014/15. thi lvl wrk d rc h

    abc majr prjc imilar h udrak i hpa w yar ad i ci wih rca lvl rad

    cruci vr h x v yar.

    Alg wih miig ad havy idury cruci, harbur

    ad railway cruci ha a vry rg ulk. Wrk

    d i rca arly ripl vr h x v yar ad

    rmai lvad vr much h x dcad. shr rm

    aciviy will rciv a mprary b rm rcruci

    wrk, bu h ral drivr grwh will cm rm wrk

    a umbr pagrrlad prjc i h uh a

    crr ad urhr upgrad ad xpai Qulad

    va calrlad wrk. suaid, rg dmad rcal will ciu driv cidrabl ivm i cal

    hadlig rlad irarucur i h lg rm, whil w rail

    irarucur uppr ppulai grwh will al b a ky

    drivr aciviy.

    4.4 War & swrag

    srg ppulai grwh, ucraiy urrudig uur

    pabl war uppli ad h d upply h war

    iiv rurc cr will ciu prvid h impu

    r grwh vr h x v yar i war ad wrag

    wrk. Currly, a umbr dam ad pipli prjc ar

    udrpiig $2.7 billi i aciviy acr h a. Hwvr,

    c h majr prjc wid dw, aciviy will all blw

    h $2 billi mark hrugh 2013/14 ad 2014/15 wih

    urhr dam ad pipli wrk, bu a much mallr cal,

    upprig aciviy.

    4.5 elcriciy & Ga Pipli

    ovrcmig h hra pwr hrag ad urig

    ufci rgy capaciy r bh bui ad ridial

    cumr will ciu b a ky drivr aciviy vr

    h x dcad. Qulad ha a grar umbr high

    rgy ur ypically rurc cr ad havy iduryur ha hr a. Addiially, Qulad al ha h

    a grwig ppulai placig urhr r lcriciy

    grai, ramii ad upply wrk r ridial

    ad cmmrcial u. A rprd i h rc sam

    oppruii publihd by h Auralia ergy Mark

    oprar AeMo, rgy dmad i Qulad i xpcd

    grw a a avrag pac 4.1% pr aum hrugh h

    x v yar, cmpard a naial elcriciy Mark

    neM avrag ju 2.3% pr aum.

    srg grwh i dmad r rgy, a wll a h dvlpm

    dmic ad LnGbad ga upply ym will urhrrg grwh i lcriciy ad ga pipli cruci.

    Frm a cmbid valu $2.5 billi i 2010/11, wrk d

    i xpcd ri $3.2 billi i 2011/12 ad abv $4

    billi i 2012/13.

    4.6 Miig & Havy Idury

    th miig ad havy idury cruci cagry i ar

    ad away h larg gm girig cruci

    i Qulad ad i h ky drivr grwh i h a.

    Frm ju $650 milli i 2000/01, aual cruci

    wrk bmd $3.5 billi by 2005/06 ad $6 billi pr

    aum by 2008/09 wh h GFC hi. th rc rcvry i

    cal ad cal hadlig wrk cmbid wih a bm i LnGrlad cruci ha al aciviy i h cr ri

    vr $10 billi i 2010/11. o hi, rughly hal i cal

    ad cal hadligrlad cruci ad hird i il

    ad garlad cruci icludig h ga pipli

    wrk dcribd arlir. th rmaidr i mly cmprid

    alumia/alumiium upgrad, hr miral dvlpm

    ad hr havy idury.

    ovr h x hr yar, al miig ad havy idury

    cruci i Qulad i rca dubl agai

    $20 billi i wrk d pr aum. M hi grwh will

    b driv by a urhr riplig h dmic cruci

    rquirm up 4 majr LnG dvlpm i h

    Glad rgi, alhugh hr rmai ccr ha all

    prjc will b abl b cmpld i prpd imram i

    udrak imulauly. Mawhil, uaid dmad r

    bh ckig ad hrmal cal rm Aia i xpcd

    ubaial xpai i radiial cal miig rgi bu

    al h dvlpm h sura ad Galil Bai. ovrall,

    cal ad cal hadlig cruci aciviy i rca ri

    70% vr h x ur yar, icludig aciad railway

    ad harbur wrk.Mawhil, hr miral cruci aciviy i prdicd

    dubl vr h x w yar ad rmai lvad.

    Gld, cppr, zic ad phpha prjc hav all b

    armarkd r dvlpm ad ar likly driv a rcrd

    vlum cruci wrk. o h hr had, alumiium

    aciviy, ar riig rcrd lvl, will all away harply i

    li wih h cmpli majr prjc icludig h Yarwu

    alumia rry xpai ad h By Ilad mlr

    mdriai.

    5. QUeensLAnD MAJoR PRoJeCts

    5.1 Bai h QMCA Majr Prjc Li

    th QMCA 2011 Majr Prjc Li i prd i h

    Appdix hi rpr. th Majr Prjc Li i r prjc

    i xc $100 milli ad wa dvlpd by BIs shrapl

    i crdiai wih QMCA mmbr kwldg hugh ocbr

    ad nvmbr 2011.

    5.2 Majr Prjc Cmmim

    Figur 13 highligh h curr aciviy prjci r majr

    prjc i.. grar ha $100 milli r h prid 2010/11 2015/16 ha wr dvlpd hrugh hi xrci. thi

    i bad daa availabl spmbr 2011. th graph

    al cmpar h aciviy prjci r h ky girig

    cruci cr.

  • 7/30/2019 Final Qmca Report 2012 2

    14/26

    2012MAJORPROJ

    ECTSREPORTQuEEnSlAndEn

    ginEERing

    COnSTRuCTiOnO

    uTlOOK

    14

    2012

    MAJORPROJECTSREPORTQuEEnSlAndEnginEERing

    COn

    STRuCTiOnOuTlOOK

    14

    tal girig cruci majr prjc i Qulad,

    accrdig hi aalyi, i xpcd ri rm $10.7 billi

    i 2011/12 $19.7 billi i bh 2013/14 ad 2014/15.

    Bad h xiig majr prjc pipli, aciviy majr

    prjc i xpcd pak i 2014/15, br dcliig

    i 2015/16 a currly idid prjc mv a

    cmpli pha.

    oil ad ga, alg wih cal, will b h primary drivr aciviy i h girig cruci cr r prjc vr

    $100 milli i valu vr h v yar rca hriz. oil

    ad ga aciviy i pak i 2014/15 a arly $8 billi

    wrk d whil cal mi ad cal hadlig i xpcd

    pak vr 201415 a rughly $5.2 billi pr aum

    avrag, u a al alm $20 billi r all cr

    cmbid. Rail; rad ad bridg; ad harbur ad pr

    ar h x rg cribur aciviy, wih m majr

    prjc aimd a big cal xpr capaciy. All pak

    a rughly $2 billi i wrk d bu wih aggrd pak

    hrugh h rca hriz: rad ad bridg ar xpcd

    pak r i 2011/12, h harbur ad pr i 2012/13

    ad ally rail i 2014/15.

    5.3 Majr Prjc Wrkrc Rurcig

    Du h iiv labur rquirm girig

    cruci aciviy, hr xi a dirc rlaihip bw

    majr prjc prpc ad uur labur dmad. I cmpilig

    h majr prjc li, a wrkrc ima ha b acribd

    r ach prjc, i rm cruci labur rquird. thi

    irmai ha b draw rm variu publihd urc.

    Whr irmai rquird wrkrc wr availabl,

    h wrkrc rquirm ha b imad bad imilarprjc lwhr. By mappig u wrkrc rquirm by

    majr prjc, i i h pibl build up a ima al

    wrkrc rquirm by girig gm hrugh h

    x v yar. Furhrmr, by ackwldgig which prjc

    hav b awardd udig, prai ca b mad h

    ulk r wrkrc rquirm i aggrga, r r udd

    prjc ly.

    5.4 tal Majr Prjc Dmad

    Cidrd i um, wrkrc dmad r girig

    cruci prjc grar ha $100 milli i Qulad

    ar rca dubl bw 2011/12 ad 2014/15, rmju vr 15,000, ju vr 30,000 pr. Alhugh

    largly driv by wrk i h miig ad havy idury

    gm mr dail blw, i huld b d ha all

    girig gm wih h xcpi rad will a

    riig majr prjc wrkrc rquirm durig hi prid.

    Figur 14 hw ha i will b uil 2015/16 ha currly

    idid majr prjc mv cmpli ad hc

    h maurd wrkrc rquirm a. Hwvr, h

    wrkrc rquirm will ill b ar abv hirical lvl r

    h girig cruci cr i ha yar; arly 50%

    highr ha 2011/12. Furhrmr, a ad prviuly, hr

    i a high liklihd ha urhr majr prjc will b rvald

    vr h x w yar which culd h ivm cycl

    xdd i h ubqu v yar prid. thi wuld

    a hallwr dwur i 2015/16, wih h prpc

    a uaid high lvl aciviy ad majr prjc wrkrc

    dmad byd.

    I i impra ackwldg ha hi prjci i bad

    a cidrd ad raabl viw h likly dvlpm

    prjc i h a, a daild i h Majr Prjc Li

    aachd i h Appdix hi rpr, whhr r h

    prjc hav currly rcivd udig apprval. thi i likly

    prvid a mr raliic ulk majr prjc aciviyi Qulad, ad hw hw h wrkrc rquirm i

    likly b uaid vr vral yar. I h xrci wr

    imply arrwd cidr ju h prjc which currly

    had udig apprval, h majr prjc aciviy wuld

    xpric a larg a icra hrugh h x w yar

    ad wuld b lwr i 2015/16. Hwvr, hi wuld b

    a raliic ulk r aciviy giv may currly uudd

    prjc ar vry likly b giv a udig cmmim vr

    h x 1218 mh.

    5.4.1 Rad & Bridg

    A dcribd arlir, rad ad bridg cruci wrk ixpcd crac vr h x v yar a h Fdral

    ad sa gvrm amp clida hir budg,

    a pla ar dvlpd r h x rud nai Buildig

    Prgram prjc rm 2013/14, ad giv w majr

    priva ll rad ar h rca hriz. Cquly,

    dmad curv r bh udd ad al majr prjc

    wrkrc dmad ar rdig dwward rm h pak

    arud 4,900 pr i 2011/12. tal wrkrc dmad

    i rca rach a rugh ju vr 2,500 pr i

    2013/14 br ig rghig rm 2014/15 ward.

    I i impra ha whil rad cruci aciviy i ha will b upprd by d rcruci ad rcvry

    r, i i mr likly ha h wrk which ar igica

    i aggrga will b prad widly i mallr packag, ad

    ar icludd i h majr prjc dmad prjci.

    0

    5

    10

    15

    20

    25

    30

    35

    0

    5

    10

    15

    20

    25

    2011/12 2012/13 2013/14 2014/15 2015/16

    TotalFunded(LHS) TotalNotFunded(LHS)TotalLabourDemand (RHS) TotalFundedLabourDemand (RHS)

    Thousands$BillionsYearEndedJune Source:BIS Shrapnel,ABSData

    :

    FIGURe 14: MAJoR PRoJeCts WoRK Done & WoRKFoRCe DeMAnD ALL seGMents.

    0

    1

    2

    3

    4

    5

    6

    7

    8

    2011/12 2012/13 2013/14 2014/15 2015/16Oil&Gas Coal Rail Roads&BridgesHarbours/Ports Water Sewerage Electricity

    Pipelines Telecom Bauxite,Alumina &Aluminium OtherHeavyIndustry

    YearEndedJune Source:BISShrapnel,QMCA$Billion

    FIGURe 13: QUeensLAnD MAJoR PRoJeCts WoRK Done BY seCtoR FoReCAst.

  • 7/30/2019 Final Qmca Report 2012 2

    15/26

    2012MAJORPROJ

    ECTSREPORTQuEEnSlAndEn

    ginEERing

    COnSTRuCTiOnO

    uTlOOK

    15

    2012

    MAJORPROJECTSREPORTQuEEnSlAndEnginEERing

    COn

    STRuCTiOnOuTlOOK

    15

    5.4.2 Railway ad Harbur

    I cra rad ad bridg, majr railway ad harbur

    prjc wrk i xpcd grw rgly rm hr, alg wih

    wrkrc dmad. Majr railway prjc wrk i xpcd

    climb rm ju udr $1 billi i 2011/12 $1.5 billi by

    2013/14 ad vr $2 billi by 2014/15. Mawhil, harbur

    majr prjc wrk i xpcd ri rm $855 milli i

    2011/12 ju vr $2.2 billi i 2012/13 ad ay vr $2

    billi i 2013/14. A hw i h Appdix prjc li, h

    va bulk rail ad harbur wrk i driv by h dmad

    h cal cr.

    A hw i Figur 16, majr prjc wrkrc rquirm

    r railway ad harbur aciviy i ramp up rm 1,900

    pr i 2011/12, a pak 6,000 pr i 2014/15

    r all prjc, whhr udd r uudd. th cmpli

    a rag prjc i h xpcd h labur

    rquirm a back 4,600 pr by 2015/16, bu hi

    i ill much highr ha h curr lvl. o a udd bai,

    wrk d majr prjc i xpcd pak i 2012/13

    a alm $3 billi wih a crrpdig labur rquirm

    3,750 pr br dcliig i ubqu yar.

    5.4.3 War ad swrag

    War ad wragrlad cruci aciviy i upprd

    by rg ppulai grwh ad h d upply war r

    miral prjc. A aciviy majr dam ad pipli wrk

    wid dw, will labur rquirm ward h d

    h v yar rca prid. Hwvr, a hw i Figur 17,

    labur rquirm gravia i h rag 530 pr a

    h rugh i 2012/13 a pak 840 wrkr i 2013/14

    wih a avrag 685 pr vr h rca prid. Ihuld b d ha may prjc i h war ad wrag

    gm will xcd $100 milli idividually .g. m

    ypical wa war ram pla, alg wih riculai

    wrk c, ad ar icludd i hi aalyi.

    5.4.4 elcriciy, Pipli ad tlcm

    Wrkrc dmad r majr prjc i h lcriciy,

    pipli ad lcm gm i xpcd mr ha

    dubl by 2012/13 ju udr 3,300 pr rm a

    imad cruci labur rc ju 1,400 i 2011/12.

    Ulik h rca r hi gm dcribd i ci 4.5

    whr aciviy i xpcd rmai xrmly rg ar

    2012/13, lrig u h prjc l ha $100 milli i

    valu cra a dir picur. Fr larg prjc vr $100

    milli, hr i likly b a dcli i bh wrk d ad

    wrkrc rquirm ar 2012/13. M h dcli

    i driv by h cmpli ga pipli wrk r vral

    LnG dvlpm hrugh 2013/14 ad 2014/15, a wll a

    h imig larg lcriciy grai prjc. Cvrly,

    i m h lcriciy grai prjc wr b

    dlayd, h wrkrc rquirm wuld grw mr lwly

    vr 2012/13, ad b mr uaid a highr lvl vr

    2013/14 ad 2014/15. Hwvr, h gm vrall will

    ill b acd by h cmpli ga pipli cruci

    which cmpri h bulk h wrkrc rquirm.ovrall, wrkrc rquirm r hi gm will rd

    dwward vr h hr yar 2015/16. Hwvr, labur

    rc rquirm ar likly rmai rg hrughu h

    rca prid a mallr prjc will rmai aciv durig

    hi prid.

    5.4.5 Miig & Havy Idury

    Miig & havy idury cruci i rca b h m

    igica mplyr i h girig cruci cr vr

    h rca prid i rm bh hr umbr mplyd

    ad i rm i aggriv grwh pah. Accrdig h

    aalyi majr prjc, wrk d majr miig adhavy idury cruci prjc i xpcd ri rm

    $5.4 billi i 2011/12 arly $14 billi by 2013/14.

    M hi grwh will b driv by il ad ga $3.4 billi

    i 2011/12 arly $8 billi by 2013/14 ad cal

    :

    0.0

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    0.00

    0.20

    0.40

    0.60

    0.80

    1.00

    1.20

    1.40

    1.60

    1.80

    2011/12 2012/13 2013/14 2014/15 2015/16

    Electricity,PipelinesandTelecomeFunded( LHS ) E le ctr ic it y,Pipeline&TelecomUnfunded(LHS)TotalLabourDemand(RHS) FundedLabourDemand (RHS)

    $BillionsYearEndedJune Source:BIS Shrapnel,ABSData

    Thousands

    FIGURe 18: MAJoR eLeCtRICItY, PIPeLIne AnD teLeCoM WoRK Done & WoRKFoRCe

    DeMAnD FoReCAst.

    0

    1

    2

    3

    4

    5

    6

    0.0

    0.5

    1.0

    1.5

    2.0

    2.5

    2011/12 2012/13 2013/14 2014/15 2015/16Roads&BridgesFunded(LHS) Roads&BridgesUnfunded(LHS)TotalLabourDemand(RHS) FundedLabour Demand (RHS)

    Thousands$Billions

    YearEndedJune Source:BIS Shrapnel,ABSData

    :

    FIGURe 15: MAJoR RoADs AnD BRIDGes PRoJeCts WoRK Done & WoRKFoRCe DeMAnD FoReCAst.

    0123456789

    0

    100

    200

    300

    400

    500

    600

    700

    800

    2011/12 2012/13 2013/14 2014/15 2015/16Water&SewerageFunded(LHS) Water&SewerageUnfunded (LHS)FundedLabourDemand(RHS) TotalLabourDemand (RHS)

    YearEndedJune Source:BIS Shrapnel,ABSData$Millions Hundreds

    :

    FIGURe 17: MAJoR WAteR AnD seWeRAGe WoRK Done & WoRKFoRCe DeMAnD FoReCAst.

    :

    0

    1

    2

    3

    4

    5

    6

    7

    0.0

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    4.0

    2011/12 2012/13 2013/14 2014/15 2015/16

    Railways&HarboursFunded(LHS) Railways&Harbours Unfunded(LHS)TotalLabourDemand (RHS) FundedLabourDemand (RHS)

    YearEndedJune Source:BIS Shrapnel,ABSData$Billions Thousands

    FIGURe 16: MAJoR RAILWAYs AnD HARBoURs WoRK Done & WoRKFoRCe DeMAnD FoReCAst.

  • 7/30/2019 Final Qmca Report 2012 2

    16/26

    2012MAJORPROJ

    ECTSREPORTQuEEnSlAndEn

    ginEERing

    COnSTRuCTiOnO

    uTlOOK

    16

    2012

    MAJORPROJECTSREPORTQuEEnSlAndEnginEERing

    COn

    STRuCTiOnOuTlOOK

    16

    $1.4 billi i 2011/12 vr $5 billi by 2013/14. smallr

    ri ar xpcd r hr miral prjc, whil h

    cmpli alumia/alumiium wrk will majr prjc

    wrkrc dcli i hi gm i 2011/12 ad 2012/13

    br a pickup i 2013/14 bad a likly xpai

    h Wipa bauxi mi.

    Figur 19 illura ha majr prjc wrkrc rquirm

    r miig ad havy idury prjc i 2011/12 i rca b 6,400 mply. By 2014/15, mr ha 19,000 pr

    will b mplyd majr prjc i hi gm rprig

    a riplig i h wrk rc rquirm r hi cr. M

    hi grwh i h wrkrc rquirm will cm rm il

    ad ga riig rm a imad 3,500 pr i 2011/12

    9,800 pr by 2014/15 ad cal riig rm 1,700

    pr i 2011/12 7,800 pr by 2014/15. Agai,

    ha h gur ar bad idid cal mi ad

    cal hadlig cruci prjc wrh mr ha $100

    milli ad d iclud cal mi prduci mply r

    cruci wrkr rlad irarucur uch a railway

    ad pr which ar xpcd grw i umbr ubaially

    al hrugh h rca prid. Cquly, h impac

    cal ivm majr prjc wrkrc dmad will

    b highr ha ha idicad r cal mi ad hadlig

    prjc al.

    I rm currly udd wrk ly, majr prjc

    cruci wrk d i xpcd pak i 2012/13 a

    $8.6 billi ad b uaid a hi lvl hrugh 2013/14

    arud 60% highr ha i 2011/12. thi i xpcd driv

    a rg ri i h wrkrc rquirm 11,000 pr

    rm 6,200 pr i 2011/12, wih allig y ill vry

    high rquirm vr 2013/14 ad 2014/15 a uddwrk mv cmpli.

    A h d h rca prid, i 2015/16, h ar

    cmpli vral majr prjc i h li LnG ad cal

    driv a aig i majr prjc wrk d ad imad

    wrkrc dmad. Agai, hwvr, i huld b d ha

    hr rmai a rg pibiliy ha w miig ad havy

    idury prjc will b rvald vr h x w yar

    which culd uai aciviy a vry high lvl i 2015/16 ad

    byd.

    6. KeY PoInts, IMPLICAtIons AnDCHALLenGes

    ovrall, h ky pi, implicai ad challg hi

    aalyi ar a llw:

    1. Grwh i Qulad cruci aciviy lwd

    ubaially bw 2008/09 ad 2009/10

    a larg priva prjc wr pu hld i h

    wak h GFC. Whil h x h lwdw wa

    miigad by a rg curcyclical cal imulu i

    h rm h BeR chm hi ly had limid b

    r h majr prjc girig cruci mark. I

    ur, h lwdw i h cruci idury, cmbid

    wih h impac h high Auralia dllar radabl

    iduri, ad h GFC urim paricularly, puhd

    Qulad civly i rci durig h prid.

    2. th la girig cruci daa rm h

    ABs ugg ha h Qulad girig

    cruci mark urd h crr i 2011, wih

    a 25% li i aciviy cmig hrugh i h Ju quarr

    ad a 18.5% icra i h acial yar. Aalyi ad

    rca prvidd by BIs shrapl ugg ha hi i

    ju h ar a vry rg upwig i girigcruci wrk, wih al aual girig

    cruci wrk d xpcd ri rm $23.6

    billi i 2010/11 $34.7 billi by 2013/14.

    3. I ur, aual wrk d Qulad majr

    girig prjc i.. h wih a valu grar

    ha $100 milli i xpcd ri rm $10.7

    billi i 2011/12 ju udr $20 billi i bh

    2013/14 ad 2014/15. thi iclud bh udd ad

    uudd prjc currly, bu rpr a balacd

    ad raabl ulk r majr prjc aciviygiv rca glbal ad aial cmic cdii.

    Rricig h aalyi udd prjc ly, majr

    prjc wrk d i ill xpcd ri $10.6 billi

    i 2011/12 ad h ju udr $14 billi i 2012/13,

    br rraig i ubqu yar a currly udd

    wrk mv i a cmpli pha.

    4. ev i h aalyi i rricd cvr ly h

    prjc wih udig apprval r cmmim, wrk

    d majr prjc will ri igicaly i 2012/13

    ad rmai vry high i 2013/14, ailig a wrkrcrquirm hiig up arly 20,000 pr i

    2012/13 ad 17,300 pr i 2013/14, up rm ju

    udr 15,000 pr i 2010/11. thi i igicaly

    highr ha ima prvidd i h 2010 Majr Prjc

    0

    5

    10

    15

    20

    25

    2011/12 2012/13 2013/14 2014/15 2015/16

    Oil&Gas Coa l O the rMinerals OtherHeavyIndustry Bauxite,Alumina&Aluminium

    Thousands

    YearEndedJune Source:BIS Shrapnel,ABSData

    FIGURe 20: MInInG & HeAVY InDUstRY ConstRUCtIon WoRKFoRCe DeMAnD BY seGMent.

    0

    5

    10

    15

    20

    25

    30

    35

    0

    5

    10

    15

    20

    25

    2011/12 2012/13 2013/14 2014/15 2015/16

    TotalFunded(LHS) TotalNotFunded(LHS)TotalLabourDemand (RHS) TotalFundedLabourDemand (RHS)

    Thousands$BillionsYearEndedJune Source:BIS Shrapnel,ABSData

    :

    FIGURe 19: MInInG AnD HeAVY InDUstRY PRoJeCts WoRK Done & WoRKFoRCe DeMAnD

    FoReCAst.

  • 7/30/2019 Final Qmca Report 2012 2

    17/26

    2012MAJORPROJ

    ECTSREPORTQuEEnSlAndEn

    ginEERing

    COnSTRuCTiOnO

    uTlOOK

    17

    2012

    MAJORPROJECTSREPORTQuEEnSlAndEnginEERing

    COn

    STRuCTiOnOuTlOOK

    17

    Rpr, alhugh h hap grwh i dmad rmai

    imilar, wih a pakig i udd majr prjc dmad

    cmig hrugh i 2012/13.

    5. th aalyi udrak i hi udy ugg ha,

    bad a likly ad raabl cari curr

    ad uur prjc wrk, h girig cruci

    wrkrc rquird dlivr Qulad majr prjc

    will d ri ubaially vr h x ur yar.

    Frm arud 15,300 pr i 2011/12, h majr

    prjc cruci wrkrc i xpcd ri ju

    vr 30,000 pr by 2014/15. thi ugg a

    civ dublig i h majr prjc wrkrc

    rquirm i ur yar. th larg ramp up i

    wrkrc rquirm implid i hi udy ugg

    ha prcurig ad raiig killd wrkr will b crucial

    hrugh h rca prid.

    6. Cmbid wih a vual pickup i ridial buildig

    ad ridial buildig wrk, h harp icra i

    majr girig prjc wrk will driv a ubaial

    icra i al buildig ad cruci aciviy. thi

    i likly urhr rg grwh i cruci

    wag i Qulad abv ha Auralia a

    wll a a racclrai i cruci c

    grally.

    7. A pial rik prjc imli i mig

    virmal adard dvlpm hrugh h

    virmal apprval prc. Whil may majr

    prjc hav alrady rcivd virmal apprval,

    h im ak pa hi ag ad h quaum

    virmal cdii aachd dvlpm ha

    b, i m ca, ubaial. Furhrmr, m

    virmal apprval ar currly big challgd

    hrugh h lgal ym which will urhr dlay prjc

    implmai. Giv h iz ad cmplxiy may

    h majr prjc prpd r Qulad vr h

    x 5 yar, i i uraabl xpc ha m

    prjc may ac dlay a a rul h apprval

    prc. ovrall, hwvr, i prjc ar dlayd hrughcapaciy crai r apprval prc, hi i mr

    likly xd h cycl i majr prjc wrk.

    8. A a rul h prviu 3 pi, hr rmai a

    ubaial rik ha majr girig cruci

    prjc i Qulad will b placd udr c

    prur r culd b dlayd byd h imli

    prpd by h prp r uggd hr.

    Cquly, barrig ay igica chag h

    glbal cmic ulk acig dmad r mal,

    miral ad rgy, hr ill rmai h rik hah girig cruci cycl culd b xdd

    i durai, albi wih a wakr ramp up prid, i c

    prur r kill hrag bgi bi. ev , h

    majr prjc li, cmpild i cjuci wih Qulad

    cracr, rpr a balacd ad raabl

    xpcai majr prjc dvlpm i h a.

    9. th ubaial icra i h majr prjc cruci

    wrkrc hrugh h x ur yar will likly d

    b m hrugh rarrig kill bw iduri

    a wll a imprig kill rm uid Qulad,

    ihr rm h r Auralia r rm vra. I h

    ca h lar, hi i likly driv a vrall r

    acclrai i ppulai grwh, wih aual

    immigrai i Qulad likly ri rm ju

    udr 40,000 pr i 2010/11 vr 70,000

    pr by 2012/13. thi will hav implicai r

    h adquacy huig ad irarucur dd

    uai ad uppr h ppulai icra,

    paricularly i h rgi uid Briba whr much

    h prjc wrk i.. miig ad havy idury rlad

    will b akig plac. I al ha implicai r h abiliy

    urc ppl wh ar willig wrk i h rgi

    ad uid h suh ea crr.

    10. th aalyi r hi rpr idica ha h girig

    cruci ladcap i Qulad will b rarmd

    vr h x v yar ad byd alhugh all

    prjc hav y rcivd udig cmmim r

    virmal apprval. th vry rg ulk

    pr challg h idury i rm

    avidig kill ad quipm hrag, blck

    ad riig c which hav characrid prviu

    bm. thi rquir a rarmai i hikig

    abu h way prjc ad kill ar dvlpd

    ad ivai i hw hy ar dlivrd. I hi

    virm, ai killig hrugh ducai

    ad raiig iiiaiv will b crucial. I h hr rm,

    i will b difcul m h wrkrc rquirm

    majr prjc hrugh ducai ad raiig iiiaiv

    al, wih much h icrad wrkrc rquirm

    likly b m by highr ira ad vra

    migrai. Hwvr, hrugh h mdium lgr rm,

    argd ducai ad raiig prgram will b vial i

    big h availabl upply wrkr m dmad.I high kill ara, uch a h girig pri,

    ducai ad raiig iiiaiv will b cary imply

    rplac ldr wrkr wh ar ririg vr h cmig

    dcad, l al buildig up largr wrkrc capabilii

    m prjcd dmad.

    11. th rg ulk r majr prjc aciviy ad

    hc h rg ulk r wrkrc rquirm

    rla h ubaial miig ad havy idury

    cruci gm. Majr prjc wrk i hi cr

    al i xpcd ri rm $5.4 billi i 2011/12 $13.5 billi by 2013/14. Much hi i i ur driv

    by LnG ad calrlad wrk i h sura ad Bw

    Bai, Glad ad Mackay rgi. Apar rm

    craig h p i h rgi i rm

  • 7/30/2019 Final Qmca Report 2012 2

    18/26

    2012MAJORPROJ

    ECTSREPORTQuEEnSlAndEn

    ginEERing

    COnSTRuCTiOnO

    uTlOOK

    18

    2012

    MAJORPROJECTSREPORTQuEEnSlAndEnginEERing

    COn

    STRuCTiOnOuTlOOK

    18

    c ad irarucur rquirm, h prjc

    will b i dirc cmpii r rurc wih

    hr imilar prjc i Wr Auralia, suh

    Auralia i.. olympic Dam, h nrhr trriry

    ad nw suh Wal. thi will mak rurcig

    Qulad prjc mr challgig.

    12. th rgial cu may miig ad rgy prjc

    paricularly i h Mackay/Fizry aiical divii

    ad, ably, Glad i ur will cra ubaial

    challg r h cruci idury. Fr iac,

    hw will kill b aracd uid h majr ppulai

    cr i h suh ea crr h a ad hr

    mrplia rgi i h r Auralia i h

    rgi? Wha irarucur pla ar i plac ad big

    prgrd i h rgi accmmda ad prvid

    rvic r h larg umbr killd pr rquird

    i bh h cruci ad prduci pha h

    dvlpm? I ummary, h cmig miig adrgy ivm cycl will cia ubaial

    ivm i cial irarucur i h rgi,

    rm huig chl, hpial, park ad

    rcraial acilii arac wrkig amili

    p h mr udamal cmic irarucur

    rquirm acr rapr gm ad

    h uilii. Whil Fly i / Fly u r FIFo wrkig

    arragm may bcm mr prval, i will b a

    paaca r ivig i uaiabl cmmuii i h

    rgi.

    13. th alm igular cu miig ad rgy prjc

    a a ky drivr majr prjc grwh al dir

    ubaially rm h prGFC prid, wh bh h public

    ad priva cr wr big dmad r majr

    prjc wrk. By cra, h x w yar will

    wr majr prjc ppruii prvidd by h

    public cr, a sa ad Fdral Gvrm

    k rr hir acial pii ar mvig

    i dci durig h GFC ad i armah.

    Furhrmr, whr public wrk ar rd, i will b

    l likly b aggrgad i vry larg packag agvrm k prad wrk amg mdium izd

    ad mallr cracr ad ihu wrkrc ad k

    cmpiiv fcicy gai. thi will hav implicai r

    h prcurm ragi Qulad cracr.

    14. th imprac miig ad rgy prjc

    h ulk, rlaiv h public cr, al ma

    ha Qulad majr prjc ulk i w,

    mr ha vr, id h ru h glbal

    cmy, paricularly Chia ad h Aia rgi.

    Whil miig prjc ru m rik big dlayd iChi grwh wr lw prcipiuly ad mr ha

    aicipad ad cmmdiy pric wr all, h rgy

    i.. LnG prjc ar mr likly prcd udr mr

    advr glbal cmic cdii. thi i bcau

    hir larg upr capial c which ar likly all i

    im wakr cmic cdii bcau h w

    hrugh lwr cmmdiy pric ad labur c r

    cruci bu al h lg ru aur hir upply

    crac. thi ma ha a ubaial pri h

    icra i miig ad havy idury prjc wrk i

    alrady lckd i r h x v yar.

    15. Cvrly, giv h dmiac h public cr i

    rad prvii, majr rad ad bridg prjc wrk

    ar xpcd dcli hrugh h rca prid.

    thi will b acclrad by h cmpli h larg ad

    privaly udd Airpr Lik prjc, bu i al acd

    by dcliig highway ad arrial majr prjc wrk i

    h a ar 2011/12. Whil h irduci a w

    nai Buildig Prgram r udig lad rapr rm

    2013/14 may h majr prjc ulk imprv,

    h aalyi i hi rpr ugg ha majr rad ad

    bridg prjc wrk d will lip rm $2 billi praum i 2011/12 $1.2 billi pr aum bw

    2012/13 ad 2014/15. Cquly h wrkrc

    rquirm majr rad ad bridg prjc will all

    rm 4,900 pr i 2011/12 2,600 pr by

    2013/14. th wrkrc ar likly hi ara

    grar d i h girig cruci gm

    ad carily ju i Qulad.

    16. Bh aciviy ad majr prjc wrkrc

    rquirm ar prjcd a i 2015/16

    a h x rud majr prjc bgi wid

    dw. ev , aciviy i prjcd rmai wll

    abv ha 2011/12. Furhrmr, hi ulk i

    bad a raabl am currly kw

    prjc ly. I i highly likly ha mr majr prjc

    will b dvlpd ad idid vr h x w yar

    icludig urhr miig ad rgy prjc i h

    rgi ad w irarucur ivm i h urba

    cr which culd b aciviy i 2015/16 ad

    byd. Cquly, ay dwur i 2015/16 may b

    hallwr ha prd hr ad rairy i aur. thi

    ha implicai r h lg rm dvlpm kill mach cruci idury dmad ar 2015/16.

    Cracr will d kp abra dvlpm i

    rdr pla r wrk i 2015/16 ad byd.

  • 7/30/2019 Final Qmca Report 2012 2

    19/26

  • 7/30/2019 Final Qmca Report 2012 2

    20/26

  • 7/30/2019 Final Qmca Report 2012 2

    21/26

  • 7/30/2019 Final Qmca Report 2012 2

    22/26

  • 7/30/2019 Final Qmca Report 2012 2

    23/26

  • 7/30/2019 Final Qmca Report 2012 2

    24/26

  • 7/30/2019 Final Qmca Report 2012 2

    25/26

  • 7/30/2019 Final Qmca Report 2012 2

    26/26