Transcript of Final Project Presentation[1]
INTERNALJanuary 13, 2012
Presentation on Brazil
Flying Learners
INTERNAL- 2 -
Phases of the Project
•Analysis and Design
•Development/Construction
•Testing/Defect Fixing
Analysis and Design
INTERNAL- 4 -
ETVX for Analysis and Design
Entry:
- NSEP Case Study
- Standards and guidelines for Use cases,Sequence diagram,SRS.
Activities:
- Requirement Analysis
• Analyzing the problems and identifying requirements that would solve the stated problems
- Preparation of Use-Cases
- Preparation of HLD like Domain diagram,class diagram
- Preparation of LLD like sequence diagram
- Creation and finalization of database design
- Preparation of SRS document
- Preparation of the first draft of System Test Plan(STP)
INTERNAL- 5 -
ETVX for Analysis and Design
Verification/Validation:
- Review the SRS document
- Review of HLD and LLD
- Review the System Test Plan
Exit:
- SRS document is complete
- Reviewed HLD and LLD exists
- Database Design document is prepared
- Initial version of the System Test plan exists
Work Items/Deliverable:
- SRS Document
- Sequence diagram
Document Name SVN Link
SRS Document v1.0 https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupb/document/
Development/Construction
INTERNAL- 7 -
ETVX for Development/ConstructionEntry:
- SRS, HLD and LLD documents are available.
- Database design document is available.
- Standards for construction are available.
Activities:
- Conduct meeting for code design of development phase
- Prepare detailed plan for development phase(Sub-module division and assigning tasks)
- Development of application is done based on SRS and design documents
Document Name SVN Link
SRS document v1.1 https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupb/document/
Database design document v1.0 https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupb/project/groupB.sql
INTERNAL- 8 -
ETVX for Development/Construction
- Conduct Project Status Report meeting
- Prepare Project Status Report
- Conduct team meeting for casual analysis
Verification/Validation:
- Review/Walk through the code
- Review the unit test results
- Review of code against Code review checklist.
Document Name SVN Link
Programs https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupb/project/nsep_account_management/
Code review checklist https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupa/document/EQA/
INTERNAL- 9 -
ETVX for Development/ConstructionExit:
- Reviewed code is available
- Unit tested programs are available.
Work Items/Deliverables:
Document Name SVN Link
Programs https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupb/project/nsep_account_management/
SRS document v1.1
Code review checklist https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupa/document/EQA/
Testing/Defect Fixing
INTERNAL- 11 -
ETVX for Testing/Defect Fixing
Entry:
- Program code is obtained
- Traceability matrix, Program code, Functional test cases
Document Name SVN Link
SRS document v1.1
Program https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupb/project/nsep_account_management/
INTERNAL- 12 -
ETVX for Testing/Defect Fixing
Activities:
- Testing and defect fixing of the developed application is done
- Code review document is prepared
- Conduct System Test
- Prepare Unit test cases by refining Functional test cases
- Prepare Defect log
- Log defects in Bug tracker
- Fix defects and log the same in Bug tracker
Verification/Validation:
- Reviewing the System Test Plan.
- Reviewing the defect log.
INTERNAL- 13 -
ETVX for Testing/Defect Fixing
Exit:
- System Test Plan is updated.
- Defect log is created.
Work Items/Deliverable:
Document Name SVN Link
Defect Log v1.0 https://ingnrilpsql02.tcsgnrilp.local/svn/ahd15j2ee/a58pd/trunk/p1/groupa/document/Defect%20Logs/