Final presentation pm
-
Upload
mati-ur-rehman -
Category
Documents
-
view
264 -
download
3
description
Transcript of Final presentation pm
PROJECT MANAGEMENTONLINE INTEGRATION OF BLOOD BANKS
P R E S E N T E D T O
Honorable Sir Mehboob ul HaqFaculty member of Management Sciences,Iqra University,Quetta Campus
P R E S E N T E R S
Muti ur Rehman Khan Lodhi – 4463Arshad Hussain Mengal - 4467Salman Shakir - 4657Ibrar Khan – 4385Students of Master In Business Administration,Iqra University,Quetta Campus
12th of January, 2011
Acknowledgement
• We would like to show great esteem and
deference to Honorable Sir Mehboob ul
Haq, to make it possible for us to have
spectacles to see and understand the
matter with different ideas and outcomes.
He gave us a new way of brainstorming on
the various matters as project manager.
RISKS AND CONTINGENCY PLAN
ESTIMATIONS
PROCESS BREAKDOWN STRUCTURE
WORK BREAKDOWN STRCUTURE
SCOPE OF THE PROJECT
CO
NTEN
TS
PRIORITY MATRIX
• PERFORMANCE• Very Important as helps in future growth and continuation
• TIME AND COST• Negotiable• Limited variation can
be acceptable
SCOPE OF THE PROJECT
• OBJECTIVES– To establish an online integrated blood banks database
and information system which will be designed to
facilitate the requirements of customers in Quetta city
with the collaboration of various blood banks.
– As well as developing an online platform for the donors
to make their donations to be utilized efficiently.
SCOPE OF THE PROJECT
• DELIVERABLES– A database system with an online platform which will
integrate all the blood banks at a single place to
acknowledge the need of blood in timely manner.
– A website which will help to develop coordination
between Blood Banks, Customers, and Donors.
– It will help the customers to reach to their specified
blood groups without roaming all over the city as well as
to trace out the nearest place.
SCOPE OF THE PROJECT
• DELIVERABLES (Continued)
– It will help to the blood banks to maintain their stock on
the basis of better forecasting method in term of
requirement.
– The project will also play its role in the society to aware
the public about the healthy blood.
SCOPE OF THE PROJECT
• MILESTONES– Technical Requirements
– Convincing all the blood banks to integrate on our
system.
– Locating the center point for our setup.
– Implementation of database and integration with all
available blood banks.
– Designing and launching of website.
– Promotions will be covered up to fifteen hospitals.
SCOPE OF THE PROJECT
• TECHNICAL REQUIREMENTS– Well equipped setup with high configuration server.
– Well skilled two personnel having sound knowledge
about database and website maintenance.
– Fully Converged local area network within the setup so
the upgrading the website with database can be easy.
– Affiliation with laboratories and hospitals for attestation
of donor’s blood.
SCOPE OF THE PROJECT
• TECHNICAL REQUIREMENTS (Continued)
– Security implementation on website and database
system.
– Remote access to database and web portal for
administrators.
– Backup of information available on database system as
well as a tool for restoration, if required.
– UPS for smooth running of database system.
SCOPE OF THE PROJECT
• LIMITATIONS AND EXCLUSIONS– Initially working geographically within the premises of
Quetta City and nearby areas.
– Blood donors must be in between of eighteen years to
fifty years of age.
– We can facilitate our customer only in case that we have
the required blood in our database system, else wise,
the customer would not be entertained.
SCOPE OF THE PROJECT
• CUSTOMER REVIEWS / FEED BACK– Website
– contacts details
– phone calls
– Post box number
WORK/ PROCESS
BREAKDOWN STRUCTURE
WO
RK
B
REA
KD
OW
N
STR
UC
TU
RE
1ONLINE BLOOD
BANK
1.1
BLOOD BANK
1.1.1Analysis
1.1.2Negotiation
1.1.3Agreement
2.1
DATABASE
2.1.1Analysis
2.1.2Design
2.1.3Coding
2.1.4Testing
2.1.5Implementatio
n
3.1
WEBSITE
3.1.1Design Approval
3.1.2Development
3.1.3Integration
with database
3.1.4Launch
LEVELS
1
2
3
4
5
6
1.1 BLOOD BANKS
ANALYSIS NEGOTIATION AGREEMENT
2.1 DATABASE DEVELOPMENT
ANALYSIS
DESIGN
CODING
TESTING
IMPLEMENTATION
3.1 WEBSITE
Company Logo
INTEGRATION WITH DATABASE
DEVELOPMENT
DESIGN APPROVAL
LAUNCH
Design Sample
* Secondary Information
4.1 SETUP
SETUP
INTERNETCONNECTION
LOCATION
NETWORKIMPLEMENTATION
FURNITURE
COMPUTERS AND ACCESSORIES
5.1 PROMOTION
• MEDIA• ELECTRONIC MEDIA
• Facebook - Twitter• PRINT MEDIA
Tasks Arshad Ibrar Mati Salman Out sourced
1. BLOOD BANK
ANALYSIS A R
NEGOTIATION R A
AGREEMENT R A
2. DATA BASE
ANALYSIS A R
DESIGN A R
CODING A R
TESTING R A
IMPLEMENTATION S S R
3. WEBSITE
DESIGN APPROVAL R A
DEVELOPMENT A R
INTEGRATION WITH DATABASE A R
LAUNCH R R S S R
4. SETUP
LOCATION A R
COMPUTER & ACCESSORIES A R
FURNITURE R A A
INTERNET CONNECTION R A
NETWORKING IMPLEMENTATION R A
5.PROMOTION
PRINT MEDIA A R
ELECTRONIC MEDIA A RRES
PO
NS
IBIL
ITY M
ATR
IX
CO
ST E
STIM
ATIO
N
1ONLINE BLOOD BANK
(Rs: 320,000)
1.1
BLOOD BANK
(Rs: 15,000)
1.1.1Analysis
1.1.2Negotiation
1.1.4Agreement
2.1
DATABASE(Rs: 36,000)
2.1.1Analysis
2.1.2Design
2.1.3Coding
(Rs: 16,000)
2.1.4Testing
2.1.5Implementation
(20,000)
3.1
WEBSITE(Rs: 40,000)
3.1.1Design Approval
3.1.2Development(Rs: 15,000)
3.1.3Integration with
database
3.1.4Launch
(Rs: 20,000)
4.1
SETUP(Rs: 179,000)
4.1.1Location
(Rs: 115,000)
4.1.2Computers &
Accessories(Rs: 40,000)
4.1.3Furniture
(Rs: 12,000)
4.1.4Network
Implementation(Rs: 10,000)
4.1.5Internet Access
(Rs: 2000)
5.1
PROMOTION(Rs: 50,000)
5.1.1Media
(Rs: 50,000)
5.1.1.1Electronic Media
(Rs: 30,000)
5.1.1.2Print Media
(20,000)
TIM
E E
STIM
ATIO
N1
ONLINE BLOOD BANK(175 Days)
1.1
BLOOD BANK
(42 Days)
1.1.1Analysis(7 Days)
1.1.2Negotiation
(15 Days)
1.1.4Agreement
(20 Days)
2.1
DATABASE(38 Days)
2.1.1Analysis(3 Days)
2.1.2Design
(7 Days)
2.1.3Coding
(25 Days)
2.1.4Testing(2 Days)
2.1.5Implementation
(1 Day)
3.1
WEBSITE(44 Days)
3.1.1Design Approval
(3 Days)
3.1.2Development
(30 Days)
3.1.3Integration with
database(10 Days)
3.1.4Launch(1 Day)
4.1
SETUP(37 Days)
4.1.1Location(10 Days)
4.1.2Computers &
Accessories(7 Days)
4.1.3Furniture(2 Days)
4.1.4Network
Implementation(4 Days)
4.1.5Internet Access
(14 Days)
5.1
PROMOTION(14 Days)
5.1.1Media
(14 Days)
5.1.1.1Electronic Media
(7 Days)
5.1.1.2Print Media
(7 Days)
RISKS RELATED TO PROJECT
• PROJECT• Future Financial Obligations
• Time Frame not be met?
• BLOOD BANKS• Will they associate with system?
• If they do no have Electronic Record System?
• Technical Expertise?
• Influence to be a part of project, How?
• If not accepting to Agreement Signing?
• DATABASE– Design not fulfilling the needs
– Backup of data in case of crash
– Upgrade of database in percept of coding without losing
data
– Responsibility on data leaking
– Cost Reduction
– Energy short fall and impact on stake holders
RISKS RELATED TO PROJECT
• WEBSITE– Design
– Integration
– Cost of web/Expensive procedure
– Completion in time
– Web launching ceremony
RISKS RELATED TO PROJECT
• SETUP / CENTER POINT– Location Availability
– Rent more than expected
– Chances of theft and stealing
– Database Malfunctioning
– Furniture Cost
– Network Implements
– Internet Facility
RISKS RELATED TO PROJECT
• PROMOTION– Minimization of Cost, how?
– Electronic Media, how to afford that?
– Inability to pass message to target customers
– How to brought someone onboard for promotional
activities?
RISKS RELATED TO PROJECT
• PROJECT– Project Sponsor Meetings
– Blood Bank Suppliers Confidence and trust building
• BLOOD BANK– New Business opportunity. Only manage the data of donors.
– Training by one of our employees
– Good for welfare purpose and business. Facts and figures of
Quetta blood market.
– ULEMA statements on rewards by nature’s perspective
– Single table arrangements for all blood banks
CONTINGENCY PLAN
• DATABASE– Analysis phase personnel hired
– ISA Server as third party backup is expensive
– Agreement with developers and ability of layout to
enhance future capabilities.
– Administrators would have to follow our terms and
conditions
– Dividing various responsibilities within team members as
per through our expertise.
– UPS or generator in extreme cases
CONTINGENCY PLAN
• WEBSITE– Continuous upgradation and stakeholder feedback
– DOTnet Framework
– Expertise by us on known processes
– The time of launching ceremony with buffer
CONTINGENCY PLAN
• SETUP– Near Imdad Chowk or Civil Hospital Quetta
– Turn towards Zarghoon Road
– Watchmen
– Resolution of server
– China furniture from Lahore Market
– Dialup or Vfone
CONTINGENCY PLAN
• PROMOTION– Publishing an article
– Attracting journalists
– Non profit organization charity
– Cable TV ads
– High traffic websites
– Online forums
– Badges
CONTINGENCY PLAN
• COST– Total = Rs.350,000/-
– WBS = Rs.320,000/-
– Contingency Reserves = Rs.15000/-
• TIME– 1 year
– But try to launch a project within 6 months
• Evaluation and Assessment of Performance
– Time Buffer of 1 month
CONTINGENCY RESERVES
FUTURE PLANS
• Expending Geographically– Out from Quetta (To major parts of Balochistan)
• Time frame expansion– Plans depend on feedbacks from customers and
stakeholders.
• Sponsor required– For future operations
REGARDS
Mut i ur Rehman Khan LodhiArshad HussainSalman Shaki rIbrar Khan