Basic Facts about the pilot project
• Palombina Pilot Project• Palombina beach, Ancona• Municipality of Ancona and Adriatic
ICZM Expert Group • Realization planned for 2009
Final Meeting Meeting Ravenna 27.03.08
Today
ANCONA
RAILWAY
Final Meeting Meeting Ravenna 27.03.08
Today
Final Meeting Meeting Ravenna 27.03.08
Today
Final Meeting Meeting Ravenna 27.03.08
Image of Palombina beach
RAILWAY CYCLISTIC PATH SHORE LINE
Final Meeting Meeting Ravenna 27.03.08
Results attended
Final Meeting Meeting Ravenna 27.03.08
Results attended
Final Meeting Meeting Ravenna 27.03.08
How
WORK HARBOUR SITEaround 500.000 m3 of sand
To dredge
Distance from dredged site to the nourishment, 6 miles to go
NOURISHMENT SITE
(6 miles to come back)
Final Meeting Meeting Ravenna 27.03.08
Technical information
• The sand dredged in Ancona harbor is an option for the beach nourishment of Palombina
• The quantity of sand for linear meter of coast: 200 m3 for a meter of beach
• The working technique is a refluent dredge off the breakwater defense
• The additional cost for harbor work consisting in pushing longshore the sand stocked on the seaside is equal to € 100.000,00.
Final Meeting Meeting Ravenna 27.03.08
Cyclistic path from tourist port of Ancona
Final Meeting Meeting Ravenna 27.03.08
Activities completed
• Meetings with experts • Spatial data collection• Feasibility study • Partnership between public and
private organizations• Working maps produced
Final Meeting Meeting Ravenna 27.03.08
Follow up activities planned
1. Planning barriers and/or relocation for the railway
2. Planning a possible tourist revaluation of Palombina beach, redevelopment of existing structures and construction of new ones
3. Creating of green areas
Final Meeting Meeting Ravenna 27.03.08
Implementation
Palombina is a complex sandy landscape divided between two municipalities, with a strong private activity. At the higher level we needed to achieve a public & private network for the whole area.
Is it realistic?Yes, absolutely.
Why?All the actions are planned considering the environmental, social and economic impact.The keywords are “simplicity” and rationality.
Final Meeting Meeting Ravenna 27.03.08
Lessons learned
1. It was successful becausethe proposed plan satisfies actual needs of the beach
2. The hardest part of the work wasa creating working network
3. That surprised us the most wasthe interest and commitment for the realization of the plan
4. We are particularly proud ofthe real feasibility of all the project