Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 13, 2021 County Fiscal Year Initially Proposed Proposed Project Status Project Type Title Description Location Components Est Start Est Completion Est Useful Life Assembly Districts Senate Districts Alameda 19/20 In Progress Complete Streets Components Hesperian Boulevard Corridor Improvement Project This project will include: Construct complete street improvements along a major business corridor including sidewalks, class II bike lanes, street lighting, storm drains, traffic signals, crosswalks, pavement, landscaping and streetscaping Hesperian Boulevard from I-880 to A Street Construction 07/2020 05/2023 18-50 20 10 Alameda 21/22 New Complete Streets Components Mission Blvd Corridor Improvement Project This project will include: The project includes the construction of new sidewalk, bike lanes, pavement rehab, crosswalks, storm drain, ADA ramps and features typical of complete street design Mission Blvd from I-238 to Hayward City limit in the Cherryland Community of Unincorporated Alameda County Pre-Construction and Construction 01/2021 05/2022 12/2021 11/2024 10-50 20 10 Alameda 21/22 New Safety Calaveras Road Retaining Wall & Guardrail Repair This project will include: Storm Drain/Culvert Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing) | Guardrail Installations and re-construction of failing retaining wall Calaveras Road at Mile Marker 8.65 In Eastern Alameda County Construction 08/2021 08/2022 15-20 20 7 Alameda 21/22 New Safety Collier Canyon Road Culvert Repair Project This project will include: Paving and/or Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing) | Repair Culvert Crossing including wingwalls and install/repair guardrail and restore pavement Collier Canyon Road Mile Larker 3.66 Eastern Alameda County Pre-Construction and Construction 01/2021 04/2022 11/2021 11/2022 20-50 20 7 Alameda 21/22 New Safety Strobridge Ave - Norbridge Ave Realignment This project will include: Project Scope Development, Feasibility Study, Cost Estimating, Preliminary Design, Environmental Study/Documents | Design and construct new street realignment with traffic signal to enhance safety and circulation Norbridge Ave and Strobridge Ave in Unincorporated community of Castro Valley. Pre-Construction 03/2021 11/2024 10-20 20 10 Alameda 21/22 New Safety Redwood Road M4.1 Retaining Wall and Shoulder Restoration This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents Redwood Road Mile Marker 4.1 in Unincorporated Alameda County Pre-Construction 09/2021 06/2023 20-50 20 10 Alameda 21/22 New Traffic Control Devices Traffic Signal at Greenville Rd and Tesla Road This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Greenville Road at Tesla Road in Eastern Alameda County Construction 07/2021 11/2022 10-20 16 7 Alameda 20/21 In Progress Complete Streets Components Anita Avenue Sidewalk Construction Project This project will include: Cost Estimating, Preliminary Design, Environmental Study/Documents Anita Avenue from Castro Valley Boulevard to Somerset Avenue Pre-Construction and Construction 07/2019 05/2022 12/2021 11/2023 15-50 20 10 Alameda 20/21 In Progress Road Maintenance & Rehabilitation Somerset Ave Sidewalk Construction Project This project will include: Project Scope Development, Feasibility Study, Cost Estimating, Preliminary Design, Environmental Study/Documents Somerset Avenue from Redwood Road to Stanton Ave Pre-Construction 12/2019 08/2025 40-50 20 10 Alameda 20/21 In Progress Road Maintenance & Rehabilitation Crow Canyon Road Pavement Rehabilitation Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) Crow Canyon Road from East Castro Valley Blvd to Contra Costa County Line Construction 04/2020 11/2023 15-20 20 10 Alameda 21/22 New Complete Streets Components Tesla Road Rural Road Safety Improvement Project This project will include: Project Scope Development, Feasibility Study, Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents Tesla Road from Greenville to Concannon Road in Eastern Alameda County Pre-Construction 03/2022 08/2025 10-20 16 7 Alameda 21/22 New Road Maintenance & Rehabilitation 21-22 Pavement Rehabilitation Program-East County Overlay This project will include: Pavement Rehab/Repair (Existing) Altamont Pass Road and Pleasanton Sunol Road in Eastern Alameda County Construction 06/2022 11/2022 10-20 16 7 Alameda 21/22 New Road Maintenance & Rehabilitation 21-22 Pedestrian Ramp Project This project will include: ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing) Alameda County Unincorporated Communities of Ashland, Cherryland, Castro Valley; Fairview and San Lorenzo Construction 06/2022 11/2022 20-50 20 10 Alameda 21/22 New Road Maintenance & Rehabilitation 21-22 Pavement Rehabilitation Program-Overlay This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Central Unincorporated Alameda County Communities of Castro Valley and Fairview Construction 06/2022 11/2022 10-20 20 10 Alameda 21/22 New Road Maintenance & Rehabilitation 21-22 Pavement Rehabilitation Program-Micro Surfacing This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Eden Area Communities of Central Alameda County Construction 06/2022 11/2022 5-10 20 10

Transcript of Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Page 1: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Alameda 19/20 In Progress Complete Streets Components

Hesperian Boulevard Corridor Improvement Project

This project will include: Construct complete street improvements along a major business corridor including sidewalks, class II bike lanes, street lighting, storm drains, traffic signals, crosswalks, pavement, landscaping and streetscaping

Hesperian Boulevard from I-880 to A Street Construction 07/2020 05/2023 18-50 20 10

Alameda 21/22 New Complete Streets Components

Mission Blvd Corridor Improvement Project

This project will include: The project includes the construction of new sidewalk, bike lanes, pavement rehab, crosswalks, storm drain, ADA ramps and features typical of complete street design

Mission Blvd from I-238 to Hayward City limit in the Cherryland Community of Unincorporated Alameda County

Pre-Construction and Construction

01/2021 05/2022

12/2021 11/2024 10-50 20 10

Alameda 21/22 New Safety Calaveras Road Retaining Wall & Guardrail Repair

This project will include: Storm Drain/Culvert Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing) | Guardrail Installations and re-construction of failing retaining wall Calaveras Road at Mile Marker 8.65 In Eastern Alameda County Construction 08/2021 08/2022 15-20 20 7

Alameda 21/22 New Safety Collier Canyon Road Culvert Repair Project

This project will include: Paving and/or Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing) | Repair Culvert Crossing including wingwalls and install/repair guardrail and restore pavement

Collier Canyon Road Mile Larker 3.66 Eastern Alameda County Pre-Construction and Construction

01/2021 04/2022

11/2021 11/2022 20-50 20 7

Alameda 21/22 New Safety Strobridge Ave - Norbridge Ave Realignment

This project will include: Project Scope Development, Feasibility Study, Cost Estimating, Preliminary Design, Environmental Study/Documents | Design and construct new street realignment with traffic signal to enhance safety and circulation

Norbridge Ave and Strobridge Ave in Unincorporated community of Castro Valley. Pre-Construction 03/2021 11/2024 10-20 20 10

Alameda 21/22 New Safety Redwood Road M4.1 Retaining Wall and Shoulder Restoration

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents Redwood Road Mile Marker 4.1 in Unincorporated Alameda County Pre-Construction 09/2021 06/2023 20-50 20 10

Alameda 21/22 New Traffic Control Devices

Traffic Signal at Greenville Rd and Tesla Road This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Greenville Road at Tesla Road in Eastern Alameda County Construction 07/2021 11/2022 10-20 16 7

Alameda 20/21 In Progress Complete Streets Components

Anita Avenue Sidewalk Construction Project This project will include: Cost Estimating, Preliminary Design, Environmental Study/Documents Anita Avenue from Castro Valley Boulevard to Somerset Avenue Pre-Construction and

Construction 07/2019 05/2022

12/2021 11/2023 15-50 20 10

Alameda 20/21 In Progress Road

Maintenance & Rehabilitation

Somerset Ave Sidewalk Construction Project

This project will include: Project Scope Development, Feasibility Study, Cost Estimating, Preliminary Design, Environmental Study/Documents Somerset Avenue from Redwood Road to Stanton Ave Pre-Construction 12/2019 08/2025 40-50 20 10

Alameda 20/21 In Progress Road

Maintenance & Rehabilitation

Crow Canyon Road Pavement Rehabilitation Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) Crow Canyon Road from East Castro Valley Blvd to Contra Costa County Line Construction 04/2020 11/2023 15-20 20 10

Alameda 21/22 New Complete Streets Components

Tesla Road Rural Road Safety Improvement Project

This project will include: Project Scope Development, Feasibility Study, Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents Tesla Road from Greenville to Concannon Road in Eastern Alameda County Pre-Construction 03/2022 08/2025 10-20 16 7

Alameda 21/22 New Road

Maintenance & Rehabilitation

21-22 Pavement RehabilitationProgram-East County Overlay This project will include: Pavement Rehab/Repair (Existing) Altamont Pass Road and Pleasanton Sunol Road in Eastern Alameda County Construction 06/2022 11/2022 10-20 16 7

Alameda 21/22 New Road

Maintenance & Rehabilitation

21-22 Pedestrian Ramp Project This project will include: ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing)

Alameda County Unincorporated Communities of Ashland, Cherryland, Castro Valley; Fairview and San Lorenzo Construction 06/2022 11/2022 20-50 20 10

Alameda 21/22 New Road

Maintenance & Rehabilitation

21-22 Pavement RehabilitationProgram-Overlay This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Central Unincorporated Alameda County Communities of Castro Valley and Fairview Construction 06/2022 11/2022 10-20 20 10

Alameda 21/22 New Road

Maintenance & Rehabilitation

21-22 Pavement RehabilitationProgram-Micro Surfacing This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Eden Area Communities of Central Alameda County Construction 06/2022 11/2022 5-10 20 10

Page 2: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Alameda 21/22 New Road

Maintenance & Rehabilitation

21-22 Pavement Rehabilitation Program-Slurry Seal This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Alameda County Unincorporated Community of San Lorenzo Construction 06/2022 11/2022 3-6 20 10

Alpine 20/21 Carried Over Road

Maintenance & Rehabilitation

Bear Valley Pavement Treatments Project This project will include: Pavement Improvement (New), Pavement Rehab/Repair (Existing) Bear Valley, Alpine County CA

Creekside Drive, Cub Lane, Flynn Road and John Ebbetts Road. Construction 02/2022 06/2022 7-10 5 1

Amador 21/22 New Road

Maintenance & Rehabilitation

County Road Dig-outs/Major Repairs/Improvements This project will include: Pavement Improvement (New), Pavement Rehab/Repair (Existing) Jackson Valley Road, Buckhorn Ridge Road, Shenandoah Road, Pine Grove Volcano

Road, Stony Creek Road, Martell Road. Construction 07/2021 06/2022 10-15 5 8

Amador 21/22 New Road

Maintenance & Rehabilitation

County Road Striping This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

Meadow Drive, Pine Grove Volcano Road, Pioneer Volcano Road, Climax Road, Clinton Road, New York Ranch Road, Butte Mountain Road, Shake Ridge Road, Irish Town Road, Tabeaud Road, Consolation Street, Mt. Zion Road, Homestead Road, Carson Drive, Buckhorn Ridge Road, Tiger Creek Road, Meadow Vista Drive, McKenzie Drive, Barton Road, Lupe Road, Gayla Drive, Sugar Pine Drive.

Construction 07/2021 07/2022 4-5 5 8

Amador 21/22 New Road

Maintenance & Rehabilitation

Countywide Roadway Maintenance This project will include: Minor Repairs/Materials (HMA pothole patching, HMA road patching, rock, minor facility repair, guardrail repair/replacement). Various locations throughout the county maintained road system. Pre-Construction 07/2021 06/2022 5-20 5 8

Amador 21/22 New Road

Maintenance & Rehabilitation

Countywide Culvert Repair/Replacement/Installation This project will include: Document Preparation, Preliminary Design Culvert repair/replacement/installation to be coordinated with county road dig-

outs/major repairs/improvements. Pre-Construction 07/2021 06/2022 30-50 5 8

Amador 21/22 New Road

Maintenance & Rehabilitation

County Road Crackfilling This project will include: Project Scope Development Various locations within the county maintained road system. Pre-Construction 07/2021 06/2022 5-7 5 8

Amador 21/22 New Road

Maintenance & Rehabilitation

County Roadside Maintenance This project will include: Ditching, vegetation management Various roads within the county maintained road system Pre-Construction 07/2021 06/2022 3-5 5 8

Amador 21/22 New Road

Maintenance & Rehabilitation

Equipment and Tool Replacement/Acquisition

This project will include: Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment For use on county maintained road system. Procurement/Operatio

nal Needs 07/2021 06/2022 10-15 5 8

Amador 21/22 New Road

Maintenance & Rehabilitation

Micro-surface/Pavement Treatment This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design | Pavement surface treatment and associated striping anticipated for Shenandoah Road.

County maintained road system (anticipated Shenandoah Road) Pre-Construction 07/2021 06/2022 7-10 5 8

Butte 19/20 In Progress Road

Maintenance & Rehabilitation

Foothill Blvd.

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Environmental Study/Documents | Grind and replace (Rehabilitate) existing road surface. Place striping, pavement markers, pavement markings, and prepare finish grade for the traveling public. Grade roadside ditches to drain. Replacement of culverts. | This project is in preliminary design and continuation is subject to future SB1 funding.

Oroville City Limits south to Green Bank. Pre-Construction and Construction

01/2021 09/2021

09/2021 12/2022 20-25 3 4

Butte 20/21 In Progress Road

Maintenance & Rehabilitation

Las Plumas Avenue Overlay

This project will include: Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Right of Way Acquisition, Paving and/or Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) | Safe Routes to Schools mainline rehab, new ADA compliant curb, gutter, sidewalks. Upgrade storm drain system. New ADA crosswalk systems.

From Las Plumas Way to Lower Wyandotte Rd. Construction 07/2020 12/2021 30-30 3 4

Butte 20/21 In Progress Match Funds Dark Canyon Road This project will include: Repair and Rehabilitation of the existing roadway infrastructure lost during a heavy rain event with in the Camp Fire footprint. 2.5 Miles Southeast of Big Bend Road Construction 09/2020 12/2022 25-30 3 4

Butte 20/21 Carried Over Match Funds Monte Vista/Lower Wyandotte This project will include: Project Scope Development, Right of Way, Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents Lincoln Blvd. to Lower Wyandotte Road. Pre-Construction 09/2021 12/2021 20-25 3 4

Page 3: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Butte 20/21 Carried Over Match Funds Autrey Lane This project will include: Project Scope Development, Right of Way, Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents Las Plumas Ave. to Monte Vista Ave. Pre-Construction 01/2021 06/2022 20-25 3 4

Butte 20/21 Carried Over Match Funds Monte Vista Avenue This project will include: Right of Way, Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents Autry Lane to Western Property line of Las Plumas High School. Pre-Construction 09/2021 06/2022 20-25 3 4

Butte 20/21 Carried Over Match Funds Baldwin Ave (Palermo) This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents Lincoln Blvd. to Hewitt Ave. Pre-Construction 01/2021 08/2022 20-25 3 4

Butte 20/21 Carried Over Safety Cohasset Road - Metal Beam Guard Rail Project

This project will include: Project Scope Development, Right of Way, Maintenance Program Plan Development, Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents | Metal beam guardrail upgrades. | Upgrading existing sub standard metal Beam guard rail (MBGR)

Cohasset Road Pre-Construction and Construction

01/2021 05/2022

05/2022 12/2022 20-30 3 4

Butte 20/21 In Progress Road

Maintenance & Rehabilitation

Foothill Blvd. East Rehabilitation

This project will include: Project Scope Development, Right of Way, Maintenance Program Plan Development, Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents | Full Depth Reclamation (FDR), Cement treated 4%, pavement, shoulder backing, roadside ditch grading

Foothill Blvd. - 0.0mi - 1.9mi (Mile Marker) Pre-Construction 04/2020 06/2022 20-25 3 4

Butte 20/21 In Progress Match Funds Pentz Road Repair

This project will include: Project Scope Development, Right of Way, Maintenance Program Plan Development, Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents | Replacement of damaged roadway due to debris hauling associated with the Camp Fire | Matching funds for the ER funded Roadway Replacement Project

Pentz Road - Malibu Drive to State Hwy 70 Pre-Construction and Construction

01/2021 01/2022

09/2021 12/2022 20-30 3 4

Butte 21/22 New Road

Maintenance & Rehabilitation

Midway Road Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design

Midway Pre-Construction and Construction

11/2020 05/2021

04/2021 12/2021 20-30 3 4

Butte 20/21 In Progress Road

Maintenance & Rehabilitation

Bidwell Avenue Strom Damage Repair

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents | Storm Damage Repairs (Design and Permitting)

Three Sites Between W. Sacramento St. on the West and Oak Lawn Ave. on the East. Pre-Construction 04/2020 12/2023 20-20 3 4

Butte 19/20 In Progress Road

Maintenance & Rehabilitation

New Skyway This project will include: Project incorporates drainage and roadway rehabilitation for an Emergency Response Project. | Pre-construction underground utility work will proceed this project From Paradise Town Limit to Coutolenc Road Pre-Construction and

Construction 01/2021 04/2022

03/2021 12/2022 20-25 3 4

Calaveras 20/21 Carried Over Road

Maintenance & Rehabilitation

Copper Cove This project will include: Pavement Rehab/Repair (Existing) O'Byrnes Ferry Road to Little John Construction 07/2021 10/2021 8-10 5 8

Calaveras 20/21 Carried Over Road

Maintenance & Rehabilitation

O'Byrnes Ferry Road This project will include: Pavement Rehab/Repair (Existing) Main Street (Copperopolis) to Toulumne County Line Construction 07/2021 10/2021 8-10 5 8

Calaveras 20/21 Carried Over Road

Maintenance & Rehabilitation

Little John This project will include: Pavement Rehab/Repair (Existing) Various sections from Main Street to Kiva Drive Construction 07/2021 10/2021 8-10 5 8

Calaveras 20/21 Carried Over Road

Maintenance & Rehabilitation

Main Street (Copperopolis) This project will include: Pavement Rehab/Repair (Existing) O'Byrnes Ferry Road to Highway 4 Construction 07/2021 10/2021 8-10 5 8

Calaveras 20/21 Carried Over Road

Maintenance & Rehabilitation

Copper Cove Subdivision This project will include: Pavement Rehab/Repair (Existing) Various streets within the Copper Cove Subdivision Construction 07/2021 10/2021 8-10 5 8

Page 4: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Calaveras 20/21 Carried Over Road

Maintenance & Rehabilitation

Hogan Dam Road This project will include: Pavement Rehab/Repair (Existing) Highway 26 to Silver Rapids Construction 07/2021 10/2021 8-10 5 8

Calaveras 20/21 Carried Over Road

Maintenance & Rehabilitation

Vista Del Lago This project will include: Pavement Rehab/Repair (Existing) Highway 26 to Hogam Dam Road Construction 07/2021 10/2021 8-10 5 8

Calaveras 20/21 Carried Over Road

Maintenance & Rehabilitation

Burson Road This project will include: Pavement Rehab/Repair (Existing) Highway 26 to Hillvale Drive Construction 07/2021 10/2021 8-10 5 8

Calaveras 20/21 Carried Over Road

Maintenance & Rehabilitation

Garner Place This project will include: Pavement Rehab/Repair (Existing) Highway 26 to Baldwin Street Construction 07/2021 10/2021 8-10 5 8

Calaveras 20/21 Carried Over Road

Maintenance & Rehabilitation

Kirby Street This project will include: Pavement Rehab/Repair (Existing) Jenny Lind Road to Baldwin Street Construction 07/2021 10/2021 8-10 5 8

Calaveras 20/21 Carried Over Road

Maintenance & Rehabilitation

Silver Rapids Road This project will include: Pavement Rehab/Repair (Existing) Heney Lane to Hogan Dam Road Construction 07/2021 10/2021 8-10 5 8

Calaveras 20/21 Carried Over Road

Maintenance & Rehabilitation

Jenny Lind Road This project will include: Pavement Rehab/Repair (Existing) Highway 26 to Baldwin Street Construction 07/2021 10/2021 8-10 5 8

Calaveras 20/21 Carried Over Road

Maintenance & Rehabilitation

Contingency - Utility Coordination This project will include: Pavement Rehab/Repair (Existing)

Copper Cove, O'Byrnes Ferry Road, Little John, Main Street (Copperopolis), Copper Cove Subdivision, Hogan Dam Road, Vista Del Lago, Burson Road, Garner Place, Kirby Street, Silver Rapids Road, Jenny Lind Road, Big Trees Road, Scott Street, Main Street (Murphys), Jones Street, Algiers Street, Sheep Ranch Road

Construction 07/2021 10/2021 8-10 5 8

Calaveras 21/22 New Road

Maintenance & Rehabilitation

Big Trees Road This project will include: Pavement Rehab/Repair (Existing) Main Street (Murphys) to Creekview Drive Construction 07/2021 10/2021 8-10 5 8

Calaveras 21/22 New Road

Maintenance & Rehabilitation

Scott Street This project will include: Pavement Rehab/Repair (Existing) Jones Street to Main Street (Murphys) Construction 07/2021 10/2021 8-10 5 8

Calaveras 21/22 New Road

Maintenance & Rehabilitation

Main Street (Murphys) This project will include: Pavement Rehab/Repair (Existing) Highway 4 to Scott Street Construction 07/2021 10/2021 8-10 5 8

Calaveras 21/22 New Road

Maintenance & Rehabilitation

Jones Street This project will include: Pavement Rehab/Repair (Existing) Highway 4 to Main Street (Murphys) Construction 07/2021 10/2021 8-10 5 8

Calaveras 21/22 New Road

Maintenance & Rehabilitation

Algiers Street This project will include: Pavement Rehab/Repair (Existing) Scott Street to Church Street Construction 07/2021 10/2021 8-10 5 8

Calaveras 21/22 New Road

Maintenance & Rehabilitation

Sheep Ranch Road This project will include: Pavement Rehab/Repair (Existing) Main Street (Murphys) to Ponderosa Way Construction 07/2021 10/2021 8-10 5 8

Calaveras 21/22 New Road

Maintenance & Rehabilitation

Blagen Road This project will include: Pavement Rehab/Repair (Existing) Longman Lane to 1216 Blagen Road Construction 04/2022 10/2022 8-10 5 8

Page 5: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Calaveras 21/22 New Road

Maintenance & Rehabilitation

Moran Road This project will include: Pavement Rehab/Repair (Existing) Highway 4 to Avery Hotel Road Construction 04/2022 10/2022 8-10 5 8

Calaveras 21/22 New Road

Maintenance & Rehabilitation

Arnold This project will include: Pavement Rehab/Repair (Existing) Various County roads within the community of Arnold Construction 04/2022 10/2022 8-10 5 8

Calaveras 21/22 New Road

Maintenance & Rehabilitation

West Point This project will include: Pavement Rehab/Repair (Existing) Various County roads within the community of West Point Construction 04/2022 10/2022 8-10 5 8

Calaveras 21/22 New Road

Maintenance & Rehabilitation

Dorrington This project will include: Pavement Rehab/Repair (Existing) Various County roads within the community of Dorrington Construction 04/2022 10/2022 8-10 5 8

Calaveras 21/22 New Road

Maintenance & Rehabilitation

Contingency - Utility Coordination This project will include: Pavement Rehab/Repair (Existing) Blagen Road, Moran Road, Arnold, West Point, Dorrington Construction 04/2022 10/2022 8-10 5 8

Colusa 21/22 New Road

Maintenance & Rehabilitation

Grimes Arbuckle Road Rehabilitation

This project will include: Document Preparation, Pavement Rehab/Repair (Existing), Preliminary Design, Right of Way, Cost Estimating Sycamore Slough Road to Lodi Road Pre-Construction and

Construction 03/2022 06/2022

05/2022 08/2022 20-25 3 4

Contra Costa 21/22 New Road

Maintenance & Rehabilitation

Road Drainage Maintenance

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | Ditch Cleaning – (RMRA = $300,000) - remove debris and vegetation which may obstruct the passage of stormwater and cause local flooding Flush Culvert – (RMRA = $250,000) - cleaning of culverts by flushing with water and removing debris to ensure proper drainage and reduce flooding Clean Catch Basin – (RMRA = $550,000) - cleaning of sediment and prevent obstructions of catch basins (drainage inlets) and related pipe systems | Inspect Catch Basin – (RMRA = $300,000) -perform inspections of catch basins and associated systems. This includes a visual inspection of the drainage inlet and any clean water inserts. Follow-up video inspections may be required for deeper inlets and/or suspected structural issue concerning the inlets

Work will occur on roadways throughout the County, including but not limited to San Pablo Dam Road, Alhambra Valley Road, Appian Way, Fred Jackson Way, Richmond Parkway, San Pablo Avenue, Bear Creek Road, Danville Blvd., Marsh Creek Road, Deer Valley Road, Kirker Pass Road, Stone Valley Road, Blackhawk Road, Camino Tassajara, Balfour Road, Vasco Road, and Byron Highway

Procurement/Operatio nal Needs 07/2021 06/2022 15-40 11, 14, 15, 16 3, 7, 9

Contra Costa 21/22 New Road

Maintenance & Rehabilitation

Traffic Safety Devices Maintenance

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | Traffic Signing – (RMRA = $450,000) - sign repair, replacement, and installation along the roadway Traffic Striping – (RMRA = $350,000) - perform new painting, routine painting and replacement of pavement striping along the roadway to enhance public safety Paint Pavement Marking – (RMRA = $200,000) - perform all work associated with new painting, routine painting, and replacement of existing pavement markings along the roadway Inspect & Maintain Guardrails – (RMRA = $100,000) | Thermoplastic Pavement Markings – (RMRA = $100,000) - perform all work associated with the new application, routine maintenance, and replacement of existing thermoplastic pavement markings Safety Lighting – (RMRA = $100,000) - perform the repair, installation, and replacement of County-maintained safety lighting Signals and Flashers – (RMRA = $200,000) - perform the repair, installation, and replacement of County-maintained safety lighting

Work will occur on roadways throughout the County, including but not limited to San Pablo Dam Road, Alhambra Valley Road, Appian Way, Fred Jackson Way, Richmond Parkway, San Pablo Avenue, Bear Creek Road, Danville Blvd., Marsh Creek Road, Deer Valley Road, Kirker Pass Road, Stone Valley Road, Blackhawk Road, Camino Tassajara, Balfour Road, Vasco Road, and Byron Highway

Procurement/Operatio nal Needs 07/2021 06/2022 2-10 11, 14, 15, 16 3, 7, 9

Contra Costa 21/22 New Road

Maintenance & Rehabilitation

Pavement Repairs and Preparation

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | Pot Hole Patching – (RMRA = $200,000) Pavement Fabric Patching – (RMRA = $200,000) Pavement Failure Repair - Backhoe – (RMRA = $300,000) Pull Box Paving – (RMRA = $325,000) Hand Patching – (RMRA = $300,000) Crack Sealing – (RMRA = $300,000) Leveling – (RMRA = $225,000) Grinder Follow-up Paving – (RMRA = $80,000) Pavement Failure Repair – Grinder (RMRA = $92,000)

Work will occur on roadways throughout the County, including but not limited to San Pablo Dam Road, Alhambra Valley Road, Appian Way, Fred Jackson Way, Richmond Parkway, San Pablo Avenue, Bear Creek Road, Danville Blvd., Marsh Creek Road, Deer Valley Road, Kirker Pass Road, Stone Valley Road, Blackhawk Road, Camino Tassajara, Balfour Road, Vasco Road, and Byron Highway

Procurement/Operatio nal Needs 07/2021 06/2022 7-7 11, 14, 15, 16 3, 7, 9

Page 6: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Contra Costa 21/22 New Road

Maintenance & Rehabilitation

Countywide Surface Treatment Project (2021)

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | This project will apply an asphalt rubber chip seal covered with a type II slurry seal to various roads as a pavement preservation project in the unincorporated Contra Costa County. Work will also include preparation and pavement striping and markings. (Total Project Cost – $8,070,000; RMRA Cost – $7,892,000)

Countywide (El Sobrante - 2 streets, North Richmond - 33 streets, Castle Hill (Alamo/Walnut Creek) - 25 streets, Alamo - 113 streets, Clyde - 17 streets, Unincorporated Concord - 9 streets)

Procurement/Operatio nal Needs 07/2021 10/2022 7-7 11, 14, 15, 16 3, 7, 9

Contra Costa 21/22 New Road

Maintenance & Rehabilitation

Countywide Chip Seal Projects

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | Single Chip Seal Project (2021) – (RMRA = $500,000) - apply a single chip seal to various roads as a pavement preservation project. Work will also include surface preparation and pavement striping and markings. Double Chip Seal Project (2021) – (RMRA = $2,000,000) - apply a double chip seal to various roads as a pavement preservation project. Work will also include surface preparation and pavement striping and markings.

Countywide (Bay Point - 8 streets, Bethel Island - 12 streets, Clyde - 1 street, North Richmond - 5 streets)

Procurement/Operatio nal Needs 07/2021 10/2022 7-7 11, 14, 15, 16 3, 7, 9

Contra Costa 21/22 New Complete Streets Components 2021 Curb Ramp Project

This project will include: ADA Curb Ramp Installation (New) | The project consists of all the work associated with constructing curb ramps at various intersections throughout unincorporated Contra Costa County in advance of the surface treatment project described above, including design, right-of-way acquisition, and construction. (RMRA = $1,386,000)

•Countywide (Alamo - 54 ramps, North Richmond - 126 ramps, Clyde - 39 ramps, Unincorporated Concord - 4 ramps) Construction 07/2021 09/2022 40-40 11, 14, 15, 16 3, 7, 9

Del Norte 21/22 New Road

Maintenance & Rehabilitation

2022 Countywide Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

Base Repair & Paving: Pebble Beach Drive (Dale Rupert Road to Washington Boulevard Intersection) Paving: Lake Earl Drive (Tryon Corner to Highway 101). Grind Outs/Base Repair: El Dorado Street (Hamilton Avenue to Harding Avenue), Washington Boulevard (East of Inyo Street to Joaquin Street), Lake Earl Drive (PBSP to Purdy Lane). Striping: Various County Roads

Construction 07/2021 06/2022 3-20 2 2

Del Norte 21/22 New Other Mower Acquisition This project will include: Procurement of Public Works Equipment Countywide Procurement/Operatio nal Needs 07/2021 06/2022 10-15 2 2

Del Norte 21/22 New Other Hydraulic Hammer Acquisition This project will include: Procurement of Public Works Equipment Countywide Procurement/Operatio nal Needs 07/2021 06/2022 25-25 2 2

El Dorado 20/21 In Progress Road

Maintenance & Rehabilitation

El Dorado Hills Subdivisions Surface Treatment

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The first phase will consist of roadside brushing of 3.86 miles of roadway within Franciscan Village and Marina Woods Unit 1 and 2. Brushing consists of removing hazardous trees and all low hanging foliage and opening up site distances as needed. Phase two (2) will consist of repairing damaged asphalt in the 3.86 miles within Franciscan Village and Marina Woods Unit 1 and 2, if needed. Phase Three (3) will consist of a surface treatment.

Franciscan Village is located in El Dorado Hills, CA between El Dorado Hills Boulevard, Francisco Drive, and Green Valley Road. Marina Woods Unit 1 and 2 is located in El Dorado Hills, CA between Francisco Drive and Folsom Lake.

Construction 11/2020 10/2021 13-17 5 1

El Dorado 20/21 In Progress Road

Maintenance & Rehabilitation

Bar J Ranch Surface Treatment

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | The first phase will consist of roadside brushing of 5.90 miles of roadway within Bar J Ranch. Brushing consists of removing hazardous trees and all low hanging foliage and opening up site distances as needed. Phase two (2) will consist of repairing damaged asphalt in the 5.90 miles within Bar J Ranch, if needed. Phase Three (3) will consist of a surface treatment and all ADA upgrades that are required.

Bar J Ranch is located in Cameron Park, CA on both sides of Country Club Drive, north of Highway 50 and west of Cambridge Road. Construction 11/2020 10/2021 13-17 5 1

El Dorado 20/21 In Progress Road

Maintenance & Rehabilitation

Carson Road Surface Treatment

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Carson Road Surface Treatment is a multi-year project. The first phases will concentrate on the preparation for the surface treatment. The first phase will consist of roadside brushing and ditching of 6. 77 miles of roadway along Carson Road. Brushing consists of removing hazardous trees and all low hanging foliage and opening up site distances as needed. Ditching involves correcting drainage issues and verifying all cross culverts are free of debris and are functioning to their fullest capacity | At that time, all culverts will be inspected for life expectancy and be replaced if needed. Phase two (2) will consist of repairing damaged asphalt in the 6. 77 miles of Carson Road, if needed. Phase Three (3) will consist of a surface treatment.

Carson Road starts in Placerville, CA and extends into Camino, CA and runs parallel north of Highway 50. Construction 11/2020 10/2021 13-17 5 1

Page 7: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

El Dorado 20/21 In Progress Road

Maintenance & Rehabilitation

Greenstone Road Area Surface Treatment

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The first phase will consist of roadside brushing and ditching of 4.31 miles of roadway along Greenstone Road area. Brushing consists of removing hazardous trees and all low hanging foliage and opening up site distances as needed. Ditching involves correcting drainage issues and making sure all cross culverts are free of debris and are functioning to their fullest capacity. At that time, all culverts will be inspected for life expectancy and be replaced if needed. | Phase two (2) will consist of repairing damaged asphalt in the 4.31 miles of Greenstone Road area, if needed. Phase Three (3) will consist of a surface treatment.

Greenstone Road Area is located in Placerville, CA and runs perpendicular to Highway 50. Construction 11/2020 09/2021 13-17 5 1

El Dorado 20/21 In Progress Road

Maintenance & Rehabilitation

Sawmill Road Rehabilitation and Surface Treatment

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The first phase will consist of roadside brushing and ditching of 1.83 miles of roadway along Sawmill Road. Brushing consists of removing hazardous trees and all low hanging foliage and opening up site distances as needed. Ditching involves correcting drainage issues and making sure all cross culverts are free of debris and are functioning to their fullest capacity. At that time, all culverts will be inspected for life expectancy and be replaced if needed. | Phase two (2) will consist of repairing damaged asphalt in the 1.83 miles of Sawmill Road. Phase Three (3) will consist of a surface treatment.

Sawmill Road is located in South Lake Tahoe, CA between Lake Tahoe Boulevard and Highway 89. Construction 11/2020 10/2021 13-17 5 5

El Dorado 21/22 New Road

Maintenance & Rehabilitation

El Dorado Hills Blvd Section One Surface Treatment

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Brushing to remove hazardous trees and all low hanging foliage and opening up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of debris and functioning to the fullest capacity. Culverts will be replaced as needed. ADA will be brought up to current standards. Grind and pave to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed on the identified roads. Approximately 2.5 miles of roadway. Average PCI is 70.

El Dorado Hills Blvd is located in El Dorado Hills, CA between US Highway 50 and Green Valley Road. The project will cover the section of El Dorado Hills Blvd from Green Valley Road to Wilson Blvd.

Construction 10/2021 10/2022 15-20 5 1

El Dorado 21/22 New Road

Maintenance & Rehabilitation

Bucks Bar Road Road Rehabilitation and Surface

Treatment

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Brushing to remove hazardous trees and all low hanging foliage and opening up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of debris and functioning to the fullest capacity. Culverts will be replaced as needed. Grind and pave to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed on the identified roads. Approximately 4.84 miles of roadway. Average PCI is 46.

Bucks Bar Road is located between Pleasant Valley Road and Mt. Aukum Road in the southern region of El Dorado County. Construction 10/2021 10/2022 15-20 5 1

El Dorado 21/22 New Road

Maintenance & Rehabilitation

Various Roads in Diamond Springs Road Rehabilitation and Surface

Treatment

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Brushing to remove hazardous trees and all low hanging foliage and opening up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of debris and functioning to the fullest capacity. Culverts will be replaced as needed. Grind and pave to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed on the identified roads. Approximately 4.7 miles of roadway. Average PCI is 54.

Various roads in the Diamond Springs area. Project area consists of identified roads southeast of Highway 49 from Patterson Road to Koki Lane and north of Highway 49 from Grace Drive to Ryan Drive.

Construction 12/2021 10/2022 15-20 5 1

El Dorado 21/22 New Road

Maintenance & Rehabilitation

Greenwood Road Road Rehabilitation and Surface

Treatment

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Brushing to remove hazardous trees and all low hanging foliage and opening up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of debris and functioning to the fullest capacity. Culverts will be replaced as needed. Grind and pave to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed on the identified roads. Approximately 5 miles of roadway. Average PCI is 67.

Greenwood Road is located between Highway 193 and Marshall Road in the Georgetown and Garden Valley areas of El Dorado County. Construction 10/2021 10/2022 15-20 5 1

El Dorado 21/22 New Road

Maintenance & Rehabilitation

Cold Creek Area Rehabilitation and Surface Treatment

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing) | Brushing to remove hazardous trees and all low hanging foliage and opening up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of debris and functioning to the fullest capacity. Culverts will be replaced as needed. Grind and pave to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed on the identified roads. Approximately 4.2 miles of roadway. Average PCI is 51.

Cold Creek is located in South Lake Tahoe, CA between Pioneer Trail , Cold Creek Trail and Cold Creek. Construction 09/2021 09/2022 15-20 5 1

Page 8: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

El Dorado 21/22 New Road

Maintenance & Rehabilitation

Road-widener Offset Roller Attachment

This project will include: Procurement of Public Works Equipment | Road-widener off-set roller attachment is used for new road surface and road shoulder materials compaction for sloped-edge areas where a standard compaction ride-on roller would bot be possible or safe to operate.

Placerville, CA Procurement/Operatio nal Needs 09/2021 10/2021 19-20 5 1

El Dorado 21/22 New Road

Maintenance & Rehabilitation

Cold-planer Attachment

This project will include: Procurement of Public Works Equipment | A cold-planer attachment is an asphalt recycling grinder head attachment that connects to a compact loader for medium size spot repairs or roadway areas that have potholes or failed asphalt. The attachment grinds and cross-mixes the material into a finer grind which can be reused as a base in the same area with minor amounts of new asphalt to make a repair, saving time and material costs.

Placerville, CA Procurement/Operatio nal Needs 09/2021 10/2021 19-20 5 1

Fresno 21/22 New Traffic Control Devices

20-20-C American Avenue and Golden State Traffic Signal

This project will include: Pavement Improvement (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety)

American Ave from Golden State Blvd to Peach Ave Construction 07/2021 02/2022 20-30 31 12, 14

Fresno 21/22 New Road

Maintenance & Rehabilitation

21/22 Overlays This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Brawley: Belmont to Church Colorado: .125 Mi. S/O Manning To SSR 145 Manning: Jameson To SSR 145 Willow: McKenzie To Clay Manning: Elm To Blythe Mt Whitney: Garfield To West Lawn Alta: Dinuba To Floral Dinuba: Golden State To McCall Fancher: Dinuba To Cortley Highland: Dinuba To .262 Mi. S/O Dinuba Khan: Leonard To Fancher

Construction 05/2022 09/2022 7-10 23, 31 8, 12, 14

Leonard: Dinuba To Khan Ostler: Leonard To Fancher Weber: Khan To Cortley McCall: Manning To .057 Mi. N/O Dinuba Ashlan: Minnewawa to .03 E/O Sunnyside

Fig Garden Village Neighborhood Streets Old Fig Garden Neighborhood Streets

Fresno 21/22 New Road

Maintenance & Rehabilitation

21-03-M Slurry Seals This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Mayfair Neighborhood Streets Calwa Community Streets Caruthers Community Streets Raisin City Community Streets

Construction 04/2022 06/2022 5-8 23, 31 8, 12, 14

Riverdale Comminuty Streets Easterby Neighborhood Streets

Dickenson From Shields To Herndon Nees From Jerrold To Fairfax Jefferson From Calaveras To San Mateo

Fresno 21/22 New Road

Maintenance & Rehabilitation

20-14-M Bituminous Seal Coats This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Coalinga-Mendota From Derrick To 2.5 Se/O Derrick Henderson From Ormus To Ontario Ormus From Manning To Henderson Mountain View For Sr 41 To Marks

Construction 04/2021 07/2021 5-8 1 1

Sand Creek From Tulare County Line To Ennis Auberry From 2.652 N/E Of Dry Creek To Millerton (East) Mckinley From Mccall To Newmark Ennis From George Smith To Sand Creek

Page 9: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Fresno 21/22 New Road

Maintenance & Rehabilitation

Overlays - Day Labor/Force Account

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Central From Elm to Cornelia Shasta From Ashlan to Shaw Russell From I-5 to Shields Kamm From Jameson to SSR 145 Daleville From Cherry to Mary Oakland From 1.34 Mi. W/O Howard Align to 1.12 Mi. W/O Ssr 269 West From Mountain View to Elkhorn Tivy Valley Rd & Piedra Neighborhood Streets Shaw & Academy Nw Neighborhood Streets (Cumorah, Heather, Morningside, Poinsetta, Redbank) Greenwood - Shaw to Heather Indianola - Shields to Sierra

Construction 07/2021 06/2022 5-8 23, 31 8, 12

Fresno 21/22 New Road

Maintenance & Rehabilitation

Bituminous Seal Coats This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Central: Bryan Algn-Chateau Fresno Chateau Fresno: North-.1mi S/O Muscat Nees: Fairfax-Oxford Ltl Panoche: Shields-San Benito CL Lyon: California-North Academy: Central- Mtn View Manning: Crawford-Hill Jayne: .36mi W/O Butte-El Dorado American: Jefferson-South Goodfellow: Newmark-Reed Manning: 1.379mi W/O Lassen Align-Reed Huntsman: Lac Jac-Kings Rvr Ave Reed: SSR 180-Central Rose: Del Rey Algn-Mendocino Adams: Highld-McCall Alta: Manning-Dinuba Dinuba: .295mi E/O Zumwalt-Alta

Construction 04/2022 06/2022 5-8 23, 31 8, 12, 14

Fresno 20/21 Forecasted Complete Streets Components

Jensen Avenue Reconstruction from Fruit Ave to West Ave

This project will include: Project Scope Development, Right of Way, Preliminary Design, Environmental Study/Documents Jensen Ave from Fruit Ave to West Ave. Pre-Construction 05/2023 10/2023 20-30 31 14

Fresno 20/21 Forecasted Road

Maintenance & Rehabilitation

American Avenue from Peach to Temperance Avenue This project will include: Right of Way American Avenue from Peach to Temperance Avenue Pre-Construction 02/2024 12/2025 50-70 31 14

Fresno 20/21 Carried Over Safety Elkhorn over Liberty Millrace Canal This project will include: Right of Way, Preliminary Design, Environmental Study/Documents W. Elkhorn Avenue approximately 1 mile west of S. Cornelia Ave. and 6.4 miles west of SR 41. Pre-Construction 07/2021 12/2021 50-70 31 12

Fresno 20/21 Carried Over Safety Markwood Creek on Dinkey Creek Road

This project will include: Project Scope Development, Right of Way, Preliminary Design, Environmental Study/Documents Dinkey Creek Road over Markwood Creek, 4.87 miles east of Highway 168. Pre-Construction 07/2021 12/2021 50-70 23 8

Fresno 20/21 In Progress Road

Maintenance & Rehabilitation

Lincoln Avenue from SR 145 to Grantland Alignment

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Shoulder Improvements Lincoln Avenue between Grantland Alignment and SR 145 Construction 05/2021 09/2021 10-15 31 12

Fresno 20/21 Carried Over Complete Streets Components Tranquility Road Improvements This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or

Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing) Community of Tranquillity: Juanche Ave from Randolph Ave to Silvena Ave, and Daniels Ave from Randolph Ave to RR tracks. Construction 09/2021 12/2021 20-30 31 12

Fresno 20/21 Carried Over Complete Streets Components

Jensen Avenue Reconstruction from Fig to Fruit This project will include: Pavement Improvement (New) Jensen Ave from Fig Ave to Fruit Ave. Construction 05/2021 08/2021 20-30 31 14

Fresno 20/21 Carried Over Other American Avenue SR145 to Placer Ave This project will include: Shoulder Improvements American Avenue from State route 145 to Placer Avenue Construction 05/2021 10/2021 20-30 31 12

Page 10: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Fresno 20/21 In Progress Traffic Control Devices

Copper Avenue and Auberry Avenue Traffic Signal This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Copper Avenue and Auberry Avenue Construction 07/2020 07/2021 20-30 23 8

Fresno 20/21 Carried Over Road

Maintenance & Rehabilitation

Overlay of Lincoln from SR 41 to Chateau Fresno Alignment

This project will include: Pavement Rehab/Repair (Existing) | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Lincoln from SR 41 to Chateau Fresno Alignment Construction 08/2021 12/2021 7-10 31 12

Fresno 20/21 Carried Over Road

Maintenance & Rehabilitation

McCall Overlay from SR 180 to Shaw This project will include: Pavement Rehab/Repair (Existing) McCall Ave from SR 180 to Shaw Construction 07/2021 10/2021 7-10 23 14

Fresno 20/21 Carried Over Road

Maintenance & Rehabilitation

Church - Orange to Cedar

This project will include: Pavement Rehab/Repair (Existing) | The project involves localized grinding and dig outs and placement of a hot mix asphalt overlay. Adjustment of utilities and installation of Americans with Disabilities Act facilities may be performed as necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

Church - Orange to Cedar Construction 07/2021 09/2021 7-10 31 14

Fresno 20/21 Carried Over Road

Maintenance & Rehabilitation

James Bypass Overflow on Manning - Replace 2 Bridges

This project will include: Paving and/or Striping Installation (New Safety) | Replace 2 existing bridges James Bypass Overflow at Manning Construction 07/2021 12/2021 50-70 31 12

Fresno 20/21 Forecasted Road

Maintenance & Rehabilitation

Delta Mendota Canal Bridge on Nees Avenue Bridge Replacement This project will include: Bridge replacement Delta Mendota Canal Bridge at Nees Avenue Construction 12/2022 12/2023 50-70 31 12

Fresno 20/21 Carried Over Road

Maintenance & Rehabilitation

Travers Creek Bridge repalcement on Manning Avenue This project will include: Bridge Replacement Travers Creek Bridge at Manning Avenue Construction 12/2022 12/2023 50-70 31 14

Fresno 20/21 Forecasted Road

Maintenance & Rehabilitation

Dry Creek on Burrough Valley Road Bridge Replacement This project will include: Bridge replacement Dry Creek at Burrough Valley Road Bridge Construction 12/2022 12/2023 50-70 23 8

Fresno 20/21 Forecasted Road

Maintenance & Rehabilitation

North Fork Road over San Joaquin River Bridge Replacement This project will include: Replace Bridge North Fork Road at San Joaquin River Bridge Construction 11/2025 11/2026 50-70 23 8

Fresno 20/21 Carried Over Road

Maintenance & Rehabilitation

Mt. Whitney from Marks to Blythe This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing)

Mt. Whitney Avenue from Marks Avenue to Blythe Avenue Construction 04/2022 10/2022 20-30 31 12

Fresno 21/22 Carried Over Road

Maintenance & Rehabilitation

Cerini Ave From East to Cedar This project will include: Project Scope Development, Right of Way, Feasibility Study, Cost Estimating, Document Preparation, Preliminary Design Cerini Ave from East to Cedar Pre-Construction 04/2022 10/2022 20-30 12 31

Fresno 19/20 In Progress Road

Maintenance & Rehabilitation

Lincoln Avenue from SR 145 to Grantland Alignment

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety) | Road Reconstruction / Rehabilitation

Lincoln Avenue between Grantland Alignment and SR 145 Construction 08/2021 12/2021 10-12 31 12

Fresno 19/20 In Progress Other Jensen Avenue SR 145 to Dickenson This project will include: Construct 4 ' wide Hot Mix Asphalt shoulders on each side of roadway Jensen Avenue from State Route 145 to Dickenson Avenue Construction 05/2021 10/2021 20-30 31 12

Fresno 19/20 Forecasted Match Funds Golden State Boulevard over Fowler Switch Bridge Replacement This project will include: Replace Bridge Golden State Boulevard at Fowler Switch Bridge Construction 01/2023 04/2024 50-70 31 14

Page 11: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Glenn 21/22 New Road

Maintenance & Rehabilitation

Chip Seal Project - Various Sites -72.02 Centerline Miles

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing

CR S, CR 9 to Tehama County Line; CR 53, CR D to CR F; Sac. Ave, 1st St to SR 32; Los Robles Ave, 1st St to SR 32; Capay Ave, 1st St to SR 32; Main St, 1st St to SR 32; 1st St, SR 45 to Sac. Ave; 2nd St, SR 45 to Sac. Ave; 3rd St, SR 45 to Sac. Ave; 4th St, SR 45 to Sac. Ave; 5th St, SR 45 to Sac. Ave; CR P, CR 39 to CR 45; CR 99W, Willows City Limits to Orland City Limits; CR Z, SR 162 to CR 67; CR 34, SR 45 to CR V; CR 45, CR P to CR S; CR S, CR 45 to CR 44; CR XX, CR 69 to Colusa County Line;

Procurement/Operatio nal Needs 07/2021 08/2021 7-10 3 4

Glenn 21/22 New Road

Maintenance & Rehabilitation

Road Fund Equipment This project will include: Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment Countywide chip seal projects Procurement/Operatio

nal Needs 07/2021 06/2022 15-20 3 4

Glenn 21/22 New Road

Maintenance & Rehabilitation

Engineering Department – Bridge Repair

This project will include: Project Scope Development, Right of Way, Bridge Structure Rehab/Repair (Existing), Feasibility Study, Maintenance Program Plan Development, Document Preparation, Right of Way Acquisition, Cost Estimating, Preliminary Design, Environmental Study/Documents | Bridge maintenance and repair

Bridge 11C0075 - County Road Z over Angel Slough Pre-Construction and Construction

07/2021 07/2021

06/2022 06/2022 30-50 3 4

Glenn 21/22 New Road

Maintenance & Rehabilitation

Alleyway Maintenance This project will include: Right of Way, Maintenance Program Plan Development, Preliminary Design | Alleyway Maintenance

Hamilton City Northeast Willows

Pre-Construction and Construction

07/2021 07/2021

06/2022 06/2022 3-5 3 4

Humboldt 21/22 New Other FY 2021-22 ADA Curb Ramp/Rehabilitation

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing) | This project covers the installation of accessible curb ramps in various locations throughout the county.

Unincorporated communities of Hoopa, Garberville, and McKinleyville, and unincorporated areas near the Cities of Eureka, Ferndale, adn Fortuna (Maintenance Areas); Traffic Service Areas and Bridges.

Construction 07/2020 06/2023 20-20 2 2

Humboldt 21/22 New Safety FY 2021-22 Emergency Services

This project will include: Procurement of Public Works Safety Materials and Gear, Procurement of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | This project encompasses all costs that pertain to emergency opening of roadways and the actions made to expedite repairs or provide service to disenfranchised citizens. This includes both contracted and non-contracted work. | These projects include, but are not limited to, culvert repair such as trenching, tunneling, compacting, armoring, as well as flagging, detouring, hauling, repairing, and providing essentials services such as transporting and accommodating citizens who have been deprived of the ability to utilize roadways due to unexpected road damages and closures.

Unincorporated communities of Hoopa, Garberville, and McKinleyville, and unincorporated areas near the Cities of Eureka, Ferndale, and Fortuna (Maintenance Areas); Traffic Service Areas and Bridges.

Procurement/Operatio nal Needs 07/2020 06/2023 1-1 2 2

Humboldt 21/22 New Road

Maintenance & Rehabilitation

FY 2021-22 Roadway and Culvert Maintenance/Rehabilitation

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | This project covers labor, materials and equipment needed for road system maintenance repairs throughout the entirety of Humboldt County. These activities include, but are not limited to: crack filling and sealing, pothole patching, grading, grader patching, dig outs, slurry seal, chip seal, striping, painting, and brush cutting. | Additionally, materials required to complete these tasks, include, but are not limited to: hot and cold mix, tar, thermoplastic striping paints, culvert piping, and couplers, aggregate and any other materials used in the express intent of repairing a roadway or projects pertaining to safety. This includes both contracted and non-contracted work.

Unincorporated communities of Hoopa, Garberville, and McKinleyville, and unincoporated areas near the Cities of Eureka, Ferndale, and Fortuna (Maintenance Areas); Traffic Service Areas and Bridges.

Construction 07/2020 06/2023 20-20 2 2

Humboldt 21/22 New Safety FY 2021-22 Illegal Dumping and Encampment Reclamation Costs

This project will include: Procurement of Public Works Safety Materials and Gear, Procurement of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials, Public Works Staffing, Repair and Servicing of Public Works Equipment | This project covers the costs to clean up illegally dumped materials and restore sites where dumping has occurred and discourage future illegal dumping. Costs include labor, materials and equipment required to clean, repair and reclaim affected sites. It is anticipated that illegal dumping will continue to occur at sites until efforts to discourage illegal dumping take effect.

Unincorporated communities of Hoopa, Garberville, and McKinleyville, and unincorporated areas near the Cities of Eureka, Ferndale, and Fortuna (Maintenance Areas); Traffic Service Areas and Bridges.

Procurement/Operatio nal Needs 07/2020 06/2023 1-1 2 2

Humboldt 21/22 New Match Funds FY 2021-22 Roadside Brush

Clearing for Traffic Safety and Fire Fuels Reduction

This project will include: Procurement of Public Works Safety Materials and Gear, Procurement of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials, Public Works Staffing, Repair and Servicing of Public Works Equipment | This project covers the added cost for labor materials and equipment required to perform brush clearing on county-maintained roads. This will also enhance the grant funding that the county has received for this type of work.

Unincorporated communities of Hoopa, Garberville, and McKinleyville, and unincorporated areas near the Cities of Eureka, Ferndale, and Fortuna (Maintenance Areas); Traffic Service Areas and Bridges.

Procurement/Operatio nal Needs 07/2020 06/2023 1-1 2 2

Page 12: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Imperial 20/21 In Progress Road

Maintenance & Rehabilitation

Road Improvements for Baughman Rd. from Forrester Rd. to Lack Rd.

& Casey Rd. from Griffin Rd. to Hwy. 78

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Right of Way, Pavement Rehab/Repair (Existing), Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | Rehabilitate approximately 2.5 miles of road. The project will include the re-paving with Asphalt Concrete and the repair of failure areas of road markings. | Funds from FY 2020-21 will be used to reimburse the County for its other funds used to advance the project per SHC 2034(c).

Baughman Road from Forrester Road to Lack Road; Casey Road from Griffin Road to State Route 78

Pre-Construction and Construction

12/2017 07/2022

06/2022 12/2022 7-10 56 40

Imperial 20/21 In Progress Road

Maintenance & Rehabilitation

Schartz Road Project 1

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Preliminary Design | Rehabilitate approximately 1.5 miles of road. The project will include the re-paving with asphalt concrete and the repair of failure areas and road markings.

Schartz Road McConnell Road to Old Highway 111 Pre-Construction and Construction

10/2017 01/2022

12/2021 06/2022 5-9 56 40

Imperial 20/21 In Progress Road

Maintenance & Rehabilitation

Forrester Road Improvements This project will include: Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and re-striping. | Maintenance work to be completed by County's forces.

Forrester Road: from Evan Hewes Highway to Interstate 8, from Evan Hewes Highway to Hackleman Road, from 0.80 Mi. N. of Worthington Road to Larsen Road, from 0.15 Mi. N. of Worthington Road to 0.20 Mi. S of Murphy Road, from Thompson Road to Keystone Road

Construction 07/2021 06/2022 7-10 56 40

Imperial 20/21 Carried Over Road

Maintenance & Rehabilitation

Dogwood Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | 2-inch Asphalt Concrete Overlay, shoulder backing, pavement markings, and signage.

Dogwood Road from Keystone Road to Harris Road Pre-Construction and Construction

07/2019 07/2023

06/2023 12/2023 7-10 56 40

Imperial 20/21 In Progress Road

Maintenance & Rehabilitation

Zenos Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | 2-inch Asphalt Concrete Overlay, shoulder backing, pavement markings, and signage.

Zenos Road from SR 115 to Melon Road Pre-Construction and Construction

07/2019 10/2021

09/2021 06/2022 7-10 56 40

Imperial 20/21 Carried Over Safety Rural School Safety Improvements This project will include: Safety Improvements Signage/striping. Magnolia Union Elementary at intersection of Casey Road and Silliman Road Pine Elementary at intersection of Holt Road and Townsend Road Meadows Union Elementary at Intersection of Bowker Road and Evan Hewes Highway

Procurement/Operatio nal Needs 09/2019 06/2022 5-10 56 40

Imperial 20/21 In Progress Road

Maintenance & Rehabilitation

Picacho Road Bridge This project will include: Bridge Structure Rehab/Repair (Existing), Document Preparation, Preliminary Design | The project will consist on the design and construction of the Bridge Rehabilitation for Picacho Road Bridge over Yuma Main.

Picacho Road Bridge over Yuma Main Pre-Construction and Construction

09/2019 07/2022

06/2022 12/2022 10-15 56 40

Imperial 20/21 In Progress Road

Maintenance & Rehabilitation

Gateway of the Americas Road System This project will include: Preliminary Design

Maggio Road from HWY 7 to Rood Road, Zinetta Road from Clara Nofal Road to Rood Road, Pan American Road from Nina Lee Road to Rood Road, Rood Road from Pan American Rood to Stergios Road, Menville Road from HWY 7 to Menvielle Court , Nina Lee Road from Carr Road to HWY 7, Los Alamos Road from Pan American Road to North End

Pre-Construction 05/2019 12/2021 7-10 56 40

Imperial 20/21 In Progress Road

Maintenance & Rehabilitation

AC Skin Patching for Various County Roads

This project will include: Pavement Rehab/Repair (Existing) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and re-striping. | Maintenance work to be completed by County's forces.

Board Rd, Bowker Rd, Evan Hewes Highway, Holt Road, Hovley Road, Imperial Road, Kalin Road, McCabe Rd, Miller Rd, Ross Rd, Rutherford Rd, Underwood Rd, Wahl Road, Yuma Rd, Heber Road, and McCabe Road. Locations are estimates not yet final.

Construction 03/2020 12/2021 4-6 56 40

Imperial 20/21 In Progress Road

Maintenance & Rehabilitation

Pavement Overlay for Various County Roads This project will include: Preliminary Design

Clark Road from Wahl Road to .5 N. of HWY 98, Picacho Road from Quechan Road to Indian Rock Rd., Treadwell Road from HWY 86 to Camino Drive, Orchard Road from Bailey Road to .25 Mi. S of Edwards Road. All locations listed are an estimate, and have yet to be finalized.

Pre-Construction 08/2019 12/2021 7-10 56 40

Imperial 20/21 In Progress Safety Lack Road Bridge Project This project will include: Bridge Structure Rehab/Repair (Existing), Document Preparation, Preliminary Design | The project consists of replacement of structurally compromised road bridge over the New River. The project is anticipated to require multiple years to be completed.

Lack Road Bridge over New River, County Brodge No. 58C-0101 Pre-Construction and Construction

12/2017 07/2021

06/2021 12/2022 45-50 56 40

Imperial 20/21 In Progress Road

Maintenance & Rehabilitation

AC Skin Patching for Various County Roads

This project will include: Pavement Rehab/Repair (Existing) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement makings and restriping. | Maintenance work to be completed by County's forces.

Beal Road, Bonesteele Road, Evan Hewes Highway, Imperial Road, Kalin Road, Kubler Road, Niles Ave, Bowker Road, Spa Road, Hot Mineral Spa Road, and Cocopah Road. Locations are estimates not yet final.

Construction 07/2020 12/2022 4-6 56 40

Page 13: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Imperial 20/21 In Progress Road

Maintenance & Rehabilitation

Bombay Beach Townsite

This project will include: Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | AC Overlay, ARAM, Slurry Seal Coat and Road Markings.

"Bombay Beach Townsite: Avenue A, Avenue B, Avenue C, Avenue D, Avenue E, Avenue F, Avenue G, Avenue H, Aisle for Palms, 1st Street, 2nd Street, 3rd Street, 4th Street, and 5th Street. "

Pre-Construction and Construction

09/2020 09/2021

08/2021 12/2021 7-10 56 40

Imperial 20/21 In Progress Road

Maintenance & Rehabilitation

Pavement Overlay for Various County Roads

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)

Picacho Road from Quechan Road to Indian Rock Road, Treadwell Blvd from Holtville City Limits to Camino Drive, Orchard Road from Bailey Road to .25 Mi. S of Edwards Road. All locations listed are an estimate, and have yet to be finalized.

Construction 07/2020 12/2021 7-10 56 40

Imperial 21/22 New Road

Maintenance & Rehabilitation

Salton Sea Beach Townsite This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | AC Overlay, ARAM, Slurry Seal Coat and Road Markings.

Barbara Ave., Coachella Ave., Imperial Ave., Brawley Ave., El Centro Ave., Indio Ave., Thermal Ave. Seaview Ave., Judy Ave., Thermal Ave., Niland Ave. Don Ave., Santa Rosa Ave., Eddie Ave., Cahuillla Ave. Aloha Ln, Cal Ave., Holt Ave., Brawley Ave.

Pre-Construction and Construction

07/2021 07/2022

06/2022 12/2022 7-10 56 40

Imperial 21/22 New Road

Maintenance & Rehabilitation

Imperial Townsite Various Roads This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | AC Overlay, ARAM, Slurry Seal Coat and Road Markings.

Apolonia Road, Austin Road, Belford Road, Belford Road, Coyne Road, Hamblet Ct., Ironwood Road Ironwood Road, La Brucherie Road, Lee Road Murphy Road, Nance Road, Neckel Road, Powell Ct. Preciado Road, Winona Ct., Worthington Road.

Pre-Construction and Construction

07/2021 07/2022

06/2022 12/2022 7-10 56 40

Imperial 21/22 New Road

Maintenance & Rehabilitation

Salton City Various Roads

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Rehabilitate approximately 9.84 miles of road. The project will include the re-paving with asphalt concrete and the repair of failure areas and road markings.

Niles Dr., Atlantic Blvd., N. Marina Drive Treadwell Blvd.

Pre-Construction and Construction

07/2021 07/2022

06/2022 12/2022 7-10 56 40

Imperial 21/22 New Road

Maintenance & Rehabilitation

Various County Roads Skin Patch This project will include: Pavement Rehab/Repair (Existing) | Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and re-striping. | Maintenance work to be completed by County's forces.

Aten Road, Austin Road, Bryant Road, Butters Road Butters Road, Clark Road, English Road Hartshorn Road, Haskel Road, Holt Road Holt Road, James Road, Jasper Road Old Highway 111, Ross Road, Rutherford Road Worthington Road, and Worthington Road.

Construction 07/2021 12/2022 4-6 56 40

Imperial 21/22 New Road

Maintenance & Rehabilitation

Design and Construction for Various County Roads

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Rehabilitate approximately 2.55 miles of road. The project will include the re-paving with asphalt concrete and the repair of failure areas and road markings.

McCabe Cove Road, Brockman Road, Cruickshank Road, Villa Lane, and Villa Road.

McCabe Cove Road Brockman Road Cruickshank Road Villa Lane Villa Road

Pre-Construction and Construction

07/2021 07/2022

06/2022 12/2022 7-10 56 40

Imperial 21/22 New Road

Maintenance & Rehabilitation

Fog Seal and Pothole Repair for Various County Roads

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | This project will just include Fog Seal and Pothole Repair. | Maintenance work to be completed by County's forces. Various County Roads. Locations are estimates not yet final. Construction 07/2021 06/2022 2-3 56 40

Imperial 21/22 New Road

Maintenance & Rehabilitation

Storm Damaged for Various County Roads This project will include: Rain Damage Repair. Various County Roads. Locations are estimates not yet final. Construction 07/2021 06/2022 4-6 56 40

Imperial 20/21 In Progress Road

Maintenance & Rehabilitation

Road Surface Repair Program in Imperial County

This project will include: Rehabilitate pavement failure road areas with Asphalt Concrete Skinpatching, pavement markings and re-striping | Maintenance work to be completed by County's forces

Ross Road from Forrester Road to Silsbee Road; Bowles Road from English Road to Lyerly Road; Gentry Road from Eddins Road to Vail Canal; Rutherford Road from Kershaw Road to HWY 115 (1.75 Mi. E); Meloland Road from Evan Hewes Highway to Grumbles Road.

Construction 03/2019 12/2021 4-6 56 40

Imperial 19/20 In Progress Safety Forrester Road Bridge Project This project will include: The project consists of the replacement of existing road bridge to retrofit seismically (Low Sufficiency rated). The project will be require a multiple years. This initial phase will be to conduct planning and design for the bridge. | This project is funded in part by FHWA.

Forrester Road Bridge over Westside Main Canal, County Bridge No. 58C-0104 Pre-Construction and Construction

07/2020 11/2020

10/2021 12/2021 50-75 56 40

Inyo 20/21 Carried Over Road

Maintenance & Rehabilitation

Project# 5 South Lake Road

This project will include: On South Lake Road, the project will pulverize and reclaim the existing pavement and portion of the existing subgrade for use as a new base course and overlay with a new asphalt concrete pavement section on 6.9 miles of South Lake Road, as well as minor widening along the first 2.1 miles.

South Lake Road (#2022) between US 168 and the South Lake trailhead parking area, approximately 12 miles Southwest of Bishop, California. Construction 05/2020 06/2021 20-20 26 8

Page 14: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Inyo 20/21 Carried Over Road

Maintenance & Rehabilitation

Project #13 Crack Fill, Patching, Restriping, Overlay, Guardrails,

and Culvert – As Required

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Application of rubberized crack fill and pot-hole patching to seal asphalt pavement to prevent water intrusion to the subgrade, protecting the subgrade from erosion and causing pavement failure. Overlay for some roads that are in an advanced state of deterioration, restriping, and guardrail and culvert repairs and/or replacement as necessary.

The Inyo County Road Route system, where several roads are grouped in areas, or ‘zones’ will be used for identification of the residential streets, outlying roads, and individual roads. Bishop Area; Routes #1001 through #1006. Big Bine Area; Routes #2001, through #2004. Independence Area; Routes #3001 through #3005, and #3008. Lone Pine Area; Routes #4001 through #4008. Tecopa/Shoshone Area; Routes 5002 through #5006

Construction 07/2021 06/2022 10-10 26 8

Inyo 20/21 Carried Over Road

Maintenance & Rehabilitation

Project #14 Warm Springs Road – Grader Overlay

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The Warm Springs Road Grader Overlay involves that application of includes the prepping, tack coating, and application of a 2” +/- layer of Cold Mix Asphalt (CMA) to 2.3 miles of existing roadway 24’ wide. Also included in this scope-of-work is any necessary shoulder backing and ditch clearing/shaping, as well as striping/asphalt markings.

The location is from US 395 to Eastside Construction 07/2021 06/2022 15-15 26 8

Inyo 20/21 Carried Over Road

Maintenance & Rehabilitation

Project #15 Death Valley Road – Chip Seal

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The Death Valley Road Chip Seal project includes the chip sealing to 4 miles of existing roadway 24’ wide. Also included in this scope-of-work is the striping/asphalt markings for areas overlaid by the chip seal | The anticipated life of the chip seal is 5 years

The location is the road segment from 11.2 miles and 15.2 miles east of US 395 on Hwy 168 out of Big Pine. Construction 07/2021 06/2022 5-5 26 8

Inyo 20/21 Carried Over Road

Maintenance & Rehabilitation

Project #16 Trona Wildrose Road – Chip Seal

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The Trona Wildrose Road Chip Seal project includes the chip sealing of 2) 2 mile long segments of existing roadway 22’ wide. Also included in this scope-of-work are the striping/asphalt markings for areas overlaid by the chip seal. | The estimated useful life for the chip seal is 5 years

The location of the two road segments are north of the County Line on the South end Construction 07/2021 06/2022 5-5 26 8

Inyo 20/21 Carried Over Road

Maintenance & Rehabilitation

Project #17 Panamint Valley Road – Paver Overlay

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The Panamint Valley Road project involves performing a paver overlay of intermittent segments of the 14 mile long section of existing roadway 22’ wide. Also included in this scope-of-work is the striping/asphalt markings for areas affected by the asphalt overlay. | The estimated useful life for the paver overlay is 10 years

The location of the Panamint Valley Road is between Highway 190 and Trona Wildrose Road Construction 07/2021 06/2022 10-10 26 8

Inyo 20/21 Carried Over Road

Maintenance & Rehabilitation

Project #18 Old Spanish Trail Road – Grader Overlay

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The Old Spanish Trail Road project involves performing a grader overlay of intermittent segments of the existing roadway 22’ wide. Also included in this scope-of-work is the striping/asphalt markings for areas affected by the asphalt overlay. | The estimated useful life for the grader overlay is 10 years

The location of the Old Spanish Trail Road is between Highway 127 and the Nevada Border Construction 07/2021 06/2022 10-10 26 8

Inyo 20/21 Carried Over Road

Maintenance & Rehabilitation

Project #19 Grandview, Mesquite, and Meadow Lane Fiber Seal

Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The Grandview, Mesquite, and Meadow Lane Project involves applying a fiber seal coat to approximately 1 mile of residential roadway 36’ wide. Also included in this scope-of-work is the striping/asphalt markings for areas affected by the asphalt overlay. | The estimated useful life for the fiber seal coating is 5 years

The location of the Grandview, Mesquite, and Meadow Lane fiber seal coating project is in the residential area off West Line Street (CA 168 West) behind Manor Market. Construction 07/2021 06/2022 5-5 26 8

Inyo 20/21 Carried Over Road

Maintenance & Rehabilitation

Project #20 Meadow Creek I/II & Lazy A Sidewalk Improvement

Project

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | The Meadow Creek I/II & Lazy A Sidewalk Improvement Project involves the identification, removal, and replacement of damaged or displaced areas of concrete sidewalk as well as sections of curb & gutter. Tree removal, root pruning, installation of root barrier, and asphalt patching will also be required. | The estimated useful life for the sidewalk and curb & gutter replacement will be approximately 20+ years.

The neighborhoods of Lazy A, Meadow Creek I and II Construction 07/2021 06/2022 20-20 26 8

Inyo 20/21 Carried Over Road

Maintenance & Rehabilitation

Project #21 Lasky Lane Drainage Remediation Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The Lasky Lane Drainage Remediation Project involves the application of cold mix overlay to low areas of the existing Lasky Lane roadway to reconfigure drainage patterns to appropriate surface drainage transport mechanisms. | The estimated useful life for the Lasky Lane Drainage Remediation work will be approximately 30+ years.

The location of the Lasky Lane Drainage Remediation area is the section of Lasky Lane just north and west of Lone Pine. Construction 07/2021 06/2022 30-30 26 8

Inyo 20/21 Carried Over Road

Maintenance & Rehabilitation

Project #9 Cactus Flat Road Repair This project will include: Pavement Rehab/Repair (Existing)

Cactus Flat Road is located in Inyo County, just south of Olancha. The section that will be repaired is approximately 5 miles west of the intersection of Cactus Flat Road and US395, 5 miles south of Olancha.

Construction 07/2021 06/2022 20-20 26 8

Page 15: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Inyo 20/21 Carried Over Road

Maintenance & Rehabilitation

Project #10 North Round Valley Bridge Replacement, Birchim Lane

improvement; State matching funds requirement

This project will include: Project Scope Development, Bridge Structure Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Installation (New), Preliminary Design, Paving and/or Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Environmental Study/Documents | The North Round Valley Bridge Replacement and Birchim Lane improvement project will address damages caused by a 2017 storm system that destroyed the bridge and access route for the 40 Acres Community. The County is using a percentage of its RMRA funds as a match for the State of California OES disaster funds being received for design and construction. | Total North Round Valley Bridge design and construction costs are estimated to be $3,400,000, of which the California OES will contribute 75% or $2,550,000. The remaining Inyo County match of 25% of project costs will be meet using RMRA funds

North Round Valley Road, with the damaged bridge, and Birchim Lane, that intersects North Round Valley Road, is located in Inyo County, 15 miles North West of Bishop.

Pre-Construction and Construction

07/2020 07/2021

06/2021 06/2022 50-50 26 8

Inyo 21/22 New Road

Maintenance & Rehabilitation

Project #22 - Micro Fiber Slurry Seal

This project will include: Pavement Rehab/Repair (Existing) | Apply micro-fiber slurry seal to select roadways and restripe as necessary

Numerous roads in the neighborhoods of Aspendell, Habbegers, Bishop, Big Pine, Independence, and Lone Pine. Includes segments of: COLUMBINE DRIVE (0.38 MI) NORTH STREET (0.10 MI) ALPINE DRIVE (0.23 MI) WHITE PINE ROAD (0.09 MI) IRIS DRIVE (0.09 MI) CATARACT ROAD (0.73 MI) SAGE DRIVE (0.15 MI) CARDINAL ROAD (0.41 MI) BROOK LANE (0.07 MI) MIDDLE FORK ROAD (0.27 MI) RESERVOIR ROAD (0.56 MI) HABEGGER LANE (0.09 MI) CANYON DRIVE (0.23 MI) MOUNT TOM VIEW DRIVE (0.09 MI) SIERRA SUMMIT (0.05 MI)

Construction 07/2021 06/2022 5-5 26 8

Inyo 21/22 New Road

Maintenance & Rehabilitation

Project #23 - Guardrail Replacement and Modernization

This project will include: Repair or replace multiple guardrails in Inyo County at locations currently identified. Additional guardrails may be added to this list as required.

Whitney Portal Road, Five Bridges Road, Warm Springs Road, Onion Valley Road, Sabrina Road, Brockman Lane, Barlow Lane, and Poleta Road. Construction 07/2021 06/2022 20-20 26 8

Inyo 21/22 New Road

Maintenance & Rehabilitation

Project #24 - Trona Wildrose Reconstruction This project will include: Pavement Rehab/Repair (Existing) One mile long stretch of Trona Wildrose Road starting at the Inyo County/San

Bernardino County line. Construction 07/2021 06/2022 20-20 26 8

Inyo 21/22 New Road

Maintenance & Rehabilitation

Project #25 - Lone Pine Town Streets Asphalt Resurfacing

Project

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing)

East Mountain Street, North and South Brewery Street, North and South Mt. Whitney Drive, East and West Post Street, Tim Holt Street, North and South Lone Pine Avenue, North and South Lake View Street, and East Muir Street.

Construction 07/2021 06/2022 20-20 26 8

Inyo 21/22 New Road

Maintenance & Rehabilitation

Project #26 - Lone Pine Sidewalks and ADA Improvement Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New)

Whitney Portal Road from Washington Street to Jackson Street, Jackson Street from Whitney Portal to Begole, as well as Locust Street in front of the school Construction 07/2021 06/2022 30-30 26 8

Kern 19/20 In Progress Road Grade Separation Standard Street Alternate Access

This project will include: Project Scope Development, Right of Way, Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents | This safety, railroad grade separation, and complete street component project consists, in general, of constructing a grade separation, curb, gutter, sidewalk, drainage, and paved roadway on Atlas Court from Standard Street to Hageman Road. In the interest of public safety and aiding motor vehicle traffic, the new railroad crossing will serve as a second ingress/egress point to allow emergency responders, as well as the public, to freely enter and exit the area without disruption from rail traffic. | Prior FYs mistakenly reported as construction in progress. The project is currently pre-construction in progress.

Atlas Court at the San Joaquin Valley Railroad and from Standard Street to Hageman Road Pre-Construction 12/2018 06/2024 15-20 34 16

Kern 20/21 Carried Over Road

Maintenance & Rehabilitation

Belle Terrace from Wible Road to City Limit

This project will include: Project Scope Development, Right of Way, Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents | This road maintenance and rehabilitation project consists, in general, of roadway resurfacing.

Belle Terrace from Wible Road to City Limit Pre-Construction 07/2021 06/2022 8-10 34 14

Kern 19/20 Carried Over Road

Maintenance & Rehabilitation

Airport Drive from State Road to West China Grade Loop

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design | This road maintenance and rehabilitation project consists in general, of roadway resurfacing.

Airport Drive from State Road to West China Grade Loop Pre-Construction 07/2021 06/2022 8-10 34 16

Page 16: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Kern 19/20 Carried Over Road

Maintenance & Rehabilitation

Lake Isabella Boulevard from Kernville Road/Nugget Avenue to

Kern River Canyon Road

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | This road maintenance and rehabilitation project consists in general, of roadway resurfacing.

Lake Isabella Boulevard from Kernville Road/Nugget Avenue to Kern River Canyon Road

Pre-Construction and Construction

07/2021 01/2022

12/2021 06/2022 8-10 26 16

Kern 21/22 New Road

Maintenance & Rehabilitation

Palm Avenue from Allen Road to Old Farm Road

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | This road maintenance and rehabilitation project consists, in general, of roadway resurfacing.

Palm Avenue from Allen Road to Old Farm Road Pre-Construction 07/2021 12/2021 8-10 34 16

Kern 19/20 Carried Over Road

Maintenance & Rehabilitation

Mc Cray Street from West Day Avenue to Merle Haggard Drive

This project will include: Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design | This road maintenance and rehabilitation project consists, in general, of roadway resurfacing.

Mc Cray Street from West Day Avenue to Merle Haggard Drive Pre-Construction and Construction

07/2021 01/2022

12/2021 06/2022 8-10 34 14

Kern 21/22 New Road

Maintenance & Rehabilitation

County Maintained Road System -Road Maintenance Program

This project will include: Procurement of Public Works Safety Materials and Gear, Procurement of Public Works Systems/Databases, Procurement of Public Works Equipment, Repair and Servicing of Public Works Systems/Databases, Procurement of Road Maintenance and Rehab Materials, Public Works Staffing, Repair and Servicing of Public Works Equipment | FY 2021-22 Countywide Maintenance Program of road right-of-way including, but not limited to patching, crack filling, weed abatement, overlaying, sealing, snow removal, storm damage repair, ditch clearing, sump cleaning, culvert repair, and shoulder backing.

Throughout the County Maintained Road System including, but not limited to, unincorporated areas of Arvin, Bakersfield, Boron, Buttonwillow, Delano, Frazier Park, Kernville, Lake Isabella, Lamont, Lebec, Lost Hills, McFarland, Mojave, Oildale, Ridgecrest, Rosamond, Shafter, Taft, Tehachapi, and Wasco.

Procurement/Operatio nal Needs 07/2021 06/2022 1-5 26, 32, 34, 36 14, 16

Kern 21/22 New Road

Maintenance & Rehabilitation

County Maintained Road System -Traffic Maintenance Program

This project will include: Procurement of Public Works Systems/Databases, Procurement of Public Works Safety Materials and Gear, Procurement of Public Works Equipment, Public Works Staffing, Repair and Servicing of Public Works Systems/Databases, Procurement of Road Maintenance and Rehab Materials, Repair and Servicing of Public Works Equipment | FY2021/22 Countywide Maintenance Program of traffic safety devices including, but not limited to, lights, signals, pavement markings, and signs.

Throughout the County Maintained Road System including, but not limited to, unincorporated areas of Arvin, Bakersfield, Boron, Buttonwillow, Delano, Frazier Park, Kernville, Lake Isabella, Lamont, Lebec, Lost Hills, McFarland, Mojave, Oildale, Ridgecrest, Rosamond, Shafter, Taft, Tehachapi, and Wasco.

Procurement/Operatio nal Needs 07/2021 06/2022 2-5 26, 32, 34, 36 14, 16

Kern 21/22 New Road

Maintenance & Rehabilitation

FY 2021/22 Job Order Contract of General Maintenance on Various

Roads

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | This road maintenance and rehabilitation project consists, in general, of asphalt concrete overlays, drainage improvements, and other rehabilitation repairs as funding allows.

General Maintenance on Various Roads. Locations to be determined in the pre-construction phase. Pre-Construction 07/2021 06/2022 8-10 26, 32, 34, 36 14, 16

Kern 21/22 New Road

Maintenance & Rehabilitation

FY 2021/22 Slurry Seals on Various Roads

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design | This road maintenance and rehabilitation project consists, in general, of placing slurry seal on county neighborhood roads to preserve and protect the pavement.

FY 2021/22 Slurry Seal on Various Roads. Locations to be determined in the pre-construction phase. Pre-Construction 07/2021 06/2022 3-5 26, 32, 34, 36 14, 16

Kern 21/22 New Road

Maintenance & Rehabilitation

FY 2021/22 Asphalt-Rubber Chip Seal on Various Roads

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | This road maintenance and rehabilitation project consists, in general, of placing asphalt-rubber chip seal on county neighborhood roads to preserve and protect the pavement.

FY 2021/22 Asphalt-Rubber Chip Seal on Various Roads. Locations to be determined in the pre-construction phase. Pre-Construction 07/2021 06/2022 3-5 26, 32, 34, 36 14, 16

Kern 21/22 New Road

Maintenance & Rehabilitation

Asphalt-Rubber Chip Seal on Various Roads in the Oildale Area

and on Rosedale Highway

This project will include: Pavement Rehab/Repair (Existing) | This road maintenance and rehabilitation project consists, in general, of placing asphalt-rubber chip seal on county neighborhood roads to preserve and protect the pavement.

Asphalt-Rubber Chip Seal on Various Roads in the Oildale Area Construction 07/2021 06/2022 3-5 34 16

Kern 21/22 New Road

Maintenance & Rehabilitation

FY 2021/22 Chip Seal located on Various Roads

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | This road maintenance and rehabilitation project consists, in general, of placing chip seal on county roadways to preserve and protect the pavement.

FY 2021/22 Chip Seal located on Various Roads. Locations to be determined in the pre-construction phase. Pre-Construction 07/2021 06/2022 3-5 26, 32, 34, 36 14, 16

Kern 21/22 New Road

Maintenance & Rehabilitation

FY 2021/22 Asphalt Concrete Stockpile at Various Locations

This project will include: Pavement Rehab/Repair (Existing) | This road maintenance project consists, in general, of purchasing approximately 60,500 tons of road maintenance asphalt material to perform pothole patching and thin asphalt overlays.

FY 2021/22 Asphalt Concrete Stockpile at Various Locations in Kern County including Arvin, Edison Highway, Patton Way, Buttonwillow, Curnow, Inyokern, Kernville, Caliente Bodfish Road, Entrada Boulevard, Burlando Road, Lebec Road, Vernon Drive, Elmo Highway, Sierra Highway, Rosamond, Taft, Tehachapi, and Wasco.

Construction 07/2021 06/2022 1-2 26, 32, 34, 36 14, 16

Page 17: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Kings 21/22 New Road

Maintenance & Rehabilitation

2021-2022 Paving Fabric, Slurry and Micro Seals

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Pavement Rehab/Repair (Existing), Maintenance Program Plan Development, Preliminary Design

Grangeville (14th to 18th Ave); Kansas Ave (16th - SR 41); 6th Ave (Grangeville -Excelsior); Excelsior Ave (19th Ave - 17th Ave); Liberty Dr (13 1/2 Ave to Frontier St); Frontier St (Liberty - Grangeville); Heritage Ln (Liberty - End); Locust St (Arbor - 14 1/2 Ave); Ambrose (Locust - Front); Front (13th Ave - 14th Ave); 1st (Excelsior - Blowers); 2nd St (Excelsior - Blowers); 3rd St (Johnson-Blowers); Blowers (1st - 3rd); Johnson (1st-3rd)

Pre-Construction and Construction

03/2022 04/2022

04/2022 06/2022 15-25 32 14

Lake 20/21 Carried Over Road

Maintenance & Rehabilitation

Nice-Lucerne Cutoff

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design | Resurface 1043 feet of road on Nice-Lucerne Cutoff to the intersections of Lakeshore Blvd and Westlake Rd. Current work includes project design and development of bid documents.

.2 miles from exit/entrance from south bound lane to Lakeshore Blvd to intersections of Lakeshore Blvd and Westlake Rd

Pre-Construction and Construction

07/2021 01/2022

12/2021 06/2022 10-20 4 2

Lake 19/20 Carried Over Road

Maintenance & Rehabilitation

Rainbow Road;Lakeshore Blvd.

This project will include: Rainbow Road - Resurface 1 mile of road. Current work includes preliminary engineering and development of bid documents and construction: reconstruct and resurface Rainbow Road; Lakeshore Blvd - Resurface 1.2 miles of road. Current work includes preliminary engineering and development of bid documents. | Linked projects from FY 17/18 PE phase with FY 18/19 Con Phase for Rainbow Rd

Lakeshore Blvd. to Howard Ave.; Lakeport City Limit to Park Way Construction 09/2021 09/2022 10-20 4 2

Lake 19/20 Carried Over Road

Maintenance & Rehabilitation

Martin Street; Hartley Road This project will include: Martin Street - Resurface 1.4 miles of road. Hartley Road - Resurface 0.6 mile of road. Lakeport City Limit to Riggs Rd.; Lakeport City Limit to Crystal Lake Way Construction 07/2021 09/2022 10-20 4 2

Lassen 21/22 New Road

Maintenance & Rehabilitation

Old Town Road Rehab Project This project will include: Preliminary Design, Pavement Improvement (New) Westwood Area. Segment of road between Mooney Road and Firland Drive Pre-Construction and Construction

06/2021 09/2021

12/2021 09/2022 10-15 1 1

Lassen 21/22 New Road

Maintenance & Rehabilitation

Mail Route Road Rehab Project This project will include: Pavement Improvement (New) Ravendale Area Construction 06/2022 09/2022 10-15 1 1

Lassen 20/21 Carried Over Road

Maintenance & Rehabilitation

FY 2021/22 Chip Seal Project This project will include: Pavement Rehab/Repair (Existing), Cost Estimating

Various County Roads including, Capezzoli Lane, Sage Valley Road, Sierra Vista Road, Hemphill Road, Blickenstaff Road, Diamond Way, Hayden Terrace, Emerson Drive, Florence Lane, Emerson Court, Circle Drive, Fairway Drive, Eagle Drive, Circle Court, San Francisco Street, Riverside Drive, Grove Street, Bonnie Way, Prattville Road, miller Road and South Street alley /road

Pre-Construction and Construction

02/2022 06/2022

06/2022 08/2022 5-10 1 1

Los Angeles 19/20 In Progress Safety Avocado Heights- Don Julian Road at 5th Avenue This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Intersection of Don Julian Rd and 5th Ave within the unincorporated County of Los

Angeles community of Avocado Heights Construction 09/2020 07/2021 20-20 57 22

Los Angeles 19/20 In Progress Traffic Control Devices

Covina Islands - Irwindale Avenue at Cypress Street - upgrade traffic

signal

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install left turn phasing eastbound and westbound for Cypress Street. | Work completed by County force account labor. Does not include expenditures prior to RMRA.

Unincorporated Vincent area and City of Irwindale - Irwindale Avenue at Cypress Street. Construction 06/2021 09/2021 15-15 48 22

Los Angeles 19/20 In Progress Safety Covina Islands - Enid Avenue at Newburgh Street - Striping and

Curb Ramps

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Paving and/or Striping Installation (New Safety) | Install curb ramp and striping for crosswalk. | Work completed using force account labor.

Unincorporated Covina island - Enid Avenue at Newburgh Street Construction 03/2021 07/2021 10-10 48 22

Los Angeles 19/20 In Progress Traffic Control Devices

East Los Angeles - 1st Street at Eastman Avenue and 1st Street at

Townsend Avenue

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Audible pedestrian alerts, new pedestrian push buttons, and upgraded signal heads. | $10k design $90k construction

1st Street at its intersections with Townsend Avenue and Eastman Avenue in the unincorporated County community of East Los Angeles Construction 06/2021 10/2021 15-15 51 24

Los Angeles 19/20 In Progress Traffic Control Devices

East Los Angeles - 1st Street at Marianna Avenue

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety) | New traffic signal.

1st Street and Marianna Avenue in the unincorporated community of East Los Angeles Construction 02/2021 07/2021 20-20 51 24

Page 18: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 19/20 In Progress Safety East Los Angeles - Atlantic Blvd and 6th St, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Upgrade pedestrian push button and activate accessible pedestrian signal and audible alert.

This project is at the intersections Atlantic Blvd at 6th St, Whittier Blvd at Goodrich Blvd, Sadler Ave at Beverly Blvd, and Whittier Blvd at Hoefner Ave in the unincorporated County of Los Angeles community of East Los Angeles and the City of Commerce.

Construction 01/2021 07/2021 15-15 51, 58 24, 32

Los Angeles 19/20 In Progress Safety East Los Angeles - Cesar E Chavez Av at Alma Av

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Upgrade and install crosswalks, bulbouts, rectangular rapid flashing beacons, access ramps, and other associated equipment.

Intersection of East Cesar E. Chavez Ave at Alma Ave. in the unincorporated County community of East Los Angeles in Supervisorial District No. 1. Construction 02/2021 07/2021 15-15 51 24

Los Angeles 19/20 In Progress Traffic Control Devices

East Los Angeles - Cesar E Chavez Av at Eastern Av

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install protective permissive left turn phasing.

Cesar E. Chavez Avenue and Eastern Avenue in the unincorporated community of East Los Angeles Construction 06/2021 12/2021 15-15 51 24

Los Angeles 19/20 In Progress Safety East Los Angeles - Eastern Av at City Terrace Dr

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install protected/permissive left turn phasing. | Total project cost reflects design costs only.

Intersection of Eastern Ave and City Terrace Drive in the unincorporated County of Los Angeles community of East Los Angeles. Construction 02/2021 10/2021 15-15 51 24

Los Angeles 19/20 In Progress Traffic Control Devices

East Los Angeles - Eastern Avenue at Ramona Boulevard

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Upgrade signal poles, mast arms, crosswalks, curb ramps; vehicle and pedestrian heads; pedestrian push button; and install bicycle detection.

Eastern Avenue and Ramona Boulevard, in the unincorporated County of Los Angeles community of East Los Angeles. Construction 06/2021 12/2021 15-15 51 24

Los Angeles 19/20 In Progress Safety East Los Angeles and Saybrook

Communities Traffic Safety Improvements

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Roundabout Installation (New), Paving and/or Striping Installation (New Safety) | Traffic circle for calming traffic

The intersections of Northside Drive at Montebello Parkway, and Southside Drive at Coolidge Way, in the unincorporated County of Los Angeles communities of East Los Angeles and Saybrook.

Construction 06/2021 10/2021 10-10 51 24

Los Angeles 19/20 In Progress Traffic Control Devices

East Los Angeles Traffic Signals -Olympic Bl at Garfield Ave and

Whittier Bl at Eastern Ave

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Upgrade standards, mastarms, vehicle heads, protected left-turn phasing, bicycle and vehicle detection, ADA access ramps, communication, and other associated equipment. | Final plans completed July 2020

Unincorporated East Los Angeles - Olympic Bl at Garfield Av Construction 08/2021 04/2022 15-15 51 24

Los Angeles 19/20 In Progress Traffic Control Devices

San Gabriel Valley Traffic Signal Safety Project Group I, Workman

Mill Rd at Lomitas Ave

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Upgrade standards, mast arms, vehicle heads, bicycle and vehicle detection, access ramps, communication, and other associated equipment.

Unincorporated North Whittier area - Workman Mill Road at Lomitas Avenue Construction 08/2021 04/2022 15-15 57 22

Los Angeles 19/20 In Progress Traffic Control Devices

San Gabriel Valley Traffic Signal Safety Project Group II, Amar Rd at Baldwin Park Bl, Badillo St at

Irwindale Ave, and Temple Ave at Azusa Ave

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Upgrade standards, mast arms, vehicle heads, protected left-turn phasing, bicycle and vehicle detection, access ramps, communication, and other associated equipment.

Unincorporated area - Amar Rd at Baldwin Park Bl, Badillo St at Irwindale Ave, and Temple Ave at Azusa Ave Construction 08/2021 04/2022 15-15 48, 57 22

Los Angeles 19/20 In Progress Traffic Control Devices

South San Gabriel - Del Mar Av at Potrero Grande Dr

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Add protected left turn phasing to all approaches. | Project completion date postponed.

South San Gabriel - Del Mar Av at Potrero Grande Dr Construction 04/2021 09/2021 15-15 49 22

Los Angeles 19/20 In Progress Safety South San Gabriel - Del Mar Av at Redding Av

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing) | New traffic signal.

Intersection of Del Mar Avenue and Redding Avenue, in the unincorporated County of Los Angeles community of South San Gabriel. Construction 09/2021 01/2022 20-20 49 22

Page 19: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 19/20 In Progress Safety Walnut Park - Miscellaneous crossing improvements

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Active Transportation Plan, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Document Preparation, Paving and/or Striping Installation (New Safety), Preliminary Design | Install curb extensions, ADA ramps, restripe crosswalks | Project costs reflect $600,000 design and $1,400,000 construction.

Walnut Park Pre-Construction and Construction

06/2021 06/2022

12/2021 10/2022 20-20 59 33

Los Angeles 19/20 In Progress Traffic Control Devices

Walnut Park – Pacific Boulevard at Broadway

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install protected left turn phasing.

Pacific Boulevard at Broadway, in the unincorporated County of Los Angeles community of Walnut Park. Construction 06/2022 11/2022 15-15 59 33

Los Angeles 19/20 In Progress Traffic Control Devices

Walnut Park - Santa Fe Av - Sale Pl to South Gate City Boundary

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Preliminary Design, Paving and/or Striping Installation (New Safety) | New rectangular rapid flashing beacons and curb extensions for crosswalk. | $45k design and $105k construction

Santa Fe Avenue starting from Sale Place to the County's boundary line with the City of South Gate.

Pre-Construction and Construction

07/2019 01/2022

12/2021 06/2022 15-15 59 32

Los Angeles 19/20 In Progress Traffic Control Devices

West Valinda - Amar Rd at Vineland Av

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Upgrade the existing traffic signal on Amar Road at Vineland Avenue with protected left-turn phasing for eastbound and westbound traffic.

Amar Road and Vineland Avenue in the unincorporated County community of West Valinda Construction 04/2021 07/2021 15-15 57 22

Los Angeles 19/20 In Progress Safety West Valinda- Amar Road at Willow Ave

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install protected permissive left turn phasing. | Project to be administered by City of La Puente.

Intersection of Amar Road and Willow Avenue, in the unincorporated County of Los Angeles community of West Valinda and the City of La Puente. Construction 07/2020 07/2021 15-15 48, 57 22

Los Angeles 19/20 In Progress Safety West Valina - Azusa Ave at Gemini St

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install bike detection, update push button, add vehicle head, install cut back loops for traffic signal. | Estimated advertise date February 2021.

Intersection of Azusa Avenue at Gemini Street, in the unincorporated County of Los Angeles community of East Valinda. Construction 02/2021 07/2021 15-15 57 22

Los Angeles 19/20 In Progress Safety West Valinda-West Puente Valley -Unruh Av at Giordano St This project will include: Preliminary Design | Plan check costs only - construction at City expense. Intersection of Unruh Avenue and Giordano Street, in the Unincorporated West

Valinda-West Puente Valley community Pre-Construction 05/2020 07/2021 20-20 57 22

Los Angeles 19/20 In Progress Traffic Control Devices

West Valinda - Vineland Av at Giordano St

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety) | Install rectangular rapid flashing beacons on the north approach of Vineland Avenue and Giordano Street.

Vineland Avenue at Giordano Street in the unincorporated County community of West Valinda. Construction 04/2020 08/2021 15-15 57 22

Los Angeles 19/20 In Progress Safety West Valinda - Fairgrove Ave at Sandia Ave

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install flashing beacon and restripe crosswalk

West Valinda - Fairgrove Av at Sandia Av Construction 04/2021 10/2021 15-15 48 22

Los Angeles 19/20 In Progress Traffic Control Devices

Whittier Narrows - Rosemead Bl at Gallatin Rd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)

Rosemead Boulevard at Gallatin Road, in the unincorporated County of Los Angeles community of Whittier Narrows Construction 04/2021 09/2021 15-15 48, 58 32

Los Angeles 20/21 In Progress Traffic Control Devices

Angeles Forest - Mt Baldy Rd -Mills Av to County Boundary

This project will include: Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design, Paving and/or Striping Installation (New Safety) | Install curve advisory signs and centerline rumble strips in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Mount Baldy Road. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable.

County of Los Angeles unincorporated communities of Claremont and Angeles National Forest, and the City of Claremont. It begins at Mills Avenue and ends at the County boundary. The length of the project is approximately 8.0 miles.

Pre-Construction and Construction

04/2021 01/2022

12/2021 07/2022 10-10 41 25

Los Angeles 19/20 In Progress Traffic Control Devices

Azusa - Barranca Av at Baseline Rd

This project will include: Document Preparation, Cost Estimating, Preliminary Design | Currently developing plans. | .

Barranca Avenue and Baseline Road in the unincorporated County community of Azusa

Pre-Construction and Construction

10/2019 04/2022

02/2022 10/2022 15-15 48 22

Page 20: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 19/20 In Progress Traffic Control Devices

San Gabriel Valley Traffic Signal Safety Project Group I

(Covina/Hollenbeck and Cypress/Vincent)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Construct various traffic signal improvements, including upgrading standards, master arms, and vehicle heads at the intersections of Covina Boulevard at Hollenbeck Avenue and Cypress Street at Vincent Avenue. | Design costs are tracked in the constituent projects. The project will be combined for construction.

The intersections of Covina Boulevard at Hollenbeck Avenue and Cypress Street at Vincent Avenue in the unincorporated County community of Covina. Construction 08/2021 06/2022 15-15 48 22

Los Angeles 19/20 In Progress Traffic Control Devices

120th Street Traffic Signal Safety Project, 120th St at Normandie

Ave and 120th St at Compton Av

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Upgrade standards, mast arms, vehicle heads, bicycle and vehicle detection, protected-permissive left-turn phasing, access ramps, communication, and other associated equipment. | .

Unincorporated Willowbrook area - 120th Street at Compton Avenue Construction 03/2021 12/2021 15-15 64 35

Los Angeles 19/20 In Progress Traffic Control Devices

Athens-Westmont - Normandie Av at 104th St

This project will include: Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The objective of this project is to upgrade the traffic signal at the intersection of Normandie Avenue at 104th Street, including installing protected-permissive left turn phasing and upgrading the signal standards, mast arms, vehicle heads, bicycle & vehicle detection, ADA access ramps, communication, and other associated equipment.

Normandie Avenue at 104th Street, in the unincorporated County of Los Angeles community of Athens/Westmont.

Pre-Construction and Construction

08/2019 09/2021

09/2021 07/2022 15-15 62 30

Los Angeles 20/21 In Progress Traffic Control Devices

Athens-Westmont - Vermont Av at 98th St

This project will include: Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Preliminary Design, Paving and/or Striping Installation (New Safety) | Install a new traffic signal at the intersection of Vermont Avenue at 98th Street.

This project is located at the intersection of Vermont Avenue at 98th Street, in the unincorporated County of Los Angeles community of Athens/Westmont and the City of Los Angeles.

Pre-Construction and Construction

09/2020 01/2022

12/2021 07/2022 20-20 62 30

Los Angeles 19/20 In Progress Traffic Control Devices

Del Rey - Centinela Avenue at Lucile Street

This project will include: Document Preparation, Cost Estimating, Preliminary Design | Upgrade signal for left turn phasing | .

Centinela Avenue at Lucile Street, in the unincorporated County of Los Angeles community of Del Rey and the City of Los Angeles.

Pre-Construction and Construction

07/2021 05/2022

04/2022 12/2022 15-15 62 26

Los Angeles 19/20 In Progress Traffic Control Devices

East Rancho Dominguez -Rosecrans Av at Atlantic Av

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | The objective of this project is to upgrade the traffic signal at the intersection of Rosecrans Avenue at Atlantic Avenue, including installing protected-permissive left turn phasing and upgrading the signal standards, mast arms, vehicle heads, bicycle & vehicle detection, ADA access ramps, communication, and other associated equipment.

Rosecrans Avenue at Atlantic Avenue, in the unincorporated County of Los Angeles community of East Rancho Dominguez and City of Compton.

Pre-Construction and Construction

08/2019 09/2021

09/2021 07/2022 15-15 64 35

Los Angeles 19/20 In Progress Safety El Camino Village-Manhattan

Beach Bl at Cranbrook Ave and at Cerise Av

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety) | Install pedestrian actuated overhead flashing beacons and new crosswalk lines | .

Intersections of Manhattan Beach Blvd and Cranbrook Ave, and Manhattan Beach Blvd and Cerise, in the unincorporated County of Los Angeles community of El Camino Village.

Construction 08/2019 07/2021 15-15 66 35

Los Angeles 19/20 In Progress Traffic Control Devices

Florence Firestone - Hooper Avenue at 84th Place

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety) | The objective of this project is to install rectangular rapid flashing beacons and required striping at the existing marked pedestrian crossing on Hooper Avenue and 84th Place. | .

Hooper Avenue and 84th Place, in the unincorporated County of Los Angeles community of Florence/Firestone. Construction 06/2021 06/2022 15-15 59 33

Los Angeles 19/20 In Progress Safety Florence/Firestone - Compton Av at Nadeau St

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install protected permissive left turn phasing. | .

Intersection of Compton Avenue and Nadeau Street in the unincorporated County community of Florence/Firestone. Construction 10/2020 09/2021 15-15 59 32

Page 21: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 19/20 In Progress Safety Florence-Firestone - Firestone Boulevard Vision Zero Project

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Active Transportation Plan, Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Paving and/or Striping Installation (New Safety) | Implement the following traffic safety enhancements : High visibility crosswalks (22 crosswalks at 8 intersections); Leading Pedestrian Intervals (2 intersections); Curb extensions, paint and bollard (35 corners at 11 intersections); Install 1 Accessible Pedestrian Signal system; Upgrade 17 traffic signal vehicle heads from 8 inch to 12 inch; Upgrade 8 count-down pedestrian modules | Total costs.

Firestone Boulevard between Central Avenue and Alameda Street in the unincorporated County of Los Angeles community of Florence-Firestone.

Pre-Construction and Construction

10/2019 09/2021

09/2021 06/2022 5-5 59 32

Los Angeles 19/20 In Progress Traffic Control Devices

Florence-Firestone - Gage Avenue at Hooper Avenue

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | Installation of protected/permissive left-turn phasing for all four approaches | Total project cost.

f Gage Avenue and Hooper Avenue in the unincorporated community of Florence-Firestone

Pre-Construction and Construction

11/2019 09/2021

09/2021 06/2022 15-15 59 32

Los Angeles 19/20 In Progress Traffic Control Devices

View Park/Windsor Hills - Overhill Drive at 58th Place/Orchid Drive

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety) | New traffic signal | Total project cost

Overhill Drive at 58th Place/Orchid Drive, in the unincorporated County of Los Angeles community of View Park/Windsor Hills.

Pre-Construction and Construction

06/2020 09/2021

09/2021 06/2022 20-20 54 30

Los Angeles 19/20 In Progress Traffic Control Devices

West Carson - Normandie Av at 228th St

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | The objective of this project is to upgrade the traffic signal at the intersection of Normandie Avenue at 228th Street, including installing protected-permissive left turn phasing and upgrading the signal standards, mast arms, vehicle heads, bicycle & vehicle detection, ADA access ramps, communication, and other associated equipment. | Total cost

Normandie Avenue at 228th Street, in the unincorporated County of Los Angeles community of West Carson.

Pre-Construction and Construction

08/2019 01/2022

12/2021 07/2022 15-15 66 35

Los Angeles 19/20 In Progress Traffic Control Devices

Willowbrook - Broadway at El Segundo Bl

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The objective of this project is to upgrade the traffic signal at the intersection of Broadway at El Segundo Boulevard, including installing protected-permissive left turn phasing and upgrading the signal standards, mast arms, vehicle heads, bicycle & vehicle detection, ADA access ramps, communication, and other associated equipment | Total cost.

Broadway at El Segundo Boulevard, in the unincorporated County of Los Angeles community of Willowbrook.

Pre-Construction and Construction

08/2019 01/2022

12/2021 07/2022 15-15 64 35

Los Angeles 19/20 In Progress Traffic Control Devices

Willowbrook - Rosecrans Avenue at Broadway

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | Add left turn phasing. | Total cost - $60k design $140k construction.

Rosecrans Avenue at Broadway, in the unincorporated County of Los Angeles community of Willowbrook.

Pre-Construction and Construction

08/2019 01/2022

12/2021 07/2022 15-15 64 35

Los Angeles 19/20 In Progress Traffic Control Devices

Willowbrook - Wadsworth Av at E 126th St

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The objective of this project consists various safety improvements, including installing continental crosswalk and stop controls at the intersection of Wadsworth Avenue and E 126th Street, and install advanced Stop Ahead warning signage/pavement markings on Wadsworth Avenue south of E 126th Street. | Construction costs only.

Wadsworth Avenue and E 126th Street in the unincorporated community of Willowbrook Construction 12/2020 07/2021 20-20 64 35

Los Angeles 19/20 In Progress Safety Wiseburn - La Cienega Blvd at 133rd St and La Cienga Blvd at

137th St

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The objective of this project is to install a pedestrian activated warning system at existing marked pedestrian crossings at the intersections of La Cienega Boulevard at 133rd Street and 137th Street | .

Intersections of La Cienega Boulevard at 133rd Street and 137th Street, in the unincorporated County of Los Angeles community of Wiseburn. Construction 07/2019 07/2021 15-15 62 35

Page 22: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 19/20 In Progress Traffic Control Devices

Calabasas - Kanan Rd from Mulholland Hwy to 3096ft N/O

Silver Creek Rd

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | New and replaced MUTCD compliant signs. | Final plans completed fall 2020, advertise spring 2021, start construction 2022.

County of Los Angeles unincorporated community of Calabasas Construction 12/2020 06/2022 10-10 50 27

Los Angeles 19/20 In Progress Traffic Control Devices

Calabasas - Cornell Rd -Mulholland Hwy to Cornell Way

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Cornell Road. | Total costs of $20k design and $45k construction.

Cornell Road beginning at Mulholland Highway and ending at 900’ S/O Cornell Way in unincorporated community of Calabasas.

Pre-Construction and Construction

06/2021 12/2021

12/2021 07/2022 10-10 50 27

Los Angeles 19/20 In Progress Traffic Control Devices

Las Virgenes Road at Mulholland Highway and Piuma Road - Traffic

Signals

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Upgrade vehicle heads, install video detection, battery back up, CCTV system and establish communications with LA County Traffic Management Center (TMC) | .

Unincorporated Santa Monica Mountains - Las Virgenes Road at Mulholland Highway and Piuma Road Construction 02/2021 07/2021 20-20 45 27

Los Angeles 19/20 In Progress Traffic Control Devices

Malibu Lake - Kanan Dume Rd from 2560ft N/O Cavalleri Rd to

Mulholland Hwy

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Kanan Dume Rd from 2560ft N/O Cavalleri Rd to Mulholland Hwy. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. | .

County of Los Angeles unincorporated community of Malibu Lake. Construction 03/2021 06/2022 10-10 50 27

Los Angeles 19/20 In Progress Traffic Control Devices

Monte Nido - Malibu Canyon Rd from 1050ft N/O Malibu Crest Dr to

Piuma Rd

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Malibu Canyon Rd. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. | .

County of Los Angeles unincorporated community of Monte Nido. Construction 03/2021 06/2022 10-10 50 27

Los Angeles 19/20 In Progress Traffic Control Devices

Topanga - Old Topanga Cyn Rd -Valdez Rd to Topanga Cyn Blvd

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Old Topanga Canyon Road. | Project cost includes $36k design and $84k construction.

Old Topanga Canyon Road beginning at 2723’ S/O Valdez Road and ending at Topanga Canyon in unincorporated community of Topanga. Boulevard.

Pre-Construction and Construction

01/2021 01/2022

12/2021 07/2022 10-10 50 27

Los Angeles 20/21 In Progress Traffic Control Devices

Hacienda Heights - Gale Ave at Falstone Ave

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install flashing beacon and restripe crosswalk; New traffic signal; New traffic signal with left turn phasing; Protected left-turn phasing for west approach. | Advertised May 12, 2020.

Hacienda Heights - Gale Ave at Falstone Ave Construction 05/2020 08/2021 20-20 57 32

Los Angeles 19/20 In Progress Safety Hacienda Heights - Turnbull Cyn Rd at Vallecito Dr

This project will include: Cost Estimating, Document Preparation, Preliminary Design | northbound left turn pocket. | Final plans completed early 2022 and to be advertised summer 2022.

Turnbull Canyon Road at Vallecito Drive is in the unincorporated community of Hacienda Heights

Pre-Construction and Construction

12/2019 04/2022

03/2022 07/2022 10-10 57 32

Los Angeles 19/20 In Progress Traffic Control Devices

Marina Del Rey - Admiralty Way at California Yacht Club Driveway

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install new traffic signal. | .

Admiralty Way at California Yacht Club Driveway, in the unincorporated County of Los Angeles community of Marina Del Rey. Construction 06/2021 09/2021 20-20 62 26

Los Angeles 19/20 In Progress Traffic Control Devices

Marina Del Rey - Fiji Way at Lincoln Bl

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | Install split phasing for the east and west approaches of the signalized intersection. | Design costs $60k and construction $140k, start of construction summer 2022

Fiji Way and Lincoln Bl, in the unincorporated County of Los Angeles community of Marina Del Rey.

Pre-Construction and Construction

06/2021 06/2022

06/2022 12/2022 15-15 62 26

Los Angeles 19/20 In Progress Traffic Control Devices

Marina Del Rey - Via Marina at Channel Walk

This project will include: Cost Estimating, Document Preparation, Preliminary Design | New traffic signal.

Via Marina at Channel Walk, in the unincorporated County of Los Angeles community of Marina Del Rey. Pre-Construction 01/2022 05/2023 20-20 62 26

Los Angeles 19/20 In Progress Traffic Control Devices

Rowland Heights - Nogales St at Pathfinder Rd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install southbound right turn overlap movement | Total cost.

Rowland Heights - Nogales St at Pathfinder Rd Construction 03/2021 07/2021 15-15 55 29

Page 23: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 19/20 In Progress Safety South Whittier-Leffingwell road at Stamy Road

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | Install traffic signals with marked crosswalks. | Design cost of $100k and construction of $560k.

Intersections of Leffingwell Road/Stamy Road (East) and Leffingwell Road/Stamy Road (West), in the unincorporated County of Los Angeles community of South Whittier and East Whittier

Pre-Construction and Construction

12/2019 10/2021

09/2021 04/2022 20-20 57 32

Los Angeles 19/20 In Progress Traffic Control Devices

South Whittier - Mulberry Drive at Calmada Avenue

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | The objective of this project is to upgrade the traffic signal poles, mast arms, crosswalks and curb ramps to Caltrans standards, install nearside vehicle heads, upgrade existing vehicle and pedestrian heads, upgrade existing pedestrian push buttons, recut advance loop detectors for eastbound and westbound traffic and install bicycle detection for the intersection of Mulberry Drive at Calmada Avenue. | Total cost of $60k for design and $140k for construction.

Mulberry Drive at Calmada Avenue, in the unincorporated County of Los Angeles community of South Whittier.

Pre-Construction and Construction

11/2019 11/2021

11/2021 07/2022 15-15 57 32

Los Angeles 19/20 In Progress Traffic Control Devices

West Whittier/Los Nietos - Norwalk Bl at Reichling Ln

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install additional traffic signal equipment and upgrade pedestrian equipment at the intersection of Norwalk Boulevard and Reichling Lane. | .

Intersection of Norwalk Boulevard and Reichling Lane in the unincorporated County community of West Whittier. Construction 04/2021 12/2021 20-20 57 32

Los Angeles 19/20 In Progress Safety Agua Dulce - Bouquet Canyon Rd

at Vasquez Canyon Rd - Traffic Signal

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Estimated advertising date September 2022.

Intersection of Bouquet Canyon Road and Vasquez Canyon Road in the unincorporated County of Los Angeles community of Agua Dulce.

Pre-Construction and Construction

07/2021 01/2023

09/2022 12/2023 20-20 36 21

Los Angeles 19/20 In Progress Traffic Control Devices

Agua Dulce - Bouquet Canyon Rd -Santa Clarita BL to 640' n/o MM

16.43 & 1145' n/o MM 3.52 to 950' n/o MM 0.18

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install curve advisory signs and chevron signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Bouquet Canyon Road. The project will update existing signing along the road including the installation of advance curve advisory signs and arrows for horizontal curves where applicable | Design cost $60k, construction cost $120k.

This project includes two segments of Bouquet Canyon Road located near the County of Los Angeles unincorporated communities of Leona Valley and Bouquet Canyon. First segment begins at Santa Clarita City boundary and ends 640¿ n/o M.M.16.43. The other segment begins at 1145¿ n/o M.M. 3.52 and ends 950¿ n/o M.M. 0.18. The total length of the project is approximately 6.48 miles.

Pre-Construction and Construction

10/2020 07/2022

07/2022 06/2023 10-10 36 21

Los Angeles 19/20 In Progress Traffic Control Devices

Agua Dulce - Bouquet Cyn Rd -Elizabeth Lake Rd to City of Santa

Clarita Boundary Line

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Cost Estimating, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Bouquet Canyon Road. | Design $48k construction $488k

Bouquet Canyon Road beginning at Elizabeth Lake Road and ends at the Santa Clarita City Boundary.

Pre-Construction and Construction

03/2019 10/2021

09/2021 07/2022 10-10 36 21

Los Angeles 19/20 In Progress Traffic Control Devices

Agua Dulce - Sierra Hwy at Vasquez Canyon Rd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Upgrade the existing traffic signal on Sierra Highway at Vasquez Canyon Road with protected left-turn phasing for northbound and southbound traffic. | .

Sierra Highway at Vasquez Canyon Road in the uincorporated County community of Agua Dulce . Construction 06/2021 06/2022 15-15 38 21

Los Angeles 19/20 In Progress Traffic Control Devices

Agua Dulce - Vasquez Cyn Rd -Bouquet Cyn Rd to Sierra Hwy

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Vasquez Canyon Road. | Design $45k construction $65k

Vasquez Canyon from Bouquet Canyon Road to Sierra Highway in unincorporated community of Agua Dulce.

Pre-Construction and Construction

03/2021 08/2021

08/2021 07/2022 10-10 38 21

Page 24: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 19/20 In Progress Traffic Control Devices

Agua Dulce/Acton - Sierra Hwy -2100' s/o Quinn Dr to Ave S

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Cost Estimating, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Sierra Hwy from 2100ft S/O Quinn Dr to Avenue S. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. This is a 27 mile long project. | Design $362k construction $845k

County of Los Angeles unincorporated community of Agua Dulce/Acton. The length of the entire project is approximately 27 miles.

Pre-Construction and Construction

04/2020 03/2022

03/2022 06/2022 10-10 38 21

Los Angeles 19/20 In Progress Traffic Control Devices

Altadena - Lake Av at Mendocino St

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Add split left turn phasing on Mendocino Street | PS&E August 2021, begin construction February 2022. Total cost listed - design $38k construction $280k

Altadena - Lake Av at Mendocino St Pre-Construction and Construction

04/2020 11/2021

09/2021 05/2022 15-15 41 25

Los Angeles 19/20 In Progress Traffic Control Devices

Altadena - Windsor Av at Figueroa Dr

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install new traffic signal on Windsor Avenue at Figueroa Drive. | Cost includes right of way acquisition.

The intersection of Windsor Avenue and Figueroa Drive in the unincorporated County community of Altadena. Construction 06/2021 05/2022 15-15 41 25

Los Angeles 19/20 In Progress Traffic Control Devices

Canyon Country - Sand Canyon Rd - 4500' N/O Soledad Cyn Rd to

Sierra Hwy

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Sand Canyon Road. | Design $110k construction $255k

San Canyon Road from 4500 feet north of Soledad Canyon Road to Sierra Highway in the unincorporated community of Canyon Country.

Pre-Construction and Construction

02/2021 01/2022

12/2021 07/2022 10-10 36 21

Los Angeles 19/20 In Progress Traffic Control Devices

Castaic Road at Ridge Route Road and The Old Road at Parker Rd

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Cost Estimating, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety) | Install traffic signal at these intersections. | Total cost.

Castaic Rd at Ridge Route Rd and The Old Rd at Parker Rd Pre-Construction and Construction

01/2020 09/2021

09/2021 07/2022 20-20 38 21

Los Angeles 19/20 In Progress Traffic Control Devices

Castaic - Del Valle Rd - Hunstock Ave to Hasley Cyn Rd

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Del Valle Road. | Design $52k and construction $98k.

Del Valle Road from Hunstock Avenue to Hasley Canyon Road in the unincorporated community of Castaic.

Pre-Construction and Construction

04/2020 01/2022

01/2022 07/2022 10-10 38 21

Los Angeles 19/20 In Progress Traffic Control Devices

Castaic -Hillcrest Pkwy at Beryl Place

This project will include: The objective of this project is to install pedestrian-actuated overhead flashing beacons (PAOFBs), high-visibility yield lines and remove advance flashing beacons at the existing marked school crossing on Hillcrest Pkwy at Beryl Place | .

Hillcrest Pkwy at Beryl Place, in the unincorporated County of Los Angeles community of Castaic/Val Verde. Construction 05/2021 12/2021 15-15 38 21

Los Angeles 19/20 In Progress Traffic Control Devices

Charter Oak - Cienega Av at Sunflower Av

This project will include: Upgrade pedestrian heads and curb ramps, install highway safety lighting, and remove striping within crosswalk at the intersection of Cienega Avenue and Sunflower Avenue. | .

The intersection of Cienega Avenue and Sunflower Avenue in the unincorporated County community of Covina.

Pre-Construction and Construction

05/2021 10/2022

09/2022 12/2022 15-15 48 22

Los Angeles 19/20 In Progress Traffic Control Devices

Charter Oak - Covina Hills Rd -Rancho La Carlota Rd to Via Verde

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Covina Hills Road. | Design cost $14k and construction $31k

Covina Hills Road beginning at 490’ W/O Rancho La Carlota Road and ending at 50’ S/O Via Verde Street in the unincorporated community of Charter Oak.

Pre-Construction and Construction

03/2021 12/2021

11/2021 07/2022 10-10 55 29

Page 25: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 19/20 In Progress Traffic Control Devices

Charter Oak - Sunflower Ave at Cypress Street

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Right of Way, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Document Preparation, Paving and/or Striping Installation (New Safety) | The project scope includes installation of a new traffic signal, including pedestrian push buttons, detection, and accessible curb ramps at all corners. | Design $95k and construction $305k

Sunflower Ave and Cypress Street In the unincorporated community of Charter Oak. Pre-Construction and Construction

01/2019 09/2021

09/2021 06/2022 20-20 48 22

Los Angeles 19/20 In Progress Traffic Control Devices

Covina - Arrow Hwy at Sunflower Av

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | Upgrade the existing traffic signal on Arrow Highway at Sunflower Avenue with protected left-turn phasing for eastbound and westbound traffic. | Design cost $84k and construction $196k

The intersection of Arrow Highway and Sunflower Avenue in the unincorporated County community of Covina.

Pre-Construction and Construction

11/2019 10/2021

09/2021 07/2022 15-15 48 22

Los Angeles 19/20 In Progress Traffic Control Devices

Del Sur - Avenue D - 14 Fwy to Sierra Hwy

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Avenue D. | $15k design and $45k construction

Avenue D beginning at Highway 14 and ending at Sierra Highway in unincorporated community of Del Sur.

Pre-Construction and Construction

10/2020 04/2022

03/2022 07/2022 10-10 36 21

Los Angeles 19/20 In Progress Traffic Control Devices

Del Sur - Sierra Hwy - Avenue G to Avenue A

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Sierra Hwy from Avenue G to Avenue A. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. | $92k design and $214k construction

County of Los Angeles unincorporated community of Del Sur. Pre-Construction and Construction

01/2020 10/2021

09/2021 03/2022 10-10 36 21

Los Angeles 19/20 In Progress Traffic Control Devices

Desert View Highlands - Elizabeth Lake Rd at Mesquite Rd

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The objective of this project is to upgrade signal mast arm and install additional vehicle heads for through movements from the East bound and West bound travel, install a West approach through nearside high mount vehicle head on the Southeast corner standard, install detectable warning surfaces on the Northwest curb access ramp, install bicycle loops, and install continental crosswalk. | .

Elizabeth Lake Rd at Mesquite Rd, in the unincorporated County of Los Angeles community of Desert View Highlands. Construction 02/2021 08/2021 15-15 36 21

Los Angeles 19/20 In Progress Traffic Control Devices

La Crescenta - Foothill Blvd at Cloud Av

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install new traffic signal. | Design $100k and construction $400k

Foothill Boulevard and Cloud Avenue in the unincorporated County community of La Crescenta-Montrose

Pre-Construction and Construction

11/2020 11/2021

11/2021 04/2022 20-20 43 25

Los Angeles 19/20 In Progress Traffic Control Devices

La Crescenta-Montrose - Ocean View Blvd at Montrose Av

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Protected permissive left turn phasing. | .

Ocean View Boulevard and Montrose Avenue is located in the unincorporated County community of La Crescenta Construction 05/2021 05/2022 15-15 43 25

Los Angeles 19/20 In Progress Traffic Control Devices

Lake Hughes - Johnson Rd -Elizabeth Lake Rd to 110th St

West

This project will include: Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Johnson Road. | Design $30k and construction $70k.

Johnson Road beginning at Elizabeth Lake Road and ending at 110th Street West in the unincorporated community of Elizabeth Lake.

Pre-Construction and Construction

10/2020 06/2022

06/2022 12/2022 10-10 36 21

Los Angeles 19/20 In Progress Safety

Lake Hughes - San Francisquito Canyon Road Signage and Lake

Hughes Road Regulatory Signage Project

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Cost Estimating, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install advance curve advisory signs and chevron signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along San Francisquito Canyon Road and Lake Hughes Road. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. Length of project 42 miles. | Design $200k and construction $886.5k

Install advance curve advisory signs and chevron signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along San Francisquito Canyon Road and Lake Hughes Road. For San Francisquito Canyon Road, it begins at Elizabeth Lake Road to the City of Santa Clarita Boundary Line. For Lake Hughes Road, it begins at Elizabeth Lake Road to Ridge Route Road. The length of the entire project is approximately 42 miles.

Pre-Construction and Construction

10/2020 04/2022

03/2022 11/2022 20-20 36, 38 21

Page 26: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 19/20 In Progress Traffic Control Devices

Leona Valley/Lake Hughes -Elizabeth Lake Rd from Lake

Hughes Rd to 2095ft E/O Bouquet Cyn Rd

This project will include: Project Scope Development, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Curve advisory signs.

County of Los Angeles unincorporated community of Leona Valley/Lake Hughes. Pre-Construction and Construction

10/2020 05/2022

05/2022 06/2022 10-10 36 21

Los Angeles 19/20 In Progress Traffic Control Devices

Littlerock - 110th Street East -Avenue S to Palmdale Bl

This project will include: Project Scope Development, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along 110th Street East.

110th Street East beginning at Avenue S and ending at Palmdale Boulevard in the unincorporated community of Littlerock.

Pre-Construction and Construction

03/2021 12/2021

11/2021 07/2022 10-10 36 21

Los Angeles 19/20 In Progress Traffic Control Devices

Littlerock - Palmdale Bl at 90th St East

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Protected left turn phasing | .

Littlerock - Palmdale Bl at 90th St East Construction 03/2021 09/2021 15-15 36 21

Los Angeles 19/20 In Progress Traffic Control Devices

Llano - 170th Street East - 165th St East to Avenue J

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along 170th Street East. | $102k design and $238k construction

170th Street East beginning at Avenue J and ending 165th Street East in the unincorporated community of Lake Los Angeles.

Pre-Construction and Construction

03/2020 12/2021

11/2021 04/2022 10-10 36 21

Los Angeles 19/20 In Progress Traffic Control Devices

Quartz Hill - Avenue L at 42nd St West

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | New traffic signal | Shared with City of Lancaster.

Quartz Hill - Avenue L at 42nd St West Construction 03/2021 12/2021 20-20 36 21

Los Angeles 19/20 In Progress Traffic Control Devices

San Gabriel Valley Traffic Signal Safety Project Group II, Santa

Anita Ave at Freer St

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Upgrade standards, mast arms, vehicle heads, protected left-turn phasing, bicycle and vehicle detection, access ramps, communication, and other associated equipment. | .

Unincorporated South Arcadia area - Santa Anita Avenue at Freer Street Construction 08/2020 09/2021 15-15 49 22

Los Angeles 19/20 In Progress Traffic Control Devices

South Antelope Valley - 90th Street East - Avenue P-8 to Avenue M

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along 90th Street East. | Design $30k construction $75k

90th Street East beginning at Avenue P-8 and ending at Avenue M in the unincorporated community of Sun Village.

Pre-Construction and Construction

10/2020 11/2021

10/2021 07/2022 10-10 36 21

Los Angeles 19/20 In Progress Safety Stevenson Ranch - Pico Cyn Rd at Stevenson Ranch Parkway

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Cost Estimating, Paving and/or Striping Installation (New Safety), Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The project scope includes installation of fully protected left turn phasing for the eastbound traffic and other traffic signal upgrades including; vehicle heads, new traffic signal pole with mast arm for east approach and cut back of the median at the west approach on Pico Canyon Road. | $50k design, $300k construction

Intersection of Pico Cyn Rd at Stevenson Ranch Parkway, in the unincorporated County of Los Angeles community of Stevenson Ranch.

Pre-Construction and Construction

02/2020 08/2021

07/2021 06/2022 15-15 38 27

Los Angeles 19/20 In Progress Safety Stevenson Ranch - The Old Road at Valencia Blvd

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design, Paving and/or Striping Installation (New Safety) | Installation of continental crosswalk on channelized right turn located at eastern approach of Valencia Boulevard. Installation of Yield Markings, R1-5, W11-2, W16-7P, Type K-1 (CA) and R3-7 posts. Installation of chevrons on edge line. Upgrade of all crosswalks to continental at intersection. | Total project cost.

Valencia Boulevard at the Old Road in Stevenson Ranch Pre-Construction and Construction

04/2020 08/2021

07/2021 08/2022 15-15 38 27

Los Angeles 19/20 In Progress Traffic Control Devices

Covina Islands - Arrow Highway at Lark Ellen Avenue

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | Install left turn phasing at Arrow Highway and Lark Ellen Ave | $60k design, $140k construction

Arrow Highway and Lark Ellen Avenue, in the unincorporated County of Los Angeles community of Covina Islands.

Pre-Construction and Construction

03/2020 09/2021

08/2021 02/2022 15-15 48 22

Page 27: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

Ingleside Way @ MM 0.11 to 0.18

This project will include: Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents | The primary objective of this project is to provide slope and road repair in the unincorporated Malibu area. The proposed work includes constructing a new wall to replace the existing deteriorating wall. The wall will stabilize the slope, protect the roadway, and secure access for residents. | Concept costs only

Unincorporated Malibu area. Pre-Construction and Construction

04/2020 11/2021

10/2021 06/2022 20-20 50 27

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Santa Monica Mountains - Culvert Upgrades - Phase II

This project will include: Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents | Repair or replace existing corrugated metal pipe culverts which have documented deterioration or less than 24 inches in diameter | Currently in design, deferred pending available funding. Total project cost.

11 locations in unincorporated County area near Malibu, Agoura Hills, and Calabasas Pre-Construction and Construction

10/2011 05/2022

05/2022 06/2022 50-50 50 27

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Santa Monica Mountains - Culvert Upgrades - Phase III

This project will include: Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents | Repair or replace existing corrugated metal pipe culverts which have documented deterioration or less than 24 inches in diameter | Total project cost.

29 locations in unincorporated County area near Malibu, Agoura Hills, and Calabasas Pre-Construction and Construction

10/2011 05/2022

05/2022 06/2022 50-50 50 27

Los Angeles 19/20 In Progress Safety Santa Monica Mountains - Kanan Rd at the entrances to the Tunnels

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Cost Estimating, Preliminary Design, Paving and/or Striping Installation (New Safety) | Install guardrail. | Total project cost.

Kanan Road in the unincorporated Santa Monica Mountains Pre-Construction and Construction

07/2020 06/2022

05/2022 06/2023 30-30 50 27

Los Angeles 19/20 In Progress Safety Santa Monica Mountains - Malibu Canyon Rd at MM 2.32

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install 1240 feet of guardrail on Malibu Canyon Road at the subject location. | .

Malibu Canyon Road approximately 1 mile north of Francisco Ranch Road Pre-Construction and Construction

08/2020 01/2022

11/2021 07/2022 30-30 50 27

Los Angeles 19/20 In Progress Safety Santa Monica Mountains - Stunt Rd near Mile Marker 2.55

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Guardrail replacement on Stunt Road in Santa Monica Mountains. | Will be constructed through County force account labor.

Stunt Road north of City of Malibu. Construction 07/2021 08/2021 30-30 50 27

Los Angeles 19/20 In Progress Safety Angeles National Forest -

Escondido Canyon Rd Near Mile Marker 1.65

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Design and construction of 325 feet of guardrail on a mountain road near MM 1.65. | Work to be completed with County force account labor.

Escondido Canyon Road in unincorporated Acton-Agua Dulce community. Construction 07/2021 08/2021 30-30 36 21

Los Angeles 20/21 In Progress Safety Angeles National Forest - Mt Baldy Rd - 678' n/o MM 3.01

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design | The objective of this project is to install approximately 380' feet of guardrail/concrete barrier, which will be replacing existing rock wall on the east side of Mt Baldy Road.

Mount Baldy Rd in unincorporated Claremont area Pre-Construction and Construction

06/2019 04/2022

04/2022 06/2022 30-30 41 25

Los Angeles 19/20 In Progress Safety Avenue E at Sierra Highway guardrail

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Preliminary Design | Improve truck turning radius by widening Sierra Highway, shifting left turn pockets, extending reinforced box culvert, relocate 36 inch drain pipe, reconfigure guardrail and restripe roadway. | Design $260k and construction $440k.

Unincorporated County community of North Lancaster. Pre-Construction and Construction

11/2020 06/2022

06/2022 06/2023 30-30 36 21

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Avocado Heights – 6th – Valley Bl and Lomitas Ave (City/County

Coop) This project will include: Document Preparation, Preliminary Design | . Unincorporated County community of Avocado Heights and City of Industry Pre-Construction 03/2021 06/2022 20-20 57 22

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Avocado Heights - Temple Av Et Al (Phase I)

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New), Document Preparation, Preliminary Design, Paving and/or Striping Installation (New Safety), Environmental Study/Documents | Resurface 3.9 miles of major roads. The project includes parkway improvements, curb ramps upgrade, and pavement resurfacing. Uses recycled and in-place materials. | $1.1M design and $3.8M construction

Various roadways within the Unincorporated Community of Avocado Heights.

Pre-Construction and Construction

07/2019 01/2022

12/2021 06/2022 10-10 48 22

Page 28: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

East Los Angeles - Cesar E Chavez Avenue

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design | The primary objective of this project is to resurface 1.9 miles of major roadway. The project includes the following proposed work: - Parkway improvements - Curb ramp upgrades - Pavement resurfacing | .

Various roadways within the Unincorporated Community of East Los Angeles. Pre-Construction and Construction

09/2019 07/2022

07/2022 12/2022 10-10 51 24

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

East Los Angeles Community – City Terrace Drive Et Al

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | Reconstruct 3.1 miles of major roads, including parkway improvements and curb ramps upgrade. | .

Various roadways within the Unincorporated Community of East Los Angeles Pre-Construction 08/2019 06/2022 10-10 51 24

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

East Los Angeles - Michigan Avenue, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | The primary objective of this project is to preserve 8.7 miles of residential roads. The project includes the following proposed work: - Pavement prep-work - Parkway improvements - Curb ramps upgrades - Pavement preservation | .

Various roadways within the Unincorporated Community of East Los Angeles Construction 06/2021 09/2021 7-7 51 24

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

East Los Angeles - Whiteside St, et al. Phase I

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Preliminary Design, Paving and/or Striping Installation (New Safety) | Reconstruct 2.3 miles of residential roads, parkway improvements, curb ramp upgrade. | The project cost includes design and construction. The project will be split into two phases for construction. Phase I - $2458k design $4110k construction.

East Los Angeles community bounded by Interstate 10, City of Los Angeles, and Indiana Street, and Woods Avenue from State Route 60 and Pomona Boulevard

Pre-Construction and Construction

10/2017 03/2022

03/2022 06/2022 20-20 51 24

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

East Los Angeles - Whiteside Street, et al. (Phase II)

This project will include: Project Scope Development, Feasibility Study, Cost Estimating, Document Preparation, Preliminary Design | Resurface 2.1 miles of residential roads, parkway improvements, curb ramp upgrade. | The project cost includes design and construction. The project will be split into two phases for construction. The primary objective of this project is to resurface 2.1 miles of residential roads. The project includes parkway improvements, curb ramp upgrades, new sidewalks (as appropriate), and roadway resurfacing.

Various roadways within the Unincorporated Community of East Los Angeles. Pre-Construction and Construction

09/2020 04/2023

04/2023 06/2023 20-20 51 24

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Avocado Heights/San Jose Hills -Valley Boulevard This project will include: Cost Estimating, Document Preparation, Preliminary Design | . Various roadways within the Unincorporated Community of Avocado Heights/San Jose

Hills. Pre-Construction and

Construction 07/2019 06/2022

05/2022 04/2023 10-10 57 22

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Walnut Park – Walnut Street Et Al.

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Preliminary Design | Reconstruct 7.1 miles of residential roads, including parkway improvements and curb ramps upgrade. | Total project cost.

Unincorporated Walnut Park community bounded by City of Huntington Park, Seville Avenue, and City of South Gate

Pre-Construction and Construction

12/2018 03/2022

03/2022 06/2022 20-20 59 33

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

West Puente Valley – Fairgrove Avenue, et al.

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Landscape Safety Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Preserve 6.0 miles of residential roads, including pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation. The proposed work includes micro-milling to improve road ride-ability; scrub seal to seal cracks; and slurry seal to preserve the pavement and provide a smoother, more finished driving surface. | The project cost includes design and construction.

Unincorporated West Puente Valley community bounded by City of La Puente, Sunset Avenue, Fairgrove Avenue, and Willow Avenue Construction 10/2020 07/2021 7-7 48 22

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Del Aire - Community Road Improvements

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Road reconstruction.

Various roadways within the Unincorporated Community of Del Aire. Construction 11/2020 07/2021 20-20 62 35

Page 29: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

East Rancho Dominguez -Compton Bl, et al.

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents | .

Various roadways within the Unincorporated Community of East Rancho Dominguez.

Pre-Construction and Construction

01/2020 07/2022

07/2022 12/2022 20-20 64 35

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Ladera Heights - Centinela Av, ET AL.

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Resurface 1.2 miles of roadway, parkway improvements, curb ramp upgrade

Ladera Heights community - West Centinela Ave from Green Valley Cir to La Tijera Blvd. and South Centinela Ave from Jefferson Blvd to Compton Creek.

Pre-Construction and Construction

05/2020 06/2022

05/2022 11/2023 10-10 54 30

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

West Carson – Milton Street, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents, ADA Curb Ramp Rehab/Repair (Existing) | Preserve 2.3 miles of residential roads. The project includes parkway improvements and curb ramps upgrade. | Total project cost.

Unincorporated community of West Carson bounded by City of Los Angeles, Torrance Boulevard, and New Hampshire Avenue.

Pre-Construction and Construction

06/2020 04/2022

03/2022 06/2022 7-7 66 35

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

West Rancho Dominguez - - 139th Street, et al. Phase 2

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Preliminary Design, Environmental Study/Documents | The primary objective of this project is to reconstruct 4.15 miles of residential roads. The project includes the following proposed work:

- Parkway improvements - Curb ramps upgrades - Roadway reconstruction | Total project cost.

Various roadways within the Unincorporated Community of West Rancho Dominguez. Pre-Construction and Construction

01/2020 07/2022

06/2022 06/2023 20-20 64 35

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Westmont – 99th Street, et al.

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Resurface 13 miles of residential roads. The project includes parkway improvements and curb ramps upgrade. | .

Unincorporated community of Westmont bounded by City of Los Angeles and Century Boulevard Construction 07/2020 12/2021 20-20 59, 62 30

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

East La Mirada – Imperial Highway Et Al.

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | Reconstruct 2.7 miles of major roads. The project includes parkway improvements, and curb ramps upgrade. | Total project cost.

Lambert Road, First Avenue, and Imperial Highway in the unincorporated community of East La Mirada

Pre-Construction and Construction

11/2020 02/2023

01/2023 06/2023 20-20 57 32

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Hacienda Heights - Leticia Dr, ET AL

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | Reconstruct 7.2 miles of residential roads, parkway improvements, curb ramps upgrade | Currently in design. Total project costs.

Hacienda Heights bounded by Los Altos Drive, Hacienda Boulevard, Colima Road, Camino Del Sur, and Vallecito Drive

Pre-Construction and Construction

05/2020 06/2022

05/2022 12/2022 20-20 57 32

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Los Nietos Community – Pioneer Boulevard et al

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Landscape Safety Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | Resurface 1.6 miles of major roads including parkway improvements and curb ramps upgrade. | Total project cost.

Pioneer Boulevard, Norwalk Boulevard, and Washington Boulevard in the unincorporated community of Los Nietos bounded by the Cities of Pico Rivera, Santa Fe Springs, and Whittier.

Pre-Construction and Construction

07/2021 02/2023

01/2023 06/2023 10-10 48, 57 32

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Rolling Hills - Crenshaw Blvd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Resurface 0.6 miles of roads with 1.5 inch AC pavement cold mill and overlay. | Total project cost.

Various roadways within the Unincorporated Community of Rolling Hills Construction 05/2021 07/2022 10-10 66 26

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Rowland Heights – Saleroso Drive, et al.

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Landscape Safety Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Reconstruct 3.0 miles of residential roads including parkway improvements and curb ramps upgrade. | Total project cost.

Calle Barcelona, Calle Madrid, Crosshaven Drive, Saleroso Drive, and Sunrise Drive bounded by Colima Road, Fullerton Road, the City of La Habra Heights, and Schabarum Regional Park.

Construction 04/2021 03/2022 20-20 55 29

Page 30: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

South Whittier – Leland Avenue Et Al.

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Preliminary Design, Paving and/or Striping Installation (New Safety) | Reconstruct 5.6 miles of residential roads including parkway improvements and curb ramps upgrade. | Total project cost.

Unincorporated community of South Whittier bounded by Carmenita Road, Meyer Road, Leffingwell Road, and Telegraph Road.

Pre-Construction and Construction

02/2019 09/2021

09/2021 09/2022 20-20 57 32

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

West Whittier/Los Nietos - Mines Boulevard, et al.

This project will include: Pavement Improvement (New), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | The primary objective of this project is to resurface 3.0 miles of major roads. The project includes the following proposed work:

- Parkway improvements - Curb ramp upgrades - Roadway resurfacing | .

Various roadways within the Unincorporated Community of West Whittier Los Nietos. Pre-Construction and Construction

07/2022 07/2023

06/2023 06/2024 20-20 57 32

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

West Whittier - Los Nietos/South Whittier - Sunshine Acres - Keith

Dr, ET AL

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New), Paving and/or Striping Installation (New Safety) | Reconstruct 11.4 miles of residential roads, parkway improvements, curb ramps upgrade | Total project cost.

West Whittier - Los Nietos/South Whittier communities bounded by Norwalk Boulevard, Mines Boulevard, Colima Road, and City of Whittier Construction 03/2020 09/2021 20-20 57 32

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Altadena - Altadena Dr and Washington Blvd Roadway

Improvement

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Paving and/or Striping Installation (New Safety), Preliminary Design | Reconstruct 1.6 miles of major road. | Total project cost.

Various roadways within the unincorporated County community of Altadena. Pre-Construction and Construction

04/2019 04/2022

04/2022 03/2023 20-20 41 25

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

Altadena - Glenrose Avenue, et al.

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | The primary objective of this project is to preserve 9.5 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramp upgrades, and pavement preservation. Project ID recoded. Concrete work begins June 2020 and ends August 2020. (Construction in FY 2021-22)

Various roadways within the Unincorporated Community of Altadena. Construction 10/2020 07/2021 7-7 41 25

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Angeles National Forest - Big Tujunga Canyon Road (Ph I)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | Rehabilitate 10.1 miles of major roadway. | Total project cost.

Various roadways within the Angeles National Forest. Pre-Construction and Construction

07/2019 07/2021

07/2021 07/2022 20-20 39, 43 25

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Canyon Country – Sierra Highway -Sand Cyn Rd to city boundary

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety) | Reconstruct 1.1 miles of urban major road to repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses, parkway improvements, and curb ramps upgrade | Total project cost.

Unincorporated area of Canyon Country - City of Santa Clarita to Sand Canyon Road Construction 06/2021 08/2021 20-20 36 21

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

La Crescenta-Montrose – La Crescenta Avenue, et al.

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design | Rehabilitate 5.2 miles of major roads, including parkway improvements and curb ramps upgrade. Formerly known as La Crescenta-Montrose – Pennsylvania Avenue, et al.

Unincorporated La Crescenta-Montrose area surrounded by the Cities of Glendale and La Canada Flintridge.

Pre-Construction and Construction

11/2019 04/2023

03/2023 06/2023 20-20 43 25

Page 31: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Lake Los Angeles - 240th Street East, et al. - Palmdale Bl to Ave J

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Rehabilitate 9.5 miles of major roadway. | .

Various roadways within the Unincorporated Community of Lake Los Angeles. Construction 05/2021 07/2022 10-10 36 21

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Leona Valley - Godde Hill Road -Elizabeth Lake Road to California

Aqueduct

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Preliminary Design | Rehabilitate 2.4 miles of major roadway. | .

Various roadways within the Unincorporated Community of Leona Valley Pre-Construction and Construction

08/2020 08/2021

08/2021 07/2022 20-20 36 21

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Roosevelt - Avenue J - 210th Street East to 240th Street East

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Resurface 3 miles of major road.

Unincorporated community of Roosevelt Construction 07/2021 10/2021 10-10 36 21

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Santa Clarita Valley - Hasley Hills South

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design, Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing) | Reconstruct 5.8 miles of residential roads, parkway improvements, curb ramps upgrade | Currently in design. Total project cost.

Castaic community, Hasley Hills neighborhood Pre-Construction and Construction

06/2018 04/2022

03/2022 06/2022 20-20 38 21

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

South Antelope Valley - Avenue N -2640 ft west of 50th St East to 90th

St East

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Rehabilitate 4.5 miles of local street | .

Unincorporated Community of Palmdale. Pre-Construction and Construction

09/2020 09/2021

09/2021 07/2022 20-20 36 21

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

South Monrovia Islands - Walnut Grove Avenue, et al.

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | Reconstruct 3.9 miles of major roadway. | Total project cost.

Various roadways within the Unincorporated Communities of Mayflower Village and East San Gabriel.

Pre-Construction and Construction

10/2020 02/2023

02/2023 06/2023 20-20 48, 49 22

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

West Chatsworth - Lake Manor Dr, ET AL.

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | Reconstruct 1.9 miles of residential roads, parkway improvements, curb ramps upgrade | Total project cost.

West Chatsworth unincorporated community Pre-Construction and Construction

05/2019 04/2022

03/2022 06/2022 20-20 45 27

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Floral Dr from 60 feet w/o Humphreys Av to Mednik Av This project will include: Resurface 0.5 miles of major roadway Unincorporated County Community of East Los Angeles and the City of Monterey Park Pre-Construction and

Construction 10/2019 09/2022

08/2022 12/2022 7-7 51 24

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

West Carson Community Bikeways-Pavement

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Landscape Safety Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) | Reflects the total cost of design of the whole project (including bikeways).

- Bike lanes on West Carson St between Vermont Ave and Normandie Ave. - Bike lanes on Lomita Blvd between Vermont Ave and Frampton Ave. - Bike route along West 220th St between I-110 and Normandie Ave.

Construction 06/2021 07/2022 10-10 66 35

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Walnut Park - Pacific Boulevard, et al.

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Preliminary Design, Paving and/or Striping Installation (New Safety) | Reconstruct 2.6 miles of major roadway. | Total project cost.

Various roadways within the Unincorporated Community of Walnut Park. Pre-Construction and Construction

07/2020 05/2023

04/2023 06/2024 10-10 59 33

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Hacienda Heights - Hacienda Boulevard

This project will include: Document Preparation, Cost Estimating, Preliminary Design | Resurface 3.2 miles of major roadways | Total project cost. County Unincorporated Community of Hacienda Heights. Pre-Construction and

Construction 02/2020 08/2022

07/2022 12/2022 10-10 57 32

Page 32: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Agua Dulce - Sierra Highway (Phase II) - Vasquez Canyon Road

to Davenport Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Resurface 3.0 miles of a major road. | Total project cost.

Unincorporated community of Agua Dulce Pre-Construction and Construction

06/2021 08/2021

08/2021 07/2022 10-10 38 21

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

West Whittier Los Nietos - Aeolian Street, et al.

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Preserve 5.6 miles of local street, and perform needed sidewalk, curb, and gutter repair | Total project cost.

Various roadways within the Unincorporated Community of West Whittier Los Nietos. Pre-Construction and Construction

06/2020 09/2021

09/2021 11/2021 7-7 57 32

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Hasley Canyon Rd - Commerce Center Dr to 4776' W/o Valley Glen

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | Rehabilitate 4 miles of urban major roadway. | Total project cost Hasley Canyon Road - unincorporated Castaic and Val Verde area Pre-Construction and

Construction 06/2020 11/2023

10/2023 06/2024 10-10 38 21

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

East San Gabriel - Acacia Street, et al.

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Preliminary Design | Preserve 9.6 miles of local roads and install curb ramps, and perform needed concrete repair. | Total project cost

Various roadways within the Unincorporated Community of East San Gabriel. Pre-Construction and Construction

11/2020 08/2021

08/2021 07/2022 7-7 49 22

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Stevenson Ranch - Stevenson Ranch Tract (Phase 3)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design | Preserve 5.3 miles of roads. | Total project cost.

Unincorporated Stevenson Ranch community Pre-Construction and Construction

01/2022 07/2023

06/2023 06/2024 7-7 38 27

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Stevenson Ranch - Stevenson Ranch Tract (Phase 2)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Preserve 4.6 miles of local roads. | Total project cost.

Unincorporated community of Stevenson Ranch Construction 06/2021 07/2022 7-7 38 27

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

West Puente Valley - Duff Ave et al. (Phase I)

This project will include: Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | The primary objective of this project is to preserve 7.7 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation. | Total project cost.

Various roadways within the Unincorporated Community of West Puente Valley. Pre-Construction and Construction

08/2020 05/2022

05/2022 06/2022 7-7 48 22

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

Windsor Hills - 59th St, ET AL. -Reconstruction

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Reconstruct 2.2 miles of residential roads, parkway improvements, curb ramp upgrade | The project cost includes design and construction.

Windsor Hills community bounded by La Cienega Boulevard, Slauson Avenue, Fairfax Avenue, and City of Los Angeles Construction 10/2020 07/2021 20-20 54 30

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

Rosewood - San Pedro Street, et al.

This project will include: Pavement Improvement (New), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design | The primary objective of this project is to resurface 3.5 miles of major roadways. The project includes parkway improvements, curb ramps upgrade, and pavement resurface.

Various roadways within the Unincorporated Community of Rosewood. Pre-Construction and Construction

05/2021 03/2024

02/2024 06/2024 10-10 64 35

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

Florence-Firestone - 58th Place, et al.

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to preserve 7.0 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation

Various roadways within the Unincorporated Community of Florence-Firestone. Pre-Construction and Construction

08/2019 04/2022

03/2022 06/2022 7-7 59 33

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

Malibu - Entrada Road, et al.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | The primary objective of this project is to preserve 7.6 miles of residential roads. The project includes pavement prep-work and pavement preservation.

Various roadways within the Unincorporated Community of Malibu. Pre-Construction and Construction

01/2021 08/2021

07/2021 11/2021 7-7 50 27

Page 33: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

Malibu - Saddle Peak Road, et al.

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Landscape Safety Rehab/Repair (Existing), Document Preparation, Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to resurface 3.6 miles of residential roads. The project includes parkway improvements, curb ramps upgrades, and roadway resurfacing.

Various roadways within the Unincorporated Community of Malibu. Pre-Construction and Construction

07/2020 06/2022

05/2022 07/2023 10-10 50 27

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Santa Monica Mountains -Ingleside Wy @ MM 0.14 to 0.18

This project will include: Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents | Repair slope and road. | Funding for design of reconstruction only.

Ingleside Way in unincorporated Malibu area. Pre-Construction 04/2020 07/2022 20-20 50 27

Los Angeles 19/20 In Progress Road

Maintenance & Rehabilitation

Hacienda Heights - Colima Rd -Hacienda Bl to Halliburton Rd

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents | Pavement preservation, road widening, bike lanes, and landscape improvements. | The total project cost is for the much larger bike lane and road widening project. RMRA component is $1,531,000 as reflected on approved document.

Colima Rd between Hacienda Bl and Halliburton Rd (as part of a larger grant funded project)

Pre-Construction and Construction

05/2016 07/2022

07/2022 06/2023 20-20 57 32

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

Rowland Heights - Nearbank Street, et al.

This project will include: Pavement Improvement (New), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | The primary objective of this project is to resurface 8.7 miles of residential roads. The project includes parkway improvements, curb ramps upgrade, and roadway resurfacing.

Various roadways within the Unincorporated Community of Rowland Heights. Pre-Construction and Construction

03/2021 12/2023

11/2023 06/2024 10-10 55, 57 29, 32

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

South Whittier - Lakeland Rd Pavement Improvements

(ABO)(SFS)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | This is a County contribution to the city of Santa Fe Springs for a resurfacing of 0.2 miles of residential roads.

Lakeland Road adjacent to the City of Santa Fe Springs. Construction 06/2021 12/2021 10-10 51 24

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

South Whittier - Lemon Dr et al.

This project will include: Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | The primary objective of this project is to resurface 5.4 miles of residential roads. The project includes parkway improvements, curb ramps upgrades, and roadway resurface.

Various roadways within the Unincorporated Community of South Whittier. Pre-Construction and Construction

07/2021 11/2023

10/2023 06/2024 10-10 51 24

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

Agua Dulce - 101st Street East -Avenue S to Avenue T

This project will include: Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design | The primary objective of this project is to preserve 1.0 miles of Division Street. The project includes pavement prep-work and pavement preservation.

Unincorporated Community of Agua Dulce. Pre-Construction and Construction

01/2021 07/2021

07/2021 07/2022 7-7 36 21

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

Agua Dulce - San Francisquito Canyon Road - Elizabeth Lake

Road to MM 4.6

This project will include: Pavement Improvement (New), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Paving and/or Striping Installation (New Safety), Preliminary Design, Environmental Study/Documents | The primary objective of this project is to rehabilitate 4.6 miles of rural major roads. The project includes pavement prep work and pavement rehabilitation.

Unincorporated County Community of Agua Dulce. Pre-Construction and Construction

01/2021 07/2021

07/2021 07/2023 20-20 36 21

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

Altadena - Marengo Avenue, et al.

This project will include: Sidewalk and/or Crosswalk Installation (New), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | The primary objective of this project is to preserve 5 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation.

Various roadways within the Unincorporated Community of Altadena. Pre-Construction and Construction

01/2021 08/2021

08/2021 07/2022 7-7 41 25

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

Angeles National Forest - Mount Wilson Road, et al.

This project will include: Pavement Improvement (New), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to resurface 5.6 miles of rural local roads. The project includes pavement prep-work and pavement resurfacing.

Various roadways within the Angeles National Forest. Pre-Construction and Construction

05/2021 02/2024

02/2024 06/2024 7-7 41 25

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

Desert View Highlands - Mesquite Road, et al.

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to resurface 7.4 miles of residential roads. The project includes parkway improvements, curb ramps upgrade, and roadway resurfacing.

Within the Unincorporated Community of Desert View Highlands Pre-Construction and Construction

05/2021 07/2023

06/2023 02/2024 10-10 36 21

Page 34: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

East La Verne - Webb Canyon Rd, et al.

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Preliminary Design | The primary objective of this project is to resurface 5.9 miles of residential roads. The project includes parkway improvements, curb ramps upgrades, and roadway resurfacing.

Various roadways within the Unincorporated Community of East La Verne. Pre-Construction and Construction

01/2021 07/2022

06/2022 09/2023 10-10 41 25

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

Littlerock - 102nd Street, et al.

This project will include: Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to preserve 15.9 miles of rural local roads. The project includes pavement prep-work and pavement preservation.

Within the Unincorporated Community of Littlerock. Pre-Construction and Construction

01/2021 07/2021

07/2021 10/2021 7-7 36 21

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

Roosevelt/North Lancaster - 120th Street East - Avenue D to Avenue I

This project will include: Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design | The primary objective of this project is to preserve 5.0 miles of Division Street. The project includes pavement prep-work and pavement preservation

Unincorporated Community of Roosevelt and North Lancaster. Pre-Construction and Construction

07/2021 05/2022

05/2022 06/2022 7-7 36 21

Los Angeles 20/21 In Progress Road

Maintenance & Rehabilitation

Sun Village/Lake Los Angeles -Palmdale Boulevard (Phase 3) -90th Street East to 140th Street

East

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design, Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The primary objective of this project is to rehabilitate 5.0 miles of a major highway. | Total project cost.

Various roadways within the Unincorporated Communities of Sun Village and Lake Los Angeles.

Pre-Construction and Construction

01/2021 09/2021

08/2021 07/2023 20-20 36 21

Los Angeles 21/22 New Traffic Control Devices

Bassett - I-605 Freeway/Valley Bl/Temple Ave Safety

Improvements

This project will include: Document Preparation, Preliminary Design | Installation and reconstruction of new and existing traffic signals, installation of pre-signal operation at an existing traffic signal with adequate advance preemption time as part of Metro's I-605 / Valley Blvd Interchange Project | County contribution to review only. Scheduled construction in FY 2023-24.

Bassett - I-605 Freeway/Valley Boulevard/Temple Avenue Pre-Construction and Construction

06/2022 01/2023

12/2022 07/2025 20-20 57 22

Los Angeles 21/22 New Traffic Control Devices

East Los Angeles - Beverly Bl -Pomona Bl to Gerhart Ave (County

Intersections)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Roundabout Installation (New), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | The objective of this project is to upgrade the traffic signals to increase the safety of the intersection while improving the movement of vehicles and decreasing the amount of time motorists will be stopping at red traffic signals. | Total project cost.

East Los Angeles Pre-Construction and Construction

05/2020 07/2021

07/2021 06/2022 15-15 51 24

Los Angeles 21/22 New Safety East Los Angeles - Whiteside St

between Fowler St and Ditman Ave Speed Humps

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety) | Install speed humps on Whiteside Street between Fowler Street and Ditman Avenue.

Whiteside Street, between Fowler Street and Ditman Avenue, in the unincorporated community of City Terrace in the First Supervisorial District Construction 06/2021 07/2021 20-20 51 24

Los Angeles 21/22 New Traffic Control Devices

East Los Angeles - Olympic Bl at Telegraph Rd/Augusta Ave

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The objective of this project is to upgrade the traffic signal to increase the safety of the intersection while improving the movement of vehicles and decreasing the amount of time motorists will be stopping at red traffic signals.

Community of East Los Angeles Construction 03/2021 12/2021 15-15 51 24

Los Angeles 21/22 New Safety Valinda - St Mary Church Left Turn Pocket on Azusa Ave

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety) | Installation of delineators to channelize the left-turn pocket for southbound roadway users on Azusa Ave, approximately 365 feet N/O of Temple Avenue. The treatment will require southbound drivers to travel further south in the left turn pocket to attempt a U-turn and reduce conflict with church parishioners exiting the northerly driveway.

Azusa Ave, approximately 365 feet N/O of Temple Avenue in the unincorporated community of South San Jose Hills in the First Supervisorial District. Construction 06/2022 08/2022 10-10 57 22

Los Angeles 21/22 New Complete Streets Components

Walnut Park - Pacific Bl (Florence Ave to Broadway) - Vision Zero

Initiative Traffic Safety Enhancements

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Active Transportation Plan, Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design | Implement the following traffic safety enhancements (see map): High visibility crosswalks; Leading Pedestrian Intervals; Curb extensions, paint and bollard

This project is located on Pacific Bl between Florence Av and Broadway in the unincorporated community of Walnut Park.

Pre-Construction and Construction

06/2021 12/2021

12/2021 01/2022 5-5 59 33

Page 35: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 21/22 New Safety Athens - West 110th St between Western Ave and Denker Ave -

Speed Humps

This project will include: Document Preparation, Cost Estimating, Preliminary Design | Install speed humps on W 110th Street, between Western Avenue and Denker Avenue.

Athens - West 110th Street between Western Avenue and Denker Avenue - Speed humps

Pre-Construction and Construction

06/2022 07/2022

07/2022 06/2023 20-20 62 30

Los Angeles 21/22 New Traffic Control Devices

Del Aire - El Segundo Bl at I-405 NB On/Off Ramp

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design | Upgrade traffic signal and install signage at railroad crossing. Shared jurisdiction with Caltrans.

Del Aire - El Segundo Bl at I-405 NB On/Off Ramp Pre-Construction and Construction

06/2022 07/2024

06/2024 07/2025 15-15 62 35

Los Angeles 21/22 New Traffic Control Devices

East Rancho Dominguez - Atlantic Bl at Compton Bl

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design | Install protective / permissive left-turn phasing for eastbound and westbound movements. Install fully protected left-turn phasing for northbound and southbound movements. Upgrade all existing vehicle heads.

East Rancho Dominguez - Atlantic Blvd at Compton Blvd Pre-Construction and Construction

07/2021 07/2022

07/2022 12/2022 15-15 64 35

Los Angeles 21/22 New Traffic Control Devices

Florence-Firestone - Florence Ave @ Graham Ave, et al

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | The primary objective of the Florence Avenue @ Graham Avenue, et al. Traffic Signal Synchronization Project is to improve the movement of vehicles and decrease the amount of time motorists will be stopping at red traffic signals. The project will upgrade Florence Av at Graham Av RR crossing | Total project cost.

Community of Florence/Firestone and the Cities of Huntington Park and Bell. Pre-Construction and Construction

07/2021 04/2022

03/2022 06/2022 15-15 59 33

Los Angeles 21/22 New Traffic Control Devices

Florence-Graham - Holmes Ave at Randolph St

This project will include: Document Preparation, Cost Estimating, Preliminary Design | Signage and traffic signal upgrade at railroad crossing | Total project cost. Need railroad coordination. Florence-Graham - Holmes Ave at Randolph Street Pre-Construction and

Construction 07/2021 08/2024

07/2024 07/2025 15-15 59 33

Los Angeles 21/22 New Traffic Control Devices

Rancho Dominguez - Del Amo Bl at Wilmington Ave

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | Upgrade traffic signal and install signage at railroad crossing | Total project cost. Requires railroad coordination.

Rancho Dominguez - Del Amo Blvd at Wilmington Ave Pre-Construction and Construction

07/2021 07/2024

06/2024 07/2025 15-15 64 35

Los Angeles 21/22 New Traffic Control Devices

Rosewood - Avalon Bl HSIP Cycle 9

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Upgrade traffic signal | Total project cost

Avalon Blvd at 135th St and Avalon Blvd at Rosecrans Ave Pre-Construction and Construction

07/2021 05/2022

04/2022 06/2022 15-15 64 35

Los Angeles 21/22 New Safety Rosewood - Santa Fe Ave at Union

Pacific Railroad Crossing Safety Improvements Project

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Paving and/or Striping Installation (New Safety), Environmental Study/Documents | In railroad right of way, new flashing light signal assemblies, and new gate arms in accordance with current standards, new circuitry and new signal house, and 128 feet of concrete panel surfacing. In street right of way, install approximately 100 feet of concrete sidewalk at the crossing along northbound Santa Fe Avenue, approximately 150 feet of concrete sidewalk and a bus pad along southbound Santa Fe Avenue, raised median islands, and reconstruct pavement 50 feet each side of crossing | Total project cost

The Santa Fe Avenue single-track crossing is a north-south roadway located approximately 400 feet south of the signalized State Route 91 on/off-ramp and Santa Fe Avenue intersection, in the unincorporated community of Rancho Dominguez.

Pre-Construction and Construction

06/2016 07/2022

06/2022 06/2023 15-15 64 35

Los Angeles 21/22 New Traffic Control Devices

View Park/Windsor Hills - Angeles Vista Bl at 48th St

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Cost Estimating, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety) | The objective of this project is to install a new traffic signal at the intersection of Angeles Vista Boulevard and 48th Street. | Total project cost.

This project is located at the intersection of Angeles Vista Boulevard and 48th Street, in the unincorporated County of Los Angeles community of View Park in Supervisorial District No. 2.

Pre-Construction and Construction

07/2020 01/2022

12/2021 08/2022 20-20 54 30

Los Angeles 21/22 New Traffic Control Devices

Walnut Park - Alameda St at Manchester Ave

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Traffic Signal Improvements at the intersection of Alameda Street at Manchester Avenue. | Total project cost.

The intersection of Alameda Street and Manchester Avenue Construction 03/2021 09/2021 15-15 59 33

Page 36: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 21/22 New Traffic Control Devices

Walnut Park - Alameda St HSIP Cycle 9

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | The objective of this project is to upgrade the traffic signal to increase the safety of the intersection while improving the movement of vehicles and decreasing the amount of time motorists will be stopping at red traffic signals. | Total project cost.

This project includes the following intersections: Alameda Street at Nadeau Street, Alameda Street at 92nd Street/Southern Avenue, Alameda Street at Firestone Boulevard, and Alameda Street at El Segundo Boulevard in the Cities of South Gate and Compton and Unincorporated Communities of Florence and Willowbrook

Pre-Construction and Construction

02/2019 05/2022

12/2021 06/2022 15-15 59 33

Los Angeles 21/22 New Complete Streets Components

West Carson - Normandie Ave (95th St to 110th St) - Vision Zero

Traffic Safety Enhancements

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Active Transportation Plan, Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Paving and/or Striping Installation (New Safety), Preliminary Design | Implement the following traffic safety enhancements: High visibility crosswalks (26 crosswalks at 7 intersections); Leading Pedestrian Intervals (5 intersections); Curb extensions, paint and bollard (64 corners at 17 intersections) | A one-mile segment of Normandie Av between 95th St and 110th St is within a Vision Zero Collision Concentration Corridor. This project will install traffic safety enhancements aimed at reducing fatal and severe injury collisions along Normandie Av.

Normandie Av from 95th St to 110th St Pre-Construction and Construction

03/2021 08/2021

07/2021 12/2021 5-5 59, 62 30

Los Angeles 21/22 New Traffic Control Devices

West Carson - Torrance Bl at Conradi Ave

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety) | A constituent requested Public Works the installation of a left-turn pocket at the east approach of the intersection of Torrance Boulevard and Conradi Avenue.

The project is at the intersection of Torrance Boulevard and Conradi Avenue in the unincorporated community of Harbor Gateway in Supervisorial District 2 Construction 06/2021 07/2021 10-10 66 35

Los Angeles 21/22 New Safety Willowbrook - Avalon Bl at 127th St

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | Install a marked yellow, continental crosswalk, with all appropriate school crossing signages and markings, at and in advance of the proposed crosswalk, including advance yield markings and signage, on the south leg of the intersection across Avalon Boulevard at 127th Street. Red curb at the crosswalk approach. | Total project cost.

Avalon Boulevard and 127th Street is in the unincorporated community of Willowbrook

in the Second Supervisorial District.

Pre-Construction and Construction

12/2020 07/2021

07/2021 08/2021 10-10 64 35

Los Angeles 21/22 New Traffic Control Devices

Willowbrook - Willowbrook Ave -119th St to Stockwell St

This project will include: Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Upgrade traffic signal and install signages | Total project cost. Requires railroad cordination.

Signage and traffic signal upgrade at railroad crossing; including intersections of Willowbrook Ave at 119th St, at 124th St, at 130th St, at El Segundo Blvd, and at Stockwell St

Pre-Construction and Construction

06/2022 07/2024

06/2024 07/2025 15-15 64 35

Los Angeles 21/22 New Traffic Control Devices

Santa Monica Mountains - Lechusa Rd between Decker Rd and

Encinal Canyon Rd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Lechusa Rd. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable.

Lechusa Road from Decker Road to Encinal Canyon Road. Pre-Construction and Construction

07/2021 07/2022

07/2022 06/2023 10-10 50 27

Los Angeles 21/22 New Traffic Control Devices

La Mirada - Alondra Bl at Stage Rd and Trojan Wy

This project will include: Preliminary Design | Traffic Signal Plan review | Plan review is initiated upon request of the City of La Mirada. Plan review costs only - construction TBD

This project is located at the intersection of Alondra Blvd at Stage Rd and Alondra Blvd at Trojan Way, in the City of La Mirada. Pre-Construction 06/2020 06/2022 20-20 57 32

Los Angeles 21/22 New Complete Streets Components

Los Nietos - Norwalk Bl (Mines Bl to Broadway) Vision Zero Traffic

Safety Enhancements

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Paving and/or Striping Installation (New Safety) | Public Works is currently scoping this project. Potential traffic safety enhancements may include high visibility crosswalks, Leading Pedestrian Intervals, curb extensions (paint and bollard), and edge-line striping. | Total project cost.

This project is located on Norwalk Bl between Mines Bl and Broadway in the unincorporated community of West Whittier/Los Nietos.

Pre-Construction and Construction

03/2021 08/2021

07/2021 12/2021 5-5 57 32

Los Angeles 21/22 New Safety Altadena - Safe Streets Altadena

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety) | Install temporary pop-up pedestrian sidewalk/walkway along on the north side of Loma Alta Drive as well as along the west side of Sunset Ridge Drive.

Loma Alta Dr between Lincoln Av and Dabney St; Sunset Ridge Dr between Loma Alta Dr and 1100' n/o Loma Alta Dr Construction 04/2021 07/2021 10-10 41 25

Page 37: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 21/22 New Traffic Control Devices

Altadena - Woodbury Rd at Fair Oaks Ave

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Installation of protected left-turn phasing for the eastbound and westbound directions Altadena - Woodbury Road at Fair Oaks Avenue Pre-Construction 07/2021 07/2022 15-15 41 25

Los Angeles 21/22 New Safety Altadena-Mariposa Street Road Diet

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Altadena Town Council requested Public Works to provide traffic calming devices and diagonal parking and handicapped parking at the frontage of Altadena Public Library. The project scope installation of a class II bike lane, reduction to one lane in each directions and diagonal parking to the frontage of Altadena Public Library. The project will include signing and striping improvements.

The project is on Mariposa Street from Fair Oaks Avenue to Lake Avenue in the unincorporated County of Los Angeles community of Altadena. Pre-Construction 07/2021 07/2022 10-10 41 25

Los Angeles 21/22 New Traffic Control Devices

Castaic - Ridge Route Rd between Pine Crest Place and 1881 feet

north of Pine Crest Place

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Ridge Route Road. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable.

Ridge Route Road between Pine Crest Place and 1881 north of Pine Crest Place Pre-Construction and Construction

04/2021 10/2021

09/2021 07/2022 10-10 38 21

Los Angeles 21/22 New Traffic Control Devices

Castaic - The Old Road between Villa Canyon Road and Parker

Road

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along The Old Road. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable.

The Old Road between Villa Canyon Road and Parker Road Pre-Construction and Construction

04/2021 10/2021

09/2021 07/2022 10-10 38 21

Los Angeles 21/22 New Traffic Control Devices

Castaic - Traffic Signal at Chiquito Canyon Rd at SR-126

This project will include: Conduct plan review services and cover permit fees for Caltrans to install a temporary traffic signal and a permanent traffic signal on SR-126 at Chiquito Cyn Rd in the Castaic Community. Public Works will not be funding the design or construction work.

At the intersection of SR-126 at Chiquito Canyon Rd in the Castaic Community. Pre-Construction and Construction

01/2021 07/2025

06/2025 07/2026 20-20 38 21

Los Angeles 21/22 New Safety La Crescenta - Briggs Ave at Los Amigos St Intersection Bulb-outs

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing) | Install delineated bulb-outs along on the east side of Briggs Avenue at Los Amigos Street

Briggs Avenue at Los Amigos Street Intersection Construction 06/2021 07/2021 10-10 43 25

Los Angeles 21/22 New Safety La Crescenta - Briggs Ave at

Mayfield Ave Intersection Bulb-outs

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Install delineated bulb-outs along the both side of Briggs Avenue at Mayfield Avenue Briggs Avenue at Mayfield Avenue, in the unincorporated community of La Crescenta Pre-Construction and

Construction 07/2021 09/2022

08/2022 12/2022 10-10 43 25

Los Angeles 21/22 New Traffic Control Devices

Leona Valley - Godde Hill Rd - 674' N/O Elizabeth Lake Rd to 11345'

N/O Elizabeth Lake Rd

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Godde Hill Road. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable.

This project is located near the County of Los Angeles unincorporated community of Quartz Hill. It begins at 674' N/O Elizabeth Lake Road and ends at 11,345' N/O Elizabeth Lake Road.

Pre-Construction and Construction

10/2020 05/2022

04/2022 06/2022 10-10 38 21

Los Angeles 21/22 New Safety Loma Alta Drive Pop Up Sidewalk This project will include: Sidewalk and/or Crosswalk Installation (New), Document Preparation, Cost Estimating, Preliminary Design | Install temporary pop-up pedestrian sidewalk/walkway along on the north side of Loma Alta Drive as well as along the west side of Sunset Ridge Drive.

This project is located along Loma Alta Drive, between Lincoln Avenue and Dabney Street, in the unincorporated community of Altadena

Pre-Construction and Construction

06/2022 08/2022

07/2022 12/2022 10-10 41 25

Los Angeles 21/22 New Traffic Control Devices

South Antelope Valley - 30th St East at Ave P

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | New traffic signal - Will include new ADA Ramps and crosswalks as applicable.

The intersection of 30th Street East and Avenue P, in the unincorporated community of South Antelope Valley in Supervisorial District 5, adjacent to the City of Palmdale

Pre-Construction and Construction

04/2019 02/2022

01/2022 06/2022 15-15 36 21

Los Angeles 21/22 New Safety

South Antelope Valley - Sierra Hwy at 1000' s/o Barrel Springs Rd

Metrolink Railroad Crossing Safety Improvements Project

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Advance warning signs, railroad pavement markings, railroad stop bars.

South Antelope Valley - Sierra Hwy at 1000' s/o Barrel Springs Rd and Metrolink crossing Construction 06/2021 12/2021 15-15 36 21

Page 38: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 21/22 New Traffic Control Devices

Stevenson Ranch - Chiquito Canyon Rd between Henry Mayo

Dr and Hunstock Av

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Cost Estimating, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install curve advisory signs in accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Chiquito Canyon Road. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable.

This project is located near the County of Los Angeles unincorporated community of Stevenson Ranch.

Pre-Construction and Construction

04/2021 10/2021

09/2021 07/2022 10-10 38 21

Los Angeles 21/22 New Traffic Control Devices

Stevenson Ranch - Stevenson Ranch Parkway at Hemingway Ave

This project will include: Project Scope Development, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install protected left-turn phasing for the northbound direction

Stevenson Ranch Parkway at Hemingway Ave in the Stevenson Ranch community Pre-Construction and Construction

07/2021 08/2022

07/2022 07/2023 15-15 38 27

Los Angeles 21/22 New Safety Traffic Safety Program - Program Management This project will include: Public Works Staffing | Program management Countywide Procurement/Operatio

nal Needs 07/2021 06/2022 20-20

36, 38, 39, 41, 43, 44, 45, 46, 48, 49, 50, 51, 52, 53, 54, 55, 57, 58, 59, 62,

18, 20, 21, 22, 23, 24, 25, 26, 27, 29, 30, 32,

33, 34, 35

Los Angeles 21/22 New Safety Traffic Safety Program HSIP Cycle 9 - Program Management This project will include: Public Works Staffing | Program management Countywide Procurement/Operatio

nal Needs 07/2021 06/2022 20-20

36, 38, 39, 41, 43, 44, 45, 46, 48, 49, 50, 51, 52, 53, 54, 55, 57, 58, 59, 62,

18, 20, 21, 22, 23, 24, 25, 26, 27, 29, 30, 32,

33, 34, 35

Los Angeles 21/22 New Safety Malibu - Mulholland Hwy 1000 Feet North of Encinal Canyon Rd

This project will include: Right of Way, Document Preparation, Cost Estimating, Preliminary Design | Install two segments of guardrail, approximately 180 foot and 110 foot, along the south edge of Mulholland Highway, 1000 feet north of Encinal Canyon Road. | Total project cost. May require right of way acquisition.

The project is on the south side of Mulholland Highway, 1000 feet north of Encinal Canyon Road, in the unincorporated community of Malibu, in the Third Supervisorial District.

Pre-Construction 09/2020 06/2022 30-30 50 27

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Avocado Heights - Metro I-605 / Valley Bl Interchange

This project will include: Document Preparation, Cost Estimating, Preliminary Design | Reconstruct County roadway near the I-605/Valley Boulevard interchange, which is a Metro project. Construction of Valley Blvd at the I-605 Interchange in Avocado Heights. Pre-Construction and

Construction 01/2021 07/2023

06/2023 06/2024 20-20 57 22

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

East Los Angeles - 1st St

This project will include: Document Preparation, Cost Estimating, Preliminary Design | The primary objective of this project is to preserve 1.8 miles of major roads. The project includes the following proposed work:

- Pavement Preservation

1st Street from Indiana St to Rowan Av and from Herbert Av to 140 feet west of Vancouver Av.

Pre-Construction and Construction

06/2021 01/2023

08/2022 07/2023 7-7 51 24

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

East Los Angeles - La Verne Ave, et al.

This project will include: The primary objective of this project is to preserve 3.7 miles of residential roads. The project includes the following proposed work:

- Pavement prep-work - Parkway improvements - Curb ramps upgrades - Pavement preservation

Various roadways within the Unincorporated Community of East Los Angeles. Pre-Construction and Construction

08/2021 01/2023

12/2022 06/2023 7-7 51 24

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

West Puente Valley - Duff Ave, et al (Phase II)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | The primary objective of this project is to preserve 6.1 miles of residential roads. The project includes the following proposed work:

- Pavement prep-work - Parkway improvements - Curb ramps upgrades - Pavement preservation

Various roadways within the Unincorporated Community of West Puente Valley. Pre-Construction and Construction

08/2021 08/2022

07/2022 07/2023 7-7 48 22

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Florence-Firestone - 83rd St, et al.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to preserve 7.6 miles of residential roads. The project includes the following proposed work:

- Pavement prep-work - Parkway improvements - Curb ramps upgrades - Pavement preservation

Various roadways within the Unincorporated Community of Florence-Firestone. Pre-Construction and Construction

04/2022 07/2023

06/2023 12/2023 7-7 59 33

Page 39: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Florence-Firestone - Nadeau St, et al.

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design | The primary objective of this project is to reconstruct 3.4 miles of various roadways. The project includes the following proposed work:

- Parkway improvements - Curb ramps upgrades - Roadway reconstruction

Various roadways within the Unincorporated Community of Florence-Firestone. Pre-Construction and Construction

06/2022 02/2025

01/2025 06/2025 20-20 59 33

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Ladera Heights - Shenandoah Ave, et al.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to preserve 7.3 miles of residential roads. The project includes the following proposed work:

- Pavement prep-work - Parkway improvements - Curb ramps upgrades - Pavement preservation

Various roadways within the Unincorporated Community of Ladera Heights. Pre-Construction and Construction

07/2021 07/2023

06/2023 12/2023 7-7 54 30

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Lennox - Buford Ave, et al.

This project will include: Document Preparation, Cost Estimating, Preliminary Design | The primary objective of this project is to preserve 4.5 miles of residential roads. The project includes the following proposed work:

oPavement prep-work oParkway improvements oCurb ramps upgrades oPavement preservation

Various roadways within the Unincorporated Community Lennox. Pre-Construction and Construction

06/2022 09/2023

08/2023 12/2023 7-7 62 35

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

West Rancho Dominguez - 139th St, ET AL. (Phase I) (*)

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to preserve 2.4 miles of residential roads. The project includes the following proposed work:

- Pavement prep-work - Parkway improvements - Curb ramps upgrades - Pavement preservation

Various roadways within the Unincorporated Community of West Rancho Dominguez. Pre-Construction and Construction

06/2020 08/2021

07/2021 09/2021 7-7 64 35

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Willowbrook - Oris St, et al.

This project will include: Document Preparation, Cost Estimating, Preliminary Design | The primary objective of this project is to reconstruct 11.2 miles of residential roads. The project includes the following proposed work:

oParkway improvements oCurb ramps upgrades oRoadway reconstruction

Various roadways within the Unincorporated Community of Willowbrook. Pre-Construction 06/2022 08/2023 20-20 64 35

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Windsor Hills - Southridge Ave, et al

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | The primary objective of this project is to resurface 6.3 miles of residential roads. The project includes the following proposed work: - Parkway improvements - Curb ramps upgrades - Roadway resurfacing

Various roadways within the Unincorporated Community of Windsor Hills. Pre-Construction and Construction

06/2022 09/2023

08/2023 06/2024 10-10 54 30

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Malibu - Calamigos Rd, et al.

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to preserve 10.6 miles of residential roads. The project includes the following proposed work:

- Pavement prep-work - Pavement preservation

Various roadways within the Unincorporated Community of Malibu. Pre-Construction and Construction

07/2021 07/2023

06/2023 12/2023 7-7 50 27

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Malibu - Cornell Rd

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to resurface 2.1 miles of Cornell Road. The project includes the following proposed work:

- Pavement resurfacing

Cornell Road between Mulholland Highway and 900 feet south of Cornell Way within the community of Agoura Hills.

Pre-Construction and Construction

07/2021 07/2023

06/2023 07/2024 10-10 50 27

Page 40: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Acton - Crown Valley Rd et al

This project will include: Document Preparation, Cost Estimating, Preliminary Design | The primary objective of this project is to preserve 14 miles of rural roads. The project includes the following proposed work:

- Pavement prep-work - Pavement preservation

Various roadways within the Unincorporated Community of Acton. Pre-Construction and Construction

08/2021 09/2022

08/2022 12/2023 7-7 38 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Acton - Sierra Hwy - Crown Valley Rd to 411 Ft Eo Mountain Springs

Rd

This project will include: Document Preparation, Cost Estimating, Preliminary Design | The primary objective of this project is to rehabilitate 4.7 miles of major/local roads. Unincorporated Community of Acton. Pre-Construction and

Construction 09/2021 08/2022

07/2022 12/2023 20-20 38 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Agua Dulce - Agua Dulce Canyon Rd (Phase 1) - Burke Rd to

Escondido Canyon Rd

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The primary objective of this project is to preserve 4.2 miles of Agua Dulce Canyon Road. The project includes the following proposed work:

oPavement prep-work oPavement preservation

Within the Unincorporated Community of Agua Dulce. Construction 07/2021 07/2023 10-10 36 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Agua Dulce - Caprock Rd et al

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The primary objective of this project is to preserve 1.8 miles of residential roads. The project includes the following proposed work:

- Pavement prep-work - Pavement preservation

Various roadways within the Unincorporated Community of Agua Dulce Construction 06/2021 07/2023 7-7 36 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Agua Dulce - Darling Rd et al

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The primary objective of this project is to resurface 4 miles of a rural local road. The project includes the following proposed work:

- Pavement resurface

The Unincorporated Community of Agua Dulce. Construction 04/2021 07/2023 10-10 36 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Agua Dulce - Sierra Hwy (Phase 3) - Davenport Rd to Center Street

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to rehabilitate 2.5 miles of a major road. The project includes the following proposed work: - Pavement prep work - Pavement rehabilitation

Unincorporated Community of Agua Dulce Pre-Construction 12/2021 07/2023 20-20 36 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Azusa - Arrow Hwy (Abo)(Cov)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | The primary objective of this project is to resurface 0.2 miles of major roads. The project includes the following proposed work:

- Parkway improvements - Curb ramps upgrades - Roadway resurfacing

Arrow Highway -430 feet west of Fenimore Ave to 660 feet east of Citrus Ave Construction 06/2021 07/2022 10-10 48 22

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Bouquet Canyon - Bouquet Cyn Rd - MM 8.74 to Spunky Cyn Rd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | The primary objective of this project is to rehabilitate 2.3 miles of major/local roads. The project includes the following proposed work: - Pavement prep work - Pavement rehabilitation

Unincorporated Community of Bouquet Canyon Pre-Construction and Construction

07/2020 08/2021

07/2021 07/2022 20-20 36 21

Page 41: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Castaic - The Old Rd - Lake Hughes Rd to Royal Rd

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | The primary objective of this project is to resurface 0.5 miles of major urban roads. The project includes the following proposed work: - Parkway improvements - Curb ramps upgrade - Pavement resurface

The Unincorporated Community of Castaic/Val Verde Construction 06/2021 06/2023 10-10 38 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Castaic/Lake Hughes - Bobcat Way et al

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | The primary objective of this project is to resurface 0.5 miles of local roads. The project includes the following proposed work: - Parkway improvements - Curb ramps upgrade - Pavement resurface

Unincorporated Community of Castaic/Lake Hughes Construction 05/2023 08/2023 10-10 38 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Castaic/Val Verde - Oak Valley Rd et al

This project will include: Project Scope Development, Document Preparation, Cost Estimating | The primary objective of this project is to preserve 1.3 miles of residential roads. The project includes the following proposed work:

- Pavement prep-work - Parkway improvements - Curb ramps upgrades - Pavement preservation

Various roadways within the Unincorporated Community of Castaic/Val Verde Pre-Construction and Construction

12/2021 08/2022

07/2022 12/2023 7-7 38 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Charter Oak - Thelborn St, et al.

This project will include: Document Preparation, Cost Estimating, Preliminary Design | The primary objective of this project is to resurface 3.1 miles of residential roads. The project includes the following proposed work:

- Parkway improvements - Curb ramps upgrade - Roadway resurface

Various roadways within the Unincorporated Community of Charter Oak. Pre-Construction and Construction

05/2022 02/2024

02/2024 06/2024 10-10 48, 55 22, 29

Los Angeles 21/22 New Safety Charter Oak - Via Verde - I-10

On/Off Ramps to Covina Hills Rd (administered by others)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | The primary objective of this project is to resurface 0.2 miles of major roads. The project includes the following proposed work:

- Parkway improvements - Curb ramps upgrades - Roadway resurfacing | Per the draft Coop agreement, the total project cost is estimated to be $2,721,000, with the County's jurisdictional share of the project cost estimated to be $399,000.

Various roadways within the Unincorporated Community of San Dimas. Construction 06/2021 07/2022 10-10 41 25

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Covina Islands - Benbow St et al

This project will include: Document Preparation, Cost Estimating, Preliminary Design | The primary objective of this project is to preserve 5.6 miles of residential roads. The project includes the following proposed work:

- Pavement prep-work - Parkway improvements - Curb ramps upgrades - Pavement preservation

Various roadways within the Unincorporated Community of Covina Islands. Pre-Construction and Construction

12/2021 08/2022

07/2022 07/2023 7-7 48 22

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Del Sur - 70th St West - Ave B to Ave G

This project will include: Document Preparation, Cost Estimating, Preliminary Design | The primary objective of this project is to resurface 5 miles of a rural major road to repair the deteriorating pavement. The project includes the following proposed work:

- Pavement dig-outs associated with severe pavement distresses. - Pavement resurface

Unincorporated community of Del Sur. Pre-Construction and Construction

09/2021 07/2022

07/2022 07/2023 10-10 36 21

Page 42: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Del Sur - 90th St West - Ave A to Ave D

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The primary objective of this project is to resurface 3 mile of rural major road to repair the deteriorating pavement. The project includes the following proposed work:

- Pavement dig-outs associated with severe pavement distresses. - Pavement resurface

Unincorporated community of Del Sur Construction 07/2021 07/2022 10-10 36 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Del Sur - Ralphs Ranch Rd et al

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | The primary objective of this project is to preserve 7.3 miles of a major road. The project includes the following proposed work:

- Pavement prep-work - Pavement preservation

Various roadways within the Unincorporated Community of Del Sur. Pre-Construction and Construction

06/2021 09/2023

09/2021 12/2023 7-7 36 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Desert View Highlands - Elizabeth Lake Rd - 142' East of Dianron Rd

to 10th St West

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to resurface 0.75 mile of major road. The project includes the following proposed work:

oParkway improvements oPavement resurface

Unincorporated Community of Desert Highlands Pre-Construction and Construction

07/2021 07/2022

06/2022 07/2023 20-20 36 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

East Palmdale - 50th St East, et al.

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | The primary objective of this project is to preserve 3.1 miles of residential roads. The project includes the following proposed work:

- Pavement prep-work - Pavement preservation

Various roadways within the Unincorporated Community of Roosevelt. Pre-Construction and Construction

07/2021 10/2021

10/2021 11/2021 7-7 36 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Kagel/Lopez Canyon - Kagel Canyon Rd, et al (Phase 3) (*)

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design | The primary objective of this project is to preserve 1.8 miles of residential roads. The project includes the following proposed work:

- Pavement prep-work - Pavement preservation

Various roadways within the Unincorporated Community of Kagel Canyon Pre-Construction and Construction

08/2021 05/2022

04/2022 07/2022 7-7 39 25

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Kagel/Lopez Canyon - Kagel Canyon Rd, et al (Phase II) (*)

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The primary objective of this project is to preserve 1.8 miles of residential roads. The project includes the following proposed work:

- Pavement prep-work - Pavement preservation

Various roadways within the Unincorporated Community of Kagel Canyon Construction 06/2021 07/2021 7-7 39 25

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

La Crescenta - Prospect Ave et al (Phase 1)

This project will include: Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to preserve 5.8 miles of residential roads. The project includes the following proposed work:

- Pavement prep-work - Parkway improvements - Curb ramps upgrades - Pavement preservation

Various roadways within the Unincorporated Community of La Crescenta-Montrose Pre-Construction and Construction

05/2021 07/2023

07/2023 12/2023 7-7 43 25

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Lake Los Angeles - Palmdale Bl (Phase 4) - 215th St East to 240th

St East

This project will include: Document Preparation, Cost Estimating, Preliminary Design | The primary objective of this project is to preserve 2.7 miles of a rural major highway. The project includes the following proposed work:

- Pavement prep-work - Pavement preservation

The Unincorporated Community of Hi Vista. Pre-Construction and Construction

09/2021 08/2022

07/2022 07/2023 7-7 36 21

Page 43: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Littlerock - 120th St East - Ave H to Ave I

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design, Paving and/or Striping Installation (New Safety) | The primary objective of this project is to preserve 1 mile of 120th Street East. The project includes the following proposed work:

- Pavement prep-work - Pavement preservation

Unincorporated County Community of Roosevelt. Pre-Construction and Construction

09/2021 08/2022

07/2022 07/2023 7-7 36 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Littlerock/Sun Village - 87th St East - Ave T to Hwy 138

This project will include: Pavement Improvement (New), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design, Paving and/or Striping Installation (New Safety) | The primary objective of this project is to resurface 0.5 miles of major urban roads. The project includes the following proposed work:

- Pavement resurface

The Unincorporated Community of Pearblossom Pre-Construction and Construction

01/2022 08/2022

07/2022 07/2023 10-10 36 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Quartz Hill - Ave O-8 et al

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Landscape Safety Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design, Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | The primary objective of this project is to resurface 1.6 miles of major roads. The project includes the following proposed work:

- Parkway improvements - Curb ramps upgrade - Pavement resurface

Unincorporated Community of Quartz Hill. Pre-Construction and Construction

09/2021 08/2022

07/2022 07/2023 10-10 36 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

South Antelope Valley - 47th St East - Pearblossom Hwy to Mt

Emma Rd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design | The primary objective of this project is to resurface 2.7 miles of major roads.

Unincorporated Community of South Antelope Valley. Pre-Construction and Construction

09/2021 08/2022

07/2022 07/2023 10-10 36 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

South Antelope Valley - Barrel Springs Rd - City Of Palmdale

Boundary to Cheseboro Rd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design | The primary objective of this project is to resurface 2.6 miles of major road. The project includes the following proposed work:

oParkway improvements oPavement resurface

Unincorporated Community of South Antelope Valley. Pre-Construction and Construction

09/2021 07/2022

07/2022 07/2023 10-10 36 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Sun Village/Roosevelt/Redman -90th St East - Palmdale Bl to Ave

D

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design | The primary objective of this project is to resurface 11.8 miles of a rural major road to repair the deteriorating pavement. The project includes the following proposed work:

- Pavement dig-outs associated with severe pavement distresses. - Pavement resurface

Various roadways within the Unincorporated Communities of Antelope Valley, Sun Village, Roosevelt, and Redman.

Pre-Construction and Construction

09/2021 07/2022

07/2022 07/2023 10-10 36 21

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

White Fence Farm - 30th St West -Ave N-8 to Ave M

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The primary objective of this project is to resurface 1.5 miles of a major road. The project includes the following proposed work: - Pavement prep work - Pavement resurface

Unincorporated Community of Quartz Hill. Pre-Construction and Construction

09/2021 08/2022

07/2022 07/2023 10-10 36 21

Los Angeles 21/22 In Progress Traffic Control Devices

Hacienda Heights - Hacienda Bl at Shadybend Dr

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install flashing beacon and restripe crosswalk; New traffic signal; New traffic signal with left turn phasing; Protected left-turn phasing for west approach. | Advertised May 12, 2020.

Hacienda Heights - Hacienda Bl at Shadybend Dr Construction 05/2020 08/2021 15-15 57 32

Page 44: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Los Angeles 21/22 New Road

Maintenance & Rehabilitation

Rowland Heights - Los Padres Dr, et al.

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | The proposed work includes 1.5 inches rubberized AC pavement cold mill and overlay; reconstruction of curb and gutter, sidewalk, driveways, and curb ramps; installation of striping and pavement markings; and the performance of other appurtenant work.

Various roadways within the Unincorporated Community of Rowland Heights. Pre-Construction and Construction

06/2022 07/2023

06/2023 07/2024 10-10 55 29

Los Angeles 21/22 In Progress Traffic Control Devices

South Whittier - Telegraph Rd at Victoria Av

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Install flashing beacon and restripe crosswalk; New traffic signal; New traffic signal with left turn phasing; Protected left-turn phasing for west approach. | Advertised May 12, 2020.

South Whittier - Telegraph Rd at Victoria Av Construction 05/2020 08/2021 20-20 57 32

Los Angeles 21/22 New Safety West Whittier/Los Nietos - Mines Bl Traffic Safety Improvements

(Concept)

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Active Transportation Plan, Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Pavement Rehab/Repair (Existing), Document Preparation, Paving and/or Striping Installation (New Safety), Preliminary Design | Public Works is currently scoping this project. Potential traffic safety enhancements may include high visibility crosswalks, Leading Pedestrian Intervals, curb extensions (paint and bollard), and edge-line striping.

Unincorporated West Whittier/Los Nietos community. Pre-Construction and Construction

06/2021 07/2022

06/2022 06/2023 10-10 57 32

Madera 20/21 Carried Over Road

Maintenance & Rehabilitation

Avenue 14 2"Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Road 23 and end at Road 23 1/2 Construction 10/2021 06/2022 15-25 5 12

Madera 20/21 Carried Over Road

Maintenance & Rehabilitation

Avenue 17 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at city limit and end 684 feet West Construction 10/2021 06/2022 15-25 5 12

Madera 20/21 Carried Over Road

Maintenance & Rehabilitation

Avenue 18 1/2 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Road 15 and end at Road 16 Construction 10/2021 06/2022 15-25 5 12

Madera 20/21 Carried Over Road

Maintenance & Rehabilitation

Road 200 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Mountain View Peak Road and end at Road 8082 Construction 10/2021 06/2022 15-25 5 12

Madera 20/21 Carried Over Road

Maintenance & Rehabilitation

Road 222 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Power House Road and end at Tunoi Pl Construction 10/2021 06/2022 15-25 5 12

Madera 20/21 Carried Over Road

Maintenance & Rehabilitation

Avenue 12 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Road 30 and end 1,000 ft east of Road 30 1/2 Construction 10/2021 06/2022 15-25 5 12

Madera 20/21 Carried Over Road

Maintenance & Rehabilitation

Road 225 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Rainbow Drive and end at Whiskey Pines Drive Construction 10/2021 06/2022 15-25 5 12

Madera 20/21 Carried Over Road

Maintenance & Rehabilitation

Road 23 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Avenue 7 1/2 and end at Avenue 8 Construction 10/2021 06/2022 15-25 5 12

Madera 20/21 Carried Over Road

Maintenance & Rehabilitation

Road 23 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Avenue 9 1/2 and end at Avenue 10 Construction 10/2021 06/2022 15-25 5 12

Madera 20/21 Carried Over Road

Maintenance & Rehabilitation

Road 26 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Avenue 21 and end at Avenue 23 Construction 10/2021 06/2022 15-25 5 12

Page 45: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Madera 20/21 Carried Over Road

Maintenance & Rehabilitation

Road 28 1/2 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Ellis Street and end at Harper Blvd. Construction 10/2021 06/2022 15-25 5 12

Madera 20/21 Carried Over Road

Maintenance & Rehabilitation

Avenue 7 1/2 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Road 8 1/2 and end at Road 9 Construction 10/2021 06/2022 15-25 5 12

Madera 20/21 Carried Over Road

Maintenance & Rehabilitation

Avenue 7 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Chowchilla Canal Road and end 4,770 ft. east of Chowchilla Canal Construction 10/2021 06/2022 15-25 5 12

Madera 20/21 Carried Over Road

Maintenance & Rehabilitation

Avenue 7 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Road 20 and end at Road 21 Construction 10/2021 06/2022 15-25 5 12

Madera 21/22 New Road

Maintenance & Rehabilitation

Ave 13 1/2 2" Hot Mix Asphlat Overlay This project will include: Pavement Rehab/Repair (Existing) Ave 13 1/2 City Limits to dead-end Construction 10/2021 06/2022 15-25 5 12

Madera 20/21 Carried Over Road

Maintenance & Rehabilitation

Self-Loading Patch Trucks This project will include: Procurement of Public Works Equipment Countywide Procurement/Operatio nal Needs 10/2021 06/2022 15-25 5 12

Madera 21/22 New Road

Maintenance & Rehabilitation

Hot Box Patch Truck This project will include: Procurement of Public Works Equipment Hot Box Patch Truck Procurement/Operatio nal Needs 10/2021 06/2022 15-25 5 12

Madera 21/22 New Road

Maintenance & Rehabilitation

Power Broom This project will include: Procurement of Public Works Equipment Power Broom Procurement/Operatio nal Needs 10/2021 06/2022 15-25 5 12

Marin 21/22 New Road

Maintenance & Rehabilitation

2022 Western Region This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | Additional info: Roadway rehabilitation with asphalt resurfacing Hicks Valley Road, Wilson Hill Road, Marshall-Petaluma Road Pre-Construction 06/2021 09/2022 30-30 10 2

Marin 21/22 New Road

Maintenance & Rehabilitation

2022 Central Region This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | Additional info: Roadway rehabilitation with asphalt resurfacing

Santa Venetia and California Park neighborhoods; includes segments of Auburn St, Woodland Ave, Oakhurst Rd, Adrian Terrace, Chalda Ct, Jefferson Ave, Labrea Way, Madison Ave, Meriam Dr, Meadow Dr, N. San Pedro Ct, Northview Ct, Roosevelt Ave, Schmidt Ln, Steven Wy, Washington Ave, Woodoaks Dr

Pre-Construction 06/2021 02/2022 30-30 10 2

Marin 21/22 New Road

Maintenance & Rehabilitation

2022 Sealant Project This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | Additional info: Roadway preservation with microsurfacing including localized pavement failure repairs and associated accessibility improvements as required by law.

20 miles of roadway on various segments throughout unincorporated Marin County in the Santa Venetia, Marinwood, Lucas Valley, Pt. San Pedro, Kentfield, Mill Valley and Tamalpais Valley neighborhoods

Pre-Construction 10/2021 04/2022 7-10 10 2

Marin 21/22 New Road

Maintenance & Rehabilitation

Lomita Drive Rehabilitation This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | Additional info: Roadway rehabilitation with asphalt resurfacing Lomita Drive, Mill Valley Pre-Construction 01/2021 03/2022 30-30 10 2

Mariposa 21/22 New Safety Roadway Striping This project will include: Paint center and fog lines on 90 miles of roads (90CL miles & 180FL miles) Countywide Pre-Construction 09/2021 06/2022 4-6 5 8

Mariposa 21/22 New Safety Road Shoulder Weed and Fire Fuel Abatement

This project will include: Remove weeds and brush and repair road shoulders removing hazard for vehicles and reducing Fire Fuels Countywide Pre-Construction 07/2021 06/2022 1-3 5 8

Mariposa 21/22 New Road

Maintenance & Rehabilitation

Triangle Rd. Fog Seal 1.5 miles This project will include: Pavement Rehab/Repair (Existing) Triangle Rd. HWY 49 to Tip Top Road Construction 08/2021 06/2022 5-8 5 8

Mariposa 21/22 New Road

Maintenance & Rehabilitation

Chowchilla Mtn. Rd. Slurry Seal 1.7 miles This project will include: Pavement Rehab/Repair (Existing) Chowchilla Mtn. Rd. SR49 to Harris Cutoff Rd. Construction 08/2021 06/2022 5-8 5 8

Page 46: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Mariposa 21/22 New Road

Maintenance & Rehabilitation

East Westfall Slurry Seal 1 mi. This project will include: Pavement Rehab/Repair (Existing) East Westfall Rd. Chowchilla Mtn. Rd to end of pavement. Construction 08/2021 10/2022 5-8 5 8

Mariposa 21/22 New Road

Maintenance & Rehabilitation

Darrah Rd Slurry Seal 5 miles This project will include: Pavement Rehab/Repair (Existing) Darrah Rd. Construction 08/2021 06/2022 5-8 5 8

Mariposa 21/22 New Road

Maintenance & Rehabilitation

West Whitlock Rd. Slurry Seal 2.5 mi. This project will include: Pavement Rehab/Repair (Existing) West Whitlock Rd Construction 07/2021 06/2022 5-8 5 8

Mariposa 21/22 New Road

Maintenance & Rehabilitation

East Whitlock Rd Slurry Seal 2.4 mi. This project will include: Pavement Rehab/Repair (Existing) East Whitlock Rd. Construction 07/2021 06/2022 5-8 5 8

Mariposa 21/22 New Road

Maintenance & Rehabilitation

Schilling Road Slurry Seal 2 mi. This project will include: Pavement Rehab/Repair (Existing) Schilling Rd Construction 08/2021 06/2022 5-8 5 8

Mariposa 21/22 New Road

Maintenance & Rehabilitation

Bondurant Rd. Slurry Seal 2.5 miles This project will include: Pavement Rehab/Repair (Existing) Bondurant Rd. Construction 08/2021 06/2022 5-8 5 8

Mariposa 21/22 New Road

Maintenance & Rehabilitation

Dogtown Rd. Slurry Seal 5.5 miles This project will include: Pavement Rehab/Repair (Existing) Dogtown Rd Construction 08/2021 06/2022 5-8 5 8

Mariposa 21/22 New Road

Maintenance & Rehabilitation

Greeley Hill Road 10 miles This project will include: Pavement Rehab/Repair (Existing) Greeley Hill Road Construction 08/2021 06/2022 5-8 5 8

Mariposa 21/22 New Road

Maintenance & Rehabilitation

Fiske Rd. Slurry Seal 1.5 mi. This project will include: Pavement Rehab/Repair (Existing) Fiske Rd Greeley Hill Construction 08/2021 06/2022 5-8 5 8

Mariposa 21/22 New Road

Maintenance & Rehabilitation

Dexter Rd. Slurry Seal 2.5 mi. This project will include: Pavement Rehab/Repair (Existing) Dexter Rd. Construction 08/2021 06/2022 5-8 5 8

Mariposa 21/22 New Road

Maintenance & Rehabilitation

Tip Top Rd. Crack/Chip Seal 2.3 mi. This project will include: Pavement Rehab/Repair (Existing) Tip Top Rd Construction 08/2021 06/2022 5-8 5 8

Mariposa 21/22 New Road

Maintenance & Rehabilitation

Sherlock Rd. Crack/Chip Seal 3.5 mi. This project will include: Pavement Rehab/Repair (Existing) Sherlock Rd. Construction 08/2021 06/2022 5-8 5 8

Mariposa 21/22 New Road

Maintenance & Rehabilitation

Schoolhouse Rd. Crack /Chip Seal 1.94 Miles This project will include: Pavement Rehab/Repair (Existing) Schoolhouse Rd. Construction 08/2021 06/2022 5-8 5 8

Mariposa 21/22 New Other Purchase Mini Excavator for Road Shoulder Maintenance This project will include: Procurement of Public Works Equipment Countywide Roadway Use Procurement/Operatio

nal Needs 09/2021 06/2022 10-20 5 8

Mariposa 21/22 New Road

Maintenance & Rehabilitation

Gravel Road Maintenance -Countywide This project will include: Rock and grade gravel roadways Countywide Pre-Construction 07/2021 11/2022 1-5 5 8

Mariposa 21/22 New Safety ROW Hazard Tree Removal This project will include: Remove hazardous trees from the roads rights of way. Countywide Pre-Construction 07/2021 06/2022 1-30 5 8

Page 47: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Mariposa 21/22 New Safety Replace Regulatory Signage as needed Countywide This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Countywide Regulatory Signage Upgrades to improve Retro reflectivity Construction 08/2021 06/2022 5-8 5 8

Mariposa 21/22 New Other Harris Rd. Culvert Creek Crossing at Creel Rd.

This project will include: Project Scope Development, Feasibility Study, Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents Harris Rd. at Creel Rd. Pre-Construction 07/2021 06/2022 1-3 5 8

Mariposa 21/22 New Match Funds Darrah Bridge Construction This project will include: Bridge Structure Rehab/Repair (Existing) Darrah Rd near SR49 Construction 08/2021 06/2023 30-50 5 8

Mendocino 21/22 New Road

Maintenance & Rehabilitation

2021 Corrective/Preventative Maintenance Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) Orr Springs Rd, CR 223, MP 24.25 - 37.11 Construction 07/2021 09/2021 15-21 2 2

Mendocino 21/22 New Road

Maintenance & Rehabilitation

2022 Corrective/Preventative Maintenance Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Road Crew prep work for road segments identified for project.

Goose Rd, CR 640, MP 0.00-1.20 Primrose Dr, CR 604, MP 0.00-4.60 Poppy Dr, CR 623, MP 0.00-3.24 Lilac Rd, CR 605, MP 0.00-1.43 Daphne Way, CR 608, MP 0.00-0.85

Construction 07/2021 09/2022 15-21 2 2

Mendocino 21/22 New Road

Maintenance & Rehabilitation

2023 Corrective/Preventative Maintenance Project

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | Road Crew prep work for road segments identified for project.

Philo Greenwood Rd, CR 132, MP 0.00-18.00 Cameron Rd, CR 516, MP 0.00-5.72 Construction 07/2021 09/2023 15-21 2 2

Merced 21/22 New Road

Maintenance & Rehabilitation

General Roadway Maintenance, Repairs and Materials

This project will include: Public Works Staffing, Procurement of Road Maintenance and Rehab Materials | This project consists of general routine roadway maintenance performed by county forces and the purchase of needed material for but limited to pot-hole repairs, thin asphalt overlays, shoulder grading/mowing, weed control, debris/trash removal, tree trimming, sign repairs, traffic striping and minor repairs to existing bridges within unincorporated areas of Merced County.

Unincorporated areas of County. Specific locations are yet to be determined; all locations will be selected based upon priority need, resources and available funding.

Procurement/Operatio nal Needs 07/2021 06/2022 1-10 21 12

Merced 21/22 New Road

Maintenance & Rehabilitation

Roadway Surface Treatments at Various Locations

This project will include: Project Scope Development, Maintenance Program Plan Development, Cost Estimating | This project consists of applying pavement preservation asphalt surface treatments to existing roadways. This preventative maintenance project will increase pavement life and improve safety for all traveling motorists.

Unincorporated areas of County. Specific locations are yet to be determined; all locations will be selected based upon priority need, resources and available funding. Pre-Construction 07/2021 12/2021 1-5 21 12

Merced 21/22 New Road

Maintenance & Rehabilitation

Install Shoulder Backing at Various Locations

This project will include: Project Scope Development, Maintenance Program Plan Development | This project consists of maintaining existing road shoulders by replenishing the shoulder material. Therefore, extending the pavement life and improve safety for all traveling motorists.

Unincorporated areas of County. Specific locations are yet to be determined; all locations will be selected based upon priority need, resources and available funding. Pre-Construction 07/2021 12/2021 1-5 21 12

Merced 21/22 New Road

Maintenance & Rehabilitation

General Bridge Maintenance & Repairs at Various Locations

This project will include: Project Scope Development, Maintenance Program Plan Development | This project consists of routine maintenance and constructing needed repairs to existing bridges. Therefore, maintaining the safety and integrity of the County’s existing bridge structures and improving safety for all traveling motorists.

Unincorporated areas of County. Specific locations are yet to be determined; all locations will be selected based upon priority need, resources and available funding. Pre-Construction 07/2021 12/2021 5-10 21 12

Merced 21/22 New Match Funds Los Cerritos Road over Dry Creek Bridge Replacement Project

This project will include: Bridge Structure Rehab/Repair (Existing) | This project involves the replacement of the existing 2-lane structurally deficient bridge on Los Cerritos Road at Dry Creek. The new bridge will provide adequate and safe vehicle access. Therefore, meeting current safety design standards and enhancing public safety. Funds will supplement costs associated with construction.

Approximately 1.4 miles north of Keyes Road in the community of Snelling. Construction 01/2022 11/2022 25-50 21 12

Merced 21/22 New Match Funds Kibby Road over Bear Creek

Bridge Replacement Project (Local Match)

This project will include: Right of Way, Preliminary Design, Environmental Study/Documents | This project involves the replacement of the existing 2-lane structurally deficient bridge on Kibby Road at Bear Creek. The new bridge will provide adequate and safe vehicle access. Therefore, meeting current safety design standards and enhancing public safety. Funds will supplement costs associated with Preliminary Engineering Design.

Approximately 1 miles east of the City of Merced. Pre-Construction 07/2021 06/2022 25-50 21 12

Page 48: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Merced 21/22 New Match Funds Quinley Avenue over Black Rascal Creek Bridge Replacement Project

(Local Match)

This project will include: Right of Way, Preliminary Design, Environmental Study/Documents | This project involves the replacement of the existing 2-lane structurally deficient bridge on Quinley Avenue at Black Rascal Creek. The new bridge will provide adequate and safe vehicle access. Therefore, meeting current safety design standards and enhancing public safety. Funds will supplement costs associated with Preliminary Engineering.

Approximately 0.6 miles south of State Route 140 and 0.6 miles south of the community of Atwater. Pre-Construction 07/2021 06/2022 25-50 21 12

Merced 21/22 New Match Funds Burchell Avenue over Duck Slough Bridge Replacement Project (Local

Match)

This project will include: Right of Way, Preliminary Design, Environmental Study/Documents | This project involves the replacement of the existing 2-lane structurally deficient bridge on Burchell Avenue at Black Rascal Creek. The new bridge will provide adequate and safe vehicle access. Therefore, meeting current safety design standards and enhancing public safety. Funds will supplement costs associated with Preliminary Engineering.

Approximately 3.3 miles northwest of the community of LeGrand. Pre-Construction 07/2021 06/2022 25-50 21 12

Merced 21/22 New Match Funds Cottonwood Road over Outside

Canal Bridge Replacement Project (Local Match)

This project will include: Right of Way, Preliminary Design, Environmental Study/Documents | This project involves the replacement of the existing 2-lane structurally deficient bridge on Cottonwood Road at Outside Canal. The new bridge will provide adequate and safe vehicle access. Therefore, meeting current safety design standards and enhancing public safety. Funds will supplement costs associated with Preliminary Engineering.

Approximately 6.7 miles southwest of the City of Gustine. Pre-Construction 07/2021 06/2022 25-50 21 12

Merced 21/22 New Match Funds Merced Avenue over TID Lateral

No. 6 Bridge Replacement Project (Local Match)

This project will include: Right of Way, Preliminary Design, Environmental Study/Documents | This project involves the replacement of the existing 2-lane structurally deficient bridge on Merced Avenue at TID Lateral No. 6. The new bridge will provide adequate and safe vehicle access. Therefore, meeting current safety design standards and enhancing public safety. Funds will supplement costs associated with Preliminary Engineering.

Approximately 0.12 miles north of Schendel Avenue in the community of Delhi. Pre-Construction 07/2021 06/2022 25-50 21 12

Merced 21/22 New Match Funds River Road over San Joaquin

River Bridge Replacement Project (Local Match)

This project will include: Right of Way, Preliminary Design, Environmental Study/Documents | This project involves the replacement of the existing 2-lane structurally deficient bridge on River Road at San Joaquin River. The new bridge will provide adequate and safe vehicle access. Therefore, meeting current safety design standards and enhancing public safety. Funds will supplement costs associated with Preliminary Engineering.

Stevinson area. Pre-Construction 07/2021 06/2022 25-50 21 12

Merced 20/21 Carried Over Road

Maintenance & Rehabilitation

Gurr Road at SR 140 Intersection Improvements and Overlay (FY

19/20 Carryover)

This project will include: Pavement Rehab/Repair (Existing) | The project consists of widening the turning radius of the southern shoulder of State Route 140 and Gurr Road and resurfacing 0.12miles of Gurr Road.

Gurr Road from SR 140 to Wardrobe Road in the Atwater area. Construction 11/2021 04/2022 10-15 21 12

Merced 20/21 Carried Over Road

Maintenance & Rehabilitation

Central Avenue Overlay Project (FY20/21 Carryover)

This project will include: Pavement Rehab/Repair (Existing) | This project consists of repairing specific structural failures (digouts), resurfacing the roadway with an asphalt overlay and placing shoulder backing.

Central Avenue from Turner Avenue to County Line, in the Stevinson area. Construction 07/2021 06/2022 10-15 21 12

Merced 20/21 Carried Over Road

Maintenance & Rehabilitation

River Road Overlay Project (FY 20/21 Carryover)

This project will include: Pavement Rehab/Repair (Existing) | This project consists of repairing specific structural failures (digouts), resurfacing the roadway with an asphalt overlay and placing shoulder backing.

River Road from Keaton Road to SR165, in the Stevinson area. Construction 07/2021 06/2022 10-15 21 12

Merced 20/21 Carried Over Road

Maintenance & Rehabilitation

Dan Ward Road Overlay Project (FY 20/21 Carryover)

This project will include: Pavement Rehab/Repair (Existing) | This project consists of repairing specific structural failures (digouts), resurfacing the roadway with an asphalt overlay and placing shoulder backing.

Dan Ward Road from Franklin Road to Beachwood Drive Construction 07/2021 06/2022 10-15 21 12

Merced 20/21 Carried Over Road

Maintenance & Rehabilitation

August Avenue Overlay Project (FY 20/21 Carryover)

This project will include: Pavement Rehab/Repair (Existing) | This project consists of repairing specific structural failures (digouts), resurfacing the roadway with an asphalt overlay and placing shoulder backing.

August Avenue from Griffith Avenue to Shanks Road, in the Delhi area. Construction 07/2021 06/2022 10-15 21 12

Merced 20/21 Carried Over Road

Maintenance & Rehabilitation

Hinton Avenue Overlay Project (FY 20/21 Carryover)

This project will include: Pavement Rehab/Repair (Existing) | This project consists of repairing specific structural failures (digouts), resurfacing the roadway with an asphalt overlay and placing shoulder backing.

Hinton Avenue from August Avenue to Schendel Avenue, in the Delhi area. Construction 07/2021 06/2022 10-15 21 12

Page 49: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Merced 21/22 New Road

Maintenance & Rehabilitation

Traffic Stripe Truck Purchase This project will include: Procurement of Public Works Equipment | This project involves the procurement/purchase of a new traffic stripe truck. Various Procurement/Operatio

nal Needs 07/2021 06/2022 10-15 21 12

Modoc 21/22 New Road

Maintenance & Rehabilitation

Chip Seal & Paving Projects for Modoc County Roads 21-22 This project will include: Pavement Rehab/Repair (Existing), Cost Estimating County Roads 101, 113, 114, 97, 82, 83, 203, 161, 162, 133c, 27, 33, 35, & 38. Pre-Construction and

Construction 04/2021 07/2021

06/2021 08/2021 7-20 1 1

Mono 20/21 In Progress Road

Maintenance & Rehabilitation

Airport Road Rehabilitation PS&E and Construction Contingencies

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Storm Drain and/or Culvert Rehab/Repair (Existing) Airport Road and a portion of Hot Creek Hatchery Road Construction 05/2021 12/2021 25-25 5 8

Mono 20/21 Carried Over Road

Maintenance & Rehabilitation

Rock Creek Road Drainage Repairs

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Pavement Rehab/Repair (Existing), Maintenance Program Plan Development, Document Preparation, Cost Estimating, Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design

Rock Creek Road near the Mono-Inyo County Line Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 25-35 5 8

Mono 20/21 In Progress Road

Maintenance & Rehabilitation

Long Valley Streets Rehabilitation PS&E and Construction

Contingencies

This project will include: Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design, Environmental Study/Documents

Long Valley - Including Crowley Lake, Sunny Slopes, and a portion of Swall Meadows Pre-Construction and Construction

06/2021 07/2021

07/2021 08/2022 10-25 5 8

Mono 20/21 In Progress Road

Maintenance & Rehabilitation

Twin Lakes Road Maintenance This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) Bridgeport Valley Construction 06/2021 12/2021 5-5 5 8

Mono 20/21 Carried Over Road

Maintenance & Rehabilitation

Bridge Maintenance Program This project will include: Project Scope Development, Maintenance Program Plan Development, Document Preparation, Cost Estimating, Environmental Study/Documents Antelope Valley, Bridgeport, Long Valley, etc. Pre-Construction 06/2021 06/2022 10-10 5 8

Mono 20/21 In Progress Road

Maintenance & Rehabilitation

Road Division Crack Sealing This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Maintenance Program Plan Development, Preliminary Design County-wide Pre-Construction and

Construction 06/2021 03/2022

12/2021 06/2022 5-5 5 8

Mono 20/21 Carried Over Road

Maintenance & Rehabilitation

Virginia Lakes Road Maintenance This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Virginia Lakes Road Construction 06/2021 11/2021 5-5 5 8

Mono 20/21 Carried Over Road

Maintenance & Rehabilitation

2022 Pavement Preservation This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents

Rock Creek Rd, Mt Morrison Rd, Convict Lake Rd, Aspen Springs Ranch Rd, Gregory Lane, Larkspur Ln, Shanna Cr, Camp Antelope Rd, Patricia Ln

Pre-Construction and Construction

06/2021 03/2022

12/2021 12/2022 5-5 5 8

Mono 21/22 New Road

Maintenance & Rehabilitation

Road Division Striping This project will include: Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Maintenance Program Plan Development, Preliminary Design

Chalfant Valley, Lee Vining, Bridgeport areas, Crowley Lake Drive, and Mono County Communities, including areas to improve safety for pedestrians and bicycles by improving or adding shoulder striping

Pre-Construction and Construction

06/2021 03/2022

12/2021 06/2022 5-5 5 8

Mono 21/22 New Safety June Lake Village Pedestrian Safety Project

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents

June Lake Village Streets including Knoll Ave, Bruce St, Crawford Ave, Granite Ave, Howard Ave, Gull Lake Road, Leonard Drive, Alderman St, Foster Ave, or other June Streets as design determines are required.

Pre-Construction and Construction

07/2021 03/2022

06/2022 12/2022 10-10 5 8

Monterey 20/21 In Progress Road

Maintenance & Rehabilitation

Las Lomas Drive This project will include: Storm Drain/Culvert Installation (New) On Las Lomas Drive, from Hall Road to Thomas Road, the community of Las Lomas. Construction 07/2021 10/2022 20-30 29 17

Monterey 19/20 Forecasted Road

Maintenance & Rehabilitation

Alisal Road This project will include: Project is to rehabilitate Alisal Road near Salinas, approximately 700 feet of road. On Alisal Road, near Salinas. Construction 03/2021 08/2022 10-20 30 12

Monterey 19/20 Forecasted Road

Maintenance & Rehabilitation

Cooper Road This project will include: Cost Estimating, Preliminary Design | Project is to reconstruct/rehabilitate 1.3 miles of road. On Cooper Road, from Nashua Road to State Route 183, near the City of Salinas. Pre-Construction 07/2021 01/2023 10-20 29 12, 17

Page 50: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Monterey 19/20 Carried Over Road

Maintenance & Rehabilitation

Old Stage Road This project will include: Cost Estimating, Preliminary Design | Reconstruct/rehabilitate 6.4 miles of road. On Old Stage Road, from Alisal Road to Iverson Road, near the City of Salinas. Pre-Construction 07/2021 01/2023 10-20 30 12

Monterey 21/22 New Road

Maintenance & Rehabilitation

Inter-Garrison Road This project will include: Cost Estimating, Preliminary Design | Project is to resurface 0.8 mile of road.

On Inter-Garrison Road, from Schoonover Road to Sherman Boulevard, near the City of Marina. Pre-Construction 07/2021 01/2023 10-20 29 17

Monterey 21/22 New Road

Maintenance & Rehabilitation

Murphy Road This project will include: Cost Estimating, Preliminary Design | Project is to resurface 0.6 mile of road.

On Murphy Road, from San Juan Road to Santa Cruz County Line, near the City of Watsonville. Pre-Construction 07/2021 01/2023 10-20 29 17

Monterey 21/22 New Road

Maintenance & Rehabilitation

Street Sweeping This project will include: Public Works Staffing | Perform street sweeping on County roads at various urbanized locations, totaling approximately 300 miles of sweeping. Sweeping is performed at least twice per year for each location, typically in September and April. (NPDES)

County-wide at various locations. Locations are identified in County Resolution 21-161 attachment "Monterey Cnty Resolution FY22."

Procurement/Operatio nal Needs 07/2021 06/2022 1-1 29, 30 12, 17

Monterey 21/22 New Road

Maintenance & Rehabilitation

Drainage Clearing This project will include: Public Works Staffing | Perform drainage clearing on County roads at various locations to prevent localized flooding during rain/storm events, which could lead to road pavement failure.

County-wide at various locations. Locations are identified in County Resolution 21-161 attachment "Monterey Cnty Resolution FY22."

Procurement/Operatio nal Needs 07/2021 06/2022 1-1 29, 30 12, 17

Monterey 21/22 New Road

Maintenance & Rehabilitation

Vegetation Clearing/Removal This project will include: Public Works Staffing | Perform vegetation clearing/removal along County roads at various locations. Vegetation often encroaches onto road right-of-way blocking and hindering motorists' sight distance. This will ensure to keep sight distance clear.

County-wide at various locations. Locations are identified in County Resolution 21-161 attachment "Monterey Cnty Resolution FY22."

Procurement/Operatio nal Needs 07/2021 06/2022 1-1 29, 30 12, 17

Monterey 21/22 New Road

Maintenance & Rehabilitation

County Wide Striping This project will include: Public Works Staffing, Procurement of Road Maintenance and Rehab Materials | Perform traffic stripe maintenance on County roads at various locations.

County-wide at various locations. Locations are identified in County Resolution 21-161 attachment "Monterey Cnty Resolution FY22."

Procurement/Operatio nal Needs 07/2021 06/2022 2-5 29, 30 12, 17

Napa 21/22 New Match Funds Bell Canyon Bridge Repairs This project will include: Bridge Structure Rehab/Repair (Existing) Silverado Trail at Bell Canyon Creek Pre-Construction and Construction

01/2021 07/2021

06/2021 12/2021 15-20 4 3

Napa 19/20 In Progress Traffic Control Devices Traffic Signal This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair

(Existing Safety) Devlin Road/Airport Boulevard Intersection Pre-Construction and Construction

07/2020 07/2021

06/2021 12/2021 10-15 4 3

Napa 19/20 In Progress Road

Maintenance & Rehabilitation

Buhman Road Bridge This project will include: Bridge Replacement Buhman Avenue at Congress Valley Road Pre-Construction and Construction

07/2020 07/2021

06/2021 12/2021 40-40 4 3

Napa 19/20 In Progress Road

Maintenance & Rehabilitation

Silverado Trail Phase K Paving This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) Oak Knoll Avenue to Yountville Crossroad Pre-Construction and

Construction 07/2020 07/2021

06/2021 12/2021 15-20 4 3

Napa 20/21 Carried Over Road

Maintenance & Rehabilitation

Olive Hill Lane Paving This project will include: Pavement Rehab/Repair (Existing) Olive Hill Lane - Hagen Road to Hagen Road Construction 07/2021 12/2021 15-20 4 3

Napa 20/21 Carried Over Road

Maintenance & Rehabilitation

Mount George Road Paving This project will include: Pavement Rehab/Repair (Existing) Mount George Road - Olive Hill Lane to end. Construction 07/2021 12/2021 15-20 4 3

Nevada 21/22 New Road

Maintenance & Rehabilitation

Road Maintenance and Rehabilitation Program - 2021

Overlay and Pavement Rehabilitation

This project will include: Pavement Rehab/Repair (Existing) Lake Vera Purdon Rd, Gracie Rd, Allison Ranch Rd, Auburn Rd, E. Empire St, Birchville Rd, Brunswick Rd, Loma Rica Rd Construction 07/2021 06/2022 15-20 1 1

Nevada 21/22 New Road

Maintenance & Rehabilitation

Road Maintenance and Rehabilitation Program - 2021 Brushing, Shoulder, General

Maintenance Project

This project will include: Landscape Safety Rehab/Repair (Existing) Throughout unincorporated Nevada County and primarily in Areas 1 and 3. Red Dog Cross Road, Nevada City Hwy Construction 07/2021 06/2022 1-5 1 1

Page 51: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Nevada 21/22 New Road

Maintenance & Rehabilitation

Egress/Ingress Fire Safety Project This project will include: Landscape Safety Rehab/Repair (Existing) Throughout unincorporated Nevada County, all Areas. Washington Road, Rough and Ready Hwy, Arctic Close Construction 07/2021 06/2022 1-5 1 1

Orange 21/22 New Road

Maintenance & Rehabilitation

Annual Road Maintenance Brea This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Brea Blvd from 1400' West/ Tonner Canyon Road to 3200' North East/ Tonner Canyon Road, Lambert Road from 2640 East/ Kraemer Blvd to Valencia Ave, and Tonner Canyon Rd from Brea Canyon Blvd to End South East/

Pre-Construction and Construction

04/2022 09/2022

05/2022 01/2023 7-10 55 29

Orange 21/22 New Road

Maintenance & Rehabilitation

Annual Road Maintenance Hidden Ranch

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Various Streets North of Glenn Ranch Road, South of Ridgeline, East of El Toro Rd within Hidden Ranch Service Area

Pre-Construction and Construction

01/2022 05/2022

02/2022 08/2022 7-10 73 36

Orange 20/21 Carried Over Road

Maintenance & Rehabilitation

Annual Road Maintenance Ladera Ranch

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Antonio Pkwy from 1900' South/ Covenant Hills to Ortega Hwy, Antonio Pkwy from 615' North/ Benjamin Drive to 3600' South/ Tijeras Creek Road, Avendale Blvd from Antonio Pkwy to Daisy St, Narrow Canyon from O'Neill Drive to Etheral Street

Pre-Construction and Construction

07/2021 04/2022

09/2021 07/2022 7-10 73 36

Orange 21/22 New Road

Maintenance & Rehabilitation

Annual Road Maintenance Lemon Heights

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Various Streets North of and including Foothill Boulevard and Skyline Drive, South of Cowan Heights Drive, West of Newport Boulevard, East of Browning Avenue within Lemon Heights Service Area

Pre-Construction and Construction

08/2021 05/2022

09/2021 08/2022 7-10 68 37

Orange 21/22 New Road

Maintenance & Rehabilitation

Annual Road Maintenance Panorama Heights

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Various Streets North of Foothill Blvd, South of Chapman Ave, West of Newport Blvd, East of Hewes St within Panorama Heights Service Area

Pre-Construction and Construction

03/2022 07/2022

04/2022 11/2022 7-10 68 37

Orange 21/22 New Road

Maintenance & Rehabilitation

Annual Road Maintenance San Clemente

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Avenida Pico from 1250 feet East/ Camino La Pedriza to End of Roadway 300 feet East/

Pre-Construction and Construction

07/2021 04/2022

11/2021 06/2022 7-10 73 36

Orange 21/22 New Road

Maintenance & Rehabilitation

Annual Road Maintenance Red Hill This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Various Streets North of La Colina Dr, South of Foothill Blvd, West of Tustin Ranch Rd, and East of Red Hill Ave in Red Hill Service Area

Pre-Construction and Construction

04/2022 08/2022

05/2022 12/2022 7-10 68 37

Orange 21/22 New Road

Maintenance & Rehabilitation

Bridge Maintenance– Silverado Canyon Road Bridge (55C0179)

over Silverado Canyon Creek This project will include: Bridge Structure Rehab/Repair (Existing) 5.4 Miles East of

Santiago Canyon Road Pre-Construction and

Construction 01/2021 11/2021

10/2021 06/2022 5-7 73 36

Orange 21/22 New Road

Maintenance & Rehabilitation

Bridge Maintenance– Silverado Canyon Road Bridge (55C0181)

over Silverado Canyon Creek This project will include: Bridge Structure Rehab/Repair (Existing) 3.1 Miles East of Santiago Canyon Road Pre-Construction and

Construction 01/2021 11/2021

10/2021 06/2022 5-7 68 37

Orange 21/22 New Road

Maintenance & Rehabilitation

Bridge Maintenance - Silverado Canyon Road over Silverado

Canyon Creek (55C0182) This project will include: Bridge Structure Rehab/Repair (Existing) 3.6 Miles East of Santiago Canyon Road Pre-Construction and

Construction 01/2021 11/2021

10/2021 06/2022 5-7 68 37

Orange 21/22 New Road

Maintenance & Rehabilitation

Bridge Maintenance– Sycamore Drive Bridge (55C0189) over

Silverado Canyon Creek This project will include: Bridge Structure Rehab/Repair (Existing) 50 Ft North of Silverado Canyon Road Pre-Construction and

Construction 01/2021 11/2021

10/2021 06/2022 5-7 68 37

Orange 20/21 Carried Over Road

Maintenance & Rehabilitation

Bridge Maintenance- Hamilton-Victoria (55C0103) over Santa Ana

River This project will include: Bridge Structure Rehab/Repair (Existing) Hamilton-Victoria Bridge over Santa Ana River Pre-Construction and

Construction 07/2021 07/2022

04/2022 12/2022 5-7 74 37

Orange 19/20 In Progress Road

Maintenance & Rehabilitation

Trabuco Creek Road Stabilization (Design Phase) This project will include: Preliminary Design, Environmental Study/Documents Along Trabuco Creek Road at Trabuco Canyon Road to Cleveland National Forest, in

unincorporated County, Trabuco Canyon Pre-Construction 07/2019 12/2022 5-10 73 36

Page 52: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Orange 19/20 In Progress Safety Modjeska Grade Road, Road & Drainage Improvement (Design

Phase) This project will include: Preliminary Design from 400 feet North of Canyon Heights Drive to Modjeska Canyon Road Pre-Construction 01/2020 06/2023 25-25 73 36

Orange 19/20 In Progress Safety Gilbert Street Improvements -Phase II This project will include: Project Scope Development, Preliminary Design Along Gilbert Street at Pacific Place Union Pacific Railroad (UPRR) Crossing in the

Cities of Anaheim and Stanton Pre-Construction 01/2018 06/2023 20-20 65 29

Orange 20/21 In Progress Safety ADA (Americans with Disabilities Act) Upgrade (Annual)-Midway City This project will include: Project Scope Development, Preliminary Design Various streets within unincorporated portions of Orange County Pre-Construction 06/2020 03/2022 20-20 72 34

Orange 20/21 In Progress Safety

Kellog Drive Sidewalk Rehabilitation(Annual) previously Sidewalk Gap Closure - Kellogg

Drive (Design & Construction Phases)

This project will include: Project Scope Development, Right of Way, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, Preliminary Design | provides accessibility for all people while satisfying current ADA standards and requirements

Kellogg Drive between McCarthy Lane and Old Ranch Road Pre-Construction and Construction

05/2020 05/2021

02/2021 12/2021 25-25 55 29

Orange 19/20 In Progress Safety Crawford Canyon Road Sidewalk Extension (Design & Construction

Phase)

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Storm Drain and/or Culvert Rehab/Repair (Existing)

Crawford Canyon Road from Willis Lane to Newport Avenue, and Newport Avenue from Hyde Park Drive to Crawford Canyon Road

Pre-Construction and Construction

05/2020 08/2022

07/2022 06/2024 25-25 68 37

Orange 19/20 In Progress Traffic Control Devices

Traffic Management Center Fiber Optics Expansion (Annual)

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | project will expand the existing Fiber Optic Network to improve traffic flow throughout the County; 100% plans expected late October. Advertise and award from October 2020 to Feb 2021

Various street segments along Crown Valley Parkway, O'Neil Drive, Gilbert Street, Cow Camp Road And Oso Parkway

Pre-Construction and Construction

10/2019 09/2021

04/2021 09/2022 20-20 65, 73 29, 36

Orange 20/21 In Progress Traffic Control Devices

Traffic Signal Upgrade- Newland St at Hazard Ave (Design &

Construction)

This project will include: Preliminary Design, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Environmental Study/Documents | The project consists of upgrading the existing traffic signal system by replacing aged, damaged, or obsolete equipment with new equipment, and modifying the signal phasing.

Intersection of Newland Street and Hazard Avenue Pre-Construction and Construction

01/2020 06/2021

05/2021 12/2021 20-20 72 34

Orange 19/20 In Progress Complete Streets Components

Brookhurst Street Road and Sidewalk Improvements

(Construction Phase) This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane (New) Brookhurst Street from Cerritos Avenue to Ball Road Construction 07/2020 06/2022 25-25 65 29

Orange 19/20 In Progress Complete Streets Components

Coast Highway Bikeway and Pedestrian Bridge at Capistrano

Beach (Pre-Construction) -Previously Surfside Inn Pedestrian

Overcrossing

This project will include: Project Scope Development Over Metrolink railroad tracks Pre-Construction 01/2019 08/2022 50-75 73 36

Orange 20/21 In Progress Safety Barrett Lane Drainage and Sidewalk Improvement (Design) This project will include: Preliminary Design Along Circula Panorama, Fairhaven Extension and Barrett Lane Pre-Construction 02/2020 06/2022 25-25 68 37

Orange 20/21 In Progress Safety Trabuco Canyon Bridge (55C0008) Replacement (Pre-Construction) This project will include: Preliminary Design Over Trabuco Creek Channel (L02) Pre-Construction 07/2020 07/2022 50-75 73 36

Orange 20/21 In Progress Safety Guardrail Projects - Silverado Canyon Road This project will include: Project Scope Development Along various streets within unincorporated Orange County Pre-Construction 02/2021 06/2022 10-20 68, 73 36, 37

Orange 21/22 New Safety ADA (Americans with Disabilities

Act) Upgrades (Annual) - Northeast Tustin

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The project consists of curb ramp, sidewalk, and driveway upgrades and improvements to satisfy current ADA standards and requirements.

The area surrounded by Foothill Blvd, Newport Ave and Skyline Drive within Unincorporated County island of North Tustin

Pre-Construction and Construction

11/2020 11/2021

10/2021 06/2022 20-20 68 37

Page 53: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Orange 21/22 New Safety Santiago Creek Island Improvements (Pre-Construction)

This project will include: Project Scope Development, Preliminary Design | Construct sidewalk for ADA accessibility and upgrade the traffic signal system at the intersection of Villa Park Road and Hewes Street

Villa Park Road from Lemon Street to 650-feet east of Hewes Street, and Hewes Street from Villa Park Road to 450-feet south of Villa Park Road Pre-Construction 04/2019 12/2023 10-20 68 37

Orange 21/22 New Safety Modjeska Canyon Road Bridge (55C0172) Replacement (Design) This project will include: Preliminary Design from 50 ft Northwest to 50 ft South/of the bridge over Santiago Creek Channel (E08) Pre-Construction 07/2019 06/2022 50-50 68 37

Orange 21/22 New Safety Silverado Canyon Road Bridge

(55C-0175) Replacement (Design & Construction)

This project will include: Right of Way | bridge structure and roadway improvements; maintaining pedestrian pathway and shoulder widening over Ladd Canyon Creek (E18) (from 50 feet West to 50 feet East of the bridge) Pre-Construction and

Construction 02/2022 06/2022

06/2022 10/2022 50-50 68, 73 36, 37

Orange 21/22 New Safety Silverado Canyon Road Bridge (55C-0177) Replacement (Design) This project will include: Preliminary Design over Silverado Canyon Creek (E17) (from 50 feet West to 50 feet East of the bridge) Pre-Construction 07/2019 06/2022 50-50 68, 73 36, 37

Orange 20/21 In Progress Safety Antonio Parkway Gateway

Improvements (Pre-Construction and Construction)

This project will include: Preliminary Design, Paving and/or Striping Installation (New Safety) | The project consists of installing a raised median to enhance traffic safety along Antonio Parkway.

1,500 feet along Antonio Parkway from the end of City of Rancho Santa Margarita boundary line

Pre-Construction and Construction

07/2020 01/2022

12/2021 08/2022 20-20 73 36

Orange 21/22 New Safety

Santa Clara Avenue, Prospect Avenue and Yorba Street Drainage and Sidewalk Improvements (Pre-

Construction)

This project will include: Project Scope Development, Preliminary Design Along Santa Clara Avenue, Prospect Avenue and Yorba Street within North Tustin. Pre-Construction 07/2019 07/2023 20-25 68 37

Orange 21/22 New Other Antonio Parkway and Crown Valley

Parkway Intersection Improvements (Pre-Construction)

This project will include: Preliminary Design Intersection of Antonio Parkway and Crown Valley Parkway Pre-Construction 07/2021 12/2022 25-25 73 36

Orange 19/20 In Progress Other OC Loop Segment H El Cajon Bikeway (Construction Phases) This project will include: Bicycle Lane (New) from Yorba Linda Recreational Trail to Santa Ana River Trail Construction 10/2020 09/2022 20-25 55, 68 29, 37

Orange 19/20 In Progress Other OC Loop Segment P Coyote Creek Bikeway (Design Phase)

This project will include: Project Scope Development, Feasibility Study, Document Preparation, Preliminary Design, Environmental Study/Documents from Artesia Boulevard to Knott Avenue Pre-Construction 07/2019 06/2023 20-25 65 32

Orange 19/20 In Progress Other OC Loop Segment Q Coyote Creek Bikeway (Design Phase)

This project will include: Project Scope Development, Right of Way, Feasibility Study, Document Preparation, Preliminary Design, Environmental Study/Documents from Knott Avenue to La Mirada Boulevard Pre-Construction 07/2019 06/2023 20-25 65 32

Orange 19/20 In Progress Other OC Loop Segment O Coyote Creek Bikeway (Design Phase)

This project will include: Project Scope Development, Right of Way, Document Preparation, Preliminary Design, Environmental Study/Documents North Fork Trail to Artesia Boulevard Pre-Construction 07/2019 06/2023 20-25 58, 65 29, 32

Placer 20/21 Carried Over Road

Maintenance & Rehabilitation

FY 19/20 RMRA Greenstone Ct. Culvert Repair This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) Greenstone Ct, Auburn, CA Construction 03/2022 10/2022 30-35 1 1

Placer 20/21 Carried Over Road

Maintenance & Rehabilitation

Rollins Lake Road Slide Repair This project will include: Cut Slope Rehab/Repair to protect roadway (Existing). Rollins Lake Road, Colfax Construction 07/2018 10/2022 20-50 1 1

Placer 20/21 Carried Over Road

Maintenance & Rehabilitation

Alta Forestry Road Slide Repair This project will include: Cut Slope Rehab/Repair to protect roadway (Existing). Alta Forestry Road, Alta Construction 07/2020 10/2022 20-50 1 1

Page 54: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Placer 20/21 Carried Over Road

Maintenance & Rehabilitation

FY 20/21 RMRA Resurfacing Project - HMA Overlay/Slurry Seal

2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Totaling in approximately 75 miles of various County roads within the following areas: Tahoe West Shore, Meadow Vista, Colfax, Penryn, Foresthill, Auburn, Granite Bay, Newcastle.

Construction 07/2020 10/2021 7-25 1, 5, 6 1, 4

Placer 20/21 Carried Over Road

Maintenance & Rehabilitation

FY 20/21 RMRA Chip Seal Project -Chip Seal - Western Placer County

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) Penryn, Newcastle, Auburn, Foresthill, Meadow Vista, Colfax, Alta/Dutch Flat Construction 07/2020 08/2021 7-10 1, 5, 6 1, 4

Placer 21/22 New Road

Maintenance & Rehabilitation

FY 21/22 Chip Seal Project This project will include: Project Scope Development | This project will include: Pavement Improvement (New),Pavement Rehab/Repair (Existing), Paving and/or StripingRehab/Repair (Existing Safety)

Various locations throughout unincorporated Placer County. Pre-Construction 11/2021 03/2022 7-20 1, 5, 6 1, 4

Placer 21/22 New Road

Maintenance & Rehabilitation

FY 21/22 Resurfacing Project This project will include: Project Scope Development | Project will include: Pavement Rehab/Repair (Existing),Paving and/or Striping Rehab/Repair (Existing Safety Various locations throughout unincorporated Placer County Pre-Construction 11/2021 03/2022 7-10 1, 5, 6 1, 4

Placer 21/22 New Road

Maintenance & Rehabilitation

FY 21/22 Overlay Project This project will include: Project Scope Development | This project will include: Pavement Improvement (New),Paving and/or Striping Rehab/Repair (Existing Safety) Various locations throughout unincorporated Placer County Pre-Construction 11/2021 03/2022 25-40 1, 5, 6 1, 4

Placer 21/22 New Road

Maintenance & Rehabilitation

FY 21/22 Pothole Patching and Road Repairs - Purchase of

Aggregate/Asphalt Material for miscellaneous repairs

This project will include: Procurement of Road Maintenance and Rehab Materials Various locations throughout unincorporated Placer County Procurement/Operatio nal Needs 07/2021 06/2022 7-30 1, 5, 6 1, 4

Placer 21/22 New Road

Maintenance & Rehabilitation

FY 21/22 Miscellaneous Concrete/ADA Curb Repair

This project will include: Project Scope Development | This project will include: ADA Curb Ramp Rehab/Repair(Existing) Various locations throughout unincorporated Placer County Pre-Construction 07/2021 06/2022 20-50 1, 5, 6 1, 4

Placer 21/22 New Road

Maintenance & Rehabilitation

FY 21/22 Tree Trimming/Vegetation Management

This project will include: Project Scope Development | Removal of trees and vegetation obscuring or causing damage to existing roadway. Removal of trees and vegetation in preparation for resurfacing projects.

Various locations throughout unincorporated Placer County Pre-Construction 07/2021 06/2022 1-7 1, 5, 6 1, 4

Plumas 20/21 In Progress Complete Streets Components

Greenville Streets Pavement Rehabilitation

This project will include: ADA Curb Ramp Installation (New) | Curb, Gutter & Sidewalk Repairs - in conjunction with a pavement repair project. Grand Street, Bush Street Construction 07/2021 12/2022 15-25 1 1

Plumas 21/22 New Road

Maintenance & Rehabilitation

Public Works Staffing, Maintenance and Operations This project will include: Procurement of Public Works Equipment Countywide - Quincy, Chester, Greenville, Graeagle, Beckwourth, La Porte Districts Procurement/Operatio

nal Needs 07/2021 09/2022 1-5 1 1

Plumas 21/22 New Road

Maintenance & Rehabilitation

Equipment Acquisition This project will include: Procurement of Public Works Equipment | Equipment acquisition contract to replace (4) Ford F550 Plow/Sander/Dump Trucks for C.A.R.B. compliance. Countywide - Quincy, Chester, Greenville, Graeagle, Beckwourth, La Porte Districts Procurement/Operatio

nal Needs 07/2021 09/2022 15-25 1 1

Plumas 19/20 In Progress Match Funds Blairsden-Graeagle Road Bridge Replacement - Final Design Phase

This project will include: Bridge Replacement over the Middle Fork of the Feather River - Final Design Phase | The consultant team was selected and the contract for the final design phase was approved and executed on 11/20/18. Currently the consultant is working towards 95% Design submittal.

Blairsden-Graeagle Road Bridge, Br. No. 9C-0134, over the MFFR near Blairsden Pre-Construction 07/2021 12/2022 50-50 1 1

Riverside 19/20 In Progress Road Grade Separation 66th Ave Grade Separation This project will include: Environmental Study/Documents | Construct bridge over Union Pacific

Railroad & SR-111 SR 111 to Dale Kiler Rd Pre-Construction and Construction

06/2019 05/2020

11/2019 12/2021 75-100 56 28

Page 55: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Riverside 21/22 New Road

Maintenance & Rehabilitation

Brown St This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Oleander St to Nandina Ave Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 61 31

Riverside 19/20 In Progress Road

Maintenance & Rehabilitation

Hammond Rd, 66th Ave, & Date Palm St

This project will include: Sidewalk and/or Crosswalk Installation (New), Storm Drain/Culvert Installation (New), Pavement Rehab/Repair (Existing), Cost Estimating, Environmental Study/Documents

2nd St to 2nd St Pre-Construction and Construction

07/2019 05/2023

10/2022 10/2023 15-20 56 28

Riverside 21/22 New Road

Maintenance & Rehabilitation

11th St This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Gibson Ave to Lakeview Ave Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 67 23

Riverside 21/22 New Road

Maintenance & Rehabilitation

Archer Rd This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents D'Agay Canyon Rd to Cajalco Rd Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 67 28

Riverside 21/22 New Road

Maintenance & Rehabilitation

Aloha Rd This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents San Jacinto Ave to Old Elsinore Rd Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 67 28

Riverside 21/22 New Road

Maintenance & Rehabilitation

Nuevo Rd This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Webster Ave to E'ly Webster Ave .18 mi Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 61 31

Riverside 21/22 New Road

Maintenance & Rehabilitation

Webster Ave This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Nuevo Rd to N'ly Nuevo Rd .09 mi Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 61 31

Riverside 21/22 New Road

Maintenance & Rehabilitation

Bobbitt St This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Newton St to Kayne St Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 60 31

Riverside 21/22 New Road

Maintenance & Rehabilitation

Boyd Ave This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Newton St to Rockwell Rd Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 60 31

Riverside 21/22 New Road

Maintenance & Rehabilitation

Case St This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Boyd St to Liberty Ave Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 60 31

Riverside 21/22 New Road

Maintenance & Rehabilitation

Kayne St This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Liberty Ave to S'ly Liberty Ave .33 mi Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 60 31

Riverside 21/22 New Road

Maintenance & Rehabilitation

Layton St This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Boyd Ave to Bobbitt St Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 60 31

Riverside 21/22 New Road

Maintenance & Rehabilitation

Newton St This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Boyd Ave to Liverty Ave Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 60 31

Riverside 21/22 New Road

Maintenance & Rehabilitation

Rockwell Rd This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Boyd Ave to Bobbitt St Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 60 31

Riverside 21/22 New Road

Maintenance & Rehabilitation

Sackett Ct This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Layton St to W'ly Layton St .03 mi Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 60 31

Page 56: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Riverside 21/22 New Road

Maintenance & Rehabilitation

Los Alamos Rd This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Briggs Rd to W'ly Briggs Rd .86 mi Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 67 28

Riverside 21/22 New Road

Maintenance & Rehabilitation

Los Alamos Rd This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Clinton Keith Rd to NE Clinton Keith Rd .41 mi Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 67 28

Riverside 21/22 New Road

Maintenance & Rehabilitation

Johnson Rd This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Contreras Rd to E Contreras Rd .51 mi Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 71 28

Riverside 21/22 New Road

Maintenance & Rehabilitation

54th Ave This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Fillmore St to Pierce St Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 56 28

Riverside 21/22 New Road

Maintenance & Rehabilitation

Buchanan St This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents 60th Ave to 58th Ave Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 56 28

Riverside 21/22 New Road

Maintenance & Rehabilitation

64th Ave This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Grapefruit Blvd to SW'ly Grapefruit Blvd .52 mi Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 56 28

Riverside 21/22 New Road

Maintenance & Rehabilitation

Orange St This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Airport Blvd to S Airport Blvd .15 mi Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 56 28

Riverside 21/22 New Road

Maintenance & Rehabilitation

Pierce St This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Airport Blvd to 52nd Ave Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 56 28

Riverside 21/22 New Road

Maintenance & Rehabilitation

Fuller Ave This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Orange St to Pine St Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 42 23

Riverside 21/22 New Road

Maintenance & Rehabilitation

Mountain View Ave This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Orange St to Pine St Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 42 23

Riverside 21/22 New Road

Maintenance & Rehabilitation

Pine St This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Carmen Ave to S Carmen Ave .10 mi Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 15-20 42 23

Riverside 20/21 In Progress Road

Maintenance & Rehabilitation

Thousand Palms Canyon Rd This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Pavement Rehab/Repair (Existing), Preliminary Design Ramon Rd/Washington St to Dillon Rd Pre-Construction and

Construction 07/2017 05/2022

03/2022 08/2022 12-15 56 28

Riverside 20/21 Carried Over Road

Maintenance & Rehabilitation

14th Ave This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Stephenson Blvd to SH 78 Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 10-12 42 28

Riverside 20/21 Carried Over Road

Maintenance & Rehabilitation

Culvert Rehab I This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | Reconstruct Culverts Various locations in 1st District Map: https://rctlma.org/districts

Pre-Construction and Construction

07/2019 12/2021

08/2021 06/2022 20-40 60, 61, 67 23, 28, 31

Riverside 21/22 New Road

Maintenance & Rehabilitation

1st District Chip Seal FY21/22 This project will include: Pavement Rehab/Repair (Existing) Various locations in 1st District Map: https://rctlma.org/districts Construction 08/2021 09/2021 5-7 60, 61, 67 28, 31

Page 57: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Riverside 21/22 New Road

Maintenance & Rehabilitation

3rd District Chip Seal FY21/22 This project will include: Pavement Rehab/Repair (Existing) Various locations in 3rd District Map: https://rctlma.org/districts Construction 07/2021 08/2021 5-7 42, 67, 75 23, 28

Riverside 21/22 New Road

Maintenance & Rehabilitation

4th District Chip Seal FY21/22 This project will include: Pavement Rehab/Repair (Existing) Various locations in 4th District Map: https://rctlma.org/districts Construction 02/2022 04/2022 5-7 42, 56 28

Riverside 21/22 New Road

Maintenance & Rehabilitation

5th District Chip Seal FY21/22 This project will include: Pavement Rehab/Repair (Existing) Various locations in 5th District Map: https://rctlma.org/districts Construction 04/2022 06/2022 5-7 42, 61, 67 23, 28, 31

Riverside 21/22 New Road

Maintenance & Rehabilitation

4th District Curb Ramps FY21/22 This project will include: Environmental Study/Documents, ADA Curb Ramp Rehab/Repair (Existing)

Various locations in 4th District Map: https://rctlma.org/districts

Pre-Construction and Construction

03/2021 09/2021

04/2021 12/2021 25-40 42, 56 28

Riverside 21/22 New Road

Maintenance & Rehabilitation

1st District Slurry Seal FY21/22 This project will include: Environmental Study/Documents Various locations in 1st District Map: https://rctlma.org/districts Pre-Construction 07/2021 08/2021 5-7 60, 61, 67 28, 31

Riverside 21/22 New Road

Maintenance & Rehabilitation

3rd District Curb Ramps FY21/22 This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Various locations in 3rd District Map: https://rctlma.org/districts

Pre-Construction and Construction

07/2021 08/2021

08/2021 06/2022 25-40 42, 67, 75 23, 28

Riverside 21/22 New Road

Maintenance & Rehabilitation

5th District Curb Ramps FY21/22 This project will include: Pavement Rehab/Repair (Existing), Environmental Study/Documents Various locations in 3rd District Map: https://rctlma.org/districts

Pre-Construction and Construction

07/2021 09/2021

08/2021 12/2021 25-40 42, 61, 67 23, 28, 31

Riverside 20/21 In Progress Road

Maintenance & Rehabilitation

Soboba St This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Stetson Ave to SH 74 Pre-Construction and Construction

08/2019 05/2021

05/2020 01/2022 12-15 71 28

Riverside 20/21 In Progress Road

Maintenance & Rehabilitation

Mockingbird Cyn Rd This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Markham St to Van Buren Blvd Pre-Construction and Construction

11/2020 05/2022

12/2021 06/2023 15-20 61 31

Riverside 20/21 In Progress Road

Maintenance & Rehabilitation

Rainbow Cyn Rd This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing) | Reconstruct Road Frontage Rd to City of Temecula Limits Pre-Construction and

Construction 08/2019 12/2021

11/2021 01/2022 12-15 75 28

Riverside 20/21 In Progress Road

Maintenance & Rehabilitation

Van Buren Blvd This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing)

.10 mi NW Pine Ct to Capella St Pre-Construction and Construction

11/2020 05/2022

01/2022 10/2022 15-20 61 31

Riverside 19/20 In Progress Road

Maintenance & Rehabilitation

Central Ave & Ramona Ave This project will include: Environmental Study/Documents Central Ave: Menifee Rd to W Rosary Ave .13 mi & Ramona Ave: Nuevo Rd to Stalder Ave

Pre-Construction and Construction

07/2019 09/2021

04/2021 10/2021 15-20 67 23

Riverside 21/22 New Road

Maintenance & Rehabilitation

Clark St This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Markham St to Nandina Ave Pre-Construction and

Construction 07/2020 08/2022

03/2022 12/2022 15-20 61 31

Riverside 21/22 New Road

Maintenance & Rehabilitation

Fisher St This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Marshall St to Cox St Pre-Construction and

Construction 07/2020 03/2022

10/2021 06/2022 15-20 67 28

Riverside 19/20 In Progress Road

Maintenance & Rehabilitation

Borel Rd This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Right of Way, Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) .04 mi N of Buck Rd to Warren Rd Pre-Construction and

Construction 07/2019 01/2023

11/2022 06/2023 15-20 71 28

Page 58: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Riverside 21/22 New Road

Maintenance & Rehabilitation

Girard St This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing)

Pachea Trail to SH-74 Pre-Construction and Construction

07/2020 08/2022

06/2022 12/2022 15-20 67 23

Riverside 19/20 In Progress Road

Maintenance & Rehabilitation

Pauba Rd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Storm Drain/Culvert Installation (New), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Right of Way Acquisition, Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Via Del Monte to Calle Contento Pre-Construction and Construction

07/2019 09/2022

06/2022 04/2023 12-20 71 28

Riverside 21/22 New Road

Maintenance & Rehabilitation

Ragsdale Rd This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) Eagle Mountain Rd to E SH-177 .93 mi Pre-Construction and

Construction 07/2021 11/2021

09/2021 12/2021 15-20 56 28

Riverside 21/22 New Road

Maintenance & Rehabilitation

1st District Curb Ramps FY21/22 This project will include: Environmental Study/Documents Various locations in 1st District Map: https://rctlma.org/districts Pre-Construction 07/2021 06/2022 25-40 60, 61, 67 28, 31

Sacramento 19/20 In Progress Other Twin Cities Road Bridge Replacement at Snodgrass Slough

This project will include: Project Scope Development, Right of Way, Bridge Structure Rehab/Repair (Existing), Feasibility Study, Active Transportation Plan, Document Preparation, Cost Estimating, Right of Way Acquisition, Preliminary Design, Environmental Study/Documents | Replace the existing structurally deficient movable swing, steel bridge with a new concrete structure and roadway approaches.

Twin Cities Road at Snodgrass Slough, located 2.0 miles east of River Road Pre-Construction and Construction

04/2017 04/2023

12/2022 11/2024 75-90 9 3

Sacramento 19/20 In Progress Other Alta Mesa Rd Bridge Replacement at Laguna Creek

This project will include: Project Scope Development, Right of Way, Bridge Structure Rehab/Repair (Existing), Feasibility Study, Active Transportation Plan, Cost Estimating, Document Preparation, Right of Way Acquisition, Preliminary Design, Environmental Study/Documents | Replace the existing structurally-deficient two-lane concrete deck on timber stringers bridge with a new two-lane concrete slab bridge.

Alta Mesa Road at Laguna Creek, located north of State Route 104 Pre-Construction and Construction

05/2012 04/2022

11/2021 09/2023 75-90 8 8

Sacramento 19/20 In Progress Other Michigan Bar Road Bridge Replacement at Cosumnes River

This project will include: Right of Way, Bridge Structure Rehab/Repair (Existing), Feasibility Study, Active Transportation Plan, Cost Estimating, Right of Way Acquisition, Preliminary Design, Environmental Study/Documents | Replace the existing structurally deficient modular concrete panel deck on modular steel box deck trusses and steel girders bridge with a new one-lane concrete slab bridge.

Michigan Bar Road at the Cosumnes River, located approximately one mile north of State Route 16

Pre-Construction and Construction

07/2011 05/2023

11/2022 11/2024 75-90 8 8

Sacramento 19/20 In Progress Safety HSIP Street Light Installation

This project will include: Project Scope Development, Right of Way, Feasibility Study, Active Transportation Plan, Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Preliminary Design, Environmental Study/Documents | Install new LED street lights in a neighborhood bounded by Florin Rd, Stockton Blvd and 65th Ave.

Coyle Ave. from Woodleigh Dr. to Dewey Dr.; Hillsdale Blvd. from Frizell Ave. to McCloud Dr.; Watt Ave. from Elkhorn Blvd. to 700’ north of Elkhorn Blvd.

Pre-Construction and Construction

07/2019 07/2022

11/2021 10/2022 20-30 6, 7, 8 4

Sacramento 19/20 In Progress Road

Maintenance & Rehabilitation

AC Overlay SB1 Phase 5

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Maintenance Program Plan Development, Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) | Rehabilitate arterial and residential streets, including: repair failed areas of the pavement (base repair); overlay the roadway with asphalt concrete pavement; repair damaged curb, gutter, sidewalk; placing slurry seal, adjusting manholes, and restriping the roadway.

* Kenneth Ave - Central Ave Oak Ave * Madison Ave - Dewey Dr - San Juan Ave

Pre-Construction and Construction

07/2019 06/2019

02/2020 02/2020 20-25 8 6

Sacramento 19/20 In Progress Other New Hope Road Bridge Replacement at Grizzly Slough

This project will include: Project Scope Development, Right of Way, Bridge Structure Rehab/Repair (Existing), Feasibility Study, Active Transportation Plan, Cost Estimating, Document Preparation, Right of Way Acquisition, Preliminary Design, Environmental Study/Documents | Replace the existing structurally deficient two-lane concrete bridge with a new two-lane pre-tension multiple-girder bridge.

New Hope Road at Grizzly Slough waterway, located approximately one half-mile north of the San Joaquin County line

Pre-Construction and Construction

05/2012 04/2023

10/2022 11/2023 75-90 9 5

Sacramento 19/20 In Progress Complete Streets Components

Power Inn Rd Improvements Project

This project will include: Sidewalk and/or Crosswalk Installation (New), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Feasibility Study, Active Transportation Plan, Bicycle Lane (New), Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents | Construct complete street improvements including new sidewalks, curb and gutter, ADA-compliant curb ramps, bike lanes, street lighting, and center medians. Rehabilitate the existing roadway including repair of failed pavement areas, slurry seal and asphalt concrete pavement overlay.

Power Inn Road, from 450 feet south of Loucreta Drive to 52nd Avenue Pre-Construction and Construction

08/2016 03/2022

12/2020 12/2022 50-60 9 6

Page 59: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Sacramento 19/20 In Progress Complete Streets Components AC Overlay SB1 Phase 3

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Maintenance Program Plan Development, Feasibility Study, Bicycle Lane (New), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing) | Repair failed areas of the pavement (base repair); overlay the roadway with rubberized asphalt concrete pavement; install complete street features including ADA compliant curb ramps and bike lanes; install video vehicle detection; and various items of work to complete the overlay including but not limited to placing slurry seal, adjusting manholes, and restriping the roadway.

*El Camino Ave - Mission Ave Garfield Ave (Moved from RF0D90) *Hazel Ave - Pershing Ave Greenback Ln *Kingsford Ave - American River Dr - Arden Way *Marconi Ave - Eastern Ave Walnut Ave *Rio Linda Blvd - Elverta Rd Placer County Line

Pre-Construction and Construction

06/2019 06/2019

07/2020 07/2020 20-25 6, 7, 8 1, 4, 6

Sacramento 20/21 In Progress Safety 47th Avenue Pedestrian and Bicycle Improvements Project

This project will include: Right of Way, Feasibility Study, Bicycle Lane (New), Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents | Construct a continuous 2-mile Class II bicycle and pedestrian facility and will connect to the existing bicycle lane network.

47th Ave, between the City of Sacramento/Sacramento County border and light rail tracks (western limit) to Stockton Blvd (eastern limit).

Pre-Construction and Construction

07/2017 07/2021

03/2021 10/2021 40-50 7, 9 6

Sacramento 20/21 In Progress Complete Streets Components

Pavement Rehabilitation and Overlay Project (SB1 Phase 4)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Rehabilitate arterial and residential streets, including: repair failed areas of the pavement (base repair); overlay the roadway with asphalt concrete pavement; repair damaged curb, gutter, sidewalk; and various items of work to complete the overlay including but not limited to placing slurry seal, adjusting manholes, and restriping the roadway. RMRA funding for FY 2020-21 will be used for construction only.

*Ashton Dre - Saverien Dr - Wixford Way *Barberry Lane - Morse Ave - Watt Ave *California Ave - Oak Ave - Palm Ave *Charleston Dr - Rustic Road - Winding Way *Holly Dr - Crocker Rd - Larch Lane *Robertson Ave - Walnut Ave - Fair Oaks Blvd *Saverien Dr American River Dr Fair Oaks Blvd *Watt Ave - Cottage Way - El Camino Ave *Wixford Way - American River - Drive End *W Elkhorn Blvd - West 2nd St -2nd St See Project List for additional 20 locations.

Pre-Construction and Construction

06/2019 03/2021

02/2020 11/2021 20-25 6, 7, 8, 9, 11 1, 3, 4, 6, 8

Sacramento 20/21 In Progress Road

Maintenance & Rehabilitation

Franklin Blvd Bridge Replacement at Lost Slough

This project will include: Project Scope Development, Right of Way, Bridge Structure Rehab/Repair (Existing), Feasibility Study, Active Transportation Plan, Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents | Replace the existing structurally deficient two-lane timber trestle bridge with a new two-lane steel reinforced concrete bridge.

Franklin Boulevard at Lost Slough waterway, located south of Twin Cities Road and east of Interstate 5

Pre-Construction and Construction

05/2010 07/2023

02/2020 10/2024 75-90 9 3

Sacramento 21/22 New Safety Accessible Curb Ramp Improvements - 2021

This project will include: Project Scope Development, ADA Curb Ramp Installation (New), Feasibility Study, Cost Estimating, Preliminary Design | Install and upgrade curb ramps to current ADA standards at non-signalized intersections throughout the unincorporated areas of Sacramento County.

Approximately 90 curb ramp locations are from the constituent special request list, and are for the unincorporated area in the County of Sacramento. A complete list of the locations are listed at https://sacdot.saccounty.net/Documents/Projects/ADA/Ramp%20Location%20List%20-%206-17-21.pdf

Pre-Construction and Construction

07/2020 07/2021

02/2021 12/2021 50-60 6, 7, 8 1, 4, 6

Sacramento 21/22 New Road

Maintenance & Rehabilitation

Pavement Maintenance and Rehabilitation - Force Account

2021

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Maintenance Program Plan Development, Feasibility Study, Cost Estimating | Repair and rehabilitate failed areas of pavement on arterial, residential and rural roadways, including: removal and replacement of failed pavement and base material, pothole repair, patching, crack sealing, pavement balancing, slurry and chip sealing, and pavement overlay. This project is continuous throughout the fiscal year and involves pavement maintenance on roadways in all communities of unincorporated Sacramento County.

* South Watt N/B, Fruitridge Rd. to Jackson Hwy. * Twin Cities Rd., Pellandlni Rd. to Hardesty Ln. * Excelsior Rd., Calvine Rd. to Spiva Rd. A complete list of locations is at https://sacdot.saccounty.net/Pages/Pavement-Maintenance-and-Rehabilitation---2021.aspx

Pre-Construction and Construction

06/2020 07/2021

07/2021 06/2022 20-25 7, 8, 9 1, 4, 5, 6, 8

Sacramento 21/22 New Road

Maintenance & Rehabilitation

AC Overlay Pavement Project SB1 2021 - Phase 1

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating | Rehabilitate arterial and residential streets, including: repair failed areas of the pavement (base repair); overlay the roadway with asphalt concrete pavement; repair damaged curb, gutter, sidewalk; and various items of work to complete the overlay including but not limited to placing slurry seal, adjusting manholes, and restriping the roadway.

* FR04A North (14th Ave - 44th Ave - 18th Ave - E. Nichols Ave) * Roosevelt Ave (slurry seal) - 44th st - Stockton Blvd * 44Th St (Slurry Seal) - 23rd Ave - 14th Ave * Palmer House Dr - Gerber Rd - Skander Wy * Lemon Hill Ave - 44th St - Sampson Blvd * AP06A (Hurley Wy - Watt Ave - Windsor Dr - Morse Ave) * FO07D (Manzanillo St, Shamrock Dr, Ascolano Ave - Sunset Ave) A complete list of locations is at https://sacdot.saccounty.net/Pages/SB-1---AC-Overlay-Pavement-Project-Phase-1.aspx

Pre-Construction and Construction

06/2021 07/2021

07/2021 09/2022 20-25 6, 7, 8, 9, 11 1, 3, 4, 5, 6, 8

Sacramento 21/22 New Road

Maintenance & Rehabilitation

AC Overlay Pavement Project SB1 2021 - Phase 2

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating | Rehabilitate arterial and residential streets, including: repair failed areas of the pavement (base repair); overlay the roadway with asphalt concrete pavement; repair damaged curb, gutter, sidewalk; and various items of work to complete the overlay including but not limited to placing slurry seal, adjusting manholes, and restriping the roadway.

* Franklin Boulevard - A Pkwy - Turnbridge Dr * Andrea Boulevard - Diablo Dr - Tupelo Dr * Madison Avenue - Roseville Rd - Jackson St * Phoenix Avenue - Illinois Ave - Hazel Ave * Eastern Avenue - Whitney Ave - Engle Rd * Elkhorn Blvd - 2nd St - Rio Linda Blvd * Hazel Avenue - Greenback Ln - Central Ave

Pre-Construction and Construction

06/2021 07/2021

07/2021 09/2022 20-25 6, 7, 8, 9 1, 4, 6

Page 60: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

San Benito 20/21 Carried Over Road

Maintenance & Rehabilitation

Anzar Road Heavy Maintenance, CAPE - Double Chip Seal with

Slurry Seal

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) From Cole Road to School Road Construction 09/2021 06/2022 10-15 30 12

San Benito 20/21 Carried Over Road

Maintenance & Rehabilitation

Anzar Road Medium Maintenance, CAPE Seal (Chip Seal w/ Slurry

Seal)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) From School Road to Searle Rd Construction 09/2021 06/2022 5-10 30 12

San Benito 20/21 Carried Over Road

Maintenance & Rehabilitation

Anzar Road Heavy Maintenance, CAPE - Double Chip Seal with

Slurry Seal

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) From Searle Road to San Juan Highway Construction 09/2021 06/2022 10-15 30 12

San Benito 20/21 Carried Over Road

Maintenance & Rehabilitation

Carr Avenue Medium Rehab, Cold-in-Place Recycling with HMA

Overlay

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) From Anzar Rd to Carpenteria Rd Construction 09/2021 06/2022 10-15 30 12

San Bernardino 21/22 New Road

Maintenance & Rehabilitation

Matterhorn Drive And Other Roads This project will include: Pavement Rehab/Repair (Existing)

Lake Arrowhead Area - Matterhorn Dr: Grass Valley Rd NEly/North Bay Rd; Nadelhorn Dr: Bernina Dr NE/ Matterhorn Dr; Polar Dr: St Bernard Ln NW .010M; Portillo Ln: End N Arbon Ln; Quebec Dr: Golden Rule Ln E/End; Regina Dr: Golden Rule Ln N/End; St Anton Dr: Arbon Ln NE & SE/ Zermatt Dr; St Bernard Lane: Matterhorn Dr E&S/.08MS,St Bernard W; St Bernard Way: St Bernard Ln NE .08M; Toronto Dr: End NW/Golden Rule Ln; Voltaire Dr: West Shore Rd N/Arbon Ln; Yukon Court: Yukon Dr N/End;

Construction 07/2021 10/2021 10-12 33 23

San Bernardino 21/22 New Road

Maintenance & Rehabilitation

Sunfair Road and Other Roads This project will include: Pavement Rehab/Repair (Existing)

Joshua Tree area. Sunfair Rd: 29 Palms Hwy N/End,Maint; Sierra Ave: Foothill N/29 Palms Hwy; Rotary Way: SH62 N/Sandy Ridge Dr (Nm); Mount Shasta Ave: .04N, Base Line N/29 Palms Ohs; Mount Lassen Ave: Base Line N/29 Palms Ohs; Mojave Ranch Rd: .09M S,29 Palms Hwy N/29 Palms Hwy; Mile Square Rd: 0013M S,Cactus Dr N/29 Palms Hwy; Chicasaw Rd: .13M W,White Feather Rd E/White Fthr; Cascade Rd: Base Line N/SH62; Cactus Dr: Mt Lassen Ave E/Sierra Ave; Base Line: Cascade Rd E .06M;

Construction 07/2021 04/2022 7-10 42 16

San Bernardino 21/22 New Road

Maintenance & Rehabilitation

San Bernardino Ave and Commerce Ave (Construction

Phase Only)

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

San Bernardino Ave: Etiwanda Ave E/Cherry Ave; Commerce Ave: Valley Blvd N/San Bernardino Construction 06/2022 12/2022 12-15 52 20

San Bernardino 21/22 New Road

Maintenance & Rehabilitation

Fontana Ave and Valley Blvd (Construction Phase Only)

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Valley Blvd: Etiwanda Ave E/Banana Ave & Cherry Ave E/Hemlock Ave; Fontana Ave: Valley Blvd NE/Lime Ave Construction 06/2022 12/2022 12-15 52 20

San Bernardino 21/22 New Road

Maintenance & Rehabilitation

Third Street and Other Roads (Construction Phase Only)

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

3rd Street & 4th Street & 5th Street: Waterman Ave E/Tippecanoe Ave; Base Line St: Yates St E/Del Rosa Dr & 0.02 E, Conejo Dr E/Glasgow Ave; Date Place: .04M NW, Bonnie St E/Sterling Ave; Elm Ave: Pacific St Nly/Merito Pl; Highland Ave: .03M W, Merito Pl E/Sterling Ave; Monterey Ave: .04M E, Waterman Ave E/Cooley St

Construction 06/2022 12/2022 12-15 40 23

San Bernardino 21/22 New Road

Maintenance & Rehabilitation

Phillips Blvd (Construction Phase Only)

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Project includes guardrail replacement Los Angeles County Line east to Benson Ave Construction 09/2022 03/2023 12-20 52 20

San Bernardino 21/22 New Road

Maintenance & Rehabilitation

Francis Ave and Other Roads (Construction Phase Only)

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Benson Ave: Phillips Blvd N/.06M N,Howard St; Francis Ave: .11M W,East End Av E/.13M E,Telephone; Grand Ave: Pipeline Ave E/Ramona Ave; Grand Ave: .09M W,Greenwood Wy E/Monte Vista Av; Grand Ave: Mission Bl SH60 N/State St; Grand Ave: Mission Bl SH60 N/State St; Monte Vista Ave: Phillips Blvd N/Howard Street; Norton Ave: Philadelphia St N .13M; Norton Ave: 0.13M S,Francis N/Phillips; Ramona Ave: Phillips Blvd N/Grand Ave; Ramona Ave: .03M N,Philadelphia Av N/Phillips Bl;

Construction 09/2022 12/2024 12-15 52 20

Page 61: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

San Bernardino 21/22 New Road

Maintenance & Rehabilitation

Arden Ave and Other Roads This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing)

Del Rosa Ave: .03M N,Date St (Nleg)N/Marshall Bl; Del Rosa Ave: Del Rosa Dr N .08M; Sixth St: Waterman Ave E/.23M W,Pedley Rd; Harrison St: Lynwood Dr N/.02M S,Del Norte Dr; Harrison St: Del Norte Dr N/Marshall Blvd; Harrison St: Marshall Blvd N/.03M S,35th St; Waterman Ave: S Line,Ward N/Sixth St; Waterman Ave: Alley S,5th N/N Line ,5th; Waterman Ave: Third St N/Fourth St; Arden Ave: .07M N,Highland Ave N/Lynwood Dr; Lynwood Dr: Sterling Ave E/Arden Ave; Lynwood Dr: Arden Ave E/.03M

Pre-Construction and Construction

06/2021 01/2025

12/2024 12/2025 15-20 40 23

San Bernardino 21/22 New Road

Maintenance & Rehabilitation

Tippecanoe Avenue and Other Roads

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing)

Cooley Street: Monterey N/5th; Cooley Street: 5th N/6th; Sixth Street: .03M W,Pedley Rd E/Tippecanoe Ave; Tippecanoe Avenue: Third St N/Sixth St; Tippecanoe Avenue: Sixth St N/Vine St; Ward Street: Waterman Ave E/Cooley St;

Pre-Construction and Construction

06/2021 04/2025

03/2025 12/2025 15-20 40 23

San Bernardino 21/22 New Road

Maintenance & Rehabilitation

Central Road and Other Roads This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

Apple Valley area - Central Rd: Tussing Ranch Rd N/.50M S,Bear Vly C; Central Rd: Poppy Rd N/Tussing Ranch Rd; Joshua Rd: Las Tunas Dr N/Bear Valley Cutoff; Kiowa Rd: Van Dusen Rd N/Tussing Ranch Rd; Ocotillo Way: Kiowa Rd E .99M; Arrowhead Lake Rd: SH173 NE 1.30M; Arrowhead Lake Rd: 1.30M N,SH173 N 1.28M; Bear Valley Cutoff: Joshua Rd E/SH18; Central Rd: Roundup Wy N/ Poppy Rd; Deep Creek Rd: 1.41M S,Happy Valley Wy N/.16M N,Ocotil; Deep Creek Rd: .16M N,Ocotillo Wy N/Tussing Rch Rd;

Construction 03/2021 05/2021 7-10 33 21

San Bernardino 21/22 New Road

Maintenance & Rehabilitation

Rosena Ranch Road and Other Roads (Construction Phase Only)

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Devore area - Rosena Ranch Rd: Bur Oak Rd E/Cedrela Wy; Rosena Ranch Rd: Cedrela Wy E/Perilla Dr; Perilla Dr: N R/W Sycamore Creek Dr N/Bur Oak Rd; Passionflower Lane: White Ash Rd N/American Elm Rd; Obsidian Rd: Evening Primrose Ln E .03M; Leafcup Ct: Rosena Ranch Rd N .04M; Lapis Lane: .02M S,Alpine Fir Ct NE/.03M N,Currant; Lacebark Ct: White Ash Rd N .08M; Fetterbush Lane: Black Cottonwood Wy N/Currant Ln; Fawn Lily Lane: Deerberry Wy E/Valerian Wy;

Construction 03/2022 05/2022 7-10 47 20

San Bernardino 21/22 New Complete Streets Components

North Mentone Area ADA Ramp Project This project will include: Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing)

Various ramp locations in the north Mentone area - Along Moss Street from Beryl Ave E/Crafton Ave; Along Nice Ave from Ashley Ln E/Sapphire Ave; Along Alderwood Ln from Madeira Ave S/Cedar Lane Dr

Pre-Construction and Construction

07/2021 08/2023

07/2023 12/2023 15-20 40 23

San Bernardino 21/22 New Complete Streets Components Colton Area ADA Ramp Project This project will include: Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing)

Ramps along: B St: Tejon Ave E/.03M W,Rancho Ave; Cypress Ave: Valley Blvd N/Stevenson St; G St: Cypress Ave E/Grand Ave (Colton Cl); Grand Ave: Valley Blvd N/Stevenson St; H St: Cypress Ave E/Grand Ave; Latham St: C St N/0.11M N,Walnut Cove; Olive St: .07M W,Jackson E/.03M W,Rancho Ave; Tejon Ave: C St N/Edgehill Drive; Valley Blvd: .13M W,Cypress Ave E/.08M E,Grand Av;

Pre-Construction and Construction

07/2021 07/2023

06/2023 12/2023 15-20 47 20

San Bernardino 21/22 New Road

Maintenance & Rehabilitation

Havasu Lake Area and Amboy/Essex Area This project will include: Pavement Rehab/Repair (Existing)

Five Mile Station Rd: .39M SE,SH95 SE .96M; Five Mile Station Rd: 1.35M SE,SH95 E .40M; Park Moabi Rd: .019M SE,I40 N/National Trails Hwy; Kelbaker Rd: Natl Trls Hwy N/.01M N,WB I-40 Ramp; Essex Rd: Natl Trls Hwy N/.01M N,WB I-40 Ramps; Mojave Ranch Rd: .09M S,29 Palms Hwy N/29 Palms Hwy; Various Locations in the Havasu Lake and Amboy/Essex area

Construction 05/2021 05/2022 7-10 33 16

San Diego 21/22 New Road

Maintenance & Rehabilitation

FY 21/22 Asphalt Concrete Overlay and ADA Ramp Project

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Right of Way, Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Document Preparation, Right of Way Acquisition, Paving and/or Striping Installation (New Safety), Preliminary Design, Environmental Study/Documents

Project includes numerous locations throughout the unincorporated areas of San Diego County. For a complete and detailed list of locations, please visit the Annual Roadway Resurfacing Plan website at: https://www.sandiegocounty.gov/content/sdc/dpw/roads/Resurfacing_Program.html and click on the Road Resurfacing List (then scroll down to FY 21/22) or the Interactive GIS Map. Locations are estimates and not yet finalized.

Pre-Construction and Construction

10/2020 07/2022

12/2021 06/2023 10-15 71, 75, 77, 79,

80 36, 38, 40

Page 62: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

San Diego 21/22 New Road

Maintenance & Rehabilitation

FY 21/22 Pavement Seal and Culvert Replacement Project

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Right of Way, Pavement Rehab/Repair (Existing), Document Preparation, Right of Way Acquisition, Preliminary Design, Paving and/or Striping Installation (New Safety), Environmental Study/Documents

Project includes numerous locations throughout the unincorporated areas of San Diego County. For a complete and detailed list of locations, please visit the Annual Roadway Resurfacing Plan website at: https://www.sandiegocounty.gov/content/sdc/dpw/roads/Resurfacing_Program.html and click on the Road Resurfacing List (then scroll down to FY 21/22) or the Interactive GIS Map. Locations are estimates and not yet finalized.

Pre-Construction and Construction

10/2020 07/2022

12/2021 11/2022 7-10 71, 75, 77, 79,

80 36, 38, 40

San Francisco 21/22 New Road

Maintenance & Rehabilitation

Various Locations Pavement Renovation No 57

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing) | Construction of ADA compliant curb ramps Grind and pave 43 Blocks Grind and pave 13 Intersections

Various residential street blocks throughout the Sunset District and Telegraph Hill, on: 11th Ave, 16th Ave, 17th Ave, 21st Ave, 25th Ave, 30th Ave, 33rd Ave, 40th Ave, 46th Ave, 47th Ave, Child St, Dunnes Aly, Edgardo Pl, Genoa Pl, Kramer Pl, La Playa, Lawton St, Montague Pl, Moraga St, Sacramento St, Telegraph Pl, Telegraph Hill Blvd, Vallejo St, Venard Aly

Construction 12/2021 12/2023 14-21 17, 19 11

San Francisco 21/22 New Road

Maintenance & Rehabilitation

Various Locations Pavement Renovation No 58

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing) | Construction of ADA compliant curb ramps Grind and pave 46 Blocks Grind and pave 33 Intersections

Various residential street blocks in the Portola, Excelsior, and Balboa Park areas. The project includes blocks on 26th St, Athens St, Avalon Ave, Bacon St, Cambridge St, Cayuga Ave, Felton St, Hamilton St, Harvard St, Howth St, Louisburg St, Marston Ave, Onondaga Ave, Oxford St, Frida Kahlo Way, Princeton St, Sillman St, Staples Ave, Sweeny St, University St, Wayland St

Construction 05/2022 05/2024 14-21 17 11

San Francisco 21/22 New Road

Maintenance & Rehabilitation

Various Locations Pavement Renovation No 59

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing) | Construction of ADA compliant curb ramps Grind and pave 42 Blocks Grind and pave 24 Intersections

Various residential street blocks in the Castro, Twin Peaks and Bayview neighborhoods. The project includes blocks on 15th St, 19th St, Burnett Ave, Collingwood St, Corbett Ave, Douglass St, Graystone Ter, Levant St, Mars St, Mckinnon Ave, Oakdale Ave, Ord St, Phelps St, Quint St, Shafter Ave, States St, Underwood Ave

Construction 07/2022 07/2024 14-21 17 11

San Francisco 21/22 New Road

Maintenance & Rehabilitation

Various Locations Pavement Renovation No 60

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing) | Construction of ADA compliant curb ramps Grind and pave 46 Blocks Grind and pave 14 Intersections

Various residential street blocks in the Sunset District, Pacific Heights, and Fillmore District areas. The project includes blocks on: 17th Ave, 29th Ave, 34th Ave, Buchanan St, California St, Clay St, Pacheco St, Eddy St, Ellis St, O'Farrell St, Ortega St, Pacheco St, Presidio Ave, Sacramento St, Turk St, Ulloa St

Construction 09/2022 09/2024 14-21 17, 19 11

San Francisco 21/22 New Road

Maintenance & Rehabilitation

Various Locations Pavement Renovation No 61

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing) | Construction of ADA compliant curb ramps Grind and pave 42 Blocks Grind and pave 9 Intersections

Various residential street blocks in the Portola, Excelsior, Visitacion Valley and Bayview neighborhoods. The project includes blocks on Alpha St, Athens St, Bancorft Ave, Barneveld Ave, Brazil Ave Brussels St, Carter St, Desmond St, Gaven St, Gilman Ave, Girard St, Goettingen St, Hawes St, Hollister Ave, Ingalls St, Ingerson Ave, Jennings St, Keith St, Olmstead St, Peninsula Ave, Rutland St

Construction 11/2022 11/2024 14-21 17 11

San Francisco 21/22 New Road

Maintenance & Rehabilitation

FY21-22 Citywide Pavement Preservation This project will include: Cost Estimating, Preliminary Design Work will occur throughout the County, primarily on residential streets, including but

not limited to blocks on Cabrillo Street, Octavia Street, and Cayuga Avenue. Pre-Construction 02/2021 12/2023 3-7 17, 19 11

San Joaquin 21/22 New Road

Maintenance & Rehabilitation

Sneed Road and Wolfe Road Resurfacing

This project will include: Right of Way, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Environmental Study/Documents | Design and construction to repair and resurface approximately 1.9 miles of existing roadways with asphalt concrete.

RD 1: Sneed Road from Wolfe Road to East End; Wolfe Road from Bowman Road to Mathews Road

Pre-Construction and Construction

07/2021 07/2022

07/2022 08/2022 10-15 13 5

San Joaquin 21/22 New Road

Maintenance & Rehabilitation

Industrial Park Area Streets Resurfacing

This project will include: Right of Way, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Environmental Study/Documents | Design and construction to repair and resurface approximately 1.0 mile of existing roadways with asphalt concrete.

RD 2: Lance Drive from Wigwam Drive to Teepee Drive; Teepee Drive from Wigwam Drive to Cherokee Road; Tomahawk Drive from Wigwam Drive to Teepee Drive; Wigwam Drive from Teepee Drive to Cherokee Road

Pre-Construction and Construction

07/2021 08/2022

08/2022 09/2022 10-15 13 5

San Joaquin 21/22 New Road

Maintenance & Rehabilitation

Moreland Street Resurfacing This project will include: Right of Way, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Environmental Study/Documents | Design and construction to repair and resurface approximately 0.2 miles of existing roadway with asphalt concrete.

RD 2: Moreland Street from South End to Stockton City Limits Pre-Construction and Construction

07/2021 04/2022

04/2022 05/2022 10-15 13 5

Page 63: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

San Joaquin 21/22 New Road

Maintenance & Rehabilitation

Roberts Road Resurfacing This project will include: Right of Way, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Environmental Study/Documents | Design and construction to repair and resurface approximately 1.9 miles of existing roadway with asphalt concrete.

RD 3: Roberts Road from Muller Road to State Route 4 Pre-Construction and Construction

07/2021 05/2022

05/2022 06/2022 10-15 13 5

San Joaquin 21/22 New Road

Maintenance & Rehabilitation

Alpine Road Resurfacing This project will include: Right of Way, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Environmental Study/Documents | Design and construction to repair and resurface approximately 1.5 miles of existing roadway with asphalt concrete.

RD 4: Alpine Road from Live Oak Road to Harney Lane Pre-Construction and Construction

07/2021 05/2022

05/2022 06/2022 10-15 13 5

San Joaquin 21/22 New Road

Maintenance & Rehabilitation

Arthur Road Resurfacing This project will include: Right of Way, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Environmental Study/Documents | Design and construction to repair and resurface approximately 2.0 miles of existing roadway with asphalt concrete.

RD 4: Arthur Road from Sexton Road to Escalon City Limits Pre-Construction and Construction

07/2021 05/2022

05/2022 06/2022 10-15 12 5

San Joaquin 21/22 New Road

Maintenance & Rehabilitation

Atkinson Road Resurfacing This project will include: Right of Way, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Environmental Study/Documents | Design and construction to repair and resurface approximately 0.9 miles of existing roadway with asphalt concrete.

RD 4: Atkinson Road from Jack Tone Road to Hibbard Road Pre-Construction and Construction

07/2021 06/2022

06/2022 07/2022 10-15 12 5

San Joaquin 21/22 New Road

Maintenance & Rehabilitation

Bruella Road Resurfacing This project will include: Right of Way, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Environmental Study/Documents | Design and construction to repair and resurface approximately 2.2 miles of existing roadway with asphalt concrete.

RD 4: Bruella Road from 785' North of 3rd Street to Acampo Road Pre-Construction and Construction

07/2021 05/2022

05/2022 06/2022 10-15 12 5

San Joaquin 21/22 New Road

Maintenance & Rehabilitation

Dodds Road Resurfacing This project will include: Right of Way, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Environmental Study/Documents | Design and construction to repair and resurface approximately 1.6 miles of existing roadway with asphalt concrete.

RD 4: Dodds Road from Carrolton Road to Mariposa Road Pre-Construction and Construction

07/2021 04/2022

04/2022 05/2022 10-15 12 5

San Joaquin 21/22 New Road

Maintenance & Rehabilitation

Live Oak Road Resurfacing This project will include: Right of Way, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Environmental Study/Documents | Design and construction to repair and resurface approximately 1.5 miles of existing roadway with asphalt concrete.

RD 4: Live Oak Road from Jack Tone Road to Tully Road Pre-Construction and Construction

07/2021 06/2022

06/2022 07/2022 10-15 12 5

San Joaquin 21/22 New Road

Maintenance & Rehabilitation

Tully Road Resurfacing This project will include: Right of Way, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Environmental Study/Documents | Design and construction to repair and resurface approximately 1.0 miles of existing roadway with asphalt concrete.

RD 4: Tully Road from Baker Road to Comstock Road Pre-Construction and Construction

07/2021 04/2022

04/2022 05/2022 10-15 12 5

San Joaquin 21/22 New Road

Maintenance & Rehabilitation

Avenue D Resurfacing This project will include: Right of Way, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Environmental Study/Documents | Design and construction to repair, resurface, and widen approximately 1.4 miles of existing roadway with asphalt concrete.

RD 5: Avenue D from Airport Way to Division Road Pre-Construction and Construction

07/2021 06/2022

06/2022 07/2022 10-15 12 5

San Joaquin 21/22 New Road

Maintenance & Rehabilitation

Lammers Road Resurfacing This project will include: Right of Way, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Environmental Study/Documents | Design and construction to repair and resurface approximately 1.4 miles of existing roadway with asphalt concrete.

RD 5: Lammers Road from Corral Hollow Road to 2,110' North of Bethany Road Pre-Construction and Construction

07/2021 06/2022

06/2022 07/2022 10-15 13 5

San Joaquin 21/22 New Road

Maintenance & Rehabilitation

Linne Road Resurfacing This project will include: Right of Way, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Environmental Study/Documents | Design and construction to repair and resurface approximately 1.5 miles of existing roadway with asphalt concrete.

RD 5: Linne Road from Koster Road to Kasson Road Pre-Construction and Construction

07/2021 04/2022

04/2022 05/2022 10-15 13 5

San Luis Obispo 21/22 New Road

Maintenance & Rehabilitation

300663 - 2021-22 HMA Overlay Various County Roads

This project will include: Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Right of Way, Pavement Rehab/Repair (Existing), Preliminary Design, Environmental Study/Documents, ADA Curb Ramp Rehab/Repair (Existing)

HMA overlay of approximately 10.2 miles of various county roads: • 2.7 miles in Los Osos • 5.5 miles in Templeton • 2.0 miles in Whitley Gardens

Pre-Construction and Construction

06/2021 01/2023

12/2022 12/2023 20-25 35 17

Page 64: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

San Luis Obispo 21/22 New Road

Maintenance & Rehabilitation

300662 - 2021-22 Surface Treatment Various County Roads

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Right of Way, Pavement Rehab/Repair (Existing), Preliminary Design, Environmental Study/Documents, ADA Curb Ramp Rehab/Repair (Existing)

Surface treatment of approximately 61.7 miles of various county roads: • 14.4 miles in Paso Robles • 2.1 miles in San Miguel • 4.2 miles in Shandon • 8.7 miles in Templeton • 8.4 miles in Arroyo Grande • 7.0 miles in Avila • 5.3 miles in Los Ranchos/Edna • 0.8 miles in North Pismo • 10.8 miles in San Luis Obispo

Pre-Construction and Construction

06/2021 08/2022

08/2022 02/2023 5-15 35 17

San Mateo 21/22 New Other Asset Management System This project will include: Procurement of Public Works Systems/Databases Countywide Procurement/Operatio nal Needs 07/2021 12/2022 10-15 22, 24 13

San Mateo 21/22 New Traffic Control Devices 2022 Sign Replacement

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | This project consists of replacing existing street and regulatory signs to meet reflectivity and sizing requirements.

Countywide - various locations Pre-Construction 07/2021 12/2022 20-25 22, 24 13

San Mateo 21/22 New Road

Maintenance & Rehabilitation

2021 In House Crack Seal This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design | This project consists of placing an adhesive sealant into cracks on the pavement surface to extend pavement life.

Countywide - various locations Pre-Construction 07/2021 12/2021 3-5 22, 24 13

San Mateo 21/22 New Road

Maintenance & Rehabilitation

2021 Gazo's Creek Road Microsurfacing

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design | Microsurfacing consists of the application of polymer modified asphaltic emulsion and fine aggregate approximately ¼ to 3/8 inch in depth over the existing road surface.

Gazos Creek Road in the Pescadero Area. Pre-Construction and Construction

07/2021 07/2022

06/2022 12/2022 5-10 24 13

San Mateo 21/22 New Road

Maintenance & Rehabilitation

Reconstruction of Roads in the North Fair Oaks Area (Encina

Avenue)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Storm Drain/Culvert Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design | A reconstruction project consists of removal of the existing road surface, reconstructing or rehabilitating the road bed, and placement of a new road surface. The road bed is the layer below the road surface. It can be reconstructed with similar material or it can be rehabilitated by pulverizing and mixing cement into the existing structural section to a depth of approximately 1 foot. | Replacing or rehabilitating the road bed increases the structural capacity of the road section to a level that is required for long term performance. The new road surface is typically 2 inches of asphalt concrete or seal placed on top of the road bed.

Encina Avenue in the North Fair Oaks Area, from Middlefield Road to the end of road Pre-Construction and Construction

07/2021 07/2022

06/2022 12/2022 20-25 24 13

San Mateo 21/22 New Complete Streets Components

Bay Road Drainage Improvement (Between 5th Ave & 10th Ave,

North Fair Oaks)

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design | This project consists of removing and replacing eroded or collapsed culverts with new sections to provide a continuous network of storm drainage system and minimize damage to the road system.

Bay Road in the North Fair Oaks Area Pre-Construction and Construction

07/2021 07/2022

06/2022 12/2022 20-25 22, 24 13

San Mateo 21/22 New Complete Streets Components

Ferdinand Avenue Drainage Improvements (Between Ave

Alhambra and The Alameda, El Granada)

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design | This project consists of removing and replacing eroded or collapsed culverts with new sections to provide a continuous network of storm drainage system and minimize damage to the road system.

Ferdinand Avenue in the El Granada Area, from Avenue Alhambra to The Alameda. Pre-Construction and Construction

07/2021 07/2022

06/2022 12/2022 20-25 24 13

San Mateo 21/22 New Safety Ticonderoga Road Retaining Wall Repair

This project will include: Project Scope Development, Feasibility Study, Document Preparation, Cost Estimating, Preliminary Design | This project consists of conducting a feasibility analysis and constructing improvements, including retaining walls to stabilize hillside slopes along Ticonderoga Road in San Mateo Highlands Area.

Ticonderoga Road in the San Mateo Highlands Area. Pre-Construction and Construction

07/2021 07/2022

06/2022 12/2022 50-75 22 13

San Mateo 21/22 New Traffic Control Devices 2022 Traffic System Improvements

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design | This project consists of modifying/replacing the existing traffic system to meet current requirements.

Countywide - various locations Pre-Construction 07/2021 12/2022 20-25 22, 24 13

Page 65: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

San Mateo 21/22 New Traffic Control Devices

2022 Pavement Striping and Marking Improvements

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design | This project consists of replacing the existing pavement stripings and markings to meet current requirements.

Countywide - various locations Pre-Construction 07/2021 12/2022 5-10 22, 24 13

San Mateo 21/22 New Road

Maintenance & Rehabilitation

2022 Countywide Seal Project

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design | Seal projects can be a chip seal, slurry seal, cape seal, or microsurfacing. A chip seal is the application of asphaltic emulsion, a type of road oil, immediately followed by an application of small rocks called chips approximately ¼ to 3/8 inch in depth over the existing road surface. . A slurry seal is the application of asphaltic emulsion and fine aggregate approximately ¼ inch in depth over the existing road surface. | A cape seal is a chip seal covered by a slurry seal. Microsurfacing consists of the application of polymer modified asphaltic emulsion and fine aggregate approximately ¼ to 3/8 inch in depth over the existing road surface.

Countywide - various locations Pre-Construction 07/2021 12/2022 5-15 22, 24 13

Santa Barbara 21/22 New Road

Maintenance & Rehabilitation

In-house Pavement maintenance This project will include: Pavement Rehab/Repair (Existing)

Rice Ranch Road; Glenwood Drive; Bell Road - various; Santa Maria Mesa Road -various; Betteravia Road - various; Jalama Road - various; Santa Rosa Road -various; Figueroa Mountain Road - various; Ballard Canyon Road - various; Happy Canyon Road - various; Zaca Station Road - various; Roblar Avenue - various; Foxen Canyon Road - various; Hapgood Road Mountain Drive - east; Queen Ann Lane; Windsor Court Ripley Street

Construction 11/2021 06/2022 10-20 35, 37 19

Santa Barbara 21/22 New Road

Maintenance & Rehabilitation

21/22 RdMAP Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design

Alston Rd; Mountain Dr E; Eucalyptus Hill Rd; Primero St; San Marcos Rd; San Marcos Rd; Cathedral Oaks Rd; Los Carneros Rd; Obern Bikeway; Camino Majorca; Burton Mesa Bl; Carina Dr; Jupiter Ave; Shephard; Mustang Dr; Camino Arroyo S; Cheyenne Ln; Willow St; Tyndall; Olive St; Numancia St; Purisima RD; Patterson Rd; Foxen Canyon Rd

Pre-Construction and Construction

05/2021 04/2022

04/2022 06/2022 10-20 35, 37 19

Santa Barbara 21/22 New Safety 21/22 Striping & Signs This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

School Zone Striping: Anita St, Hollister, Turnpike, Nogal Dr, Point Sal Rd, Pine St, School St, Baseline, Centennial, Via Lato, Burton Mesa Boulevard, Aldebaran Avenue, Hillview Road, Dahlia Place, Bradley Road, Rice Ranch Road Striping: N. Jameson Lane Jameson Lane Padaro Ln, Calle Real, Lillie Ave, Santa Claus Ln Ortega Hill Rd, Ortega Ridge Rd, Santa Monica Rd, Cravens Ln, Lillingston Canyon Rd, Gobernador Canyon Rd, Rincon, Shepard Mesa Rd, Lambert Rd, Mission Canyon Rd

Construction 04/2022 06/2022 3-5 35, 37 19

Santa Barbara 21/22 New Road

Maintenance & Rehabilitation

21/22 Drainage Repairs This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Storm Drain/Culvert Installation (New), Preliminary Design

Various locations on the following roads: Jalama Rd Ray Road, Tepusquet Road, Jalama Road, Tunnel Road, Shoreline Drive, Modoc Road.

Pre-Construction and Construction

07/2021 01/2022

03/2022 06/2022 20-50 35, 37 19

Santa Barbara 21/22 New Safety 21/22 Metal Beam Guardrail Repair and Replacement This project will include: Metal Beam Guardrail Repair/Replace/Upgrade (New) Alisos Road, Black Rd, Bonita School Rd, Bonita School Rd, Calle Real, Cat Canyon

Rd, Central Av, Dominion Rd, Foxen Canyon Rd Construction 01/2022 06/2022 20-50 35, 37 19

Santa Barbara 21/22 New Other 21/22 Bridge Maintenance & Construction

This project will include: Bridge Structure Rehab/Repair (Existing), Cost Estimating, Preliminary Design Black Road - Bridge 51C-034 Pre-Construction and

Construction 05/2021 01/2022

12/2024 06/2022 50-75 35, 37 19

Santa Clara 19/20 In Progress Road

Maintenance & Rehabilitation

Installation of Small Full Capture Trash Devices on Expressway

Drainage Inlets

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | This project enables the County to meet on-going trash reduction mandates by retrofitting existing storm drain inlets with trash capturing screens.

County Expressways Central, Lawrence, Foothill, Page Mill-Oregon, San Tomas, Montague, Almaden, and Capitol (all locations are yet to be finalized and are determined based on priority need, resources, and funding throughout the year)

Construction 06/2019 07/2024 20-50 24 10

Santa Clara 20/21 Carried Over Complete Streets Components ADA Pedestrian Ramps This project will include: ADA Curb Ramp Installation (New)

Tallent Avenue, Freeman Avenue, Ridgetop Drive, McKee Road, Fairway Drive, Alum Rock Avenue, Gion Avenue, Ridgeview Avenue, Piazza Way, Porter Lane, McVay Avenue, Woodhaven Drive, Tunis Avenue, San Martin Avenue, Lawrence Expressway

Construction 09/2021 12/2021 25-50 27, 30 15, 17

Santa Clara 20/21 Carried Over Road

Maintenance & Rehabilitation

Replacement of Hooker Creek Bridge @ Aldercroft Heights Road

(37C0506) This project will include: Bridge Structure Rehab/Repair (Existing) | Bridge replacement. Aldercroft Heights Road Construction 08/2021 11/2027 30-50 28 15

Page 66: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Santa Clara 20/21 In Progress Road

Maintenance & Rehabilitation

Replacement of Los Gatos Creek Bridge @ Aldercroft Heights Road

(37C0508) This project will include: Bridge Structure Rehab/Repair (Existing) | Bridge replacement. Aldercroft Heights Road Construction 10/2021 11/2027 30-50 28 15

Santa Clara 19/20 In Progress Road

Maintenance & Rehabilitation

Mitigation & Monitoring of Stevens Canyon Bridges 37C0604 & 605

(Old 37C0574 & 575)

This project will include: Once bridge is constructed, plantings have to be done as mitigation. Monitor and reporting to regulatory agencies are conditions of permits. 10-yr monitoring and reporting requirement.

Stevens Canyon Construction 05/2016 05/2028 30-50 28 13

Santa Clara 19/20 In Progress Road

Maintenance & Rehabilitation

37C0089 - MMR - Isabel Cr. Bridge at San Antonio Valley Rd. (10Yr)

This project will include: Once bridge is constructed, plantings have to be done as mitigation. Monitor and reporting to regulatory agencies are conditions of permits. 10-yr monitoring and reporting requirement.

San Antonio Valley Rd. Construction 08/2019 12/2029 30-50 25 15

Santa Clara 20/21 In Progress Safety Red Fox Creek Bridge @ New Ave. 37C-172 This project will include: Bridge Structure Rehab/Repair (Existing) | Bridge replacement. New Ave. Construction 08/2020 10/2022 30-50 30 17

Santa Clara 19/20 In Progress Road

Maintenance & Rehabilitation

Cochrane Bridge Monitoring Program 37C-166

This project will include: Maintenance Program Plan Development | Continuous seismic monitoring of bridge over Anderson Lake. Cochrane bridge at Anderson Lake Pre-Construction 08/2020 06/2028 30-50 25 17

Santa Clara 19/20 In Progress Safety Alma Pump Station Upgrades This project will include: Safety and electrical improvements at Alma Street and Oregon Expressway Construction 08/2020 01/2022 30-50 24 13

Santa Clara 20/21 Carried Over Traffic Control Devices

Signal Mast Arms at Foothill Expressway/Arboretum and San

Tomas Expressway/Forbes This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Arboretum Avenue at Foothill Expressway, Forbes Avenue at San Tomas Expressway Construction 12/2021 06/2022 30-50 24, 25 10, 13

Santa Clara 19/20 Carried Over Traffic Control Devices

Leavesley Road at New Avenue -New Traffic Signal Installation This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Leavesley Road at New Avenue Construction 09/2021 12/2023 10-10 30 17

Santa Clara 20/21 In Progress Traffic Control Devices

Traffic Signal at Watsonville Road and Uvas Road

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Preliminary Design Watsonville Road at Uvas Road Pre-Construction and

Construction 12/2020 11/2021

11/2021 12/2023 30-50 17 30

Santa Clara 21/22 New Traffic Control Devices

Signal Mast Arms at Almaden Expressway at Via Monte and Page Mill Expressway at Peter

Coults

This project will include: Cost Estimating, Preliminary Design Almaden Expressway at Via Monte and Page Mill Expressway at Peter Coults Pre-Construction 06/2022 12/2023 30-50 28, 29 13, 15

Santa Clara 21/22 New Road

Maintenance & Rehabilitation

Pavement and Other General Road Maintenance

This project will include: Procurement of Public Works Safety Materials and Gear, Procurement of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials, Public Works Staffing, Repair and Servicing of Public Works Equipment

County Wide all locations are yet to be finalized and are determined based on priority need, resources, and funding throughout the year.

Procurement/Operatio nal Needs 06/2021 06/2022 7-10 24, 25, 27, 28,

29, 30 10, 13, 15, 17

Santa Clara 19/20 In Progress Road

Maintenance & Rehabilitation

Uvas Creek Bridge @ Uvas Rd This project will include: Preliminary Design | Bridge replacement and realign roadway. Uvas Rd Pre-Construction 01/2008 11/2023 30-50 29 17

Santa Clara 19/20 In Progress Road

Maintenance & Rehabilitation

Replacement of Los Gatos Creek Bridge @ Aldercroft Heights Road

(37C0507) This project will include: Preliminary Design | Bridge replacement. Aldercroft Heights Road Pre-Construction 06/2014 10/2021 30-50 28 15

Santa Clara 19/20 In Progress Road

Maintenance & Rehabilitation

Replacement of Los Gatos Creek Bridge @ Aldercroft Heights Road

(37C0508) This project will include: Preliminary Design | Bridge replacement. Aldercroft Heights Road Pre-Construction 03/2016 10/2021 30-50 28 15

Santa Clara 21/22 New Safety Roadside Safety Barrier Improvements

This project will include: Repair existing damaged guard rail and new installation, including terminal systems.

Almaden Expwy; Capitol Expwy; Mt Pleasant; Mt Eden; Redwood Gulch; Bohlman; Willow Springs; Gilroy Hot Springs; Cañada Construction 09/2021 03/2022 25-50 24, 28, 30 13, 15, 17

Santa Cruz 21/22 New Other San Lorenzo Way Bridge This project will include: Replace Existing Bridge San Lorenzo Way Bridge Construction 05/2022 12/2022 50-75 29 17

Page 67: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Santa Cruz 21/22 New Road

Maintenance & Rehabilitation

Soquel Drive Multimodal Project This project will include: Resurfacing, sidewalk, and bike lane improvements, striping La Fonda Av to State Park Drive Pre-Construction and Construction

05/2021 06/2023

06/2023 12/2024 50-75 29 17

Santa Cruz 20/21 Carried Over Other Jamison Creek Road PM 1.61 This project will include: Slipout - 25'L x 10'D - Recommend Roadway and Shoulder Reconstruction and Installation of Soldier Pile Wall Jamison Creek Road PM 1.61 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 20/21 Carried Over Safety Pinehurst Dr at Greenbrier Dr This project will include: Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Installation (New) Pinehurst Dr at Greenbrier Dr Pre-Construction and

Construction 05/2020 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 20/21 Carried Over Other Soquel San Jose Rd PM 1.25 This project will include: Slipouts - 60' long. Recommend soil nail retaining wall Soquel San Jose Rd PM 1.25 Pre-Construction and Construction

02/2017 05/2023

05/2023 12/2023 50-75 29 17

Santa Cruz 20/21 Carried Over Safety State Park Dr at Santa Cruz Av, Broadway, & Center Ave

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Landscape Safety Installation (New), Paving and/or Striping Installation (New Safety) State Park Dr at Santa Cruz Av, Broadway, & Center Ave Pre-Construction and

Construction 05/2020 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 20/21 Carried Over Road

Maintenance & Rehabilitation

2020 RSTP/STIP Resurfacing Project This project will include: Pavement Rehab/Repair (Existing)

GLEN ARBOR RD HIHN RD EAST ZAYANTE RD UPPER ZAYANTE RD WEST VINE HILL RD VINE HILL RD MOUNTAIN VIEW RD NORTH RODEO GULCH RD LAUREL GLEN RD MOUNT HERMON RD LOCKWOOD LN GRAHAM HILL RD PIONEER RD VARNI RD EMPIRE GRADE

Pre-Construction and Construction

09/2019 05/2020

05/2020 12/2021 10-10 29 17

Santa Cruz 20/21 Carried Over Other Countywide Roadway Culvert Survey This project will include: Countywide Roadway Culvert Survey All Roads Construction 05/2020 12/2022 50-50 29 17

Santa Cruz 20/21 Carried Over Other Road Drainage Master Plan Study -Zone 5 roads This project will include: Road Drainage Master Plan Study - Zone 5 roads All Roads Construction 05/2020 06/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Bear Creek Rd PM 4.99 This project will include: Preparation of design and environmental documents for roadway/Embankment Settling (70' L) - Recommend WB Traveled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

Bear Creek Road (PM 4.99) Pre-Construction and Construction

02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Bear Creek Rd PM 7.0 This project will include: Preparation of design and environmental documents for slipout (25' L) -Recommend EB Travelled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

Bear Creek Road (PM 7.0) Pre-Construction and Construction

02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Branciforte Dr PM 2.22 This project will include: Preparation of design and environmental documents for slipout (15' W x 75' L) - Recommend SB Shoulder Reconstruction, Creek Bank Armoring and Retaining Wall (Soldier Pile) Installation

Branciforte Dr (PM 2.22) Pre-Construction and Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Glen Haven Road PM 0.81 This project will include: Slipout (40' W x 35' L) - Recommend SB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation Glen Haven Road PM 0.81 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Page 68: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Glen Haven Road PM 2.27 This project will include: Preparation of design and environmental documents for slipout (19' W x 100' L) - Recommend NB Traveled Way and Shoulder Reconstruction, New Culvert and Retaining Wall (Soldier Pile) Installation

Glen Haven Road PM 2.27 Pre-Construction and Construction

02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Lompico Road PM 0.22 This project will include: Slipout (40' W x 100' L) - Recommend SB Travelled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation Lompico Road PM 0.22 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Lompico Road PM 2.38 This project will include: Preparation of design and environmental documents for slipout (10' W x 25' L) - Recommend NB Travelled Way and Shoulder Reconstruction and Installation of Retaining Wall (Crib)

Lompico Road PM 2.38 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Redwood Lodge Road PM 2.02 This project will include: Preparation of design and environmental documents for large Slipout (30' W x 120' L) and Landslide - Recommend Roadway Reconstruction and Retaining Wall (Stitch Pile) Installation

Redwood Lodge Road PM 2.02 Pre-Construction and Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Soquel Drive at Aptos Street This project will include: Slipout (35' L) - Recommend SB Travelled Way and Shoulder Reconstruction, Drainage Improvements, Rock Slope Protection and Retaining Wall (Crib) Installation

Soquel Drive at Aptos Street Pre-Construction and Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Soquel San Jose Road PM 5.91 This project will include: Preparation of design and environmental documents for large Slipout (24' W x 115' L) - Recommend Roadway Reconstruction and Retaining Wall (TBD) Installation Soquel San Jose Road PM 5.91 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Stetson Road PM 1.20 This project will include: Preparation of design and environmental documents for slipout (60' W x 200' L) - Recommend EB Traveled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

Stetson Road PM 1.20 Pre-Construction and Construction

02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Swanton Road PM 0.72 This project will include: Preparation of design and environmental documents for 8' Concrete Arch Culvert Failure and Slipout (54' L) - Recommend Temporary Creek Diversion System, SB Travelled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

Swanton Road PM 0.72 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Alba Road 1.58 This project will include: Preparation of design and environmental documents for 75" x 60" deep slipout and retaining wall Alba Road 1.58 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 In Progress Road

Maintenance & Rehabilitation

Branciforte Drive PM 1.77 This project will include: Preparation of design and environmental documents for 50' L x 60' W x 10' D slipout, repair with engineered fill, A.C. dike and oversize drain Branciforte Drive PM 1.77 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Hazel Dell Road PM 2.0 This project will include: Preparation of design and environmental documents for large Slipout/ landslide 85' long x 10' deep, slip potential - stitch pile Hazel Dell Road PM 2.0 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2023 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Hazel Dell Road PM 2.08 This project will include: Preparation of design and environmental documents for repairs to slipout,failure of previous damage site. Hazel Dell Road PM 2.08 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2023 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Hazel Dell Road PM 2.13 This project will include: Preparation of design and environmental documents for slipout repair - 30' wideby 10' deep Hazel Dell Road PM 2.13 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2023 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Hazel Dell Road PM 2.16 This project will include: Preparation of design and environmental documents for repairs to settling roadway 85' long, possible cross culvert damage. Hazel Dell Road PM 2.16 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2023 50-75 29 17

Page 69: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Hazel Dell Road PM 2.21 This project will include: Preparation of design and environmental documents for repairs to failing crib wall - 50' long 12' tall Hazel Dell Road PM 2.21 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2023 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Hazel Dell Road PM 2.37 This project will include: Preparation of design and environmental documents for repairs to slipout embankment settlement Hazel Dell Road PM 2.37 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Hazel Dell Road PM 2.58 This project will include: Preparation of design and environmental documents for repair of failed crib wall Hazel Dell Road PM 2.58 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Jamison Creek Road PM 0.70 This project will include: Preparation of design and environmental documents for road embankment slipout, soldier pile wall repair. Jamison Creek Road PM 0.70 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Jamison Creek Road PM 0.80 This project will include: Preparation of design and environmental documents for repairs to slipout -80'L x8'D - and install soldier pile wall Jamison Creek Road PM 0.80 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Jamison Creek Road PM 1.09 This project will include: Preparation of design and environmental documents for repair to slipout -49'L x8'D - and install soldier pile wall Jamison Creek Road PM 1.09 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Jamison Creek Road PM 1.44 This project will include: Preparation of design and environmental documents for 50'L slipout and install stitch pile wall Jamison Creek Road PM 1.44 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Mt. Charlie Road PM 0.26 This project will include: Preparation of design and environmental documents for slipout shoulder embankment repair Mt. Charlie Road PM 0.26 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Mt. Charlie Road PM 2.47 This project will include: Preparation of design and environmental documents for repairs to 50' wide slipout, install 50' x 20' pile wall, and install oversize drain, underdrain and downdrain Mt. Charlie Road PM 2.47 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Rider Road PM 0.07 This project will include: This project will include: Preparation of design and environmental documents for repairs to a 35' L slipout, Installing Retaining Wall (TBD), Pavement and Shoulder Reconstruction

Rider Road PM 0.07 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Rider Road PM 0.80 This project will include: This project will include: Preparation of design and environmental documents for repair to 80' L slipout, Installing Soldier Pile Wall, Pavement and Shoulder Reconstruction

Rider Road PM 0.80 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Schulties Road PM 2.05 This project will include: Preparation of design and environmental documents for slipout repair Schulties Road PM 2.05 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Stetson Road PM 1.08 This project will include: Preparation of design and environmental documents for repair to slipout -55'L x 18'D and install soldier pile wall Stetson Road PM 1.08 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Swanton Road PM 3.00 This project will include: Preparation of design and environmental documents for repair to 60' L slipout, install pier/lagging wall, pavement repair, AC dike, drainage system, guard rail. Swanton Road PM 3.00 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Traffic Control Devices Holohan/Hwy 152 Signal Upgrade This project will include: Preparation of design and environmental documents for Traffic Signal,

Sidewalk & Drainage Improvements, Striping installation Holohan/Hwy 152 Signal Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 30 17

Page 70: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

Alba Road PM 0.73 This project will include: Preparation of design and environmental documents for repairs to retaining wall and repairs due to roadway settlement with large cracks. Alba Road (PM 0.73) Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Vine Hill Rd This project will include: Slipout 30' L) - Recommend Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Vine Hill Rd PM 1.18 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Ice Cream Grade Rd This project will include: Slipout (37' L) Due to Downed Tree - Recommend WB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Geogrid Reinforced MSE) Installation

Ice Cream Grade Rd PM 1.55 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other North Rodeo Gulch Rd This project will include: Slipout (50'+/- W x 66' L) - Recommend NB (Outboard) Traveled Way and Shoulder Reconstruction, 18" Culvert Replacement and Retaining Wall (Soldier Pile) Installation North Rodeo Gulch Rd PM 0.92 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Smith Grade Rd This project will include: Road slump. Slurry and earth backfill repair Smith Grade Rd PM 1.38 Pre-Construction and Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Felton Empire Rd This project will include: Roadway/Embankment Settling (36' L) Near Existing Crib Wall -Recommend WB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation

Felton Empire Rd PM 1.62 Pre-Construction and Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd This project will include: Culvert Failure and Slipout (12' L) - Recommend SB (Outboard) Shoulder Reconstruction, Drainage Improvements including 36" Culvert Replacement and Retaining Wall (Soldier Pile) Installation

Eureka Canyon Rd PM 3.16 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd This project will include: Major Slipout (20+/-' W x 70' L) with Potential Deep Seated Landslide -Recommend NB Traveled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

Eureka Canyon Rd PM 3.36 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Highland Way This project will include: Culvert Failure/Slipout (15' L) - Recommend SB Shoulder Reconstruction, Drainage Improvements including 36" Culvert, and Retaining Wall (Soldier Pile) Installation Highland Way @ Spanish Ranch Rd Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Glenwood Dr This project will include: Culvert failure and road damage, replace culvert and place headwall Glenwood Dr PM 4.27 Pre-Construction and Construction

02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Glenwood Cutoff This project will include: Slipout (4' W x 35' L) - Recommend WB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation Glenwood Cutoff PM 0.02 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Laurel Rd This project will include: Slipout (15'+/- W x 50' L) - Recommend NB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Laurel Rd PM 1.97 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other North Rodeo Gulch Rd This project will include: Slipout (30'+/- W x 40' L) -Recommend SB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation North Rodeo Gulch Rd PM 4.31 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other North Rodeo Gulch Rd This project will include: Slipout (48' L) - Recommend SB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation North Rodeo Gulch Rd PM 4.94 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Redwood Lodge Rd This project will include: Slipout Along Existing Stitch Pile Wall (65' L) - Recommend Replace Damaged Guardrail and Backfill Eroded Slope Redwood Lodge Rd PM 1.65 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Page 71: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Santa Cruz 19/20 Carried Over Other Smith Grade Rd This project will include: 3' diameter sinkhole Smith Grade Rd PM 1.90 Pre-Construction and Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Smith Grade Rd This project will include: slipout/settlement pavement separation Smith Grade Rd PM 0.43 Pre-Construction and Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Smith Grade Rd This project will include: Slipout (25' W x 12' L) - Recommend EB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Smith Grade Rd PM 4.06 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Browns Valley Rd This project will include: Slipout (10' L) - Recommend NB Shoulder Reconstruction, RSP and Drainage Improvements Browns Valley Rd PM 2.93 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other East Zayante Rd This project will include: Culvert Failure and Slipout - Installation of 18" Culvert w/ Concrete Headwall and NB Shoulder and Embankment Reconstruction East Zayante Rd PM 0.59 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Granite Creek Rd This project will include: Slipout (3'+/- W x 10' L) - Recommend SB Traveled Way and Shoulder Reconstruction and Placement of RSP Granite Creek Rd PM 2.10 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other McGregor Dr This project will include: Slipout (15' L) - Recommend SB Shoulder Reconstruction and Drainage Improvements McGregor Dr PM 1.35 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Bear Creek Rd This project will include: Slipout (40' L) - Recommend SB/WB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Bear Creek Rd PM 7.26 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd This project will include: Slipout (25' L) - Recommend SB Shoulder Reconstruction, Drainage Improvements, RSP and Retaining Wall (Soldier Pile) Installation Eureka Canyon Rd PM 5.05 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Ice Cream Grade Rd This project will include: Road/Embankment Settling (12' W x 100' L) - Recommend EB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

Ice Cream Grade Rd PM 1.60 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Valencia Rd This project will include: Slipout (90' L) - Recommend Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Valencia Rd PM 2.43 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd This project will include: Slipout (25' L) - Recommend NB Shoulder Reconstruction, RSP and Retaining Wall (Soldier Pile) Installation Eureka Canyon Rd PM 5.31 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Highland Way This project will include: Large Slipout (200' L) - Recommend Roadway Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Highland Way PM 3.19 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Laurel Glen Rd This project will include: Slipout (25' L) - Recommend NB/WB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Laurel Glen Rd PM 1.97 Pre-Construction and

Construction 02/2017 05/2023

05/2023 12/2023 50-75 29 17

Santa Cruz 19/20 Carried Over Other Redwood Lodge Rd This project will include: Slipout (50' L) - Recommend EB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Redwood Lodge Rd PM 1.50 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Page 72: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Santa Cruz 19/20 Carried Over Other San Andreas Rd This project will include: Slipout (20' W x 40' L) - Recommend SB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation San Andreas Rd PM 1.24 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other San Andreas Rd This project will include: Slipout (20' W x 10' L) Over Existing Culvert - SB Shoulder Reconstruction and Drainage Improvements San Andreas Rd PM 1.30 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Soquel San Jose Rd This project will include: 2 slipouts, 20x50x10 & 50x150x10 Soquel San Jose Rd PM 3.97 Pre-Construction and Construction

02/2017 11/2020

11/2020 10/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Soquel San Jose Rd This project will include: Slipout (39' L) - Recommend Roadway Reconstruction, Drainage Improvements, RSP and Retaining Wall (Soldier Pile) Installation Soquel San Jose Rd PM 5.67 Pre-Construction and

Construction 02/2017 11/2020

11/2020 10/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Vine Hill Rd This project will include: Slipout (20' W x 50' L) - Recommend NB Shoulder Reconstruction, Drainage Improvements including 24" Culvert and Retaining Wall (Soldier Pile) Installation Vine Hill Rd PM 1.27 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Casserly Rd This project will include: Slipout (20' W x 80' L) - Recommend EB/SB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Casserly Rd PM 2.93 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 30 17

Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd

This project will include: Roadway/Embankment Settling (20' L) Caused by Fallen Trees and Near Existing Retaining Wall (Crib) - Recommend NB and SB Traveled Way and Shoulder Reconstruction, Drainage Improvements including RSP and Retaining Wall (Soldier Pile) Installation

Eureka Canyon Rd PM 4.67 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd This project will include: Slipout (50' L) - Recommend SB Shoulder Reconstruction, Drainage Improvements, RSP and Retaining Wall (Soldier Pile) Installation Eureka Canyon Rd PM 8.39 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Felton Empire Rd This project will include: Slipout (70' L) Near Existing Retaining Wall (Crib) - Recommend WB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Felton Empire Rd PM 2.62 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Glenwood Dr This project will include: Retaining Wall Failure Caused by Erosion Under Footing, Adjacent to Existing Retaining Walls (Crib) - Recommend Backfill Eroded Footing, Install Drainage Improvements and Retaining Wall (Crib)

Glenwood Dr PM 2.60 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Highland Way This project will include: Slipout (70' L) - Recommend SB Traveled Way and Shoulder Reconstruction, 18" Culvert and Retaining Wall (Soldier Pile) Installation Highland Way PM 5.45 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Ice Cream Grade Rd This project will include: Road/Embankment Settling (65' L) - Recommend EB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Ice Cream Grade Rd PM 1.36 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Valencia Rd This project will include: Slipout (12' W x 60' L) - Recommend WB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Valencia Rd PM 0.34 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Highland Way This project will include: Landslide Caused Damage to Existing Downdrain and Retaining Wall -Recommend Removal of Debris, Installation of Inlet Debris Protection Wall and New Overside Drain

Highland Way PM 3.24 Pre-Construction and Construction

02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Browns Valley Rd This project will include: Existing Retaining Wall Damaged - Recommend WB/SB Traveled Way and Shoulder Reconstruction, Drainage Improvements and 18" Culvert and Repair of Existing Retaining Wall (Crib)

Browns Valley Rd PM 2.14 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Page 73: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Santa Cruz 19/20 Carried Over Other Casserly Rd This project will include: Slipout (20' W x 20' L) - Recommend EB/SB Shoulder Reconstruction and Drainage Improvements Casserly Rd PM 3.39 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 30 17

Santa Cruz 19/20 Carried Over Other Highland Way This project will include: Slipout (10+/-' W x 25' L) - Recommend SB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Highland Way PM 3.91 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Highland Way This project will include: Slipout (8' W x 36' L) - Recommend SB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Highland Way PM 3.74 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Mt. Madonna Rd This project will include: Culvert Repair and Sinkhole - NB/EB Traveled Way and Shoulder Reconstruction @ Sinkhole Mt. Madonna Rd PM 0.96 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Felton Empire Rd This project will include: Roadway/Embankment Settling (60' L) - Recommend NB/EB Traveled Lane and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

Felton Empire Rd PM 1.40 Pre-Construction and Construction

02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Lompico Rd This project will include: Slipout (45' L) - Recommend NB Shoulder Reconstruction, Drainage Improvements, RSP and Retaining Wall (Crib) Installation Lompico Rd PM 1.22 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Redwood Lodge Rd This project will include: Culvert Failure - Recommend embankment reconstruction, excavation and backfill, concrete headwall, 120'' culvert, erosion control and revegetation. Redwood Lodge Rd PM 1.80 Pre-Construction and

Construction 02/2017 05/2023

05/2023 12/2023 50-75 29 17

Santa Cruz 19/20 Carried Over Other North Rodeo Gulch Rd This project will include: Slipout (6' W x 50' L) - Recommend SB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation North Rodeo Gulch Rd PM 3.82 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Hubbard Gulch Rd This project will include: Slipout (50' W x 40' L) - Recommend EB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Hubbard Gulch Rd PM 0.80 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Jarvis Rd This project will include: Slipout (6' W x 20+/-') - Recommend NB (Outboard) Traveled Way and Shoulder Reconstruction, Earth backfill and Downdrain Jarvis Rd PM 0.64 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Jarvis Rd This project will include: Culvert Failure & Roadway/Embankment Settling - Recommend Roadway Reconstruction and Drainage Improvements including 18" Culvert and Headwalls Recommend SB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation,

Jarvis Rd PM 0.68 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Little Basin Rd This project will include: Slipout (35' L) - Recommend EB (Outboard) Roadway Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Little Basin Rd PM 0.64 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Lower Highland Way This project will include: Slipout (18' W x 65'L) - Recommend Traveled Way and Shoulder Reconstruction, RSP, and Retaining Wall (Soldier Pile) Installation Lower Highland Way PM 0.34 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Trout Gulch Rd This project will include: Slipout (15+/-' W x 20' L) - Recommend NB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation Trout Gulch Rd PM 3.05 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other West Park Av This project will include: Slipout (15' L) - Recommend SB Roadway Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation West Park Av PM 0.80 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Page 74: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Santa Cruz 19/20 Carried Over Other Nelson Rd This project will include: Road washout due to clogged culvert/flooding. Place new culvert, place headwalls, and reconstruct roadway Nelson Rd PM 0.44 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Bean Creek Rd This project will include: Slipout (25+/-' L) - Recommend SB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Bean Creek Rd PM 2.10 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Cox Rd This project will include: Slipout (60'W x 100' L) - Recommend WB Traveled Way and Shoulder Reconstruction, Drainage Improvements, RSP and Retaining Wall (Soldier Pile) Cox Rd PM 2.03 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Cox Rd This project will include: Slipout (40' L) - Recommend WB Shoulder Reconstruction, Drainage Improvements (New Storm Drain Through Wall) and Retaining Wall (Soldier Pile) Installation Cox Rd PM 1.93 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Jarvis Rd

This project will include: PM 1.02 - Slipout (20+/-' W x 60' L) - Recommend SB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation, PM 1.04 - Slipout (6' W x 40' L) - Recommend SB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation

Jarvis Rd PM 1.02, 1.04, 1.07 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Jarvis Rd This project will include: Culvert Failure & Roadway/Embankment Settling - Recommend Roadway Reconstruction and Drainage Improvements including 18" Culvert and Headwalls Jarvis Rd PM 1.66 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Kings Creek Rd This project will include: Slipout (40' L) and Landslide - Recommend Roadway Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Kings Creek Rd PM 3.03 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Kings Creek Rd This project will include: Slipout and Roadway/Embankment Settling - Recommend Roadway Reconstruction, Drainage Improvements, and Retaining Wall (Stitch Pile) Installation Kings Creek Rd PM 3.16 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Gaffey Rd This project will include: Slipout (20' L) - Recommend EB (Outboard) Embankment Reconstruction, RSP and Drainage Improvements Gaffey Rd PM 0.03, 0.04, 0.08 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 30 17

Santa Cruz 19/20 Carried Over Other Kings Creek Rd This project will include: Slipout and Damaged Downdrain - Recommend Installation of Gabion Baskets or RSP, Backfill and Reinstall Culvert Kings Creek Rd PM 1.65 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Redwood Rd

This project will include: PM 0.29 Roadway/Embankment Settling (120' L) Near Existing Retaining Wall - Recommend NB (Outboard) Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation, PM 0.31 Slipout (40' L) - Recommend NB (Outboard) Traveled Way and Shoulder Reconstruction, 18" Culvert, RSP and Retaining Wall (Soldier Pile) Installation, PM 0.33 Culvert Failure & Slipout (30' L) - NB (Outboard) Shoulder Reconstruction, Drainage Improvements including 18" Culvert

Redwood Rd PM 0.29, 0.31, 0.33 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Redwood Rd

This project will include: PM 0.38 Slipout (50' L) - Recommend NB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation, PM 0.40 ULTRABLOCK Retaining Wall Failure - Recommend NB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile)

Redwood Rd PM 0.38, 0.40 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Trout Gulch Rd This project will include: Slipout (20' W x 20' L) Due to Fallen Tree - Recommend SB Traveled Way and Shoulder Reconstruction and Drainage Improvements Trout Gulch Rd PM 2.36 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Valencia School Rd This project will include: Slipout (10+/-' W x 60' L) - Recommend WB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Valencia School Rd PM 0.35 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Mountain Charlie Rd This project will include: Slipout and Damage to Existing Culvert - NB (Outboard) Shoulder Reconstruction, Removal of Existing Culvert, 18" Culvert Replacement Mountain Charlie Rd PM 0.54 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Page 75: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Santa Cruz 19/20 Carried Over Other Mountain Charlie Rd This project will include: Roadway Settling (10' W x 40'L) - Recommend New Roadway Structural Section and Drainage Improvements Mountain Charlie Rd PM 1.89 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Two Bar Rd This project will include: Slipout (40' W x 65' L) - Recommend NB/EB Traveled Lane and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Two Bar Rd PM 1.13 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Cathedral Dr This project will include: Slipout (10+/-' W x 60' L) and Roadway/Embankment Settling (60' L) -Recommend SB Traveled Way and Shoulder Reconstruction, , Drainage Improvements and Retaining Wall (Soldier Pile) Installation

Cathedral Dr PM 1.21 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Green Valley Rd This project will include: Large Sinkhole Caused by Culvert Failure - 72" Culvert and Headwalls and Roadway Reconstruction. Green Valley Rd PM 1.85 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Loma Prieta Av This project will include: Slipout (20'L) - Recommend SB Shoulder Reconstruction, Drainage Improvements, and Retaining Wall (Soldier Pile) Installation Loma Prieta Av PM 2.82 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Loma Prieta Way This project will include: Slipout (60' L) - Recommend EB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Loma Prieta Way PM 3.33 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Merk Rd This project will include: Slipout (15' W x 25' L) - Recommend NB (Outboard) Shoulder Reconstruction, RSP and Drainage Improvements Merk Rd PM 1.10 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Morrell Rd This project will include: Slipout and Culvert Failure- Recommend Roadway Reconstruction, 18" and 24" Culvert Replacement and Retaining Wall (Soldier Pile) Installation Morrell Rd PM 0.15 Pre-Construction and

Construction 02/2017 05/2023

05/2023 12/2023 50-75 29 17

Santa Cruz 19/20 Carried Over Other Mt. Bache Rd This project will include: Slipout (13' W x 40' L) - Recommend EB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Mt. Bache Rd PM 0.14 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Old Santa Cruz Hwy This project will include: Slipout (50'L) - Recommend NB/EB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Old Santa Cruz Hwy PM 1.01 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Old Santa Cruz Hwy This project will include: Slipout - Recommend NB/EB Traveled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation Old Santa Cruz Hwy PM 1.06 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Old Santa Cruz Hwy This project will include: Slipout (10' W x 50' L) - Recommend NB/EB Traveled Way, Drainage Improvements and Shoulder Reconstruction and Retaining Wall (Crib) Installation Old Santa Cruz Hwy PM 1.20 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Old Santa Cruz Hwy This project will include: Slipout (12' W x 90' L) - Recommend NB/EB (Outboard) Traveled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation Old Santa Cruz Hwy PM 1.36 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Paper Mill Rd This project will include: Slipout (20' W x 30' L) - Recommend NB Shoulder Reconstruction and Retaining Wall (Soldier Pile) 3559 Paper Mill Rd Pre-Construction and

Construction 02/2017 05/2023

05/2023 12/2023 50-75 29 17

Santa Cruz 19/20 Carried Over Other Porter Gulch Rd This project will include: Slipout (8' W x 35' L) - Recommend NB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Porter Gulch Rd PM 0.33 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Prescott Rd This project will include: Slipout - Recommend NB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation Prescott Rd PM 0.52 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Page 76: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Santa Cruz 19/20 Carried Over Other Redwood Rd This project will include: Slipout (50' L) - Recommend SB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Redwood Rd PM 0.15 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Schulties Rd This project will include: Large Slipout (17' W x 100' L) - Recommend Roadway Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Schulties Rd PM 0.51 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Siesta Rd This project will include: Slipout (20' L) - Recommend EB Embankment Reconstruction and Erosion Control Siesta Rd PM 0.04 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Alta Via Rd This project will include: Roadway Failure (12' W x 50' L)- Recommend Roadway Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Alta Via Rd PM 0.42 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Little Basin Rd This project will include: Slipout (80' L) - Recommend SB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Little Basin Rd PM 0.85 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Lockhart Gulch Rd This project will include: Slipout (55'L) - Recommend NB Shoulder Reconstruction, Drainage Improvements, and Retaining Wall (Crib) Installation Lockhart Gulch Rd PM 0.24 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Lorenzo Av This project will include: Slipout and Culver Failure - Temporary Creek Diversion, Removal of Existing Culvert, Installation of a 48" Culvert w/ Concrete Headwalls, and NB (Outboard) Embankment Reconstruction

12415 Lorenzo Av Pre-Construction and Construction

02/2017 05/2021

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Morrell Rd This project will include: Slipout (15' W x 25' L) - Recommend Roadway Reconstruction, Drainage Improvements and Installation of Geogrid Reinforced Earth Retaining Structure Morrell Rd PM 0.50 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Mountain Charlie Rd This project will include: Roadway Settling (10' W x 45'L) - Recommend New Roadway Structural Section and Drainage Improvements Mountain Charlie Rd PM 1.35 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Seacliff Dr This project will include: Downdrain repair Seacliff Dr PM 0.56 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Spanish Ranch Rd This project will include: Slipout (30' L) Located Adjacent to Existing Crib wall Installed 2002 -Recommend NB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

Spanish Ranch Rd PM 0.20 Pre-Construction and Construction

02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Spanish Ranch Rd This project will include: Slipout (70' L) - Recommend Roadway Reconstruction, 18" Culvert and Retaining Wall (Soldier Pile) Installation Spanish Ranch Rd PM 0.37 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Trout Gulch Rd This project will include: Slipout (20' W x 40' L) - Recommend NB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Trout Gulch Rd PM 1.16 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Trout Gulch Rd This project will include: Culvert Failure and Slipout (18' W x 25' L) - Recommend NB Traveled Way and Shoulder Reconstruction and 18" Culvert and Retaining Wall (Soldier Pile) Installation Trout Gulch Rd PM 1.18 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Trout Gulch Rd This project will include: Slipout (20+/-' W x 50' L) - Recommend SB Traveled Way and Shoulder Reconstruction, RSP. and Retaining Wall (Soldier Pile) Installation Trout Gulch Rd PM 1.85 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Page 77: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Santa Cruz 19/20 Carried Over Other Old Bear Creek Rd This project will include: Slipout (20' W x 36' L) - Recommend WB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Old Bear Creek Rd PM 0.01 Pre-Construction and

Construction 02/2017 05/2020

05/2020 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Bear Creek Rd This project will include: Slipout (40' W x 20+/-' L) - Recommend NB/EB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Bear Creek Rd PM 2.12 Pre-Construction and

Construction 02/2017 05/2021

05/2022 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Granite Creek Rd This project will include: Slipout (50' L) - Recommend NB Shoulder Reconstruction, RSP and Overside Drain Replacement Granite Creek Rd PM 0.47 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Nelson Rd This project will include: 3 Slipouts (Varying 30 to 50' L) - Recommend NB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Nelson Rd PM 0.43 Pre-Construction and

Construction 02/2017 05/2023

05/2023 12/2023 50-75 29 17

Santa Cruz 19/20 Carried Over Other Miller Cutoff Rd This project will include: Slipout (15' W x 85'L) Adjacent to Existing Crib Wall (Installed 2016) -Recommend NB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

Miller Cutoff Rd PM 0.49 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Paulsen Rd This project will include: Culvert Failure (3' W x 50' L) - Shoulder Reconstruction, Existing Culvert Removal, 36" Culvert Replacement w/ Concrete Headwalls and Energy Dissipator Paulsen Rd PM 0.43 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Redwood Rd This project will include: Slipout (18' W x 35' L) - Recommend NB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation Redwood Rd PM 0.23 Pre-Construction and

Construction 02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Smith Grade Rd This project will include: Road/Embankment Settling (30+/-' L) and Culvert Failure- WB Traveled Way and Shoulder Reconstruction and Drainage Improvements including 24" Culvert Smith Grade Rd PM 2.83 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Santa Cruz 19/20 Carried Over Other Soquel Dr This project will include: Install traffic signal, thermoplastic striping and curb ramps Soquel Dr @ Robertson St. Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Other Trout Gulch Rd This project will include: Large Slipout (40+/-' L) Near Existing Cross Culvert - Recommend SB Traveled Way and Shoulder Reconstruction, 18" Culvert, RSP, and Retaining Wall (Soldier Pile) Installation

Trout Gulch Rd PM 1.90 Pre-Construction and Construction

02/2017 05/2022

05/2022 12/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

COUNTYWIDE ROADSIDE DRAINAGE MAINT This project will include: Countywide Roadside Drainage Maintenance Project Various locations in the northern and southern portions of Santa Cruz County. Construction 05/2020 07/2022 5-5 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

COUNTYWIDE CULVERT MAINTENANCE This project will include: Countywide Culvert Maintenance Project Multiple worksites in the northern, central, and southern portions of Santa Cruz

County. Construction 05/2020 07/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

COUNTYWIDE ROADBED MAINTENANCE This project will include: Countywide Roadbed Maintenance Project Multiple worksites in the northern, central, and southern portions of Santa Cruz

County. Construction 05/2020 07/2022 10-20 29 17

Santa Cruz 19/20 In Progress Road

Maintenance & Rehabilitation

COUNTYWIDE STRIPING MAINTENANCE This project will include: Countywide Striping Maintenance Project Multiple worksites in the northern, central, and southern portions of Santa Cruz

County. Construction 05/2020 07/2022 5-5 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

COUNTYWIDE SIGNAGE MAINTENANCE This project will include: Countywide Signage Maintenance Project Multiple worksites in the northern, central, and southern portions of Santa Cruz

County. Construction 05/2020 07/2022 50-75 29 17

Page 78: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

COUNTYWIDE GUARDRAIL MAINENANCE

This project will include: Guard Rail maintenance at various locations throughout northern, central, and southern Santa Cruz County.

Multiple worksites in the northern, central, and southern portions of Santa Cruz County. Construction 05/2020 07/2022 50-75 29 17

Santa Cruz 19/20 Carried Over Road

Maintenance & Rehabilitation

COUNTYWIDE ROADSIDE VEG MAINENANCE This project will include: Vegetation Management Various locations in the northern and southern portions of Santa Cruz County. Construction 05/2020 07/2022 5-5 29 17

Santa Cruz 19/20 Carried Over Other Upper East Zayante Rd This project will include: Slipout (45' L) Near Existing Retaining Wall (Crib) and Landslide -Recommend SB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

Upper East Zayante Rd PM 1.68 Pre-Construction and Construction

02/2017 05/2023

05/2023 12/2023 50-75 29 17

Santa Cruz 19/20 Carried Over Other Glenwood Dr This project will include: Erosion Under Existing Retaining Wall (Soldier Pile) - Recommend Backfill of Eroded Slope, Drainage Improvements and Erosion Control Glenwood Dr PM 2.02 Pre-Construction and

Construction 02/2017 05/2021

05/2021 12/2021 50-75 29 17

Shasta 20/21 In Progress Road

Maintenance & Rehabilitation

2021 SB-1 PAVEMENT REHABILITATION

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents | New asphalt concrete overlay of roadway, restripe, and replace pavement markers.

BIG BEND RD from Hatchet Creek Bridge to 1 mi n/o Hatchet Creek Bridge; CHINA GULCH DR from Oak St to Bohn Blvd; OAK RUN RD from 3.2 miles e/o Old 44 Dr to 4.2 miles e/o Old 44 Dr; OLD OREGON TRL from Redding C/L to 200' s/o Grande Vista Ln; OASIS RD from Baier Rd to Oak Leaf Ln

Pre-Construction and Construction

12/2020 06/2021

06/2021 10/2021 10-10 1 1

Shasta 21/22 New Road

Maintenance & Rehabilitation

2022 SB-1 PAVEMENT REHABILITATION

This project will include: Document Preparation, Cost Estimating, Environmental Study/Documents | TBD - Digouts, new asphalt concrete overlay of roadway or surface seals, restriping, and replacing pavement markers.

TBD - Various county maintained residential, collector, and/or arterial roads. Pre-Construction 12/2021 10/2022 10-10 1 1

Shasta 21/22 New Other COTTONWOOD ACTIVE

TRANSPORTATION TRUNK LINE EXPRESS (CATTLE) NETWORK

This project will include: Project Scope Development, Right of Way, Active Transportation Plan, Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents | Active Transportation Project and safety improvements for pedestrians and bicyclists by creating a low-stress network connecting key attractions and community resources. Adds new non-motorized user paths and alters existing roadways to improve safety.

Unicorporated Cottonwood. MAIN ST; GAS POINT RD; 1ST ST; 4TH ST; LOCUST ST; BRUSH ST; I-5 ON/OFF RAMPS at Gas Point Rd. Pre-Construction 07/2021 10/2027 20-20 1 1

Shasta 19/20 In Progress Traffic Control Devices

DESCHUTES ROAD AT CEDRO LANE

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | Install intersection controls DESCHUTES ROAD at CEDRO LANE Construction 02/2019 10/2022 50-50 1 1

Shasta 19/20 In Progress Safety DESCHUTES ROAD WIDENING PHASE 2 HSIPL-5906(122)

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety) | Highway Safety Improvement Project (HSIP) to widen roadway shoulders. DESCHUTES RD from Beatie Rd to Brundage Rd Construction 05/2021 10/2021 10-10 1 1

Shasta 19/20 In Progress Road

Maintenance & Rehabilitation

GAS POINT ROAD AT NO NAME DITCH BOX CULVERT

REPLACEMENT BRLS-5906(119)

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Bridge Structure Rehab/Repair (Existing), Right of Way Acquisition | Replace box culvert and widen road.

GAS POINT ROAD between Anthony St and Charles St Construction 07/2021 10/2021 50-50 1 1

Shasta 19/20 In Progress Safety RIVERLAND DRIVE WIDENING PROJECT HSIPL-5906(128)

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Storm Drain and/or Culvert Rehab/Repair (Existing) | Highway Safety Improvement Project (HSIP) to widen roadway shoulders. Widen Shoulders to improve safety for motorized and non-motorized users.

RIVERLAND DRIVE from Knighton Rd to 2 miles south of Knighton Rd Construction 01/2016 10/2022 10-10 1 1

Sierra 21/22 New Road

Maintenance & Rehabilitation

2021-2022 Sierra Countywide Road Maintenance Program

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Landscape Safety Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Countywide Construction 07/2021 06/2022 2-5 1 1

Sierra 21/22 New Other 2021-2022 Road Equipment Purchases This project will include: Procurement of Public Works Equipment Countywide Procurement/Operatio

nal Needs 07/2021 06/2022 6-15 1 1

Page 79: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Siskiyou 21/22 New Road

Maintenance & Rehabilitation

Roadway Striping and Pavement Markings

This project will include: This routine maintenance item includes restriping Centerline, edge line and reapplying painted and thermoplastic legends stop bars and crosswalks Countywide. County wide roads that currently have existing paint or thermoplastic markings. Pre-Construction 07/2021 06/2022 1-2 1 1

Siskiyou 21/22 New Road

Maintenance & Rehabilitation

Road Sign upgrade and Maintenance

This project will include: This project includes upgrading of Regulatory signs to meet the Retroreflecivity requirement. Project will also include maintenance of road side delineation and post repair.

Location will be determined by priority based on routine Retroreflecivity Study. Locations subject to change based upon needs and available resources throughout the year.

Pre-Construction 07/2021 06/2022 5-7 1 1

Siskiyou 21/22 New Road

Maintenance & Rehabilitation

Roadside Tree Trimming and Vegetation Management

This project will include: This project consists of hazard tree removal, tree trimming, mowing and road side grass and weed control.

Various location throughout Siskiyou County based on need. Planed areas include but not limited to Shasta Acres, Shasta Uplands and the Happy Camp Area. Construction 07/2021 06/2022 1-2 1 1

Siskiyou 21/22 New Road

Maintenance & Rehabilitation

Gravel Road Maintenance This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | This routine maintenance item includes gravel grading and surface application of crushed rock.

Various location Countywide. Roads include but are not limited to: Louie Road, Old State Hwy, Sheepy Creek Road, Doris Brownell Road, Willow Creek Red Rock Road, Big Springs Road, York Road, Willow Creek Road, Crushed rock application will be prioritized by need.

Construction 07/2021 06/2022 1-5 1 1

Siskiyou 21/22 New Road

Maintenance & Rehabilitation

Aggregate Production This project will include: Procurement of Road Maintenance and Rehab Materials | This project will consist of production of aggregate materials at the County's Yellow Butte and aggregate purchases for Districts 4,5 and 6.

Yellow Butte cinder production and other aggregate purchases Procurement/Operatio nal Needs 07/2021 06/2022 1-3 1 1

Siskiyou 21/22 New Road

Maintenance & Rehabilitation

Roadside Shoulder Maintenance This project will include: This project will include: Pavement Rehab/Repair (Existing) This will be a County Wide project. Shoulder improvements will be prioritized by current condition. Pre-Construction 07/2021 06/2022 1-2 1 1

Siskiyou 21/22 New Road

Maintenance & Rehabilitation

Culvert and Ditch Maintenace This project will include: This project will consist of debris removal from drainages, ditches and culverts, reestablishing ditch lines. In an effort to maintain flow lines and reduce the potential for flooding and sediment disbursement into waterways.

Various locations throughout the Siskiyou County road system. Pre-Construction 07/2021 06/2022 1-3 1 1

Siskiyou 21/22 New Road

Maintenance & Rehabilitation

Pavement Patching and Repair This project will include: This project will include: Pavement Rehab/Repair (Existing) This is a Countywide project. Priority will be dictated by need and roadway safety. Pre-Construction 07/2021 06/2022 1-5 1 1

Siskiyou 21/22 New Road

Maintenance & Rehabilitation

District 1 Chip Seal This project will include: Pavement Rehab/Repair (Existing) Lichens Rd MP 0 to 2.7, Desevado Rd MP 0 to 1.5, Willow Creek MP 0 to 4.2 Construction 07/2021 09/2022 5-7 1 1

Siskiyou 21/22 New Road

Maintenance & Rehabilitation

District 2 Chip Seal This project will include: Pavement Rehab/Repair (Existing) Ski Village Dr MP 0 TO .66, Shasta Alpine MP 0 to.07, Black Butte MP 0 to .1, Butte MP 0 to .5, Morris St MP 0 to .06, Cold Creek Circle MP 0 TO.6, McCloud Ave MP 0 to .22

Construction 07/2021 09/2022 5-7 1 1

Siskiyou 21/22 New Road

Maintenance & Rehabilitation

District 3 Chip Seal This project will include: Pavement Rehab/Repair (Existing) Oberlin Rd MP 0 to 4.94 , Fairlane Rd N MP 0-1, Westside Rd MP 0 to .27, Fairlane Rd S MP 0 to .25 , Walters Lane MP 0 to .27

Construction 07/2021 09/2022 5-7 1 1

Siskiyou 21/22 New Road

Maintenance & Rehabilitation

District 4 Chip Seal This project will include: Pavement Rehab/Repair (Existing) Scarface Road MP 0 to 2.7and S. Hamlin Rd MP 0 to .6 Construction 07/2021 09/2022 5-7 1 1

Siskiyou 21/22 New Road

Maintenance & Rehabilitation

District 5 Chip Seal This project will include: Pavement Rehab/Repair (Existing) Island Rd MP 0 to 4.6 and Lovers Lane MP 0 to 2.7 Construction 07/2021 09/2022 5-7 1 1

Siskiyou 21/22 New Road

Maintenance & Rehabilitation

District 6 Chip Seal This project will include: Pavement Rehab/Repair (Existing) Shady Dell MP 0 to 6.36 and Dorris Technor Rd MP 2.65 to 3.65 Construction 07/2021 09/2022 5-7 1 1

Page 80: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Solano 21/22 New Complete Streets Components Benicia Road This project will include: Right of Way, Preliminary Design Benicia Road from Beach Street to Lemon Street @ I-80 overpass. Pre-Construction 07/2021 06/2022 20-30 14 3

Solano 21/22 New Road

Maintenance & Rehabilitation

McCormack Road Phase 2 This project will include: Right of Way, Preliminary Design McCormack Road from Canright Road to State Route 113. Pre-Construction 07/2021 06/2022 20-100 11 3

Solano 21/22 New Road

Maintenance & Rehabilitation

Putah Creek Road This project will include: Right of Way, Preliminary Design Putah Creek Road from 500 feet east of Winters Road Bridge to 9820 feet east of Boyce Road. Pre-Construction 07/2021 06/2022 50-100 4 3

Solano 21/22 New Road

Maintenance & Rehabilitation

Chip Seal 21-22 This project will include: Pavement Rehab/Repair (Existing)

Location Details at: https://www.solanocounty.com/depts/rm/public_works/default.asp Capital Improvement Plan. Anderson Rd, Batavia Rd, Binghamton Rd, Canal Lane, Circle C Lane, Cordelia Rd, Currie Rd, Denverton Rd, Doyle Lane, Flannery Rd, Fox Rd, Goose Haven Rd, King Rd, Maine Prairie Rd, McCloskey Rd, Miller Rd, Montezuma Rd, Nelson Rd, Norten Rd, Ryer Rd East, Scally Rd, Shelton Ln, Sweeney Rd, Talbert Ln, Vaughn Rd, Midway Rd.

Construction 07/2021 12/2021 10-10 4, 11 3

Solano 21/22 New Safety On-Call Guardrail Repair 21-22 This project will include: Maintenance Program Plan Development | Guardrail Repair/Replacement Various Locations. Pre-Construction 07/2021 10/2021 10-20 4, 11, 14 3

Solano 21/22 New Road

Maintenance & Rehabilitation

Paving Project 21-22 This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Right of Way, Preliminary Design

Fox Road from One mile north of Hawkins Road to Weber Road, Goodyear Road from Benicia City Limit to Morrow Lane, Lambie Road from SR12 to Goose Haven Road and Midway Road from Timm Road to Vacaville City Limit.

Pre-Construction and Construction

07/2021 03/2022

12/2021 06/2022 15-20 4, 11, 14 3

Sonoma 20/21 Carried Over Road

Maintenance & Rehabilitation

Viaduct Replacement This project will include: Bridge Structure Rehab/Repair (Existing) | Viaduct Replacement Summerhome Park Road Construction 07/2021 06/2022 30-30 2 2

Sonoma 20/21 Carried Over Road

Maintenance & Rehabilitation

Culvert Repair and Replacement This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) Canyon Road Construction 07/2021 06/2022 15-20 2, 10 2, 3

Sonoma 21/22 New Road

Maintenance & Rehabilitation

Install Culverts This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing)

West Dry Creek RdPM 10.45, Rio Lindo Ave PM 12.28, Laurell Dell Ave PM 10.11, Walling Rd PM 10.78, Pine Mountain Rd PM 11.17, Pine Mountain Rd PM 11.19, Pine Mountain Rd PM 11.26, Templeman Rd PM 10.36, Thornsbury RdPM 10.13, Thornsbury Rd PM 10.15, Thornsbury RdPM 10.27, Taylor Ln PM 10.38, Taylor Ln PM 10.94, Taylor Ln PM 10.97, San Antonio Rd PM 13.66, Occidental Rd PM 13.44, Oak Ave PM 20.00, Lytton Station Rd PM 11.40, Frei Rd PM 11.35

Pre-Construction and Construction

07/2021 10/2021

09/2021 06/2022 20-40 2, 10 2, 3

Sonoma 21/22 New Road

Maintenance & Rehabilitation

Road Striping This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

Cazadero, Jenner, Bodega Bay, Forestville, Graton, Occidental, Geyserville, Asti, Cloverdale, Windsor, Healdsburg, Stewarts Point , Skaggs Springs, Freestone, Bodega, Penngrove, Liberty, Petaluma, Valley Ford, Bloomfield, Two Rock, Sonoma, Boyes Hot Springs, Kenwood, Glen Ellen, Eldridge

Construction 07/2021 06/2022 5-5 2, 10 2, 3

Sonoma 21/22 New Road

Maintenance & Rehabilitation

Stenciling Intersections This project will include: Paving and/or Striping Rehab/Repair (Existing Safety)

Cazadero, Jenner, Bodega Bay, Forestville Graton, Occidental, Geyserville, Asti, Cloverdale, Alexander Valley, Dry Creek, Freestone, Bodega, Penngrove, Petaluma, Valley Ford, Bloomfield, Two Rock, Sonoma, Boyes Hot Springs, Kenwood, Glen Ellen, Eldridge

Construction 07/2021 06/2022 5-5 2, 10 2, 3

Sonoma 21/22 New Safety Sign Reflectivity Upgrade This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Petaluma/Southern Sonoma County Construction 07/2021 06/2022 5-5 2, 10 2, 3

Sonoma 21/22 New Road

Maintenance & Rehabilitation

Grind & Patch Pave This project will include: Pavement Rehab/Repair (Existing) Old Redwood Highway, River Road, Wagon Road Construction 07/2021 06/2022 5-10 2, 10 2, 3

Page 81: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Sonoma 21/22 New Road

Maintenance & Rehabilitation

Road Reconstruction This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Lawndale Road (PM 11.72-13.43), West Railroad Ave (PM 10-11.47), Jean Marie Drive (PM 10-10.48), Pacific Heights Drive (PM 10-10.71), Gold Ridge Road (PM 10-11.44), Main Street (PM 18.73-20.05)

Pre-Construction and Construction

07/2021 09/2021

08/2021 06/2022 15-20 2, 10 2, 3

Sonoma 21/22 New Other Equipment Purchases This project will include: Procurement of Public Works Equipment (2) Pickup Trucks, (6) 10 Yard Dump Trucks, (7) 5 Yard Dump Trucks, (1) Mower, (1) Loader, (7) Sanders for Bobtails, (1) Lowbed Trailer

Procurement/Operatio nal Needs 07/2021 06/2022 10-20 2, 10 2, 3

Stanislaus 19/20 In Progress Road

Maintenance & Rehabilitation

Del Puerto Canyon Road Phase I This project will include: Diablo Grande Parkway to County Line 22 miles, resurfacing Del Puerto Canyon Road Pre-Construction and Construction

07/2021 04/2022

03/2022 06/2023 5-7 21 12

Stanislaus 19/20 Forecasted Road

Maintenance & Rehabilitation

Tenaya Drive Pavement Rehabilitation

This project will include: Tenaya Drive Pavement Rehabilitation from City Limits to S Riverside Drive Tenaya Drive from City Limits to S Riverside Drive Pre-Construction 07/2021 06/2022 5-10 21 8

Stanislaus 19/20 In Progress Other Quincy Road Bridge This project will include: Replace Bridge over TID Lateral No. 3 Quincy Road @ E Taylor Road Pre-Construction 07/2018 06/2022 75-100 12 8

Stanislaus 19/20 Forecasted Other Quincy Road Bridge This project will include: Replace Bridge over TID Lateral No. 3 Quincy Road @ E Taylor Road Construction 07/2022 06/2023 75-100 12 8

Stanislaus 20/21 In Progress Match Funds Crows Landing Road Bridge Replacement

This project will include: Bridge Structure Rehab/Repair (Existing) | The Crows Landing Road Bridge Replacement, will be a 3-lane bridge replacement. The bridge was determined to be scour critical and functionally obsolete. SB1 will be used as a match to HBP and LSSRP State bond funding

Crows Landing Road over San Joaquin River Construction 07/2020 06/2024 75-100 21 12

Stanislaus 19/20 In Progress Road

Maintenance & Rehabilitation

Paradise Road Pavement Rehabilitation

This project will include: Paradise Road Pavement Rehabilitation in County Areas from Chicago to Carpenter Road | This project will be part of a City of Modesto project. Paradise Road in County Areas from Chicago to Carpenter Road Construction 07/2021 06/2023 15-15 21 12

Stanislaus 19/20 Carried Over Road

Maintenance & Rehabilitation

Garner Road Repavement This project will include: Pavement Rehab/Repair (Existing) | Garner Road Pavement Rehabilitation Garner Road at Yosemite Blvd (SR132) to Leckron Pre-Construction and Construction

07/2020 09/2021

08/2021 06/2022 15-15 21 8

Stanislaus 19/20 In Progress Road

Maintenance & Rehabilitation

Sisk Road Pavement Rehabilitation

This project will include: Sisk Road Pavement Rehabilitation from Green Leaf Court to Kiernan Avenue Sisk Road from Green Leaf Court to Kiernan Avenue Pre-Construction and

Construction 07/2019 07/2022

06/2022 06/2023 15-15 12 5

Stanislaus 19/20 In Progress Road

Maintenance & Rehabilitation

Gates Rd/Dakota Ave/Diablo Grande Blvd This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Gates Road, Dakota Ave and Diablo Grande Blvd Construction 07/2020 06/2022 7-10 21 12

Stanislaus 20/21 In Progress Match Funds Hickman Road Bridge Replacement

This project will include: Bridge Structure Rehab/Repair (Existing) | Hickman Bridge was inspected by Caltrans in 2017 and has a sufficincy rating of 64.7 and is classified as structurally deficient it also has been deemed scour deficient. The County is using SB1 to as match funding to HBP and LSSRP - State 1B for replacement of the bridge

HIckman Road over the Tuolumne River Construction 07/2020 06/2022 75-100 21 8

Stanislaus 20/21 In Progress Road

Maintenance & Rehabilitation

2021 Chip Seal This project will include: Pavement Rehab/Repair (Existing)

Harding Rd, Golf Rd, S Berkeley Ave, Paulson Rd, S Daubenberger, Youngstown, S Center, Linwood, S Johnson, S Quincy, S Roselawn, S Verduga, S Vincent, East Ave, Roeding, McGee, Don Pedro, Service, Redwood, Faith Home, Lockwood, Washington, Pioneer, Grayson, Mountain View, Tully, 7th, Griffin, Walnut, Tully, Barnhart, Tegner, Whitmore, Moore, Rohde, Esmar, Starlite. Total Mileage 126. See uploaded document for specific limits

Construction 05/2021 12/2021 5-7 5, 8 12

Page 82: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Stanislaus 21/22 New Match Funds Milton Road Bridge over Rock Creek Tributary

This project will include: The bridge was built in 1918 and consist of continuous reinforced concrete (RC) "T" beam on RC columns bents on spread footing. The bridge span is approximately 143 feet with an ADT of 706 vehicles per day. The bridge has been identified by Caltrans as deficient and will be replaced.

Milton Road Bridge across Rock Creek tributary is located north of State Route 4 and approximately 2 miles south of the Stanislaus County boundary Construction 07/2021 06/2023 75-100 12 8

Stanislaus 21/22 New Match Funds 7th Street Bridge over Tuolumne This project will include: The bridge was built in 1916, is approximately 1,170 feet in length and has a ADT of approximately 15,700 vehicles a day. The bridge will be replaced with a 4 lane bridge. 7th Street over Tuolumne river Pre-Construction 07/2021 06/2025 75-100 21 12

Stanislaus 21/22 New Match Funds Milton Road Bridge over Hood Creek

This project will include: The bridge was built in 1931 and consist of continuous reinforced concrete (RC) "T" beam on RC columns bents on spread footing. The bridge span is approximately 120 feet with an ADT of 1,778 vehicles per day. The bridge is considered scour critical and functional obsolete by Caltrans and will be replaced.

Milton Rd over Hood Creek tributary bridge is located 1.6 miles south of State Route 4 and 1.8 miles north of E Sonora Road Pre-Construction 07/2021 06/2023 75-100 12 8

Stanislaus 21/22 New Match Funds Oakdale-Waterford over Claribel Lateral Bridge Replacement

This project will include: The bridge was built in 1920 on two spans of reinforced concrete continuous slab and widened in 1963. The bridge has exceeded it's design life and will be replaced with a 2 lane bridge.

The bridge is located .5 miles north of Claribel Rd on the Oakdale-Waterford Highway Pre-Construction and Construction

07/2021 07/2024

06/2024 06/2025 75-100 12 8

Stanislaus 21/22 New Match Funds Montpelier Rd over TID Main Canal Bridge Replacement

This project will include: The bridge was built in 1920 on spread footings with monolithic wingwalls and abutments. The bridge has exceed design life and will be replaced. The bridge is located at Dallas Rd in the town of Hickman Pre-Construction and

Construction 07/2021 07/2024

06/2024 06/2025 75-100 12 8

Stanislaus 21/22 New Road

Maintenance & Rehabilitation

2022 Chip Seal This project will include: Project Scope Development Supervisor District 5 and 2. While the Supervisor Districts have been identified, specific roads have not be been determined and are still being evaluated by staff. The Supervisor District map has been uploaded as a PDF for general reference.

Pre-Construction 04/2022 06/2023 5-7 12, 21 5, 8, 12

Stanislaus 21/22 New Road

Maintenance & Rehabilitation

2022 Countywide Center and Edge-Line Striping This project will include: Project Scope Development Countywide in all Supervisor Districts as reported or identified through out the year.

Supervisor District map has been uploaded as PDF for reference. Pre-Construction 07/2021 06/2022 2-2 12, 21 5, 8, 12

Stanislaus 21/22 New Road Grade Separation North County Cooridor Phase I This project will include: Phase I includes grade separation structure crossing of the Burlington

Northern Santa Fe (BNSF) rail line. Grade separation is at Terminal Rd and Claribel Construction 07/2021 06/2026 100-100 12 5

Stanislaus 21/22 New Road

Maintenance & Rehabilitation

Curb Ramps - Paradise/Victoria This project will include: ADA Curb Ramp Installation (New) Paradise Rd at Victoria Pre-Construction and Construction

07/2021 10/2021

09/2021 06/2022 100-100 21 12

Sutter 20/21 Carried Over Road

Maintenance & Rehabilitation

FY2020-21 Road Overlay Project This project will include: Pavement Rehab/Repair (Existing) Sinard Road from Paseo Avenue to Pennington Road; Sheldon Road from Paseo Avenue to Pennington Road; Farmlan Road from SR99 to Decker Road Construction 02/2022 08/2023 10-20 3 4

Sutter 20/21 Carried Over Road

Maintenance & Rehabilitation

FY2020-21 Road Seals Project This project will include: Pavement Rehab/Repair (Existing)

Franklin Road from Township Road to Acacia Avenue; Elmer Avenue from CYC Limit to Eckhart Road; Eckhart Road from Elmer Avenue to Tierra Buena Road; East Onstott Frontage Road from CYC Limit to Eager Road; Villa Avenue from Butte House Road to North End; Romero Street from Butte House Road to North End; Long Street from Romero Street to East End; Valencia Street from Romero Street to East End; Capistrano Street from Romero Street to West End; Laredo Street from Romero Street to West End; Peralta

Construction 02/2022 08/2023 7-15 3 4

Sutter 21/22 New Other Sanders Road Bridge at Larkin Road Replacement

This project will include: Project Scope Development, Right of Way, Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents | Preconstruction will be completed prior to the anticipated Summer 2024 construction

On Sanders Road as it Intersects with Larkin Road and crosses Live Oak Canal Pre-Construction 07/2021 12/2022 50-80 3 4

Sutter 21/22 New Other Mark Hopkins Culvert Replacement

This project will include: Project Scope Development, Right of Way, Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents | Preconstruction will be completed prior to the anticipated Summer 2024 construction

On Mark Hopkins Road as it crosses Ping Slough, 0.41 miles south of Berry Road and 1.27 miles north of Cornelius Avenue in Sutter County Pre-Construction 07/2021 12/2022 50-80 3 4

Page 83: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Tehama 20/21 Carried Over Road

Maintenance & Rehabilitation

District A - Road Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Dist A- carryover roads from prior years. New roads include: Rawson, Paskenta, Benson, Bowman, and Evergreen. Construction 07/2021 06/2023 7-10 3 4

Tehama 20/21 Carried Over Road

Maintenance & Rehabilitation

District B - Road Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

District B roads rolled forward from prior FY. Shasta Blvd, South Ave., Forward Rd., Wildcat Rd. Construction 07/2021 06/2023 7-10 3 4

Tehama 20/21 Carried Over Road

Maintenance & Rehabilitation

District C - Road Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

District C roads rolled over from prior FY. Black Butte, Boggs Champlin, Capay, Corning, Glenn, Hall, Kirkwood, Long Hollow, Lowery, Paskenta, Round Valley, South, Toomes Camp

Construction 07/2021 06/2023 7-10 3 4

Tehama 20/21 Carried Over Road

Maintenance & Rehabilitation

Engineering Department - Bridge Repair

This project will include: Project Scope Development, Feasibility Study, Document Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents Woodson Bridge, South Avenue @Sacramento River Pre-Construction 07/2021 06/2023 30-30 3 4

Tehama 20/21 Carried Over Road

Maintenance & Rehabilitation

Shop Equipment This project will include: Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment | Equipment Purchase: Snow Blower, Grader, Rollers, Dump Bed, Backhoe, Skip Loader, Patch truck

In support of Countywide road rehabilitation. Procurement/Operatio nal Needs 07/2021 07/2023 15-20 3 4

Trinity 21/22 New Road

Maintenance & Rehabilitation

North County Chip Seal Project (Weaverville) This project will include: Pavement Rehab/Repair (Existing) East Fork Road, East Side Road, Tom Bell Road, Denny Road Construction 05/2022 10/2022 15-15 2 2

Trinity 21/22 New Road

Maintenance & Rehabilitation

Pavement Preparation Project (Weaverville) This project will include: Pavement Rehab/Repair (Existing) El Dorado Way, Judy Street, Norwegian Ranch Road Construction 07/2021 10/2021 10-10 2 2

Trinity 21/22 New Road

Maintenance & Rehabilitation

Mid County Chip Seal Project (Hayfork) This project will include: Pavement Rehab/Repair (Existing) Big Creek Road Construction 07/2021 10/2021 15-15 2 2

Trinity 21/22 New Road

Maintenance & Rehabilitation

South County Chip Seal Project (Ruth) This project will include: Pavement Rehab/Repair (Existing) Zenia Lake Mountain Road Construction 07/2022 09/2023 15-15 2 2

Trinity 21/22 New Road

Maintenance & Rehabilitation

County Wide Slurry Seal Program This project will include: Cost Estimating County wide Pre-Construction 08/2021 10/2021 7-7 2 2

Trinity 21/22 New Road

Maintenance & Rehabilitation

Pavement Preparation Project (Weaverville) This project will include: Procurement of Public Works Equipment County wide Procurement/Operatio

nal Needs 07/2021 06/2022 1-3 2 2

Trinity 21/22 New Safety Lance Gulch Traffic Signal This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Lance Gulch Road and State Route 299 Construction 07/2021 11/2021 30-30 2 2

Tulare 21/22 New Road

Maintenance & Rehabilitation

2022 RRAA Project 1 This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design

The proposed project locations are: Road 196 between Avenue 296 (SR 198) and D184B (Lort Drive); Road 156( Mariposa Avenue) between Avenue 256 (Oakdale Avenue) and Avenue 280 (W. Visalia Road); Road 180 between Avenue 280 and Avenue 296 (SR 198); Road 164 between Avenue 256 and Alignment of Avenue 276 (City of Farmerville City Limits); Road 140 between Avenue 232 (SR137) and Avenue 256 (Oakdale Avenue); Road 56 between Avenue 384 and Avenue 400 (SR 201)

Pre-Construction and Construction

07/2021 06/2022

05/2022 10/2022 10-15 26 18

Tulare 21/22 New Road

Maintenance & Rehabilitation

2022 RRAA Project 2 This project will include: Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design

The proposed project locations are: Road 96 (Pratt Street) between Avenue 160 and Alignment of Avenue 213 (City of Tulare City Limits); Avenue 128 (Teapot Dome Avenue) between SR 65 and Road 252 (Plano Street); Road 208 (Rockford Road) between Avenue 96 (Terra Bella Avenue) and Avenue 128.

Pre-Construction and Construction

07/2021 06/2022

05/2022 10/2022 10-15 26 16, 18

Page 84: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Tulare 21/22 New Road

Maintenance & Rehabilitation

2022 RRAA Project 3 This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

The proposed project locations are: Road 228 between Avenue 200 and Avenue 212; Road 92 (Shirk Road) between Avenue 272 and Avenue 280 (Caldwell Avenue); Road 144 between Avenue 416 and Avenue 432; Road 264 between Avenue 96 and Avenue 104.

Construction 07/2021 06/2022 10-15 26 16, 18

Tuolumne 19/20 In Progress Road

Maintenance & Rehabilitation

Tuolumne Road North Surface Treatment

This project will include: This is for the testing and preparation of plans for the project. Construction will occur using future funds estimated date 2024. Located on Tuolumne Road North from Ponderosa Way to SR108 Pre-Construction 07/2021 06/2024 7-20 5 8

Tuolumne 19/20 In Progress Road

Maintenance & Rehabilitation

Kewin Mill Road Reconstruction This project will include: Pavement Rehab/Repair (Existing) Located on Kewin Mill Road Pre-Construction and Construction

07/2021 07/2021

06/2023 06/2023 20-20 5 8

Tuolumne 19/20 In Progress Other Intersection Improvements to Parrotts Ferry Road and SR 49 This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Located on Parrotts Ferry Road between SR 49 to Union Hill Road. Construction 07/2021 06/2022 20-20 5 8

Tuolumne 19/20 In Progress Road

Maintenance & Rehabilitation

Capital-Standard Road Rehabilitation Project This project will include: Preliminary Design Standard Road from Mono Way to Camage Ave. Pre-Construction 07/2021 06/2025 7-20 5 8

Tuolumne 19/20 In Progress Road

Maintenance & Rehabilitation

Capital-Tuolumne Road Surface Treatment Project This project will include: Preliminary Design Tuolumne Road from Mono Way to Tuolumne Road North Pre-Construction 07/2021 06/2023 7-8 5 8

Tuolumne 21/22 New Road

Maintenance & Rehabilitation

Phoenix Lake Rd Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | Pavement rehabilitation by means of roadway widening and realignment to improve sight distance, replacement of drainage features and installation of shoulders.

Phoenix Lake Rd from Ridgewood Dr. to Paseo De Los Portales (0.52 miles) Pre-Construction and Construction

07/2021 07/2021

06/2022 06/2022 1-20 5 8

Tuolumne 21/22 New Other Maintenance - Software This project will include: Annual renewal of StreetSaver software County of Tuolumne Department of Public Works Procurement/Operatio nal Needs 07/2021 06/2022 1-1 5 8

Tuolumne 21/22 New Other Roadside Spraying Program This project will include: Purchasing materials for roadside vegetation spraying within the road right-of-way, semiannually. Various county roadways Procurement/Operatio

nal Needs 07/2021 06/2022 1-6 5 8

Tuolumne 21/22 New Other Culvert Replacement Program This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) Middle Camp Rd, Yosemite Rd, Jamestown Rd and other local roads in various locations. Construction 07/2021 06/2022 1-30 5 8

Tuolumne 21/22 New Traffic Control Devices

Traffic Signal and Safety Program -Signal Maintenance Contract

This project will include: Signal maintenance contract. Contractor performs routine traffic signal maintenance, including phasing schedules (timing), lights, signage rehab/repair, and emergency work on 13 county-owned signals.

13 County-owned signals, various locations Procurement/Operatio nal Needs 07/2021 06/2022 1-1 5 8

Tuolumne 21/22 New Road

Maintenance & Rehabilitation

Surface Treatment Program This project will include: Pavement Rehab/Repair (Existing) | Crack filing road surface treatment Phoenix Lake Rd, Ferretti Rd, Mono Wy and other local roads in various locations. Construction 07/2021 06/2022 1-2 5 8

Tuolumne 21/22 New Other Misc/Specialized Equipment This project will include: Procurement of Public Works Equipment | Purchases of a Streetsweeper County of Tuolumne Department of Public Works Procurement/Operatio nal Needs 07/2021 06/2022 1-20 5 8

Ventura 21/22 New Road

Maintenance & Rehabilitation

Pavement Resurfacing – Camarillo Heights and Las Posas Valley

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Roads within the Camarillo Heights Neighborhood between Mission Drive and Loop Drive North, also includes roads within Las Posas Valley between Donlon Road and State Route 118, and roads within Rancho Las Posas neighborhood between Kingsgrove Drive and Greentree Drive North (6.12 centerline miles)

Construction 07/2021 06/2023 10-20 44 19

Ventura 21/22 New Road

Maintenance & Rehabilitation

Pavement Resurfacing – Balcom Canyon Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) Balcom Canyon Road between SR 118 and Bradley Road (4.02 centerline miles) Construction 07/2021 06/2023 10-20 37 19

Page 85: Final Adopted County Submitted - Fiscal Year 2021-22 Local ...

Final Adopted County Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1).

October 13, 2021

County Fiscal Year Initially Proposed

Proposed Project Status Project Type Title Description Location Components Est Start Est

Completion Est Useful Life Assembly Districts

Senate Districts

Ventura 21/22 New Road

Maintenance & Rehabilitation

Pavement Resurfacing – Creek Road and Live Oaks Acres

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing)

Creek Road between State Route 33 and Country Club Drive and Roads within Live Oaks Acres between SR 150 and Burnham Road (8.17 centerline miles) Construction 07/2021 06/2023 10-20 37 19

Ventura 21/22 New Road

Maintenance & Rehabilitation

Pavement Resurfacing – Nyeland Acres

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

All roads within the Nyeland Acres Neighborhood between Santa Clara Avenue and Ventura Blvd (1.81 centerline miles) Construction 07/2021 06/2023 10-20 44 19

Ventura 21/22 New Road

Maintenance & Rehabilitation

Pavement Resurfacing – Oxnard West and Oxnard Plains

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing)

Roads within the Oxnard West Community between Harbor Blvd and Patterson Road, and roads within the Oxnard Plain Area between Hueneme Road and Wood Road (11.42 centerline miles)

Construction 07/2021 06/2023 10-20 44 19

Ventura 21/22 New Road

Maintenance & Rehabilitation

Road Maintenance Activities Countywide

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Maintenance/ rehabilitation of existing unpaved shoulders, ditches, culverts, catch basins, re-striping, sign replacement/ maintenance, pavement markings, and tree trimming (Existing)

West County areas including: Ojai, Ventura, Oxnard, Limoneira, and Yerba Buena. East County areas including: Moorpark, Somis, Piru, Camarillo, Las Posas, and Simi. Construction 07/2021 06/2022 1-2 37, 38, 44, 45 19, 27

Yolo 19/20 In Progress Road

Maintenance & Rehabilitation

South River Road Rehabilitation This project will include: Pavement Rehab/Repair (Existing) | Cold In-place Recycle and asphalt overlay from West Sacramento to Freeport Bridge. Cape seal from Freeport Bridge to Rose Road. South River Road from the City of West Sacramento to Rose Road Construction 07/2021 12/2021 10-20 4 3

Yolo 21/22 New Road

Maintenance & Rehabilitation

2021 Chip Seal Project This project will include: Pavement Rehab/Repair (Existing) | Chip seal treatment maintenance project.

CR95 from CR32 (Russell Blvd) to CR24; CR24 from CR95 to CR93; CR93 from CR24 to State Route 16

Construction 08/2021 12/2021 7-10 4 3

Yolo 21/22 New Road

Maintenance & Rehabilitation

2022 Pavement Preservation Project

This project will include: Pavement Rehab/Repair (Existing) | Planned 3-layer seal maintenance treatment (microsurface/chip seal/slurry) for CR99W. Various maintenance treatments (e.g., mill and fill, 3-layer seal) planned for roads in the Town of Yolo.

County Road (CR) 99W from CR1 to CR18; Roads within the Town of Yolo Construction 06/2022 12/2022 12-15 4 3

Yuba 21/22 In Progress Road

Maintenance & Rehabilitation

2021 Overlay Project This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Digouts and asphalt overlay.

Various Roads, including: Alicia Avenue, Almond Avenue, Boyer Road, Calvin Lane, Chandler Road, Cleveland Avenue, Cohn Avenue, Grand Avenue, Hammonton-Smartsville Road, Jackson Street, Lago Road, Laurellen Road, Magnolia Road, Mill Street, Pike City Road, Poplar Avenue, Old Camptonville Road, Riverside Drive, Road 270, School Street, Scott Grant Road, Spencer Street, Spring Street, Sycamore Avenue, and Walnut Avenue. Locations are estimates and not yet final.

Construction 07/2021 12/2021 10-20 3 3