Final Project From USGS Hydrologic Atlas online.

14
Final Project From USGS Hydrologic Atlas online
  • date post

    20-Dec-2015
  • Category

    Documents

  • view

    217
  • download

    3

Transcript of Final Project From USGS Hydrologic Atlas online.

Page 1: Final Project From USGS Hydrologic Atlas online.

Final Project

From USGSHydrologic Atlas online

Page 2: Final Project From USGS Hydrologic Atlas online.
Page 3: Final Project From USGS Hydrologic Atlas online.

Playa

Recharge Recharge

Conceptual Modelof the flow system

Page 4: Final Project From USGS Hydrologic Atlas online.
Page 5: Final Project From USGS Hydrologic Atlas online.
Page 6: Final Project From USGS Hydrologic Atlas online.

Layer 3 – variable bottom

Layer 2

Layer 1

50 ft gap representsconfining bed

Layers

Datum

The problem of dry cells and re-saturation

Page 7: Final Project From USGS Hydrologic Atlas online.

from GWV

Layer 1 = type 1Layer 2, 3 = type 3

Page 8: Final Project From USGS Hydrologic Atlas online.

Leakance between layers where eachLayer belongs to a different hydrogeologic unit

See A&W, p. 81

Layer 1leakance

Page 9: Final Project From USGS Hydrologic Atlas online.

Leakance“Quasi 3D” model

See A&W, p. 81

Layer 2leakance

Page 10: Final Project From USGS Hydrologic Atlas online.

from GWV

Page 11: Final Project From USGS Hydrologic Atlas online.

Playa

Recharge Recharge

Conceptual Modelof the flow system

Page 12: Final Project From USGS Hydrologic Atlas online.

h

QET = RETM xy [h - (hs-d)] / dET

d

hs

extinction depth

RETM is the maximum ET rate,which occurs when h = hs.

for h hs-dand h < hs

Page 13: Final Project From USGS Hydrologic Atlas online.

QET = 0 below theextinction depth.

QET = QETM at the land surface.

Page 14: Final Project From USGS Hydrologic Atlas online.

Calibration Targets

calibration value

associated error

20.24 m

0.80 m

Target with relativelylarge associated error.

Target with smaller associated error.