Final Plans 06-2018-013
Transcript of Final Plans 06-2018-013
???-???J.02STAGE 1 TRAFFIC CONTROL
STAGE 1 TRAFFIC CONTROL
T:\ENG\Design\06\2020\002\Drawings\Plan Shts\Final Plans\B-S-SHEETS.dgn 07-JAN-2021 09:48
GDH GDH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE06-2020-002
190051
XX-XX-2020FROM GRAND AVENUE TO WALNUT HILL DRIVE
62ND STREET RECONSTRUCTION ABC
Road Closure
42" Channelizer
LEGEND
Traffic direction
Drum
Sign
Arrow Board
Typ III Barricade
Stage 1 Work Area
DETOUR
AHEAD
36" X 36"
W20-2DETOUR
AHEAD
36" X 36"
W20-2
62ND STREET
GR
AN
D
AV
EN
UE
WA
LN
UT
HIL
L
DRIV
E
61ST STREET
DETOUR
M4-10L
48'' X 18''
DETOUR
M4-10R
48'' X 18''
R11-2 (MODIFIED)
48'' X 30''
TRAIL
CLOSEDR11-2 (MODIFIED)
48'' X 30''
TRAIL
CLOSED
SHEET 31 OF 66
626-098
???-???J.03STAGE 2 TRAFFIC CONTROL
STAGE 2 TRAFFIC CONTROL
T:\ENG\Design\06\2020\002\Drawings\Plan Shts\Final Plans\B-S-SHEETS.dgn 07-JAN-2021 09:49
GDH GDH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE06-2020-002
190051
XX-XX-2020FROM GRAND AVENUE TO WALNUT HILL DRIVE
62ND STREET RECONSTRUCTION ABC
Road Closure
42" Channelizer
Traffic direction
Drum
Sign
Arrow Board
Typ III Barricade
Stage 2 Work Area
LEGEND
62ND STREET
GR
AN
D
AV
EN
UE
WA
LN
UT
HIL
L
DRIV
E
61ST STREET
R11-2
48'' X 30''
ROAD
CLOSED
R11-2
48'' X 30''
ROAD
CLOSED
ROAD
CLOSED
AHEAD
W20-3
48'' X 48''
R11-4
60'' X 30''
ROAD CLOSED
TO
THRU TRAFFIC
R11-4
60'' X 30''
ROAD CLOSED
TO
THRU TRAFFIC
CAR WASH
ACCESS
30'' X 30''
R11-2
48'' X 30''
ROAD
CLOSED
R11-2
48'' X 30''
ROAD
CLOSED
SHEET 32 OF 66
626-099
???-???J.04STAGE 3 TRAFFIC CONTROL
STAGE 3 TRAFFIC CONTROL
T:\ENG\Design\06\2020\002\Drawings\Plan Shts\Final Plans\B-S-SHEETS.dgn 07-JAN-2021 09:49
GDH GDH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE06-2020-002
190051
XX-XX-2020FROM GRAND AVENUE TO WALNUT HILL DRIVE
62ND STREET RECONSTRUCTION ABC
Road Closure
42" Channelizer
Traffic direction
Drum
Sign
Arrow Board
Typ III Barricade
Stage 3 Work Area
LEGEND
62ND STREET
GR
AN
D
AV
EN
UE
WA
LN
UT
HIL
L
DRIV
E
61ST STREET
R11-2
48'' X 30''
ROAD
CLOSED
R11-4
60'' X 30''
ROAD CLOSED
TO
THRU TRAFFIC
ROAD
CLOSED
AHEAD
W20-3
48'' X 48''
30'' X 30''
CAR WASH
ACCESS
30'' X 30''
CAR WASH
ACCESS
ACCESS
30'' X 30''
CAR WASH
CAR WASH
ACCESS
30'' X 30''
30'' X 30''
ACCESS
CAR WASH
ARROW BOARD REQUIRED
AS PER FIGURE 8030.110
CLOSE RIGHT LANE OF GRAND AVE.
R11-2
48'' X 30''
ROAD
CLOSED
SHEET 33 OF 66
626-100
???-???L.01INTERSECTION DETAILS
T:\ENG\Design\06\2020\002\Drawings\Plan Shts\Final Plans\B-S-SHEETS.dgn 07-JAN-2021 09:49
GDH GDH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE06-2020-002
190051
XX-XX-2020FROM GRAND AVENUE TO WALNUT HILL DRIVE
62ND STREET RECONSTRUCTION ABC
B
13.5' RT FG 42.07
STA 10+52.58 ER
STA 10+43.59
15.17' RT FG 42.13
STA 10+35.81
19.96' RT FG 42.19
25'
R
STA 10+30.27
27.22' RT FG 42.11
35.99' RT FG 42.03
STA 10+27.7 BR
9.19'
9.19'
9.19'
9.1
9'
STA 10+52.58
38.50' RTRP
GR
AN
D
AV
E.
62ND ST.
35.63' RT
STA 10+22.53
15.81' RT
STA 10+24.97
26.37' LT
STA 10+33.01
26.59' LT
STA 10+30.83
41.79' LT
STA 10+32.16
0.15' RT
STA 10+26.23
0.28' RT
STA 10+30.84
EXISTING JOINT (TYP)
EXISTING JOINT (TYP)
42.26 FG
42.29 FG
25'
R
41.64' LT
STA 10+33.8442.70 FG
STA 10+33.76 BR
40.83' LT FG 42.69
STA 10+34.95 ER
30.57' LT FG 42.52
STA 10+40.18 ER
21.66' LT FG 42.36
STA 10+48.56 ER
15.63' LT FG 42.19
13.5' LT FG 42.03
STA 10+58.65 ER
STA 10+58.65RP
38.50' LT
10.4'
10.4'
10.4'
10.4'
10
+50
SHEET 34 OF 66
626-101
???-???L.02JOINTING PLAN
JOINTING PLAN
T:\ENG\Design\06\2020\002\Drawings\Plan Shts\Final Plans\B-S-SHEETS.dgn 07-JAN-2021 10:03
GDH GDH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE06-2020-002
190051
XX-XX-2020FROM GRAND AVENUE TO WALNUT HILL DRIVE
62ND STREET RECONSTRUCTION ABC
B
10
+00 1
1+00
EXISTING JOINT (TYP)
L-1
L-1
L-1
12'10'
13'11'10.7'
C
C
CC
C
3'
3'
10.5'
10.5'
C
C
B
EF
BT-5
BT-5
Sta 10+65.58
62ND ST.
GR
AN
D
AV
E
A
A
L-1
L-1
L-1
12.3'
12.3'
12.3'
12.3'
12.3'
12.3'
12.5'
3'
3'
10.5'
10.5'
C
C
C
C
C
13'12'
ED ED
B
RT
B
EDED
15+00
16+00
62ND ST.
WA
LN
UT
HIL
L
DR.
STA 15.60.14
CC
STA 14+60.73
SHEET 35 OF 66
626-102
???-???S.01SIDEWALK INFORMATION
T:\ENG\Design\06\2020\002\Drawings\Plan Shts\Final Plans\B-S-SHEETS.dgn 07-JAN-2021 09:50
GDH GDH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE06-2020-002
190051
XX-XX-2020FROM GRAND AVENUE TO WALNUT HILL DRIVE
62ND STREET RECONSTRUCTION ABC
B
1101
1105
1102
1107
1108
1106
1103
1104
11091110
1201 1202
1203
1204
1205
1206
10
+50
62ND ST.
GR
AN
D
AV
E.
A
13021301
1303
1304
10'
5'
R
5'
R
10'
62ND ST.
WAL
NU
T
HIL
L
DR.
1'
1'
EXISTING HMA TRAIL
16'
15+00
RAMP
SIDEWALK
LEGEND
TURNING SPACE
CROSS SLOPE TRANSITION
SHEET 36 OF 66
626-103
???-???S.02SIDEWALK INFORMATION
T:\ENG\Design\06\2020\002\Drawings\Plan Shts\Final Plans\B-S-SHEETS.dgn 07-JAN-2021 09:50
GDH GDH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE06-2020-002
190051
XX-XX-2020FROM GRAND AVENUE TO WALNUT HILL DRIVE
62ND STREET RECONSTRUCTION ABC
PASTE SCALE 24 (15.5 HOME)
SHEET 37 OF 66
626-104
???-???W.01CROSS SECTIONS
T:\ENG\Design\06\2020\002\Drawings\Plan Shts\Final Plans\W-SHEETS.dgn 07-JAN-2021 09:50
GDH GDH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE06-2020-002
190051
XX-XX-2020FROM GRAND AVENUE TO WALNUT HILL DRIVE
62ND STREET RECONSTRUCTION ABC
N GUTTER GRAND AVE.
WALK RT.
WALK LT.
END EXISTING PCC PAVING
42
44
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
10+30.9
42
44
42
44
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
10+34.0
42
44
42
44
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
10+39.8
42
44
40
42
44
46
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
10+50.0
40
42
44
46
40
42
44
46
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
10+67.3
40
42
44
46
0.2% 0.7%
0.2% 0.9%
0.7% 1.2%
0.4%
3.0%
1.4% 1.6%
3.1%
3.3%
2.0% 2.0%
5.2%
OF EXISTING WALK (TYP)
GRADE TO FRONT
27'
SHEET 38 OF 66
626-105
???-???W.02CROSS SECTIONS
T:\ENG\Design\06\2020\002\Drawings\Plan Shts\Final Plans\W-SHEETS.dgn 07-JAN-2021 09:50
GDH GDH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE06-2020-002
190051
XX-XX-2020FROM GRAND AVENUE TO WALNUT HILL DRIVE
62ND STREET RECONSTRUCTION ABC
40
42
44
46
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
10+75.0
40
42
44
46
40
42
44
46
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
11+00.0
40
42
44
46
40
42
44
46
48
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
11+25.0
40
42
44
46
48
2.3%
2.0% 2.0%
5.2%
0.5%
2.0% 2.0%
6.2%
1.8%2.0% 2.0%
7.5%
OF EXISTING WALK (TYP)
GRADE TO FRONT
OF TRAIL (TYP)
GRADE TO FRONT
SHEET 39 OF 66
626-106
???-???W.03CROSS SECTIONS
T:\ENG\Design\06\2020\002\Drawings\Plan Shts\Final Plans\W-SHEETS.dgn 07-JAN-2021 09:50
GDH GDH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE06-2020-002
190051
XX-XX-2020FROM GRAND AVENUE TO WALNUT HILL DRIVE
62ND STREET RECONSTRUCTION ABC
S EDGE DRIVE LT
40
42
44
46
48
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
11+50.0
40
42
44
46
48
40
42
44
46
48
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
11+75.0
40
42
44
46
48
40
42
44
46
48
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
11+82.2
40
42
44
46
48
0.1%
2.0% 2.0%
11.2%
1.4%
2.0% 2.0%
13.3
%
2.0% 2.0%
13.2
%
1.5%
1.5%
1.5%
OF EXISTING WALK (TYP)
GRADE TO FRONT
10'
OF TRAIL (TYP)
GRADE TO FRONT
4%
SHEET 40 OF 66
626-107
???-???W.04CROSS SECTIONS
T:\ENG\Design\06\2020\002\Drawings\Plan Shts\Final Plans\W-SHEETS.dgn 07-JAN-2021 09:50
GDH GDH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE06-2020-002
190051
XX-XX-2020FROM GRAND AVENUE TO WALNUT HILL DRIVE
62ND STREET RECONSTRUCTION ABC
N EDGE DRIVE LT
40
42
44
46
48
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
12+00.0
40
42
44
46
48
40
42
44
46
48
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
12+05.4
40
42
44
46
48
40
42
44
46
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
12+25.0
40
42
44
46
2.0% 2.0%
13.4
%
2.0% 2.0%
13.1
%
4.2%
2.0% 2.0%
1.5%
1.5%
1.5%12
%
OF EXISTING WALK (TYP)
GRADE TO FRONT
27'OF TRAIL (TYP)
GRADE TO FRONT
10'
4%
SHEET 41 OF 66
626-108
???-???W.05CROSS SECTIONS
T:\ENG\Design\06\2020\002\Drawings\Plan Shts\Final Plans\W-SHEETS.dgn 07-JAN-2021 09:50
GDH GDH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE06-2020-002
190051
XX-XX-2020FROM GRAND AVENUE TO WALNUT HILL DRIVE
62ND STREET RECONSTRUCTION ABC
S EDGE DRIVE LT
10%
40
42
44
46
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
12+50.0
40
42
44
46
38
40
42
44
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
12+75.0
38
40
42
44
38
40
42
44
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
12+84.6
38
40
42
44
38
40
42
44
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
13+00.0
38
40
42
44
5.7%
2.0% 2.0%
7.7%
7.4%
2.0% 2.0%
2.0% 2.0%
2.0% 2.0%
3.0%
1.5%
1.5%
1.5%
1.5%
OF EXISTING WALK (TYP)
GRADE TO FRONT
OF TRAIL (TYP)
GRADE TO FRONT10'
4%
4%
SHEET 42 OF 66
626-109
???-???W.06CROSS SECTIONS
T:\ENG\Design\06\2020\002\Drawings\Plan Shts\Final Plans\W-SHEETS.dgn 07-JAN-2021 09:50
GDH GDH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE06-2020-002
190051
XX-XX-2020FROM GRAND AVENUE TO WALNUT HILL DRIVE
62ND STREET RECONSTRUCTION ABC
N EDGE DRIVE LT
9%
38
40
42
44
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
13+07.8
38
40
42
44
38
40
42
44
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
13+25.0
38
40
42
44
38
40
42
44
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
13+50.0
38
40
42
44
36
38
40
42
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
13+75.0
36
38
40
42
2.0% 2.0%
2.8%
5.1%
2.0% 2.0%
3.2%
2.1%
2.0% 2.0%
3.3%
1.2%
2.0% 2.0%
2.6%2.2%
1.5%
1.5%
1.5%
OF EXISTING WALK (TYP)
GRADE TO FRONT
27'
OF TRAIL (TYP)
GRADE TO FRONT
10'
SHEET 43 OF 66
626-110
???-???W.07CROSS SECTIONS
T:\ENG\Design\06\2020\002\Drawings\Plan Shts\Final Plans\W-SHEETS.dgn 07-JAN-2021 09:50
GDH GDH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE06-2020-002
190051
XX-XX-2020FROM GRAND AVENUE TO WALNUT HILL DRIVE
62ND STREET RECONSTRUCTION ABC
S EDGE DRIVE RT
2%
N EDGE DRIVE RT
3%
36
38
40
42
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
14+00.0
36
38
40
42
38
40
42
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
14+02.4
38
40
42
38
40
42
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
14+25.0
38
40
42
38
40
42
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
14+26.6
38
40
42
38
40
42
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
14+50.0
38
40
42
1.9%
2.0% 2.0%
0.9%
1.9%
2.0% 2.0%
2.6%2.5%
2.0% 2.0% 2.0% 2.0%
2.6%
2.0% 2.0%
2.1%2.2%
2.0% 2.0%
4.0%
OF EXISTING WALK (TYP)
GRADE TO FRONT
SHEET 44 OF 66
626-111
???-???W.08CROSS SECTIONS
T:\ENG\Design\06\2020\002\Drawings\Plan Shts\Final Plans\W-SHEETS.dgn 07-JAN-2021 09:50
GDH GDH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE06-2020-002
190051
XX-XX-2020FROM GRAND AVENUE TO WALNUT HILL DRIVE
62ND STREET RECONSTRUCTION ABC
38
40
42
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
14+75.0
38
40
42
38
40
42
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
15+00.0
38
40
42
38
40
42
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
15+25.0
38
40
42
38
40
42
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
15+42.8
38
40
42
38
40
42
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
15+50.0
38
40
42
0.7%
2.0% 2.0%
3.0%3.1%
0.1% 0.0% 0.0%
2.0% 2.0%
0.9%2.0% 1.8%
4.0%
2.0%1.0%
7.4%
2.0% 0.8%
4.4%
27'
SHEET 45 OF 66
626-112
???-???W.09CROSS SECTIONS
T:\ENG\Design\06\2020\002\Drawings\Plan Shts\Final Plans\W-SHEETS.dgn 07-JAN-2021 09:51
GDH GDH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE06-2020-002
190051
XX-XX-2020FROM GRAND AVENUE TO WALNUT HILL DRIVE
62ND STREET RECONSTRUCTION ABC
38
40
42
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
15+60.1
38
40
42
38
40
42
44
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
15+75.0
38
40
42
44
40
42
44
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
16+00.0
40
42
44
12.5%
2.0% 0.4%
6.1%
SHEET 46 OF 66
626-113
TOTAL NUMBER OF SHEETS
LOCATION MAP
NOT TO SCALE
PLANS OF PROPOSED IMPROVEMENT FOR THE
ACTIVITY ID 06-2019-007
Cit
y
of
Des
Moin
es
AC
TIVIT
Y I.D.: 0
6-2019-007
SCALES: As Noted
PROVISIONS SHALL APPLY TO CONSTRUCTION WORK ON THIS PROJECT.
PLUS CURRENT SUPPLEMENTAL SPECIFICATIONS AND SPECIAL
THE URBAN STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS,
INDEX OF SHEETS
No. Description
A Sheets Title SheetsA.01 Title Sheet
B Sheets
C Sheets
D Sheets Plan and Profile SheetsRemovals
J SheetsJ.01-J.02
X SheetsX.01-X.09
Cross Sections
Typical Sections and Design Details
and General NotesEstimated Quantities, Tabulations,
Temporary Traffic Control, Staging, and Detours
City of Des Moines
Mid American Energy: Matt Novy, 515-252-6730
Mediacom: Paul May, 515-246-2252
Des Moines Water Works: Carla Schumacher, 515-323-6227
CenturyLink: Chuck Brun, 515-371-3429
Iowa One Call: 1-800-292-8989
UTILITY CONTACTS
RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
LOCATIONPROJECT
B.01 Design Details
C.01 Estimate Reference Information
C.02 General Notes
General InformationC.03-C.04
D.01
D.02
D.03
Plan
Profile
LI
CE
NS
ED P
ROFESSION
AL
E
NGI
NE
ER
IOWA
MY LICENSE RENEWAL DATE IS DECEMBER 31,
PAGES OR SHEETS COVERED BY THIS SEAL:
DATE
ENGINEER UNDER THE LAWS OF THE STATE OF IOWA.
SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL
WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT
17891
BOUSKA
CRAIG M. CRAIG M. BOUSKA IOWA LICENSE NO. 17891
2019
20
626-054A.01TITLE SHEET
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_A Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE01-15-2021
RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
ST
SW
ST
LIN
CO
LN
CT
31 S
T ST
NO
RTH
WO
OD
RD
SW 3
1 S
T ST
32
ND
PL
DR
BOLTON RIDGE RD
FOREST
GILMORE AVE
TERRACE DR
JOHN LYNDE RD
WELKER AVE
LINCOLN
BRENTWOOD
DR
AVE
TERRACE
RD
MAHAS
KA
PKWY
TERRACE
RD
JOHN
ST
SENIOMSED
RD
LYNDE
39TH
37TH S
T 29TH
28TH
DR27TH
ST
AL
L
ENPARKPL
PL
ZWA
RT
DR
AWANDA
DR
FOREST
MUSKOGEE
AV
E
RIVER
OAKS
DR
DR
DR
WOO
DS
BR
OWNS
MARS
H
DR
DR
DR
38TH P
L
DR
ON
A
W
AN
DA
ARAPA
HO
ED
R
JEW
ETT
EL
MWOOD
LN
RD
35TH ST 30TH ST
DR SH
ORT
VIE
W
DR
31ST ST
JOHN
ST
SW 3
4TH S
T
AVE
EDWARDS
GEORGE FLAGG PARKWAY
PLACE
SW 2
9TH
ST
T
SW 23R
D S
T
SITE NO. 4
SHEET 47 OF 66
SHEETS 47 - 66
2021
626-114
1/26/2021
1
2
3
4
5
NOTES
NO SCALE
CL
LINCOLN PLACE DRIVE
TYPICAL CROSS SECTION
6
2% 2%
626-055B.01DESIGN DETAILS
7
8
BT, KT, OR L JOINT DEPENDING ON CONSTRUCTION STAGING
SPACING
PROVIDE TYPE CD (3/4" DOWEL BAR) TRANSVERSE JOINTS AT 12'
PAVEMENT
CONSTRUCT CD JOINT A MINIMUM OF 5FT FROM END OF NEW
SUBDRAIN SHALL BE INSTALLED BEFORE PLACEMENT OF SUBBASE.
MAY BE REDUCED TO AVOID CONFLICTS WITH UTILITY POLES.
6" SUBDRAIN (TYPE 1, CASE B) DISTANCE FROM BACK OF CURB
TYPE II GEOGRID
6" SUBGRADE PREPARATION
6" STANDARD CURB. REFER TO FIGURE 7010.102
8" THICK MODIFIED SUBBASE
6" THICK PCC PAVEMENT
9
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_B Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLE
01-15-2021RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
1
2
3
45
66
9
99
13' 13'
2' (TYP.)
2'-
6"
MIN
2"
MIN
1'
26' BACK TO BACK
3' 3'
SHEET 48 OF 66
626-115
4' M
IN. D
EP
TH
4' MIN. DEPTH
626-056C.01ESTIMATE REFERENCE INFORMATION
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_C Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLE
01-15-2021RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
REFER TO SHEET 2 OF 66 FOR CONTRACT QUANTITIESFOR THE 2021 PCC RESIDENTIAL PAVING PROGRAM
SHEET 49 OF 66
626-116
626-057C.02GENERAL NOTES
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_C Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE01-15-2021
RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
SHEET 50 OF 66
626-117
PLACE DRIVE
NORTH EDGE OF LINCOLN
CORE #1
PLACE DRIVE
CENTER OF LINCOLN
CORE #2
PLACE DRIVE
SOUTH EDGE OF LINCOLN
CORE #3
LINCOLN PLACE DRIVE CORE INFORMATION
LINCOLN PLACE DRIVE
JOHN LYNDE ROAD
SW
34
TH
ST
MAHASKA
PARKWAY
626-058C.03GENERAL INFORMATION
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_C Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLE
01-15-2021RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
SHEET 51 OF 66
626-118
LINCOLN PLACE DRIVE CORE INFORMATION
626-059C.04GENERAL INFORMATION
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_C Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLE
01-15-2021RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
SHEET 52 OF 66
626-119
AND LANDSCAPING
RETAINING WALL
PROTECT
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_D Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLE
01-15-2021RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
LOT 11
BLOCK "K"
LINCOLN PLACE RE-PLAT
LOT 6
BLOCK "K"
LINCOLN PLACE RE-PLAT
LOT 7
BLOCK "K"
LINCOLN PLACE RE-PLAT
LOT 8
BLOCK "K"
LINCOLN PLACE RE-PLAT
LOT 9
BLOCK "K"
LINCOLN PLACE RE-PLAT
PT. LOT 58
LINCOLN GRANDE
LINCOLN GRANDE
PT. LOT 59
PT. LOT 57
LINCOLN GRANDE
17
WE CAN BUILD IT LC
3300 LINCOLN PLACE DRIVE
COD: BK. 8157, PG. 11
PT. LOT 4
BLOCK "K"
LINCOLN PLACE RE-PLAT
PT. LOT 4
BLOCK "K"
LINCOLN PLACE RE-PLAT
PT. L
OT 5
BL
OC
K "K
"
LIN
CO
LN PL
AC
E
RE-PL
AT
PT. L
OT 5
BL
OC
K "K
"
LIN
CO
LN PL
AC
E
RE-PL
AT
11
3211 LINCOLN PLACE DRIVE
J.P. HARDING
WD: BK. 7301, PG. 840
12
3205 LINCOLN PLACE DRIVE
WD: BK. 17219, PG. 51
ANDRAA K. VON BOESELAGER
KRISTIN A. VON BOESELAGER
13
3201 LINCOLN PLACE DRIVE
QCD: BK. 8516, PG. 978
MARTHA A. RENO
14
WD: BK. 17167, PG. 20
DONLIN INVESTING LLC
3200 JOHN LYNDE ROAD
?D: BK. 6154, PG. 817
3220 JOHN LYNDE ROADREBECCA E. WOODBURN
CHESTER C. WOODBURN
STUMP
20"
8"
20"
STUMP
24"
3"
4"
SPHD
6"
4"
10"
10"
12"
STUMP
12" 12
"
20"
STUMP
GVGV
GVGVGV
GV
FL S
LINCOLN
PLACE DRI
VE
MAH
AS
KA P
AR
KW
AY
DEAD TREE
REMOVE 24"
DEAD TREE
REMOVE 15"
DEAD TREE
REMOVE 20"
DEAD TREE
REMOVE 18"
DEAD TREE
REMOVE 18"
STRUCTURE
REMOVE
DRIVEWAY APPROACHES
REMOVE AND REPLACE STRUCTURE.
BOXOUT. PROTECT
REMOVE CONCRETE
OR GREATER.
A TRUCK DIAMETER OF 12"
10' WIDE. AVOID TREES WITH
AND GRUBBING BY AREA.
TO STA 11+38 CLEARING
FROM EXISTING DRIVEWAY
CONSTRUCTION.
POLES AS NECESSARY DURING
HOLD AND PROTECT UTILITY
WITH MIDAMERICAN ENERGY TO
CONTRACTOR SHALL COORDINATE
CONSTRUCTION.
POLES AS NECESSARY DURING
HOLD AND PROTECT UTILITY
WITH MIDAMERICAN ENERGY TO
CONTRACTOR SHALL COORDINATE
10
+00
11+00
12
+00
13+00
14+00
14+7514+75
626-060D.01REMOVALS
12" OR GREATER.
WITH A TRUCK DIAMETER OF
AREA. 10' WIDE. AVOID TREES
CLEARING AND GRUBBING BY
STA 10+74 TO STA 12+40
12" OR GREATER.
WITH A TRUCK DIAMETER OF
AREA. 5' WIDE. AVOID TREES
CLEARING AND GRUBBING BY
STA 12+40 TO STA 14+65
SHEET 53 OF 66
626-120
LANDSCAPING
WALL AND
PROTECT RETAINING
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_D Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLE
01-15-2021RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
STUMP
20"
8"
20"
STUMP
10"
10"
12"
STUMP
12" 12
"
20"
STUMP
FL S
BLOCK "K"
LINCOLN PLACE RE-PLAT
LOT 8
BLOCK "K"
LINCOLN PLACE RE-PLAT
LOT 9
BLOCK "K"
LINCOLN PLACE RE-PLAT
PT. LOT 58
LINCOLN GRANDE
PT. LOT 57
LINCOLN GRANDE
17
WE CAN BUILD IT LC
3300 LINCOLN PLACE DRIVE
COD: BK. 8157, PG. 11
PT. LOT 4
BLOCK "K"
LINCOLN PLACE RE-PLAT
PT. L
OT 5
BL
OC
K "K
"
LIN
CO
LN PL
AC
E
RE-PL
AT
11
3211 LINCOLN PLACE DRIVE
J.P. HARDING
WD: BK. 7301, PG. 840
12
3205 LINCOLN PLACE DRIVE
WD: BK. 17219, PG. 51
ANDRAA K. VON BOESELAGER
KRISTIN A. VON BOESELAGER
13
3201 LINCOLN PLACE DRIVE
QCD: BK. 8516, PG. 978
MARTHA A. RENO
14
WD: BK. 17167, PG. 20
DONLIN INVESTING LLC
3200 JOHN LYNDE ROAD
LINCOLN
PLACE DRI
VE
MAH
AS
KA P
AR
KW
AY
1" = 30'
0 10 20 30
6" SUBDRAIN
6" SUBDRAIN
6" SUBDRAIN
6" SUBDRAIN
CLEANOUT
SUBDRAIN
CLEANOUT
SUBDRAIN
CLEANOUT
SUBDRAIN CLEANOUT
SUBDRAIN
DURING PAVING
ENERGY,
MIDAMERICAN
HOLD POLE, BY
DURING PAVING
MIDAMERICAN ENERGY,
HOLD POLE, BY
DURING PAVING
MIDAMERICAN ENERGY,
HOLD POLE, BY
ADJUSTMENT
MANHOLE
MINOR
BLOCK
EXISTING SPLASH
CONNECT TO
BEEHIVE CASTING.
WITH RISER AND
10' OF 6" SUBDRAIN
FROM BACK OF CURB.
EXISTING SUBDRAIN, 20'
CONNECT 6" SUBDRAIN TO
TO NEAREST JOINT.
STORM SEWER. REPLACE
8 LF OF 15" RCP
TO NEAREST JOINT.
STORM SEWER. REPLACE
8 LF OF 18" RCP
CLEANOUT
INSTALL A SUBDRAIN
EXISTING DRIVEWAY AND
EXTEND SUBDRAIN TO
626-061D.02PLAN
50 FT
55 F
T
55 FT
60 FT
60 F
T
65 F
T
65 F
T
65 FT
70 FT
70 FT
70 FT
15" INV S: 69.93
15" INV N: 70.36
RIM: 76.67
INSTALL SW-505
75 FT
75 F
T
75 FT
77
77
78
78
78
79
79
80 FT
80 FT
80 FT
80
GRADING LIMITS
85 FT
85 F
T
DURING PAVING
MIDAMERICAN ENERGY,
HOLD POLE, BY
ADJUSTMENT
MANHOLE
MINOR
90 FT
SHEET 54 OF 66
626-121
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_D Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLE
01-15-2021RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
70
72
74
76
78
80
82
84
86
88
9090
70
72
74
76
78
80
82
84
86
88
9090
10
+0
0
10
+2
5
10
+5
0
10
+7
5
11
+0
0
11
+2
5
11
+5
0
11
+7
5
12
+0
0
12
+2
5
12
+5
0
12
+7
5
13
+0
0
13
+2
5
13
+5
0
70
72
74
76
78
80
82
84
86
88
9090
70
72
74
76
78
80
82
84
86
88
9090
13
+5
0
13
+7
5
14
+0
0
14
+2
5
14
+5
0
14
+7
5
PROPOSED GRADE
EXISTING GRADE
EXISTING GRADE
PROPOSED GRADE
PI 10+10.00Elev 86.18
PI 11+62.32Elev 77.99
PI 12+41.36Elev 76.76
-5.38%
-1.55% 1.14%
55' VC
55' VC
PI 14+60.00Elev 79.26
PI 14+65.00Elev 79.45
1.14%3.75%
626-062D.03PROFILE
SHEET 55 OF 66
626-122
SIGN TABULATIONTRAFFIC CONTROL PLAN STAGING NOTES
WORK.PAVEMENT MARKING PAINT SHALL BE INSTALLED DURING PARTIAL DEPTH REPAIR PARKWAY SHALL BE COMPLETED AFTER ALL ADJOINING WORK HAS BEEN COMPLETED. PERMANENT PAVEMENT MARKING TAPE INSTALLATION ON W. MARTIN LUTHER KING JR.
TOURNAMENT GAMES.HOURS PRIOR TO AND ONE (1) HOUR AFTER IOWA CUBS AND STATE BASEBALL EASTBOUND PEAK TRAFFIC FROM 7:00 AM TO 8:30 AM. NO WORK ALLOWED THREE (3) THROUGH FRIDAY FOR WESTBOUND PEAK TRAFFIC FROM 4:00 PM TO 6:00 PM AND FOR W. MARTIN LUTHER KING JR. PARKWAY LANE CLOSURE WORK RESTRICTIONS MONDAY
STAGED SUCH THAT WORK CAN BE COMPLETED IN A TIMELY MANNER.MAINTAINED WHEN WORKING IN LEFT TURN LANES. TURN LANE WORK SHALL BE MAINTAINED AT ALL TIMES. TWO LANES OF DIRECTIONAL TRAFFIC SHALL BE CREATE CONFUSION FOR MOTORISTS. ONE LANE OF DIRECTIONAL TRAFFIC SHALL BE CONCURRENTLY WITH WORK ON SW 2ND STREET AND SW 3RD STREET, BUT SHALL NOT PARTIAL DEPTH REPAIR WORK ON W. MARTIN LUTHER KING JR. PARKWAY CAN OCCUR
GENERAL STAGING:
GAMES.PRIOR TO AND ONE (1) HOUR AFTER IOWA CUBS AND STATE BASEBALL TOURNAMENT SOUTHBOUND PEAK TRAFFIC AFTER 4:00 PM. NO WORK ALLOWED THREE (3) HOURS SW 3RD STREET LANE CLOSURE WORK RESTRICTION MONDAY THROUGH FRIDAY FOR
NECESSARY FOR A LANE CLOSURE.TRANSPORTATION STANDARD ROAD PLAN TC-419 FOR STANDARD TRAFFIC CONTROL MAINTAINING ONE LANE OPEN TO TRAFFIC. REFER TO IOWA DEPARTMENT OF WORK ON THE REMAINING SECTIONS OF SW 3RD STREET SHALL BE COMPLETED
DETAILS AND SHEET J.03 FOR DETOUR LAYOUT.IOWA CUBS BASEBALL SEASON. REFER TO COMPLETION PROVISIONS FOR FURTHER (20) WORKING DAYS. CLOSURE OF NORTHBOUND LANES SHALL OCCUR OUTSIDE OF THE SW 3RD STREET NORTHBOUND LANE CLOSURE SHALL BE COMPLETED WITHIN TWENTY
STAGE 2:
GAMES.PRIOR TO AND ONE (1) HOUR AFTER IOWA CUBS AND STATE BASEBALL TOURNAMENT NORTHBOUND PEAK TRAFFIC PRIOR TO 8:30 AM. NO WORK ALLOWED THREE (3) HOURS SW 2ND STREET LANE CLOSURE WORK RESTRICTION MONDAY THROUGH FRIDAY FOR
NECESSARY FOR A LANE CLOSURE.TRANSPORTATION STANDARD ROAD PLAN TC-419 FOR STANDARD TRAFFIC CONTROL MAINTAINING ONE LANE OPEN TO TRAFFIC. REFER TO IOWA DEPARTMENT OF WORK ON THE REMAINING SECTIONS OF SW 2ND STREET SHALL BE COMPLETED
DETAILS AND SHEET J.02 FOR DETOUR LAYOUT.IOWA CUBS BASEBALL SEASON. REFER TO COMPLETION PROVISIONS FOR FURTHER (20) WORKING DAYS. CLOSURE OF SOUTHBOUND LANES SHALL OCCUR OUTSIDE OF THE SW 2ND STREET SOUTHBOUND LANE CLOSURE SHALL BE COMPLETED WITHIN TWENTY
STAGE 1:
THE LUMP SUM BID AMOUNT FOR TRAFFIC CONTROL.NO FIELD MEASUREMENT SHALL BE MADE FOR THE TRAFFIC CONTROL BID ITEM. THE CONTRACTOR SHALL BE PAID METHOD OF MEASUREMENT AND BASIS OF PAYMENT:
EXISTING PAVED PATH IS PRESENT OR NOT.CONSTRUCTION AREAS WITHIN EACH STAGE. BARRICADES SHALL BE PLACED REGARDLESS OF WHETHER AN PEDESTRIAN PATH CLOSURE BARRICADES SHALL BE PLACED AT THE BEGINNING AND END OF SIDEWALK PEDESTRIAN TRAFFIC CONTROL:
ACHEIVED.THE CONTRACTOR SHALL COORDINATE CLOSURE WITH THE ENGINEER TO ENSURE THE ABOVE DEADLINES ARE CLOSURE. STREET OR LANE CLOSURE NOTIFICATION TO BE ISSUED BY THE CITY FIVE (5) DAYS PRIOR TO CLOSURE. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF STREET OR LANE CLOSURE TWO (2) WEEKS PRIOR TO THE
AVAILABLE FOR CORRECTIVE ACTION 24 HOURS A DAY, 7 DAYS A WEEK.RESPONSIBLE FOR THE MAINTENANCE OF TRAFFIC CONTROL DEVICES AND SIGNING. THE INDIVIDUAL(S) SHALL BE THE CONTRACTOR SHALL FURNISH THE ENGINEER WITH NAMES AND TELEPHONE NUMBERS OF INDIVIDUALS
UNSAFE CONDITIONS PRIOR TO REMOVING TRAFFIC CONTROL DEVICES.ACTIVE CONSTRUCTION WORK. THE CONTRACTOR SHALL PROPERLY CLEAN ALL SURFACES AND ELIMINATE ALL ALL TRAFFIC LANE CLOSURES SHALL BE RE-OPENED FOR PUBLIC USE WITHIN 24 HOURS OF THE COMPLETION OF
HIGH-VISIBILITY PRISMATIC REFLECTIVE SHAEETING (TYPE III OR HIGHER).WHEN THESE TRAFFIC CONTROL DEVICES ARE SHEETED WITH TYPE "C" STEADY BURN WARNING LIGHTS ARE NOT REQUIRED FOR VERTICAL PANELS, BARRICADES, AND DRUMS
THIS PROJECT SHALL BE SHEETED WITH HIGH-VISIBILITY PRISMATIC REFLECTIVE SHAEETING (TYPE III OR HIGHER).ALL CONTRACTOR FURNISHED TRAFFIC CONTROL AND FIXED, POST MOUNTED, TRAFFIC CONTROL SIGNS USED ON
REPLACED THE PERMANENT TRAFFIC SIGNS.THE ENGINEER. TEMPORARY SIGNS SHALL BE REMOVED BY THE CONTRACTOR ONLY AFTER THE CITY HAS SHALL REMOVE ANY SIGN BASE, POST, OR FOOTING NOT SALVAGED BY THE CITY UNLESS OTHERWISE DIRECTED BY ANY TEMPORARY TRAFFIC SIGNS AS REQUIRED PRIOR TO THE EXISTING SIGN BEING REMOVED. THE CONTRACTOR REQUESTING A TRAFFIC SIGN BE MOVED OR REMOVED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PLACING SHALL CONTACT THE CONSTRUCTION INSPECTOR OR ENGINEER WITH 48 HOURS ADVANCE NOTICE WHEN THE CONTRACTOR SHALL NOT RELOCATE OR REMOVE ANY CITY OF DES MOINES TRAFFIC SIGNS. THE CONTRACTOR
CONDITIONS SHALL BE COVERED BY THE CONTRACTOR AS APPROVED BY THE ENGINEER. MESSAGE CONTRARY TO THE MESSAGE OF THE TEMPORARY SIGNING NOT APPLICABLE TO THE WORKING ALL "STOP"AND OTHER REGULATORY SIGNS SHALL NOT BE DISTURBED. PERMANENT SIGNING THAT CONVEYS A
CONTROL DEVISES.THIS LAYOUT DOES NOT INCLUDE ALL BARRICADES AS MAY BE REQUIRED BY THE MANUAL ON UNIFORM TRAFFIC
ARE MADE.PROPOSED CHANGES IN THE TRAFFIC CONTROL PLAN SHALL BE REVIEWED WITH THE ENGINEER BEFORE CHANGES
RESTRICTIONS, OR TO PREVENT OBSTRUCTION OF THE MOTORIST'S VIEW OF PERMANENT SIGNING.PROPOSED SIGN SPACING MAY BE MODIFIED, AS APPROVED BY THE ENGINEER, TO MEET EXISTING FIELD
ALL SIGNS SHALL BE POST MOUNTED UNLESS NOTED OR OTHERWISE APPROVED BY THE ENGINEER.
APPROVED BY THE ENGINEER PRIOR TO CLOSING THE ROAD.ALL DETOUR ROUTE SIGNS AND ROAD CLOSURE BARRICADES SHALL BE INSTALLED BY THE CONTRACTOR AND
OUTSIDE EDGE OF SHOULDER WHERE POSSIBLE.ALL TRAFFIC CONTROL SIGNS SHALL BE PLACED A MINIMUM OF TWO (2) FEET CLEAR OF THE BACK OF CURB OR
ADMINISTRATIVE CODE (IAC) CHAPTER 130.AND HIGHWAYS AS ADOPTED BY THE IOWA DEPARTMENT OF TRANSPORTATION PER 761 OF THE IOWA LIMITS OF THIS PROJECT SHALL CONFORM TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS TRAFFIC CONTROL DEVICES, PROCEDURES, LAYOUTS, SIGNING, AND PAVEMENT MARKINGS INSTALLED WITHIN THE
MAINTAINED, AND REMOVED BY THE CONTRACTOR.DURING CONSTRUCTION FOR THIS PROJECT. ALL TRAFFIC CONTROL DEVICES SHALL BE FURNISHED, ERECTED, THE LUMP SUM BID ITEM FOR "TRAFFIC CONTROL" SHALL INCLUDE ALL COSTS FOR TRAFFIC CONTROL MEASURES
INFORMATION, REFER TO THE 2009 MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE CLOSURES SHOWN ON THE J SHEETS. FOR ADDITIONAL THE CONTRACTOR SHALL COORDINATE TRAFFIC CONTROL WITH OTHER PROJECTS IN THE AREA IF NECESSARY.
TO THE PUBLIC. ALL TRAFFIC CONTROL SIGNS SHALL BE THE CONTRACTOR'S RESPONSIBILITY.TRAFFIC TO ADJACENT PROPERTIES SHALL BE MAINTAINED AS PER SUDAS SECTION 1070, PART 2 - RESPONSIBILITIES THE J SHEETS DESCRIBE TRAFFIC CONTROL NECESSARY FOR THE CONSTRUCTION OF LINCOLN PLACE DRIVE. LOCAL
626-063J.01TRAFFIC CONTROL NOTES
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_J Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLEGRAPHIC SCALE01-15-2021
RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
SHEET 56 OF 66
626-123
TEMPORARY TRAFFIC SIGN
1
CLOSED
ROAD
LEGEND
48" X 30"R11-2
WORK AREA
ROAD
AHEAD
TYPE III BARRICADE
WORK
36" X 36"W20-1
2
2
1
1
SW
34th St
Lin
coln Pl
ace
Dr
Maha
ska Pk
wy
John Lynde Rd
John Lynde Rd
32nd
Pl
34th St
Terrace Dr Terrace Dr
Lincoln
Place
Dr
36" X 36"W20-3
ROAD
CLOSED
AHEAD
2 3
3
3
626-064J.02TRAFFIC CONTROL PLAN
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_J Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLE
01-15-2021RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
SHEET 57 OF 66
626-124
626-065X.01CROSS SECTIONS
86
88
90
92
0 10 20 30-10-20-30
10+00.00
86
88
90
92
84
86
88
90
0 10 20 30-10-20-30
10+10.00
84
86
88
90
84
86
88
90
0 10 20 30-10-20-30
10+20.00
84
86
88
90
84
86
88
90
0 10 20 30-10-20-30
10+30.00
84
86
88
90
84
86
88
90
0 10 20 30-10-20-30
10+40.00
84
86
88
90
82
84
86
88
0 10 20 30-10-20-30
10+50.00
82
84
86
88
82
84
86
88
0 10 20 30-10-20-30
10+60.00
82
84
86
88
82
84
86
88
0 10 20 30-10-20-30
10+70.00
82
84
86
88
87.71
-20.1'
86.18
0.0'
85.93
12.5'
86.18
5:1
2.0% 2.0%
85.89
-13.2'
85.65
0.0'
85.40
12.5'
85.65
2.0% 2.0%
85.41
-13.4'
85.11
-0.0'
84.86
12.5'
85.11
2.0% 2.0%
84.89
-13.5'
84.57
0.0'
84.32
12.5'
84.57
2.0% 2.0%
84.31
-13.5'
84.03
0.0'
83.78
12.5'
84.03
2.0% 2.0%
83.78
-13.5'
83.49
0.0'
83.24
12.5'
83.49
2.0% 2.0%
83.22
-13.4'
82.95
0.0'
82.70
12.5'
82.95
2.0% 2.0%
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_X Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLE
01-15-2021RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
SHEET 58 OF 66
626-125
626-066X.02CROSS SECTIONS
80
82
84
86
0 10 20 30-10-20-30
10+80.00
80
82
84
86
78
80
82
84
86
0 10 20 30-10-20-30
10+90.00
78
80
82
84
86
76
78
80
82
84
86
0 10 20 30-10-20-30
11+00.00
76
78
80
82
84
86
76
78
80
82
84
86
0 10 20 30-10-20-30
11+10.00
76
78
80
82
84
86
76
78
80
82
84
0 10 20 30-10-20-30
11+20.00
76
78
80
82
84
74
76
78
80
82
84
0 10 20 30-10-20-30
11+30.00
74
76
78
80
82
84
82.70
-13.4'
82.42
0.0'
82.17
12.5'
82.42
2.0% 2.0%
82.15
-13.3'
81.88
0.0'
81.63
12.5'
81.88
2.0% 2.0%
82.69
-20.1'
81.34
0.0'
81.09
12.5'
81.34
6:1
2.0% 2.0%
82.14
-20.1'
80.80
0.0'
80.55
12.5'
80.80
6:1
2.0% 2.0%
81.04
-16.8'
80.26
0.0'
80.01
12.5'
80.26
7:1
2.0% 2.0%6:1
80.96
-19.9'
79.73
0.0'
79.48
12.5'
79.73
7:1
2.0% 2.0% 6:1
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_X Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLE
01-15-2021RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
SHEET 59 OF 66
626-126
626-067X.03CROSS SECTIONS
74
76
78
80
82
84
0 10 20 30-10-20-30
11+40.00
74
76
78
80
82
84
76
78
80
82
0 10 20 30-10-20-30
11+50.00
76
78
80
82
74
76
78
80
82
0 10 20 30-10-20-30
11+60.00
74
76
78
80
82
74
76
78
80
82
0 10 20 30-10-20-30
11+70.00
74
76
78
80
82
74
76
78
80
0 10 20 30-10-20-30
11+80.00
74
76
78
80
72
74
76
78
80
0 10 20 30-10-20-30
11+90.00
72
74
76
78
80
80.57
-20.1'
79.20
0.0'
78.95
12.5'
79.20
6:1
2.0% 2.0% 5:1
79.94
-20.1'
78.73
0.0'
78.48
12.5'
78.73
7:1
2.0% 2.0%4:1
79.93
-20.1'
78.33
0.0'
78.08
12.5'
78.33
5:1
2.0% 2.0%4:1
79.02
-20.1'
78.00
0.0'
77.75
12.5'
78.00
5:1
2.0% 2.0%5:1
78.68
-20.1'
77.75
-0.0'
77.50
12.5'
77.75
6:1
2.0% 2.0%
4:1
78.31
-20.1'
77.56
0.0'
77.31
12.5'
77.56
7:1
2.0% 2.0%
4:1
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_X Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLE
01-15-2021RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
SHEET 60 OF 66
626-127
626-068X.04CROSS SECTIONS
72
74
76
78
80
0 10 20 30-10-20-30
12+00.00
72
74
76
78
80
72
74
76
78
80
0 10 20 30-10-20-30
12+10.00
72
74
76
78
80
70
72
74
76
78
80
82
0 10 20 30-10-20-30
12+20.00
70
72
74
76
78
80
82
72
74
76
78
80
82
0 10 20 30-10-20-30
12+30.00
72
74
76
78
80
82
72
74
76
78
80
82
0 10 20 30-10-20-30
12+40.00
72
74
76
78
80
82
72
74
76
78
80
82
0 10 20 30-10-20-30
12+50.00
72
74
76
78
80
82
77.94
-20.1'
77.40
0.0'
77.15
12.5'
77.40
9:12.0% 2.0%
4:1
78.15
-20.1'
77.25
0.0'
77.00
12.5'
77.25
6:1
2.0% 2.0%
4:1
78.51
-20.1'
77.10
0.0'
76.85
12.5'
77.10
4:1
2.0% 2.0%
4:1
78.38
-20.1'
77.00
0.0'
76.75
12.5'
77.00
6:1
2.0% 2.0%3:1
78.81
-20.1'
76.95
0.0'
76.70
12.5'
76.954:1
2.0% 2.0% 4:1
78.92
-20.1'
76.95
0.0'
76.70
12.5'
76.954:1
2.0% 2.0% 5:1
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_X Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLE
01-15-2021RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
SHEET 61 OF 66
626-128
626-069X.05CROSS SECTIONS
70
72
74
76
78
80
82
84
0 10 20 30-10-20-30
12+60.00
70
72
74
76
78
80
82
84
70
72
74
76
78
80
82
84
0 10 20 30-10-20-30
12+70.00
70
72
74
76
78
80
82
84
70
72
74
76
78
80
82
84
0 10 20 30-10-20-30
12+80.00
70
72
74
76
78
80
82
84
70
72
74
76
78
80
82
84
0 10 20 30-10-20-30
12+90.00
70
72
74
76
78
80
82
84
77.85
-15.3'
76.99
0.0'
76.74
12.5'
76.99
4:1
2.0% 2.0% 6:1
79.24
-20.1'
77.09
0.0'
76.84
12.5'
77.094:1
2.0% 2.0% 8:1
79.25
-20.1'
77.20
0.0'
76.95
12.5'
77.204:1
2.0% 2.0%9:1
79.48
-20.1'
77.32
-0.0'
77.07
12.5'
77.324:1
2.0% 2.0%8:1
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_X Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLE
01-15-2021RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
SHEET 62 OF 66
626-129
626-070X.06CROSS SECTIONS
70
72
74
76
78
80
82
84
0 10 20 30-10-20-30
13+00.00
70
72
74
76
78
80
82
84
70
72
74
76
78
80
82
0 10 20 30-10-20-30
13+10.00
70
72
74
76
78
80
82
68
70
72
74
76
78
80
82
0 10 20 30-10-20-30
13+20.00
68
70
72
74
76
78
80
82
70
72
74
76
78
80
82
0 10 20 30-10-20-30
13+30.00
70
72
74
76
78
80
82
79.30
-20.1'
77.43
0.0'
77.18
12.5'
77.434:1
2.0% 2.0%9:1
78.60
-17.0'
77.54
0.0'
77.29
12.5'
77.54
5:1
2.0% 2.0% 5:1
79.73
-20.1'
77.66
0.0'
77.41
12.5'
77.664:1
2.0% 2.0% 4:1
79.13
-20.1'
77.77
0.0'
77.52
12.5'
77.77
6:1
2.0% 2.0% 3:1
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_X Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLE
01-15-2021RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
SHEET 63 OF 66
626-130
626-071X.07CROSS SECTIONS
70
72
74
76
78
80
82
0 10 20 30-10-20-30
13+40.00
70
72
74
76
78
80
82
70
72
74
76
78
80
82
0 10 20 30-10-20-30
13+50.00
70
72
74
76
78
80
82
70
72
74
76
78
80
82
0 10 20 30-10-20-30
13+60.00
70
72
74
76
78
80
82
72
74
76
78
80
82
84
0 10 20 30-10-20-30
13+70.00
72
74
76
78
80
82
84
79.32
-20.1'
77.89
0.0'
77.64
12.5'
77.89
6:1
2.0% 2.0% 3:1
79.51
-20.1'
78.00
0.0'
77.75
12.5'
78.00
6:1
2.0% 2.0% 4:1
79.65
-20.1'
78.12
0.0'
77.87
12.5'
78.12
5:1
2.0% 2.0% 7:1
79.76
-20.1'
78.23
0.0'
77.98
12.5'
78.23
5:1
2.0% 2.0% 8:1
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_X Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLE
01-15-2021RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
SHEET 64 OF 66
626-131
626-072X.08CROSS SECTIONS
72
74
76
78
80
82
84
0 10 20 30-10-20-30
13+80.00
72
74
76
78
80
82
84
74
76
78
80
82
84
0 10 20 30-10-20-30
13+90.00
74
76
78
80
82
84
76
78
80
82
0 10 20 30-10-20-30
14+00.00
76
78
80
82
76
78
80
82
0 10 20 30-10-20-30
14+10.00
76
78
80
82
76
78
80
82
84
0 10 20 30-10-20-30
14+20.00
76
78
80
82
84
76
78
80
82
84
0 10 20 30-10-20-30
14+30.00
76
78
80
82
84
79.95
-20.1'
78.35
-0.0'
78.10
12.5'
78.35
5:1
2.0% 2.0%9.5%
79.94
-20.1'
78.46
-0.0'
78.21
12.5'
78.46
6:1
2.0% 2.0%7.8%
79.97
-20.1'
78.57
0.0'
78.32
12.5'
78.57
6:1
2.0% 2.0%9.5%
79.90
-20.1'
78.69
-0.0'
78.44
12.5'
78.69
7:1
2.0% 2.0% 8:1
80.13
-20.1'
78.80
0.0'
78.55
12.5'
78.80
6:1
2.0% 2.0% 6:1
80.40
-20.1'
78.92
-0.0'
78.67
12.5'
78.92
6:1
2.0% 2.0%8.8%
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_X Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLE
01-15-2021RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
SHEET 65 OF 66
626-132
626-073X.09CROSS SECTIONS
76
78
80
82
84
0 10 20 30-10-20-30
14+40.00
76
78
80
82
84
76
78
80
82
84
0 10 20 30-10-20-30
14+50.00
76
78
80
82
84
76
78
80
82
84
0 10 20 30-10-20-30
14+60.00
76
78
80
82
84
76
78
80
82
84
0 10 20 30-10-20-30
14+70.00
76
78
80
82
84
76
78
80
82
84
86
0 10 20 30-10-20-30
14+75.00
76
78
80
82
84
86
80.70
-20.1'
79.03
0.0'
78.78
12.5'
79.035:1
2.0% 2.0%6.1%
80.83
-20.1'
79.15
0.0'
78.90
12.5'
79.155:1
2.0% 2.0% 7:1
81.12
-20.1'
79.26
0.0'
79.01
12.5'
79.264:1
2.0% 2.0%
8.8%
T:\ENG\Design\06\2019\007\Drawings\Plan Shts\062019007_X Sheets.dgn
DMK
06-2019-007
190008CKK BCH
FILE NO.SHEET
DATE
NOTES
SURVEY
BY
DRAWN
BY
DESIGNED
BY
CHECKEDPROJECT
BYDATEMARK
(515) 283-4931
CITY OF DES MOINES, IOWA
DEPARTMENT OF ENGINEERING
I.D.
ACTIVITY
SHEET TITLE
01-15-2021RECONSTRUCTION
LINCOLN PLACE DRIVE AT MAHASKA
SHEET 66 OF 66
626-133