Final Project

23
Final Project Renewable Energy Method: Solar Photovoltaic Mentors: Adrienne Gould- Choquette Imanol Gabellanes Goicoechea USURBIL Presenters: Burton Bellamy Andrew Sink Iberian Partnership for Technician Excellence, Summer 2012

description

Renewable Energy Method: Solar Photovoltaic. Final Project. Iberian Partnership for Technician Excellence, Summer 2012. Andrew Sink. Studying Energy Technology at SCF Taken various courses related to Alternative Energy Electronics Hobbyist Very excited to be in Spain. Burton Bellamy. - PowerPoint PPT Presentation

Transcript of Final Project

Page 1: Final Project

Final Project

Renewable Energy Method:

Solar Photovoltaic

Mentors:

Adrienne Gould-Choquette Imanol Gabellanes GoicoecheaUSURBIL

Presenters:

Burton Bellamy Andrew Sink

Iberian Partnership for Technician Excellence, Summer 2012

Page 2: Final Project

Andrew Sink

• Studying Energy Technology at SCF

• Taken various courses related to Alternative Energy

• Electronics Hobbyist

• Very excited to be in Spain.

Iberian Partnership for Technician Excellence, Summer 2012

Page 3: Final Project

Burton Bellamy

• Has an A.S. in Engineering Technology from HCC

• Interested in DIY projects, alternative energy included

• Pursuing a degree in Mechanical Engineering

Iberian Partnership for Technician Excellence, Summer 2012

Page 4: Final Project

Project Scope

• We will be using what is known as a “Grid-tie” system, which allows the PV panels to interface with the electrical grid.

• We are going to show some of the technology and calculations that go into building a system such as this.

Iberian Partnership for Technician Excellence, Summer 2012

Page 5: Final Project

Off Grid Systems

Iberian Partnership for Technician Excellence, Summer 2012

• Battery Banks, a good idea for everybody?

24 kWh System$3,500Would support our house For only 1 day.

Page 6: Final Project

Iberian Partnership for Technician Excellence, Summer 2012

An example of a Grid Tie PV system

Page 7: Final Project

Project Scope

• Site Plan• Monthly House Electrical Loads• Utility Costs• System Sizing• Panel Selection & Connection• Panel Calculations• Net Metering• Costs & ROI

Iberian Partnership for Technician Excellence, Summer 2012

Page 8: Final Project

House Specifications

• 3-bed, 2-bath, 2,000 sq. ft., located in Tampa, FL.

• Single story, 5,000 gal. pool, 2 adults, 2 children.

• The pitch of the roof is 25.5 degrees, the front door is facing NE.

• Calculations made assuming the month of January.

Iberian Partnership for Technician Excellence, Summer 2012

Page 9: Final Project

Household Electrical Loads

• The basic needs in an average Florida home.• The kWh they consume monthly.• Energy efficient products.• Total monthly electrical load is 432.6 kWh.

Iberian Partnership for Technician Excellence, Summer 2012

Page 10: Final Project

Household Electrical Loads

Iberian Partnership for Technician Excellence, Summer 2012

Page 11: Final Project

Efficiency Calculations

• Tilt= tilt-(41-Lat)

• Lat: 28, Tilt:83

• Tilt=83-(41-28)=70

• 75% Efficiency

Iberian Partnership for Technician Excellence, Summer 2012

Page 12: Final Project

Efficiency Calculations

• Leaves us with 4140W (4.1kW)• 4.1kW x 5.6(MPH) x 31= 712kWh/m

Iberian Partnership for Technician Excellence, Summer 2012

Page 13: Final Project

Panel Selection

• Schott Poly 230

• 230 Watt output

• 30 Volts, 7.66 Amps

• Superb Warranty

Iberian Partnership for Technician Excellence, Summer 2012

Page 14: Final Project

System Sizing

• Total of 237.6 sq. ft. of usable space on each side of the roof.

• We used 2, creating a usable area of 475.2 sq. ft.

• 12 panels on each side of the roof

• Orientation/Inclination

• Panels are 5.57 x 3.3 ft. in size.

Iberian Partnership for Technician Excellence, Summer 2012

Page 15: Final Project

Panel Connection

• Series/Parallel Combination

• 3 groups of 8 in parallel.

• Each group provides 30 Volts, 61.28 Amps.

• Total when placed in series is 90 Volts, 61.28 Amps

Iberian Partnership for Technician Excellence, Summer 2012

Page 16: Final Project

Inverter Technology

• Outback Inverter 6000W

• Provides an all-in-one solution for power conditioning. Regulator/Conditioner/AC Inverter

• 120V grid tie-in output, regulated voltage/current

• Provides a small battery back-up

Iberian Partnership for Technician Excellence, Summer 2012

Page 17: Final Project

Component CostsSchott Poly 230 @ $400 ea. (24) $9,600

Outback Inverter 6000W @ $9,400 (1) $9,400

6 AWG Wire, 500 Ft. @$326 (1) $326

Mounting Hardware @ $190 (12) $2,280

Iberian Partnership for Technician Excellence, Summer 2012

Total System Cost: $21,606

Page 18: Final Project

Net Metering

• A brief introduction to Net Metering

• Replace 2 counters with 1 single Bi-Directional grid tie-in Meter.

• Now available through all Florida Utilities

Iberian Partnership for Technician Excellence, Summer 2012

Page 19: Final Project

Total Costs

• Cost of installed system : $21,606

• Cost of energy consumed/year: $467.20

• Projected price of energy generated/year: $758.79

• Price per kWh: $0.09

Iberian Partnership for Technician Excellence, Summer 2012

Page 20: Final Project

Rebate and Incentive Programs

• Florida Renewable Energy Technologies and Energy Efficiency Act

• Provides $4 a watt, maximum of $20,000

• Federal Program

• Allows for 30% to be refunded as a tax credit.

Iberian Partnership for Technician Excellence, Summer 2012

Page 21: Final Project

Return of Investment (ROI)

• Formula = Investment / Yearly Income

• Investment Before Rebate = $21,606

• Investment After Rebate = $1,606

• ROI = ~2 Years

Iberian Partnership for Technician Excellence, Summer 2012

Page 22: Final Project

Conclusion

• Sensible amount of electrical loads• Above 100% power generation• Simple grid tie-in system• Very low amount of maintenance • Very low Return of Investment time

A very good decision!

Iberian Partnership for Technician Excellence, Summer 2012

Page 23: Final Project

Iberian Partnership for Technician Excellence, Summer 2012