Final Drainage Report Affordable Housing Project 104 th Ave and Colorado Blvd City of Thornton, Colorado November 20 th , 2015 Prepared For: Adams County Housing Authority 7190 Colorado Blvd, 6 th Floor Commerce City, Colorado 80022 Prepared By: EES Entitlement and Engineering Solutions, Inc. 518 17 th Street, Suite 1575 Denver, CO 80202 Phone: (303) 572-7997 Contact: Jay Peters, PE Email: [email protected]

Transcript of Final Drainage Report - City of Thorntonand Colorado, Final Drainage Report EES Page 7 303.572.7997...

  • Final Drainage Report Affordable Housing Project 104th Ave and Colorado Blvd City of Thornton, Colorado November 20th, 2015

    Prepared For: Adams County Housing Authority 7190 Colorado Blvd, 6th Floor Commerce City, Colorado 80022

    Prepared By:

    EES Entitlement and Engineering Solutions, Inc. 518 17th Street, Suite 1575 Denver, CO 80202 Phone: (303) 572-7997 Contact: Jay Peters, PE Email: [email protected]

  • Certification Adams County Housing Authority hereby certifies that the drainage facilities for ‘Affordable Housing at 104th and Colorado’ will be constructed according to the design presented in this report. I understand that the City of Thornton does not and shall not assume liability for the drainage facilities designed and/or certified by my engineer. I understand that the City of Thornton reviews drainage plans but cannot, or behalf ‘Affordable Housing at 104th and Colorado’ guarantee that final drainage design review will absolve Adams County Housing Authority and/or their successors and/or assigns of future liability for improper design. I further understand that approval of the Plat and/or Development Permit does not imply approval of my engineer’s drainage deign. Attest: ___________________________________ Name of Responsible Party ____________________________ ___________________________________ Notary Public Authorized Signature I hereby certify that this report (plan) for the final drainage design of ‘Affordable Housing at 104th and Colorado’ was prepared by me (or under my direct supervision) in accordance with the provisions of the City of Thornton Standards and Specifications for the Design and Construction of Public and Private Improvements for the Responsible Parties thereof. I understand that the City of Thornton does not and shall not assume liability for drainage facilities designed by others Jay S. Peters P.E. Registered Professional Engineer State of Colorado No. 35068

  • 104th and Colorado, Final Drainage Report

    EES Page 1 303.572.7997

    TABLE OF CONTENTS

    1.0 GENERAL LOCATION AND DESCRIPTION ...................................................... 2 2.0 DRAINAGE BASINS AND SUB-BASINS ............................................................ 3 3.0 DRAINAGE DESIGN CRITERIA .......................................................................... 4 4.0 DRAINAGE FACILITY DESIGN ........................................................................... 5 5.0 CONCLUSIONS ................................................................................................... 7 6.0 REFERENCES ..................................................................................................... 7 TABLES

    1. Detention Basin Volume Summary

    APPENDIX

    Location map Hydrology Calculations Detention Pond EURV Calculations Pond Stage-Storage Table Hydraulic Calculations Inlet Capacity Calculations NRCS Soils Information Geotechnical Soils Tables Drainage Map

  • 104th and Colorado, Final Drainage Report

    EES Page 2 303.572.7997

    1.0 GENERAL LOCATION AND DESCRIPTION 1.1 LOCATION 1.1.1 City, County, State Highway, and Local Streets The 104th and Colorado project is located in the City of Thornton at the intersection of 104th Avenue and Colorado Blvd (see Location Map). It is bounded by open space on the South, commercial development and Colorado Blvd. on the west, 104th Avenue on the north, and open space on the east. 1.1.2 Township, Range, Section The project lies within the NW ¼ of Section 18, Township 2 South, Range 67 West of the 6th Principal Meridian in the City and County of Denver, Colorado. 1.1.3 Surrounding Developments The site is bounded by the commercial development to the west and north, and open space to the east and south. 1.2 DESCRIPTION OF PROPERTY 1.2.1 General Project Description 104th and Colorado is an affordable housing project consisting mostly of residential townhomes and apartments buildings with some retail in the north building. There will be 3 multi-family residential buildings on the site. 1.2.2 Area The area of the site is 5.02 acres. 1.2.3 Ground Cover The project site is currently undeveloped. The site is primarily open space covered with short grasses. The site generally slopes to the east at around 1% to 5%. The NRCS soil survey lists the soils on the site as Platner and Ulm Loam, that are in Hydrologic Soil Group C. A geotechnical study for the Phase I improvements at Aria found lean clays on the site, indicating the soils are Group D. 1.2.4 Major Drainage-ways and Facilities

  • 104th and Colorado, Final Drainage Report

    EES Page 3 303.572.7997

    No major drainage-ways or facilities exist on the project site. The site is located within the Grange Hall Creek watershed. 1.2.5 Existing Major Irrigation Facilities No major irrigation facilities exist within the site. 1.2.6 History of Flooding There are no reported flooding problems on the site. 1.2.7 Easements within and Adjacent to the Site There are no easements on the site. 2.0 DRAINAGE BASINS AND SUB-BASINS 2.1 MAJOR BASIN DESCRIPTION 2.1.1 Major Drainage-way Studies There is one previous major drainage-way study that included the project site, which is the Grange Hall Creek Major Drainage-way Planning Study completed in 1997. This Master Plan is currently being updated by UDFCD and the Project Sponsors. 2.1.2 Major Basin Characteristics The site is within the Grange Hall Creek watershed, specifically the Riverdale Tributary. The stream channel is about 400 feet to the south of the project site. The site is within sub-basins 8 and 54 of the planning study. The north portion of the site is within Sub-basin 8 and flows east to the creek. The south portion of the site is within sub-basin 54 and flows southeast to the creek. Runoff from the site is conveyed overland to the stream channel, there are no storm sewers or other types of formal conveyance systems between the site and the Creek. 2.1.3 Irrigation Facilities No irrigation facilities are located within the site. 2.2 SUB-BASIN DESCRIPTION 2.2.1 Historic Drainage Patterns

  • 104th and Colorado, Final Drainage Report

    EES Page 4 303.572.7997

    The site generally conveys runoff overland to the east and southeast. Runoff flows overland to the creek through the open space. 2.2.2 On-Site and Off-Site Sub-basin Characteristics There is a portion of a small retail development to the west of the site that convey runoff overland onto the site. The north portion of the site flows east to the creek. The southern portion of the site flows southeast to the creek. 3.0 DRAINAGE DESIGN CRITERIA 3.1 REGULATIONS The 104th and Colorado Project design criteria were developed using regulations, standards, and criteria found within the City of Thornton’s Storm Drainage Design, Grading, and Water Quality Technical Criteria, CDOT’s Drainage Manual, and the Urban Drainage and Flood Control District’s Drainage Criteria Manual, Volumes I, II, and III. 3.2 DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS 3.2.1 Previous Drainage Studies for the Site There are no known drainage studies specifically for the project site. 3.2.2 Relationship to and Implication of Adjacent Drainage Studies No adjacent drainage studies are available for this site. 3.2.3 Site Drainage Impact The site will not adversely impact surrounding drainage systems. 3.3 HYDROLOGIC CRITERIA Design Rainfall: 1-hour point rainfall depths of 1.38 and 2.69 for the 10- and 100-year storm

    events, respectively. Depths were obtained from Table 400-1 of the City of Thornton’s Criteria.

    Hydrologic Soil Group: NRCS hydrologic soil group C. Runoff Calculation Method: Rational Formula. Conveyance System Design Storm Recurrence Intervals: 5-year & 100-year Detention Release Rates: 0.30 cfs/acre for 10-year, 1.0 cfs/acre for 100-year Size detention ponds using the Excess Urban Runoff Volume Method (EURV).

  • 104th and Colorado, Final Drainage Report

    EES Page 5 303.572.7997

    3.4 HYDRAULIC CRITERIA Size storm sewers for the 5-event. Size inlets for the 5-year event. Size major system for the 100-year event. Hydraulic Calculation Method: Standard Step Backwater. Do not adversely impact existing storm systems for surrounding developments. 3.5 WATER QUALITY CRITERIA Provide permanent BMPs in accordance with V3 of the UDFCD USDCM. 3.6 VARIANCES FROM CRITERIA

    No waivers are requested for this portion of the project. 4.0 DRAINAGE FACILITY DESIGN 4.1 GENERAL CONCEPT The overall storm improvements at Aria will consist of: Inlets and storm sewers that convey runoff from the site to the NW Pond; Regional detention and water quality treatment pond to the south of the site. The project will implement new storm sewers and inlets within the on the site, and convey runoff to the regional pond to the south of the site. Storm sewers are sized for a minimum capacity of a 5-year storm event, with the 100-year storm event conveyed in the streets. Storm sewers in several locations are sized to convey the 100-year storm event to prevent runoff from entering property adjacent to the site, or where grades do not allow surface conveyance on the streets. 4.2 SPECIFIC DETAILS 4.2.1 Conveyance System The storm infrastructure improvements will consist of storm sewers, chases, and inlets. The new conveyance system for the site will consist of the following: Chases in parking lot medians. Type C and Type R inlets at low points on the site. 18- to 30-inch diameter storm sewer along the east side of the site. Several short 18-inch storm sewer laterals. Relocation of the inlets in 104th Avenue at the new drive access.

  • 104th and Colorado, Final Drainage Report

    EES Page 6 303.572.7997

    Concrete pan above the retaining wall along the west site boundary. Chases will be installed within parking lot medians to allow runoff to be conveyed overland to the storm system on the east side of the site. There will be an 18- to 30- inch primary storm sewer with numerous inlets along the east boundary of the site. The storm sewer and inlets are sized to capture and convey the 100-year storm event to the regional detention pond. There is a new 18-inch storm sewer at the low point of the south access drive that captures runoff from the open space to the north, and runoff from the roadway. The storm sewer will connect to the new family dollar storm sewer. The storm sewer and inlets will capture and convey the 100-year storm event to the regional detention pond. Existing inlets within 104th Avenue will need to be removed and reconstructed to accommodate the deceleration lane to the project site. A concrete pan will be constructed immediately above the proposed retaining wall along the west boundary of the site. The pan will convey off-site runoff to the north around the planned development, and is sized for the 100-year event. 4.2.2 Water Quality Treatment Facilities and BMPs An extended detention basin (EDB) permanent BMP will be installed in the regional pond. The EDB is sized to capture and treat runoff from the entire site, in addition to the RTD light rail station and Colorado Marketplace retail center. Volumes and water surface elevations are provided in Section 4.2.3. 4.2.3 Detention Facilities The Regional pond will detain and treat runoff from the site, as well as the off-site watershed areas from the 104th Light Rail Station, and the retail center, for a total watershed area of 32.48 acres. Overall imperviousness for the watershed contributing to the detention pond is estimated to be 69%. The required volumes for the Northwest Detention Pond are summarized in Table 2 below.

    Table 1 Detention Pond Summary

    Pond Area, acres %

    imperviousness EURV,

    AF 100-year

    Volume, AF Release Rate, cfs

    Previous RTD 60% Design 27.48 64 1.75 3.40 27.48

    Expanded for ADCHA Project 32.48 69 2.24 3.92 32.48

  • 104th and Colorado, Final Drainage Report

    EES Page 7 303.572.7997

    4.2.4 Drainage Easements and Tracts An easement will be provided for the storm sewer that crosses through the public open space. No drainage easements are planned for the site, as the storm sewer will be private, and serving only one owner. 4.2.5 Maintenance The stormwater improvements on the project site are private improvements, and will be maintained by ADCHA. 4.2.6 Groundwater and Bedrock The storm sewers for the site are above the estimated groundwater and bedrock levels on the site. Pickering, Cole, and Hivner, LLC prepared a preliminary geotechnical investigation report for the Site in October 2014. The boring logs from the report are included in the appendix. 4.2.7 Wetland Mitigation and Preservation There are no wetlands on the site. 5.0 CONCLUSIONS 5.1 COMPLIANCE WITH STANDARDS This drainage report presents the drainage analysis for 104th and Colorado, and complies with the criteria and standards of the City of Thornton’s Storm Drainage Design, Grading, and Water Quality Technical Criteria. 5.2 DRAINAGE CONCEPT The drainage system provides a 100-year level of protection for the site. The conveyance system is designed to safely convey the 100-year storm. 5.3 WATER QUALITY Water quality treatment is provided for the site in accordance with the UDFCD Volume 3 USDCM. 6.0 REFERENCES

  • 104th and Colorado, Final Drainage Report

    EES Page 8 303.572.7997

    1. Pickering, Cole, and Hivner, LLC. October 2014. Preliminary Geotechnical Engineering Report.

    2. City of Thornton. October 2012. Standards and Specifications. 3. Colorado Dept. of Transportation. 2004. Drainage Design Manual.

    4. Merrick and Company. August 2015. Thornton Family Dollar Construction Documents.

    5. Regional Transportation District. May 2015. 104th Station 60% Preliminary Design

    Documents. 6. Urban Drainage and Flood Control District. February 1997. Grange Hall Creek Major

    Drainage-way Planning Study, Preliminary Design Report.

  • 104th and Colorado, Final Drainage Report

    EES Page 9 303.572.7997

    APPENDIX

  • VICINITY MAP

    SITE

  • 104th and Colorado Proposed Hydrology.xls Summary

    Design Point Contributing Basins

    Area (acres)

    5-Year (cfs)

    100-Year (cfs)

    1 SB50,SB70 0.82 2.0 4.42 SB10,SB20,SB30,SB40,SB50,SB60,SB70 2.37 6.1 13.2

    3SB10,SB20,SB30,SB40,SB50,SB60,SB70, SB80,SB90 4.03 10.1 22.0

    4SB10,SB20,SB30,SB40,SB50,SB60,SB70, SB80,SB90,SB125 4.20 10.3 22.6

    5SB10,SB20,SB30,SB40,SB50,SB60,SB70, SB80,SB90,SB100,SB110,SB120,SB125 5.08 11.3 24.5

    6 OS20,OS30,SB130 2.87 4.3 12.4

    Table A-1Summary of Site Hydrology

    104th and ColoradoThornton, Colorado

  • % Imp. C2 C5 C10035 0.25 0.33 0.5750 0.34 0.40 0.6080 0.60 0.63 0.742 0.04 0.15 0.5090 0.71 0.73 0.81

    Area (acres) % Area (acres) % Area (acres) % Area (acres) % Area (acres) %SB10 0.19 0 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.19 100.0% 100.00% 90% 0.71 0.73 0.81SB20 0.33 0 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.33 100.0% 100.00% 90% 0.71 0.73 0.81SB30 0.32 0 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.32 100.0% 100.00% 90% 0.71 0.73 0.81SB40 0.33 0 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.33 100.0% 100.00% 90% 0.71 0.73 0.81SB45 0.38 0 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.38 100.0% 100.00% 90% 0.71 0.73 0.81SB50 0.58 0 0.0% 0.00 0.0% 0.58 100.0% 0.00 0.0% 0.00 0.0% 100.00% 80% 0.60 0.63 0.74SB60 0.38 0 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.38 100.0% 100.00% 90% 0.71 0.73 0.81SB70 0.24 0 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.24 100.0% 100.00% 90% 0.71 0.73 0.81SB80 0.26 0 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.26 100.0% 100.00% 90% 0.71 0.73 0.81SB90 1.40 0 0.0% 0.00 0.0% 1.40 100.0% 0.00 0.0% 0.00 0.0% 100.00% 80% 0.60 0.63 0.74SB100 0.21 0 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.21 100.0% 100.00% 90% 0.71 0.73 0.81SB110 0.33 0 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.33 100.0% 100.00% 90% 0.71 0.73 0.81SB120 0.34 0 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.34 100.0% 100.00% 90% 0.71 0.73 0.81SB125 0.17 0 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.17 100.0% 100.00% 90% 0.71 0.73 0.81SB130 0.41 0 0.0% 0.00 0.0% 0 0.0% 0.00 0.0% 0.41 100.0% 100.00% 90% 0.71 0.73 0.81OS10 1.80 0 0.0% 0.00 0.0% 0 0.0% 0.00 0.0% 1.80 100.0% 100.00% 90% 0.71 0.73 0.81OS20 0.98 0 0.0% 0.00 0.0% 0 0.0% 0.00 0.0% 0.98 100.0% 100.00% 90% 0.71 0.73 0.81OS30 1.48 0 0.0% 0.00 0.0% 0 0.0% 1.48 100.0% 0.00 0.0% 100.00% 2% 0.04 0.15 0.50

    Total 10.13 0.00 0.0% 0.00 0.0% 1.98 19.6% 1.48 14.6% 6.67 65.8% 100.00% 75% 0.59 0.63 0.75

    1. From Table RO-3 and RO-5 in the UDFCD USDCM2. C coefficients calculated by weighting global C values based on percentage of land use type.

    Commercial/Parking Lot

    Subbasin Total Area (acres)

    C Coefficient2Composite Imperviousness 5-year

    Land Use Area per Sub-BasinResidential Parks/Open Space

    100-yearLow Density Medium Density Apartments 2-yearCommercial/Parking Lot % Check

    Global Parameters1

    ApartmentsParks/Open Space

    Table A-2C Value Calculations

    Aria Stormwater Master planDenver, Colorado

    Medium Density Residential

    Land UseLow Density Residential

  • 104th and Colorado Proposed Hydrology.xls Q Peak 3 of 5

    Tc Final Tc

    Des

    ign

    Pt.

    Basi

    n ID

    Area

    C CA

    C CA

    C CA

    Leng

    th (3

    00' m

    ax)

    Slop

    e

    ti Leng

    th

    Slop

    e

    Velo

    city

    tt tc=t

    i+tt

    Tota

    l len

    gth

    Tc =

    (l/1

    80+1

    0)

    Fina

    l Tc

    2-ye

    ar

    5-ye

    ar

    100-

    year

    2-ye

    ar

    5-ye

    ar

    100-

    year

    acres ft % min. ft % fps min min ft min min in/hr cfs1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

    SB50 0.58 0.60 0.35 0.63 0.37 0.74 0.43 200 2.0% 9.7 0 2.0% 3.0 0.0 9.7 200 11.1 9.7 2.60 3.67 7.04 0.9 1.3 3.0SB70 0.24 0.71 0.17 0.73 0.18 0.81 0.19 40 2.0% 3.4 0 0.8% 3.0 0.0 3.4 40 10.2 3.4 3.52 4.96 9.52 0.6 0.9 1.9

    1 0.82 0.63 0.52 0.66 0.54 0.76 0.62 9.7 2.60 3.67 7.04 1.4 2.0 4.4

    SB10 0.19 0.71 0.13 0.73 0.14 0.81 0.15 130 2.0% 6.1 330 2.0% 3.0 1.8 8.0 460 12.6 8.0 2.80 3.94 7.56 0.4 0.5 1.2SB20 0.33 0.71 0.23 0.73 0.24 0.81 0.27 100 2.0% 5.4 120 2.0% 3.0 0.7 6.1 220 11.2 6.1 3.06 4.31 8.27 0.7 1.0 2.2SB30 0.32 0.71 0.23 0.73 0.23 0.81 0.26 60 2.0% 4.2 100 2.0% 3.0 0.6 4.7 160 10.9 4.7 3.27 4.61 8.84 0.7 1.1 2.3SB40 0.33 0.71 0.23 0.73 0.24 0.81 0.27 100 2.0% 5.4 220 3.0% 3.0 1.2 6.6 320 11.8 6.6 2.97 4.20 8.05 0.7 1.0 2.2SB50 0.58 0.60 0.35 0.63 0.37 0.74 0.43 200 2.0% 9.7 0 2.0% 3.0 0.0 9.7 200 11.1 9.7 2.60 3.67 7.04 0.9 1.3 3.0SB60 0.38 0.71 0.27 0.73 0.28 0.81 0.31 300 2.0% 9.3 0 0.8% 3.0 0.0 9.3 300 11.7 9.3 2.64 3.72 7.14 0.7 1.0 2.2SB70 0.24 0.71 0.17 0.73 0.18 0.81 0.19 40 2.0% 3.4 0 0.8% 3.0 0.0 3.4 40 10.2 3.4 3.52 4.96 9.52 0.6 0.9 1.9

    2 2.37 0.68 1.62 0.71 1.67 0.79 1.88 9.7 2.60 3.67 7.04 4.2 6.1 13.2

    SB10 0.19 0.71 0.13 0.73 0.14 0.81 0.15 130 2.0% 6.1 520 2.0% 3.0 2.9 9.0 650 13.6 9.0 2.67 3.77 7.23 0.4 0.5 1.1SB20 0.33 0.71 0.23 0.73 0.24 0.81 0.27 100 2.0% 5.4 120 2.0% 3.0 0.7 6.1 220 11.2 6.1 3.06 4.31 8.27 0.7 1.0 2.2SB30 0.32 0.71 0.23 0.73 0.23 0.81 0.26 60 2.0% 4.2 100 2.0% 3.0 0.6 4.7 160 10.9 4.7 3.27 4.61 8.84 0.7 1.1 2.3SB40 0.33 0.71 0.23 0.73 0.24 0.81 0.27 100 2.0% 5.4 220 3.0% 3.0 1.2 6.6 320 11.8 6.6 2.97 4.20 8.05 0.7 1.0 2.2SB50 0.58 0.60 0.35 0.63 0.37 0.74 0.43 200 2.0% 9.7 0 2.0% 3.0 0.0 9.7 200 11.1 9.7 2.60 3.67 7.04 0.9 1.3 3.0SB60 0.38 0.71 0.27 0.73 0.28 0.81 0.31 300 2.0% 9.3 0 0.8% 3.0 0.0 9.3 300 11.7 9.3 2.64 3.72 7.14 0.7 1.0 2.2SB70 0.24 0.71 0.17 0.73 0.18 0.81 0.19 40 2.0% 3.4 0 0.8% 3.0 0.0 3.4 40 10.2 3.4 3.52 4.96 9.52 0.6 0.9 1.9SB80 0.26 0.71 0.18 0.73 0.19 0.81 0.21 40 2.0% 3.4 240 0.8% 2.0 2.0 5.4 280 11.6 5.4 3.16 4.45 8.54 0.6 0.8 1.8SB90 1.40 0.60 0.84 0.63 0.88 0.74 1.04 200 2.0% 9.7 0 2.0% 2.0 0.0 9.7 200 11.1 9.7 2.60 3.67 7.04 2.2 3.2 7.3

    3 4.03 0.66 2.64 0.68 2.74 0.78 3.13 9.7 2.60 3.67 7.04 6.9 10.1 22.0

    SB10 0.19 0.71 0.13 0.73 0.14 0.81 0.15 130 2.0% 6.1 720 2.0% 3.0 4.0 10.1 850 14.7 10.1 2.56 3.61 6.92 0.3 0.5 1.1SB20 0.33 0.71 0.23 0.73 0.24 0.81 0.27 100 2.0% 5.4 120 2.0% 3.0 0.7 6.1 220 11.2 6.1 3.06 4.31 8.27 0.7 1.0 2.2SB30 0.32 0.71 0.23 0.73 0.23 0.81 0.26 60 2.0% 4.2 100 2.0% 3.0 0.6 4.7 160 10.9 4.7 3.27 4.61 8.84 0.7 1.1 2.3SB40 0.33 0.71 0.23 0.73 0.24 0.81 0.27 100 2.0% 5.4 220 3.0% 3.0 1.2 6.6 320 11.8 6.6 2.97 4.20 8.05 0.7 1.0 2.2SB50 0.58 0.60 0.35 0.63 0.37 0.74 0.43 200 2.0% 9.7 0 2.0% 3.0 0.0 9.7 200 11.1 9.7 2.60 3.67 7.04 0.9 1.3 3.0SB60 0.38 0.71 0.27 0.73 0.28 0.81 0.31 300 2.0% 9.3 0 0.8% 3.0 0.0 9.3 300 11.7 9.3 2.64 3.72 7.14 0.7 1.0 2.2SB70 0.24 0.71 0.17 0.73 0.18 0.81 0.19 40 2.0% 3.4 0 0.8% 3.0 0.0 3.4 40 10.2 3.4 3.52 4.96 9.52 0.6 0.9 1.9SB80 0.26 0.71 0.18 0.73 0.19 0.81 0.21 40 2.0% 3.4 240 0.8% 2.0 2.0 5.4 280 11.6 5.4 3.16 4.45 8.54 0.6 0.8 1.8SB90 1.40 0.60 0.84 0.63 0.88 0.74 1.04 200 2.0% 9.7 0 2.0% 2.0 0.0 9.7 200 11.1 9.7 2.60 3.67 7.04 2.2 3.2 7.3

    SB125 0.17 0.71 0.12 0.73 0.12 0.81 0.14 120 2.0% 5.9 150 3.0% 3.0 0.8 6.7 270 11.5 6.7 2.96 4.17 8.00 0.4 0.5 1.14 4.20 0.66 2.76 0.68 2.87 0.78 3.26 10.1 2.56 3.61 6.92 7.1 10.3 22.6

    SB10 0.19 0.71 0.13 0.73 0.14 0.81 0.15 130 2.0% 6.1 800 2.0% 3.0 4.4 10.6 930 15.2 10.6 2.51 3.54 6.80 0.3 0.5 1.0SB20 0.33 0.71 0.23 0.73 0.24 0.81 0.27 100 2.0% 5.4 120 2.0% 3.0 0.7 6.1 220 11.2 6.1 3.06 4.31 8.27 0.7 1.0 2.2SB30 0.32 0.71 0.23 0.73 0.23 0.81 0.26 60 2.0% 4.2 100 2.0% 3.0 0.6 4.7 160 10.9 4.7 3.27 4.61 8.84 0.7 1.1 2.3SB40 0.33 0.71 0.23 0.73 0.24 0.81 0.27 100 2.0% 5.4 220 3.0% 3.0 1.2 6.6 320 11.8 6.6 2.97 4.20 8.05 0.7 1.0 2.2SB50 0.58 0.60 0.35 0.63 0.37 0.74 0.43 200 2.0% 9.7 650 2.0% 3.0 3.6 13.3 850 14.7 13.3 2.28 3.22 6.17 0.8 1.2 2.6SB60 0.38 0.71 0.27 0.73 0.28 0.81 0.31 300 2.0% 9.3 0 0.8% 3.0 0.0 9.3 300 11.7 9.3 2.64 3.72 7.14 0.7 1.0 2.2SB70 0.24 0.71 0.17 0.73 0.18 0.81 0.19 40 2.0% 3.4 0 0.8% 3.0 0.0 3.4 40 10.2 3.4 3.52 4.96 9.52 0.6 0.9 1.9SB80 0.26 0.71 0.18 0.73 0.19 0.81 0.21 40 2.0% 3.4 240 0.8% 2.0 2.0 5.4 280 11.6 5.4 3.16 4.45 8.54 0.6 0.8 1.8SB90 1.40 0.60 0.84 0.63 0.88 0.74 1.04 200 2.0% 9.7 0 2.0% 2.0 0.0 9.7 200 11.1 9.7 2.60 3.67 7.04 2.2 3.2 7.3

    SB100 0.21 0.71 0.15 0.73 0.15 0.81 0.17 60 2.0% 4.2 140 0.8% 2.0 1.2 5.3 200 11.1 5.3 3.17 4.47 8.57 0.5 0.7 1.5SB110 0.33 0.71 0.23 0.73 0.24 0.81 0.27 110 2.0% 5.6 160 3.0% 3.0 0.9 6.5 270 11.5 6.5 2.98 4.21 8.07 0.7 1.0 2.1

    Table A-3Rational Method Hydrologic Calculations

    Aria Stormwater Master PlanDenver, Colorado

    Sub-Basin DataOverland Time (ti) Travel Time (tt) Tc Check

    Time of Concentration, Tc2-year 5-year 100-year

    C Values Intensity, I Peak Discharge, Q

  • 104th and Colorado Proposed Hydrology.xls Q Peak 4 of 5

    Tc Final Tc

    Des

    ign

    Pt.

    Basi

    n ID

    Area

    C CA

    C CA

    C CA

    Leng

    th (3

    00' m

    ax)

    Slop

    e

    ti Leng

    th

    Slop

    e

    Velo

    city

    tt tc=t

    i+tt

    Tota

    l len

    gth

    Tc =

    (l/1

    80+1

    0)

    Fina

    l Tc

    2-ye

    ar

    5-ye

    ar

    100-

    year

    2-ye

    ar

    5-ye

    ar

    100-

    year

    acres ft % min. ft % fps min min ft min min in/hr cfs1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

    Table A-3Rational Method Hydrologic Calculations

    Aria Stormwater Master PlanDenver, Colorado

    Sub-Basin DataOverland Time (ti) Travel Time (tt) Tc Check

    Time of Concentration, Tc2-year 5-year 100-year

    C Values Intensity, I Peak Discharge, Q

    SB120 0.34 0.71 0.24 0.73 0.25 0.81 0.28 100 2.0% 5.4 160 3.0% 3.0 0.9 6.3 260 11.4 6.3 3.02 4.26 8.18 0.7 1.1 2.3SB125 0.17 0.71 0.12 0.73 0.12 0.81 0.14 120 2.0% 5.9 150 3.0% 3.0 0.8 6.7 270 11.5 6.7 2.96 4.17 8.00 0.4 0.5 1.1

    5 5.08 0.67 3.39 0.69 3.51 0.78 3.97 13.3 2.28 3.22 6.17 7.7 11.3 24.5

    OS20 0.98 0.71 0.70 0.73 0.72 0.81 0.79 100 2.0% 5.4 120 2.0% 3.0 0.7 6.1 220 11.2 6.1 3.06 4.31 8.27 2.1 3.1 6.6OS30 1.48 0.04 0.06 0.15 0.22 0.50 0.74 100 2.0% 13.8 120 2.0% 3.0 0.7 14.5 220 11.2 11.2 2.45 3.46 6.64 0.1 0.8 4.9SB130 0.41 0.71 0.29 0.73 0.30 0.81 0.33 60 2.0% 4.2 100 2.0% 3.0 0.6 4.7 160 10.9 4.7 3.27 4.61 8.84 1.0 1.4 2.9

    6 2.87 0.36 1.05 0.43 1.24 0.65 1.87 11.2 2.45 3.46 6.64 2.6 4.3 12.4

    Notes:

    2. I = 28.5P1/(10+Tc)0.786

    3. Ti = 0.395(1.1-C5)(L)0.5/S0.33

    4. Minimun Tc is 5.0 minutes for urban areas.

    1. Flows calculated using the rational method, based on the methods provided in chapter 4 section 4 (rainfall), and Chapter 5 Section 2 (runoff) of the USDCM by UDFCD (2008).

  • 104th and Colorado Proposed Hydrology.xls Rainfall

    Recurrence Interval (yrs) 1-hr Rainfall Depth (in)

    2 0.955 1.3410 1.5525 2.0050 2.25100 2.57

    Note: From TOCR Criteria Manual

    Table A-4Rainfall Data

    Denver, Colorado

  • Steam UD-Detention_v2.35.xls 11/22/2015, 10:31 PM

    Project:Basin ID:

    32.48

    69.0%

    0

    69.0%

    Percentage of Area Area (acres)0.00.0

    100.0% 32.5

    Initial--f i Final--fo3 0.5 0.0018

    (watershed inches) (acre-feet)

    0.83 2.24 Design Oulet to Empty EURV in 72 Hours

    100-year Detention Volume Including WQCV 5 1.45 3.92 32.48

    Notes:

    Hydrologic Soil TypeType AType B

    Excess Urban Runoff Volume4

    Infiltration (inches per hour)

    Maximum Allowable Release Rate, cfs3

    4) EURV approximates the difference between developed and pre-developed runoff volume.5) 100-yr detention volume includes EURV. No need to add more volume for WQCV or EURV

    Detention Volumes 2,5

    DETENTION VOLUME BY THE FULL SPECTRUM METHOD

    104th and ColoradoRegional Detention Pond

    1) Effective imperviousness is based on Figure ND-1 of the Urban Storm Drainage Criteria Manual (USDCM).

    Area of Watershed (acres)

    Subwatershed ImperviousnessLevel of Minimizing Directly Connected

    Impervious Area (MDCIA)

    * User input data shown in blue.

    2) Results shown reflect runoff reduction from Level 1 or 2 MDCIA and are plotted at the watershed's total imperviousness value; the impact of MDCIA is reflected by the results being below the curves.3) Maximum allowable release rates for 100-year event are based on Table SO-1. Outlet for the Excess Urban Runoff Volume (EURV) to be designed to empty out the EURV in 72 hours. Outlet design is similar to one for the WQCV outlet of an extended detention basin (i.e., perforated plate with a micro-pool) and extends to top of EURV water surface elevation.

    Recommended Horton's Equation Parameters for CUHP

    Effective Imperviousness1

    Type C or D

    Decay Coefficient--a

    0.00

    0.50

    1.00

    1.50

    2.00

    2.50

    0 20 40 60 80 100

    Runo

    ff Vo

    ume

    - Inc

    hes

    Percent Total Imperviousness

    100-yr Vol Type A Soil

    100-yr Vol Type B, C & D Soils

    EURV Type A Soil

    EURV Type B Soil

    EURV Type C/D Soil

    100-yr Storage Volume

    EURV Storage Volume

  • Incremental Total Incremental Total5163.0 Pond Bottom 0 0 75 0 0 0.005164.0 1 1 75 75 75 0.005165.0 1 2 2,000 821 896 0.025166.0 1 3 7,037 4,263 5,159 0.125167.0 1 4 13,461 10,077 15,236 0.355168.0 1 5 20,229 16,731 31,966 0.735169.0 1 6 24,513 22,337 54,303 1.255170.0 EURV 1 7 28,883 26,668 80,971 1.865171.0 1 8 33,308 31,069 112,040 2.575172.0 100-year 1 9 37,845 35,552 147,593 3.39

    1. Calculated using the Conical method.

    Table 1Stage, Storage Data

    60% RTD Pond

    Elevation (ft., NAVD88) Description Depth (ft.) Area (sf) Volume (cubic-feet)1

    Volume AF

    104th and Colorado

  • Incremental Total Incremental Total5163.0 Pond Bottom 0 0 75 0 0 0.005164.0 1 1 75 75 75 0.005165.0 1 2 2,000 821 896 0.025166.0 1 3 7,037 4,263 5,159 0.125167.0 1 4 16,880 11,605 16,764 0.385168.0 1 5 26,010 21,281 38,045 0.875169.0 1 6 31,100 28,517 66,562 1.535170.0 EURV 1 7 35,592 33,321 99,883 2.295171.0 1 8 41,380 38,450 138,333 3.185172.0 100-year 1 9 46,180 43,758 182,091 4.18

    1. Calculated using the Conical method.

    Table 1Stage, Storage Data

    Expanded Pond to Include 104th Site104th and Colorado

    Elevation (ft., NAVD88) Description Depth (ft.) Area (sf) Volume (cubic-feet)1

    Volume AF

  • Project Description

    Friction Method Manning Formula

    Solve For Full Flow Capacity

    Input Data

    Roughness Coefficient 0.013

    Channel Slope 0.00400 ft/ft

    Normal Depth 2.50 ft

    Diameter 2.50 ft

    Discharge 25.94 ft³/s

    Rating Curve Plot

    Rating Curve for Circular Pipe - 1

    11/22/2015 8:36:11 PMBentley Systems, Inc. Haestad Methods Solution CenterBentley FlowMaster V8i (SELECTseries 1) [08.11.01.03]

    27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1of1Page

  • ResultsOpening

    Area (sq.ft.) C

    % Blockage H (ft)

    Weir length (ft.)

    % Blockage C H (ft)

    100-Yr Ponding

    Depth (ft.)

    1 S-63 1 R 4.4 2.5 0.67 10% 0.13 5 10% 3.0 0.47 0.472 S-73 1 C 9.0 6 0.67 50% 0.31 12 50% 3.0 0.63 0.633 S-66 1 C 1.8 6 0.67 50% 0.01 12 50% 3.0 0.22 0.224 S-82 1 C 7.3 6 0.67 50% 0.20 12 50% 3.0 0.55 0.555 S-76 1 R 1.1 2.5 0.67 10% 0.01 5 10% 3.0 0.19 0.196 S-79 1 R 3.6 2.5 0.67 10% 0.09 5 10% 3.0 0.41 0.417 S-77 1 R 2.2 2.5 0.67 10% 0.03 5 10% 3.0 0.30 0.308 S-86 1 C 3.2 6 0.67 50% 0.04 12 50% 3.0 0.32 0.329 S-85 1 R 2.9 2.5 0.67 10% 0.06 5 10% 3.0 0.36 0.36

    1. Orifice Equation: Q = (1-%blockage) CA (2gH)0.5

    2. Weir Equation: Q = (1-%blockage) CLH1.5

    No. of Inlets

    Table 3Inlet Ponding Depth Calculations

    100-year Design EventInlets in a Sag

    Inlet ID Description Inlet Type 100-yr Q (cfs)

    Orifice Calcs1 Weir Calcs2

  • Hydrologic Soil Group—Adams County Area, Parts of Adams and Denver Counties, Colorado(104th and Colorado)

    Natural ResourcesConservation Service

    Web Soil SurveyNational Cooperative Soil Survey

    11/22/2015Page 1 of 4

    4414

    700

    4414

    740

    4414

    780

    4414

    820

    4414

    860

    4414

    900

    4414

    940

    4414

    980

    4414

    700

    4414

    740

    4414

    780

    4414

    820

    4414

    860

    4414

    900

    4414

    940

    4414

    980

    505160 505200 505240 505280 505320 505360 505400

    505160 505200 505240 505280 505320 505360 505400

    39° 53' 6'' N10

    4° 5

    6' 2

    2'' W

    39° 53' 6'' N

    104°

    56'

    12'

    ' W

    39° 52' 55'' N

    104°

    56'

    22'

    ' W

    39° 52' 55'' N

    104°

    56'

    12'

    ' W

    N

    Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS840 50 100 200 300

    Feet0 20 40 80 120

    MetersMap Scale: 1:1,590 if printed on A portrait (8.5" x 11") sheet.

  • MAP LEGEND MAP INFORMATION

    Area of Interest (AOI)Area of Interest (AOI)

    SoilsSoil Rating Polygons

    A

    A/D

    B

    B/D

    C

    C/D

    D

    Not rated or not available

    Soil Rating LinesA

    A/D

    B

    B/D

    C

    C/D

    D

    Not rated or not available

    Soil Rating PointsA

    A/D

    B

    B/D

    C

    C/D

    D

    Not rated or not available

    Water FeaturesStreams and Canals

    TransportationRails

    Interstate Highways

    US Routes

    Major Roads

    Local Roads

    BackgroundAerial Photography

    The soil surveys that comprise your AOI were mapped at 1:20,000.

    Warning: Soil Map may not be valid at this scale.

    Enlargement of maps beyond the scale of mapping can causemisunderstanding of the detail of mapping and accuracy of soil lineplacement. The maps do not show the small areas of contrastingsoils that could have been shown at a more detailed scale.

    Please rely on the bar scale on each map sheet for mapmeasurements.

    Source of Map: Natural Resources Conservation ServiceWeb Soil Survey URL: http://websoilsurvey.nrcs.usda.govCoordinate System: Web Mercator (EPSG:3857)

    Maps from the Web Soil Survey are based on the Web Mercatorprojection, which preserves direction and shape but distortsdistance and area. A projection that preserves area, such as theAlbers equal-area conic projection, should be used if more accuratecalculations of distance or area are required.

    This product is generated from the USDA-NRCS certified data as ofthe version date(s) listed below.

    Soil Survey Area: Adams County Area, Parts of Adams andDenver Counties, ColoradoSurvey Area Data: Version 12, Sep 22, 2015

    Soil map units are labeled (as space allows) for map scales 1:50,000or larger.

    Date(s) aerial images were photographed: Aug 30, 2014—Sep18, 2014

    The orthophoto or other base map on which the soil lines werecompiled and digitized probably differs from the backgroundimagery displayed on these maps. As a result, some minor shiftingof map unit boundaries may be evident.

    Hydrologic Soil Group—Adams County Area, Parts of Adams and Denver Counties, Colorado(104th and Colorado)

    Natural ResourcesConservation Service

    Web Soil SurveyNational Cooperative Soil Survey

    11/22/2015Page 2 of 4

  • Hydrologic Soil Group

    Hydrologic Soil Group— Summary by Map Unit — Adams County Area, Parts of Adams and Denver Counties, Colorado(CO001)

    Map unit symbol Map unit name Rating Acres in AOI Percent of AOI

    PlB Platner loam, 0 to 3percent slopes

    C 5.8 62.9%

    ReD Renohill loam, 3 to 9percent slopes

    D 0.2 1.7%

    UlC Ulm loam, 3 to 5 percentslopes

    C 3.3 35.3%

    Totals for Area of Interest 9.3 100.0%

    Description

    Hydrologic soil groups are based on estimates of runoff potential. Soils areassigned to one of four groups according to the rate of water infiltration when thesoils are not protected by vegetation, are thoroughly wet, and receive precipitationfrom long-duration storms.

    The soils in the United States are assigned to four groups (A, B, C, and D) andthree dual classes (A/D, B/D, and C/D). The groups are defined as follows:

    Group A. Soils having a high infiltration rate (low runoff potential) when thoroughlywet. These consist mainly of deep, well drained to excessively drained sands orgravelly sands. These soils have a high rate of water transmission.

    Group B. Soils having a moderate infiltration rate when thoroughly wet. Theseconsist chiefly of moderately deep or deep, moderately well drained or well drainedsoils that have moderately fine texture to moderately coarse texture. These soilshave a moderate rate of water transmission.

    Group C. Soils having a slow infiltration rate when thoroughly wet. These consistchiefly of soils having a layer that impedes the downward movement of water orsoils of moderately fine texture or fine texture. These soils have a slow rate of watertransmission.

    Group D. Soils having a very slow infiltration rate (high runoff potential) whenthoroughly wet. These consist chiefly of clays that have a high shrink-swellpotential, soils that have a high water table, soils that have a claypan or clay layerat or near the surface, and soils that are shallow over nearly impervious material.These soils have a very slow rate of water transmission.

    If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter isfor drained areas and the second is for undrained areas. Only the soils that in theirnatural condition are in group D are assigned to dual classes.

    Hydrologic Soil Group—Adams County Area, Parts of Adams and Denver Counties, Colorado 104th and Colorado

    Natural ResourcesConservation Service

    Web Soil SurveyNational Cooperative Soil Survey

    11/22/2015Page 3 of 4

  • Rating Options

    Aggregation Method: Dominant Condition

    Component Percent Cutoff: None Specified

    Tie-break Rule: Higher

    Hydrologic Soil Group—Adams County Area, Parts of Adams and Denver Counties, Colorado 104th and Colorado

    Natural ResourcesConservation Service

    Web Soil SurveyNational Cooperative Soil Survey

    11/22/2015Page 4 of 4

  • !"#$%&'(")*+$"%',$**-'.#"."/0,'*.*#+-0%+',010(".-0%+'02'345+6'*10%70'8')"("#*,"'!(1,2'

    +6"#%+"%9')"("#*,"'.)6'.#":0)+'%"2'3;25

  • !"#$"%$&"'()#$)"*$+

    Pickering, Cole, and HivnerGeotechnical and Environmental Engineers

    Westminster, Colorado - 303.996.2999

    !"#$%&'%(%!)*+*!,

    %

    $)*-. - "#/ !/)

    !+#$ !)"

    ,-).,/")0$&0.'"123%012345%'6%78195'6:4;%834'?44:%819425%35%5=6?:%&62%3:&62@1'36:%6:89;%1D'C18%'21:53'36:5%@19%>4%623:86?5*&'%NC:8455%6'=42?354%:6'4AO%C53:43:A3D1'304%6&%B'1:A12A%P4:4'21'36:%I45'%NQ(018C45O#

    /)

    F$ $

    ,F)

    E623:

  • !"#$"%$&"'()#$)"*$+

    Pickering, Cole, and HivnerGeotechnical and Environmental Engineers

    Westminster, Colorado - 303.996.2999

    !"#$%&%'()*)'+

    %

    ,-)./$!0-)$1!-/$23$1!-/0/$,-).,%-./01%1"%2$3.42%56"7#,%89-896$"4:,%1698$%/69;$-,%2".:1,%0963)2$3.42%3$#:$

    1!-/,4")05,-).,4")0$&0.'"167%.#1$65$33$3,%-./01%1"%3960.:%.#?"6291."#%A$619.#:%"#-=%1"%10.:%5"6.#/%9#3%:0"4-3%#"1%5$%.#1$6A6$1$3%9:%5$.#/%.#3.891.;$%"?%10$%:.1$@BB%C.:1465$3%:92A-$

    D EF G()HI H 'J@K ''L

    +(

    B%M9-4$:%6$A6$:$#1%5-"7:)?1%N4#-$::%"10$67.:$%#"1$3O%4:.#/%:92A-$6%.#3.891$3@%%>0.:%;9-4$%29=%#"1%5$.#3.891.;$%"?%P19#3963%Q$#$1691."#%>$:1%N!&;9-4$:O@

    HG

    H(

    ''D

    F"6.#/%1$62.#91$3%91%95"41%HG%?$$1

    G EF G()GI G 'H@L

    ''++ EF G()DI D 'K@(

    '(* J@+ '@(H EF G()DI D J(@J'G

    J(

    JG

    '''L@(%?1

    J EF G()DI D H@K

    'J*' PE EF +( 'J *@HG

    '(

    R$8";$6=,%.#

    S".:146$%

    E"#1$#

    1,%T

    C6=%C$

    #:.1=

    ,%A8?

    P7$--%"6%

    E"#:"-@%N&O,%T

    P468096/$,%<:?

    U"7%/6"710%/69::)7$$3:%91%:46?98$

    %CVQ>W%>X%YZ>VR[ !"#$%&%Y0.-$%C6.--.#/

    C$A10

    P".-%\69A0.8

    C$:86.A1."#P92A-$:

    !"@

    ]PEP

    >=A$

    F-"7

    :%A$6%

    ?""1B

    %UXEZ>^X![ >0"6#1"#,%E"-"693" VUVMZ>^X![ !"1%Q6";.3$3%CR^UUVR%)%R^\[ C9%!X@[ 'J@+H'@'+%EU^V!>[ Z392:%E"4#1=%W"4:.#/%Z410"6.1= CZ>V[ K&X81&'+

  • !"#$"%$&"'()#$)"*$+

    Pickering, Cole, and HivnerGeotechnical and Environmental Engineers

    Westminster, Colorado - 303.996.2999

    !"#$%&%'()*)'+

    %

    ,!-./0")12/-)3/0")1$&13'",45%,#-$./$00$01%2,34-%3.$51%2,34-%/."6#1%7",8-1%9$.5%4:.0

    !1-)$,!-.$6789$/-)31%2,34-%-"%7$0,;7%/."6#1%4,8%,#=".7:-,"#%@$.-:,#8%"#25%-"%-4,8%/".,#3%:#0%84";20%#"-%/$%,#-$.@.$-$0%:8%/$,#3%,#0,^X![ >4".#-"#1%C"2".:0" VDVKZ>^X![ !"-%O."9,0$0

    %BR^DDVR%)%R^\[ B:U"-:%B.,22,#3%)%B,$0.,[ O."@"8$0%Z@:.-7$#-%B$9?%%&%V?%'(+-4%Z9$?%b%C"2".:0"%E290? ORXaVC>%!X?[ 'P?+J'?'+

    %CD^V!>[ Z0:78%C";#-5%W";8,#3%Z;-4".,-5 BZ>V[ I&X

  • !"#$"%$&"'()#$)"*$+

    Pickering, Cole, and HivnerGeotechnical and Environmental Engineers

    Westminster, Colorado - 303.996.2999

    !"#$%&%'()*)'+

    %

    ,%-./0$1%2$32$1$#4%5/"61)74%80#/$11%"49$26:1$%#"4$;3/$2%:#;:?.4$;@%%A9:1%B./0$%>.C%#"4%5$:#;:?.4:B$%"7%D4.#;.2;%E$#$42.4:"#%A$14%8!&B./0$1.4:"#%"#/CF%.?40./%42.#1:4:"#1%>.C%5$%=2.;0./@A9:1%:#7"2>.4:"#%3$24.:#1%"#/C%4"%49:1%5"2:#=%.#;%19"0/;%#"4%5$%:#4$232$4$;%.1%5$:#=%:#;:?.4:B$%"7%49$%1:4$@,,%G:14025$;%1.>3/$

    +(

    HI

    JI

    H(

    J(

    '@* '@(K"2:#=%4$2>:#.4$;%.4%.5"04%'I%7$$4

    LK I()MN M 'H@O 'JJ

    ,!-./0")12/-)3/0")1$&13'",45%:#4$25$;;$;F%/:=94%=2$CF%/:=94%52"6#F%:2"#&14.:#$;F%>":14F%B$2C%9.2;

    'I H

    'J@(%74

    DP LK HH 'J Q@Q 'J'

    ''OI ' DP LK H' 'J Q@J

    /(!0.$67$$,!-.1.$/-)3F%/:=94%52"6#F%B.2:$1%1/:=94/C%?./?.2$"01F%>":14F%>$;:0>%;$#1$

    '( J

    R$?"B$2CF%:#

    P":1402$%

    L"#4$#

    4F%S

    G2C%G$

    #1:4C

    F%3?7

    D6$//%"2%

    L"#1"/@%8&

  • !"#$"%$&"'()#$)"*$+

    Pickering, Cole, and HivnerGeotechnical and Environmental Engineers

    Westminster, Colorado - 303.996.2999

    !"#$%&'%(%!)*+*!,

    %

    -%./0123%42542326'%70893*&'%:160233%8';249

  • !"#$"%$&"'()#$)"*$+

    Pickering, Cole, and HivnerGeotechnical and Environmental Engineers

    Westminster, Colorado - 303.996.2999

    !"#$%#!'()(!"

    #

    *+,-./%/0-.#12%322-#4,52+.#/.#.603-#$0+#/-$0+7,%/0-#0-458#,9%:,4#%+,-./%/0-.#7,5#12#;+,2+%,/-.#0-45#%0#%6/.#10+/-;#,-9$

    C3244#0+#

    B0-.04=#E&F8#S

    C:+96,+;28#T.$

    N03#;+03%6#;+,..(322%6

    C0/4#\+,>6/9

    A2.9+/>%/0-C,7>42.

    H0=

    ]CBC

    *5>2

    K403

    .#>2+#

    $00%@

    #NWBY*^WHZ *60+-%0-8#B040+,

  • Proposed Apartment DevelopmentSE of East 104th Avenue and Colorado Boulevard - Thornton, COPCH Project No. 12.431.14

    SUMMARY OF LABORATORY TEST RESULTS

    Pickering, Cole and Hivner, LLC 1070 W. 124th Ave., Suite 300 • Westminster, Colorado 80234

    LL PL PI

    1 4 Sandy Lean Clay 7.3% 130 +5.2 500

    1 9 Sandy Lean Clay 11.2% 120 51 31 20 11

    1 14 Sandstone Bedrock 15.9% 108

    1 19 Sandstone Bedrock 19.2% 107

    1 24 Sandstone Bedrock 18.5% 107

    2 4 Clayey Sand 8.3% 128 49 27 21 6

    2 9 Sandstone Bedrock 3.7% 111

    2 14 Claystone Bedrock 20.2% 108 +2.4 1,000

    2 19 Claystone Bedrock 17.0% 114

    2 24 Claystone Bedrock 13.9% 116

    2 34 Claystone Bedrock 12.7% 119

    3 2 Lean Clay with Sand 11.7% 113 75 45 18 27

    3 4 Lean Clay with Sand 15.8% 105 +6.8 500 6,900

    3 9 Lean Clay with Sand 17.8% 112 +5.4 500 5,800

    3 14 Claystone/Sandstone Bedrock 15.0% 105

    4 4 Silty Sand 7.2% 119 30

    4 9 Silty Sand 7.7% 121 26

    4 14 Claystone/Sandstone Bedrock 13.9% 122 +1.8 1,000

    5 4 Sandy Lean Clay 14.4% 120 +6.0 500

    5 9 Sandy Lean Clay 14.9% 115 51 29 21 8

    5 14 Sandy Lean Clay 20.9% 105

    5 19 Sandy Lean Clay 18.2% 116

    5 24 Claystone Bedrock 18.1% 112

    5 34 Claystone Bedrock 16.4% 116

    6 4 Sandy Lean Clay 10.4% 118 66 37 19 18

    6 9 Sandy Lean Clay 14.0% 1066 14 Sandy Lean Clay 19.8% 108 -1.2 1,000

    Non-plastic

    Non-plastic

    Surcharge Pressure (psf)

    Passing #200 Sieve (%)

    Atterberg LimitsSwell (+) or Consolidation (-)

    (%)

    Water Soluble Sulfates (ppm)

    Test Boring

    Depth (ft) Soil Description

    Dry Density

    (pcf)

    Moisture Content

    (%)

  • N

    1 INCH = FT.

    0 50 100

    50

    BASIN RUNOFF SUMMARY

    LEGEND

    EASEMENT (BY SEPARATE DOCUMENT)

    PROPERTY LINE

    EXISTING FENCE

    EXISTING CURB AND GUTTER

    EXISTING WATER LINE

    EXISTING UNDERGROUND COMM

    EXISTING STORM SEWER

    EXISTING SANITARY SEWER

    EXISTING GAS LINE

    EXISTING UNDERGROUND ELECTRIC

    EXISTING STORM MANHOLE

    EXISTING INLET

    EXISTING SANITARY MANHOLE

    EXISTING FIRE HYDRANT

    BUILDING

    6" CURB AND GUTTER

    STORM SEWER

    SANITARY SEWER

    WATER LINE

    STORM SEWER MANHOLE

    INLET

    SANITARY SEWER MANHOLE

    FIRE HYDRANT

    WATER METER

    DRAINAGE FLOW PATTERN DIRECTION

    BASIN AREA/C5/C100

    DESIGNATOR

    DATE:

    DESIGNED BY:

    PROJECT NO:

    DRAWN BY:

    11

    /2

    0/2

    01

    5 4

    :3

    3 P

    M P

    :\V

    MW

    P\1

    04

    TH

    A

    ND

    C

    OL

    OR

    AD

    O\0

    8 C

    AD

    \C

    4.7

    S

    TO

    RM

    D

    RA

    IN

    AG

    E M

    AP

    .D

    WG

    EE

    SE

    NTI

    TLE

    ME

    NT

    & E

    NG

    INE

    ER

    ING

    SO

    LUTI

    ON

    S, I

    nc.

    518

    17th

    Str

    eet

    Suit

    e 15

    75D

    enve

    r, C

    O 8

    0202

    ww

    w.e

    es.u

    s.co

    m30

    3-57

    2-79

    97

    AD

    AM

    S

    CO

    UN

    TY

    HO

    US

    IN

    G

    AU

    TH

    OR

    IT

    Y

    2015

    , A

    LL R

    IG

    HT

    S R

    ES

    ER

    VE

    D.

    P

    R

    E

    L

    I

    M

    I

    N

    A

    R

    Y

    N

    O

    T

    F

    O

    R

    C

    O

    N

    S

    T

    R

    U

    C

    T

    I

    O

    N

    104T

    H A

    VE

    &

    C

    OLO

    RA

    DO

    B

    LV

    D. T

    HO

    RN

    TO

    N, C

    O

    CO

    NS

    TR

    UC

    TIO

    N D

    RA

    WIN

    GS

    VAN001.01

    ST

    OR

    M D

    RA

    IN

    AG

    E M

    AP

    10

    4T

    H A

    ND

    C

    OL

    OR

    AD

    O

    Know what's

    R

    CALL UTILITY NOTIFICATION

    CENTER OF COLORADO

    CALL 3-BUSINESS DAYS (NOT INCLUDING INITIAL

    DAY OF CONTACT) IN ADVANCE BEFORE YOU DIG,

    GRADE, OR EXCAVATE FOR THE MARKING OF

    UNDERGROUND MEMBER UTILITIES.

    0-104th and Colorado Drainage Report 11-04-20151.0 GENERAL LOCATION AND DESCRIPTION2.0 DRAINAGE BASINS AND SUB-BASINS3.0 DRAINAGE DESIGN CRITERIA4.0 DRAINAGE FACILITY DESIGN5.0 CONCLUSIONS6.0 REFERENCES

    1 vicinity map2 104th and Colorado Proposed HydrologySummaryC CoeffQ PeakRainfall

    3 104th EURV UD-Detention_v2.35Full-Spectrum

    4 104th Pond Volumes60% RTD PondExpanded Pond

    5 Hydraulic calcs6 inletsSag Inlets

    7 NRCS Soils Info8 Geotech Report Excerpts9 drainage map