Final Feasibility Report of Entertainment Point

download Final Feasibility Report of Entertainment Point

of 30

Transcript of Final Feasibility Report of Entertainment Point

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    1/28

    U n i ve rs i t y o f C en t r a l P u n j ab

    C O U R S E N A M E : R E S E A R C H P R O J E C T

    From:Muhmmad Bilal Ashraf L1S08MBBF2016Muheeb Ahmad L1F07MBBF2040

    Tahir Ahmad L1S08MBBF0012

    Nimer Ahmad L1S08MBBF2004

    Feasibility Report for

    Entertainment Point

    on Lahore Canal

    Advisor: Prof. Hafiz Musaddiq

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    2/28

    Feasibility Report_____________________

    Preface

    This project was assigned by the University of Central Punjab to prepare Feasibility Report

    of Entertainment point on Lahore Canal, Our Advisor give us all material about the

    project in which everything is mentioned that what kind of project he demand from us atearlier we think that it is an easy task because most of the contents required were understood

    but as we started working on the project we realized that its a tough job. We try to include

    accurate data and figures whereas some assumptions are necessary to be taken. In this time

    period we were in touch with Professional Engineers, Charted Accountants and market with

    different aspect and by making this professional project we gain a lot of knowledge from

    different dimensions.

    Further that because we are bound to establish Entertainment Point on Canal so we

    recommend establishing this point in front of Medical Colony near Jalo because of huge

    space as per our requirement. We conduct a survey on the targeted Population and got

    appreciable response to open this point. Then we prepare the feasibility report in which we

    include Project Cost, Yearly Expense, Yearly Revenue, Income Statement, Payback Period

    and Internal Rate of Return to check Whether it is attractive to make investment or not?

    During the preparation of the project, we have faced many difficulties especially in

    calculating TotalConstruction Cost, Project Cost and Financial Analysis etc. All were tough

    but interesting tasks but we have done them successfully. Despite of all these problems and

    tough task, the whole work was very worth full. The whole project was very interesting and

    we have learned a lot.

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    3/28

    Feasibility Report_____________________

    Acknowledgement

    After Almighty Allah, who is very merciful and most beneficial to us, we would like to

    thanks our advisorProf. Hafiz Musadiq who helped us in every step or whenever we faced

    any problem on the ladder regarding the preparation of the project. He never disappoints us

    on any step which make hurdle for further proceeding. We pay our deepest gratitude to all

    those persons and sitesthat helped us in getting primary as well as secondary data and

    information to particular problem regarding the project for implementation point of view.

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    4/28

    Feasibility Report_____________________

    Table of ContentsExecutive Summary ........................................................................................... 6

    Introduction ....................................................................................................... 7

    Capacity .......................................................................................................... 7

    Visit Frequency................................ ............................................................... 8

    Investment ...................................................................................................... 8

    Proposed Location .......................................................................................... 8

    Market Entry Timing ................................ ...................................................... 8

    Risk Factors In Decision Making ....................................................................... 9

    Recommendations .............................................................................................. 9

    Marketing ....................................................................................................... 9

    Pricing ................................................................................................ ............ 9

    Product/Product Packaging ............................................................................. 9

    Technology & Processes .................................................................................. 10

    Machinery Cost............................................................................................. 10

    Land & Building Requirement ......................................................................... 10

    Land ............................................................................................................. 10

    Requirement ................................................................................................. 10Space Allotment ........................................................................................... 10

    Construction Cost ......................................................................................... 11

    Utilities ................................................................................................ ......... 11

    Suitable Location .......................................................................................... 11

    Sketch ........................................................................................................... 12

    Human Resource .............................................................................................. 13

    FinancialAnalysis ............................................................................................. 13

    Project Appraisal Summary ................................ .......................................... 13Total Project Cost ......................................................................................... 13

    Income Statement ......................................................................................... 14

    Balance Sheet ................................................................ ............................... 15

    Cash Flow Statement ................................ .................................................... 16

    Payback Period & Internal Rate OF Return................................................... 17

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    5/28

    Feasibility Report_____________________

    Financial Calculation Notes ............................................................................. 18

    Annual Revenue Budget ............................................................................... 18

    Year WISE Calculation OF Gate & Parking ................................................. 19

    Year WISE Calculation OF Entertainment Point Money .............................. 20

    Year WISE Calculation OF Food, Souvenir Stalls & Sign Boards Money .... 21

    Notes FOR Tools, Equipment, Computer & Telephone ................................ 22

    Notes FOR Vehicles, Furniture & Security System....................................... 22

    Notes FOR Direct Cost & Expenses ............................................................. 23

    Notes FOR Salaries Expenses ....................................................................... 23

    Notes FOR Annual Stores, Spares, Repair & Maintenance ........................... 24

    Notes FOR General Expenses ....................................................................... 25

    Notes FOR Schedule OF Depreciation .......................................................... 26

    Assumptions .................................................................................................... 27

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    6/28

    Feasibility Report_____________________

    Executive Summary

    This project is submitted to University of Central Punjab as per the course requirements of

    Research Project. Our institute assignedus the topic Establishing Entertainment Point on

    Lahore Canal for our project. In this project all aspects are covered as per requirement. In

    the initial stage we have providedthe purpose of this document and factors and decision

    making for investment. Then we have Prepared project plan and all project profile which

    contain project brief, capacity, investment, Product Mix, Financial Summary, Location,

    timing and strategic recommendation etc. Then we have discussed technologies and processes

    which are used in our project which include machinery requirement and repair &

    maintenance. After that we have chosen suitable location and measured it for construction

    cost &utilities requirements for the running of this project etc. then we have figured out the

    Human Resource requirement as per our project size. At the end we have conducted Financial

    Analysis and calculate projected income statement, Revenue, Expense Payback Period and

    IRR (Internal Rate of Return) and gave all financial calculation notes and Key Assumptions.

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    7/28

    Feasibility Report_____________________

    INTRODUCTION

    This project is basically designed to facilitate the canal transportation as well as to provide an

    entertainment point for children & youngsters. The survey conducted before the project

    feasibility reveals that our country has a shortage of picnic point and the people want

    entertainment after their routine life where they can come with friend and families to relax

    themselves. The canal is a beautiful place but unfortunately no project has been established torealize its beauty. Although many decision has been made by PHA and other government

    organizations but they were only limited to the decision. In this project we have tried to cover

    all aspects regarding start up production marketing and finance.

    We sell services of joy rides and providing pleasant environment to the people visiting this

    point either they are using the canal transportation or visiting it separately. For the attraction

    of population, a combination of Six (6) different rides is used in this feasibility study.

    Although for this purpose if required the foreign rides can be imported but this will increase

    the cost very much whereas Video Games, Mini Zoo, etc. are extra options in this project.

    Foodstalls, advertisement, and car parking are also our sources of income.

    Capacity

    In this project the capacity is

    y Eighteen Thousand visitors per annumy 6 Rides are installed in an area of 6 Kanals.y Number of working days has been taken as 360.y The average round1 of a ride is 6 rounds per hour.

    Capacity and the seating capacity arecalculated as under:

    Capacity of joy rides

    Rides Van Seats/Van Total Seats Capacity/Day

    Clown Around 6 4 24 1,008Swan 6 2 12 504

    Mono Cycle 3 6 18 756

    Kiddy Rides (10 No.) 10 1 10 420

    Dodgem Cars 4 2 8 336

    Free Fall 2 6 12 504

    Total 31 21 84 3528

    y Total capacity of 84 seats x7 working hours per day x 6 Rides per hour.y Maximum number of visitors in a day is 30% of Total Capacityits mean 1,058 visitors

    per day.

    y 1The average duration of rides as 3 minutes. Loading and offloading time for the rideshave been taken as 7 minutes so one round of ride will consume 10 minutes in total,

    which would result in 6 rounds of rides per hour.

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    8/28

    Feasibility Report_____________________

    VISIT FREQUENCY

    The estimated visit frequency of these visitors is given below:

    50% would visit once a year

    25% would visit twice a year 15% would visit thrice a year

    10% would visit four times a year

    It is further estimated that average spending per person per visit to the Entertainment Point is

    Rs 100. Whereas final results can vary depending upon spending per person, ticketing fee,

    parking fee and other charges.

    Investment

    y Total cost of the project Rs. 20 million.y Fixed cost of Rs. 19.8 million.y Working capital of Rs. 0.2 million.

    Proposed Location

    The proposed locations for the this project are;

    In front of medical colony

    Wafaqi Colony

    Chabacha Area

    The most suitable location on which all the assumption and calculation is done is in front of

    Medical Colony where there is suitable place for parking and is within the reachable distance

    for the people.

    Market Entry Timing

    The main focus in this case is the children/kids and youngsters ranging from age group of 3-

    25 years so timing should be deciding accordingly.

    The Peaks season

    Summer/winter holidays of the kids

    Off peaks season

    Ramadan/Muharram & the days of exams respectively.

    Other than the Off Peaks, this project can then launched at any time in the whole year

    because this can also be used by the traveler of the canal transportation for stay &

    wait.

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    9/28

    Feasibility Report_____________________

    RISK FACTORS INDECISION MAKING

    Before making an investment it is beneficial to consider the following risk factors;

    y The number of visitors is the main portion of this project which will make it successful. This point must be established on that place where there is a continuous

    flow of visitors. The best solution is to evaluate the minimum number of visitors perday.

    We have considers that it will attract 2%-3% in the target location which figured out

    as 500 to 600 visitors per day.

    y Selection of rides based on the popularity and space available for the project. As thisproject is associated with canal transportation so it can be established at any point

    where there is a suitable space and the rides can be increased or decreased to cover the

    available. We have chosen the place in front of Lahore dental college as there is a

    huge place there for average number of rides parking and other facilities. The most

    benefit of that place is that it will affect the traffic flow on a lesser extend as

    compared to wafaqi colony and chabacha.

    y In addition to rides there must be other facilities like suitable place for sitting, cleandrinking water, ticket counter and food and beverage stops.

    Recommendations

    Marketing

    Marketing of this Entertainment Point will play a key role in the success of project. Major

    marketing options include, site advertisement, cable ads, signboards, pole signs, Billboards

    and handbills etc.

    Pricing

    It is recommended that the average spending per person per visit to the Entertainment Point

    should not exceed average per day income of the targeted market. Any pricing strategy

    should be designed based on this guideline.

    Product/ProductPackaging

    Product/Product package can be directly correlated with the type of location, spending power

    of people in that area and the total investment available with the entrepreneur for this project.

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    10/28

    Feasibility Report_____________________

    Technology & Processes

    It is recommended that local machinery with local installation is favorable. There is also

    foreign with technology with installation are available but it increases the cost which will

    become unaffordable for the investment in more than one point. Major Concern for the ride is

    the quality and safety measures which are reasonable in local machinery and local installation

    capabilities are acceptable. Therefore for this project local technology with local installationhas been considered whereas foreign technology can be used if required which results

    variation in given results.

    Machinery Cost

    Machinery Cost in Rs.

    Name of the Rides Qty Unit Cost Total Cost in Rs.

    Clown Around 1 1,170,000 1,170,000

    Swan 1 910,000 910,000

    Mono Train 1 1,400,000 1,400,000

    Kiddy Rides 10 100,000 1,000,000Dodgem Cars 4 25,000 100,000

    Free Fall 1 1,600,000 1,600,000

    Total 6,180,000

    LAND & BUILDINGREQUIREMENT

    Land

    For the proposed set up on the green belt of the canal, the land is in the ownership of govt.and this project is made for the govt. to welfare the nation. Therefore the cost of land is not

    included in this report.

    Requirement

    For the proposed set up with 6 Rides, a total of 2,4000sq.ft of land is required for this project.

    It includes

    Installation of rides Management building Ticketing booths Food and beverages places Parking space and others.

    Space Allotment

    Joy Rides 18,000 20,000sq.ft.Food Stalls & sign Boards 900 sq.ft.

    Other Construction Area2

    2,000 3100 sq.ft.

    2Other Construction Area include (Ticket booths Admin Block Public Toilets Workshops &

    stores Water Drainage & supply Boundary Wall and Telephone & Gas Works)

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    11/28

    Feasibility Report_____________________

    ConstructionCost

    Total cost of building & civil works is estimated below.

    Construction Cost

    Facilities Total Cost

    Civil works for Joy Rides 3,845,000

    Buildings 2,118,000

    Landscaping Work 1,965,000

    Total 7,928,000

    Utilities

    In this project utilities would be Electricity, water and gas. Water supply would be through

    local tube well. In addition to it we use three computers with UPS, one telephone internal

    exchange. Almost Rs. 8 millions is estimated as annual expense associated with utilities.

    Utility Requirement

    Facilities Total Cost

    Gas 500,000

    Electricity 6,500,000

    Water 500,000

    Telephone 500,000

    Total 8,000,000

    Suitable Location

    The suitable location for the project would be

    In front of Medical Colony Wafaqi Colony Mughal Pura

    The most favorable space for this

    project is in front of Medical

    Colony because our main purpose is

    to provide Entertainment Point on

    Canal as well as this space has ahuge space for parking and will

    affect the traffic flow lesser as

    compared to other locations.There is

    another benefit is that 3-4 colonies and Societies are linked with this Location.

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    12/28

    Feasibility Report_____________________

    Sketch

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    13/28

    Feasibility Report_____________________

    HUMANRESOURCE

    The following requirement of staff along with their levels and monthly salary is foreseen for

    this project:

    H

    uman Resource RequirementDesignation Salary

    Staff Monthly Annum-Rs

    C.E.O 1 30,000 360,000

    Senior Management Admin Staff 2 25,000 600,000

    Middle Management Admin Staff 2 20,000 480,000

    Junior Admin Staff 2 15,000 360,000

    Technicians & Electricians 4 8,500 408,000

    Machine Operators & Machine attendance 8 8,000 768,000

    Guards, Mali, Janitorial Service etc. 8 7,000 672,000

    Total 27 113,500 3,648,000

    FINANCIALANALYSIS

    FINANCIAL ANALYSIS

    Project Appraisal Summary

    Parameter Details

    Location In front of Medical Colony on Canal

    New/ Expansion New

    Setup Govt. Owned

    Total ProjectCost

    Description Total Rs

    Building & Civil Works 7,928,000

    Plant & Machinery 6,180,000

    Tools, Equipment, Computers & Telephones 347,000

    Electric Installations 4,000,000

    Vehicles, Furniture & Security System 1,119,400

    Contingencies 309,000

    Total Fixed Cost 19,883,400

    Net Initial Working Capital200,000

    Project Cost 20,083,400

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    14/28

    Feasibility Report_____________________

    Income Statement

    Projected Income Statement

    Year 1 Year 2 Year 3 Year 4 Year 5

    Revenue22,572,000 24,783,120 27,212,853 29,882,969 32,817,419

    Direct Cost &

    Expenses 9,904,750 10,201,893 10,507,949 10,823,188 11,147,883

    Gross Profit

    12,667,250 14,581,228 16,704,904 19,059,781 21,669,536

    Salries& Benefits

    3,648,000 3,939,840 4,255,027 4,595,429 4,963,064

    Depriciation

    1,540,530 1,540,530 1,540,530 1,540,530 1,540,530

    Other Income 0 0 0 0 0

    Operating Profit

    7,478,720 9,100,857 10,909,346 12,923,822 15,165,942Financial Charges 0 0 0 0 0

    Profit Before Tax

    7,478,720 9,100,857 10,909,346 12,923,822 15,165,942

    Taxation

    2,991,488 3,640,343 4,363,739 5,169,529 6,066,377

    Net Profit

    4,487,232 5,460,514 6,545,608 7,754,293 9,099,565

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    15/28

    Feasibility Report_____________________

    Balance Sheet

    Projected Balance Sheet

    Year 0 Year 1 Year 2 Year 3 Year 4 Year 5

    Capital & Reserves

    Capital 20,083,400 20,083,400 20,083,400 20,083,400 20,083,400 20,083,400

    Retained Earnings - 4,487,232 9,947,746 16,493,354 24,247,647 33,347,212

    Sub Total 20,083,400 24,570,632 30,031,146 36,576,754 44,331,047 53,430,612

    Current Liabilities

    Accrued Expenses - 364,800 393,984 425,503 459,543 496,306

    Tax payable - 2,991,488 3,640,343 4,363,739 5,169,529 6,066,377

    Sub Total - 3,356,288 4,034,327 4,789,241 5,629,072 6,562,683

    Total Equity &

    Liabilities 20,083,400 27,926,920 34,065,473 41,365,995 49,960,119 59,993,295

    FixedAssets

    Fixed Assets 19,883,400 18,342,870 16,802,340 15,261,810 13,721,280 12,180,750

    Sub Total 19,883,400 18,342,870 16,802,340 15,261,810 13,721,280 12,180,750

    Current Assets

    Debtors - 44,280 47,304 50,544 54,016 57,737

    Cash & Bank Balance 200,000 9,539,770 17,215,830 26,053,642 36,184,823 47,754,809

    Sub Total 200,000 9,584,050 17,263,134 26,104,186 36,238,839 47,812,546

    Total Assets 20,083,400 27,926,920 34,065,473 41,365,995 49,960,119 59,993,295

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    16/28

    Feasibility Report_____________________

    Cash Flow Statement

    Cash Flow StatementYear 0 Year 1 Year 2 Year 3 Year 4 Year 5

    Operating Profit - 7,478,720 9,100,857 10,909,346 12,923,822 15,165,942

    Add Depreciation - 1,540,530 1,540,530 1,540,530 1,540,530 1,540,530

    Capital 20,083,400

    Other Source

    Long Term Loan - - - - - -

    Inc/Dec in AccruedExp - 364,800 29,184 31,519 34,040 36,763

    Total 20,083,400 9,384,050 10,670,572 12,481,395 14,498,392 16,743,235

    Applications

    Fixed Assets 19,883,400 - - - - -

    Long Term Loan - - - - - -Payment Of

    Financial Charges - - - - - -

    Tax Paid - - 2,991,488 3,640,343 4,363,739 5,169,529

    Inc/Dec in Current Assets - 44,280 3,024 3,240 3,472 3,721

    Total 19,883,400 44,280 2,994,512 3,643,583 4,367,211 5,173,250

    Surplus 200,000 9,339,770 7,676,060 8,837,812 10,131,182 11,569,985

    Opening Balance - 200,000 9,539,770 17,215,830 26,053,642 36,184,823

    Closing Balance 200,000 9,539,770 17,215,830 26,053,642 36,184,823 47,754,809

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    17/28

    Feasibility Report_____________________

    PaybackPeriod & Internal Rate ofReturn

    Payback Period & Internal Rate of Return

    Year Net Profit Depreciation Cash Flow Net Cash

    Flow

    NPV @

    26.42%

    0 (20,083,400) 0 (20,083,400) (20,083,400) 01 4,487,232 1,540,530 6,027,762 (14,055,638) 4,767,924

    2 5,460,514 1,540,530 7,001,044 (7,054,594) 4,380,356

    3 6,545,608 1,540,530 8,086,138 1,031,544 4,001,851

    4 7,754,293 1,540,530 9,294,823 10,326,367 3,638,599

    5 9,099,565 1,540,530 10,640,095 20,966,462 3,294,670

    20,083,400

    P.P3

    = (Last Year With-ve Cash Flow) +

    (Absolute Value of Net Cash

    Flow in that Year)

    (Total Cash Flow in theFollowing Year)

    P.P = 2+ 7,054,594

    8,086,138

    P.P = 2.87 Years

    IRR = 26.42%

    3P.P= Payback Period

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    18/28

    Feasibility Report_____________________

    Financial CalculationNotes

    Annual Revenue Budget

    Year

    Annual Fee Annual Rental

    of Stalls&Signboards

    TotalGate & Parking Park

    0 0 0 0 0

    1 4,080,000 18,000,000 492,000 22,572,000

    2 4,412,520 19,845,000 525,600 24,783,120

    3 4,772,140 21,879,113 561,600 27,212,853

    4 5,161,070 24,121,722 600,178 29,882,969

    5 5,581,697 26,594,198 641,524 32,817,419See notes in next Pages

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    19/28

    Feasibility Report_____________________

    Year wise Calculation ofGate & Parking

    Average No. of visitors expected per day 500

    No of working days in one year. 360

    %age annual increase in no. of visitors. 3%

    Annual increase in visitor entrance fee in %age. 5%

    Visitors entrance fee in Rs. 20

    Vehicle Parking fee in Rs. 20

    Annual increase in vehicle parking fee in %age. 5%

    % age of visitor visiting park by their own car* It i s assumed that one vehicle contains 3 people.

    40%

    Daily Yearly

    Yr C.U4

    E.F5

    Vehicleparking

    fee

    No ofVisitor

    No ofVisitor

    withOwn

    Car

    No ofVehicles

    Incomefrom

    Entrance

    Fee

    IncomeFrom

    Parking

    Incomefrom

    Entrance

    Fee

    IncomeFrom

    ParkingTotal

    0 0 0 0 0 0 0 0 0 0 0 0

    1 100% 20 20 500 200 67 10,000 1,333 3,600,000 480,000 4,080,000

    2 100% 21 21 515 206 69 10,815 1,442 3,893,400 519,120 4,412,520

    3 100% 22 22 530 212 71 11,696 1,560 4,210,712 561,428 4,772,140

    4 100% 23 23 546 219 73 12,650 1,687 4,553,885 607,185 5,161,070

    5 100% 24 24 563 225 75 13,681 1,824 4,925,027 656,670 5,581,697

    4C.U = Capacity Utilization

    5 E.F = Entrance Fee

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    20/28

    Feasibility Report_____________________

    Year wise Calculation of EntertainmentPoint Money

    Average No. of visitors expected per day 500

    %age annual increase in no. of visitors. 5%

    Average fee for rides in Rs. 100

    Annual increase in visitors entrance fee in %age. 5%

    Daily Yearly

    YearCapacity

    Utilization

    No of

    WorkingDays

    Volume

    ofVisitors

    EntranceFee Total Total

    0 0% 0 0 0 0 0

    1 100% 360 500 100 50,000 18,000,000

    2 100% 360 525 105 55,125 19,845,000

    3 100% 360 551 110 60,775 21,879,113

    4 100% 360 579 116 67,005 24,121,722

    5 100% 360 608 122 73,873 26,594,198

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    21/28

    Feasibility Report_____________________

    Year wise Calculation of Food, Souvenir Stalls & Sign Boards Money

    Total covered area of food service/souvenir stalls 500

    Monthly average rentals per sft. in Rs. 50

    Annual increase of monthly rentals in %age. 8%

    Total area of sign board in sft. 400

    Monthly rentals of Sign Boards in sft. in Rs. 40

    Annual increase of monthly rentals in %age. 5%

    Food/Souvenir stalls Sign Boards

    YearArea

    in

    sft.

    Monthly

    Rentals

    per sft.

    Monthly

    Income

    Yearly

    Income

    Area

    in

    sft.

    Monthly

    Rentals

    per sft.

    Monthly

    Income

    Yearly

    IncomeTotal

    0 0 0 0 0 0 0 0 0 0

    1 500 50 25,000 300,000 400 40 16,000 192,000 492,000

    2 500 54 27,000 324,000 400 42 16,800 201,600 525,600

    3 500 58 29,160 349,920 400 44 17,640 211,680 561,600

    4 500 63 31,493 377,914 400 46 18,522 222,264 600,178

    5 500 68 34,012 408,147 400 49 19,448 233,377 641,524

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    22/28

    Feasibility Report_____________________

    Notes for Tools, Equipment, Computer & Telephone

    Tools, Equipments, Computers & Telephone

    DescriptionUnit Cost in

    Unit Qty Rs. Total Cost

    Tools 1 50,000 50,000

    Equipments 1 100,000 100,000Total ofTools &Equipments 150,000

    Computers

    Computers Each 3 12,000 36,000

    UPS Each 3 25,000 75,000

    Laser Printers Each 1 9,000 9,000

    Misc. 1 5,000 5,000

    Total of Computers 125,000

    Telephone

    Telephone Exchange Each 1 60,000 60,000

    Telephone Sets Each 10 700 7,000

    Misc. Accessories & Wiring 1 5,000 5,000

    Total ofTelephone 72,000

    Total 347,000

    Notes for Vehicles, Furniture & Security System

    Vehicles, Furniture & Security System

    Description Unit Qty Rs. Total Cost

    Vehicles

    Carrier Van Each 1 800,000 800,000

    Total of Vehicles 800,000Furniture

    Executive Table with Side Racks & Chairs Each 1 20,000 20,000

    Working Table with Side Racks & Chairs Each 4 10,000 40,000

    Visitor Chairs for Executive Each 8 1,500 12,000

    Visitor Chairs Each 8 800 6,400

    Computer Table Each 1 3,000 3,000

    Computer Chairs Each 1 3,000 3,000

    File Cabinets Each 1 5,000 5,000

    Steel Safe Each 1 15,000 15,000

    Air Conditioners Each 2 45,000 90,000

    Refrigerators Each 1 25,000 25,000

    Total of Furniture 219,400

    Security System

    Public Address and Paging System 1 100,000 100,000

    Total of Security System 100,000

    Total 1,119,400

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    23/28

    Feasibility Report_____________________

    Notes for DirectCost & Expenses

    DIRECT COST & EXPENSES

    YearPower, Fuel &

    Water

    Stores, Spares, Repair

    &Maint.General Exp Total

    0 0 0 0 0

    1 8,000,000 332,750 1,572,000 9,904,750

    2 8,240,000 342,733 1,619,160 10,201,893

    3 8,487,200 353,014 1,667,735 10,507,949

    4 8,741,816 363,605 1,717,767 10,823,188

    5 9,004,070 374,513 1,769,300 11,147,883

    Notes for Salaries Expenses

    Salaries Expenses

    Year Salaries & Benefits Total

    0 0 0

    1 3,648,000 3,648,0002 3,939,840 3,939,840

    3 4,255,027 4,255,027

    4 4,595,429 4,595,429

    5 4,963,064 4,963,064

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    24/28

    Feasibility Report_____________________

    Notes for Annual Stores, Spares, Repair & Maintenance

    Stores, Spares, Repair & MaintenanceTools & Consumable

    Description Qty. Unit Cost Total

    Entertainment PointTools LS 100,000 100,000

    Equipments LS 100,000 100,000

    Total 200,000

    Annual Maintenance Cost of Building & Civil Works

    Yearly Total Maint.

    Description Capital Cost Maint. Cost %age Cost

    Entertainment Point 7,928,000 0.75% 59,460

    Total 7,928,000 59,460

    Annual Maintenance Cost of Plant & Machinery

    Yearly Total Maint.

    Description Capital Cost Maint. Cost %age Cost

    Joyland Park 6,180,000 0.75% 46,350

    Total 6,180,000 46,350

    Annual Maintenance Cost ofTools, Equipments, Computers & Telephone

    Yearly Total Maint.

    Description Capital Cost Maint. Cost %age Cost

    Entertainment Point 347,000 2.00% 6,940

    Total 347,000 6,940

    Annual Maintenance Cost of Electric Installations

    Yearly Total Maint.

    Description Capital Cost Maint. Cost %age Cost

    Entertainment Point 4,000,000 0.50% 20,000

    Total 4,000,000 20,000

    Total 332,750

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    25/28

    Feasibility Report_____________________

    Notes forGeneral Expenses

    General Expenses

    Monthly Annual

    Description Charges Charges

    Postage & Courier 2,000 24,000

    Printing & Stationary 5,000 60,000Fee & Subscription 8,000 96,000

    Legal & Professional Charges 10,000 120,000

    Entertainment 10,000 120,000

    Staff Welfare 5,000 60,000

    Travelling& conveyance 5,000 60,000

    Vehicle & Equipment Running Expenses * 543,600

    News papers & periodical 200 2,400

    Publicity & advertisement 40,000 480,000

    Safety Gears 500 6,000

    1,572,000

    * Vehicle & Equipment Running Expenses

    Rate per Litter of Patrol in Rs. 75

    Rate per Litter of Diesel in Rs. 76

    Description No.Litters per

    MonthAmount

    Carrier Van 1 300 270,000

    Generators 200 KVA 1 300 273,600

    Total Vehicle Cost of Component 543,600

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    26/28

    Feasibility Report_____________________

    Notes for Schedule ofDepreciation

    Schedule of Depreciation

    Description CostRate in

    %ageAmount

    Building & civil works 7,928,000

    Contingencies 122,884

    Sub Total 8,050,884 4% 322,035

    Plant & Machinery 6,180,000

    Contingencies 98,880

    Sub Total 6,278,880 10% 627,888

    Tool, Equipment, Computers & Telephone 347,000

    Contingencies 5,379

    Sub Total 352,379 20% 70,476

    Electric Installation 4,000,000Contingencies 64,000

    Sub Total 4,064,000 10% 406,400

    Vehicles, Furniture & Security System 1,119,400

    Contingencies 17,910

    Sub Total 1,137,310 10% 113,731

    Total 19,883,453 1,540,530

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    27/28

    Feasibility Report_____________________

    Assumptions

    Project Assumptions

    Period of Construction in Years 1

    Total Covered Area of Food Service/Souvenir Stalls in Sq. ft 500

    Operating Assumptions

    No of Working Days in One Year 360

    Population of The Target Area in Millions 3

    Expected %Age of Population Visiting Per Annum of Total 6%

    Revenue Assumptions: Joy Rides

    Average Duration of Rides in Minutes 3

    Loading-Off Loading Time For Each Ride in Minutes 7

    Total No. of Rides Per Hours 6

    Virtual Capacity of The Entertainment Point/Day 3,528

    Max. No. of Visitors Per Day At 30% of Virtual Capacity 1,058

    Average No. of Visitors Expected Per Day 500

    Average No. of Visitors Expected Per Annum 180,000Estimated Percentage of Visitors Visiting Weekly 30%

    Estimated Percentage of Visitors Visiting Yearly 10%

    Estimated Percentage of Visitors Visiting Monthly 60%

  • 8/7/2019 Final Feasibility Report of Entertainment Point

    28/28

    Feasibility Report_____________________

    Revenue Assumptions: Others

    Monthly Average Rentals Per Sq. ft. In Rs. 50

    Total Area of Signboard in Sq ft. 400

    Monthly Rentals of Signboards in Sq ft. in Rs. 40

    Visitors Entrance Fee in Rs. 20

    Average Fee For Rides in Rs. 100

    Vehicle Parking Fees in Rs. 20

    Growth Rates

    Annual Increase in Visitors Entrance Fee 5%

    Annual Increase in Vehicle Parking Fee. 5%

    %Age Annual Increase in No. of Visitors. 3%

    Financial Assumptions

    Annual Increment To The Employees in %Age 8%

    Expected Increase in Electricity, Water & Gas 3%

    Annual Increase in Consumable And Maintenance 3%

    Annual Increase in General Expenses Cost Items 3%

    Accrued Expense Every Year % of Salaries 10%

    Debtor Increase by % of Revenue 9%

    Annual Repair & maintenance Cost of Plant & Machinery 0.75%

    Annual Increase in Repair & maintenance Cost of Plant & Machinery 3%

    Depreciation Rate

    Tools, Equipments, Computers & Telephones 20%

    Electric Installations 10%

    Vehicles, Furniture & Security System 10%